FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
5 Magnetization curve test.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

Technical data
Manufacture Rated voltage kV
Type Rated frequency Hz
Year of manufacture Rated ratio A
Mass kg Class and burden
Insulation level kV - Core X
Rated primary current A - Core Y
Rated short-time thermal current (Ith) kA - Core Z
Rated short-time dynamic current (Idyn) kA - Core W
Standard - Core V
Serial no.
EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground
LV ( core Z ) HV + LV ( remainder core ) + Ground
LV ( core W ) HV + LV ( remainder core ) + Ground
LV ( core V ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 3 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio VA, Class Primary Secondary % Current Phase Dev. Polarity Check
No. (A) (A) error
X1-X5 3000 : 1 C800
X2-X5 2500 : 1 C800
X1-X4 2000 : 1 C800
Core X Subtractive
X1-X3 1500 : 1 C800
X2-X3 1000 : 1 C800
X1-X2 500 : 1 C800
Y1-Y5 3000 : 1 C800
Y2-Y5 2500 : 1 C800
Y1-Y4 2000 : 1 C800
Core Y Subtractive
Y1-Y3 1500 : 1 C800
Y2-Y3 1000 : 1 C800
Y1-Y2 500 : 1 C800
Z1-Z5 3000 : 1 5P20
Z2-Z5 2500 : 1 5P20
Z1-Z4 2000 : 1 5P20
Core Z Subtractive
Z1-Z3 1500 : 1 5P20
Z2-Z3 1000 : 1 5P20
Z1-Z2 500 : 1 5P20
W1-W5 3000 : 1 5P20
W2-W5 2500 : 1 5P20
W1-W4 2000 : 1 5P20
Core W Subtractive
W1-W3 1500 : 1 5P20
W2-W3 1000 : 1 5P20
W1-W2 500 : 1 5P20
V1-V5 3000 : 1 5P20
V2-V5 2500 : 1 5P20
V1-V4 2000 : 1 5P20
Core V Subtractive
V1-V3 1500 : 1 5P20
V2-V3 1000 : 1 5P20
V1-V2 500 : 1 5P20

NOTE : INJECT PRIMARY CURRENT > 300 A OR RATED CURRENT

n = Rated ratio
(n * Is - Ip) * 100 Is = Secondary current
% ERROR =
Ip Ip = Primary current

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 4 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω )
Core No. Terminals Rated Ratio VA, Class
Core X X1-X5 3000 : 1 C800
Core Y Y1-Y5 3000 : 1 C800
Core Z Z1-Z5 3000 : 1 5P20
Core W W1-W5 3000 : 1 5P20
Core V V1-V5 3000 : 1 5P20

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 5 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

5. Magnetization curve test.


Instrument : Manufact : Model :
Serial No. : Cal Date : Date of test :

Core X Core X : MAX Core : 3000/1 Terminal : X1-X5


U (V) I (A)

Magnetization curve

Knee Point
Vknee = V Iknee = A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 6 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

Core Y Core Y : MAX Core : 3000/1 Terminal : Y1-Y5


U (V) I (A)

Magnetization curve

Knee Point
Vknee = V Iknee = A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 7 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

Core Z Core Z : MAX Core : 3000/1 Terminal : Z1-Z5


U (V) I (A)

Magnetization curve

Knee Point
Vknee = V Iknee = A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 8 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

Core W Core W : MAX Core : 3000/1 Terminal : W1-W5


U (V) I (A)

Magnetization curve

Knee Point
Vknee = V Iknee = A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 9 of 10
FIELD INSPECTION AND TEST REPORT

230kV CURRENT TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE001 Ph.A

Core V Core V : MAX Core : 3000/1 Terminal : V1-V5


U (V) I (A)

Magnetization curve

Knee Point
Vknee = V Iknee = A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 10 of 10