Joint Operating Body JOB NO. DOC. NO REV.

Pertamina Medco E&P Tomori 9608


SNO - S - CC - 05 - 010
Sulawesi SU2573 B
SHEET 1-15

SENORO GAS DEVELOPMENT PROJECT


CIVIL / CIVIL
CALCULATION CONTRACT NO. : K0498R/JOBT/MDP

CALCULATION OF PIPE RACK STRUCTURE


# 10

B 23-Jun-13 Issued for COMPANY Review AMP HDY SN FMM JHH


END' BY DATE
REV DATE DESCRIPTION PREP'D REV'D CHK'D APP'D
D CLIENT
CALCULATION OF PIPE RACK STRUCTURE # Doc. No. SNO-S-CC-05-010
10
REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

TABULATION OF REVISED PAGES

REVISION REVISION
SHEET SHEET
B B
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 x
14 X
15 X

Attach. A X
Attach. B X
Attach. C X
Attach. D X
Attach. E X
Attach. F X
Attach. G X
Attach. H X
Attach. I X
Attach .J X
Attach .K X

Page 2 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

REVISION SUMMARY

REV. DATE DESCRIPTION OF CHANGE

B 23-Jun-2013 Issued for Company Review

Page 3 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
# 10 REV
REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

TABLE OF CONTENTS

1. GENERAL ………………………………………………………………………………………………………… 5
1.1 Scope ………………………………………………………………………………………………………… 5
1.2 Codes, Standards, and References …………………………………………………………………… 5
1.3 Units ……………………………………………………………………………………………………………… 5
1.4 Quality of Material …………………………………………………………………………………… 5
1.5 Unit Weight of Material …………………………………………………………………………… 6
1.6 Abbreviation ………………………………………………………………………………………………… 6
2. ANALYSIS METHOD ………………………………………………………………………………………… 7
2.1 Design
g Conceptp ………………………………………………………………………………………… 7
2.2 Design Criteria ………………………………………………………………………………………… 7
2.3 Design Loading ………………………………………………………………………………………… 7
2.4 Load Combination ………………………………………………………………………………………… 9
2.5 Allowable Deflection …………………………………………………………………………………… 11
3 STRUCTURAL MODELING …………………………………………………………………………………… 12
4 STEEL STRUCTURE CHECKING …………………………………………………………………………………… 12
g
4.1 Steel Stress Checking …………………………………………………………………………………… 12
4.2 Deflection Checking …………………………………………………………………………………… 13
5. FOUNDATION CHECKING …………………………………………………………………………………… 15

ATTACHMENT
A. PIPE RACK PLAN VIEW & SECTION
B. PIPES, CABLE TRAY AND EQUIPMENT LOADING DATA
C. STRUCTURAL MODELLING
D. DESIGN LOAD
E. STAAD INPUT DATA
F. STRESS RATIO
G. DEFLECTION DATA
H. CONNECTION CHECK
I. ANCHOR BOLT CAPACITY
J FOUNDATION DESIGN
K. STEEL & FOUNDATION MATERIAL TAKE OFF (MTO)

Page 4 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

1. General
1.1 Scope
This document presents calculation of foundation and steel structure for pipe rack structure PR-
08.

1.2 Codes, Standards, and References


1 SNO-S-DB-001 Design Basis Tripatra-Samsung " Civil/Structural Design Criteria
SNO-S-DB-001, Criteria."
2 Job No 2894, Geotechnical Investigation For Senoro Gas Processing Plant Senoro-Central
Sulawesi Indonesia,Rev 03 by Soilens,PT on March, 21st 2013.
3 ACI 318-08 " Building Code Requirements for Structural Concrete and Commentary."
4 ASCE 7-10 " American Society of Civil Engineers - Minimum Design Loads for Buildings
and Other Structures."
5 AISC-ASD " Manual of Steel Construction ", volume 2, 9th Edition
6 UBC - 1997
1997, " Uniform Building Code
Code."
7 SNO-C-TS-101, Tripatra-Samsung " Earthquake Loads Calculation Procedure for
Structures and Foundations. "
8 SNO-C-TC-102, Tripatra-Samsung " Wind Data Evaluation Report."
9 SNO-S-TS-001, Tripatra-Samsung Specification " Spesification For Structural Steel
Material. "
10 SNO-C-CC-001, " Calculation For Piling Capacity Design."

1.3 Units
All Units are in SI Unit unless noted otherwise

1.4 Quality of Material


Material Strength
Structural Steel, ASTM A 36 or JIS G3101 Grade SS400
fy = 235 00
235.00 MPa
fu = 400.00 MPa
Ft all = 141.00 MPa
Fv all = 94.00 MPa
Material Strength
Structural Concrete fc' = 28.00 MPa
Levelling Concrete fc' = 17.50 MPa
Reinforcing Bar :
ASTM A615 grade d 60 or BDeformed
D f dBBar f =
fy 390 00
390.00 MP
MPa
Material Strength
Anchor Bolt ASTM A 307 Grade C fy = 240.00 MPa
ft all = 137.30 MPa
fv all = 68.60 MPa
HS Bolt, ASTM A 325 fy = 550.00 MPa
fu = 720.00 MPa
Weld Electrode (AWS D
D.1.1,
1 1 E60xx) Fu = 413.7
413 7 MPa
Fv all = 124.11 MPa

Page 5 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

1.5 Unit Weight of Material

Material Unit Weight


Reinforced Concrete (c) 23.54 kN/m3
Lean Concrete (pc) 21.58 kN/m3
Steel (s) 78.50 kN/m3
Soil (so) 16.50 kN/m3
3
Operating Liquid (L(o)) 10.60 kN/m
Water (L) 10.00 kN/m3
3
Sand Gravel (g) 17.65 kN/m

1.6 Abbreviation

BCD : bolt circle diameter


Ca : seismic coefficient
Cf : force coefficient
D : dead load
db : diameter bolt
E : young modulus
E : earthquake Load (E)
e : excentricity
F : minimum bolt pitch
ft : bolt tensile strength
fv : bolt shear strength
fy : yield strength of reinforce steel
G : gust effect factor
h : height of structure from ground level
I : importance factor
ID : inside diameter
Kd : wind directionaly factor
Kz : velocity pressure exposure coefficient
Kzt : topographic factor
LC1 : factored load combination
LC2 : unfactored load combination
Le : minim
minimum m bolt embedment
Mu : moment ultimate
 : coefficient of friction
n1 : number of bolt
PE : weight of pipe in empty condition
PO : piping load (operating condition)
PT : piping load (testing condition)

Page 6 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

QE : weight of machinery incl. appurtenances and it is clasiffied as empty load (erection)


Qo : equipment weight (operating condition)
QT : equipment weight (testing condition)
qz : wind pressure
T : tensile force
TF : thermal force
V : shear force
Vs : base shear
Vp : shear of plate
W : wind load
Wt : weight of equipment and/or structure
Z : modulus section

2. Analysis Method
2.1 Design Concept
- Loads to be considered in calculation consist of dead loads, live loads, pipe loads, equipment
loads and environmental loads.
- Stability :- in transverse direction, structure are designed as reinforced steel frame with
fixed connection
- in longitudinal direction, structure are designed as reinforced steel frame with
pinned connection
- Horizontal and vertical bracing is designed as truss member
- Types of support is pinned connection in all direction.
- Allowable Stress Design shall be used in the design of steel structure member conforming to
AISC ASD.
- The structure will be analyzed with STAADPro V8i structural analysis computer programming
and as space frame analysis.
2.2 Design Criteria
2.2.1 Allowable Ratio
- Allowable ratio for permanent is 1.00 with apply unfactored combination.
- Allowable ratio for temporary is 1.33 with apply unfactored combination.
2.2.1 Allowable Deflection
- Allowable ratio for vertical is L/240 with apply unfactored combination.
- Allowable ratio for horizontal is L/200 with apply unfactored combination.
2.3 Design Loading
2.3.1 Primary Load
The following loads and forces are considered in the design of Structure :
2.3.1.1. Dead Load (D)
Selfweight of Steel Structure exclude plate connection, bolt & fireproofing.
2.3.1.2. Live Load (L)
Any load not permanently fixed to the structure e.g loading caused by personnel, tools during
maintenance.
Live Load shall be applied on platform in the top level of rack, as servicing cooling tower access.
Live Load in operating or maintenance platform are 2.50 kN/m2
Live Load = 2.5 x 3 = 7.5 kN/m ---> span 3 m

Page 7 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

2.3.1.3. Equipment Load (Q)


Weight of equipment or machinery (ACHE) including appurtenances and it is classified as an
empty (erection) load QE, an operating load Qo or a testing load QT.
Dynamic load due to fan rotation has considered as additional static load that was determined
based on the fan size.
2.3.1.4. Piping Load (P)
Weight of pipe including appurtenances and it is classified as an empty (erection) load PE, an
operating load PO or a testing load PT.
Miscellaneous piping support attached on main structure that were not modeled on structure
model, will be provided by piping. The miscellaneous piping loading at any position on platform
were assumed that have been covered as live load on platform (170 kg/m2)
2.3.1.5. Cable Tray Load
Weight of cable tray is included according to Electrical and Instrument information.
Weight of cable tray is calculated as follow :
- cable tray (900 mm = 150 kg,m; 600 mm = 100 kg/m; 300 mm = 50 kg/m)

2.3.1.6. Wind Load (W)


Based on , 'Senoro Gas Development Project, SNO-C-TC-102, "Wind Data Evaluation Report"',
wind load will be calculated by following formula :
Wind Velocity (v) = 32.080 m/s Risk Category III & IV
2
Wind Pressure (qz)
( ) = 0.540 kN/m
kN/ h = 4,6 m
= 0.570 kN/m2 h = 6,1 m
= 0.590 kN/m2 h = 7,6 m
2
= 0.620 kN/m h = 9,1 m
= 0.660 kN/m2 h = 12,2 m
= 0.690 kN/m2 h = 15,2 m
= 0.710 kN/m2 h = 18 m

2.3.1.7. Earthquake Load ( E)


Based on, 'Senoro Gas Development Project, SNO-C-TS-101, "Earthquake Loads Calculation
Procedure For Structure And Foundation "'', earthquake load will be calculated in accordance
with UBC-97 as :

Vs = Cs x Wt ,with Cs = 0.260 Transv


Vs = 0.260 x Wt Cs = 0.210 Longit
Vs = 0.210 x Wt

Page 8 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

2.3.1.8. Thermal Load ( TF)


a. Thermal Load due to Material Friction
In design of pipe supports, horizontal friction forces due to thermal expansion or contraction of
flare lines and stream lines, etc shall be applied at the support bearing surfaces.
Thermal friction loads are calculated by estimating piping load by friction coeffficients ()

as follows:
 = 0.3 ( steel to steel ) (Design Criteria)
TF =  x gravity pipe operation load
Pipe Weight (Wp)

Tf

NOTE : The derived thermal forces based on normal and friction as described above is
not used when thermal force from pipe stress analysis is given from piping.
b. Thermal Load due to Pipe anchorage/ Supporting system
Anchor and guide load is resulted from pipe stress analysis (PSA) which be generated from
piping software analysis
analysis.
The PSA result were plotted on piping loading data number (Attachment B)

2.3.1.9. Platform Load


Weight of Platform
Bar Φ 6 = 0.25 d2 x 78.5 x 11 = 0.024 kN/m2
Serrated = 0.03 x 0.01 x 1 x 78.5 x 35 = 0.343 kN/m2
Total = 0 368
0.368 kN/m2
Accessories + 10% = 0.037 kN/m2
Total = 0.405 kN/m2

2.4 Load Combination


2.4.1 The following factored load combination is used to design concrete reinforcement by Load and
Resistance Factored Design method:
Empty Condition:
LC 1-11 1.4(D + PE + QE )
LC 1-21 1.2(D + PE + QE) + 1.6 W in Z(+)
LC 1-22 1.2(D + PE + QE) + 1.6 W in Z(-)
LC 1-23 1.2(D + PE + QE) + 1.6 W in X(+)
LC 1-24 1.2(D + PE + QE) + 1.6 W in X(-)
LC 1-31 1.2(D + PE + QE) + E in Z(+)
LC 1-32 1.2(D
1 2(D + PE + QE) + E in Z(-)
LC 1-33 1.2(D + PE + QE) + E in X(+)
LC 1-34 1.2(D + PE + QE) + E in X(-)
Operating Condition:
LC 1-41 1.4(D + PO + QO + TF(+))
LC 1-42 1.2(D + PO + QO + TF(+)) + 1.6 L

Page 9 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
LC 1-43 1.4(D + PO + QO + TF(-))
LC 1-44 1.2(D + PO + QO + TF(-)) + 1.6 L

Operating Condition + Wind (on positive thermal):


LC 1-51 1.2(D + PO + QO + TF(+)) + L + 1.6 W in Z(+)
LC 1-52 1.2(D + PO + QO + TF(+)) + L + 1.6 W in Z(-)
LC 1-53 1.2(D + PO + QO + TF(+)) + L + 1.6 W in X(+)
LC 1-54 1.2(D + PO + QO + TF(+)) + L + 1.6 W in X(-)
Operating Condition + Earthquake (on positive thermal):
LC 1-61 1.2(D + PO + QO + TF(+)) + L + E in Z(+)
LC 1-62 1.2(D + PO + QO + TF(+)) + L + E in Z(-)
LC 1-63 1.2(D + PO + QO + TF(+)) + L + E in X(+)
LC 1-64 1.2(D + PO + QO + TF(+)) + L + E in X(-)
Operating Condition + Wind (on negative thermal):
LC 1-71 1.2(D + PO + QO + TF(-)) + L + 1.6 W in Z(+)
LC 1-72 1.2(D + PO + QO + TF(-)) + L + 1.6 W in Z(-)
LC 1-73 1.2(D + PO + QO + TF(-)) + L + 1.6 W in X(+)
LC 1-74 1.2(D + PO + QO + TF(-)) + L + 1.6 W in X(-)
Operating Condition + Earthquake (on negative thermal):
LC 1-91 1.2(D + PO + QO + TF(-)) + L + E in Z(+)
LC 1-92 1.2(D + PO + QO + TF(-)) + L + E in Z(-)
LC 1-93 1.2(D + PO + QO + TF(-)) + L + E in X(+)
LC 1-94 1.2(D + PO + QO + TF(-)) + L + E in X(-)
Test Condition:
LC 1-80 1.2(D + PT + QT) + 1.6 (L/2)
LC 1-81 0.9(D + PT + QT) + 1.6 (W/3) in Z(+)
LC 1-82 0.9(D + PT + QT) + 1.6 (W/3) in Z(-)
LC 1-83 0.9(D + PT + QT) + 1.6 (W/3) in X(+)
LC 1-84 0.9(D + PT + QT) + 1.6 (W/3) in X(-)

2.4.2 The following unfactored load combination is used to steel structure design by Allowable Stress
Design.
Empty Condition: Increase in Allowable Stress
LC 2-11 D + PE + QE 1.00
LC 2-21 D + PE + QE + W in Z(+) 1.33
LC 2-22 D + PE + QE + W in Z(-) 1.33
LC 2-23 D + PE + QE + W in X(+) 1.33
LC 2-24 D + PE + QE + W in X(-) 1.33
LC 2-31 D + PE + QE + E in Z(+)/1,4 1.33
LC 2-32 D + PE + QE + E in Z(-)/1,4 1.33
LC 2-33 D + PE + QE + E in X(+)/1,4 1.33
LC 2-34 D + PE + QE + E in X(-)/1,4 1.33

Page 10 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Operating Condition:
LC 2-41 D + PO + QO + TF(+) 1.00
LC 2-42 D + PO + QO + TF(-) 1.00
Operating Condition + Wind (on positive thermal):
LC 2-51 D + PO + QO + TF(+) + L + W in Z(+) 1.33
LC 2-52 D + PO + QO + TF(+) + L + W in Z(-) 1.33
LC 2 53 D + PO + QO + TF(+) + L + W in X(+)
2-53 1 33
1.33
LC 2-54 D + PO + QO + TF(+) + L + W in X(-) 1.33
Operating Condition + Earthquake (on positive thermal):
LC 2-61 D + PO + QO + TF(+) + L + E in Z(+)/1,4 1.33
LC 2-62 D + PO + QO + TF(+) + L + E in Z(-)/1,4 1.33
LC 2-63 D + PO + QO + TF(+) + L + E in X(+)/1,4 1.33
LC 2-64 D + PO + QO + TF(+) + L + E in X(-)/1,4 1.33
Operating Condition + Wind (on negative thermal):
LC 2-71 D + PO + QO + TF(-) + L + W in Z(+) 1.33
LC 2-72 D + PO + QO + TF(-) + L + W in Z(-) 1.33
LC 2-73 D + PO + QO + TF(-) + L + W in X(+) 1.33
LC 2-74 D + PO + QO + TF(-) + L + W in X(-) 1.33
Operating Condition + Earthquake (on negative thermal):
LC 2-81 D + PO + QO + TF(-) + L + E in Z(+)/1,4 1.33
2 82 D + PO + QO + TF(-)
LC 2-82 ( ) + L + E in Z(-)/1,4
() , 1.33
LC 2-83 D + PO + QO + TF(-) + L + E in X(+)/1,4 1.33
LC 2-84 D + PO + QO + TF(-) + L + E in X(-)/1,4 1.33

Test Condition:
LC 2-90 D + PT + QT 1.00
LC 2-91 D + PT + QT + W in Z(+) 1.33
LC 2-92 D + PT + QT + W in Z(-) 1.33
LC 2-93 D + PT + QT + W in X(+) 1.33
LC 2-94 D + PT + QT + W in X(-) 1.33
LC 2-95 D + PT + QT + E in Z(+)/1,4 1.33
LC 2-96 D + PT + QT + E in Z(-)/1,4 1.33
LC 2-97 D + PT + QT + E in X(+)/1,4 1.33
LC 2-98 D + PT+ QT + E in X(-)/1,4 1.33

2.5 Allowable Deflection


2.5.1 The limiting permissible vertical deflection for structural steel members shall be as
specified below :
- Beam for Structural componen: L/240
2.5.2 The limiting permissible horizontal displacement of structures :
- Steel Structure : H/200
where :
L = Theoretical span of beam
H = Total Height of structures

Page 11 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
3.
3 Structural
St t l Modeling
M d li
Structural modeling at the pipe rack is applied three dimensional with seismic analysis.

4. Steel Structure Checking


4.1 Steel Stress Checking
Steel member stresses are checked in accordance with AISC by STAAD Pro V8i which
presents the actual stress to the allowable Stress Ratio as SR.

Pipe Rack PR-08


Elevation Steel Stress Ratio
Profiles Remarks
m Permanent Temporary
H-588X300X12 0.357 0.857 Column
H-588X300X12 0.369 0.640 Main beam
EL+0,00 H-300x150x6,5 0.243 0.244 Secondary beam
to H-300x150x6
H 300x150x6,5 5 0 361
0.361 0 374
0.374 Longitudinal beam
EL+5,00 H-200x100x5,5 0.089 0.093 Secondary longitudinal beam
T-150x150 0.092 0.120 Horizontal Bracing
T-200x200 0.306 0.582 Vertical Bracing
H-588X300X12 0.214 0.417 Column
H-588X300X12 0.155 0.417 Main beam
EL+5,00 H-300x150x6,5 0.465 0.467 Secondary beam
to H 300x150x6,5
H-300x150x6,5 0.210 0.278 Longitudinal beam
EL+7,00 H-200x100x5,5 0.074 0.083 Secondary longitudinal beam
T-150x150 0.106 0.121 Horizontal Bracing
T-200x200 0.101 0.218 Vertical Bracing
H-588X300X12 0.189 0.329 Column
H-588X300X12 0.094 0.354 Main beam
EL+7,00 H-300x150x6,5 0.274 0.277 Secondary beam
to H-300x150x6,5, 0.154 0.212 Longitudinal
g beam
EL+10,00H-200x100x5,5 0.069 0.088 Secondary longitudinal beam
T-150x150 0.057 0.076 Horizontal Bracing
T-200x200 0.105 0.243 Vertical Bracing
H-588X300X12 0.163 0.277 Column
H-588X300X12 0.127 0.333 Main beam
EL+10,00H-300x150x6,5 0.414 0.420 Secondary beam
to H-300x150x6,5 0.437 0.749 Longitudinal
g beam
EL+13,00H-200x100x5,5 0.032 0.065 Secondary longitudinal beam
T-150x150 0.030 0.110 Horizontal Bracing
T-200x200 0.117 0.253 Vertical Bracing
H-588X300X12 0.476 0.570 Column
H-588X300X12 0.848 0.922 Main beam
EL+13,00H-400x200x8 0.558 0.561 Secondary beam
to H-400x200x8 0.471 0.479 Longitudinal beam
EL+16,00H-200x100x5,5 0.166 0.264 Secondary longitudinal beam
T-150x150 0.159 0.305 Horizontal Bracing
T-200x200 0.184 0.285 Vertical Bracing

Page 12 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
For Permanent condition,
Max ratio 0.848 < 1.00 …OK

For Temporary condition,


Max ratio 0.922 < 1.33 …OK

4.2 Deflection Checking


Deflection check for steel structures is performed based on the unfactored load combinations.
(1). Vertical deflection (dv) Check.
dv allowed = L / 240
(2). Horizontal Deflection (dh) Check:
dh allowed = H / 200
Where, L = horizontal span length of the structure member
H = height of structure member (column)
The following tables present summary of the results.

Beam Deflection Permanent Load Condition


Elevation Properties L δall δ check Remarks
(m) (mm) (mm) (mm)
H-588X300X12 8000 33.333 1.983 OK Main beam
H-300x150x6,5 8000 33.333 1.449 OK Secondary beam
EL+5,00 H-300x150x6,5 6000 25.000 1.453 OK Longitudinal beam
H-200x100x5,5
H 200x100x5 5 3000 12.500
12 500 0.058
0 058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 5830 24.292 0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 0.985 OK Main beam
H-300x150x6,5 8000 33.333 2.536 OK Secondary beam
EL+7,00 H-300x150x6,5 6000 25.000 0.715 OK Longitudinal beam
H-200x100x5,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20 833
20.833 0 003
0.003 OK Horizontal Bracing
T-200x200 3606 15.025 0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 0.760 OK Main beam
H-300x150x6,5 8000 33.333 1.596 OK Secondary beam
EL+10,00H-300x150x6,5 6000 25.000 0.630 OK Longitudinal beam
H-200x100x5,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200
T 200x200 4243 17 679
17.679 0 003
0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 0.700 OK Main beam
H-300x150x6,5 8000 33.333 2.354 OK Secondary beam
EL+13,00H-300x150x6,5 6000 25.000 2.516 OK Longitudinal beam
H-200x100x5,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 4243 17.679 0.003 OK Vertical Bracing
H 588X300X12
H-588X300X12 8000 33.333 4.449 OK Main beam
H-300x150x6,5 8000 33.333 2.575 OK Secondary beam
EL+16,00H-300x150x6,5 6000 25.000 1.290 OK Longitudinal beam
H-200x100x5,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 4243 17.679 0.003 OK Vertical Bracing

Page 13 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Column Deflection Permanent Load Condition


Elevation Properties L δall δx check δz check Remarks
(m) (mm) (mm) (mm) (mm)
EL+5,00 H-588X300X12 5000 25.000 4.365 OK 1.105 OK AA - HA
EL+7,00 H-588X300X12 7000 35.000 4.911 OK 1.129 OK AA - HA
EL+10,00H-588X300X12 10000 50.000 5.315 OK 1.585 OK AA - HA
EL+13,00H-588X300X12 13000 65.000 5.705 OK 1.881 OK AA - HA
EL+16,00H-588X300X12 16000 80.000 6.293 OK 2.107 OK AA - HA

Beam Deflection Temporary Load Condition


Elevation Properties L δall δ check Remarks
(m) (mm) (mm) (mm)
H-588X300X12
H 588X300X12 8000 33 333
33.333 2 285
2.285 OK Main
M i bbeam
H-300x150x6,5 8000 33.333 1.462 OK Secondary beam
EL+5,00 H-300x150x6,5 6000 25.000 1.454 OK Longitudinal beam
H-300x150x6,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 5830 24.292 0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 4.070 OK Main beam
H-300x150x6,5
H 300 150 6 5 8000 33.333
33 333 2.981
2 981 OK Secondary
S d beam
b
EL+7,00 H-300x150x6,5 6000 25.000 0.595 OK Longitudinal beam
H-300x150x6,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 3606 15.025 0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 1.996 OK Main beam
H-300x150x6,5 8000 33.333 3.153 OK Secondary beam
EL+10 00H 300x150x6 5
EL+10,00H-300x150x6,5 6000 25 000
25.000 0 620
0.620 OK Longitudinal beam
H-300x150x6,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 4243 17.679 0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 0.357 OK Main beam
H-300x150x6,5 8000 33.333 2.232 OK Secondary beam
EL+13,00H-300x150x6,5 6000 25.000 0.955 OK Longitudinal beam
H 300x150x6 5
H-300x150x6,5 3000 12 500
12.500 0 058
0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833 0.003 OK Horizontal Bracing
T-200x200 4243 17.679 0.003 OK Vertical Bracing
H-588X300X12 8000 33.333 4.829 OK Main beam
H-300x150x6,5 8000 33.333 1.995 OK Secondary beam
EL+16,00H-300x150x6,5 6000 25.000 1.384 OK Longitudinal beam
H-300x150x6,5 3000 12.500 0.058 OK Secondary longitudinal beam
T-150x150 5000 20.833
20 833 0.003
0 003 OK Horizontal Bracing
T-200x200 4243 17.679 0.003 OK Vertical Bracing

Page 14 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Column Deflection Temporary Load Condition


Elevation Properties L δall δx check δz check Remarks
(m) (mm) (mm) (mm) (mm)
EL+5,00 H-588X300X12 5000 25.000 21.654 OK 2.118 OK AA - HA
EL+7,00 H-588X300X12 7000 35.000 25.557 OK 2.760 OK AA - HA
EL+10,00H-588X300X12 10000 50.000 30.298 OK 3.731 OK AA - HA
EL+13,00H-588X300X12 13000 65.000 34.463 OK 4.703 OK AA - HA
EL+16,00H-588X300X12 16000 80.000 37.950 OK 5.611 OK AA - HA

5. Foundation Checking

- Summary of pile foundation design

Pile Compression Pile Tension Pile Lateral

Pile Pile Forces Allowable Forces Allowable Forces Allowable


Condition
Loc. D-L (m) (kN) (kN) (kN) (kN) (kN) (kN)

Row Permanent 0.3 - 18 206.94 355.80 0.00 -175.00 11.57 39.00


AA-HA
zone 4 Temporary 0.3 - 18 308.47 475.00 0.00 -233.30 28.26 39.00

- Based on the given condition in structural analysis, the pile capacity of


piperack foundation considered adequate in meeting design criteria.

Row AA-HA
- Number of pile used per foundation = 4 pile
pile, diameter 300 mm,
mm effective length 18 m
m.
- Use 8 ea 1 1/4 inch dia. Anchor bolt.
- Footing shall be 2700 mm length, 2700 mm width and 500 mm thick, with D16-250 flexural
reinforcement.

