TP48300A-DX15A1 & TPC650A-DX15A1 &

TPC650A-AX15A1

Installation Guide

Issue 04

Date 2016-02-05

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2016. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: http://e.huawei.com

Issue 04 (2016-02-05) Huawei Proprietary and Confidential i


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide About This Document

About This Document

Overview
This document describes how to install and commission the power system.
The figures provided in this document are for reference only.

Intended Audience
This document is intended for:
 Installation and commissioning engineers
 Technical support engineers

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Description
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.

Indicates a potentially hazardous situation which, if not


avoided, could result in death or serious injury.

Indicates a potentially hazardous situation which, if not


avoided, may result in minor or moderate injury.

Indicates a potentially hazardous situation which, if not


avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.
Calls attention to important information, best practices and
tips.
NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential ii


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide About This Document

Change History
Changes between document issues are cumulative. The latest document issue contains all the
changes made in earlier issues.

Issue 04 (2016-02-05)
Modified all the cabinet figures.

Issue 03 (2016-01-12)
Added section 10.7 (Optional) Manually Clearing Alarms.
Modified appendix A Associations Between Alarms and Dry Contacts on the UIM.

Issue 02 (2015-11-24)
Modified section 3.1 Interior.

Issue 01 (2015-11-15)
This issue is the first official release.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential iii


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide Contents

Contents

About This Document .................................................................................................................... ii


1 Safety Precautions ......................................................................................................................... 1
1.1 General Safety .............................................................................................................................................................. 1
1.2 Electrical Safety ............................................................................................................................................................ 2
1.3 Battery Safety ............................................................................................................................................................... 3
1.4 Cable Layout ................................................................................................................................................................. 4
1.5 Mechanical Safety ........................................................................................................................................................ 4

2 Installation Preparations ............................................................................................................. 6


2.1 Required Tools .............................................................................................................................................................. 6
2.2 Product Specifications .................................................................................................................................................. 7
2.3 Installation Dimensions ................................................................................................................................................ 8
2.4 Requirements for Cable Routing ................................................................................................................................ 10

3 Components ................................................................................................................................. 11
3.1 Interior ........................................................................................................................................................................ 11
3.2 Power Distribution Unit .............................................................................................................................................. 16
3.3 Rectifier ...................................................................................................................................................................... 17
3.4 SMU02B ..................................................................................................................................................................... 18
3.5 UIM02C ...................................................................................................................................................................... 22
3.6 SMU06C ..................................................................................................................................................................... 25
3.7 Temperature Control Unit ........................................................................................................................................... 31
3.7.1 TCUC....................................................................................................................................................................... 31
3.7.2 (Optional) Heater ..................................................................................................................................................... 31
3.8 Door Status Sensor...................................................................................................................................................... 32
3.9 Battery Temperature Sensor ........................................................................................................................................ 33

4 Installing Cabinets ...................................................................................................................... 34


4.1 Unpacking and Checking ............................................................................................................................................ 34
4.2 Removing the Cabinet Pallet ...................................................................................................................................... 34
4.3 Installing a Cabling Channel for Combined Cabinets................................................................................................. 35
4.4 Determining Mounting Hole Positions ....................................................................................................................... 37
4.5 Drilling Holes and Installing Expansion Sleeves ........................................................................................................ 39
4.6 (Optional) Hoisting a Cabinet ..................................................................................................................................... 39

Issue 04 (2016-02-05) Huawei Proprietary and Confidential iv


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide Contents

4.7 Combining Cabinets ................................................................................................................................................... 41

5 Installing a Ground Cable ......................................................................................................... 43


6 Installing Components............................................................................................................... 46
6.1 Installing a Rectifier ................................................................................................................................................... 46
6.2 Installing a Heater ....................................................................................................................................................... 47

7 Installing Cables ......................................................................................................................... 53


7.1 (Optional) Installing Dry Contact Signal Cables ........................................................................................................ 53
7.2 Installing Door Status Sensor Cables .......................................................................................................................... 54
7.3 Installing the Communications Cables ....................................................................................................................... 55
7.3.1 WebUI Management ................................................................................................................................................ 55
7.3.2 NetEco Management................................................................................................................................................ 55
7.3.3 Third-Party NMS Management (over SNMP) ......................................................................................................... 56
7.4 Installing Input Power Cables for the Equipment Cabinet .......................................................................................... 57
7.5 Installing Communications Cables for the Equipment Cabinet .................................................................................. 59
7.6 Installing DC Output Power Cables ............................................................................................................................ 64
7.7 Installing AC Input Power Cables............................................................................................................................... 66

8 (Optional) Installing Batteries and Cables ............................................................................ 68


8.1 Preparing for the Second Battery String ..................................................................................................................... 69
8.2 Installing Battery Strings ............................................................................................................................................ 72
8.3 Installing Copper Bars Between Batteries .................................................................................................................. 73
8.4 Installing Battery Cables ............................................................................................................................................. 73

9 Verifying the Installation .......................................................................................................... 76


9.1 Checking Hardware Installation ................................................................................................................................. 76
9.2 Checking Electrical Connections ................................................................................................................................ 76
9.3 Checking Cable Installation ........................................................................................................................................ 76

10 Commissioning.......................................................................................................................... 77
10.1 Connecting the AC Power Supply ............................................................................................................................ 77
10.2 Setting the Display Language ................................................................................................................................... 78
10.3 Setting the Date and Time ......................................................................................................................................... 78
10.4 Setting Battery Parameters........................................................................................................................................ 78
10.5 Setting Communications Parameters ........................................................................................................................ 79
10.5.1 (Optional) Setting Parameters Before Using WebUI Management........................................................................ 79
10.5.2 (Optional) Setting Parameters Before Using the NetEco Management ................................................................. 87
10.5.3 (Optional) Setting Parameters Before Using the SNMP Management .................................................................. 89
10.6 Connecting the Battery Supply ................................................................................................................................. 90
10.7 (Optional) Manually Clearing Alarms ...................................................................................................................... 92
10.8 Subsequent Operations ............................................................................................................................................. 92

A Associations Between Alarms and Dry Contacts on the UIM .......................................... 93


B Acronyms and Abbreviations .................................................................................................. 95

Issue 04 (2016-02-05) Huawei Proprietary and Confidential v


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 1 Safety Precautions

1 Safety Precautions

1.1 General Safety


 Ensure that the product is used in an environment that meets the product design
specifications (such as the grid power, input voltage, temperature, and humidity) to avoid
causing malfunctions, damaging components, or voiding the warranty.
 Follow the precautions and special safety instructions provided by Huawei when
operating this product. Personnel who plan to install or maintain Huawei equipment must
receive a thorough training, understand all necessary safety precautions, and be able to
correctly perform all operations. Huawei will not be liable for any consequences that are
caused by the violation of general safety regulations and equipment usage safety
standards.
 Comply with local laws and regulations. The safety instructions in this document are
only supplements to local laws and regulations.
 Do not operate the product or handle cables during thunderstorms.
 Do not expose the equipment to flammable or explosive gas or smoke. Keep batteries
away from strong infrared radiation, organic solvents, and corrosive gas.
 Do not use water to clean electrical components inside or outside of the product.
 To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to
telecommunication network voltage (TNV) circuits.
 Before using the product, remove any conductors such as jewelry or watches.
 Use insulated tools for all operations that involve electrical connections.
 Follow specified procedures during installation and maintenance. Do not attempt to alter
the product or deviate from the recommended installation procedures without prior
consent from the manufacturer.
 Measure contact point voltage with an electric meter before handling a conductor surface
or terminal. Ensure that the contact point has no voltage or the voltage is within the
specified range.
 When installing or removing power cables, ensure that the corresponding circuits are
disconnected to prevent electric arcs or sparks.
 Performing maintenance or replacing components may interrupt power to the loads if
batteries are not connected or the battery reserve is insufficient. Ensure that the switches
for primary loads are in the ON position and do not turn off the battery switch and the
AC input switch at the same time.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 1


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 1 Safety Precautions

 Cables stored at subzero temperatures must be stored at room temperature for at least 24
hours before they are laid out.
 Perform routine maintenance as described in this manual; replace faulty components at
the earliest.

