A B C D E F G H A B C D E F G H 2T16 2T16 2T16
2,000 1,500 1,400 1,700 2,700 3,500 2,400 2,000 1,500 1,400 1,700 2,700 3,500 2,400
12T10-09-200B1 3T10-03-200B2 1 BEAM 02 BEAM 02

1,200 900
1 4T8-25-200T2 Y8-62-200 STIRRUPS
2
1,200 900

BEAM 02
BEAM 02
16T10-02-200B2
2 7 8 4T8-21-200T2

BEAM 01
2T16 2T16 2T16

C.
A.

B.
3

7T8-29-200T2

8T8-33-T2
4T8-34-200T2

BEAM 02
8T8-35T1 2T16 2T16 2T16
3 17T10-08-200B1

4T8-27-T2

2,000
4T8-24-200T2

BEAM 02
4T8-33-T2

150

150

150
2,000

4T8-30-T2
2 legsR8@ 2 legsR8@ 2 legsR8@

6T8-35-200T1
4

300

300

300
4T8-21-200T2 BEAM 01 BEAM 01

9T8-35T1
250 250 250

800
4
10T10-07-200B1

5 200 200 200


800

7T8-35-T2 BEAM 02
5 2T16 2T16 2T16
6 SECTION A-A SECTION B-B SECTION C-C
1

4T8-27-200T2

4T8-26-200T2
BEAM 01

22T8-28-200T2

600
2 19

6 18
4T8-31-200T2

450X250 450X250 450X250


3
600

19
4T8-36T2

12T10-09-200B1

FLAT BEAM
BEAM 01

BEAM 01
2 17

BEAM 02
BEAM 02
4
18

SCALE 1:25 SCALE 1:25 SCALE 1:25


3
5 16
17
4 15

7 13
4T8-32-200T2

3,000
16
5
7 14
15
6 13
3,000

8
7 14

8 13

C1
A1

B1
7

10

12
2T12 2T16 2T16

11
9
7
10

12
11
9

4T8-23-200T2 4T8-22-200T2 8 BEAM 02 BEAM 02 BEAM 02

600
8
600

18T10-04-200B2 20T10-06-200B1 25T10-01-200B2


7T10-05-200B2
STRUCTURAL BEAM LAYOUT Y8-62-200 STIRRUPS

150mm REINFORCED CONCRETE SLAB

C1
A1

B1
2T16 3T16 2T16
2T16 2T16 2T16

150

150

150
2 legsR8@ 2 legsR8@ 2 legsR8@

350

350

350
8T12-81-150T2 275 275 275
200 200 BEAM 02 200
8T12-80-150T1 8Treads @ 250mm - 1,750 1,100 2T16 3T16 2T16
SECTION A1-A1 SECTION B1-B1 SECTION C1-C1
A B C D E F G H 450X250 450X250 450X250
SCALE 1:25 SCALE 1:25 SCALE 1:25
2,000 1,500 1,400 1,700 2,700 3,500 2,400 8T12-86-150B2 4T12-77-150T2

9 risers@158mm
8T12-85-150B1
K

8T12-76-150T1
C1

1,425
1 B1 6T16 6T16
1,200 900

13T12-95-150B2 5T10-84-150T2
K

2 B.R.C
8T12-84-150T1 Y8-62-200 STIRRUPS
4legs R8@

200
Ref A142.
8T12-94-150B1 8T12-81-150T2 600 110
3
B.R.C
Ref A142.
FLAT BEAM 6T16
B.R.C 8T12-80-150T1 6T16
H H Ref A142.
B.R.C
SECTION THROUGH THE STAIRCASE
2,000

B.R.C Ref A142.