Page 15 of 15
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT A
PIPE RACK PLAN VIEW & SECTION
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

A.1 Pipe Rack PR-08 Plan

PR‐10

Fig.A.1.1 Pipe Rack PR-10


PR 10 Layout

A.2 Pipe Rack PR-10 Section

Note
Thi picture
This i t iis ffor ttechnical
h i l
drawing.
Please see Attachment B

Fig.A.2.1 Section of Pipe Rack PR-10

Attachment A - Page 1 of 1
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT B

PIPES, CABLE TRAY AND EQUIPMENT LOADING DATA


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

B.1 PIPING LOADING DATA


B.1.1 Piping Info ( SNO-P-INF-102)

Drawing no : SNO-INF-26A

Attachment B (Pipe Load Data) - Page 1 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-26B

Attachment B (Pipe Load Data) - Page 2 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-26C

Attachment B (Pipe Load Data) - Page 3 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-26D

Attachment B (Pipe Load Data) - Page 4 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-26E

Attachment B (Pipe Load Data) - Page 5 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-27A

Attachment B (Pipe Load Data) - Page 6 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-27B

Attachment B (Pipe Load Data) - Page 7 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-27C

Attachment B (Pipe Load Data) - Page 8 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-27D

Attachment B (Pipe Load Data) - Page 9 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Drawing no : SNO-INF-27E

Attachment B (Pipe Load Data) - Page 10 of 16


CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
B.1.2 Piping Load

Attachment B - 11 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Attachment B - 12 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Attachment B - 13 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Piping loads for each bay of PR-10 can be seen on the following table,

DEAD LOAD
GRAVITY DIRECTION (Fy)

Empty Operate Test


Piping Location Unit
PE PO PT
Elev. +5.000
Bay 45 - 46
Line <= 10 inch kN/m 3.60 5.10 5.10
x= 0.55-1.5 0.55-1.5 0.55-1.5
Line = 16 inch Kn 10.00 23.00 16.00
x= 2.200 2.200 2.200
Line = 16 inch kN 5.00 7.00 15.00
x= 2.800 2.800 2.800
Line = 16 inch kN 10.00 18.00 18.00
x= 3 325
3.325 3 325
3.325 3 325
3.325
Line = 16 inch kN 8.00 8.00 10.00
x= 0.996 0.996 0.996
Elev. +7,000
Bay 45 - 46
Line <= 10 inch kN/m 3.60 5.10 5.10
x= 1.8-3.3 1.8-3.3 1.8-3.3
Line = 12 inch kN 12.00 17.00 18.00
x= 1.600 1.600 1.600
Line = 12 inch kN 13.00 15.00 17.00
x= 2.500 2.500 2.500
Line = 12 inch kN 12.00 13.00 17.00
x= 1.100 1.100 1.100
Line = 12 inch kN 10.00 11.00 14.00
x= 3.400 3.400 3.400
Line = 16 inch kN 6.00 12.00 10.00
x= 2.425 2.425 2.425
Elev. +10,000
Bay 45 - 46
Line <= 10 inch kN/m 3 60
3.60 5 10
5.10 5 10
5.10
x= 1.5-2.25 1.5-2.25 1.5-2.25
Line = 24 inch kN 8.00 8.00 29.00
x= 0.850 0.850 0.850
Line = 16 inch kN 5.00 6.00 14.00
x= 2.450 2.450 2.450
Line = 12 inch kN 12.00 13.00 17.00
x= 0.800 0.800 0.800

Attachment B - 14 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
Elev. +16.000
Bay 45 - 46
Line <= 10 inch kN/m 3.60 5.10 5.10
x= 3-3.5 3-3.5 3-3.5
Line <= 10 inch kN/m 3.60 5.10 5.10
x= 1-1.9 1-1.9 1-1.9
Line = 20 inch kN 150.00 157.00 168.00
x= 1.600 1.600 1.600
Line = 20 inch kN 90.00 95.00 94.00
x= 2.800 2.800 2.800

THERMAL LOAD
LONGITUDINAL DIRECTION (Fz)
Long.
Piping Location Unit Direct.
Fz
Elev. +5.000
Bay 45 - 46
Line <= 10 inch kN/m 1.53
x= 0.55-1.5
Line = 16 inch Kn 35.00
x= 2.200
Line = 16 inch kN 6.00
x= 3.325
Elev. +7,000
Bay 45 - 46
Line <= 10 inch kN/m 1.53
x= 1.8-3.3
Line = 12 inch kN 15.00
x= 1.600
Line = 12 inch kN 5.00
x= 2.500
Line = 12 inch kN 8.00
x= 3.400
Elev. +10,000
Bay 45 - 46
Line <= 10 inch kN/m 1 53
1.53
x= 1.5-2.25
Line = 24 inch kN 9.00
x= 0.850
Line = 16 inch kN 2.10
x= 2.450
Line = 12 inch kN 9.00
x= 0.800
Elev. +16.000
Bay 45 - 46
Line <= 10 inch kN/m 1.53
x= 3-3.5
Line <= 10 inch kN/m 1.53
x= 1-1.9
Line = 12 inch kN 97.00
x= 2.800

Attachment B - 15 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010
. # 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
TRANSVERSE DIRECTION (Fx)
Trans.
Piping Location Unit Direct.
Fz
Elev. +5.000
Bay 45 - 46
Line = 16 inch Kn 23.00
x= 2.200
Line = 16 inch kN 7.00
x= 2.800
Line = 16 inch kN 18.00
x= 3.325
Line = 16 inch kN 8.00
x= 0.996
Elev. +7,000
Bay 45 - 46
Line = 12 inch kN 2.00
x= 1.600
Line = 12 inch kN 1.00
x= 2.500
Line = 12 inch kN 5.00
x= 1.100
Line = 12 inch kN 4.50
x= 3.400
Line = 16 inch kN 2.00
x= 2.425
Elev. +10,000
Bay 45 - 46
Line = 24 inch kN 1.50
x= 0.850
Line = 16 inch kN 3.00
x= 2.450
Line = 12 inch kN 4.00
x= 0.800
Elev. +16.000
Bay 45 - 46
Line = 20 inch kN 3.00
x= 1 600
1.600
Line = 20 inch kN 1.50
x= 2.800

Attachment B - 16 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT C
STRUCTURAL MODELLING
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

C.1 STAAD.PRO MODEL

Fig. C.1.1 Piperack 3D view

Fig. C.1.2 Plan EL. +5.000

Fig. C.1.3 Plan EL. +7.000

Attachment C - Page 1 of 3
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Fig. C.1.4 Plan EL. +10.000

Fig. C.1.5 Plan EL. +13.000

Fig. C.1.6 Plan EL. +16.000

Attachment C - Page 2 of 3
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Fig. C.1.4 Long Section

Fig. C.1.5 Short Section

Attachment C - Page 3 of 3
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT D
DESIGN LOAD
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D. DESIGN LOAD

D.1 STAAD.PRO 2007 MODEL LOAD ASSIGN

D.1.1 Dead load

Y
X
Z
Load 11

Fig. D.1.1.1 Dead Load (Selfweight)

Y
X
Z
Load 17

Fig. D.1.1.2 Dead Load (Cable Tray)

Attachment D - Page 1 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Y
X
Z
Load 18

Fig. D.1.1.3 Dead Load (Platform)

D.1.2 Live load

Y
X
Z
Load 19

Fig. D.1.2 Live Load

Attachment D - Page 2 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D.1.3 Pipe Empty load

Y
X
Z Fig. D.1.3 Pipe Empty Load

D.1.4 Pipe Operating Load

Y
X
Z
Fig. D.1.4 Pipe Operating Load

Attachment D - Page 3 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D.1.5 Pipe Test load

Y
X
Z

Fig. D.1.5 Pipe Test Load

Attachment D - Page 4 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D.1.6 Wind Load Z Direction

Y
X
Z
Load 31

Fig. D.1.6 Wind Load Z Direction

D.1.7 Wind Load X Direction

Y
X
Z
Load 21

Fig. D.1.7 Wind Load X Direction

Attachment D - Page 5 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D.1.8 Wind Load on pipes

Y
X
Z
Load 22

Fig.
g D.1.8 Wind Load on Pipes
p

D.1.9 Thermal Load Z Direction

Y
X
Z

Fig. D.1.9 Thermal Load Z Direction

Attachment D - Page 6 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D.1.10 Thermal Load X Direction

Y
X
Z

Fig. D.1.10 Thermal Load X-Dir

D.1.11 Earthquake Load Z Direction

Y
X
Z

Fig. D.1.11 Earth quake Load Z Direction

Attachment D - Page 7 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

D.1.12 Earthquake Load X Direction

Y
X
Z

Fig. D.1.12 Earth quake Load X Direction

Attachment D - Page 8 of 8
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT E
STAAD INPUT DATA
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
E. STAAD PRO INPUT

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 25-Jun-13
JOB NAME SENORO PROJECT
JOB CLIENT JOB PERTAMINA - MEDCO
JOB NO 9608
JOB REV B
JOB REF PIPE RACK PR-10
ENGINEER NAME AMP
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0.3 0; 2 0 5 0; 3 0 7 0; 4 0 10 0; 5 0 13 0; 6 0 16 0; 7 8 0.3 0; 8 8 5 0;
9 8 7 0; 10 8 10 0; 11 8 13 0; 12 8 16 0; 13 0 0.3 6; 14 0 5 6; 15 0 7 6;
16 0 10 6; 17 0 13 6; 18 0 16 6; 19 8 0.3 6; 20 8 5 6; 21 8 7 6; 22 8 10 6;
23 8 13 6; 24 8 16 6; 25 0 0.3 12; 26 0 5 12; 27 0 7 12; 28 0 10 12;
29 0 13 12; 30 0 16 12; 31 8 0.3 12; 32 8 5 12; 33 8 7 12; 34 8 10 12;
35 8 13 12; 36 8 16 12; 37 0 0.3 18; 38 0 5 18; 39 0 7 18; 40 0 10 18;
41 0 13 18; 42 0 16 18; 43 8 0.3 18; 44 8 5 18; 45 8 7 18; 46 8 10 18;
47 8 13 18; 48 8 16 18; 49 0 0.3 24; 50 0 5 24; 51 0 7 24; 52 0 10 24;
53 0 13 24; 54 0 16 24; 55 8 0.3 24; 56 8 5 24; 57 8 7 24; 58 8 10 24;
59 8 13 24;; 60 8 16 24;; 61 0 0.3 30;; 62 0 5 30;; 63 0 7 30;; 64 0 10 30;;
65 0 13 30; 66 0 16 30; 67 8 0.3 30; 68 8 5 30; 69 8 7 30; 70 8 10 30;
71 8 13 30; 72 8 16 30; 73 0 0.3 36; 74 0 5 36; 75 0 7 36; 76 0 10 36;
77 0 13 36; 78 0 16 36; 79 8 0.3 36; 80 8 5 36; 81 8 7 36; 82 8 10 36;
83 8 13 36; 84 8 16 36; 85 0 0.3 42; 86 0 5 42; 87 0 7 42; 88 0 10 42;
89 0 13 42; 90 0 16 42; 91 8 0.3 42; 92 8 5 42; 93 8 7 42; 94 8 10 42;
95 8 13 42; 96 8 16 42; 97 0 5 3; 98 8 5 3; 99 0 5 9; 100 8 5 9; 101 0 5 15;
102 8 5 15; 103 0 5 21; 104 8 5 21; 105 0 5 27; 106 8 5 27; 107 0 5 33;
108 8 5 33; 109 0 5 39; 110 8 5 39; 111 0 7 3; 112 8 7 3; 113 0 7 9; 114 8 7 9;
115 0 7 15; 116 8 7 15; 117 0 7 21; 118 8 7 21; 119 0 7 27; 120 8 7 27;
121 0 7 33; 122 8 7 33; 123 0 7 39; 124 8 7 39; 125 0 10 3; 126 8 10 3;
127 0 10 9; 128 8 10 9; 129 0 10 15; 130 8 10 15; 131 0 10 21; 132 8 10 21;
133 0 10 27; 134 8 10 27; 135 0 10 33; 136 8 10 33; 137 0 10 39; 138 8 10 39;
139 0 13 3; 140 8 13 3; 141 0 13 9; 142 8 13 9; 143 0 13 15; 144 8 13 15;
145 0 13 21; 146 8 13 21; 147 0 13 27; 148 8 13 27; 149 0 13 33; 150 8 13 33;
151 0 13 39; 152 8 13 39; 153 0 16 3; 154 8 16 3; 155 0 16 9; 156 8 16 9;
157 0 16 15; 158 8 16 15; 159 0 16 21; 160 8 16 21; 161 0 16 27; 162 8 16 27;
163 0 16 33; 164 8 16 33; 165 0 16 39; 166 8 16 39; 167 4 5 0; 168 4 5 3;
169 4 5 6; 170 4 5 9; 171 4 5 12; 172 4 5 15; 173 4 5 18; 174 4 5 21;
175 4 5 24; 176 4 5 27; 177 4 5 30; 178 4 5 33; 179 4 5 36; 180 4 5 39;
181 4 5 42; 182 4 7 0; 183 4 7 3; 184 4 7 6; 185 4 7 9; 186 4 7 12; 187 4 7 15;
188 4 7 18; 189 4 7 21; 190 4 7 24; 191 4 7 27; 192 4 7 30; 193 4 7 33;
194 4 7 36; 195 4 7 39; 196 4 7 42; 197 4 10 0; 198 4 10 3; 199 4 10 6;
200 4 10 9; 201 4 10 12; 202 4 10 15; 203 4 10 18; 204 4 10 21; 205 4 10 24;
206 4 10 27; 207 4 10 30; 208 4 10 33; 209 4 10 36; 210 4 10 39; 211 4 10 42;
212 4 13 0; 213 4 13 3; 214 4 13 6; 215 4 13 9; 216 4 13 12; 217 4 13 15;

Attachment E - Page 1 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
218 4 13 18; 219 4 13 21; 220 4 13 24; 221 4 13 27; 222 4 13 30; 223 4 13 33;
224 4 13 36; 225 4 13 39; 226 4 13 42; 227 4 16 0; 228 4 16 3; 229 4 16 6;
230 4 16 9; 231 4 16 12; 232 4 16 15; 233 4 16 18; 234 4 16 21; 235 4 16 24;
236 4 16 27; 237 4 16 30; 238 4 16 33; 239 4 16 36; 240 4 16 39; 241 4 16 42;
242 0 5 -1.5; 243 8 5 -1.5; 245 0 5 43.5; 246 8 5 43.5; 248 0 7 -1.5;
249 8 7 -1.5; 251 0 7 43.5; 252 8 7 43.5; 254 0 10 -1.5; 255 8 10 -1.5;
257 0 10 43.5; 258 8 10 43.5; 260 0 13 -1.5; 261 8 13 -1.5; 263 0 13 43.5;
264 8 13 43.5; 266 0 16 -1.5; 267 8 16 -1.5; 269 0 16 43.5; 270 8 16 43.5;
272 0 3.5 0; 273 0 3.5 42; 274 0 5.5 0; 275 0 5.5 42; 276 0 8.5 0;
277 0 8.5 42; 278 0 11.5 0; 279 0 11.5 42; 280 0 14.5 0; 281 0 14.5 42;
282 8 3.5 0; 283 8 3.5 42; 284 8 5.5 0; 285 8 5.5 42; 286 8 8.5 0;
287 8 8.5 42; 288 8 11.5 0; 289 8 11.5 42; 290 8 14.5 0; 291 8 14.5 42;
292 1.5 5 0; 293 6.5 5 0; 294 1.5 5 42; 295 6.5 5 42; 296 1.5 7 0; 297 6.5 7 0;
298 1.5 10 0; 299 6.5 10 0; 300 1.5 13 0; 301 6.5 13 0; 302 1.5 16 0;
303 6.5 16 0; 304 1.5 7 42; 305 6.5 7 42; 306 1.5 10 42; 307 6.5 10 42;
308 1.5 13 42; 309 6.5 13 42; 310 1.5 16 42; 311 6.5 16 42; 312 4 5 -1.5;
313 4 5 43.5; 314 4 7 -1.5; 315 4 7 43.5; 316 4 10 -1.5; 317 4 10 43.5;
318 4 13 -1.5; 319 4 13 43.5; 320 4 16 -1.5; 321 4 16 43.5;
MEMBER INCIDENCES
1 1 272; 2 2 274; 3 3 276; 4 4 278; 5 5 280; 6 7 282; 7 8 284; 8 9 286;
9 10 288; 10 11 290; 11 2 292; 12 3 296; 13 4 298; 14 5 300; 15 6 302; 16 2 97;
17 3 111; 18 4 125; 19 5 139; 20 6 153; 21 8 98; 22 9 112; 23 10 126;
24 11 140; 25 12 154; 26 13 14; 27 14 15; 28 15 16; 29 16 17; 30 17 18;
31 19 20; 32 20 21; 33 21 22; 34 22 23; 35 23 24; 36 14 169; 37 15 184;
38 16 199; 39 17 214; 40 18 229; 41 14 99; 42 15 113; 43 16 127; 44 17 141;
45 18 155; 46 20 100; 47 21 114; 48 22 128; 49 23 142; 50 24 156; 51 25 26;
52 26 27; 53 27 28; 54 28 29; 55 29 30; 56 31 32; 57 32 33; 58 33 34; 59 34 35;
60 35 36; 61 26 171; 62 27 186; 63 28 201; 64 29 216; 65 30 231; 66 26 101;
67 27 115; 68 28 129; 69 29 143; 70 30 157; 71 32 102; 72 33 116; 73 34 130;
74 35 144; 75 36 158; 76 37 38; 77 38 39; 78 39 40; 79 40 41; 80 41 42;
81 43 44; 82 44 45; 83 45 46; 84 46 47; 85 47 48; 86 38 173; 87 39 188;
88 40 203; 89 41 218; 90 42 233; 91 38 103; 92 39 117; 93 40 131; 94 41 145;
95 42 159; 96 44 104; 97 45 118; 98 46 132; 99 47 146; 100 48 160; 101 49 50;
102 50 51; 103 51 52; 104 52 53; 105 53 54; 106 55 56; 107 56 57; 108 57 58;
109 58 59; 110 59 60; 111 50 175; 112 51 190; 113 52 205; 114 53 220;
115 54 235; 116 50 105; 117 51 119; 118 52 133; 119 53 147; 120 54 161;
121 56 106; 122 57 120; 123 58 134; 124 59 148; 125 60 162; 126 61 62;
127 62 63; 128 63 64; 129 64 65; 130 65 66; 131 67 68; 132 68 69; 133 69 70;
134 70 71; 135 71 72; 136 62 177; 137 63 192; 138 64 207; 139 65 222;
140 66 237; 141 62 107; 142 63 121; 143 64 135; 144 65 149; 145 66 163;
146 68 108; 147 69 122; 148 70 136; 149 71 150; 150 72 164; 151 73 74;
152 74 75; 153 75 76; 154 76 77; 155 77 78; 156 79 80; 157 80 81; 158 81 82;
159 82 83; 160 83 84; 161 74 179; 162 75 194; 163 76 209; 164 77 224;
165 78 239; 166 74 109; 167 75 123; 168 76 137; 169 77 151; 170 78 165;
171 80 110; 172 81 124; 173 82 138; 174 83 152; 175 84 166; 176 85 273;
177 86 275; 178 87 277; 179 88 279; 180 89 281; 181 91 283; 182 92 285;
183 93 287; 184 94 289; 185 95 291; 186 86 294; 187 87 304; 188 88 306;
189 89 308; 190 90 310; 191 97 14; 192 98 20; 193 97 168; 194 99 26;
195 100 32; 196 99 170; 197 101 38; 198 102 44; 199 101 172; 200 103 50;
201 104 56; 202 103 174; 203 105 62; 204 106 68; 205 105 176; 206 107 74;
207 108 80; 208 107 178; 209 109 86; 210 110 92; 211 109 180; 212 111 15;

Attachment E - Page 2 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
213 112 21; 214 113 27; 215 114 33; 216 115 39; 217 116 45; 218 117 51;
219 118 57; 220 119 63; 221 120 69; 222 121 75; 223 122 81; 224 123 87;
225 124 93; 226 111 183; 227 113 185; 228 115 187; 229 117 189; 230 119 191;
231 121 193; 232 123 195; 233 125 16; 234 126 22; 235 127 28; 236 128 34;
237 129 40; 238 130 46; 239 131 52; 240 132 58; 241 133 64; 242 134 70;
243 135 76; 244 136 82; 245 137 88; 246 138 94; 247 125 198; 248 127 200;
249 129 202; 250 131 204; 251 133 206; 252 135 208; 253 137 210; 254 139 17;
255 140 23; 256 141 29; 257 142 35; 258 143 41; 259 144 47; 260 145 53;
261 146 59; 262 147 65; 263 148 71; 264 149 77; 265 150 83; 266 151 89;
267 152 95; 268 139 213; 269 141 215; 270 143 217; 271 145 219; 272 147 221;
273 149 223; 274 151 225; 275 153 18; 276 154 24; 277 155 30; 278 156 36;
279 157 42; 280 158 48; 281 159 54; 282 160 60; 283 161 66; 284 162 72;
285 163 78; 286 164 84; 287 165 90; 288 166 96; 289 153 228; 290 155 230;
291 157 232; 292 159 234; 293 161 236; 294 163 238; 295 165 240; 296 167 293;
297 168 98; 298 167 168; 299 169 20; 300 170 100; 301 169 170; 302 171 32;
303 172 102; 304 171 172; 305 173 44; 306 174 104; 307 173 174; 308 175 56;
309 176 106; 310 175 176; 311 177 68; 312 178 108; 313 177 178; 314 179 80;
315 180 110; 316 179 180; 317 181 295; 318 168 169; 319 170 171; 320 172 173;
321 174 175; 322 176 177; 323 178 179; 324 180 181; 325 182 297; 326 183 112;
327 184 21; 328 185 114; 329 186 33; 330 187 116; 331 188 45; 332 189 118;
333 190 57; 334 191 120; 335 192 69; 336 193 122; 337 194 81; 338 195 124;
339 196 305; 340 182 183; 341 184 185; 342 186 187; 343 188 189; 344 190 191;
345 192 193; 346 194 195; 347 183 184; 348 185 186; 349 187 188; 350 189 190;
351 191 192; 352 193 194; 353 195 196; 354 197 299; 355 198 126; 356 199 22;
357 200 128; 358 201 34; 359 202 130; 360 203 46; 361 204 132; 362 205 58;
363 206 134; 364 207 70; 365 208 136; 366 209 82; 367 210 138; 368 211 307;
369 197 198; 370 199 200; 371 201 202; 372 203 204; 373 205 206; 374 207 208;
375 209 210; 376 198 199; 377 200 201; 378 202 203; 379 204 205; 380 206 207;
381 208 209; 382 210 211; 383 212 301; 384 213 140; 385 214 23; 386 215 142;
387 216 35; 388 217 144; 389 218 47; 390 219 146; 391 220 59; 392 221 148;
393 222 71; 394 223 150; 395 224 83; 396 225 152; 397 226 309; 398 212 213;
399 214 215; 400 216 217; 401 218 219; 402 220 221; 403 222 223; 404 224 225;
405 213 214; 406 215 216; 407 217 218; 408 219 220; 409 221 222; 410 223 224;
411 225 226; 412 227 303; 413 228 154; 414 229 24; 415 230 156; 416 231 36;
417 232 158; 418 233 48; 419 234 160; 420 235 60; 421 236 162; 422 237 72;
423 238 164; 424 239 84; 425 240 166; 426 241 311; 427 227 228; 428 229 230;
429 231 232; 430 233 234; 431 235 236; 432 237 238; 433 239 240; 434 228 229;
435 230 231; 436 232 233; 437 234 235; 438 236 237; 439 238 239; 440 240 241;
441 2 168; 442 168 20; 443 14 168; 444 168 8; 449 74 180; 450 180 92;
451 86 180; 452 180 80; 453 3 183; 454 183 21; 455 15 183; 456 183 9;
461 75 195; 462 195 93; 463 87 195; 464 195 81; 465 4 198; 466 198 22;
467 16 198; 468 198 10; 473 76 210; 474 210 94; 475 88 210; 476 210 82;
477 5 213; 478 213 23; 479 17 213; 480 213 11; 485 77 225; 486 225 95;
487 89 225; 488 225 83; 489 6 228; 490 228 24; 491 18 228; 492 228 12;
497 78 240; 498 240 96; 499 90 240; 500 240 84; 501 1 97; 502 97 13;
505 73 109; 506 109 85; 507 7 98; 508 98 19; 511 79 110; 512 110 91; 513 2 111;
514 111 14; 517 74 123; 518 123 86; 519 8 112; 520 112 20; 523 80 124;
524 124 92; 525 3 125; 526 125 15; 529 75 137; 530 137 87; 531 9 126;
532 126 21; 535 81 138; 536 138 93; 537 4 139; 538 139 16; 541 76 151;
542 151 88; 543 10 140; 544 140 22; 547 82 152; 548 152 94; 549 5 153;
550 153 17; 553 77 165; 554 165 89; 555 11 154; 556 154 23; 559 83 166;

Attachment E - Page 3 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
560 166 95; 561 242 312; 563 245 313; 565 243 8; 567 242 2; 568 92 246;
570 86 245; 611 272 2; 612 273 86; 613 272 242; 614 273 245; 615 274 3;
616 275 87; 617 274 248; 618 275 251; 619 276 4; 620 277 88; 621 276 254;
622 277 257; 623 278 5; 624 279 89; 625 278 260; 626 279 263; 627 280 6;
628 281 90; 629 280 266; 630 281 269; 631 282 8; 632 283 92; 633 284 9;
634 285 93; 635 286 10; 636 287 94; 637 288 11; 638 289 95; 639 290 12;
640 291 96; 641 282 243; 642 283 246; 643 284 249; 644 285 252; 645 286 255;
646 287 258; 647 288 261; 648 289 264; 649 290 267; 650 291 270; 651 292 167;
652 293 8; 653 242 292; 654 293 243; 655 294 181; 656 295 92; 657 245 294;
658 295 246; 659 296 182; 660 297 9; 661 248 296; 662 297 249; 663 298 197;
664 299 10; 665 254 298; 666 299 255; 667 300 212; 668 301 11; 669 260 300;
670 301 261; 671 302 227; 672 303 12; 673 266 302; 674 303 267; 675 304 196;
676 305 93; 677 251 304; 678 305 252; 679 306 211; 680 307 94; 681 257 306;
682 307 258; 683 308 226; 684 309 95; 685 263 308; 686 309 264; 687 310 241;
688 311 96; 689 269 310; 690 311 270; 691 26 172; 692 172 44; 693 38 172;
694 172 32; 695 25 101; 696 101 37; 697 31 102; 698 102 43; 699 50 176;
700 176 68; 701 62 176; 702 176 56; 703 49 105; 704 105 61; 705 55 106;
706 106 67; 707 27 187; 708 187 45; 709 39 187; 710 187 33; 711 26 115;
712 115 38; 713 32 116; 714 116 44; 715 51 191; 716 191 69; 717 63 191;
718 191 57; 719 50 119; 720 119 62; 721 56 120; 722 120 68; 723 28 202;
724 202 46; 725 40 202; 726 202 34; 727 27 129; 728 129 39; 729 33 130;
730 130 45; 731 52 206; 732 206 70; 733 64 206; 734 206 58; 735 51 133;
736 133 63; 737 57 134; 738 134 69; 739 29 217; 740 217 47; 741 41 217;
742 217 35; 743 28 143; 744 143 40; 745 34 144; 746 144 46; 747 53 221;
748 221 71; 749 65 221; 750 221 59; 751 52 147; 752 147 64; 753 58 148;
754 148 70; 755 30 232; 756 232 48; 757 42 232; 758 232 36; 759 29 157;
760 157 41; 761 35 158; 762 158 47; 763 54 236; 764 236 72; 765 66 236;
766 236 60; 767 53 161; 768 161 65; 769 59 162; 770 162 71; 803 42 234;
804 234 60; 805 54 234; 806 234 48; 807 18 230; 808 230 36; 809 30 230;
810 230 24; 811 66 238; 812 238 84; 813 78 238; 814 238 72; 815 38 174;
816 174 56; 817 50 174; 818 174 44; 819 14 170; 820 170 32; 821 26 170;
822 170 20; 823 62 178; 824 178 80; 825 74 178; 826 178 68; 827 312 243;
828 312 167; 829 313 246; 830 181 313; 831 248 314; 832 251 315; 833 249 9;
834 248 3; 835 93 252; 836 87 251; 837 314 249; 838 314 182; 839 315 252;
840 196 315; 841 254 316; 842 257 317; 843 255 10; 844 254 4; 845 94 258;
846 88 257; 847 316 255; 848 316 197; 849 317 258; 850 211 317; 851 260 318;
852 263 319; 853 261 11; 854 260 5; 855 95 264; 856 89 263; 857 318 261;
858 318 212; 859 319 264; 860 226 319; 861 266 320; 862 269 321; 863 267 12;
864 266 6; 865 96 270; 866 90 269; 867 320 267; 868 320 227; 869 321 270;
870 241 321;
START GROUP DEFINITION
MEMBER
_C-EL.5 1 6 26 31 51 56 76 81 101 106 126 131 151 156 176 181 611 612 631 632
_MB-EL.5 11 36 61 86 111 136 161 186 296 299 302 305 308 311 314 317 651 652 -
655 656
_SB-EL.5 193 196 199 202 205 208 211 297 300 303 306 309 312 315
_LB-EL.5 16 21 41 46 66 71 91 96 116 121 141 146 166 171 191 192 194 195 197 -
198 200 201 203 204 206 207 209 210
_SLB-EL.5 298 301 304 307 310 313 316 318 TO 324
_HB-EL.5 441 TO 444 449 TO 452 691 TO 694 699 TO 702
_VB-EL.5 501 502 505 TO 508 511 512 695 TO 698 703 TO 706