1.2 Electrical Safety


Grounding
 When installing a device, install the ground cable first. When uninstalling a device,
remove the ground cable at the very end.
 Before operating a device, ensure that the device is properly grounded. Ensure that the
ground cable is installed securely (the ground resistance is less than 0.1 ohm).
Inappropriate grounding may cause device damage and even personal injury.

AC and DC Power

 The power system is powered by high-voltage power sources. Direct or indirect contact
(through damp objects) with high-voltage power sources may result in serious injury or
death.
 Non-standard and improper operations may result in fire or electric shocks.
 Before making electrical connections, turn off the protection switch on the upstream
device to cut the power supply.
 Before connecting the AC power supply, ensure that electrical connections are complete.
 Before you connect cables to loads or battery cables, check cable and terminal polarities
to prevent reverse connections.

ESD
 To prevent electrostatic-sensitive components from being damaged by static from human
bodies, wear a grounded electrostatic discharge (ESD) wrist strap or ESD gloves when
touching circuit boards.
 When holding a board, hold its edge without touching any components, especially chips.
 Package boards with ESD packaging materials before storing or transporting them.

Liquid Prevention
 Do not place the product under areas prone to water leakage, such as near air conditioner
vents, ventilation vents, or feeder windows of the equipment room. Ensure that there is
no condensation inside the product or equipment room. Ensure that no liquid enters the
product. Otherwise, short circuits will occur and may result in serious injury or death.
 If any liquid is detected inside the product, immediately disconnect the power supply and
contact the administrator.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 2


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 1 Safety Precautions

1.3 Battery Safety


Before installing, operating, or maintaining the batteries, read the battery manufacturer's
safety instructions. Observe the safety precautions provided in this section, which are
supplemental to the safety instructions provided by the battery manufacturer.

Basic Requirements
 Avoid skin contact with electrolyte overflow. Before installing or maintaining batteries,
wear goggles, rubber gloves, and protective clothing.
 When handling a battery, ensure that its electrodes always point upward. Do not tilt or
overturn batteries.
 Switch off the battery circuit breaker or remove the battery fuse before installation and
maintenance.
 Secure battery cables to the torque specified in the battery documentation. Loose
connections will result in excessive voltage drop or cause batteries to burn out in the case
of excessive current.
 Ensure that the load bearing capacity is sufficient in the installation place. For example,
add a support to mitigate the load of the floor.
 Install batteries in a dry and, clean, and ventilated environment that is free from sources
of ignition. Avoid direct exposure to sunlight or rain water.
 Do not immerse battery cables in water or expose them to rain water.

Battery Short Circuit

High short circuit currents or electric shocks can cause equipment damage, personal injury, or
death.

To prevent short circuit or electric shock, disconnect the batteries before performing operation
or maintenance.

Flammable Gas

 Do not use unsealed lead-acid batteries.


 Lead-acid batteries emit flammable gas. Therefore, place and secure lead-acid batteries
horizontally to prevent fire or corrosion.

Store lead-acid batteries in a place with good ventilation, and take fire safety precautions.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 3


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 1 Safety Precautions

Battery Leakage

High temperatures may result in battery distortion, damage, and electrolyte overflow.

If the battery temperature is higher than 60°C, battery electrolyte may overflow. If the
electrolyte overflows, wear goggles, rubber gloves, and protective clothing and absorb the
leaking electrolyte using sodium bicarbonate (NaHCO3) or sodium carbonate (Na2CO3). Do
not transport or move batteries if there is an electrolyte leakage.

Battery Overdischarge
After connecting the batteries, remove the battery fuse or turn the battery circuit breaker OFF
and then powering on the power system. This prevents battery overdischarge. After the power
system is on, replace the battery fuse or turn the battery circuit breaker ON.

1.4 Cable Layout


 Cables must be routed so that a sufficient distance exists between the cables and the DC
busbar, shunt, and fuse. This prevents damage to the insulation layer of the cables.
 Signal cables must be bound separately from power cables.
 User-supplied cables must meet the VW-1 testing requirements.
 Cables must not be routed behind the air exhaust vents of rectifiers in the cabinet.
 All cables must be securely bound.

1.5 Mechanical Safety


Hoisting Devices

Do not walk under hoisted objects.


 Only trained and qualified personnel are allowed to perform hoisting operations.
 Before hoisting objects, check that all hoisting tools are available and in good condition.
 Before hoisting objects, ensure that hoisting tools are firmly fixed onto a weight-bearing
object or wall.
 Ensure that the angle formed by the two hoisting cables is less than 90 degrees.
 If metal hoisting cables are used, add protective pads in the positions where the cables
will come in contact with the cabinet to avoid scratching the cabinet surface.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 4


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 1 Safety Precautions

Figure 1-1 Hoisting heavy objects

Drilling Holes

Do not drill holes into a cabinet without permission. Non-standard drilling may affect the
electromagnetic shielding of the cabinet and damage interior cables. Metal shavings from
drilling may short-circuit circuit boards if they enter the cabinet.
 Before drilling holes into a cabinet, remove interior cables.
 Wear goggles and protective gloves when drilling holes.
 After drilling, clean up metal shavings immediately.

Moving Heavy Objects


 Be cautious to prevent injury when moving heavy objects.
 Wear protective gloves when moving heavy objects.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 5


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 2 Installation Preparations

2 Installation Preparations

2.1 Required Tools


Figure 2-1 lists the tools that are required for the installation.

Use tools with insulated handles.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 6


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 2 Installation Preparations

Figure 2-1 Installation tools

2.2 Product Specifications


Table 2-1 Product specifications

Model Name Dimensions (H x W x D) Weight


TP48300A- Power cabinet 1500 mm x 650 mm x 650 mm ≤ 125 kg
DX15A1 (DC1) (excluding the base and the (excluding
protruding part of the door) rectifiers and
batteries)
Base 150 mm x 650 mm x 650 mm
TPC650A-D Equipment cabinet 1500 mm x 650 mm x 650 mm ≤ 115 kg
X15A1 (DC1–Ext-Free (excluding the base and the
cooling) protruding part of the door)
Base 150 mm x 650 mm x 650 mm

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 7


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 2 Installation Preparations

Model Name Dimensions (H x W x D) Weight


TPC650A-A Equipment cabinet 1500 mm x 650 mm x 650 mm ≤ 150 kg
X15A1 (DC1–Ext-Aircon) (excluding the base and the
protruding part of the door)
Base 150 mm x 650 mm x 650 mm
R4850G2 Rectifier 40.8 mm x 105 mm x 281 mm ≤ 2 kg

2.3 Installation Dimensions


 The installation space requirements are the same for the TP48300A-DX15A1 (DC1),
TPC650A-DX15A1 (DC1-Ext-Free cooling), and TPC650A-AX15A1
(DC1-Ext-Aircon). The following figure uses the TP48300A-DX15A1 (DC1) as an
example.
 The TP48300A-DX15A1 (DC1), TPC650A-DX15A1 (DC1-Ext-Free cooling), and
TPC650A-AX15A1 (DC1-Ext-Aircon) support cabinet combination, which requires an
installation space of 1000 mm reserved behind the cabinets.
 After installing the cabinet, ensure that a clearance of at least 300 mm is reserved from
the right of the cabinet for opening the cabinet door.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 8


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 2 Installation Preparations

Figure 2-2 Space for the single cabinet (DC1)

Figure 2-3 Space for combined cabinets (DC1, two DC1-Ext-Free coolings and DC1-Ext-Aircon)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 9


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 2 Installation Preparations

2.4 Requirements for Cable Routing


 Cables should be more than 20 mm away from heat sources to prevent insulation layer
damage (melting) or functional degradation (aging or breakage).
 The bending radius of cables should be at least five times the diameter of the cables.
 Cables of the same type should be bound together. Cables of different types should be a
minimum of 30 mm from each other to avoid tangling.
 Cables that are bound together should be close to each other, tidy, and undamaged.
 Ground cables must not be bound to or tangled with signal cables. There should be an
appropriate distance between them to minimize interruptions.
 AC power cables, DC power cables, signal cables, and communications cables must be
bound separately.
 Power cables must be routed straight. No joints or welding should be performed on
power cables. Use a longer cable if necessary.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 10


