Procedure
System of Construction Tools And Equipment
Management (Preliminary)
1 Revision History
Revision Description of
DATE Initiated By Completed By
No# Changes
10th Management Integration for ISO Management
December Representative 14001 and OHSAS Representative
01
2018 18001 & ISO 31000
RISK MANAGEMENT

2 Distribution List
Sr. No/ Designation Issue Date Distributed by
Projects Manager &
01 Management
Construction, Mechanical and 10th December 2018
Representative
Electrical Manager
Management Management
02 10th December 2018
Representative Representative
03 Management
CEO 10th December 2018
Representative

04 Management
Chairman 10th December 2018
Representative

Document Issue Revision Original Revision Document Document Document


Number Number Number Issue Date Issue Date Prepared By Reviewed by Approved By
Projects
Manager &
MM/EM/CM
Construction,
AJB- CTEM /PM /MR / Chairman
1.1 01 01-01-16 10-12-18 Mechanical and
-PR-01 CEO
Electrical
Manager

Copyright
This document contains confidential information. It may be copied in full or in parts only by Al-Jaber
International Company and only for the purpose of Al-Jaber International Company related activities.
Disclosure of any information contained within this procedure to any person (s) outside the employee of Al-
Jaber International Company without written permission of the Top Management is strictly prohibited.

Page 1 of 7
Al-Jaber International Company
Procedure System of
Construction Tools And Equipment
Management (Preliminary)
Original Issue Date: Revision Issue date:
Doc. No: AJB-CTEM-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 10th December 2018

TABLE OF CONTENTS

1. ACRONYMS AND DEFINITIONS ...................................................................................................................... 4


1.1. Acronyms ................................................................................................................................................. 4
1.2. Definitions ................................................................................................................................................ 4
2. INTRODUCTION ................................................................................................................................................ 4
3. PURPOSE AND SCOPE ...................................................................................... Error! Bookmark not defined.
3.1. Purpose .................................................................................................. Error! Bookmark not defined.
3.2. Scope...................................................................................................... Error! Bookmark not defined.
4. RESPONSIBILITIES&ORGANIZATION ........................................................................................................... 6
4.1. Management Responsibilities ................................................................................................................. 6
4.2. Supervisor ............................................................................................................................................... 6
4.3. Foreman .................................................................................................................................................. 6
4.4. Electrician ................................................................................................................................................ 6
4.5. Employees ............................................................................................................................................... 6
4.6. Safety Health and Environmental (SHE) Department ............................................................................. 6
5. PROCESS FLOW .............................................................................................................................................. 7
6. TOOL / EQUIPMENT INSPECTION / AUDIT .................................................................................................... 7

This document is the property of Al-Jaber International Company. Any copying and distribution of this document
without the approval of the Management is prohibited. Page 2 of 7
Al-Jaber International Company
Procedure System of
Construction Tools And Equipment
Management (Preliminary)
Original Issue Date: Revision Issue date:
Doc. No: AJB-CTEM-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 10th December 2018
LIST OF TABLES
Table 1: List of Acronyms................................................................................................................... 4
Table 2: List of Definitions ................................................................................................................... 4
Table 3: CONTRACTOR Reference Documents .................................. Error! Bookmark not defined.

This document is the property of Al-Jaber International Company. Any copying and distribution of this document
without the approval of the Management is prohibited. Page 3 of 7
Al-Jaber International Company
Procedure System of
Construction Tools And Equipment
Management (Preliminary)
Original Issue Date: Revision Issue date:
Doc. No: AJB-CTEM-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 10th December 2018

1. ACRONYMS AND DEFINITIONS


1.1. Acronyms

Table 1: List of Acronyms

Acronym Description / Meaning


CTE Construction Tools and Equipment
ECP Evaporative Cooler Project
SGPS Suleimanya Gas Power Station
1.2. Definitions

Table 2: List of Definitions

Term Definition

COMPANY Mass Group Holding Company & Donaldson Company


WAJDI GROUP W.T.E – AL-JABER INTERNATIONAL COMPANY
CONTRACTOR
Joint Venture
CONSTRUCTION TOOLS Tools and Equipment which are temporarily brought in to site
and EQUIPMENT complete CONTRACTORs SoW at the IOT Project
A Storage area that every foreman has for his daily used
TEMPORARY STORAGE material and his tools. That can be shared by more than 1
foreman.
ELECTRICIAN Who is authorized to check electricity operated hand tools

2. INTRODUCTION

The plant is located in the town of Chamchamal, which is located about 60 Km to the west of
Suleimanya city.

MGH has signed a contract with the Ministry of Electricity in Kurdistan Region to build SGPS with
a Capacity of 1500 MW on basis BOO (Build,Operate and Own). Work Started at site early 2008.
In the first and second phases (simple cycle), eight Frame-9E gas turbines were installed and
operated to produce 1000 MW and the contract for the simple cycle was signed with the
American Company GE and the German Company ABB.