Attachment E - Page 4 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
_C-EL.7 27 32 52 57 77 82 102 107 127 132 152 157 615 616 633 634
_MB-EL.7 12 37 62 87 112 137 162 187 325 327 329 331 333 335 337 339 659 660 -
675 676
_SB-EL.7 226 TO 232 326 328 330 332 334 336 338
_LB-EL.7 17 22 42 47 67 72 92 97 117 122 142 147 167 172 212 TO 225
_SLB=EL.7 340 TO 353
_HB-EL.7 453 TO 456 461 TO 464 707 TO 710 715 TO 718
_VB-EL.7 513 514 517 TO 520 523 524 711 TO 714 719 TO 722
_C-EL.10 3 8 28 33 53 58 78 83 103 108 128 133 153 158 178 183 619 620 635 636
_MB-EL.10 13 38 63 88 113 138 163 188 354 356 358 360 362 364 366 368 663 -
664 679 680
_SB-EL.10 247 TO 253 355 357 359 361 363 365 367
_LB-EL.10 18 23 43 48 68 73 93 98 118 123 143 148 168 173 233 TO 246
_SLB-EL.10 369 TO 382
_HB-EL.10 465 TO 468 473 TO 476 723 TO 726 731 TO 734
_VB-EL.10 525 526 529 TO 532 535 536 727 TO 730 735 TO 738
_C-EL.13 4 9 29 34 54 59 79 84 104 109 129 134 154 159 179 184 623 624 637 638
_MB-EL.13 14 39 64 89 114 139 164 189 383 385 387 389 391 393 395 397 667 -
668 683 684
_SB=EL.13 268 TO 274 384 386 388 390 392 394 396
_LB-EL.13 19 24 44 49 69 74 94 99 119 124 144 149 169 174 254 TO 267
_SLB-EL.13 398 TO 411
_HB-EL.13 477 TO 480 485 TO 488 739 TO 742 747 TO 750
_VB-EL.13 537 538 541 TO 544 547 548 743 TO 746 751 TO 754
_C-EL.16 5 10 30 35 55 60 80 85 105 110 130 135 155 160 180 185 627 628 639 640
_MB-EL.16 15 40 65 90 115 140 165 190 412 414 416 418 420 422 424 426 671 -
672 687 688
_SB=EL.16 289 TO 295 413 415 417 419 421 423 425
_LB-EL.16 20 25 45 50 70 75 95 100 120 125 145 150 170 175 275 TO 288
_SLB-EL.16 427 TO 440
_HB-EL.16 489 TO 492 497 TO 500 755 TO 758 763 TO 766 803 TO 826
_VB-EL.16 549 550 553 TO 556 559 560 759 TO 762 767 TO 770
END GROUP DEFINITION
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
1 TO 10 26 TO 35 51 TO 60 76 TO 85 101 TO 110 126 TO 135 151 TO 160 -
176 TO 185 611 612 615 616 619 620 623 624 627 628 631 TO 639 -
640 TABLE ST H588X300X12
11 TO 15 36 TO 40 61 TO 65 86 TO 90 111 TO 115 136 TO 140 161 TO 165 -
186 TO 190 296 299 302 305 308 311 314 317 325 327 329 331 333 335 337 339 -
354 356 358 360 362 364 366 368 383 385 387 389 391 393 395 397 412 414 416 -
418 420 422 424 426 651 652 655 656 659 660 663 664 667 668 671 672 675 676 -
679 680 683 684 687 688 TABLE ST H588X300X12
16 TO 19 21 TO 24 41 TO 44 46 TO 49 66 TO 69 71 TO 74 91 TO 94 96 TO 99 116 -

Attachment E - Page 5 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
117 TO 119 121 TO 124 141 TO 144 146 TO 149 166 TO 169 171 TO 174 191 TO 274 -
297 300 303 306 309 312 315 326 328 330 332 334 336 338 355 357 359 361 363 -
365 367 384 386 388 390 392 394 396 561 563 565 567 568 570 827 829 -
831 TO 837 839 841 TO 847 849 851 TO 857 859 861 TO 867 -
869 TABLE ST H300X150X6.5
613 614 617 618 621 622 625 626 629 630 641 TO 650 653 654 657 658 661 662 -
665 666 669 670 673 674 677 678 681 682 685 686 689 -
690 TABLE ST H200X100X5.5
441 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 497 TO 500 691 TO 694 -
699 TO 702 707 TO 710 715 TO 718 723 TO 726 731 TO 734 739 TO 742 -
747 TO 750 755 TO 758 763 TO 766 803 TO 826 TABLE ST T150X150
501 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 -
541 TO 544 547 TO 550 553 TO 556 559 560 695 TO 698 703 TO 706 711 TO 714 -
719 TO 722 727 TO 730 735 TO 738 743 TO 746 751 TO 754 759 TO 762 -
767 TO 770 TABLE ST T200X200
298 301 304 307 310 313 316 318 TO 324 340 TO 353 369 TO 382 398 TO 411 427 -
428 TO 440 828 830 838 840 848 850 858 860 868 870 TABLE ST H200X100X5.5
20 25 45 50 70 75 95 100 120 125 145 150 170 175 275 TO 295 413 415 417 419 -
421 423 425 TABLE ST H400X200X8
CONSTANTS
BETA 90 MEMB 501 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 -
535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 560 695 TO 698 703 TO 706 -
711 TO 714 719 TO 722 727 TO 730 735 TO 738 743 TO 746 751 TO 754 -
759 TO 762 767 TO 770
MATERIAL STEEL ALL
SUPPORTS
1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 PINNED
MEMBER RELEASE
16 TO 25 41 TO 50 66 TO 75 91 TO 100 116 TO 125 141 TO 150 166 TO 175 193 -
196 199 202 205 208 211 226 TO 232 247 TO 253 268 TO 274 289 TO 295 298 301 -
304 307 310 313 316 318 TO 324 340 TO 353 369 TO 382 398 TO 411 427 TO 440 -
568 570 830 835 836 840 845 846 850 855 856 860 865 866 870 START MY MZ
191 192 194 195 197 198 200 201 203 204 206 207 209 210 212 TO 225 -
233 TO 246 254 TO 267 275 TO 288 297 298 300 301 303 304 306 307 309 310 -
312 313 315 316 318 TO 324 326 328 330 332 334 336 338 340 TO 353 355 357 -
359 361 363 365 367 369 TO 382 384 386 388 390 392 394 396 398 TO 411 413 -
415 417 419 421 423 425 427 TO 440 565 567 828 833 834 838 843 844 848 853 -
854 858 863 864 868 END MY MZ
MEMBER TRUSS
441 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 497 TO 502 505 TO 508 -
511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 541 TO 544 -
547 TO 550 553 TO 556 559 560 613 614 617 618 621 622 625 626 629 630 641 -
642 TO 650 653 654 657 658 661 662 665 666 669 670 673 674 677 678 681 682 -
685 686 689 TO 770 803 TO 826
DEFINE WIND LOAD
TYPE 1
INT 0.54 0.57 0.59 0.62 0.66 0.69 0.71 HEIG 4.6 6.1 7.6 9.1 12.2 15.2 18
EXP 1 JOINT 1 TO 243 245 246 248 249 251 252 254 255 257 258 260 261 263 264 -
266 267 269 270 272 TO 321
DEFINE UBC LOAD
ZONE 0.4 I 1.25 RWX 4.5 RWZ 5.6 STYP 5 NA 1.04 NV 0.99

Attachment E - Page 6 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
SELFWEIGHT 1
MEMBER WEIGHT
***********************************************************************************
* WEIGHT OF OPERATING PIPE
***********************************************************************************
296 299 302 305 308 311 314 317 CON 23 2.2
299 302 305 308 CON 7 2.8
652 CON 7 0.3
299 302 305 308 311 314 CON 18 3.325
652 656 CON 18 0.825
141 146 CON 8 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI 5.1 0.55 1.5
333 335 337 339 CON 17 1.6
331 333 CON 15 2.5
339 CON 13 1.1
327 329 331 CON 11 3.4
660 CON 11 0.9
339 CON 12 2.425
37 62 87 112 137 162 226 TO 232 UNI 5.1 1.8 3.3
659 675 UNI 5.1 0.3 1.8
13 38 63 88 113 138 163 188 CON 8 0.85
366 368 CON 6 2.45
356 358 360 362 364 CON 13 0.8
38 63 88 113 138 163 UNI 5.1 1.5 2.25
663 679 UNI 5.1 0 0.75
14 39 64 89 114 139 164 189 CON 12 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI 5.1 1.25 1.5
412 414 416 418 420 CON 157 1.6
414 416 CON 95 2.8
40 65 289 TO 291 UNI 5.1 3 3.5
424 TO 426 UNI 5.1 1 1.9
70 CON 0.6 0.3
70 CON 0.6 0.65
70 CON 0.2 1.5
279 CON 0.2 1.05
279 CON 0.6 1.55
95 CON 0.8 0.1
95 CON 0.8 1.25
281 CON 2.5 0.8
281 CON 2.5 1.95
120 CON 0.2 1.3
120 CON 0.2 2.55
283 CON 0.2 0.45
283 CON 0.1 1.6
283 CON 0.1 1.95
287 CON 1 0.95
***********************************************************************************
* WEIGHT OF TRAY LOAD
***********************************************************************************
14 39 64 89 114 139 164 189 268 TO 274 667 683 CON 13.5 1
383 TO 397 668 684 CON 6 3.5

Attachment E - Page 7 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
383 TO 397 668 684 CON 3 2.3
***********************************************************************************
*WEIGHT OF PLATFORM LOAD
***********************************************************************************
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 861 862 -
867 869 UNI 1.215
***********************************************************************************
*WEIGHT OF LIVE LOAD
***********************************************************************************
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 861 862 -
867 869 UNI 3.75
***********************************************************************************
LOAD 1 LOADTYPE Seismic TITLE EQ +X DIR
UBC LOAD X 1
PERFORM ANALYSIS
CHANGE
LOAD 2 LOADTYPE Seismic TITLE EQ +Z DIR
UBC LOAD Z 1
PERFORM ANALYSIS
CHANGE
LOAD 11 LOADTYPE Dead TITLE SELF WEIGHT
SELFWEIGHT Y -1 LIST 1 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 -
497 TO 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 -
535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 TO 561 563 565 567 568 570 -
611 TO 770 803 TO 870
***********************************************************************************
LOAD 12 LOADTYPE Dead TITLE EMPTY PIPE
***********************************************************************************
MEMBER LOAD
296 299 302 305 308 311 314 317 CON GY -10 2.2
299 302 305 308 CON GY -5 2.8
652 CON GY -5 0.3
299 302 305 308 311 314 CON GY -10 3.325
652 656 CON GY -10 0.825
141 146 CON GY -8 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GY -3.6 0.55 1.5
333 335 337 339 CON GY -12 1.6
331 333 CON GY -13 2.5
339 CON GY -12 1.1
327 329 331 CON GY -10 3.4
660 CON GY -10 0.9
339 CON GY -6 2.425
37 62 87 112 137 162 226 TO 232 UNI GY -3.6 1.8 3.3
659 675 UNI GY -3.6 0.3 1.8
13 38 63 88 113 138 163 188 CON GY -8 0.85
366 368 CON GY -5 2.45
356 358 360 362 364 CON GY -12 0.8
38 63 88 113 138 163 247 TO 253 UNI GY -3.6 1.5 2.25
663 679 UNI GY -3.6 0 0.75
14 39 64 89 114 139 164 189 CON GY -12 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GY -3.6 1.25 1.5

Attachment E - Page 8 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
412 414 416 418 420 CON GY -150 1.6
414 416 CON GY -90 2.8
40 65 289 TO 291 UNI GY -3.6 3 3.5
424 TO 426 UNI GY -3.6 1 1.9
70 CON GY -1 0.3
70 CON GY -1 0.65
70 CON GY -1 1.5
279 CON GY -1 1.05
279 CON GY -2 1.55
95 CON GY -1.5 0.1
95 CON GY -1.5 1.25
281 CON GY -2 0.8
281 CON GY -2 1.95
120 CON GY -1 1.3
120 CON GY -1 2.55
283 CON GY -1 0.45
283 CON GY -1 1.6
283 CON GY -1 1.95
287 CON GY -0.5 0.95
***********************************************************************************
LOAD 13 LOADTYPE Dead TITLE OPERATING PIPE
***********************************************************************************
MEMBER LOAD
296 299 302 305 308 311 314 317 CON GY -23 2.2
299 302 305 308 CON GY -7 2.8
652 CON GY -7 0.3
299 302 305 308 311 314 CON GY -18 3.325
652 656 CON GY -18 0.825
141 146 CON GY -8 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GY -5.1 0.55 1.5
333 335 337 339 CON GY -17 1.6
331 333 CON GY -15 2.5
339 CON GY -13 1.1
327 329 331 CON GY -11 3.4
660 CON GY -11 0.9
339 CON GY -12 2.425
37 62 87 112 137 162 226 TO 232 UNI GY -5.1 1.8 3.3
659 675 UNI GY -5.1 0.3 1.8
13 38 63 88 113 138 163 188 CON GY -8 0.85
366 368 CON GY -6 2.45
356 358 360 362 364 CON GY -13 0.8
38 63 88 113 138 163 247 TO 253 UNI GY -5.1 1.5 2.25
663 679 UNI GY -5.1 0 0.75
14 39 64 89 114 139 164 189 CON GY -12 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GY -5.1 1.25 1.5
412 414 416 418 420 CON GY -157 1.6
414 416 CON GY -95 2.8
40 65 289 TO 291 UNI GY -5.1 3 3.5
424 TO 426 UNI GY -5.1 1 1.9
70 CON GY 0.6 0.3
70 CON GY 0.6 0.65

Attachment E - Page 9 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
70 CON GY 0.2 1.5
279 CON GY 0.2 1.05
279 CON GY 0.6 1.55
95 CON GY 0.8 0.1
95 CON GY 0.8 1.25
281 CON GY 2.5 0.8
281 CON GY 2.5 1.95
120 CON GY 0.2 1.3
120 CON GY 0.2 2.55
283 CON GY 0.2 0.45
283 CON GY 0.1 1.6
283 CON GY 0.1 1.95
287 CON GY 1 0.95
***********************************************************************************
LOAD 14 LOADTYPE Dead TITLE TEST PIPE
***********************************************************************************
MEMBER LOAD
296 299 302 305 308 311 314 317 CON GY -16 2.2
299 302 305 308 CON GY -5 2.8
652 CON GY -15 0.3
299 302 305 308 311 314 CON GY -18 3.325
652 656 CON GY -18 0.825
141 146 CON GY -19 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GY -5.1 0.55 1.5
333 335 337 339 CON GY -18 1.6
331 333 CON GY -17 2.5
339 CON GY -17 1.1
327 329 331 CON GY -14 3.4
660 CON GY -14 0.9
339 CON GY -10 2.425
37 62 87 112 137 162 226 TO 232 UNI GY -5.1 1.8 3.3
659 675 UNI GY -5.1 0.3 1.8
13 38 63 88 113 138 163 188 CON GY -29 0.85
366 368 CON GY -14 2.45
356 358 360 362 364 CON GY -17 0.8
38 63 88 113 138 163 247 TO 253 UNI GY -5.1 1.5 2.25
663 679 UNI GY -5.1 0 0.75
14 39 64 89 114 139 164 189 CON GY -33 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GY -5.1 1.25 1.5
412 414 416 418 420 CON GY -168 1.6
414 416 CON GY -94 2.8
40 65 289 TO 291 UNI GY -5.1 3 3.5
424 TO 426 UNI GY -5.1 1 1.9
70 CON GY -2.5 0.3
70 CON GY -2.5 0.65
70 CON GY -2.5 1.5
279 CON GY -2.5 1.05
279 CON GY -3 1.55
95 CON GY -2.5 0.1
95 CON GY -2.5 1.25
281 CON GY -3 0.8

Attachment E - Page 10 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
281 CON GY -3 1.95
120 CON GY -1.5 1.3
120 CON GY -1.5 2.55
283 CON GY -1.5 0.45
283 CON GY -1.5 1.6
283 CON GY -1.5 1.95
287 CON GY -1 0.95
***********************************************************************************
LOAD 15 LOADTYPE None TITLE THERMAL PIPE (FZ)
***********************************************************************************
MEMBER LOAD
296 302 308 314 CON GZ 35 2.2
302 308 314 CON GZ 6 3.325
652 CON GZ 6 0.825
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GZ 1.53 0.55 1.5
335 339 CON GZ 15 1.6
331 CON GZ 5 2.5
327 331 CON GZ 8 3.4
37 62 87 112 137 162 226 TO 232 UNI GZ 1.53 1.8 3.3
659 675 UNI GZ 1.53 0.3 1.8
13 63 113 163 CON GZ 9 0.85
368 CON GZ 2.1 2.45
358 362 CON GZ 9 0.8
38 63 88 113 138 163 247 TO 253 UNI GZ 1.53 1.5 2.25
663 679 UNI GZ 1.53 0 0.75
14 64 114 164 CON GZ 10 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GZ 1.53 1.25 1.5
414 CON GZ 97 2.8
40 65 289 TO 291 UNI GZ 1.53 3 3.5
424 TO 426 UNI GZ 1.53 1 1.9
70 CON GZ 0.3 0.3
70 CON GZ 0.3 0.65
70 CON GZ 0.1 1.5
279 CON GZ 0.1 1.05
279 CON GZ 0.3 1.55
95 CON GZ 0.5 0.1
95 CON GZ 0.5 1.25
281 CON GZ 1 0.8
281 CON GZ 1 1.95
120 CON GZ 0.2 1.3
120 CON GZ 0.2 2.55
283 CON GZ 0.2 0.45
283 CON GZ 0.1 1.6
283 CON GZ 0.1 1.95
287 CON GZ 0.2 0.95
***********************************************************************************
LOAD 16 LOADTYPE None TITLE THERMAL PIPE (FX)
***********************************************************************************
MEMBER LOAD
296 302 308 314 CON GX 11 2.2
302 308 CON GX 1 2.8

Attachment E - Page 11 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
302 308 314 CON GX 3 3.325
652 656 CON GX 30 0.825
146 CON GX 2 0.996
335 339 CON GX 2 1.6
331 CON GX 1 2.5
339 CON GX 5 1.1
327 331 CON GX 4.5 3.4
339 CON GX 2 2.425
38 88 138 188 CON GX 1.5 0.85
368 CON GX 3 2.45
358 362 CON GX 4 0.8
14 64 114 164 CON GX 4 0.75
412 416 420 CON GX 3 1.6
414 CON GX 1.5 2.8
70 CON GX 1.4 0.3
70 CON GX 1.4 0.65
70 CON GX 0.4 1.5
279 CON GX 0.4 1.05
279 CON GY 0.3 1.55
95 CON GX 2.2 0.1
95 CON GX 2.2 1.25
281 CON GX 6.8 0.8
281 CON GX 6.8 1.95
120 CON GX 0.4 1.3
120 CON GX 0.2 2.55
283 CON GX 0.2 0.45
283 CON GX 0.1 1.6
283 CON GX 0.1 1.95
287 CON GX 0.2 0.95
***********************************************************************************
LOAD 17 LOADTYPE None TITLE TRAY LOAD
MEMBER LOAD
14 39 64 89 114 139 164 189 268 TO 274 CON GY -13.5 1
668 684 CON GY -6 1
384 TO 396 CON GY -6 3.5
383 TO 397 CON GY -3 2.3
LOAD 18 LOADTYPE Dead TITLE PLATFORM LOAD
MEMBER LOAD
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 861 862 -
867 869 UNI GY -1.215
LOAD 19 LOADTYPE Live REDUCIBLE TITLE LIVE LOAD
MEMBER LOAD
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 UNI GY -7.5
LOAD 21 LOADTYPE Wind TITLE WIND +X DIR
WIND LOAD X 1 TYPE 1 XR 0 1 YR 0 17 ZR -2 44 OPEN
WIND LOAD X 1 TYPE 1 XR 7 9 YR 0 17 ZR -2 44 OPEN
LOAD 22 LOADTYPE None TITLE WIND ON PIPES +X DIR
JOINT LOAD
2 TO 6 8 14 TO 18 26 TO 30 38 TO 42 50 TO 54 62 TO 66 74 TO 78 86 TO 90 FX 1.34
3 15 27 39 51 63 75 87 FX 1.41
4 16 28 40 52 64 76 88 FX 2.34

Attachment E - Page 12 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
6 14 TO 18 26 TO 30 38 TO 42 50 TO 54 62 TO 66 74 TO 78 90 FX 2.13
LOAD 31 LOADTYPE Wind TITLE WIND +Z DIR
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 0 1 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 5 7 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 11 13 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 17 19 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 23 25 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 29 31 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 35 37 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 41 43 OPEN
******************************************************************************
*PERMANENT LOAD
******************************************************************************
LOAD COMB 101 LC : EMPTY
11 1.0 12 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 102 LC : OPERATING + THERMAL
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 103 LC : OPERATING - THERMAL
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 104 LC : TEST
11 1.0 14 1.0 17 1.0 18 1.0 19 1.0
******************************************************************************
*TEMPORARY LOAD
******************************************************************************
LOAD COMB 105 LC : OPERATING + THERMAL + WIND X
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 106 LC : OPERATING + THERMAL - WIND X
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75
LOAD COMB 107 LC : OPERATING - THERMAL - WIND X
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75
LOAD COMB 108 LC : OPERATING - THERMAL + WIND X
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 109 LC : OPERATING + THERMAL + WIND Z
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 110 LC : OPERATING + THERMAL - WIND Z
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 111 LC : OPERATING - THERMAL - WIND Z
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 112 LC : OPERATING - THERMAL + WIND Z
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 113 LC : OPERATING + THERMAL + (EQ-X / 1.4)
1 0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 114 LC : OPERATING + THERMAL - (EQ-X / 1.4)
1 -0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 115 LC : OPERATING - THERMAL - (EQ-X / 1.4)
1 -0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 116 LC : OPERATING - THERMAL + (EQ-X / 1.4)
1 0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 117 LC : OPERATING + THERMAL + (EQ-Z / 1.4)
2 0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 118 LC : OPERATING + THERMAL - (EQ-Z / 1.4)

Attachment E - Page 13 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
2 -0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 119 LC : OPERATING - THERMAL - (EQ-Z / 1.4)
2 -0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 120 LC : OPERATING - THERMAL + (EQ-Z / 1.4)
2 0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 121 LC : (0.9*OPERATING) + THERMAL + (EQ-X / 1.4)
1 0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 122 LC : (0.9*OPERATING) + THERMAL - (EQ-X / 1.4)
1 -0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 123 LC : (0.9*OPERATING) - THERMAL - (EQ-X / 1.4)
1 -0.7 11 0.9 13 0.9 15 -0.9 16 -0.9 17 0.9 18 0.9
LOAD COMB 124 LC : (0.9*OPERATING) - THERMAL + (EQ-X / 1.4)
1 0.7 11 0.9 13 0.9 15 -0.9 16 -0.9 17 0.9 18 0.9
LOAD COMB 125 LC : (0.9*OPERATING) + THE1RMAL + (EQ-Z / 1.4)
2 0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 126 LC : (0.9*OPERATING) + THERMAL - (EQ-Z / 1.4)
2 -0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 127 LC : (0.9*OPERATING) - THERMAL - (EQ-Z / 1.4)
2 -0.7 11 1.0 13 1.0 15 -0.9 16 -0.9 17 0.9 18 0.9
LOAD COMB 128 LC : (0.9*OPERATING) - THERMAL + (EQ-Z / 1.4)
2 0.7 11 0.9 13 0.9 15 -0.9 16 -0.9 17 0.9 18 0.9
******************************************************************************
LOAD COMB 129 EMPTY + WIND X
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 130 EMPTY - WIND X
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75
LOAD COMB 131 EMPTY + WIND Z
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 132 EMPTY - WIND Z
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 133 EMPTY + (EQ-X / 1.4)
1 0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 134 EMPTY - (EQ-X / 1.4)
1 -0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 135 EMPTY + (EQ-Z / 1.4)
2 0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 136 EMPTY - (EQ-Z / 1.4)
2 -0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 137 (0.9*EMPTY) + (EQ-X / 1.4)
1 0.7 11 0.9 12 0.9 17 0.9 18 0.9
LOAD COMB 138 (0.9*EMPTY) - (EQ-X / 1.4)
1 -0.7 11 0.9 12 0.9 17 0.9 18 0.9
LOAD COMB 139 (0.9*EMPTY) + (EQ-Z / 1.4)
2 0.7 11 0.9 12 0.9 17 0.9 18 0.9
LOAD COMB 140 (0.9*EMPTY) - (EQ-Z / 1.4)
2 -0.7 11 0.9 12 0.9 17 0.9 18 0.9
******************************************************************************
LOAD COMB 141 TEST + WIND X
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 142 TEST - WIND X
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75

Attachment E - Page 14 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
LOAD COMB 143 TEST + WIND Z
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 144 TEST - WIND Z
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 145 TEST + (EQ-X / 1.4)
1 0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 146 TEST - (EQ-X / 1.4)
1 -0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 147 TEST + (EQ-Z / 1.4)
2 0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 148 TEST - (EQ-Z / 1.4)
2 -0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 149 (0.9*TEST) + (EQ-X / 1.4)
1 0.7 11 0.9 14 0.9 17 0.9 18 0.9
LOAD COMB 150 (0.9*TEST) - (EQ-X / 1.4)
1 -0.7 11 0.9 14 0.9 17 0.9 18 0.9
LOAD COMB 151 (0.9*TEST) + (EQ-Z / 1.4)
2 0.7 11 0.9 14 0.9 17 0.9 18 0.9
LOAD COMB 152 (0.9*TEST) - (EQ-Z / 1.4)
2 -0.7 11 0.9 14 0.9 17 0.9 18 0.9
PERFORM ANALYSIS PRINT ALL
******************************************************************************
LOAD LIST 101 TO 104
******************************************************************************
PARAMETER 1
CODE AISC
FU 400000 ALL
FYLD 235000 ALL
LZ 6 MEMB 41 TO 50 66 TO 75 116 TO 125 141 TO 150 194 195 197 198 203 204 -
206 207 214 TO 217 220 TO 223 235 TO 238 241 TO 244 256 TO 259 262 TO 265 -
277 TO 280 283 TO 286
LZ 8 MEMB 11 TO 15 36 TO 40 61 TO 65 86 TO 90 111 TO 115 136 TO 140 -
161 TO 165 186 TO 190 193 196 199 202 205 208 211 226 TO 232 247 TO 253 268 -
269 TO 274 289 TO 297 299 300 302 303 305 306 308 309 311 312 314 315 317 -
325 TO 339 354 TO 368 383 TO 397 412 TO 426 561 563 651 652 655 656 659 660 -
663 664 667 668 671 672 675 676 679 680 683 684 687 688 827 829 831 832 837 -
839 841 842 847 849 851 852 857 859 861 862 867 869
RATIO 1 ALL
CHECK CODE ALL
******************************************************************************
LOAD LIST 105 TO 152
******************************************************************************
PARAMETER 2
CODE AISC
FU 400000 ALL
FYLD 235000 ALL
LZ 6 MEMB 41 TO 50 66 TO 75 116 TO 125 141 TO 150 194 195 197 198 203 204 -
206 207 214 TO 217 220 TO 223 235 TO 238 241 TO 244 256 TO 259 262 TO 265 -
277 TO 280 283 TO 286
LZ 8 MEMB 11 TO 15 36 TO 40 61 TO 65 86 TO 90 111 TO 115 136 TO 140 -
161 TO 165 186 TO 190 193 196 199 202 205 208 211 226 TO 232 247 TO 253 268 -

Attachment E - Page 15 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
269 TO 274 289 TO 297 299 300 302 303 305 306 308 309 311 312 314 315 317 -
325 TO 339 354 TO 368 383 TO 397 412 TO 426 561 563 651 652 655 656 659 660 -
663 664 667 668 671 672 675 676 679 680 683 684 687 688 827 829 831 832 837 -
839 841 842 847 849 851 852 857 859 861 862 867 869
RATIO 1.33 ALL
CHECK CODE ALL
STEEL MEMBER TAKE OFF LIST 1 TO 444 449 TO 456 461 TO 468 473 TO 480 -
485 TO 492 497 TO 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 -
529 TO 532 535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 TO 561 563 565 -
567 568 570 611 TO 770 803 TO 870
FINISH

Attachment E - Page 16 of 16
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT F
STRESS RATIO
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