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

3 Components

3.1 Interior
Figure 3-1 TP48300A-DX15A1 (DC1) interior

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 11


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

(1) AC output unit 1 (2) AC output (3) Cabinet ground


unit 2 bar
(4) Battery low voltage disconnection (BLVD) (5) RTN+ busbar (6) Heater
output box (optional)
(7) Heater (standard) (8) Air filter (9) Folder
(10) Free cooling fan (11) Power
subrack

Figure 3-2 Power subrack on TP48300A-DX15A1 (DC1)

(1) SMU02B (2) Space for NIM01C (3) Space for


rectifiers
(4) UIM02C (5) Battery switch (behind the (6) Battery circuit
cover) breakers
(7) Battery low voltage (8) Load low voltage (9) AC input circuit
disconnection (BLVD) circuit disconnection (LLVD) circuit breaker and terminals
breakers breakers

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 12


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Figure 3-3 AC box on TP48300A-DX15A1 (DC1)

(1) German standard maintenance socket and (2) AC output circuit breakers and
protective circuit breaker N terminals

Figure 3-4 DC output box on TP48300A-DX15A1 (DC1)

(1) BLVD circuit breakers

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 13


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

TPC650A-DX15A1 (DC1-Ext-Free cooling) and TPC650A-AX15A1


(DC1-Ext-Aircon)

Figure 3-5 TPC650A-DX15A1 (DC1-Ext-Free cooling) interior

(1) DC output unit (2) Cabinet ground bar (3) Heater (optional)
(4) Heater (standard) (5) Air filter (6) Folder
(7) TCUC (8) Free cooling fan

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 14


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Figure 3-6 TPC650A-AX15A1 (DC1-Ext-Aircon) interior

(1) DC output unit (2) Cabinet ground bar (3) Air filter
(4) Folder (5) AC air conditioner (6) SMU06C
(7) Free cooling fan

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 15


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Figure 3-7 DC output unit for DC1-Ext-Free cooling and DC1-Ext-Aircon

(1) Negative terminal for DC input (2) DC output circuit breakers (3) RTN+ busbar

3.2 Power Distribution Unit


TP48300A-DX15A1 (DC1)

Table 3-1 Power distribution specifications

Item Power Distribution Specifications


Input system 220/380 V AC three-phase
AC power distribution  AC input: one 3-pole 50 A circuit breaker
 AC output: one German standard socket (with a 10 A
RCD), four 1-pole 10 A circuit breakers
DC power distribution  BLVD circuit breakers: 3x125 A/1P, 4x32 A/1P, 2x20
A/1P, 4x16 A/1P, 4x6 A/1P
 LLVD circuit breakers: 3x63 A/1P
Battery route Two 2-pole 125 A circuit breakers

TPC650A-DX15A1 (DC1-Ext-Free cooling) and TPC650A-AX15A1


(DC1-Ext-Aircon)

Table 3-2 Power distribution specifications

Item Power Distribution Specifications


Input voltage 48 V DC
DC output circuit breaker 4x16 A/1P, 2x10A /1P, 8x6 A/1P, 1x20 A/1P (connects to
the DC temperature control unit)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 16


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

3.3 Rectifier
Rectifiers convert AC input into stable DC output.

Figure 3-8 Rectifier

(1) Power indicator (2) Alarm indicator (3) Fault indicator


(4) Locking latch (5) Handle

Table 3-3 Rectifier indicators

Indicator Color Status Description


Power indicator Green Steady on The rectifier has an AC power input.
Off The rectifier has no AC power input.
The rectifier is faulty.
Blinking The rectifier is being queried.
at 0.5 Hz
Blinking The rectifier is loading an application
at 4 Hz program.
Alarm indicator Yellow Off No alarm is generated.
Steady on  The rectifier generates an alarm for power
limiting due to ambient overtemperature.
 The rectifier generates an alarm for
shutdown due to ambient overtemperature
or undertemperature.
The rectifier protects against AC input
overvoltage or undervoltage.
The rectifier is hibernating.
Blinking The communication between the rectifier and
at 0.5 Hz the SMU is interrupted.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 17


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Indicator Color Status Description


Fault indicator Red Off The rectifier is running properly.
Steady on The rectifier locks out due to output
overvoltage.
The rectifier has no output due to an internal
fault.

3.4 SMU02B
Appearance

Figure 3-9 SMU02B appearance

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 18


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Panel

Figure 3-10 SMU02B panel

(1) Run indicator (2) Minor alarm indicator (3) Major alarm indicator
(4) Buttons (5) USB port (reserved, the (6) RS485/RS232 port
port is protected by a
security mechanism.)
(7) Handle (8) Locking latch (9) FE port
(10) Liquid crystal display
(LCD)

Indicators

Table 3-4 SMU02B indicator description

Name Color Status Description

Run indicator Green Off The SMU is faulty or has no


DC input.
Blinking at 0.5 The SMU is running properly
Hz and communicating with the
host properly.
Blinking at 4 Hz The SMU is running properly
but is not communicating
with the host properly.
Minor alarm Yellow Off No minor or warning alarm is
indicator generated.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 19


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Name Color Status Description


Steady on A minor or warning alarm is
generated.
Major alarm Red Off No critical or major alarm is
indicator generated.
Steady on A critical or major alarm is
generated.

Buttons

Table 3-5 SMU02B button description

Button Name Description

Up Turns to the previous menu or sets parameter values.


When setting parameter values, you can hold down to
quickly adjust values.
Down Turns to the next menu or sets parameter values.
When setting parameter values, you can hold down to
quickly adjust values.
Back Returns to the previous menu without saving the settings.

Confirm  Enters the main menu from the standby screen.


 Enters a submenu from the main menu.
 Saves the menu settings.

Communication Ports

Table 3-6 SMU02B communication port description

Communication Communications Communications Function


Port Parameter Protocol

FE port 10/100 M HTTPS, NetEco Connects to an


auto-adaptation network management upper-level NMS.
system (NMS), and
SNMP protocols
RS485/RS232 Baud rate: 9600 bit/s, NetEco NMS Connects to an
port 19200 bit/s protocol, YDN upper-level device
protocol such as BBU.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 20


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Communication Communications Communications Function


Port Parameter Protocol

NOTE
All the ports mentioned are protected by a security mechanism.

Figure 3-11 Pins in the FE port and RS485/RS232 port

Table 3-7 Pin definitions for the FE port

Pin Signal Description


1 TX+ Sends data over FE.
2 TX-
3 RX+ Receives data over FE.
6 RX-
4, 5, 7, and 8 None N/A.

Table 3-8 Pin definitions for the RS485/RS232 port

Pin Signal Description


1 TX+ Sends data over RS485.
2 TX-
4 RX+ Receives data over RS485.
5 RX-
3 RX232 Receives data over RS232.
7 TX232 Sends data over RS232.
6 PGND Connects to the ground.
8 None N/A.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 21


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

3.5 UIM02C
Panel
The user interface module (UIM02C) supports eight dry contact outputs, nine dry contact
inputs (including six universal dry contact inputs, one smoke sensor input, one water sensor
input, and one door status sensor input), and four analog parameter inputs (including one
ambient temperature and humidity input, two ambient temperature inputs, and one battery
temperature input).

Figure 3-12 UIM02C panel

Ports

Table 3-9 UIM02C ports

Port Type Silk Screen Description


Sensor ports TEM-HUM Ambient temperature and humidity sensor
WATER Water sensor
TEMP1 Ambient temperature sensor 1
TEMP2 Ambient temperature sensor 2
GATE Door status sensor
SMOKE Smoke sensor
BTEMP Battery temperature sensor
Dry contact input DIN1 NOTE
ports For the associations between the dry contact input
DIN2 ports and alarms, see the appendix.

DIN3
DIN4
DIN5
DIN6
Dry contact output ALM1 NOTE
ports For the associations between the dry contact output
ALM2

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 22


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Port Type Silk Screen Description


ports and alarms, see the appendix.
ALM3
ALM4
ALM5
ALM6
ALM7
ALM8
Communications port COM RS485 port

Communication Port

Table 3-10 COM communication port description

Communication Communications Communications Function


Port Parameter Protocol
COM port Baud rate: 9600 bit/s, M/S and Modbus Connects to
19200 bit/s protocol lower-level
devices such as
the battery
voltage
detector, DC
Air
Conditioner.

NOTE
The COM port supports the security mechanism.