FLIGHT 3
H

Ref A142.
8T12-79-150B1
4

300
800

B.R.C 8T12-78-150B2
5
H

Ref A142. K K
6
1
600

19

M M
2
18

2,400
3

K K B.R.C
4 17

5 16
B.R.C Ref A142. 300
B.R.C
6 15
Ref A142.
3,000

200
14

Ref A142.
7

8 13

4T12
4T12-54-150
7
10

12
11

SEC M-M
K

K
9

B1 1,100 2Treads @ 250mm - 500 1,100


8
600

C2 5T12-81-150T2
K

8T12-80-150T1
FOUNDATION LAYOUT 5T12-84-150T2 1ST

3 risers@158mm
8T12-84-150T1 FLOOR

300

300 150
475
5T12-86-150B2 5T10-81-30T2
5T10-80-30T1
8T12-85-150B1
200mm quarry dressed stones walling
reinforced with hoops iron at every alte-
rnate courses. 8T12-79-150B1
K K

2,400
150mm concrete slab with B.RC ref A 142. 5T12-78-150B2 300
50mm gravel & dust blinding.
SECTION THROUGH THE STAIRCASE K K

2,400
200
crushed hardcore filling on approved
soil backfill.
FLIGHT 2 4T12 4T12-54-100 300

200
225mm quarry stone walling. SECK-K 4T12-54-100
4T12
T8-31-175B2.
200mm concrete footing.
50mm (1:4:8) concrete blinding. SECK-K
T10-30-300B1
SECTION H-H
COLUMN TYPE C2
SECTION FOUNDATION COLUMN TYPE C1
FOR INTERNAL WALL 1:25 8Treads @ 250mm - 1,750 1,100
8T12-81-150T2
200mm quarry dressed stones walling
8T12-80-150T1
reinforced with hoops iron at every alte-
rnate courses.
150mm concrete slab with B.RC ref A 142. 1,000
4T12-77-150T2
50mm gravel & dust blinding. 8T12-79-150B1
8 risers@158mm
crushed hardcore filling on approved 7T10-76-150T1 8T10-78-150B2 4T12-53-100 starter
soil backfill. bars.
1,264
7T10-73-150T1 5 T10 @ 225 B1
4T10-72-150T2

5 T10 @ 225 B2
225mm quarry stone walling.

1,000
7T12-72-150B1 STARTER BARS. 8T12-74-150B1

300
T8-31-175B2. 13T12-75-150B2
200mm concrete footing.
1,000
50mm (1:4:8) concrete blinding. 5 T10 @ 225 B2
5 T10 @ 225 B1
T10-30-300B1
3T12-71-300B2 STARTER BARS BASE B1
SECTION K-K SECTION THROUGH THE STAIRCASE 1,200x1,200x300 BASE B1
SECTION FOUNDATION FLIGHT 1
FOR EXTERNAL WALL 1:25 (scale 1:25) 1,000x1,000x300
(scale 1:25)
NOTES B2- Denotes bottom first layer 9. All dimensions to be confirmed on site before fabrication Project: PROPOSED RESIDENTIAL HOUSE FOR AGNES WAMBUI NGURE ON S.W OF
REVISION ISSUES DATE 1.Concrete to achieve 25n/mm2 at 28 days 10. One coat of red lead oxide paint to be applied to all structural THIKA MUNICIPALITY PLOT L.R No10823/ 2365 ALONG JUJA-JUJA FARM
B1- Denotes bottom second layer
members before and after erection ROAD, JUJA SUBCOUNTY, KIAMBU COUNTY.
NO. DATE DESCRIPTION BY 2.In absence of design mix, a nominal 1:1.5:3 shall be used. 7. Cover to the reinforcement: 11. A final coat of aluminium paint to be applied Drawing Title :
3.All dimensions to be confirmed on site and any discrepancy reported to the Engineer STRUCTURAL DETAILS
-slabs:25mm -Bases: Sides: 75mm 12. All welds shall be six millimetre all round fillet weld unless
otherwise shown or approved Client : Drawn: E.M
Drawing No.
4.All foundations shall be on firm ground as shall be approved by the Engineer -beams:25mm bottom: 50mm MS. AGNES WAMBUI NGURE, Checked : T.W
5.Proper curing shall be ensured and where necessary hessian shall be used to prevent loss of moisture -columns:40mm P. O. Box .........................., Approved:
01
6. T2- Denotes top first layer NAIROBI, KENYA. Scale: 1:25, 1:75.
T1- Denotes top second layer 8. All structural steel to be to BS 4449 Date :