F. Stress Ratio
Ratio of structure Pipe Rack PR-10 can be seen in the following table.

F.1. Stress Ratio Permanent Condition

Beam No. Design Property Actual Ratio Allow. Ratio L/C


1 H588X300X12 0.255 1 103
2 H588X300X12 0.146 1 104
3 H588X300X12 0.115 1 103
4 H588X300X12 0.105 1 104
5 H588X300X12 0.154 1 104
6 H588X300X12 0.259 1 102
7 H588X300X12 0.225 1 104
8 H588X300X12 0.13 1 104
9 H588X300X12 0.107 1 104
10 H588X300X12 0.234 1 102
11 H588X300X12 0.198 1 103
12 H588X300X12 0.076 1 103
13 H588X300X12 0.071 1 103
14 H588X300X12 0.103 1 103
15 H588X300X12 0.255 1 104
16 H300X150X6.5 0.076 1 103
17 H300X150X6 5
H300X150X6.5 0 049
0.049 1 104
18 H300X150X6.5 0.062 1 103
19 H300X150X6.5 0.052 1 103
20 H400X200X8 0.026 1 103
21 H300X150X6.5 0.145 1 103
22 H300X150X6.5 0.05 1 104
23 H300X150X6.5 0.064 1 103
24 H300X150X6.5 0.07 1 103
25 H400X200X8 0.017 1 102
26 H588X300X12 0.267 1 103
27 H588X300X12 0.164 1 104
28 H588X300X12 0.15 1 104
29 H588X300X12 0.128 1 104
30 H588X300X12 0.332 1 103
31 H588X300X12 0.357 1 102
32 H588X300X12 0.211 1 102
33 H588X300X12 0.189 1 104
34 H588X300X12 0.161 1 104
35 H588X300X12 0.477 1 102
36 H588X300X12 0.152 1 103
37 H588X300X12 0.093 1 103
38 H588X300X12 0.082 1 104
39 H588X300X12 0.12 1 103
40 H588X300X12 0.542 1 103
41 H300X150X6.5 0.208 1 102
42 H300X150X6.5 0.207 1 104
43 H300X150X6.5 0.154 1 104
44 H300X150X6.5 0.437 1 102
45 H400X200X8 0.388 1 104
46 H300X150X6.5 0.109 1 103

Attachment F - Page 1 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
47 H300X150X6.5 0.138 1 103
48 H300X150X6.5 0.097 1 104
49 H300X150X6.5 0.348 1 103
50 H400X200X8 0.429 1 102
51 H588X300X12 0.29 1 103
52 H588X300X12 0.184 1 103
53 H588X300X12 0.157 1 104
54 H588X300X12 0.133 1 104
55 H588X300X12 0.333 1 104
56 H588X300X12 0.313 1 102
57 H588X300X12 0.214 1 102
58 H588X300X12 0.177 1 104
59 H588X300X12 0.163 1 104
60 H588X300X12 0.478 1 104
61 H588X300X12 0.159 1 103
62 H588X300X12 0.087 1 103
63 H588X300X12 0.094 1 104
64 H588X300X12 0.127 1 103
65 H588X300X12 0.34 1 102
66 H300X150X6.5 0.07 1 103
67 H300X150X6.5 0.044 1 103
68 H300X150X6.5 0.051 1 103
69 H300X150X6.5 0.044 1 103
70 H400X200X8 0.047 1 102
71 H300X150X6.5 0.139 1 103
72 H300X150X6.5 0.06 1 103
73 H300X150X6.5 0.055 1 103
74 H300X150X6.5 0.053 1 104
75 H400X200X8 0.058 1 102
76 H588X300X12 0.25 1 103
77 H588X300X12 0.158 1 104
78 H588X300X12 0.152 1 104
79 H588X300X12 0.127 1 104
80 H588X300X12 0.283 1 104
81 H588X300X12 0.323 1 102
82 H588X300X12 0.205 1 102
83 H588X300X12 0.167 1 104
84 H588X300X12 0.13 1 104
85 H588X300X12 0.358 1 104
86 H588X300X12 0.141 1 103
87 H588X300X12 0.099 1 103
88 H588X300X12 0.085 1 104
89 H588X300X12 0.109 1 103
90 H588X300X12 0.283 1 104
91 H300X150X6.5 0.211 1 102
92 H300X150X6.5 0.21 1 102
93 H300X150X6.5 0.154 1 104
94 H300X150X6.5 0.435 1 102
95 H400X200X8 0.471 1 102
96 H300X150X6.5 0.109 1 103
97 H300X150X6.5 0.146 1 103
98 H300X150X6.5 0.108 1 104
99 H300X150X6.5 0.353 1 103
100 H400X200X8 0.39 1 103

Attachment F - Page 2 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
101 H588X300X12 0.268 1 103
102 H588X300X12 0.184 1 103
103 H588X300X12 0.151 1 104
104 H588X300X12 0.118 1 104
105 H588X300X12 0.274 1 104
106 H588X300X12 0.269 1 102
107 H588X300X12 0.185 1 102
108 H588X300X12 0.153 1 104
109 H588X300X12 0.13 1 104
110 H588X300X12 0.366 1 104
111 H588X300X12 0.161 1 103
112 H588X300X12 0.109 1 103
113 H588X300X12 0.093 1 104
114 H588X300X12 0.11 1 103
115 H588X300X12 0.275 1 104
116 H300X150X6.5 0.07 1 102
117 H300X150X6.5 0.039 1 102
118 H300X150X6.5 0.045 1 102
119 H300X150X6.5 0.038 1 102
120 H400X200X8 0.03 1 102
121 H300X150X6.5 0.134 1 102
122 H300X150X6.5 0.074 1 103
123 H300X150X6.5 0.06 1 103
124 H300X150X6 5
H300X150X6.5 0 039
0.039 1 103
125 H400X200X8 0.033 1 102
126 H588X300X12 0.234 1 103
127 H588X300X12 0.14 1 103
128 H588X300X12 0.13 1 103
129 H588X300X12 0.1 1 104
130 H588X300X12 0.111 1 103
131 H588X300X12 0.26 1 102
132 H588X300X12 0.15 1 102
133 H588X300X12 0.115 1 102
134 H588X300X12 0.083 1 104
135 H588X300X12 0.105 1 102
136 H588X300X12 0.131 1 103
137 H588X300X12 0.098 1 103
138 H588X300X12 0.077 1 103
139 H588X300X12 0.086 1 103
140 H588X300X12 0.099 1 103
141 H300X150X6.5 0.361 1 103
142 H300X150X6.5 0.208 1 103
143 H300X150X6.5 0.154 1 102
144 H300X150X6.5 0.436 1 102
145 H400X200X8 0.373 1 104
146 H300X150X6.5 0.313 1 104
147 H300X150X6.5 0.149 1 103
148 H300X150X6.5 0.111 1 103
149 H300X150X6.5 0.349 1 104
150 H400X200X8 0.385 1 103
151 H588X300X12 0.266 1 103
152 H588X300X12 0.163 1 103
153 H588X300X12 0.121 1 103

Attachment F - Page 3 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
154 H588X300X12 0.09 1 104
155 H588X300X12 0.107 1 103
156 H588X300X12 0.232 1 102
157 H588X300X12 0.143 1 102
158 H588X300X12 0.099 1 102
159 H588X300X12 0.082 1 104
160 H588X300X12 0.111 1 102
161 H588X300X12 0.158 1 103
162 H588X300X12 0.094 1 103
163 H588X300X12 0.074 1 103
164 H588X300X12 0.086 1 103
165 H588X300X12 0.095 1 102
166 H300X150X6.5 0.083 1 103
167 H300X150X6.5 0.04 1 103
168 H300X150X6.5 0.044 1 103
169 H300X150X6.5 0.038 1 103
170 H400X200X8 0.025 1 103
171 H300X150X6.5 0.119 1 102
172 H300X150X6.5 0.057 1 103
173 H300X150X6.5 0.042 1 103
174 H300X150X6.5 0.045 1 103
175 H400X200X8 0.034 1 103
176 H588X300X12 0.18 1 103
177 H588X300X12 0 15
0.15 1 102
178 H588X300X12 0.114 1 104
179 H588X300X12 0.078 1 104
180 H588X300X12 0.085 1 103
181 H588X300X12 0.221 1 102
182 H588X300X12 0.13 1 103
183 H588X300X12 0.109 1 104
184 H588X300X12 0.072 1 104
185 H588X300X12 0.089 1 102
186 H588X300X12 0.119 1 103
187 H588X300X12 0.106 1 103
188 H588X300X12 0.064 1 103
189 H588X300X12 0.085 1 103
190 H588X300X12 0.084 1 103
191 H300X150X6.5 0.081 1 102
192 H300X150X6.5 0.093 1 102
193 H300X150X6.5 0.239 1 103
194 H300X150X6.5 0.206 1 102
195 H300X150X6.5 0.109 1 103
196 H300X150X6.5 0.24 1 102
197 H300X150X6.5 0.095 1 103
198 H300X150X6.5 0.089 1 102
199 H300X150X6.5 0.238 1 102
200 H300X150X6.5 0.208 1 102
201 H300X150X6.5 0.109 1 103
202 H300X150X6.5 0.24 1 102
203 H300X150X6.5 0.095 1 103
204 H300X150X6.5 0.074 1 102
205 H300X150X6.5 0.238 1 102
206 H300X150X6.5 0.361 1 103

Attachment F - Page 4 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
207 H300X150X6.5 0.274 1 104
208 H300X150X6.5 0.24 1 102
209 H300X150X6.5 0.077 1 102
210 H300X150X6.5 0.069 1 102
211 H300X150X6.5 0.238 1 103
212 H300X150X6.5 0.052 1 102
213 H300X150X6.5 0.046 1 102
214 H300X150X6.5 0.205 1 104
215 H300X150X6.5 0.137 1 103
216 H300X150X6.5 0.054 1 102
217 H300X150X6.5 0.054 1 102
218 H300X150X6.5 0.208 1 102
219 H300X150X6.5 0.146 1 103
220 H300X150X6.5 0.047 1 102
221 H300X150X6.5 0.048 1 102
222 H300X150X6.5 0.207 1 103
223 H300X150X6.5 0.148 1 103
224 H300X150X6.5 0.049 1 103
225 H300X150X6.5 0.051 1 102
226 H300X150X6.5 0.464 1 102
227 H300X150X6.5 0.414 1 103
228 H300X150X6.5 0.464 1 102
229 H300X150X6.5 0.414 1 102
230 H300X150X6.5 0.465 1 103
231 H300X150X6.5 0.415 1 102
232 H300X150X6.5 0.465 1 102
233 H300X150X6.5 0.043 1 102
234 H300X150X6.5 0.039 1 102
235 H300X150X6.5 0.152 1 104
236 H300X150X6.5 0.097 1 104
237 H300X150X6.5 0.048 1 102
238 H300X150X6.5 0.049 1 102
239 H300X150X6.5 0.153 1 104
240 H300X150X6.5 0.108 1 104
241 H300X150X6.5 0.046 1 102
242 H300X150X6.5 0.045 1 102
243 H300X150X6.5 0.153 1 102
244 H300X150X6.5 0.11 1 103
245 H300X150X6.5 0.042 1 102
246 H300X150X6.5 0.04 1 102
247 H300X150X6.5 0.274 1 104
248 H300X150X6.5 0.236 1 104
249 H300X150X6.5 0.274 1 104
250 H300X150X6.5 0.237 1 104
251 H300X150X6.5 0.274 1 103
252 H300X150X6.5 0.236 1 102
253 H300X150X6.5 0.274 1 102
254 H300X150X6.5 0.034 1 102
255 H300X150X6.5 0.036 1 102
256 H300X150X6.5 0.436 1 102
257 H300X150X6.5 0.348 1 103
258 H300X150X6.5 0.037 1 102
259 H300X150X6.5 0.045 1 102
260 H300X150X6.5 0.435 1 102

Attachment F - Page 5 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
261 H300X150X6.5 0.353 1 103
262 H300X150X6.5 0.035 1 104
263 H300X150X6.5 0.043 1 102
264 H300X150X6.5 0.435 1 102
265 H300X150X6.5 0.349 1 104
266 H300X150X6.5 0.032 1 102
267 H300X150X6.5 0.036 1 102
268 H300X150X6.5 0.414 1 102
269 H300X150X6.5 0.359 1 104
270 H300X150X6.5 0.413 1 102
271 H300X150X6.5 0.36 1 102
272 H300X150X6.5 0.413 1 103
273 H300X150X6.5 0.36 1 103
274 H300X150X6.5 0.414 1 103
275 H400X200X8 0.017 1 103
276 H400X200X8 0.046 1 103
277 H400X200X8 0.388 1 104
278 H400X200X8 0.429 1 102
279 H400X200X8 0.037 1 102
280 H400X200X8 0.028 1 103
281 H400X200X8 0.471 1 102
282 H400X200X8 0.39 1 103
283 H400X200X8 0.026 1 103
284 H400X200X8 0.026 1 102
285 H400X200X8 0.373 1 104
286 H400X200X8 0.385 1 103
287 H400X200X8 0.022 1 102
288 H400X200X8 0.021 1 102
289 H400X200X8 0.535 1 103
290 H400X200X8 0.535 1 103
291 H400X200X8 0.538 1 103
292 H400X200X8 0.519 1 102
293 H400X200X8 0.506 1 102
294 H400X200X8 0.505 1 102
295 H400X200X8 0.558 1 103
296 H588X300X12 0.291 1 102
297 H300X150X6.5 0.239 1 102
298 H200X100X5.5 0.062 1 101
299 H588X300X12 0.167 1 102
300 H300X150X6.5 0.24 1 103
301 H200X100X5.5 0.015 1 103
302 H588X300X12 0.369 1 102
303 H300X150X6.5 0.238 1 103
304 H200X100X5.5 0.077 1 103
305 H588X300X12 0.156 1 102
306 H300X150X6.5 0.24 1 103
307 H200X100X5.5 0.014 1 103
308 H588X300X12 0.367 1 102
309 H300X150X6.5 0.238 1 103
310 H200X100X5.5 0.084 1 103
311 H588X300X12 0.142 1 102
312 H300X150X6.5 0.243 1 103
313 H200X100X5.5 0.013 1 102
314 H588X300X12 0.361 1 102

Attachment F - Page 6 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
315 H300X150X6.5 0.238 1 102
316 H200X100X5.5 0.089 1 102
317 H588X300X12 0.085 1 102
318 H200X100X5.5 0.016 1 102
319 H200X100X5.5 0.076 1 102
320 H200X100X5.5 0.013 1 102
321 H200X100X5.5 0.077 1 102
322 H200X100X5.5 0.012 1 103
323 H200X100X5.5 0.079 1 103
324 H200X100X5.5 0.021 1 103
325 H588X300X12 0.038 1 102
326 H300X150X6.5 0.431 1 103
327 H588X300X12 0.084 1 102
328 H300X150X6.5 0.356 1 102
329 H588X300X12 0.075 1 102
330 H300X150X6.5 0.43 1 103
331 H588X300X12 0.109 1 102
332 H300X150X6.5 0.356 1 103
333 H588X300X12 0.117 1 102
334 H300X150X6.5 0.43 1 102
335 H588X300X12 0.155 1 102
336 H300X150X6.5 0.355 1 102
337 H588X300X12 0.092 1 102
338 H300X150X6.5 0.43 1 103
339 H588X300X12 0.15 1 102
340 H200X100X5.5 0.012 1 103
341 H200X100X5.5 0.017 1 102
342 H200X100X5.5 0.019 1 103
343 H200X100X5.5 0.015 1 102
344 H200X100X5.5 0.021 1 103
345 H200X100X5.5 0.023 1 102
346 H200X100X5.5 0.045 1 103
347 H200X100X5.5 0.032 1 102
348 H200X100X5.5 0.015 1 102
349 H200X100X5.5 0.045 1 102
350 H200X100X5.5 0.016 1 104
351 H200X100X5.5 0.074 1 103
352 H200X100X5.5 0.034 1 102
353 H200X100X5.5 0.052 1 103
354 H588X300X12 0.046 1 103
355 H300X150X6.5 0.269 1 104
356 H588X300X12 0.064 1 104
357 H300X150X6.5 0.194 1 102
358 H588X300X12 0.075 1 104
359 H300X150X6.5 0.268 1 104
360 H588X300X12 0.069 1 104
361 H300X150X6.5 0.193 1 103
362 H588X300X12 0.075 1 104
363 H300X150X6.5 0.268 1 102
364 H588X300X12 0.067 1 104
365 H300X150X6.5 0.194 1 103
366 H588X300X12 0.049 1 104
367 H300X150X6.5 0.269 1 103
368 H588X300X12 0.031 1 104

Attachment F - Page 7 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
369 H200X100X5.5 0.012 1 101
370 H200X100X5.5 0.026 1 102
371 H200X100X5.5 0.052 1 102
372 H200X100X5.5 0.018 1 103
373 H200X100X5.5 0.069 1 102
374 H200X100X5.5 0.016 1 102
375 H200X100X5.5 0.04 1 102
376 H200X100X5.5 0.029 1 103
377 H200X100X5.5 0.024 1 103
378 H200X100X5.5 0.02 1 103
379 H200X100X5.5 0.016 1 103
380 H200X100X5.5 0.014 1 103
381 H200X100X5.5 0.018 1 102
382 H200X100X5.5 0.012 1 101
383 H588X300X12 0.055 1 102
384 H300X150X6.5 0.414 1 102
385 H588X300X12 0.061 1 102
386 H300X150X6.5 0.339 1 104
387 H588X300X12 0.064 1 102
388 H300X150X6.5 0.413 1 102
389 H588X300X12 0.063 1 102
390 H300X150X6.5 0.339 1 102
391 H588X300X12 0.069 1 102
392 H300X150X6.5 0.413 1 103
393 H588X300X12 0.051 1 102
394 H300X150X6.5 0.339 1 103
395 H588X300X12 0.047 1 102
396 H300X150X6.5 0.414 1 103
397 H588X300X12 0.024 1 102
398 H200X100X5.5 0.014 1 101
399 H200X100X5.5 0.013 1 104
400 H200X100X5.5 0.028 1 104
401 H200X100X5.5 0.015 1 102
402 H200X100X5.5 0.032 1 102
403 H200X100X5.5 0.016 1 103
404 H200X100X5.5 0.024 1 103
405 H200X100X5.5 0.012 1 104
406 H200X100X5.5 0.013 1 104
407 H200X100X5.5 0.015 1 102
408 H200X100X5.5 0.015 1 102
409 H200X100X5.5 0.016 1 103
410 H200X100X5.5 0.017 1 103
411 H200X100X5.5 0.012 1 101
412 H588X300X12 0.338 1 104
413 H400X200X8 0.535 1 103
414 H588X300X12 0.848 1 102
415 H400X200X8 0.535 1 103
416 H588X300X12 0.437 1 102
417 H400X200X8 0.537 1 102
418 H588X300X12 0.362 1 104
419 H400X200X8 0.505 1 103
420 H588X300X12 0.36 1 104
421 H400X200X8 0.505 1 102
422 H588X300X12 0.092 1 102

Attachment F - Page 8 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
423 H400X200X8 0.505 1 102
424 H588X300X12 0.098 1 102
425 H400X200X8 0.557 1 103
426 H588X300X12 0.083 1 102
427 H200X100X5.5 0.017 1 101
428 H200X100X5.5 0.166 1 103
429 H200X100X5.5 0.086 1 102
430 H200X100X5.5 0.053 1 102
431 H200X100X5.5 0.027 1 103
432 H200X100X5.5 0.023 1 103
433 H200X100X5.5 0.016 1 102
434 H200X100X5.5 0.119 1 103
435 H200X100X5.5 0.082 1 103
436 H200X100X5.5 0.054 1 102
437 H200X100X5.5 0.028 1 102
438 H200X100X5.5 0.023 1 103
439 H200X100X5.5 0.013 1 103
440 H200X100X5.5 0.012 1 103
441 T150X150 0.013 1 102
442 T150X150 0.092 1 102
443 T150X150 0.009 1 102
444 T150X150 0.077 1 103
449 T150X150 0.083 1 102
450 T150X150 0.009 1 103
451 T150X150 0.089 1 103
452 T150X150 0.006 1 102
453 T150X150 0.004 1 103
454 T150X150 0.06 1 102
455 T150X150 0.006 1 102
456 T150X150 0.057 1 103
461 T150X150 0.106 1 103
462 T150X150 0.015 1 102
463 T150X150 0.098 1 102
464 T150X150 0.024 1 103
465 T150X150 0.008 1 103
466 T150X150 0.031 1 102
467 T150X150 0.013 1 102
468 T150X150 0.02 1 103
473 T150X150 0.032 1 103
474 T150X150 0.008 1 102
475 T150X150 0.027 1 102
476 T150X150 0.006 1 103
477 T150X150 0.03 1 102
478 T150X150 0.029 1 102
479 T150X150 0.017 1 103
480 T150X150 0.02 1 103
485 T150X150 0.011 1 103
486 T150X150 0.019 1 103
487 T150X150 0.017 1 102
488 T150X150 0.013 1 102
489 T150X150 0.152 1 103
490 T150X150 0.104 1 103
491 T150X150 0.11 1 102
492 T150X150 0.083 1 102

Attachment F - Page 9 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
497 T150X150 0.025 1 103
498 T150X150 0.022 1 102
499 T150X150 0.02 1 102
500 T150X150 0.017 1 103
501 T200X200 0.215 1 103
502 T200X200 0.191 1 102
505 T200X200 0.224 1 103
506 T200X200 0.242 1 102
507 T200X200 0.306 1 103
508 T200X200 0.278 1 102
511 T200X200 0.227 1 103
512 T200X200 0.245 1 102
513 T200X200 0.101 1 103
514 T200X200 0.083 1 102
517 T200X200 0.087 1 103
518 T200X200 0.096 1 102
519 T200X200 0.091 1 103
520 T200X200 0.062 1 102
523 T200X200 0.087 1 103
524 T200X200 0.095 1 102
525 T200X200 0.105 1 103
526 T200X200 0.078 1 102
529 T200X200 0.068 1 103
530 T200X200 0.078 1 102
531 T200X200 0.096 1 103
532 T200X200 0.043 1 102
535 T200X200 0.072 1 103
536 T200X200 0.074 1 102
537 T200X200 0.097 1 103
538 T200X200 0.072 1 102
541 T200X200 0.069 1 103
542 T200X200 0.073 1 102
543 T200X200 0.117 1 103
544 T200X200 0.054 1 102
547 T200X200 0.08 1 103
548 T200X200 0.069 1 102
549 T200X200 0.124 1 103
550 T200X200 0.098 1 102
553 T200X200 0.098 1 103
554 T200X200 0.099 1 102
555 T200X200 0.184 1 103
556 T200X200 0.124 1 102
559 T200X200 0.131 1 103
560 T200X200 0.107 1 102
561 H300X150X6.5 0.132 1 102
563 H300X150X6.5 0.074 1 103
565 H300X150X6.5 0.073 1 103
567 H300X150X6.5 0.068 1 103
568 H300X150X6.5 0.01 1 102
570 H300X150X6.5 0.008 1 102
611 H588X300X12 0.294 1 103
612 H588X300X12 0.206 1 103
613 H200X100X5.5 0.013 1 101
614 H200X100X5.5 0.013 1 101

Attachment F - Page 10 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
615 H588X300X12 0.175 1 103
616 H588X300X12 0.144 1 103
617 H200X100X5.5 0.013 1 101
618 H200X100X5.5 0.013 1 101
619 H588X300X12 0.125 1 103
620 H588X300X12 0.112 1 103
621 H200X100X5.5 0.013 1 101
622 H200X100X5.5 0.013 1 101
623 H588X300X12 0.106 1 103
624 H588X300X12 0.097 1 103
625 H200X100X5.5 0.013 1 101
626 H200X100X5.5 0.013 1 101
627 H588X300X12 0.269 1 104
628 H588X300X12 0.093 1 103
629 H200X100X5.5 0.041 1 101
630 H200X100X5.5 0.041 1 101
631 H588X300X12 0.282 1 102
632 H588X300X12 0.253 1 102
633 H588X300X12 0.202 1 102
634 H588X300X12 0.166 1 102
635 H588X300X12 0.129 1 102
636 H588X300X12 0.087 1 104
637 H588X300X12 0.132 1 103
638 H588X300X12 0.082 1 102
639 H588X300X12 0.344 1 102
640 H588X300X12 0.101 1 102
641 H200X100X5.5 0.013 1 101
642 H200X100X5.5 0.013 1 101
643 H200X100X5.5 0.013 1 101
644 H200X100X5.5 0.013 1 101
645 H200X100X5.5 0.013 1 101
646 H200X100X5.5 0.013 1 101
647 H200X100X5.5 0.013 1 101
648 H200X100X5.5 0.013 1 101
649 H200X100X5.5 0.041 1 101
650 H200X100X5.5 0.041 1 101
651 H588X300X12 0.204 1 102
652 H588X300X12 0.236 1 102
653 H200X100X5.5 0.081 1 102
654 H200X100X5.5 0.087 1 102
655 H588X300X12 0.058 1 102
656 H588X300X12 0.126 1 102
657 H200X100X5.5 0.01 1 102
658 H200X100X5.5 0.01 1 102
659 H588X300X12 0.041 1 102
660 H588X300X12 0.065 1 102
661 H200X100X5.5 0.006 1 103
662 H200X100X5.5 0.006 1 103
663 H588X300X12 0.042 1 102
664 H588X300X12 0.047 1 102
665 H200X100X5.5 0.016 1 102
666 H200X100X5.5 0.015 1 102
667 H588X300X12 0.061 1 102
668 H588X300X12 0.056 1 102

Attachment F - Page 11 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
669 H200X100X5.5 0.014 1 102
670 H200X100X5.5 0.013 1 102
671 H588X300X12 0.249 1 104
672 H588X300X12 0.302 1 102
673 H200X100X5.5 0.008 1 102
674 H200X100X5.5 0.008 1 102
675 H588X300X12 0.089 1 102
676 H588X300X12 0.112 1 102
677 H200X100X5.5 0.033 1 102
678 H200X100X5.5 0.035 1 102
679 H588X300X12 0.024 1 104
680 H588X300X12 0.048 1 104
681 H200X100X5.5 0.008 1 103
682 H200X100X5.5 0.008 1 103
683 H588X300X12 0.025 1 102
684 H588X300X12 0.045 1 102
685 H200X100X5.5 0.004 1 101
686 H200X100X5.5 0.004 1 101
687 H588X300X12 0.082 1 102
688 H588X300X12 0.091 1 102
689 H200X100X5.5 0.005 1 103
690 H200X100X5.5 0.005 1 103
691 T150X150 0.018 1 103
692 T150X150 0.041 1 103
693 T150X150 0.028 1 103
694 T150X150 0.046 1 102
695 T200X200 0.216 1 103
696 T200X200 0.208 1 102
697 T200X200 0.273 1 103
698 T200X200 0.273 1 102
699 T150X150 0.041 1 102
700 T150X150 0.028 1 103
701 T150X150 0.044 1 103
702 T150X150 0.022 1 103
703 T200X200 0.224 1 103
704 T200X200 0.229 1 102
705 T200X200 0.243 1 103
706 T200X200 0.262 1 102
707 T150X150 0.039 1 103
708 T150X150 0.042 1 102
709 T150X150 0.036 1 102
710 T150X150 0.045 1 103
711 T200X200 0.093 1 103
712 T200X200 0.09 1 102
713 T200X200 0.082 1 103
714 T200X200 0.09 1 102
715 T150X150 0.068 1 103
716 T150X150 0.054 1 102
717 T150X150 0.067 1 102
718 T150X150 0.058 1 103
719 T200X200 0.086 1 103
720 T200X200 0.091 1 102
721 T200X200 0.076 1 103
722 T200X200 0.099 1 102

Attachment F - Page 12 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
723 T150X150 0.031 1 103
724 T150X150 0.057 1 102
725 T150X150 0.025 1 102
726 T150X150 0.036 1 103
727 T200X200 0.087 1 103
728 T200X200 0.085 1 102
729 T200X200 0.063 1 103
730 T200X200 0.081 1 102
731 T150X150 0.03 1 103
732 T150X150 0.051 1 102
733 T150X150 0.027 1 102
734 T150X150 0.039 1 103
735 T200X200 0.074 1 102
736 T200X200 0.084 1 102
737 T200X200 0.053 1 103
738 T200X200 0.095 1 102
739 T150X150 0.017 1 103
740 T150X150 0.023 1 103
741 T150X150 0.03 1 102
742 T150X150 0.027 1 102
743 T200X200 0.08 1 103
744 T200X200 0.083 1 102
745 T200X200 0.064 1 103
746 T200X200 0.093 1 102
747 T150X150 0.011 1 103
748 T150X150 0.02 1 103
749 T150X150 0.02 1 102
750 T150X150 0.028 1 102
751 T200X200 0.069 1 103
752 T200X200 0.082 1 102
753 T200X200 0.051 1 103
754 T200X200 0.1 1 102
755 T150X150 0.076 1 102
756 T150X150 0.045 1 102
757 T150X150 0.122 1 102
758 T150X150 0.084 1 103
759 T200X200 0.105 1 103
760 T200X200 0.116 1 102
761 T200X200 0.115 1 104
762 T200X200 0.148 1 102
763 T150X150 0.027 1 102
764 T150X150 0.037 1 102
765 T150X150 0.052 1 103
766 T150X150 0.069 1 103
767 T200X200 0.088 1 103
768 T200X200 0.111 1 104
769 T200X200 0.094 1 103
770 T200X200 0.139 1 102
803 T150X150 0.089 1 103
804 T150X150 0.081 1 102
805 T150X150 0.055 1 103
806 T150X150 0.089 1 104
807 T150X150 0.133 1 102
808 T150X150 0.097 1 102