Figure 3-13 Pins in the COM port

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 23


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Table 3-11 Pin definitions for the COM port

Pin Signal Description


1 RX+ Receives data over RS485.
2 RX-
4 TX+ Sends data over RS485.
5 TX-
6 PGND Connects to the ground.
3, 7, 8 None N/A

Pins

Figure 3-14 UIM02C pin numbers

Table 3-12 UIM02C pin definitions

Silkscreen No. Pin Definitions

TEM-HUM 1 12 V
2 ENV_TEMP
3 12 V
4 ENV_HUM
WATER 1 12 V
2 WATER
3 GND
4 Not defined

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 24


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Silkscreen No. Pin Definitions


TEMP1 1 GND
2 TEMP1
TEMP2 1 GND
2 TEMP2
GATE 1 GATE+
2 GATE-
SMOKE 1 SMOKE
2 12 V
BTEMP 1 GND
2 BTEMP

3.6 SMU06C
Panel
Figure 3-15 shows an SMU06C panel.

Figure 3-15 SMU06C panel

(1) Alarm indicator (2) Run indicator (3) LCD


(4) Cancel button (5) Down button (6) Enter button
(7) Up button

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 25


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Table 3-13 Button description

Button Name Description


Up Turns to the previous menu or sets parameter values.

When setting parameter values, you can hold down to


quickly adjust values.
Down Turns to the next menu or sets parameter values.

When setting parameter values, you can hold down to


quickly adjust values.
Back Returns to the previous menu without saving the settings.

Confirm  Enters the main menu from the standby screen.


 Enters a submenu from the main menu.
 Saves the menu settings.

NOTE
 The LCD screen becomes dark if no button is pressed within 30 seconds.

 You need to log in again if no button is pressed within 1 minute. The preset password is 000001.

 When setting parameter values, you can hold down or to quickly adjust values.

 The LCD screen luminance increases or decreases if you hold down and or and

simultaneously for more than 2 seconds.

 The SMU is reset if you hold down and simultaneously for more than 10 seconds.

Indicators
Table 3-14 describes the indicators on the SMU06C panel.

Table 3-14 Indicator description

Name Color Status Description


Run indicator Green Off The SMU06C is faulty or has no DC input.
Blinking at The SMU06C is running properly and
0.5 Hz communicating with the host properly.
Blinking at 4 The SMU06C is running properly but is not
Hz communicating with the host properly.
Alarm Red Off No critical or major alarm is generated.
indicator
Steady on A critical or major alarm is generated.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 26


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Port Positions

Figure 3-16 Door-mounted SMU06C ports

(1) RS232/RS485 port (2) COM port (3) Dry contact output
ports
(4) Dry contact input (5) Battery temperature sensor (6) Internal fan ports
ports port
(7) External fan ports (8) Fan power port

Communications Ports
The SMU06C provides two communications ports, which are described in Table 3-15.

Table 3-15 SMU06C communications port description

Communications Communications Function


Port Parameters Protocol

COM port Baud rate: 9600 bit/s Modbus protocol Connects to


and 19,200 bit/s lower-level devices
such as the Batt. cell
detector, DC Air
Conditioner
RS485/RS232 Baud rate: 9600 bit/s NetEco NMS and Connects to
port and 19,200 bit/s Modbus protocol upper-level device
such as BBU, PSNU

Figure 3-17 Pins in a communications port

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 27


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Table 3-16 Description of pins in the COM port

Pin Signal Description


1 COM_R+ Receives data
2 COM_R-
3 NC -
4 COM_T+ Sends data
5 COM_T-
6 GND Signal ground
7 NC -
8 NC -

Table 3-17 Description of pins in the RS485/RS232 port


Pin Signal Description

1 RS485_T+ Sends data


2 RS485_T-
3 RS232_R Receives data
4 RS485_R+ Receives data
5 RS485_R-
6 GND Signal ground
7 RS232_T Sends data
8 NC -

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 28


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Sensors and Dry Contacts

Figure 3-18 Sensors and dry contacts

Table 3-18 Sensors and dry contacts description

Port Type Silk Screen Description


Sensor port TEM-HUM Ambient temperature and humidity
sensor
WATER Water sensor
GATE Door status sensor
SMOKE Smoke sensor
BTEMP Battery temperature sensor
TEMP1 Ambient temperature sensor 1
TEMP2 Ambient temperature sensor 2
Dry contact input ports DIN1 NOTE
For details about the alarms associated
DIN2 with dry contact inputs, see the appendix.

DIN3
DIN4
DIN5
DIN6

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 29


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Port Type Silk Screen Description


Dry contact output ALM1 NOTE
ports For details about the alarms associated
ALM2 with dry contact outputs, see the
appendix.
ALM3
ALM4
ALM5
ALM6
ALM7
ALM8

Table 3-19 Pin definitions

Silk Screen No. Pin Definition


TEM-HUM 1 12 V
2 ENV_TEMP
3 12 V
4 ENV_HUM
WATER 1 12 V
2 WATER
3 GND
4 -
GATE 1 GATE+
2 GATE-
SMOKE 1 SMOKE
2 12 V
BTEMP 1 BTEMP1
2 GND

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 30


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

3.7 Temperature Control Unit


3.7.1 TCUC
The TCUC controls the running of the fans. It reports alarms when faults occur. Figure 3-19
shows a TCUC.

Figure 3-19 TCUC

(1) Power input port (2) External circulation fan (3) Boolean value port
port (reserved)
(4) Door status sensor port (5) Indicator (6) E-label port (reserved)
(7) COM port (8) Communications port 1 (9) Communications port 2
(10) Temperature sensor (11) Temperature sensor port (12) Smoke sensor port
port 1 2
(13) Water sensor port (14) Internal circulation fan (15) TEC port
port

3.7.2 (Optional) Heater


A heater assembly unit (HAU) is adopted to ensure a proper operating temperature for the
equipment inside the cabinet.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 31


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Figure 3-20 Heater

(1) Indicator (2) Alarm dry contact (3) Control dry contact
(4) AC input port

Table 3-20 Indicator description

Silk
Screen Color Status Description
RUN Green Steady on The heater is powered on and takes a self-test.
Off The heater is not powered on.
ALM Red Off No alarm is generated.
Steady on An alarm is generated and the heater needs to be
replaced.

3.8 Door Status Sensor


Figure 3-21 shows a door status sensor.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 32


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 3 Components

Figure 3-21 Door Status Sensor

(1) Switch (2) Magnet

3.9 Battery Temperature Sensor


Figure 3-22 Battery temperature sensor

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 33


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

4 Installing Cabinets

4.1 Unpacking and Checking


Procedure
Step 1 Check whether packing cases are intact. If a packing case is severely damaged or wet, identify
the cause and report to the local Huawei office.
Step 2 Unpack the case.
Step 3 Check the quantity of components against the packing lists attached to the packing cases. If
the quantity differs from that specified on the packing lists, identify the cause and report to the
local Huawei office.
----End

4.2 Removing the Cabinet Pallet


Procedure
Step 1 Remove baffle plates from the cabinet base.
Step 2 Remove the bolts that secure the cabinet to the pallet.
Step 3 Remove the cabinet from the pallet.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 34


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

Figure 4-1 Removing the cabinet pallet

----End

4.3 Installing a Cabling Channel for Combined Cabinets


Prerequisites
If cabinets are combined, perform the following steps to install a cabling channel.

Context
The cabling channel is installed between two combined cabinets, which does not have a
left-right structure.

Procedure
Step 1 Remove the hole sealing boards between adjacent cabinets, as shown in the following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 35


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

Figure 4-2 Removing a hole sealing board (for example, on both sides)

Step 2 Take out the cabling channel from the equipment cabinet.
Step 3 Install the cabling channel on the side panels of the adjacent cabinets, as shown in the
following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 36


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

Figure 4-3 Installing a cabling channel to the left side of a cabinet

----End

4.4 Determining Mounting Hole Positions


Prerequisites
 The installation environment is clean and dry.
 The concrete floor for installing the cabinet is flat.