As the Third Phase of the project, MGH started converting SGPS into a Combined Cycle with
additional 500 MWs capacity, by utilizing the gas turbine exhaust heat emissions to produce
steam in Heat Recovery Steam Generators (HRSG), which will used to generate electricity in two
steam turbines. This process increases the production efficiency without using extra fuel. It also

This document is the property of Al-Jaber International Company. Any copying and distribution of this document
without the approval of the Management is prohibited. Page 4 of 7
Al-Jaber International Company
Procedure System of
Construction Tools And Equipment
Management (Preliminary)
Original Issue Date: Revision Issue date:
Doc. No: AJB-CTEM-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 10th December 2018
reduces the amount of CO2 emissions and frees the environment from combustion emission.
After the completion of the combined cycle, the plant capacity will be upgraded to 1500 MW.
It is worth mentioning that Sulaymaniyah power station is designed to operate on two types of
fuel, the prime fuel (natural gas) and secondary fuel (diesel).

The main parts of the Combined Cycle are:


- 9E gas turbines manufactured by the American company (GE).
- The steam turbines of the type (C7) manufactured by the American company (GE).
- Boilers(HRSG) of Belgian company (CMI).
- Air cooling systems from the German company (Enexio).
- The main and subsidiary transformers of the French company (Alstom).
- The main control system of the American company (Emerson).
- Gas pressure reduction system from the German company Bilfinger-Rotring.

The substation accompanying the plant is 132 KV for a Simple Cycle and a 400 KV for the
combined cycle, both were supplied by the Swedish company ABB and the power is transferred
from the station site via fourteen high voltage lines connected to the national grid in the
Kurdistan region.

3. PURPOSE AND SCOPE

3.1. Purpose

As the Warehouse System has not been established at current stage of mobilization for ECP
Project, the purpose of this preliminary procedure is to define responsibilities, activities,
documentation, requirements and the organization with respect to issue and inspection of
Construction Tools and Equipment (CTE).

This procedure is intended to outline procedural requirements to manage CTE at site based on
current site conditions and available site organization. The objective is to prevent any incident
caused by failure to manage CTE utilized at work sites.

Detailed CTE Management procedure will be issued with the Warehouse Procedures and will
supersede this preliminary procedure, upon approval and issuance.

3.2. Scope

This procedure applies to SGPS ECP project worksite and locations

This document is the property of Al-Jaber International Company. Any copying and distribution of this document
without the approval of the Management is prohibited. Page 5 of 7
Al-Jaber International Company
Procedure System of
Construction Tools And Equipment
Management (Preliminary)
Original Issue Date: Revision Issue date:
Doc. No: AJB-CTEM-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 10th December 2018

4. RESPONSIBILITIES&ORGANIZATION

4.1. Management Responsibilities


It is management's responsibility to provide a safe working environment and proper tools and
equipment for the employees of the project.
4.2. Supervisor
 Ensure temporary storage/storages are available at site.
 Ensure proper CTE is available for each type of work to be performed by crew.
 To check working areas if proper CTE are used.
 Ensure electrical hand tools are inspected and color coded by Electrician monthly

4.3. Foreman
 Ensure CTE are in good condition before issuing to crew.
 Ensure crew are using correct tools for their task
 Ensure electrical hand tools are color coded.
 Ensure CTE are returned to temporary storage end off every shift.
 Ensure crew has experience CTE for assigned task.

4.4. Electrician
 Perform monthly controls for electrical operated hand tools (not battery operated
tools).
 Keep record of his monthly checks and color codes electrical operated hand tools
(not battery operated tools). See Attachment 1 “Electrical Hand Tool Inspection
Record”

4.5. Employees

 Return CTE back to Temporary Storage end of every shift.


 Does not use any damaged CTE and inform foreman directly
 Use proper CTE for his task.
 If any CTE damaged during his task immediately informs his foreman.

4.6. Safety Health and Environmental (SHE) Department


 Perform training, if required.
This document is the property of Al-Jaber International Company. Any copying and distribution of this document
without the approval of the Management is prohibited. Page 6 of 7
Al-Jaber International Company
Procedure System of
Construction Tools And Equipment
Management (Preliminary)
Original Issue Date: Revision Issue date:
Doc. No: AJB-CTEM-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 10th December 2018
 Visually check CTE on site.

5. PROCESS FLOW
 Foreman identifies CTE required for his work crew and submit requests
 Supervisors will prepare orders for the CTE and obtain Construction Manager
approval
 Local Buyer will source and purchase the required CTE locally (from Basra)
 Upon delivery, the CTE will be issued to Foreman to execute the work
 For electrical operated hand tools, designated Electrician will checks the CTE upon
receiving before they are issued to the Foreman to be used at site
 For other type of CTE, they are directly issued to the Foreman to be used at site
 Foreman is responsible for safe keeping the CTE, inspect the CTE before they are
issued for use on daily basis, as well as maintaining the CTE as required
 Workers are responsible for correct usage of the CTE and report to Foreman in
case any failure or damaged on the CTE
 Supervisor and SHE officer will also conduct checks on conditions and correct
usage of the CTE on regular basis
 Workers will return the CTE to Foreman at end of work shift for safe keeping in a
temporary storage container or box

6. TOOL / EQUIPMENT INSPECTION / AUDIT

Independent inspection to be performed weekly by a Team consisting of a Craft Foremen,


Electrical Foremen and an HSE Officer. All faulty tools / equipment to be collected / stored for
repair and locked in closed container. Electrical Foremen to ensure all electrical equipment is
properly coded for use; otherwise collected and stored in locked container until proper
inspection / repair can be performed.

This document is the property of Al-Jaber International Company. Any copying and distribution of this document
without the approval of the Management is prohibited. Page 7 of 7