Attachment F - Page 13 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
809 T150X150 0.159 1 103
810 T150X150 0.061 1 103
811 T150X150 0.007 1 102
812 T150X150 0.025 1 102
813 T150X150 0.023 1 103
814 T150X150 0.008 1 103
815 T150X150 0.078 1 102
816 T150X150 0.008 1 102
817 T150X150 0.064 1 103
818 T150X150 0.016 1 103
819 T150X150 0.029 1 103
820 T150X150 0.046 1 102
821 T150X150 0.027 1 103
822 T150X150 0.051 1 103
823 T150X150 0.127 1 102
824 T150X150 0.019 1 102
825 T150X150 0.111 1 103
826 T150X150 0.019 1 103
827 H300X150X6.5 0.131 1 102
828 H200X100X5.5 0.099 1 102
829 H300X150X6.5 0.075 1 103
830 H200X100X5.5 0.004 1 102
831 H300X150X6.5 0.073 1 102
832 H300X150X6.5 0.096 1 103
833 H300X150X6.5 0.007 1 103
834 H300X150X6.5 0.007 1 103
835 H300X150X6.5 0.025 1 102
836 H300X150X6.5 0.028 1 102
837 H300X150X6.5 0.075 1 102
838 H200X100X5.5 0.005 1 102
839 H300X150X6.5 0.089 1 103
840 H200X100X5.5 0.032 1 103
841 H300X150X6.5 0.08 1 102
842 H300X150X6.5 0.076 1 103
843 H300X150X6.5 0.015 1 103
844 H300X150X6.5 0.017 1 103
845 H300X150X6.5 0.007 1 102
846 H300X150X6.5 0.007 1 102
847 H300X150X6.5 0.083 1 102
848 H200X100X5.5 0.019 1 102
849 H300X150X6.5 0.075 1 103
850 H200X100X5.5 0.004 1 103
851 H300X150X6.5 0.077 1 102
852 H300X150X6.5 0.071 1 101
853 H300X150X6.5 0.015 1 104
854 H300X150X6.5 0.015 1 104
855 H300X150X6.5 0.005 1 102
856 H300X150X6.5 0.005 1 102
857 H300X150X6.5 0.077 1 102
858 H200X100X5.5 0.017 1 101
859 H300X150X6.5 0.071 1 101
860 H200X100X5.5 0.003 1 103
861 H300X150X6.5 0.28 1 102
862 H300X150X6.5 0.275 1 103

Attachment F - Page 14 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
863 H300X150X6.5 0.013 1 103
864 H300X150X6.5 0.013 1 103
865 H300X150X6.5 0.013 1 102
866 H300X150X6.5 0.012 1 102
867 H300X150X6.5 0.28 1 102
868 H200X100X5.5 0.003 1 102
869 H300X150X6.5 0.274 1 103
870 H200X100X5.5 0.004 1 103

F.2. Stress Ratio Temporary Condition

Beam No. Design Property Actual Ratio Allow. Ratio L/C


1 H588X300X12 0.585 1.33 123
2 H588X300X12 0.21 1.33 148
3 H588X300X12 0.24 1.33 123
4 H588X300X12 0.21 1.33 150
5 H588X300X12 0.202 1.33 115
6 H588X300X12 0.59 1.33 121
7 H588X300X12 0.253 1.33 121
8 H588X300X12 0.253 1.33 149
9 H588X300X12 0.212 1.33 149
10 H588X300X12 0.261 1.33 113
11 H588X300X12 0.59 1.33 123
12 H588X300X12 0.389 1.33 123
13 H588X300X12 0.321 1.33 123
14 H588X300X12 0.305 1.33 123
15 H588X300X12 0.37 1.33 115
16 H300X150X6.5 0.144 1.33 127
17 H300X150X6.5 0.115 1.33 125
18 H300X150X6.5 0.112 1.33 127
19 H300X150X6.5 0.099 1.33 119
20 H400X200X8 0.04 1.33 127
21 H300X150X6.5 0.224 1.33 127
22 H300X150X6.5 0.127 1.33 125
23 H300X150X6.5 0.114 1.33 125
24 H300X150X6.5 0.117 1.33 125
25 H400X200X8 0.044 1.33 118
26 H588X300X12 0.777 1.33 123
27 H588X300X12 0.382 1.33 123
28 H588X300X12 0.309 1.33 150
29 H588X300X12 0.221 1.33 150
30 H588X300X12 0.44 1.33 115
31 H588X300X12 0.857 1.33 121
32 H588X300X12 0.417 1.33 121
33 H588X300X12 0.329 1.33 149
34 H588X300X12 0.277 1.33 145
35 H588X300X12 0.569 1.33 113
36 H588X300X12 0.626 1.33 123
37 H588X300X12 0.417 1.33 123
38 H588X300X12 0.354 1.33 150
39 H588X300X12 0.333 1.33 123
40 H588X300X12 0.554 1.33 115

Attachment F - Page 15 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
41 H300X150X6.5 0.22 1.33 105
42 H300X150X6.5 0.278 1.33 121
43 H300X150X6.5 0.211 1.33 149
44 H300X150X6.5 0.749 1.33 121
45 H400X200X8 0.401 1.33 116
46 H300X150X6.5 0.121 1.33 107
47 H300X150X6.5 0.216 1.33 123
48 H300X150X6.5 0.155 1.33 150
49 H300X150X6.5 0.668 1.33 123
50 H400X200X8 0.442 1.33 115
51 H588X300X12 0.761 1.33 123
52 H588X300X12 0.368 1.33 123
53 H588X300X12 0.295 1.33 150
54 H588X300X12 0.216 1.33 150
55 H588X300X12 0.441 1.33 115
56 H588X300X12 0.782 1.33 121
57 H588X300X12 0.365 1.33 121
58 H588X300X12 0.312 1.33 149
59 H588X300X12 0.261 1.33 145
60 H588X300X12 0.57 1.33 145
61 H588X300X12 0.595 1.33 123
62 H588X300X12 0.398 1.33 123
63 H588X300X12 0.348 1.33 150
64 H588X300X12 0.332 1.33 123
65 H588X300X12 0.464 1.33 113
66 H300X150X6.5 0.138 1.33 125
67 H300X150X6.5 0.114 1.33 125
68 H300X150X6.5 0.11 1.33 125
69 H300X150X6.5 0.096 1.33 125
70 H400X200X8 0.067 1.33 125
71 H300X150X6.5 0.22 1.33 125
72 H300X150X6.5 0.148 1.33 125
73 H300X150X6.5 0.138 1.33 125
74 H300X150X6.5 0.141 1.33 125
75 H400X200X8 0.12 1.33 118
76 H588X300X12 0.708 1.33 123
77 H588X300X12 0.359 1.33 123
78 H588X300X12 0.294 1.33 150
79 H588X300X12 0.212 1.33 150
80 H588X300X12 0.368 1.33 146
81 H588X300X12 0.777 1.33 121
82 H588X300X12 0.386 1.33 121
83 H588X300X12 0.307 1.33 121
84 H588X300X12 0.239 1.33 145
85 H588X300X12 0.427 1.33 145
86 H588X300X12 0.573 1.33 123
87 H588X300X12 0.393 1.33 123
88 H588X300X12 0.324 1.33 150
89 H588X300X12 0.284 1.33 123
90 H588X300X12 0.38 1.33 146
91 H300X150X6.5 0.224 1.33 105
92 H300X150X6.5 0.277 1.33 121
93 H300X150X6.5 0.212 1.33 149
94 H300X150X6.5 0.74 1.33 121

Attachment F - Page 16 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
95 H400X200X8 0.477 1.33 117
96 H300X150X6.5 0.122 1.33 107
97 H300X150X6.5 0.22 1.33 123
98 H300X150X6.5 0.166 1.33 150
99 H300X150X6.5 0.665 1.33 123
100 H400X200X8 0.409 1.33 115
101 H588X300X12 0.686 1.33 123
102 H588X300X12 0.341 1.33 123
103 H588X300X12 0.262 1.33 150
104 H588X300X12 0.188 1.33 146
105 H588X300X12 0.364 1.33 146
106 H588X300X12 0.695 1.33 121
107 H588X300X12 0.327 1.33 121
108 H588X300X12 0.252 1.33 149
109 H588X300X12 0.207 1.33 145
110 H588X300X12 0.44 1.33 145
111 H588X300X12 0.539 1.33 123
112 H588X300X12 0.374 1.33 123
113 H588X300X12 0.303 1.33 150
114 H588X300X12 0.277 1.33 123
115 H588X300X12 0.377 1.33 146
116 H300X150X6.5 0.144 1.33 125
117 H300X150X6.5 0.116 1.33 125
118 H300X150X6 5
H300X150X6.5 0 108
0.108 1 33
1.33 125
119 H300X150X6.5 0.094 1.33 125
120 H400X200X8 0.053 1.33 125
121 H300X150X6.5 0.214 1.33 125
122 H300X150X6.5 0.16 1.33 125
123 H300X150X6.5 0.144 1.33 125
124 H300X150X6.5 0.134 1.33 125
125 H400X200X8 0.084 1.33 125
126 H588X300X12 0.639 1.33 123
127 H588X300X12 0.315 1.33 123
128 H588X300X12 0.249 1.33 123
129 H588X300X12 0.188 1.33 123
130 H588X300X12 0.174 1.33 115
131 H588X300X12 0.675 1.33 121
132 H588X300X12 0.323 1.33 121
133 H588X300X12 0.235 1.33 121
134 H588X300X12 0.181 1.33 121
135 H588X300X12 0.151 1.33 113
136 H588X300X12 0.511 1.33 123
137 H588X300X12 0.348 1.33 123
138 H588X300X12 0.271 1.33 123
139 H588X300X12 0.205 1.33 123
140 H588X300X12 0.165 1.33 115
141 H300X150X6.5 0.374 1.33 105
142 H300X150X6.5 0.277 1.33 115
143 H300X150X6.5 0.212 1.33 121
144 H300X150X6.5 0.743 1.33 122
145 H400X200X8 0.379 1.33 118
146 H300X150X6.5 0.321 1.33 142
147 H300X150X6.5 0.223 1.33 115

Attachment F - Page 17 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
148 H300X150X6.5 0.169 1.33 123
149 H300X150X6.5 0.665 1.33 149
150 H400X200X8 0.394 1.33 119
151 H588X300X12 0.618 1.33 123
152 H588X300X12 0.298 1.33 123
153 H588X300X12 0.213 1.33 123
154 H588X300X12 0.169 1.33 123
155 H588X300X12 0.172 1.33 115
156 H588X300X12 0.627 1.33 121
157 H588X300X12 0.262 1.33 121
158 H588X300X12 0.185 1.33 121
159 H588X300X12 0.153 1.33 121
160 H588X300X12 0.17 1.33 116
161 H588X300X12 0.486 1.33 123
162 H588X300X12 0.322 1.33 123
163 H588X300X12 0.239 1.33 123
164 H588X300X12 0.197 1.33 123
165 H588X300X12 0.163 1.33 115
166 H300X150X6.5 0.16 1.33 125
167 H300X150X6.5 0.118 1.33 125
168 H300X150X6.5 0.1 1.33 125
169 H300X150X6.5 0.083 1.33 125
170 H400X200X8 0.039 1.33 119
171 H300X150X6 5
H300X150X6.5 0 199
0.199 1 33
1.33 125
172 H300X150X6.5 0.139 1.33 125
173 H300X150X6.5 0.109 1.33 125
174 H300X150X6.5 0.088 1.33 125
175 H400X200X8 0.053 1.33 119
176 H588X300X12 0.437 1.33 123
177 H588X300X12 0.175 1.33 117
178 H588X300X12 0.172 1.33 146
179 H588X300X12 0.121 1.33 146
180 H588X300X12 0.103 1.33 115
181 H588X300X12 0.452 1.33 121
182 H588X300X12 0.17 1.33 121
183 H588X300X12 0.167 1.33 149
184 H588X300X12 0.115 1.33 145
185 H588X300X12 0.107 1.33 116
186 H588X300X12 0.42 1.33 123
187 H588X300X12 0.295 1.33 123
188 H588X300X12 0.198 1.33 123
189 H588X300X12 0.158 1.33 123
190 H588X300X12 0.137 1.33 115
191 H300X150X6.5 0.159 1.33 127
192 H300X150X6.5 0.182 1.33 127
193 H300X150X6.5 0.242 1.33 108
194 H300X150X6.5 0.218 1.33 105
195 H300X150X6.5 0.121 1.33 107
196 H300X150X6.5 0.241 1.33 105
197 H300X150X6.5 0.173 1.33 127
198 H300X150X6.5 0.172 1.33 127
199 H300X150X6.5 0.241 1.33 105
200 H300X150X6.5 0.221 1.33 105

Attachment F - Page 18 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
201 H300X150X6.5 0.122 1.33 107
202 H300X150X6.5 0.241 1.33 105
203 H300X150X6.5 0.174 1.33 127
204 H300X150X6.5 0.16 1.33 127
205 H300X150X6.5 0.241 1.33 105
206 H300X150X6.5 0.374 1.33 107
207 H300X150X6.5 0.287 1.33 142
208 H300X150X6.5 0.241 1.33 105
209 H300X150X6.5 0.156 1.33 127
210 H300X150X6.5 0.159 1.33 127
211 H300X150X6.5 0.241 1.33 108
212 H300X150X6.5 0.129 1.33 127
213 H300X150X6.5 0.13 1.33 127
214 H300X150X6.5 0.276 1.33 121
215 H300X150X6.5 0.215 1.33 123
216 H300X150X6.5 0.133 1.33 127
217 H300X150X6.5 0.119 1.33 127
218 H300X150X6.5 0.276 1.33 121
219 H300X150X6.5 0.22 1.33 123
220 H300X150X6.5 0.127 1.33 127
221 H300X150X6.5 0.112 1.33 127
222 H300X150X6.5 0.276 1.33 115
223 H300X150X6.5 0.223 1.33 115
224 H300X150X6.5 0.124 1.33 127
225 H300X150X6.5 0.136 1.33 127
226 H300X150X6.5 0.467 1.33 113
227 H300X150X6.5 0.414 1.33 115
228 H300X150X6.5 0.467 1.33 105
229 H300X150X6.5 0.415 1.33 114
230 H300X150X6.5 0.467 1.33 108
231 H300X150X6.5 0.415 1.33 118
232 H300X150X6.5 0.467 1.33 105
233 H300X150X6.5 0.11 1.33 127
234 H300X150X6.5 0.117 1.33 127
235 H300X150X6.5 0.21 1.33 149
236 H300X150X6.5 0.155 1.33 150
237 H300X150X6.5 0.11 1.33 127
238 H300X150X6.5 0.091 1.33 127
239 H300X150X6.5 0.211 1.33 149
240 H300X150X6.5 0.166 1.33 150
241 H300X150X6.5 0.102 1.33 125
242 H300X150X6.5 0.086 1.33 127
243 H300X150X6.5 0.211 1.33 121
244 H300X150X6.5 0.168 1.33 123
245 H300X150X6.5 0.094 1.33 127
246 H300X150X6.5 0.107 1.33 127
247 H300X150X6.5 0.277 1.33 145
248 H300X150X6.5 0.237 1.33 146
249 H300X150X6.5 0.277 1.33 145
250 H300X150X6.5 0.237 1.33 146
251 H300X150X6.5 0.277 1.33 108
252 H300X150X6.5 0.237 1.33 114
253 H300X150X6.5 0.277 1.33 105
254 H300X150X6.5 0.087 1.33 127

Attachment F - Page 19 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
255 H300X150X6.5 0.109 1.33 127
256 H300X150X6.5 0.748 1.33 121
257 H300X150X6.5 0.668 1.33 123
258 H300X150X6.5 0.08 1.33 152
259 H300X150X6.5 0.077 1.33 127
260 H300X150X6.5 0.74 1.33 121
261 H300X150X6.5 0.665 1.33 123
262 H300X150X6.5 0.068 1.33 117
263 H300X150X6.5 0.072 1.33 117
264 H300X150X6.5 0.742 1.33 122
265 H300X150X6.5 0.665 1.33 149
266 H300X150X6.5 0.076 1.33 127
267 H300X150X6.5 0.087 1.33 127
268 H300X150X6.5 0.42 1.33 113
269 H300X150X6.5 0.36 1.33 146
270 H300X150X6.5 0.42 1.33 113
271 H300X150X6.5 0.36 1.33 114
272 H300X150X6.5 0.42 1.33 116
273 H300X150X6.5 0.361 1.33 146
274 H300X150X6.5 0.42 1.33 116
275 H400X200X8 0.035 1.33 127
276 H400X200X8 0.079 1.33 127
277 H400X200X8 0.401 1.33 116
278 H400X200X8 0.442 1.33 115
279 H400X200X8 0.056 1.33 121
280 H400X200X8 0.06 1.33 123
281 H400X200X8 0.479 1.33 117
282 H400X200X8 0.411 1.33 115
283 H400X200X8 0.032 1.33 115
284 H400X200X8 0.032 1.33 113
285 H400X200X8 0.379 1.33 118
286 H400X200X8 0.396 1.33 119
287 H400X200X8 0.03 1.33 117
288 H400X200X8 0.028 1.33 117
289 H400X200X8 0.54 1.33 119
290 H400X200X8 0.539 1.33 119
291 H400X200X8 0.542 1.33 119
292 H400X200X8 0.522 1.33 117
293 H400X200X8 0.509 1.33 117
294 H400X200X8 0.508 1.33 116
295 H400X200X8 0.561 1.33 116
296 H588X300X12 0.523 1.33 121
297 H300X150X6.5 0.242 1.33 106
298 H200X100X5.5 0.066 1.33 127
299 H588X300X12 0.64 1.33 121
300 H300X150X6.5 0.241 1.33 107
301 H200X100X5.5 0.017 1.33 119
302 H588X300X12 0.608 1.33 121
303 H300X150X6.5 0.241 1.33 106
304 H200X100X5.5 0.081 1.33 119
305 H588X300X12 0.588 1.33 121
306 H300X150X6.5 0.241 1.33 106
307 H200X100X5.5 0.015 1.33 119
308 H588X300X12 0.573 1.33 121

Attachment F - Page 20 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
309 H300X150X6.5 0.241 1.33 107
310 H200X100X5.5 0.088 1.33 119
311 H588X300X12 0.522 1.33 121
312 H300X150X6.5 0.244 1.33 107
313 H200X100X5.5 0.016 1.33 125
314 H588X300X12 0.539 1.33 121
315 H300X150X6.5 0.241 1.33 106
316 H200X100X5.5 0.093 1.33 109
317 H588X300X12 0.269 1.33 121
318 H200X100X5.5 0.017 1.33 109
319 H200X100X5.5 0.08 1.33 109
320 H200X100X5.5 0.014 1.33 109
321 H200X100X5.5 0.082 1.33 109
322 H200X100X5.5 0.013 1.33 111
323 H200X100X5.5 0.083 1.33 111
324 H200X100X5.5 0.025 1.33 111
325 H588X300X12 0.236 1.33 121
326 H300X150X6.5 0.433 1.33 115
327 H588X300X12 0.404 1.33 121
328 H300X150X6.5 0.357 1.33 113
329 H588X300X12 0.387 1.33 121
330 H300X150X6.5 0.433 1.33 107
331 H588X300X12 0.391 1.33 121
332 H300X150X6.5 0.357 1.33 119
333 H588X300X12 0.38 1.33 121
334 H300X150X6.5 0.432 1.33 106
335 H588X300X12 0.341 1.33 121
336 H300X150X6.5 0.356 1.33 113
337 H588X300X12 0.32 1.33 121
338 H300X150X6.5 0.432 1.33 107
339 H588X300X12 0.219 1.33 121
340 H200X100X5.5 0.015 1.33 109
341 H200X100X5.5 0.018 1.33 117
342 H200X100X5.5 0.023 1.33 109
343 H200X100X5.5 0.016 1.33 117
344 H200X100X5.5 0.035 1.33 125
345 H200X100X5.5 0.024 1.33 110
346 H200X100X5.5 0.057 1.33 125
347 H200X100X5.5 0.041 1.33 111
348 H200X100X5.5 0.015 1.33 109
349 H200X100X5.5 0.056 1.33 127
350 H200X100X5.5 0.016 1.33 147
351 H200X100X5.5 0.083 1.33 127
352 H200X100X5.5 0.037 1.33 118
353 H200X100X5.5 0.061 1.33 119
354 H588X300X12 0.214 1.33 123
355 H300X150X6.5 0.272 1.33 142
356 H588X300X12 0.338 1.33 149
357 H300X150X6.5 0.194 1.33 113
358 H588X300X12 0.336 1.33 149
359 H300X150X6.5 0.271 1.33 142
360 H588X300X12 0.309 1.33 149
361 H300X150X6.5 0.194 1.33 116
362 H588X300X12 0.296 1.33 149

Attachment F - Page 21 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
363 H300X150X6.5 0.271 1.33 106
364 H588X300X12 0.262 1.33 149
365 H300X150X6.5 0.195 1.33 116
366 H588X300X12 0.232 1.33 149
367 H300X150X6.5 0.272 1.33 107
368 H588X300X12 0.109 1.33 150
369 H200X100X5.5 0.013 1.33 128
370 H200X100X5.5 0.027 1.33 117
371 H200X100X5.5 0.067 1.33 125
372 H200X100X5.5 0.02 1.33 119
373 H200X100X5.5 0.088 1.33 125
374 H200X100X5.5 0.023 1.33 125
375 H200X100X5.5 0.057 1.33 125
376 H200X100X5.5 0.044 1.33 127
377 H200X100X5.5 0.024 1.33 119
378 H200X100X5.5 0.026 1.33 127
379 H200X100X5.5 0.019 1.33 125
380 H200X100X5.5 0.018 1.33 127
381 H200X100X5.5 0.029 1.33 125
382 H200X100X5.5 0.013 1.33 127
383 H588X300X12 0.192 1.33 121
384 H300X150X6.5 0.418 1.33 114
385 H588X300X12 0.279 1.33 121
386 H300X150X6.5 0.341 1.33 145
387 H588X300X12 0.278 1.33 121
388 H300X150X6.5 0.418 1.33 114
389 H588X300X12 0.242 1.33 121
390 H300X150X6.5 0.341 1.33 113
391 H588X300X12 0.246 1.33 121
392 H300X150X6.5 0.418 1.33 115
393 H588X300X12 0.188 1.33 121
394 H300X150X6.5 0.341 1.33 145
395 H588X300X12 0.183 1.33 121
396 H300X150X6.5 0.418 1.33 115
397 H588X300X12 0.08 1.33 121
398 H200X100X5.5 0.028 1.33 151
399 H200X100X5.5 0.017 1.33 128
400 H200X100X5.5 0.057 1.33 128
401 H200X100X5.5 0.026 1.33 125
402 H200X100X5.5 0.065 1.33 125
403 H200X100X5.5 0.018 1.33 119
404 H200X100X5.5 0.055 1.33 125
405 H200X100X5.5 0.022 1.33 127
406 H200X100X5.5 0.026 1.33 128
407 H200X100X5.5 0.022 1.33 110
408 H200X100X5.5 0.035 1.33 125
409 H200X100X5.5 0.019 1.33 112
410 H200X100X5.5 0.025 1.33 119
411 H200X100X5.5 0.023 1.33 127
412 H588X300X12 0.387 1.33 117
413 H400X200X8 0.54 1.33 119
414 H588X300X12 0.922 1.33 113
415 H400X200X8 0.539 1.33 119
416 H588X300X12 0.528 1.33 145

Attachment F - Page 22 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
417 H400X200X8 0.541 1.33 117
418 H588X300X12 0.408 1.33 145
419 H400X200X8 0.508 1.33 119
420 H588X300X12 0.422 1.33 145
421 H400X200X8 0.509 1.33 117
422 H588X300X12 0.143 1.33 113
423 H400X200X8 0.508 1.33 114
424 H588X300X12 0.161 1.33 113
425 H400X200X8 0.561 1.33 115
426 H588X300X12 0.107 1.33 118
427 H200X100X5.5 0.13 1.33 128
428 H200X100X5.5 0.264 1.33 128
429 H200X100X5.5 0.207 1.33 125
430 H200X100X5.5 0.171 1.33 125
431 H200X100X5.5 0.161 1.33 125
432 H200X100X5.5 0.089 1.33 128
433 H200X100X5.5 0.043 1.33 125
434 H200X100X5.5 0.183 1.33 127
435 H200X100X5.5 0.135 1.33 127
436 H200X100X5.5 0.078 1.33 126
437 H200X100X5.5 0.042 1.33 126
438 H200X100X5.5 0.057 1.33 128
439 H200X100X5.5 0.015 1.33 127
440 H200X100X5.5 0.052 1.33 127
441 T150X150 0.025 1.33 124
442 T150X150 0.114 1.33 122
443 T150X150 0.034 1.33 122
444 T150X150 0.095 1.33 107
449 T150X150 0.106 1.33 124
450 T150X150 0.023 1.33 121
451 T150X150 0.12 1.33 122
452 T150X150 0.029 1.33 123
453 T150X150 0.006 1.33 107
454 T150X150 0.071 1.33 121
455 T150X150 0.018 1.33 125
456 T150X150 0.068 1.33 107
461 T150X150 0.121 1.33 119
462 T150X150 0.034 1.33 125
463 T150X150 0.114 1.33 125
464 T150X150 0.04 1.33 119
465 T150X150 0.011 1.33 127
466 T150X150 0.045 1.33 125
467 T150X150 0.023 1.33 117
468 T150X150 0.036 1.33 127
473 T150X150 0.044 1.33 127
474 T150X150 0.025 1.33 125
475 T150X150 0.045 1.33 125
476 T150X150 0.015 1.33 127
477 T150X150 0.038 1.33 123
478 T150X150 0.034 1.33 118
479 T150X150 0.023 1.33 119
480 T150X150 0.028 1.33 115
485 T150X150 0.034 1.33 126
486 T150X150 0.044 1.33 125

Attachment F - Page 23 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
487 T150X150 0.04 1.33 128
488 T150X150 0.036 1.33 127
489 T150X150 0.301 1.33 123
490 T150X150 0.206 1.33 128
491 T150X150 0.258 1.33 125
492 T150X150 0.189 1.33 126
497 T150X150 0.09 1.33 127
498 T150X150 0.077 1.33 125
499 T150X150 0.096 1.33 125
500 T150X150 0.061 1.33 127
501 T200X200 0.465 1.33 127
502 T200X200 0.444 1.33 125
505 T200X200 0.479 1.33 127
506 T200X200 0.488 1.33 125
507 T200X200 0.582 1.33 127
508 T200X200 0.559 1.33 125
511 T200X200 0.508 1.33 127
512 T200X200 0.519 1.33 125
513 T200X200 0.213 1.33 127
514 T200X200 0.198 1.33 125
517 T200X200 0.204 1.33 127
518 T200X200 0.206 1.33 125
519 T200X200 0.215 1.33 127
520 T200X200 0.189 1.33 125
523 T200X200 0.212 1.33 127
524 T200X200 0.213 1.33 125
525 T200X200 0.238 1.33 127
526 T200X200 0.221 1.33 125
529 T200X200 0.211 1.33 127
530 T200X200 0.209 1.33 125
531 T200X200 0.243 1.33 127
532 T200X200 0.201 1.33 125
535 T200X200 0.22 1.33 127
536 T200X200 0.211 1.33 125
537 T200X200 0.214 1.33 127
538 T200X200 0.204 1.33 125
541 T200X200 0.195 1.33 127
542 T200X200 0.183 1.33 125
543 T200X200 0.253 1.33 127
544 T200X200 0.206 1.33 125
547 T200X200 0.21 1.33 127
548 T200X200 0.184 1.33 125
549 T200X200 0.197 1.33 119
550 T200X200 0.171 1.33 117
553 T200X200 0.158 1.33 119
554 T200X200 0.159 1.33 117
555 T200X200 0.285 1.33 119
556 T200X200 0.226 1.33 117
559 T200X200 0.198 1.33 119
560 T200X200 0.174 1.33 117
561 H300X150X6.5 0.135 1.33 117
563 H300X150X6.5 0.077 1.33 119
565 H300X150X6.5 0.076 1.33 108
567 H300X150X6.5 0.071 1.33 108