Procedure
Step 1 Locate the marking-off template in the packing case.
Step 2 Drill holes in the positions for four mounting holes on the marking-off template.
Step 3 Mark hole positions based on the marking-off template.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 37


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

Figure 4-4 Marking mounting hole positions (single cabinet)

(1) Mounting holes (2) Concrete floor (3) Marking-off template


(4) Marker

Figure 4-5 Marking mounting holes (combined cabinets)

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 38


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

4.5 Drilling Holes and Installing Expansion Sleeves


Procedure
Step 1 Drill holes to a depth of 52 mm to 60 mm using a hammer drill.
Step 2 Partially tighten each expansion bolt, place it vertically into the hole, and use a rubber mallet
to pound it until the expansion sleeve completely enters the hole.
Step 3 Partially tighten the expansion bolts.
Step 4 Remove the bolts, spring washers, and flat washers.

Figure 4-6 Drilling holes and installing expansion sleeves

(1) M12 bolt (2) Spring washer (3) Flat washer


(4) Expansion sleeve (5) Expansion nut (6) Concrete floor

----End

4.6 (Optional) Hoisting a Cabinet


Context
Install the cabinet based on site requirements.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 39


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

The maximum weight of the cabinet is 150 kg (excluding batteries and rectifiers). For safety,
a steel rope for carrying the cabinet should be able to bear a weight greater than 450 kg (triple
the maximum weight of the cabinet).

Procedure
Step 1 Bind ropes and then hoist the cabinet to an appropriate position, as shown in Figure 4-7.

Figure 4-7 Hoisting a cabinet

Step 2 Remove the ropes.


----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 40


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

4.7 Combining Cabinets


Procedure
Step 1 Place flat washers, spring washers, and expansion bolts into the cabinet mounting holes.
Step 2 Tighten expansion bolts to secure the cabinet.

Figure 4-8 Securing a cabinet

Step 3 Install screws for the cabling channel, as shown in the following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 41


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 4 Installing Cabinets

Figure 4-9 Installing screws for the cabling channel (combined cabinets)

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 42


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 5 Installing a Ground Cable

5 Installing a Ground Cable

Step 1 Route the ground cable into the power cabinet through the hole at the bottom of the power
cabinet.
Step 2 Secure one end of the ground cable to the cabinet ground bar, and the other end to the site
ground bar, as shown in the following figure.

Ensure that the ground cable is installed securely. Inappropriate grounding may cause device
damage and even personal injury.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 43


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 5 Installing a Ground Cable

Figure 5-1 Installing a ground cable for a single cabinet (TP48300A-DX15A1)

(1) Site ground bar

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 44


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 5 Installing a Ground Cable

Figure 5-2 Installing a ground cable for combined cabinets (DC1, DC1-Ext-Free cooling or
DC1-Ext-Aircon)

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 45


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

6 Installing Components

6.1 Installing a Rectifier


Prerequisites
 Rectifiers are found intact after unpacking and check. In case of any discrepancy, contact
your local Huawei office.
 The filler panel is removed from the slot where you will install a rectifier.

 Do not put your hands into rectifier slots, avoiding electric shocks.
 When a rectifier is running, a high temperature is generated around the air exhaust vent at
the rear. Do not touch the vent or cover the vent with cables or other objects.

Procedure
Step 1 Push the locking latch towards the left.
Step 2 Draw the handle downwards.
Step 3 Gently push a rectifier into its slot along the guide rail.
Step 4 Push the handle upwards.
Step 5 Push the locking latch towards the right to secure the handle.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 46


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

Figure 6-1 Installing a rectifier

----End

6.2 Installing a Heater


If a heater is required, perform the following steps to install it.
Step 1 Install a heater fastener and secure the heater, as shown in the following figure.
Step 2 Connect signal and power cables for the heater, as shown in the following figure.

Switch off the upstream circuit breakers before installing the heater power cables.

Table 6-1 Heater cable mapping

Heater Position Signal Cable Connection Power Cable Connection


Position Position

Power cabinet UIM DIN5 in the power AC output circuit breaker 1


cabinet in the power cabinet
Equipment cabinet 1 TCUC IN0 in equipment AC output circuit breaker 2
cabinet 1 in the power cabinet
Equipment cabinet 2 TCUC IN0 in equipment AC output circuit breaker 3
cabinet 2 in the power cabinet
Equipment cabinet 3 TCUC IN0 in equipment AC output circuit breaker 4
cabinet 3 in the power cabinet

The DIN port is polarity-insensitive, and there is no need to consider the polarity during cable
connection.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 47


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

Figure 6-2 Heater signal cables connection (DC1)

Figure 6-3 Installing a heater and fastener

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 48


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

Figure 6-4 Heater signal cables installation completed (DC1)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 49


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

Figure 6-5 Heater power cables installation completed (DC1)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 50


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

Figure 6-6 Heater signal cables connection (DC1-Ext-Free cooling)

Figure 6-7 Heater signal cables installation completed (DC1-Ext-Free cooling)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 51


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 6 Installing Components

Figure 6-8 Heater power cables installation completed (DC1 and DC1-Ext-Free cooling)

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 52


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

7 Installing Cables

 Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No
operations allowed."
 Switch off all circuit breakers before installing cables.

Cable installation for stacked cabinets and paralleled cabinets are used as examples. For paralleled
cabinets, cables are routed through the cabling channels (preferred) or the bottom cable holes. For details
about cable routing for wall-mounted and pole-mounted cabinets, see cable routing through the bottom
cable holes of the paralleled cabinets.

7.1 (Optional) Installing Dry Contact Signal Cables


Procedure
Step 1 Press the contact plate using a flat-head screwdriver to flip the metal spring inside each dry
contact.
Step 2 Connect the signal cables to the corresponding dry contacts.
Step 3 Put away the flat-head screwdriver and check that the signal cables are securely connected.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 53


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-1 Installing a dry contact signal cable

(1) Contact plate (2) Dry contact port

----End

7.2 Installing Door Status Sensor Cables


Procedure
Step 1 Locate the door status sensor in the upper left corner of the power cabinet and disconnect the
male terminal from the cable port.
Step 2 Connect the door status sensor cables between the power cabinet and equipment cabinets in
sequence.
Step 3 Install the terminal removed in step 1 at the female terminal for the door status sensor cable in
the last equipment cabinet.

Figure 7-2 Installing door status sensors

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 54


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

7.3 Installing the Communications Cables


7.3.1 WebUI Management
Procedure
Step 1 Connect the FE port on the SMU by using a network cable, as shown in Figure 7-3.

Figure 7-3 Connecting a communications cable (for WebUI management)

(1) FE port

----End

7.3.2 NetEco Management


Networking Mode 1: over FE Port
Step 1 Connect the FE port on the SMU by using a network cable, as shown in Figure 7-4.

Figure 7-4 Connecting a communications cable (over the FE port)

(1) FE port

----End

Networking Mode 2: over RS485 Port


Step 1 Connect one end of the network cable to the RS485/RS232 port on the SMU.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 55


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Step 2 Connect the other end to the MON1 port on the BBU, as shown in Figure 7-5.

Figure 7-5 Connecting a communications cable (over the RS485 port)

(1) RS485/RS232 port (2) MON1 port

----End

7.3.3 Third-Party NMS Management (over SNMP)


Procedure
Step 1 Connect the FE port on the SMU by using a network cable, as shown in Figure 7-6.

Figure 7-6 Connecting a communications cable (over SNMP)

(1) FE port

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 56


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

7.4 Installing Input Power Cables for the Equipment


Cabinet
The methods for installing DC input power cables are the same for the equipment cabinets
TPC650A-DX15A1 (DC1-Ext-Free cooling) and TPC650A-AX15A1 (DC1-Ext-Aircon).
This section uses the equipment cabinet TPC650A-DX15A1 (DC1-Ext-Free cooling) as an
example.
Step 1 Route DC power cables from the power cabinet into the equipment cabinet.
Step 2 Connect the negative DC power cable from the 3-pole 125 A circuit breaker in the power
cabinet to the negative terminal for DC input in the equipment cabinet.
Step 3 Connect the positive DC power cable from the RTN+ busbar in the power cabinet to the
RTN+ busbar for DC input in the equipment cabinet.
Step 4 (Applies only to the DC1-Ext-Aircon) Connect the AC power cables from the power port of
the AC air conditioner to an AC output circuit breaker in the power cabinet.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 57


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-7 Installing DC input power cables for the equipment cabinet (DC1-Ext-Free cooling or
DC1-Ext-Aircon)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 58


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-8 Installing air conditioner power cables for the equipment cabinet (Applies only to the
DC1-Ext-Aircon)

----End

7.5 Installing Communications Cables for the Equipment


Cabinet
Equipment Cabinet TPC650A-DX15A1 (DC1-Ext-Free cooling)
Step 1 Install a TCUC communications cable.
1. Locate the TCUC communications cable bound on the right panel of the equipment
cabinet. One end of the cable has been connected to the COM_IN port on the TCUC.
2. Connect the other end of the TCUC communications cable to the COM port on the
UIM02C in the power cabinet, as shown in the following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 59


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-9 Installing the TCUC communications cable (DC1 and DC1-Ext-Free cooling)

If two or three equipment cabinets are configured, TCUC communications cables are cascaded to the
COM port on the UIM02C, as shown in the following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 60


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-10 Installing TCUC communications cables for two or three equipment cabinets
(DC1 and DC1-Ext-Free cooling)

Step 2 Set jumpers for the TCUC in equipment cabinet 3.

 If two or less equipment cabinets are configured, the TCUC jumpers do not need to be set.
 If three equipment cabinets are configured, the TCUC jumpers in equipment cabinet 3 need to be set,
while the TCUC jumpers in equipment cabinets 1 and 2 do not need to be set.
1. Record the cable connection positions on the TCUC of the equipment cabinet 3 and
disconnect the cables.
2. Remove the enclosure from the TCUC, as shown in the following figure.

Figure 7-11 Removing the enclosure from the TCUC (equipment cabinet 3)

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 61


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

3. Set TCUC jumpers of J23 in equipment cabinet 3, as shown in the following figure.

Figure 7-12 Position for setting TCUC jumpers (equipment cabinet 3)

4. Reinstall the enclosure on the TCUC.


5. Reinstall the TCUC cables based on the cable connection information recorded during
removal.
----End

Equipment Cabinet TPC650A-AX15A1 (DC1-Ext-Aircon)


Step 1 Install a communications cable for the SMU06C.
1. Locate the SMU06C communications cable bound on the left panel of the equipment
cabinet. One end of the cable has been connected to the RS485 port on the SMU06C.
2. Connect the other end of the communications cable to the COM port on the UIM02C in
the power cabinet, as shown in the following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 62


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-13 Installing a communications cable for the SMU06C (DC1 and DC1-Ext-Aircon)

If the equipment cabinets TPC650A-DX15A1 (DC1-Ext-Free cooling) and TPC650A-AX15A1


(DC1-Ext-Aircon) are both configured, the TCUC and SMU06C are cascaded to the COM port on the
UIM02C, as shown in the following figure.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 63


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-14 Installing communications cables for the UIM02C, TCUC and SMU06C (DC1,
DC1-Ext-Free cooling and DC1-Ext-Aircon)

----End

7.6 Installing DC Output Power Cables


Step 1 Connect a negative load cable to a circuit breaker that fits the load capacity in the cabinet.
Step 2 Connect a positive load cable to the RTN+ busbar in the cabinet.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 64


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-15 Installing DC output power cables (DC1)

(1) Load 1 (2) Load 2

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 65


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-16 Installing DC output power cables (DC1-Ext-Free cooling and DC1-Ext-Aircon)

(1) Load

----End

7.7 Installing AC Input Power Cables


Step 1 Route AC input power cables into the cabinet through the cable hole in the left part of the
cabinet bottom.
Step 2 Secure the AC input power cables to corresponding AC input circuit breakers.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 66


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 7 Installing Cables

Figure 7-17 Installing a 220/380 V AC three-phase, four-wire input power cable (DC1)

(1) Alternating current distribution box (ACDB)

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 67


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

8 (Optional) Installing Batteries and Cables

 Smoking and sparks are prohibited near batteries.


 Switch off battery circuit breakers before installing batteries.
 Comply with regulations and warnings of the battery manufacturer.
 Use tools with insulated handles, otherwise, batteries may be burnt out and personal injury
may occur.
 During battery operations, wear goggles, rubber gloves, and protective clothes. Remove
conductive articles such as watches, bracelets, and rings.
 If battery acid gets in the eyes, rinse with cold water for more than 15 minutes and seek
media advice immediately. If battery acid contacts skin or clothing, wash with soap and
water immediately.
 Do not use metal to simultaneously contact two or more battery terminals. Do not use
metal to simultaneously touch battery terminals and grounded objects (for example,
battery compartment); otherwise, transient short circuit occurs, which produces sparks or
explosion.
 During battery installation, never short-circuit or reversely connect positive and negative
battery terminals. Connect the negative battery cable before the positive battery cable.
 Secure battery cables to a torque specified in battery documentation. Loose connections
will result in excessive voltage drop or cause batteries to burn out when the current is
large.

Figure 8-1 Battery installation completed

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 68


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

8.1 Preparing for the Second Battery String


Prerequisites
To change the customer equipment space to the space for the second battery string, perform
the following steps.

Procedure
Step 1 Removing the vertical beams on the rack.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 69


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

Figure 8-2 Removing vertical beams

Step 2 Removing the horizontal beams on the support.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 70


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

Figure 8-3 Removing horizontal beams

Step 3 Install the battery cables for the second battery string and insulated the cables.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 71


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

Figure 8-4 Install the battery cables for the second battery string

(1) Insulation tape

----End

8.2 Installing Battery Strings


Prerequisites
Ensure that batteries are from the same manufacturer and of the same model and have a close
voltage. New and old batteries cannot be used together.

Procedure
Step 1 Install batteries into the battery compartment in the sequence shown in Figure 8-5.

Figure 8-5 Installing battery strings

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 72


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

8.3 Installing Copper Bars Between Batteries


Procedure
Step 1 Remove insulation covers from battery 3 and battery 4.
Step 2 Use a copper bar to connect the battery 4 positive terminal to the battery 3 negative terminal.
Step 3 Reinstall the insulation cover on battery 4.

Figure 8-6 Installing copper bars between batteries

Step 4 Repeat the preceding steps to install copper bars between battery 2 and battery 3 and between
battery 1 and battery 2.
Step 5 If there are multiple battery strings, repeat the preceding steps to install copper bars between
the other batteries and reinstall insulation covers on all batteries.
----End

8.4 Installing Battery Cables


Prerequisites

When installing battery cables, install the negative cable before the positive cable.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 73


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

Procedure
Step 1 Remove the insulation cover from battery 4.
Step 2 Take off the negative battery cable from the left panel of the cabinet, and connect the cable to
the battery 4 negative terminal.
Step 3 Reinstall the insulation cover on battery 4.

Figure 8-7 Installing a negative battery cable

Step 4 If there are multiple battery strings, repeat the preceding steps to install negative battery
cables for the other battery strings.
Step 5 Remove the insulation cover from battery 1.
Step 6 Take off the positive battery cable from the right panel of the cabinet, and connect the cable to
the battery 1 positive terminal.
Step 7 Reinstall the insulation cover on battery 1.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 74


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 8 (Optional) Installing Batteries and Cables

Figure 8-8 Installing a positive battery cable

Step 8 If there are multiple battery strings, repeat Step 5 to Step 7 to install positive battery cables for
the other battery strings.
----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 75


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 9 Verifying the Installation

9 Verifying the Installation

9.1 Checking Hardware Installation


 Check that all screws, especially those used for electrical connections, are secured.
Check that flat washers and spring washers are installed properly.
 Check that rectifiers are completely inserted into their respective slots and properly
locked.

9.2 Checking Electrical Connections


 Check that all circuit breakers or fuses are OFF.
 Check that flat washers and spring washers are securely installed for all OT terminals
and that all the OT terminals are intact and properly connected.
 Check that batteries are correctly installed and that battery cables are correctly connected
and not short-circuited.
 Check that input and output power cables and ground cables are correctly connected and
not short-circuited.

9.3 Checking Cable Installation


 Check that all cables are securely connected.
 Check that all cables are arranged neatly and bound properly to their nearest cable ties,
and are not twisted or overly bent.
 Check that cable labels are properly and securely attached in the same direction.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 76


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

10 Commissioning

 The following commissioning procedure may result in power failure or alarms. Inform the
alarm center before and after the procedure.
 Commissioning involves various technologies, requires trained personnel, and requires
compliance with commissioning instructions.
 Commissioning is performed with the power on. Remove metal items such as watches and
necklaces, stand on dry insulating material, and use insulated tools.
 Do not contact two electric bodies that have different currents during operations.
 During commissioning, check that the status of the related unit or component meets
requirements before turning on any switch.
 When you are performing operations and do not want others to operate, attach the label
"Do not turn on the switch because operations are in process." to the power distribution
device.
 During commissioning, shut down the device immediately if any fault is detected. Rectify
the fault and proceed with the commissioning.