Attachment F - Page 24 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
568 H300X150X6.5 0.013 1.33 117
570 H300X150X6.5 0.011 1.33 117
611 H588X300X12 0.777 1.33 123
612 H588X300X12 0.564 1.33 123
613 H200X100X5.5 0.013 1.33 107
614 H200X100X5.5 0.013 1.33 107
615 H588X300X12 0.388 1.33 123
616 H588X300X12 0.295 1.33 123
617 H200X100X5.5 0.013 1.33 115
618 H200X100X5.5 0.013 1.33 105
619 H588X300X12 0.292 1.33 123
620 H588X300X12 0.211 1.33 123
621 H200X100X5.5 0.013 1.33 105
622 H200X100X5.5 0.013 1.33 105
623 H588X300X12 0.249 1.33 123
624 H588X300X12 0.175 1.33 123
625 H200X100X5.5 0.013 1.33 105
626 H200X100X5.5 0.013 1.33 105
627 H588X300X12 0.382 1.33 115
628 H588X300X12 0.145 1.33 115
629 H200X100X5.5 0.041 1.33 105
630 H200X100X5.5 0.041 1.33 105
631 H588X300X12 0.763 1.33 121
632 H588X300X12 0.598 1.33 121
633 H588X300X12 0.365 1.33 121
634 H588X300X12 0.315 1.33 121
635 H588X300X12 0.286 1.33 121
636 H588X300X12 0.188 1.33 149
637 H588X300X12 0.266 1.33 121
638 H588X300X12 0.161 1.33 121
639 H588X300X12 0.441 1.33 113
640 H588X300X12 0.15 1.33 116
641 H200X100X5.5 0.013 1.33 105
642 H200X100X5.5 0.013 1.33 105
643 H200X100X5.5 0.013 1.33 105
644 H200X100X5.5 0.013 1.33 105
645 H200X100X5.5 0.013 1.33 105
646 H200X100X5.5 0.013 1.33 105
647 H200X100X5.5 0.013 1.33 105
648 H200X100X5.5 0.013 1.33 105
649 H200X100X5.5 0.041 1.33 105
650 H200X100X5.5 0.041 1.33 105
651 H588X300X12 0.473 1.33 121
652 H588X300X12 0.606 1.33 121
653 H200X100X5.5 0.085 1.33 125
654 H200X100X5.5 0.091 1.33 125
655 H588X300X12 0.249 1.33 121
656 H588X300X12 0.425 1.33 121
657 H200X100X5.5 0.015 1.33 117
658 H200X100X5.5 0.015 1.33 117
659 H588X300X12 0.234 1.33 121
660 H588X300X12 0.378 1.33 121
661 H200X100X5.5 0.008 1.33 111
662 H200X100X5.5 0.008 1.33 111

Attachment F - Page 25 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
663 H588X300X12 0.21 1.33 121
664 H588X300X12 0.308 1.33 121
665 H200X100X5.5 0.02 1.33 127
666 H200X100X5.5 0.019 1.33 127
667 H588X300X12 0.191 1.33 121
668 H588X300X12 0.265 1.33 121
669 H200X100X5.5 0.03 1.33 152
670 H200X100X5.5 0.029 1.33 152
671 H588X300X12 0.259 1.33 145
672 H588X300X12 0.405 1.33 113
673 H200X100X5.5 0.077 1.33 127
674 H200X100X5.5 0.08 1.33 127
675 H588X300X12 0.206 1.33 121
676 H588X300X12 0.3 1.33 121
677 H200X100X5.5 0.04 1.33 117
678 H200X100X5.5 0.042 1.33 117
679 H588X300X12 0.11 1.33 123
680 H588X300X12 0.194 1.33 149
681 H200X100X5.5 0.014 1.33 125
682 H200X100X5.5 0.014 1.33 125
683 H588X300X12 0.09 1.33 121
684 H588X300X12 0.147 1.33 121
685 H200X100X5.5 0.02 1.33 125
686 H200X100X5.5 0.019 1.33 125
687 H588X300X12 0.1 1.33 116
688 H588X300X12 0.14 1.33 116
689 H200X100X5.5 0.033 1.33 125
690 H200X100X5.5 0.033 1.33 125
691 T150X150 0.061 1.33 124
692 T150X150 0.091 1.33 121
693 T150X150 0.081 1.33 122
694 T150X150 0.091 1.33 123
695 T200X200 0.467 1.33 127
696 T200X200 0.459 1.33 125
697 T200X200 0.552 1.33 127
698 T200X200 0.551 1.33 125
699 T150X150 0.094 1.33 124
700 T150X150 0.089 1.33 121
701 T150X150 0.104 1.33 122
702 T150X150 0.078 1.33 123
703 T200X200 0.477 1.33 127
704 T200X200 0.478 1.33 125
705 T200X200 0.523 1.33 127
706 T200X200 0.537 1.33 125
707 T150X150 0.053 1.33 127
708 T150X150 0.066 1.33 121
709 T150X150 0.061 1.33 122
710 T150X150 0.059 1.33 127
711 T200X200 0.208 1.33 127
712 T200X200 0.203 1.33 125
713 T200X200 0.205 1.33 127
714 T200X200 0.212 1.33 125
715 T150X150 0.087 1.33 124
716 T150X150 0.086 1.33 121

Attachment F - Page 26 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
717 T150X150 0.098 1.33 122
718 T150X150 0.079 1.33 123
719 T200X200 0.201 1.33 127
720 T200X200 0.203 1.33 125
721 T200X200 0.199 1.33 127
722 T200X200 0.218 1.33 125
723 T150X150 0.045 1.33 127
724 T150X150 0.076 1.33 125
725 T150X150 0.044 1.33 125
726 T150X150 0.052 1.33 127
727 T200X200 0.224 1.33 127
728 T200X200 0.222 1.33 125
729 T200X200 0.211 1.33 127
730 T200X200 0.228 1.33 125
731 T150X150 0.046 1.33 127
732 T150X150 0.071 1.33 125
733 T150X150 0.049 1.33 125
734 T150X150 0.054 1.33 127
735 T200X200 0.213 1.33 127
736 T200X200 0.219 1.33 125
737 T200X200 0.199 1.33 127
738 T200X200 0.236 1.33 125
739 T150X150 0.022 1.33 116
740 T150X150 0.049 1.33 119
741 T150X150 0.042 1.33 118
742 T150X150 0.03 1.33 117
743 T200X200 0.203 1.33 127
744 T200X200 0.205 1.33 125
745 T200X200 0.2 1.33 127
746 T200X200 0.227 1.33 125
747 T150X150 0.035 1.33 115
748 T150X150 0.11 1.33 121
749 T150X150 0.043 1.33 123
750 T150X150 0.034 1.33 123
751 T200X200 0.19 1.33 127
752 T200X200 0.2 1.33 125
753 T200X200 0.179 1.33 127
754 T200X200 0.224 1.33 125
755 T150X150 0.207 1.33 127
756 T150X150 0.178 1.33 125
757 T150X150 0.273 1.33 125
758 T150X150 0.144 1.33 127
759 T200X200 0.178 1.33 119
760 T200X200 0.188 1.33 117
761 T200X200 0.211 1.33 119
762 T200X200 0.244 1.33 117
763 T150X150 0.138 1.33 121
764 T150X150 0.236 1.33 121
765 T150X150 0.251 1.33 123
766 T150X150 0.184 1.33 123
767 T200X200 0.154 1.33 119
768 T200X200 0.178 1.33 117
769 T200X200 0.172 1.33 119
770 T200X200 0.218 1.33 117

Attachment F - Page 27 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
803 T150X150 0.203 1.33 124
804 T150X150 0.262 1.33 121
805 T150X150 0.251 1.33 123
806 T150X150 0.195 1.33 127
807 T150X150 0.275 1.33 126
808 T150X150 0.19 1.33 125
809 T150X150 0.305 1.33 128
810 T150X150 0.15 1.33 127
811 T150X150 0.075 1.33 121
812 T150X150 0.146 1.33 121
813 T150X150 0.145 1.33 123
814 T150X150 0.05 1.33 127
815 T150X150 0.167 1.33 121
816 T150X150 0.109 1.33 121
817 T150X150 0.161 1.33 123
818 T150X150 0.112 1.33 123
819 T150X150 0.076 1.33 121
820 T150X150 0.097 1.33 121
821 T150X150 0.08 1.33 122
822 T150X150 0.098 1.33 123
823 T150X150 0.191 1.33 121
824 T150X150 0.102 1.33 121
825 T150X150 0.186 1.33 123
826 T150X150 0.095 1.33 123
827 H300X150X6.5 0.134 1.33 117
828 H200X100X5.5 0.103 1.33 128
829 H300X150X6.5 0.077 1.33 119
830 H200X100X5.5 0.007 1.33 119
831 H300X150X6.5 0.075 1.33 109
832 H300X150X6.5 0.102 1.33 119
833 H300X150X6.5 0.01 1.33 107
834 H300X150X6.5 0.009 1.33 107
835 H300X150X6.5 0.029 1.33 117
836 H300X150X6.5 0.032 1.33 117
837 H300X150X6.5 0.077 1.33 109
838 H200X100X5.5 0.006 1.33 113
839 H300X150X6.5 0.093 1.33 119
840 H200X100X5.5 0.036 1.33 117
841 H300X150X6.5 0.082 1.33 117
842 H300X150X6.5 0.079 1.33 127
843 H300X150X6.5 0.018 1.33 127
844 H300X150X6.5 0.019 1.33 127
845 H300X150X6.5 0.01 1.33 125
846 H300X150X6.5 0.011 1.33 125
847 H300X150X6.5 0.086 1.33 117
848 H200X100X5.5 0.021 1.33 125
849 H300X150X6.5 0.079 1.33 127
850 H200X100X5.5 0.005 1.33 127
851 H300X150X6.5 0.084 1.33 117
852 H300X150X6.5 0.079 1.33 127
853 H300X150X6.5 0.022 1.33 127
854 H300X150X6.5 0.02 1.33 127
855 H300X150X6.5 0.013 1.33 125
856 H300X150X6.5 0.011 1.33 125

Attachment F - Page 28 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13
857 H300X150X6.5 0.085 1.33 117
858 H200X100X5.5 0.022 1.33 128
859 H300X150X6.5 0.082 1.33 127
860 H200X100X5.5 0.008 1.33 127
861 H300X150X6.5 0.324 1.33 117
862 H300X150X6.5 0.288 1.33 119
863 H300X150X6.5 0.052 1.33 127
864 H300X150X6.5 0.064 1.33 127
865 H300X150X6.5 0.032 1.33 122
866 H300X150X6.5 0.035 1.33 124
867 H300X150X6.5 0.309 1.33 117
868 H200X100X5.5 0.066 1.33 128
869 H300X150X6.5 0.286 1.33 119
870 H200X100X5.5 0.037 1.33 124

Attachment F - Page 29 of 29
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

ATTACHMENT G
DEFLECTION DATA
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

G. Deflection Data

G.1. Permanent Condition

Maximum Node Displacement at Level + 5.00

Maximum Node Displacement at Level + 7.00

Maximum Node Displacement at Level + 10.00

Attachment G - Page 1 of 4
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Maximum Node Displacement at Level + 13.00

Maximum Node Displacement at Level + 16.00

G.2. Temporary Condition

Maximum Node Displacement at Level + 5.00

Attachment G - Page 2 of 4
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Maximum Node Displacement at Level + 7.00

Maximum Node Displacement at Level + 10.00

Maximum Node Displacement at Level + 13.00

Attachment G - Page 3 of 4
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

Maximum Node Displacement at Level + 16.00

Attachment G - Page 4 of 4
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

ATTACHMENT H
CONNECTION CHECK
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H. CONNECTION CHECK
H.1 Typical Connection of Pipe Rack PR-10
g document:
Connection detail calculation shall refer to the following
1. SNO-S-SD-100-001 Standard Drawing Member Designation For Steel Structure
2. SNO-S-SD-100-002 Standard Drawing Column Base Plate
3. SNO-S-SD-100-003 Standard Drawing Steel Beam Fixed End Plate Moment
4. SNO-S-SD-100-004 Standard Drawing Steel Beam Pinned Connection
5. SNO-S-SD-100-005 Standard Drawing Column Splice
6. SNO-S-SD-100-006 Standard Drawing Vertical Bracing Connection
7. SNO-S-SD-100-007 Standard Drawing Horizontal Bracing Connection
8. SNO-S-SD-100-008 Standard Drawing Anchor Bolts

R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3
R4 R2 R2 R4
C2 C2
C5 C1 C1 C5R2
R3 R5 R3 R5 R2 R5 R3 R5 R2 R5 R3 R5 R2 R5 C3
R3 R5 R2 R5 R3 R5 R5 R3 R5 R2 R5 R3 R5 R3
R2 R2

R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7
C3 C3
R2 R2
R3 R5 R3 R5 R2 R5 R3 R5 R2 R5 R3 R5 R2 R5 R3 R5 R2 R5 R3 R5 R2 R5 R3 R5 R2 R5 R3 R5 R3

R4 R2 R2 R4
R3 R3 R3 R3 R3
C5
R3 R3
C1 R3
C3
R3 C1 R3 R3
C5
R3 R3 R3 R3 R3

C2 C2
Fig. H.1.1 Plan EL. +5.000

R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3
R4 R2
C2C1 C3 C2 R2 R4
C5 C1 C5
R3 R5 R3 R5 R2 R3 R2 R5 R3 R5 R2 R3 R2 R5 R3 R5 R2 R3 R2 R5 R3 R5 R3
R2 R2

R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7
C3 C3
R2 R2
R3 R5 R3 R5 R2 R3 R2 R5 R3 R5 R2 R3 R2 R5 R3 R5 R2 R3 R2 R5 R3 R5 R3

R4 R2 R2 R4
R3 R3 R3 R3 R3 R3 R3 C1 R3 R3 R3 R3 R3 R3 R3 R3 R3
C5 C1 C5
C2 C3 C2

Fig. H.1.2 Plan EL. +7.000

Fig. H.1.3 Plan EL. +10.000

Attachment H - Page 1 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Fig. H.1.2 Plan EL. +13.000

R3 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R3
R4 R2 C2 R2 R4
C2 C1 C3 C1
C5 C5
R3 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R3
R2 R2

R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7 R7
C3 C3
R2 R2
R3 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R2 R5 R8 R5 R3

R4 R2 R2 R4
R3 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R3
C5 C1 C3 C1 C5
C2 C2
Fig. H.1.2 Plan EL. +16.000

R3 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R8 R3
R4 R1 R1 R4
R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1
R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3
R4 R1 R1 R4
R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1
R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3
R4 R1 R1 R4
R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1
R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3
R4 R1 R1 R4
R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1
R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3 R3
R4 R1 R1 R4
C2 C2 C2 C2
C4 C4 C4 C4
R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1 R6:ß 90.00 R6:ß 90.00
R1 R1

C6 C6 C6 C6
Fig. H.1.4 Longitudinal Section

Attachment H - Page 2 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

C1 C1

C1 C1

C6 C6
Fig. H.1.6 Transversal Section

List of Property
No. Symbol Steel Property
1 R1 MH 588
2 R2 MH 588
3 R3 SH 300
4 R4 SH 200
5 R5 CT 150
6 R6 CT 200
7 R7 SH 200
8 R8 SH 400
9
10
11
12
13
14

List of Connection
No. Symbol Connection Type
1 C1 Beam to Column Moment Connection
2 C2 Beam to Column Pinned Connection
3 C3 Beam to Beam Pinned Connection
4 C4 Vertical bracing connection
5 C5 Horizontal bracing connection
6 C6 Base Plate Pinned Connection

Attachment H - Page 3 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.2 Beam to Column Moment Connection (C1)


H.2.1 Beam to Column Moment Connection ((C1)) between El. + 5.00 and Column
Main Beam El.+5.00 MH 588
Column MH 588

To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment

M T
+ ≤ 1
Mall Tall

Where :
M = Moment
T = Tension force
Mall = Allowable moment capacity
Tall = Allowable tension capacity

H.2.1.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 296 103 167 20.61 19.41 12.17 0.00 -4.27 -14.84
Min Fx 296 102 167 -40.17 -7.79 -11.93 0.00 3.86 -15.42
Max Fy 11 103 2 6.31 30.68 -8.75 0.00 0.07 81.44
Min Fy 652 102 8 16.25 -61.76 13.66 0.00 0.09 89.52
Max Fz 296 102 293 -29.17 -34.38 23.07 0.00 -15.45 15.45
Min Fz 296 103 293 9.61 -7.19 -22.83 0.00 15.66 -51.96
Max Mx 86 103 38 -10.69 28.93 1.09 0.00 -0.01 74.59
Min Mx 86 102 38 -11.56 5.08 -1.07 0.00 0.01 -20.63
Max My 296 103 293 9.61 -7.19 -22.83 0.00 15.66 -51.96
Min My 296 102 293 -29.17 -34.38 23.07 0.00 -15.45 15.45
Max Mz 652 102 8 16 25
16.25 -61.76
61 76 13 66
13.66 0 00
0.00 0 09
0.09 89 52
89.52
Min Mz 296 103 293 9.61 -7.19 -22.83 0.00 15.66 -51.96

Attachment H - Page 4 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
89.52 30.68 No Tension 346.99 573.02 1895.04 0.258 < 1...OK
89.52 -61.76 No Tension 346.99 573.02 1895.04 0.258 < 1...OK
-15.42 -7.79 -40.17 346.99 573.02 1895.04 0.066 < 1...OK
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.2.1.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 651 115 292 21.466 75.855 3.74 0.002 -13.628 170.311
Min Fx 651 113 292 -41.036 -56.121 -3.983 -0.002 13.836 -160.216
Max Fy 11 123 2 7.781 97.47 -7.779 0.003 0.062 352.717
Min Fy 652 121 8 16.23 -125.436 12.218 -0.003 0.086 359.975
Max Fz 296 118 293 -28.771 -33.222 23.395 0 -14.706 12.552
Min Fz 296 120 293 9.215 -8.35 -23.148 0 14.917 -49.064
Max Mx 186 123 86 3.408 71.985 0.169 0.003 -0.019 251.75
Min Mx 186 121 86 -32.947 -42.063 -0.12 -0.003 0.017 -204.697
Max My 296 119 293 10.003 -6.027 -22.506 0 16.407 -54.856
Min My 296 117 293 -29.559 -35.544 22.753 0 -16.196 18.344
Max Mz 652 121 8 16.23 -125.436 12.218 -0.003 0.086 359.975
Min Mz 11 121 2 -25.182 -66.714 7.888 -0.003 -0.061 -304.55

Attachment H - Page 5 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y*
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
359.98 97.47 No Tension 461.50 762.12 2520.40 0.780 < 1...OK
359.98 -125.44 No Tension 461.50 762.12 2520.40 0.780 < 1...OK
-160.22 -56.12 -41.04 461.50 762.12 2520.40 0.363 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail : TYPE-B

Attachment H - Page 6 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.2.2 Beam to Column Moment Connection (C1) between El. + 7.00 and Column
Main Beam El.+7.00 MH 588
Column MH 588

To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment

M T
+ ≤ 1
Mall Tall

Where :
M = Moment
T = Tension force
Mall = Allowable moment capacity
Tall = Allowable tension capacity

H.2.2.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy


y Fz Mx y
My Mz
kN kN kN kNm kNm kNm
Max Fx 187 103 87 19.88 27.30 -3.62 0.00 0.04 58.78
Min Fx 187 102 87 -0.44 18.28 3.31 0.00 -0.03 22.28
Max Fy 187 103 87 19.88 27.30 -3.62 0.00 0.04 58.78
Min Fy 676 102 93 8.33 -43.77 1.68 0.00 0.04 64.75
Max Fz 335 103 192 12.41 8.43 10.45 0.00 -5.88 -16.56
Min Fz 335 102 192 0.79 -3.11 -10.47 0.00 5.96 -16.45
Max Mx 659 102 296 8.36 4.85 -1.59 0.00 0.14 -13.29
Min Mx 12 103 3 8.81 18.84 0.32 0.00 -0.06 43.02
Max My 137 102 192 0.79 -2.50 2.96 0.00 5.96 -16.45
Min My 137 103 192 12.41 9.04 -2.94 0.00 -5.88 -16.56
Max Mz 676 102 93 8.33 -43.77 1.68 0.00 0.04 64.75
Min Mz 675 104 196 6 25
6.25 10 14
10.14 0 18
0.18 0 00
0.00 0 26
0.26 -29.82
29 82

Attachment H - Page 7 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
64.75 27.30 No Tension 346.99 573.02 1895.04 0.187 < 1...OK
64.75 -43.77 No Tension 346.99 573.02 1895.04 0.187 < 1...OK
22.28 18.28 -0.44 346.99 573.02 1895.04 0.064 < 1...OK
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.2.2.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 187 115 87 22.265 49.616 -3.722 0.002 0.036 148.032
Min Fx 187 121 87 -3.71 -13.299 3.13 -0.002 -0.03 -98.946
Max Fy 12 123 3 9.479 65.021 0.414 0.001 -0.05 231.008
Min Fy 331 121 45 6.645 -75.194 8.23 -0.002 0.049 211.799
Max Fz 335 111 192 13.106 8.425 11.082 0 -6.314 -16.567
Min Fz 335 109 192 0.018 -3.112 -11.1 0 6.387 -16.438
Max Mx 12 122 3 10.552 54.571 0.179 0.003 0.048 188.633
Min Mx 12 124 3 6.115 -31.111 0.139 -0.003 -0.05 -153.553
Max My 137 109 192 0.018 -2.498 3.585 0 6.387 -16.438
Min My 137 111 192 13.106 9.04 -3.567 0 -6.314 -16.568
Max Mz 12 123 3 9.479 65.021 0.414 0.001 -0.05 231.008
Min Mz 660 123 9 6.824 37.074 0.61 0.001 0.078 -201.046

Attachment H - Page 8 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y*
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
231.01 -13.30 -3.71 461.50 762.12 2520.40 0.502 < 1...OK
211.80 -75.19 No Tension 461.50 762.12 2520.40 0.459 < 1...OK
-98.95 -13.30 -3.71 461.50 762.12 2520.40 0.216 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail : TYPE-B

Attachment H - Page 9 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.2.3 Beam to Column Moment Connection (C1) between El. + 10.00 and Column
Main Beam El.+10.00 MH 588
Column MH 588

To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment

M T
+ ≤ 1
Mall Tall

Where :
M = Moment
T = Tension force
Mall = Allowable moment capacity
Tall = Allowable tension capacity

H.2.3.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy


y Fz Mx y
My Mz
kN kN kN kNm kNm kNm
Max Fx 362 102 58 13.31 -18.84 0.73 0.00 0.01 37.32
Min Fx 138 102 64 -1.37 18.31 -0.57 0.00 0.01 12.03
Max Fy 38 104 16 4.69 43.20 0.00 0.00 0.00 40.41
Min Fy 680 104 94 6.35 -21.13 0.19 0.00 0.00 27.20
Max Fz 358 103 201 4.31 8.45 8.30 0.00 -4.41 -16.58
Min Fz 358 102 201 7.54 0.16 -8.28 0.00 4.33 -16.53
Max Mx 163 103 76 0.99 20.31 7.20 0.00 -0.02 28.54
Min Mx 188 102 88 2.72 16.22 0.23 0.00 0.01 12.11
Max My 63 102 201 7.54 0.78 3.53 0.00 4.33 -16.53
Min My 63 103 201 4.31 9.07 -3.55 0.00 -4.41 -16.58
Max Mz 63 103 28 4.31 26.64 6.60 0.00 -0.01 45.17
Min Mz 38 104 199 4 69
4.69 4 62
4.62 0 00
0.00 0 00
0.00 0 02
0.02 -21.40
21 40

Attachment H - Page 10 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
45.17 9.07 No Tension 346.99 573.02 1895.04 0.130 < 1...OK
40.41 43.20 -1.37 346.99 573.02 1895.04 0.117 < 1...OK
12.03 18.31 -1.37 346.99 573.02 1895.04 0.035 < 1...OK
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.2.3.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 362 105 58 15.058 -25.147 0.726 0 0.014 62.547
Min Fx 138 125 64 -4.295 17.017 -0.557 0 0.008 13.028
Max Fy 38 150 16 4.228 77.068 0.007 0.002 -0.001 189.187
Min Fy 356 149 22 5.427 -55.064 -0.007 -0.002 0 178.402
Max Fz 358 111 201 3.108 8.453 9.002 0 -4.896 -16.569
Min Fz 358 109 201 8.163 0.162 -8.982 0 4.816 -16.529
Max Mx 163 123 76 0.544 44.033 6.48 0.002 -0.013 128.756
Min Mx 188 121 88 -0.553 -7.958 0.427 -0.002 0.01 -79.332
Max My 63 109 201 8.163 0.777 4.234 0 4.816 -16.529
Min My 63 111 201 3.108 9.067 -4.254 0 -4.896 -16.57
Max Mz 13 123 4 3.18 59.771 5.446 0.002 -0.011 192.294
Min Mz 664 123 10 -0.046 37.967 1.767 0.002 0.005 -168.66

Attachment H - Page 11 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y*
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
192.29 9.07 No Tension 461.50 762.12 2520.40 0.417 < 1...OK
189.19 77.07 -4.30 461.50 762.12 2520.40 0.412 < 1...OK
13.03 17.02 -4.30 461.50 762.12 2520.40 0.030 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail : TYPE-B

Attachment H - Page 12 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.2.4 Beam to Column Moment Connection (C1) between El. + 13.00 and Column
Main Beam El.+13.00 MH 588
Column MH 588

To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment

M T
+ ≤ 1
Mall Tall

Where :
M = Moment
T = Tension force
Mall = Allowable moment capacity
Tall = Allowable tension capacity

H.2.4.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy


y Fz Mx y
My Mz
kN kN kN kNm kNm kNm
Max Fx 139 104 65 -7.45 51.48 0.04 0.00 0.00 34.65
Min Fx 64 103 216 -67.78 5.08 -2.47 0.00 -1.88 -2.13
Max Fy 39 104 17 -66.34 54.47 0.02 0.00 0.00 52.05
Min Fy 684 104 95 -10.53 -18.28 0.18 0.00 0.00 24.54
Max Fz 114 103 53 -49.82 35.94 7.93 0.00 -0.02 45.86
Min Fz 164 102 77 -14.82 30.44 -7.96 0.00 0.02 20.11
Max Mx 39 103 17 -65.18 36.96 0.25 0.00 -0.04 51.42
Min Mx 39 102 17 -66.50 32.86 -0.22 0.00 0.04 35.05
Max My 667 103 300 -50.62 7.81 -1.21 0.00 2.45 11.42
Min My 667 102 300 -52.04 2.51 1.12 0.00 -2.60 -1.92
Max Mz 64 103 29 -63.78 37.61 7.91 0.00 -0.02 53.94
Min Mz 189 104 308 -10.53
10 53 0 96
0.96 -0.18
0 18 0 00
0.00 -0.27
0 27 -11.27
11 27

Attachment H - Page 13 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
53.94 2.51 -52.04 346.99 573.02 1895.04 0.183 < 1...OK
52.05 54.47 -67.78 346.99 573.02 1895.04 0.186 < 1...OK
-2.13 5.08 -67.78 346.99 573.02 1895.04 0.042 < 1...OK
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.2.4.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 139 152 65 6.333 45.91 0.091 0.001 0 28.443
Min Fx 387 115 216 -69.365 27.765 0.474 0.002 -1.883 -2.233
Max Fy 14 150 5 -32.656 81.809 0.12 0.001 0.016 174.917
Min Fy 668 121 11 -30.324 -48.226 -1.536 -0.002 0.011 152.67
Max Fz 114 111 53 -47.978 35.938 8.421 0.001 -0.02 45.562
Min Fz 164 109 77 -11.324 30.438 -8.435 0 0.018 19.829
Max Mx 114 123 53 -34.547 58.389 7.157 0.003 -0.018 144.354
Min Mx 39 121 17 -50.638 -1.914 -0.212 -0.002 0.036 -95.299
Max My 14 119 300 -54.408 9.001 -2.969 0.001 3.542 13.871
Min My 667 125 300 -38.249 0.964 1.774 -0.001 -3.909 -6.015
Max Mz 14 123 5 -29.473 66.625 6.178 0.002 0.005 176.746
Min Mz 668 123 11 -43.142 23.266 1.773 0.002 -0.005 -133.364

Attachment H - Page 14 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y*
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
176.75 0.96 -38.25 461.50 762.12 2520.40 0.398 < 1...OK
174.92 81.81 -69.37 461.50 762.12 2520.40 0.407 < 1...OK
-2.23 27.77 -69.37 461.50 762.12 2520.40 0.032 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail : TYPE-B

Attachment H - Page 15 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.2.5 Beam to Column Moment Connection (C1) between El. + 16.00 and Column
Main Beam El.+16.00 MH 588
Column MH 588

To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment

M T
+ ≤ 1
Mall Tall

Where :
M = Moment
T = Tension force
Mall = Allowable moment capacity
Tall = Allowable tension capacity