10.1 Connecting the AC Power Supply


Procedure
Step 1 Measure the input voltage on the AC input circuit breaker. The value should range from 85 V
AC to 300 V AC.
Step 2 Switch on the AC input circuit breaker and measure the output voltage of the AC input circuit
breaker. The value should range from 85 V AC to 300 V AC.
Step 3 Check that the Run indicators on rectifiers are steady on.
Step 4 Check that the voltage between the –48 V busbar and the RTN+ busbar ranges from –42 V
DC to –58 V DC.
----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 77


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

10.2 Setting the Display Language


After powering on the SMU, press or on the LCD to select a display language. Then
press to enter the standby screen.

If an undesired language is selected, reinstall and restart the SMU and then select the desired language.

10.3 Setting the Date and Time


 The LCD screen becomes dark if no button is pressed within 30 seconds.
 You need to log in again if no button is pressed within 1 minute.
 The preset password is 000001.

Set the date and time as required.

Table 10-1 Setting the date and time (DC1)

Main Menu Second-Level Third-Level Default Value Setting Value


Menu Menu

Setting Wizard Date and Time Time Zone UTC +08:00 Set to the local
NOTE Beijing time zone.
The date and Date and Time - Set to the local
time vary
according to date and time.
time zones. Set
the time zone, NTP Enable No Yes/No
date, and time NOTE
based on the Set the
local situation. parameter to
Yes if you need
to synchronize
the SMU time
and the site
network server
time.

10.4 Setting Battery Parameters


Set the Battery N Connected, Rated Capacity, and Installation Time as required.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 78


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Table 10-2 Setting battery parameters

Main Second- Third-Level Fourth-Level Setting


Menu Level Menu Menu
Menu
Parameters Battery Basic Battery 1 YES/NO
Settings Parameters Connected NOTE
Battery 2 If N battery strings are
connected, set Battery 1
Connected Connected to Battery N
Connected to Yes, and set the
other parameters to No.

Rated Capacity Rated capacity of the


batteries in a battery string.
NOTE
The batteries controlled by
one circuit breaker or fuse are
called a battery string.

Other Installation Set to the current date.


Parameters Time

 If battery routes 1 and 2 are respectively connected to a battery string (each battery string consists of
four 12 V, 150 Ah batteries in series), set Battery1 Connected and Battery2 Connected to Yes and
others to No, and set Rated Capacity to 150 Ah.
 If battery route 1 is connected to two battery strings in parallel (each battery string consists of four
12 V, 150 Ah batteries in series), set Battery1 Connected to Yes and others to No, and set Rated
Capacity to 300 Ah.

10.5 Setting Communications Parameters


10.5.1 (Optional) Setting Parameters Before Using WebUI
Management
Operating Environment
Operating system: Windows XP or later
Browser: Internet Explorer 8.0 or later, FireFox 13 or later, and Chrome 20

Internet Explorer is used as an example to illustrate all WebUI operations mentioned in this document.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 79


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Setting a LAN

If the SMU is connected to a LAN and a proxy server has been selected, cancel the proxy
server settings.
If the SMU is connected to the Internet but your computer is connected to a LAN, do not
cancel the proxy server settings. Otherwise, you cannot access the SMU.

To cancel proxy server settings, perform the following steps:


Step 1 Open Internet Explorer.
Step 2 Choose Tools > Internet Options.
Step 3 Click the Connections tab and click LAN settings.
Step 4 Clear Use a proxy server for your LAN, as shown in Figure 10-1.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 80


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Figure 10-1 Canceling proxy server settings

Step 5 Click OK.


----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 81


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Setting Compatibility
To ensure normal display of the WebUI in Internet Explorer, click the Compatibility View
icon shown in Figure 10-2 and set Internet Explorer compatibility in the compatibility view
displayed.

Figure 10-2 Compatibility View icon

Setting Internet Explorer Security

Set Internet Explorer security before you perform the following operations:
 Export historical logs, historical data, statistics, and battery test records.
 Upload system configuration files.
 Download system configuration files.
 Upgrade software.

To set Internet Explorer security, perform the following steps:


Step 1 Open Internet Explorer.
Step 2 Choose Tools > Internet Options.
Step 3 Click the Security tab.
Step 4 Click Internet and click Custom level, as shown in Figure 10-3. After you specify Internet
security settings, click Local intranet and click Custom level.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 82


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Figure 10-3 Internet Explorer security

Step 5 Specify the security settings.


Enable the following:
 Initialize and script ActiveX controls not marked as safe for scripting
 Allow previously unused ActiveX controls to run without prompt
 Include local directory path when uploading files to a server
 Automatic prompting for file downloads

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 83


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Figure 10-4 Internet Explorer security setting 1

Figure 10-5 Internet Explorer security setting 2

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 84


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Figure 10-6 Internet Explorer security setting 3

Figure 10-7 Internet Explorer security setting 4

Step 6 Click OK.


Step 7 Click the Advanced tab, and select all of Use SSL 3.0, Use TLS 1.0, Use TLS 1.1, and Use
TLS 1.2 that are displayed.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 85


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Figure 10-8 Internet Explorer security setting 5

Step 8 Click OK.


----End

Setting SMU Parameters


Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-3.

Table 10-3 IP parameters

Main Second- Third-Level Default


Menu Level Menu Menu Value Setting Value
Setting Network IP Address 192.168.0.10 Set this parameter
Wizard Parameters according to the address
provided by the network
administrator.
Subnet Mask 255.255.255.0 Set this parameter
according to the subnet
mask provided by the
network administrator.
Default 192.168.0.1 Set this parameter
Gateway according to the gateway
address provided by the
network administrator.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 86


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Main Second- Third-Level Default


Menu Level Menu Menu Value Setting Value
NOTE
If the Wifi module is
installed, do not set the
default gateway to
192.168.8.1, preventing
conflict with the Wifi
gateway.

----End

Login Page
Enter https://local IP address for the SMU (for example, https://192.168.0.10) in the address
box of the Internet Explorer and press Enter. The login page is displayed, as shown in Figure
10-9.

Figure 10-9 Login page

The preset user name is admin, and the preset password is Changeme.

10.5.2 (Optional) Setting Parameters Before Using the NetEco


Management
Networking Mode 1: over FE Port
Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-4.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 87


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Table 10-4 IP parameters

Main Second- Third-Level


Menu Level Menu Menu Default Value Setting
Setting Network IP Address 192.168.0.10 Set this parameter according to
Wizard Parameters the IP address assigned by the
network administrator.
Subnet Mask 255.255.255.0 Set this parameter according to
the subnet mask provided by the
network administrator.
Default Gateway 192.168.0.1 Set this parameter according to
the gateway address provided by
the network administrator.

Step 3 Set the IP Addresses and Ports for the active and standby servers of the NetEco on the LCD,
as described in Table 10-5.

Table 10-5 NetEco parameters

Main Second- Third-Level Fourth-Level


Menu Level Menu Menu Menu Default Value Setting
Parameters Comm. Network NetEco Primary IP 192.168.0.10 Set an IP address
Settings Parameters Parameters for the active
NetEco server.
NetEco Backup IP 192.168.0.10 Set an IP address
for the standby
NetEco server.
NetEco Port 31220 Set a port for the
Number NetEco.

----End

Networking Mode 2: over RS485 Port


Step 1 Check that the following parameters are set properly: Port Mode to Manual, Protocol Type
to M/S Protocol, Baud Rate to 9600, and Comm. Address to 3.

Table 10-6 Communications parameters

Main Menu Second- Third-Level Fourth- Fifth-Level Default Setting


Level Menu Menu Level Menu Menu Value

Parameters Comm. Serial Port Northbound Port Mode Manual Manual


Settings Parameters
Protocol M/S Protocol M/S Protocol
Type

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 88


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Main Menu Second- Third-Level Fourth- Fifth-Level Default Setting


Level Menu Menu Level Menu Menu Value

M/S Protocol Northbound Baud Rate 9600 9600


Comm. 3 3
Address

----End

10.5.3 (Optional) Setting Parameters Before Using the SNMP


Management
Prerequisites
Before setting SNMP parameters, obtain the information listed in Table 10-7 from the NMS.

Table 10-7 Information obtained from the NMS

Information Description
SNMP version SNMP version and port number used by the SMU and NMS.
The SNMP versions include SNMPv1, SNMPv2c, and
SNMP Port Number SNMPv3.
Read Community Name If you use SNMPv1 or SNMPv2c, enter the read community
name and write community name that comply with the NMS.
Write Community Name Otherwise, the SMU will not connect to the NMS.
User Name To enhance the security, you need a user name and password
for authentication if you use SNMPv3. After the authentication
MD5 Password succeeds, the SMU can communicate with the NMS.
DES Password
Trap Target Address IP address and port number reported in the alarm trap.
Trap Port

Procedure
Step 1 Login the Web by referring to 10.5.1 (Optional) Setting Parameters Before Using WebUI
Management.
Step 2 On the System Settings tab page, select SNMP.
 If the SNMP version is SNMPv1 or SNMPv2c, set SNMP Version to
SNMPv1&SNMPv2c under SNMP, and then set SNMP Port Number, Read
Community Name, and Write Community Name.
 If the SNMP version is SNMPv3, set SNMP Version to SNMPv3 under SNMP, click
Add under SNMPv3, and then set User Name, MD5 Password, and DES Password.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 89


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

Step 3 Under SNMP Trap, set Trap Target Address and Trap Port.
Step 4 Under Mib files, click Export to export the Mib file and import it to the NMS.

If there is only one NMS, perform Step 4 once.

----End

Follow-up Procedure
You can query the power system operating status, active alarms, and the names of
user-defined dry contact inputs, and configure dry contact outputs on the NMS that is
connected over the SNMP.

10.6 Connecting the Battery Supply


Prerequisites

To avoid damage to batteries, switch on the battery circuit breaker only after correctly setting
the battery parameters.

Procedure
Step 1 Switch off the AC input circuit breaker.
Step 2 Switch on the battery circuit breakers.
Step 3 Switch on the AC input circuit breaker.
Step 4 (Optional) Set the battery voltage as required.

Table 10-8 Setting the battery voltage

Main Second- Third- Fourth-Level Default Setting


Menu Level Level Menu Value Range
Menu Menu
Parameters Battery Basic FC Voltage 53.5 42.0-58.0
Settings Parameters
EC Voltage 56.4

Step 5 Switch on the circuit breakers on the DC1 cabinet for the DC1-Ext-Free cooling or
DC1-Ext-Aircon cabinets.
Step 6 (Only for DC1-Ext-Aircon) Setting the Date and Time as required.

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 90


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

 The LCD screen becomes dark if no button is pressed within 30 seconds.


 You need to log in again if no button is pressed within 1 minute.
 The preset password is 000001.

Table 10-9 Setting the date and time (DC1-Ext-Aircon)

Main Menu Second-Level Third-Level Default Value Setting Value


Menu Menu

Setting Wizard Date and Time Date and Time - Set to the local
date and time.

Step 7 Set all the circuit breakers based on site requirements.


Step 8 Observe the power system for 15 minutes. During this period of time, if no alarm (except for
the door status alarm) is generated on the LCD of the SMU, the voltages and currents for
batteries and loads are normal.

 The battery switch is in the AUTO position by default before delivery and the system is
under automatic control.
 Open the cover and flip the battery switch to MANUAL only when you need to power on
the battery forcibly. Remember to flip the battery back to AUTO after the commissioning.

Figure 10-10 Battery switch

(1) Battery switch (behind the cover)

----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 91


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide 10 Commissioning

10.7 (Optional) Manually Clearing Alarms


Procedure
Step 1 Clear an active alarm, such as Rectifier Missing. LCD menu path: Running Control > Clear
Alarm > Active Alarm.
Step 2 Clear the Rectifier n Comm Fail alarm. LCD menu path: Running Control > Rectifier >
Rectifier Group > Delete Rectifier.

After the Rectifier n Comm Fail alarm is cleared, the Rect. Fault (Non-rdnt), Rect. Fault (Rdnt.), or
Muti-Rect. Fault alarm should automatically disappear. Otherwise, replace the faulty rectifier.

----End

10.8 Subsequent Operations


Procedure
Step 1 Reinstall the removed cover or panel (if there is).
Step 2 Fasten package entry module.
Step 3 The paint on the surface of the cabinet should be kept intact. Therefore, any damaged paint
must be repaired.
Step 4 Lock the cabinet door and hand over the key to the administrator. Clean the site and leave.
----End

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 92


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1 A Associations Between Alarms and Dry Contacts on the
Installation Guide UIM

A Associations Between Alarms and Dry


Contacts on the UIM

Table A-1 Associations between UIM02C dry contacts and alarms

Port Type Silk Name Category Associated Alarm


Screen
Dry contact DIN1 - - Dry contact input 1 (open:
input ports normal; closed: alarm)
DIN2 - - Dry contact input 2 (open:
normal; closed: alarm)
DIN3 - - Dry contact input 3 (open:
normal; closed: alarm)
DIN4 - - Dry contact input 4 (open:
normal; closed: alarm)
DIN5 - - Heater Fault (closed:
normal; open: alarm)
DIN6 - - Dry contact input 6 (open:
normal; closed: alarm)
Dry contact ALM1 Urgent alarm System BLVD Warning, BLVD
output ports incident Disconnected, Batt. Fuse
The default Break, SMU Fault, Batt Test
setting Negative, Rectifier Fault,
(closed: DC Undervolt., DC Ultra
normal; Undervolt.
open: alarm) ALM2 Not urgent System Insuff. Rdnt. Rects.,
can be alarm incident Rectifier Fault, Fan Fault,
modified. AC Ph. Failure, Batt/Equip
Cabin A/C Comm Failure,
Batt/Equip Cabin Comm
Failure, Equip TCUC Comm
Fail
ALM3 System AC main AC Ph. Failure, AC Failure,
incident AC Long Mains Failure

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 93


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1 A Associations Between Alarms and Dry Contacts on the
Installation Guide UIM

Port Type Silk Name Category Associated Alarm


Screen

ALM4 Aircon incident Aircon/Free Compressor Fault, Cab Ret


cooling Air TS Fault, Ret. Vent TS
Fault, Fan Fault
ALM5 Rectifier - Rectifier Fault
incident
ALM6 Battery - Batt. Fuse Break, Batt Test
incident Negative
ALM7 Temperature High/low Batt. High Temp., Batt. Low
alarm temperature Temp., High Temp., Heater
Fault
ALM8 Door contact Door open Door Alarm

Table A-2 Associations between SMU06C dry contacts and alarms

Port Type Silk Screen Associated Alarm


Dry contact input DIN1 Dry contact input 1
ports
DIN2 Dry contact input 2
DIN3 Dry contact input 3
DIN4 Dry contact input 4
DIN5 Heater Fault
DIN6 Dry contact input 6
Dry contact output ALM1 Dry contact output 1
ports
ALM2 Dry contact output 2
The default setting
(closed: normal; ALM3 Dry contact output 3
open: alarm) can
be modified. ALM4 Dry contact output 4
ALM5 Dry contact output 5
ALM6 Dry contact output 6
ALM7 Dry contact output 7
ALM8 Dry contact output 8

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 94


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide B Acronyms and Abbreviations

B Acronyms and Abbreviations

A
AC alternating current

B
BLVD battery low voltage disconnection

D
DC direct current

F
FE fast ethernet

H
HAU heater assembly unit
HTTPS Hypertext Transfer Protocol Secure

I
IP Internet Protocol

L
LCD liquid crystal display
LLVD load low voltage disconnection

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 95


Copyright © Huawei Technologies Co., Ltd.
TP48300A-DX15A1 & TPC650A-DX15A1 &
TPC650A-AX15A1
Installation Guide B Acronyms and Abbreviations

S
SMU site monitoring unit
SNMP Simple Network Management Protocol

T
TCUC Temperature control unit C

U
UIM user interface module

Issue 04 (2016-02-05) Huawei Proprietary and Confidential 96