H.2.5.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy


y Fz Mx y
My Mz
kN kN kN kNm kNm kNm
Max Fx 65 103 30 70.24 99.55 0.15 0.00 0.02 168.09
Min Fx 140 102 66 16.25 40.13 -0.03 0.00 0.00 40.01
Max Fy 40 104 18 67.94 100.72 0.01 0.00 0.00 167.25
Min Fy 416 104 36 67.84 -245.79 0.00 0.00 0.00 217.49
Max Fz 414 102 24 63.97 -239.47 61.52 0.00 0.21 212.65
Min Fz 414 103 24 65.70 -237.16 -61.54 0.00 -0.21 203.34
Max Mx 40 103 18 67.20 99.23 -6.28 0.00 0.04 166.91
Min Mx 40 102 18 62.47 96.92 6.30 0.00 -0.04 157.71
Max My 40 102 229 62.47 53.75 7.06 0.00 25.73 -146.82
Min My 40 103 229 67.20 56.07 -7.05 0.00 -25.66 -146.88
Max Mz 416 104 36 67.84 -245.79 0.00 0.00 0.00 217.49
Min Mz 40 104 229 67 94
67.94 57 55
57.55 0 01
0.01 0 00
0.00 0 03
0.03 -152.47
152 47

Attachment H - Page 16 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
217.49 100.72 No Tension 346.99 573.02 1895.04 0.627 < 1...OK
217.49 -245.79 No Tension 346.99 573.02 1895.04 0.627 < 1...OK
#N/A #N/A No Tension 346.99 573.02 1895.04 #N/A #N/A
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.2.5.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 65 115 30 95.622 114.918 0.148 0.002 0.014 229.359
Min Fx 688 122 311 -4.843 0.131 -3.182 0.001 4.762 -26.071
Max Fy 65 115 30 95.622 114.918 0.148 0.002 0.014 229.359
Min Fy 416 145 36 68.944 -253.666 0.003 -0.001 -0.001 271.421
Max Fz 414 109 24 61.31 -231.974 62.004 -0.001 0.206 204.867
Min Fz 414 111 24 63.082 -229.659 -62.021 0.001 -0.206 195.577
Max Mx 115 123 54 60.379 67.443 -0.004 0.003 0.014 163.77
Min Mx 40 121 18 12.746 39.668 5.667 -0.003 -0.037 32.021
Max My 40 118 229 63.507 53.943 7.271 -0.001 26.552 -146.808
Min My 40 120 229 66.164 55.878 -7.255 0 -26.487 -146.887
Max Mz 416 145 36 68.944 -253.666 0.003 -0.001 -0.001 271.421
Min Mz 65 115 231 95.622 71.755 -0.617 0.002 0.032 -147.174

Attachment H - Page 17 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p y*
Allowable Capacity Check
M V T Mall Vall Tall M + T Remarks
(kN.m) (kN) (kN) (kN.m) (kN) (kN) Mall Tall
271.42 114.92 No Tension 461.50 762.12 2520.40 0.588 < 1...OK
271.42 -253.67 No Tension 461.50 762.12 2520.40 0.588 < 1...OK
-26.07 0.13 -4.84 461.50 762.12 2520.40 0.058 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M : Moment force or Mz in STAAD Pro
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail : TYPE-B

Attachment H - Page 18 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.3 Beam to Column Pinned Connection (C2)


H.3.1 Beam to Column Pinned Connection (C2) between El. +5.00 and Column

Longitudinal Beam El.+5.00 SH 300


Column MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With :
V = Shear force
T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.3.1.1 Permanent Condition


From Staad Pro Result,, summaryy of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 21 102 8 43.653 -0.320 -0.004 0.000 0.000 0.000
Min Fx 21 103 8 -58.217 -0.215 0.002 0.000 0.000 0.000
Max Fy 141 104 62 1.645 20.358 0.001 0.000 0.000 0.000
Min Fy 206 104 74 1.645 -7.666 -0.001 0.000 0.000 0.000
Max Fz 146 102 68 2.836 9.382 1.188 0.000 0.000 0.000
Min Fz 146 103 68 3.482 9.382 -1.191 0.000 0.000 0.000
Max Mx 46 103 20 -2.233 2.710 0.000 0.000 0.000 0.000
Min Mx 46 102 20 -2.191 2.710 -0.001 0.000 0.000 0.000
Max My 146 103 108 3.482 0.304 0.809 0.000 0.435 -10.498
Min My 146 102 108 2 836
2.836 0 304
0.304 -0.812
0 812 0 000
0.000 -0.445
0 445 -10.498
10 498
Max Mz 71 102 102 40.603 -1.436 -0.004 0.000 -0.011 2.690
Min Mz 206 104 107 1.645 -6.588 -0.001 0.000 0.003 -21.381

Attachment H - Page 19 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
20.358 -58.217 138.28 165.17 0.500 < 1...OK
-0.215 -58.217 138.28 165.17 0.354 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.3.1.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 21 125 8 83 766
83.766 -0.206
0 206 -0.004
0 004 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 21 127 8 -96.229 -0.106 0.001 0.000 0.000 0.000
Max Fy 141 145 62 0.489 20.358 0.001 0.000 0.000 0.000
Min Fy 206 145 74 0.489 -7.666 -0.001 0.000 0.000 0.000
Max Fz 146 105 68 2.433 9.382 1.333 0.000 0.000 0.000
Min Fz 146 107 68 4.146 9.382 -1.336 0.000 0.000 0.000
Max Mx 96 123 44 0.924 2.439 -0.001 0.000 0.000 0.000
Min Mx 96 121 44 -0.839 2.439 -0.001 0.000 0.000 0.000
Max My 146 107 108 4.146 0.304 1.049 0.000 0.576 -10.498
Min My 146 105 108 2.433 0.304 -1.052 0.000 -0.586 -10.498
Max Mz 198 113 102 -46.445 1.677 0.003 0.000 -0.008 3.414
Min Mz 141 145 107 0.489 0.280 0.001 0.000 0.004 -21.381

Attachment H - Page 20 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
20.358 -96.229 183.91 219.68 0.549 < 1...OK
-0.106 -96.229 183.91 219.68 0.439 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I for d > 150

Attachment H - Page 21 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.3.2 Beam to Column Pinned Connection (C2) between El. +7.00 and Column

Longitudinal Beam El.+7.00 SH 300


Column MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With :
V = Shear force
T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.3.2.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 122 102 57 25.143 0.229 0.000 0.000 0.000 0.000
Min Fx 22 103 9 -28.117 0.371 0.001 0.000 0.000 0.000
Max Fy 42 102 15 -4.135 4.556 -0.001 0.000 0.000 0.000
Min Fy 214 102 27 -3.503 -4.556 0.001 0.000 0.000 0.000
Max Fz 220 102 119 -26.904 0.651 0.002 0.000 -0.006 0.336
Min Fz 117 102 51 12.231 0.427 -0.002 0.000 0.000 0.000
Max Mx 22 102 9 7.862 0.174 0.001 0.000 0.000 0.000
Min Mx 172 102 81 19.315 0.291 0.001 0.000 0.000 0.000
Max My 72 103 116 -27.534 -0.721 0.002 0.000 0.006 0.546
Min My 117 102 119 12.231 -0.651 -0.002 0.000 -0.006 0.336
Max Mz 72 102 116 18 156
18.156 -0.905
0 905 0 000
0.000 0 000
0.000 0 000
0.000 1 099
1.099
Min Mz 42 102 113 -4.135 3.478 -0.001 0.000 -0.002 -12.051

Attachment H - Page 22 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-4.556 -4.135 138.28 165.17 0.058 < 1...OK
0.371 -28.117 138.28 165.17 0.173 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.3.2.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 122 125 57 64 262
64.262 0 242
0.242 -0.001
0 001 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 22 127 9 -65.782 0.406 0.001 0.000 0.000 0.000
Max Fy 42 113 15 -1.921 4.556 0.251 0.000 0.000 0.000
Min Fy 214 113 27 -1.289 -4.556 -0.251 0.000 0.000 0.000
Max Fz 97 108 45 -9.953 3.170 0.399 0.000 0.000 0.000
Min Fz 219 108 57 -9.755 -3.170 -0.399 0.000 0.000 0.000
Max Mx 92 123 39 2.503 4.101 -0.336 0.000 0.000 0.000
Min Mx 97 121 45 4.842 2.853 0.336 0.000 0.000 0.000
Max My 97 124 118 -9.091 1.882 0.336 0.000 1.008 -7.103
Min My 92 123 117 2.503 3.130 -0.336 0.000 -1.009 -10.846
Max Mz 213 113 112 -26.726 0.962 -0.002 0.000 0.005 1.269
Min Mz 42 113 113 -1.921 3.478 0.251 0.000 0.752 -12.052

Attachment H - Page 23 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-4.556 -1.921 183.91 219.68 0.034 < 1...OK
0.406 -65.782 183.91 219.68 0.302 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I for d > 150

Attachment H - Page 24 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.3.3 Beam to Column Pinned Connection (C2) between El. +10.00 and Column

Longitudinal Beam El.+10.00 SH 300


Column MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With :
V = Shear force
T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.3.3.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 123 102 58 18.704 0.194 0.000 0.000 0.000 0.000
Min Fx 18 103 4 -31.191 0.219 -0.001 0.000 0.000 0.000
Max Fy 93 102 40 -1.289 3.415 -0.001 0.000 0.000 0.000
Min Fy 235 102 28 -1.110 -3.415 0.001 0.000 0.000 0.000
Max Fz 241 102 133 -22.670 0.798 0.002 0.000 -0.005 0.777
Min Fz 118 102 52 7.830 0.280 -0.002 0.000 0.000 0.000
Max Mx 148 103 70 -2.497 2.399 0.000 0.000 0.000 0.000
Min Mx 143 102 64 -1.157 3.415 0.000 0.000 0.000 0.000
Max My 73 103 130 -24.674 -0.936 0.002 0.000 0.005 1.190
Min My 118 102 133 7.830 -0.798 -0.002 0.000 -0.005 0.777
Max Mz 73 102 130 12 418
12.418 -0.982
0 982 0 000
0.000 0 000
0.000 0 000
0.000 1 329
1.329
Min Mz 93 102 131 -1.289 2.337 -0.001 0.000 -0.002 -8.627

Attachment H - Page 25 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-3.415 -1.289 138.28 165.17 0.033 < 1...OK
0.219 -31.191 138.28 165.17 0.190 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.3.3.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 123 125 58 56 792
56.792 0 230
0.230 -0.001
0 001 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 23 127 10 -65.442 0.216 0.001 0.000 0.000 0.000
Max Fy 43 113 16 1.121 3.415 0.154 0.000 0.000 0.000
Min Fy 235 113 28 1.632 -3.415 -0.154 0.000 0.000 0.000
Max Fz 98 108 46 -5.982 2.399 0.447 0.000 0.000 0.000
Min Fz 240 108 58 -5.884 -2.399 -0.447 0.000 0.000 0.000
Max Mx 148 123 70 -2.451 2.159 -0.206 0.000 0.000 0.000
Min Mx 143 121 64 -1.202 3.073 0.206 0.000 0.000 0.000
Max My 98 108 132 -5.982 1.321 0.001 0.000 0.672 -5.579
Min My 93 107 131 3.760 2.337 -0.001 0.000 -0.670 -8.627
Max Mz 238 113 130 -27.460 1.031 -0.001 0.000 0.004 1.477
Min Mz 43 113 127 1.121 2.337 0.154 0.000 0.461 -8.627

Attachment H - Page 26 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-3.415 No Tension 183.91 219.68 0.019 < 1...OK
0.216 -65.442 183.91 219.68 0.299 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I for d > 150

Attachment H - Page 27 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.3.4 Beam to Column Pinned Connection (C2) between El. +13.00 and Column

Longitudinal Beam El.+13.00 SH 300


Column MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With :
V = Shear force
T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.3.4.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 99 102 47 14.133 6.898 -0.006 0.000 0.000 0.000
Min Fx 24 103 11 -36.881 0.268 -0.007 0.000 0.000 0.000
Max Fy 94 102 41 5.157 8.891 0.006 0.000 0.000 0.000
Min Fy 264 104 77 6.763 -8.891 -0.001 0.000 0.000 0.000
Max Fz 44 103 17 7.180 8.891 0.008 0.000 0.000 0.000
Min Fz 49 103 23 -4.183 6.898 -0.008 0.000 0.000 0.000
Max Mx 119 103 53 -20.434 0.403 0.004 0.000 0.000 0.000
Min Mx 124 102 59 11.041 0.313 -0.004 0.000 0.000 0.000
Max My 44 103 141 7.180 7.813 0.008 0.000 0.024 -25.055
Min My 49 103 142 -4.183 5.820 -0.008 0.000 -0.024 -19.076
Max Mz 74 102 144 9 226
9.226 -0.870
0 870 -0.007
0 007 0 000
0.000 -0.022
0 022 0 992
0.992
Min Mz 144 102 149 4.526 7.813 0.001 0.000 0.004 -25.055

Attachment H - Page 28 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-8.891 No Tension 138.28 165.17 0.064 < 1...OK
0.268 -36.881 138.28 165.17 0.225 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.3.4.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 74 125 35 55 103
55.103 0 233
0.233 -0.006
0 006 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 24 119 11 -65.696 0.274 -0.006 0.000 0.000 0.000
Max Fy 44 113 17 6.560 8.891 1.062 0.000 0.000 0.000
Min Fy 256 113 29 6.783 -8.891 -1.062 0.000 0.000 0.000
Max Fz 44 124 17 7.593 8.002 1.412 0.000 0.000 0.000
Min Fz 256 124 141 7.393 -7.032 -1.412 0.000 4.236 -22.550
Max Mx 119 123 53 -2.813 0.381 -0.002 0.000 0.000 0.000
Min Mx 124 121 59 25.500 0.300 0.002 0.000 0.000 0.000
Max My 44 124 141 7.593 7.032 1.412 0.000 4.236 -22.550
Min My 49 123 142 -2.834 5.238 -1.412 0.000 -4.236 -17.168
Max Mz 259 113 144 -27.470 0.886 0.003 0.000 -0.009 1.040
Min Mz 44 113 141 6.560 7.813 1.062 0.000 3.186 -25.056

Attachment H - Page 29 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-8.891 No Tension 183.91 219.68 0.048 < 1...OK
0.274 -65.696 183.91 219.68 0.301 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I for d > 150

Attachment H - Page 30 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.3.5 Beam to Column Pinned Connection (C2) between El. +16.00 and Column

Longitudinal Beam El.+16.00 SH 300


Column MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With :
V = Shear force
T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.3.5.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 75 102 36 47.953 1.003 0.016 0.001 0.000 0.000
Min Fx 75 103 36 -30.743 1.229 0.027 0.001 0.000 0.000
Max Fy 95 104 42 -3.405 27.298 -0.024 0.000 0.000 0.000
Min Fy 281 104 54 -3.403 -26.173 0.024 0.000 0.000 0.000
Max Fz 281 102 159 4.381 -20.488 8.664 0.000 -3.891 -56.221
Min Fz 281 103 159 -11.045 -20.488 -8.619 0.000 3.757 -56.221
Max Mx 125 104 60 1.078 1.422 0.015 0.003 0.000 0.000
Min Mx 120 104 54 -0.732 2.268 -0.015 -0.002 0.000 0.000
Max My 95 103 159 -11.044 18.140 2.242 0.000 3.757 -56.221
Min My 95 102 159 4.376 18.140 -2.287 0.000 -3.891 -56.221
Max Mz 279 104 157 -4.896
4 896 4 198
4.198 0 027
0.027 0 000
0.000 -0.082
0 082 0 486
0.486
Min Mz 95 104 159 -3.405 20.376 -0.024 0.000 -0.071 -67.386

Attachment H - Page 31 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
27.298 -30.743 138.28 165.17 0.384 < 1...OK
1.229 -30.743 138.28 165.17 0.195 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.3.5.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 75 125 36 99 439
99.439 0 217
0.217 0 004
0.004 0 001
0.001 0 000
0.000 0 000
0.000
Min Fx 75 127 36 -81.221 0.642 0.029 0.001 0.000 0.000
Max Fy 95 145 42 3.265 23.548 0.002 0.000 0.000 0.000
Min Fy 281 146 54 -9.409 -22.423 0.048 0.000 0.000 0.000
Max Fz 281 105 159 6.617 -16.738 9.058 0.000 -4.115 -44.971
Min Fz 281 107 159 -12.619 -16.738 -9.015 0.000 3.988 -44.971
Max Mx 125 146 60 -7.332 1.287 -0.003 0.004 0.000 0.000
Min Mx 120 145 54 -9.109 2.134 0.006 -0.002 0.000 0.000
Max My 95 107 159 -12.617 14.390 2.639 0.000 3.988 -44.971
Min My 95 105 159 6.613 14.390 -2.681 0.000 -4.115 -44.971
Max Mz 279 151 157 -18.952 4.389 0.025 0.000 -0.075 2.271
Min Mz 45 116 155 9.480 20.071 0.008 0.000 0.025 -63.095

Attachment H - Page 32 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
23.548 -81.221 183.91 219.68 0.498 < 1...OK
0.642 -81.221 183.91 219.68 0.373 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I for d > 150

Attachment H - Page 33 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.4 Beam to Beam Pinned Connection (C3)


H.4.1 Beam to Beam Pinned Connection (C3) between Secondary Beam El. +5.00 To El.+13.00 and
Longitudinal Beam El. +5.00 To El.+13.00
Secondary Beam El. +5.00 To El.+13.00 SH 300
Longitudinal Beam El. +5.00 To El.+13.00 SH 300

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With : V = Shear force


T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.4.1.1 Permanent Condition


From Staad Pro Result,, summaryy of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 230 102 119 0.004 7.855 -0.637 0.000 0.000 0.000
Min Fx 334 102 191 -0.001 -3.645 -0.195 0.000 0.781 -17.453
Max Fy 226 102 111 0.002 7.855 -0.633 0.000 0.000 0.000
Min Fy 338 103 124 0.002 -5.082 0.195 0.000 0.000 0.000
Max Fz 227 102 185 0.002 -2.131 1.662 0.000 0.797 -13.858
Min Fz 227 103 185 0.002 -2.131 -1.663 0.000 -0.799 -13.857
Max Mx 230 103 119 0.000 7.855 0.636 0.000 0.000 0.000
Min Mx 226 102 111 0.002 7.855 -0.633 0.000 0.000 0.000
Max My 227 102 185 0.002 -2.131 1.662 0.000 0.797 -13.858
Min My 227 103 185 0 002
0.002 -2.131
2 131 -1.663
1 663 0 000
0.000 -0.799
0 799 -13.857
13 857
Max Mz 226 101 111 0.001 6.322 0.000 0.000 0.000 0.000
Min Mz 338 103 195 0.002 -3.645 0.195 0.000 -0.781 -17.453

Attachment H - Page 34 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
7.855 -0.001 144.77 187.26 0.054 < 1...OK
-3.645 -0.001 144.77 187.26 0.025 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.4.1.2 Temporary Condition


From STAAD Pro Result, summary of inner Force maximum for SH 300 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 230 105 119 0 815
0.815 7 855
7.855 -0.637
0 637 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 334 105 191 -0.811 -3.645 -0.195 0.000 0.781 -17.453
Max Fy 226 113 111 0.432 7.855 -0.633 0.000 0.000 0.000
Min Fy 326 115 112 0.224 -5.082 0.198 0.000 0.000 0.000
Max Fz 226 118 183 0.002 -1.232 1.667 0.000 0.815 -17.453
Min Fz 226 120 183 0.002 -1.232 -1.667 0.000 -0.815 -17.453
Max Mx 229 121 117 -0.208 6.261 -0.571 0.000 0.000 0.000
Min Mx 231 123 121 0.211 6.260 0.573 0.000 0.000 0.000
Max My 226 118 183 0.002 -1.232 1.667 0.000 0.815 -17.453
Min My 226 120 183 0.002 -1.232 -1.667 0.000 -0.815 -17.453
Max Mz 226 105 111 0.813 7.855 -0.633 0.000 0.000 0.000
Min Mz 326 115 183 0.224 -3.645 0.198 0.000 -0.794 -17.454

Attachment H - Page 35 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
7.855 -0.811 192.54 249.06 0.044 < 1...OK
-3.645 -0.811 192.54 249.06 0.022 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I

½B

Type I

Attachment H - Page 36 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.4.1.3 Plate connection checking due to longitudinal force caused by thermal friction.

Top view Side view


Staad Pro Output
Fx max = 0.82 kN Mx max = 0.000 kNm
Fy max = 7.86 kN My max = 0.815 kNm
Fz max = 1.667 kN Mz max = 17.454 kNm
a = 8 mm LwA = 374 mm (vertical weld)
tp = 13 mm LwB = 196 mm (horizontal weld)

H.4.1.3.1. Welding Check


Case -1
Fy/2
// 1a =
0.707*a*LwA
3927.5
=
0.707*8*374
= 1.86 Mpa

Fx/4
// 1b =
0.707*a*LwB
203.75
=
0.707*8*196
= 0.18 Mpa

Attachment H - Page 37 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Case -2
1/4*√2 * Fz
2a = l 2a =
0.707*a*LwA
589.37
=
0.707*8 * 374
= 0.279 Mpa

1/8*√2 * Fz
2b = l 2b =
0.707*a*LwB
294.69
=
0.707*8 * 196
= 0 266
0.266 Mpa

1/4*√2 * Fx
3 = l 3 =
0.707*a*LwA
288.15
=
0.707*8*374
= 0.14 Mpa

Attachment H - Page 38 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

M1 = Fy * e = Fy * (0.5B + 10 + lh)
= 883.6875 kNmm
1.5*√2 *M1
4 = l 4 =
0.707*a*(2*LwA+LwB)2
1874584
=
5040265
= 0.37 Mpa

M2 = Fz * e = Fz * (0.5B + 10 + lh)
= 187.5375 kNmm

1/2*√2 * M2
5 = l 5 =
0.707*a*(LwA + LwB)*( s + 1/2.a√2)
132609.04
=
60148.21
= 2.20 Mpa

Attachment H - Page 39 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Summary of stress
Case Stress (Mpa)
// l 
1 1.86 - -
2 - 0.279 0.279
3 - 0.14 0.14
4 - 0.37 0.37
5 - 2.20 2.20
Max 1.86 2.20 2.20

 = √ 2 + 3 (// 2 +  l
2
) ≤  all
= 5.46 ≤ 124.11 OK

H.4.1.3.2 Plate Connection Check

Allowable shear of connection p


plate calculated as follow:
VPall = M/Z
Where:
VPall = plate allowable stress = 0.6 * Fy = 141 MPa
M = moment due to lateral force = Fz * e
Z = modulus section = 1/6 * Hg * tg2 = 3375 mm3
tg = plate thickness = 9 mm
Hg = plate height = 250 mm
e = eccentricity = 10 + 0.5B + lh = 150 mm
Fz * e
VPall =
1/6 * Hg * tg2
then
VPall * 1/6 * Hg * tg2 475.875
Fz = =
e 150
so, Fz all = 3.17 kN
Stress Ratio : 0.525 OK → Fz all > Fz max

Attachment H - Page 40 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.4.2 Beam to Beam Pinned Connection (C3) between Secondary Beam El. +16.00 and
Longitudinal Beam El. +16.00
Secondary Beam El. +16.00 SH 400
Longitudinal Beam El. +16.00 SH 400

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With : V = Shear force


T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.4.2.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 400 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 292 102 159 10.951 38.628 -0.004 0.000 0.000 0.000
Min Fx 292 103 159 -10.861 38.628 0.001 0.000 0.000 0.000
Max Fy 289 102 153 0.046 40.142 -0.112 0.000 0.000 0.000
Min Fy 425 103 166 0.019 -41.755 -0.378 0.000 0.000 0.000
Max Fz 425 103 240 0.019 0.257 0.999 0.000 -0.485 -85.520
Min Fz 425 102 240 0.016 0.257 -1.002 0.000 0.495 -85.520
Max Mx 293 104 161 0.030 38.628 -0.004 0.000 0.000 0.000
Min Mx 289 102 153 0.046 40.142 -0.112 0.000 0.000 0.000
Max My 295 102 240 0.187 2.669 0.124 0.000 0.495 -85.520
Min My 295 103 240 -0.159 2.669 -0.121 0.000 -0.485 -85.520
Max Mz 289 101 153 0 050
0.050 39 697
39.697 0 003
0.003 0 000
0.000 0 000
0.000 0 000
0.000
Min Mz 295 102 240 0.187 2.669 0.124 0.000 0.495 -85.520

Attachment H - Page 41 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-41.755 No Tension 216.07 360.12 0.193 < 1...OK
38.628 -10.861 216.07 360.12 0.209 < 1...OK
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

H.4.2.2 Temporary Condition


From STAAD Pro Result, summary of inner Force maximum for SH 400 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 292 113 159 14 024
14.024 31 128
31.128 -0.004
0 004 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 292 115 159 -13.937 38.628 0.001 0.000 0.000 0.000
Max Fy 289 116 153 2.891 40.142 0.118 0.000 0.000 0.000
Min Fy 425 115 166 3.098 -41.755 -0.378 0.000 0.000 0.000
Max Fz 425 120 240 0.016 0.257 1.019 0.000 -0.563 -85.520
Min Fz 425 118 240 0.018 0.257 -1.021 0.000 0.573 -85.520
Max Mx 293 150 161 -3.787 7.765 -0.004 0.000 0.000 0.000
Min Mx 292 123 159 -13.884 7.765 0.001 0.000 0.000 0.000
Max My 295 118 240 0.188 2.669 0.143 0.000 0.573 -85.520
Min My 295 120 240 -0.159 2.669 -0.141 0.000 -0.563 -85.520
Max Mz 289 105 153 1.277 32.642 -0.112 0.000 0.000 0.000
Min Mz 295 116 240 2.731 2.669 -0.121 0.000 -0.485 -85.520

Attachment H - Page 42 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity*y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-41.755 No Tension 287.38 478.96 0.145 < 1...OK
38.628 -13.937 287.38 478.96 0.164 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I

½B

Type I

Attachment H - Page 43 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.4.2.3 Plate connection checking due to longitudinal force caused by thermal friction.

Top view Side view


Staad Pro Output
Fx max = 14.02 kN Mx max = 0.000 kNm
Fy max = 41.76 kN My max = 0.573 kNm
Fz max = 1.021 kN Mz max = 85.520 kNm
a = 8 mm LwA = 374 mm (vertical weld)
tp = 13 mm LwB = 196 mm (horizontal weld)

H.4.2.3.1. Welding Check


Case -1
Fy/2
// 1a =
0.707*a*LwA
20877.5
=
0.707*8*374
= 9.87 Mpa

Fx/4
// 1b =
0.707*a*LwB
3506
=
0.707*8*196
= 3.16 Mpa

Attachment H - Page 44 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Case -2
1/4*√2 * Fz
2a = l 2a =
0.707*a*LwA
360.98
=
0.707*8 * 374
= 0.171 Mpa

1/8*√2 * Fz
2b = l 2b =
0.707*a*LwB
180.49
=
0.707*8
0 707*8 * 196
= 0.163 Mpa

1/4*√2 * Fx
3 = l 3 =
0.707*a*LwA
4958.23
=
0.707*8*374
= 2.34 Mpa

Attachment H - Page 45 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

M1 = Fy * e = Fy * (0.5B + 10 + lh)
= 4697.438 kNmm
1.5*√2 *M1
4 = l 4 =
0.707*a*(2*LwA+LwB)2
9964770
=
5040265
= 1.98 Mpa

M2 = Fz * e = Fz * (0.5B + 10 + lh)
= 114.8625 kNmm

1/2*√2 * M2
5 = l 5 =
0.707*a*(LwA + LwB)*( s + 1/2.a√2)
81220.05
=
60148.21
= 1.35 Mpa

Attachment H - Page 46 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Summary of stress
Case Stress (Mpa)
// l 
1 9.87 - -
2 - 0.171 0.171
3 - 2.34 2.34
4 - 1.98 1.98
5 - 1.35 1.35
Max 9.87 2.34 2.34

 = √ 2 + 3 (// 2 +  l
2
) ≤  all
= 17.73 ≤ 124.11 OK

H.4.2.3.2 Plate Connection Check

Allowable shear of connection p


plate calculated as follow:
VPall = M/Z
Where:
VPall = plate allowable stress = 0.6 * Fy = 141 MPa
M = moment due to lateral force = Fz * e
Z = modulus section = 1/6 * Hg * tg2 = 4725 mm3
tg = plate thickness = 9 mm
Hg = plate height = 350 mm
e = eccentricity = 10 + 0.5B + lh = 150 mm
Fz * e
VPall =
1/6 * Hg * tg2
then
VPall * 1/6 * Hg * tg2 666.225
Fz = =
e 150
so, Fz all = 4.44 kN
Stress Ratio : 0.230 OK → Fz all > Fz max

Attachment H - Page 47 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.4.3 Beam to Beam Pinned Connection (C3) between Secondary Longitudinal Beam El.+5.00 To
El.+16.00 and Secondary Beam El.+5.00 To El.+16.00
Secondary Longitudinal Beam El.+5.00 To El.+16.00 SH 200
Secondary Beam El.+5.00 To El.+16.00 SH 400

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With : V = Shear force


T = Tension force
Vall = Allowable shear capacity
Tall = Allowable tension capacity

H.4.3.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 200 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 428 102 229 24.528 0.307 0.000 -0.001 0.000 0.000
Min Fx 428 103 229 -25.625 0.307 0.000 -0.001 0.000 0.000
Max Fy 431 101 235 -1.531 0.307 0.000 0.000 0.000 0.000
Min Fy 431 101 236 -1.531 -0.307 0.000 0.000 0.000 0.000
Max Fz 431 103 235 -5.599 0.307 0.000 0.000 0.000 0.000
Min Fz 429 103 231 -12.311 0.307 0.000 -0.001 0.000 0.000
Max Mx 434 104 228 -0.623 0.307 0.000 0.001 0.000 0.000
Min Mx 429 104 231 -0.380 0.307 0.000 -0.001 0.000 0.000
Max My 427 101 227 -0.865 0.307 0.000 0.000 0.000 0.000
Min My 427 101 227 -0.865 0.307 0.000 0.000 0.000 0.000
Max Mz 427 101 227 -0.865
0 865 0 307
0.307 0 000
0.000 0 000
0.000 0 000
0.000 0 000
0.000
Min Mz 427 101 227 -0.865 0.307 0.000 0.000 0.000 0.000

Attachment H - Page 48 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force p
Allowable Capacity y Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-0.307 -1.531 75.40 105.64 0.019 < 1...OK
0.307 -25.625 216.07 360.12 0.073 < 1...OK

H.4.3.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 200 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 428 125 229 40.138 0.277 0.000 0.000 0.000 0.000
Min Fx 428 127 229 -40.686 0.307 0.000 -0.001 0.000 0.000
Max Fy 431 105 235 2 556
2.556 0 307
0.307 0 000
0.000 0 000
0.000 0 000
0.000 0 000
0.000
Min Fy 431 105 236 2.556 -0.307 0.000 0.000 0.000 0.000
Max Fz 431 123 235 -4.856 0.277 0.000 -0.001 0.000 0.000
Min Fz 429 123 231 -11.137 0.277 0.000 -0.001 0.000 0.000
Max Mx 435 123 230 -10.590 0.277 0.000 0.001 0.000 0.000
Min Mx 429 150 231 -0.399 0.277 0.000 -0.001 0.000 0.000
Max Myy 427 105 227 -2.576 0.307 0.000 0.000 0.000 0.000
Min My 427 105 227 -2.576 0.307 0.000 0.000 0.000 0.000
Max Mz 427 105 227 -2.576 0.307 0.000 0.000 0.000 0.000
Min Mz 427 105 227 -2.576 0.307 0.000 0.000 0.000 0.000

Attachment H - Page 49 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
Force Allowable Capacity* Check
V T Vall Tall V + T Remarks
(kN) (kN) (kN) (kN) Vall Tall
-0.307 No Tension 100.28 140.50 0.003 < 1...OK
0.307 -40.686 287.38 478.96 0.086 < 1...OK
*) For temporary load the allowable value can be increased by 33%
V : Shear force or Fy in STAAD Pro
T : Tension force or Fx in (-) value in STAAD Pro

From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-I

½B

Type I

Attachment H - Page 50 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.4.3.3 Plate connection checking due to longitudinal force caused by thermal friction.

Staad Pro Output


Fx max = 40.69 kN Mx max = 0.001 kNm
Fy max = 0.31 kN My max = 0.000 kNm
Fz max = 0.000 kN Mz max = 0.000 kNm
a = 5 mm LwA = 136 mm (vertical weld)
tp = 7 mm LwB = 73 mm (horizontal weld)

H.4.3.3.1. Welding Check


Case -1
Fy/2
// 1a =
0.707*a*LwA
153.5
=
0.707*5*136
= 0.32 Mpa

Fx/4
// 1b =
0.707*a*LwB
10171.5
=
0.707*5*72.5
= 39.69 Mpa

Attachment H - Page 51 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Case -2
1/4*√2 * Fz
2a = l 2a =
0.707*a*LwA
0.00
=
0.707*5 * 136
= 0.000 Mpa

1/8*√2 * Fz
2b = l 2b =
0.707*a*LwB
0.00
=
0.707*5
0 707*5 * 72
72.5
5
= 0.000 Mpa

1/4*√2 * Fx
3 = l 3 =
0.707*a*LwA
14384.67
=
0.707*5*136
= 29.92 Mpa

Attachment H - Page 52 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

M1 = Fy * e = Fy * (0.5B + 10 + lh)
= 34.5375 kNmm
1.5*√2 *M1
4 = l 4 =
0.707*a*(2*LwA+LwB)2
73265.1
=
419534.7
419534 7
= 0.17 Mpa

M2 = Fz * e = Fz * (0.5B + 10 + lh)
= 0 kNmm

1/2*√2 * M2
5 = l 5 =
0.707*a*(LwA + LwB)*( s + 1/2.a√2)
0.00
=
7765.19
= 0.00 Mpa

Attachment H - Page 53 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Summary of stress
Case Stress (Mpa)
// l 
1 39.69 - -
2 - 0.000 0.000
3 - 29.92 29.92
4 - 0.17 0.17
5 - 0.00 0.00
Max 39.69 29.92 29.92

 = √ 2 + 3 (// 2 +  l
2
) ≤  all
= 91.14 ≤ 124.11 OK

H.4.1.3.2 Plate Connection Check

Allowable shear of connection p


plate calculated as follow:
VPall = M/Z
Where:
VPall = plate allowable stress = 0.6 * Fy = 141 MPa
M = moment due to lateral force = Fz * e
Z = modulus section = 1/6 * Hg * tg2 = 4725 mm3
tg = plate thickness = 9 mm
Hg = plate height = 350 mm
e = eccentricity = 10 + 0.5B + lh = 150 mm
Fz * e
VPall =
1/6 * Hg * tg2
then
VPall * 1/6 * Hg * tg2 666.225
Fz = =
e 150
so, Fz all = 4.44 kN
Stress Ratio : 0.000 OK → Fz all > Fz max

Attachment H - Page 54 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.5 Horizontal Bracing Connection (C5)


H.5.1 Horizontal Bracing Connection (C5) between Horizontal Bracing El.+5.00 To El.+16.00 and
Main Beam
Horizontal Bracing El.+5.00 To El.+16.00 CT 150
Main Beam MH 588

H.5.1.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for CT 150 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 809 102 30 16.162 0.449 0.000 0.000 0.000 0.000
Min Fx 823 102 62 -13.574 0.449 0.000 0.000 0.000 0.000
Max Fy 763 101 54 0.317 0.449 0.000 0.000 0.000 0.000
Min Fy 763 101 236 0 317
0.317 -0.449
0 449 0 000
0.000 0 000
0.000 0 000
0.000 0 000
0.000
Max Fz 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Min Fz 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Max Mx 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Min Mx 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Max My 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Min Myy 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Max Mz 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000
Min Mz 489 101 6 6.061 0.449 0.000 0.000 0.000 0.000

Attachment H - Page 55 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
p
Force Allowable Capacity y Check
T or Q Tall (or Qall) T Remarks
(kN) (kN) Tall
-13.574 287.739 0.047 < 1...OK
16.162 287.739 0.056 < 1...OK
T : Tension force or Fx in (-) value in STAAD Pro
Q : Compression force or Fx in (+) value in STAAD Pro

H.5.1.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for CT 150 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 809 125 30 31 071
31.071 0 404
0.404 0 000
0.000 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 764 123 236 -26.012 0.404 0.000 0.000 0.000 0.000
Max Fy 763 105 54 2.188 0.449 0.000 0.000 0.000 0.000
Min Fy 763 105 236 2.188 -0.449 0.000 0.000 0.000 0.000
Max Fz 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Min Fz 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Max Mx 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Min Mx 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Max My 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Min My 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Max Mz 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000
Min Mz 489 105 6 -4.240 0.449 0.000 0.000 0.000 0.000

Attachment H - Page 56 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
p
Force Allowable Capacity* y Check
T or Q Tall (or Qall) T Remarks
(kN) (kN) Tall
-26.012 382.693 0.068 < 1...OK
31.071 382.693 0.081 < 1...OK
*) For temporary load the allowable value can be increased by 33%
T : Tension force or Fx in (-) value in STAAD Pro
Q : Compression force or Fx in (+) value in STAAD Pro

Detail : Angle Brace

Attachment H - Page 57 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.6 Vertical Bracing Connection (C4)


H.6.1 Vertical Bracing Connection (C4) between Vertical Bracing Trasverse Dir. El.+0.00 to
EL.+16.00 and Column
Vertical Bracing Trasverse Dir. El.+0.00 to EL.+16.00 CT 200
Column MH 588

H.6.1.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for CT 200 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 507 103 7 81.449 0.000 0.481 0.000 0.000 0.000
Min Fx 508 103 98 72.389 0.000 0.481 0.000 0.000 0.000
Max Fy 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000
Min Fy 501 101 1 9 443
9.443 0 000
0.000 0 481
0.481 0 000
0.000 0 000
0.000 0 000
0.000
Max Fz 703 101 105 4.153 0.000 0.481 0.000 0.000 0.000
Min Fz 703 101 49 5.658 0.000 0.481 0.000 0.000 0.000
Max Mx 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000
Min Mx 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000
Max My 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000
Min Myy 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000
Max Mz 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000
Min Mz 501 101 1 9.443 0.000 0.481 0.000 0.000 0.000

Attachment H - Page 58 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
p
Force Allowable Capacity y Check
T or Q Tall (or Qall) T Remarks
(kN) (kN) Tall
No tension 496.491 No TensionNo Tension
81.449 496.491 0.164 <1…OK
T : Tension force or Fx in (-) value in STAAD Pro
Q : Compression force or Fx in (+) value in STAAD Pro

H.6.1.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for CT 200 are shown below

Beam L/C Node Fx Fy Fz Mx My Mz


kN kN kN kNm kNm kNm
Max Fx 507 127 7 154 996
154.996 0 000
0.000 0 481
0.481 0 000
0.000 0 000
0.000 0 000
0.000
Min Fx 508 127 98 146.195 0.000 0.481 0.000 0.000 0.000
Max Fy 703 106 105 48.737 0.228 0.481 0.000 0.000 0.000
Min Fy 703 105 105 47.638 0.228 0.481 0.000 0.000 0.000
Max Fz 703 105 105 47.638 0.228 0.481 0.000 0.000 0.000
Min Fz 703 105 49 46.132 0.226 0.481 0.000 0.000 0.000
Max Mx 501 105 1 37.373 0.226 0.481 0.000 0.000 0.000
Min Mx 501 105 1 37.373 0.226 0.481 0.000 0.000 0.000
Max My 501 105 1 37.373 0.226 0.481 0.000 0.000 0.000
Min My 501 105 1 37.373 0.226 0.481 0.000 0.000 0.000
Max Mz 501 105 1 37.373 0.226 0.481 0.000 0.000 0.000
Min Mz 501 105 1 37.373 0.226 0.481 0.000 0.000 0.000

Attachment H - Page 59 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check
p
Force Allowable Capacity y Check
T or Q Tall (or Qall) T Remarks
(kN) (kN) Tall
No tension 660.334 No TensionNo Tension
154.996 660.334 0.235 <1…OK
*) For temporary load the allowable value can be increased by 33%
T : Tension force or Fx in (-) value in STAAD Pro
Q : Compression force or Fx in (+) value in STAAD Pro
Detail : Angle-Brace

Attachment H - Page 60 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

H.7 Base Plate Pinned Connection


H.7.1 Column
Column MH 588
To accommodate the combination of tension force and shear, the support reaction shall conform the
formula below
- Combination of tension and shear

V T
+ ≤ 1
Vall Tall

With : V = Shear force (Fx and Fz in Staad Pro)


T = Tension force (Fy in (-) value in Staad Pro)
Vall = Allowable shear capacity
Tall = Allowable tension capacity

7 19 31 43 55 67 79 91

1 13 25 37 49 61 73 85
Fig.
g H.7.1.1 Node Number of SR-02 ((PR-18))

H.7.1.1 Permanent Condition


From Staad Pro Result, summary of Support Reaction maximum for permanent condition are shown
below
Fx Fy Fz Mx My Mz
Node L/C
kN kN kN kNm kNm kNm
Node L/C Fx kN Fy kN Fz kN Mx kN-m My kN-m Mz kN-m
Max Fx 1 103 18.388 388.652 30.074 0.000 0.000 0.000
Min Fx 7 102 -18.865 270.826 -35.067 0.000 0.000 0.000
Max Fy 19 102 -15.711 552.396 -39.585 0.000 0.000 0.000
Min Fy 91 103 10.938 131.759 27.963 0.000 0.000 0.000
Max Fz 7 103 14.063 442.410 43.279 0.000 0.000 0.000
Min Fz 19 102 -15.711
15 711 552 396
552.396 -39.585
39 585 0 000
0.000 0 000
0.000 0 000
0.000
Max Mx 1 101 1.580 263.000 4.288 0.000 0.000 0.000
Min Mx 1 101 1.580 263.000 4.288 0.000 0.000 0.000
Max My 1 101 1.580 263.000 4.288 0.000 0.000 0.000
Min My 1 101 1.580 263.000 4.288 0.000 0.000 0.000
Min Mz 1 101 1.580 263.000 4.288 0.000 0.000 0.000

Attachment H - Page 61 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check:
Axial Force ((Fy)
y) = 552.396 kN < Axial ((Call)) = 1227.847 kN ,,OK
Tension Force (Fy) = 0.000 kN < Tension (Tall) = 537.106 kN ,OK
Shear Force (Fx) = 18.865 kN < Shear (Vall) = 341.600 kN ,OK
V + T 18.865 0.000
= + = 0.055 <1, OK
Vall Tall 341.600 537.106
Shear Force (Fz) = 43.279 kN < Shear (Vall) = 341.600 kN ,OK
V + T 43.279 0.000
= + = 0.127 <1,
1, OK
Vall Tall 341.600 537.106

H.7.1.2 Temporary Condition

From Staad Pro Result, summary of Support Reaction maximum for temporary condition are shown below
Fx Fy Fz Mx My Mz
Node L/C
kN kN kN kNm kNm kNm
Max Fx 1 123 76.455 468.782 12.069 0.000 0.000 0.000
Min Fx 7 121 -76.903 362.517 -46.575 0.000 0.000 0.000
Max Fy 19 113 -58.882 728.452 -51.024 0.000 0.000 0.000
Min Fy 67 123 55.406 -131.939 44.195 0.000 0.000 0.000
Max Fz 7 127 13.593 577.797 82.851 0.000 0.000 0.000
Min Fz 19 125 -14.898 651.193 -79.832 0.000 0.000 0.000
Max Mx 1 105 -29.346 111.918 -20.947 0.000 0.000 0.000
Min Mx 1 105 -29.346 111.918 -20.947 0.000 0.000 0.000
Max My 1 105 -29.346 111.918 -20.947 0.000 0.000 0.000
Min My 1 105 -29.346 111.918 -20.947 0.000 0.000 0.000
Max Mz 1 105 -29.346 111.918 -20.947 0.000 0.000 0.000
Min Mz 1 105 -29.346 111.918 -20.947 0.000 0.000 0.000

Attachment H - Page 62 of 63
Doc. No. SNO-S-CC-05-010
CALCULATION OF PIPE RACK STRUCTURE
# 10
REV. B

SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Capacity Check:
Axial Force ((Fy)
y) = 728.452 kN < Axial ((Call)) = 1633.037 kN ,,OK
Tension Force (Fy) = -131.939 kN < Tension (Tall) = 714.352 kN ,OK
Shear Force (Fx) = 76.903 kN < Shear (Vall) = 454.328 kN ,OK
V + T 76.903 -131.939
= + = 0.354 <1, OK
Vall Tall 454.328 714.352
Shear Force (Fz) = 82.851 kN < Shear (Vall) = 454.328 kN ,OK
V + T 82.851 -131.939
= + = 0.367 <1,
1, OK
Vall Tall 454.328 714.352

*) For temporary load the allowable value can be increased by 33%


From table, the support reaction has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail : TYPE-C

Attachment H - Page 63 of 63
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

ATTACHMENT
C I
ANCHOR BOLT CAPACITY
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23-Jun-13

I. ANCHOR BOLT CAPACITY

Attachment I - Page 1 of 1
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

ATTACHMENT
C J
FOUNDATION DESIGN
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

J. FOUNDATION DESIGN
J.1 Typical Plan of Foundation Design
Row AA-HA
Pedestal and Pilecap
to be used for column H588x300x12
Flange = 0.588 m
Web
W b = 0.3
03 m
Pedestal Width (BP) = 0.68 m
Pedestal Length (LP) = 0.74 m
Pilecap Height (HF) = 0.50 m
Pilecap Length (LF) = 2.70 m
Pilecap Width (BF) = 2.70 m
Pedestal Height (HP) = 0.65 m
Ground Height (HG) = 0 35
0.35 m
Concrete Cover = 0.075 m
Pile Dia. (DP) = 0.30 m
Pile Length (LP) = 18.00 m
Pile to pile distance (SZ) = 0.90 m
n PCD1 = 4.00 ea

J.1.1.1 Pile Arrangement


g
Row AA-HA
Use Pile : Diameter = 300 mm
Length = 18 m
Total nos = 4 ea

Load Pile Pile Allowable Capacity (kN)


Pile Zone
Condition Diameter Length (m) Qcomp. Qtens. Qlat.

Permanent 4 0.3 18 355.80 175.00 39.00

Temporary 4 0.3 18 475.00 233.30 39.00

Attachment J - Page 1 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

J.1.1.2 Pile Additional Load


c = 23.54 kN/m3
so = 16.50 kN/m3

Weight of column pedestal :


Ppedes = (BP * LP)* HP * c
= (0.68
(0 68 * 0.74)*0.65 23.536
0 74)*0 65 * 23 536
= 7.698 kN (assigned as point load (CP) to foundation)

Weight of pilecap :
Pcap = (BF * LF)* HF * c
= (2.7 * 2.7)*0.5 * 23.536
= 85.789 kN (assigned as point load (PC) to foundation)

Weight of soil above foundation:


Psoil = ((LF * BF)-(BP * LP))* HG * so
= ((2.7 * 2.7)-(0.68 * 0.74))*0.35 * 16.5
= 39.194 kN (assigned as point load (S) to foundation)

J.1.2
J 1 2 Maximum Support Reaction Data
J.1.2.1 Permanent Condition

Attachment J - Page 2 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

J.1.2.2 Temporary Condition

J.1.3 Piling Design

Pile Capacity Check:

Fy
1) Fv   Qcomp (for Fv in (  ) value)
n
Fy
2) Fv   Qtens (for Fv in (-) value)
n
Fx 2  Fz 2
3) Fh   Qlat
n
Where:
Fy = Axial support reaction (output STAAD Pro)
Fx = Lateral support reaction in X direction (output STAAD Pro)
Fz = Lateral support reaction in Z direction (output STAAD Pro)
Fh = Lateral reaction of pile
Fv = Axial reaction of pile ((+) for compression, and (-) for tension)

Attachment J - Page 3 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Attachment J - Page 4 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Attachment J - Page 5 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013
J.1.4 Concrete Reinforcement Design
J.1.4.1 Pilecap Reinforcement Design

Pilecap Flexural Reinforcement :

R2 = 572.22 kN

R1 = 333.90 kN

Rect 0.50x2.70 Rect 0.50x2.70

M
Max: 1
150.255
0 2 kNkNm

75.128 kNm

21.506 kNm
0 kNm Rect 0.50x2.70 Rect 0.50x2.70

-107.244 kNm

Mu = 1.2 Mmax = 180.306 kN.m


Pilecap effective thickness = d = 0.401 m
= 401 00 mm
401.00
2
Ru = Mu / ( * BF * d )
= 0.461 MPa
m = fy / ( 0.85 * fc' )
= 13.109

0.5
= (1/m) * (1 - (1 - 2m Ru/fy) )
= 0.119%
 balanced = i * 0.85 fc'
fc * 600
fy 600 + fy
= 3.93%
 max = 0.75  balanced
= 2.95%
 min = 1.4/fy = 0.35% ( min = 1.4/fy if 1.33 x required > 1.4/fy)
 min = 0.18% ( min = 0.18% if 1.33 x  required < 1.4/fy)
 used = 0.18% < 2.95%……...OK
As req =  * BF * d
2
= 1948.86 mm
Diameter of reinf. bars = 16.00 mm
As = 201.06 mm2
No.of bars = As req / As
= 9.70 ea
spacing = BF / no. of wire
= 0.310 m
= 310.34 mm 250 mm
Use D16 - 250 for top & bottom flexural reinforcement

Attachment J - Page 6 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Pilecap Shear Reinforcement:


One Way Shear Check

LF = 2.70 m
BF = 2.70 m
LP = 0.74 m
BP = 0.68
0 68 m
d = 0.401 m

Max: 572.220 kN 572.220 kN 572.220 kN

Rect 0.50x2.70 Rect 0.50x2.70

Max: -333.900 kN -333.900 kN -333.900 kN

Pu = 1.2 Pmax
Pu = 906.12 kN
AF = BF * LF
= 2.7 * 2.7
2
= 7.29 m
Pu
q =
AF
906.12
=
7.29
2
= 124.30 kN/m
A = BF * (LF - (0.5 (LF + LP) + d)) (tributary area)
= 2.7 * (2.7 - (0.5 (2.7 + 0.74) + 0.401))
2
= 1.563 m
Vu = q*A
= 194.312 kN
øVc = ø 2*(f'c)^0.5 * BF * d
= (0.85 * 2 * (35)^0.5 * 2700 * 401)/1000
= 10889.08 kN
Vu < øVc, no need shear reinforcement

Attachment J - Page 7 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

Two way shear check

Punching shear critical area:


BP + d = 1.081 m < BF = 2.700 m, width used: 1.081 m
LP + d = 1.141 m < LF = 2.700 m, length used: 1.141 m
A = (BF * LF)-(BF * (LP+d)) (tributary area)
2
= 6 057 m
6.057

q = 124.296 kN/m2
Vu = q*A
= 752.810 kN

Shear Capacity:
ratio of long side to short side of load (c) = LP/BP = 1.09
constant, (20 for corner, 30 for edge, 40 for interior column) (s) = 40.00
Effective depth of footing (d) = 401.00 mm
Length of punching shear critical area (bo) = 2*(min(LF,(Lp+d))+min(BF,(Bp+d)))
= 4,444.00 mm
Vc shall be the smallest of :
4
4.965 kN/m
Vc  (2  ) fc' * bo * d/12
βc

Vc = ( 2 + 4 / 1.09) * 35^0.5 * 4444 * 401/ 12


= 4,986.42 kN
αs*d
Vc  (2 ) fc'*bo*d/12
bo
Vc = ((2+40*401/4444)*) 35^0.5*4444*401/12
= 4,928.16 kN
Vc = 4*f'c^0.5*bo*d/12
= 4 * 35^0.5 * 4444 * 401 /12
= 3,514.24 kN

Vc used : 3,514.24 kN

ø Vc = ø x Vc
= 0.75 x 3514.24
= 2,635.68 kN Vu = 752.81 kN
Vu < øVc, no need shear reinforcement

Attachment J - Page 8 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013
J.1.4.2 Pedestal Reinforcement

740 mm

680 mm

Pedestal area = 503200 mm2


2
As Min (0.5% A bruto) = 2516 mm
2
Total area reinforcement needed = 2516 mm
d reinforcement = 16 mm
2
A reinforcement = 201.06 mm
n reinforcement needed = 12.514 = 14 nos

Use 14 D16 for vertical reinforcement and


D10 -100 for stirrups

J.1.4.3
J 1 4 3 MAXIMUM CRACK WIDTH ON TENSION AREA OF PILECAP
Row AA-HA
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as
follows:
w  1.11  10 6    fs  3 dc  A
(Ref.1 Sect. 8.8)
where
w = crack width (mm)
 = height factor (1.2 for beam, 1.35 for slab) = 1.35
fs = reinforcement calculated stress at service load (MPa),
shall be 0.6 fy for maximum crack = 234 MPa
dc = thickness of concrete cover (mm) = 75 mm
ds = cover concrete + 1/2 diameter of rebar = 83.0 mm
A = effective tension area divided by number of rebar.
= Ae/N
Ae = effective
ff tension area off concrete around the rebar layment.
= b * 2 * ds = 166,000 mm2
N = 1000/s+1 = 1000/250 + 1 = 5 nos
A = Ae/N = 166000/5 = 33,200 mm2
b

d
d
ds
ds
so:
w = 1.11e-6 * 1.35 * 234 * (75 * 33200)^(1/3)
= 0.0475 mm < 0.33 mm ……….. OK

Attachment J - Page 9 of 9
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

ATTACHMENT K
STEEL & FOUNDATION MATERIAL TAKE OFF (MTO)
CALCULATION OF PIPE RACK STRUCTURE Doc. No. SNO-S-CC-05-010

# 10 REV. B
SENORO GAS DEVELOPMENT PROJECT DATE. 23 Juni 2013

K. Pipe Rack PR-10 Steel & Foundation Material Take Off

K.1. Steel Material Take Off

L th
Length W i ht
Weight
Profiles
m kN Ton
MH 588 571.20 821.420 82.142
SH 300 670.00 240.772 24.077
SH 400 140.00 89.662 8.966
SH 200 309.85 63.482 6.348
CT 150 520 00
520.00 93 474
93.474 9 347
9.347
CT 200 350.55 112.294 11.229
TOTAL 1421.104 142.110

K.2. Foundation Material Take Off

p Rack
Pipe : PR-10

Tag Number : PR-10 row AA-HA


Number of Row : wider row = 8 lines
shorter row = 2 lines

Concrete Work
Calculation Unit Volume (per foundation and/or per pedestal)
Pile Cap
Length : 2.7 m
Width : 2.7 m
Height : 0.5 m x thick of lean concrete = 0.050 m
Volume per foundation : 3.645 m3 volume lean concrete = 0.365 m3
Rebar X : D 16 - 250
Rebar Y : D 16 - 250
Number of rebar : 12 ; Length = 6.61 m ; weight = 125.156 kg
: 12 ; Length = 6.61 m ; weight = 125.156 kg
Pedestal
Length : 0.74
0 74 m
Width : 0.68 m
Height : 0.65 m x thick of lean concrete = 0m
Volume per foundation : 0.327 m3 volume lean concrete = 0 m3
Rebar : 14 - D 16
Stirrups : 10 - 100
Number of rebar : g
14 ; Length = 1.15 m ; weightg = g
25.411 kg
: 8 ; Length = 2.56 m ; weight = 12.627 kg

Total concrete and Lean concrete is tabulated as following :

Unit Volume Unit Number Total Volume (m3)


No Description
Fc' 28 Fc' 17.5 Unit number Unit Fc' 28 Fc' 17.5
1 Footing
Type-1 3.645 0.365 m3 16 nos 58.320 5.832
2 Pedestal
Type-1 0.327 0.000 m3 16 nos 5.233 0.000
63.553 5.832

Total concrete Fc'


Fc 28 MPa for foundation of PR-10 row AA-HA = 64 m3
Total Lean concrete Fc' 17.5 MPa for foundation of PR-10 row AA-HA = 6 m3

Reinforcement Concrete
Total rebar is tabulated as following :

Unit Volume Unit Number Total Weight


g
No Description
Volume Unit number Unit (kg)
1 Footing
Type-1 250.311 kg 16 nos 4004.984
2 Pedestal
Type-1 38.038 kg 16 nos 608.606
4613.590

Total Rebar for foundation of PR-10 row AA-HA = 4.614 Ton


Ratio used rebar = rebar/concrete = 72.087 kg/m3

Total concrete Fc' 28 MPa for foundation of PR-10 = 64.000 m3


Total Lean concrete Fc'
Fc 17.5 MPa for foundation of PR-10 = 6.000 m3
Total Rebar for foundation of PR-08 = 4.614 Ton
PC Pile
Row AA-HA
Diameter : 0.3 m
Pile length : 18 m
Number pile per pile cap : 4 ea
Point 16 nos
Total length : 1152 m

Site Preparation
V l
Volume off excavation
ti isi tabulated
t b l t d as following:
f ll i

Depth Length Width Vol Unit number Total Volume


No Description (m) (m) (m) (m3) number unit (m3)
1 Footing
Type -1 1.000 3.000 3.000 11.686 16.000 nos 186.979
186.979

Excavation : 186.979 m3
Back fill : 128.659 m3
Soil Disposal : 58.320 m3

Miscellaneous
Row AA-PA
Anchor bolt dia. : 1 1/4 in
Type of anchor : Type 1 - H
Number of :
anchor
128 nos