FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.

300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.

CLIENT Haryana State Road And Bridge Development Corporation Ltd.

Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.


Contractor M/S NAGI BUILDER PVT. LTD.

Source : Date of Sampling :


Location : Date of Testing :
Type of Material : Sampled By :
Sample No. : Tested By :
Description Liquid Limit Plastic Limit
Determination No. 1 2 3 4 1 2
Nos. of blows (mm)
Container No.
Weight of container (W1)
Wt. of container + wet material (W2)
Wt. of container + dry material (W3)
Weight of water ( W2- W3)
Weight of dry material ( W3 - W1)
Water Content.
Result from Graph

LL %

PL %

PI %

Specified Limits

Activity LL(Max.) PI(Max


EMB/SG 70 45
GSB 25 6
WMM - 6

Remarks

Contractor Rep. Consultant Rep.


ATTERBERG’S LIMITS
IS: 2720 Part 5 1985
ATTERBERG’S LIMITS
IS: 2720 Part 5 1985
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.

CLIENT Haryana State Road And Bridge Development Corporation Ltd.

Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.


Contractor M/S NAGI BUILDER PVT. LTD.

Source : Date of Sampling :


Location : Date of Testing :
Type of Material : Sampled By :
Sample No. : Tested By :
Description Liquid Limit Plastic Limit
Determination No. 1 2 3 4 1 2
Penetration (mm)
Container No.
Weight of container (W1)
Wt. of container + wet material (W2)
Wt. of container + dry material (W3)
Weight of water ( W2- W3)
Weight of dry material ( W3 - W1)
Water Content.
Result from Graph

LL %

PL %

PI %

Specified Limits

Activity LL(Max.) PI(Max


EMB/SG 70 45
GSB 25 6
WMM - 6

Remarks

Contractor Rep. Consultant Rep.


Grain Size Analysis of Soil
IS: 2720 (Part-4)

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT


PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)

Haryana State Road And Bridge Development Corporation Ltd.


CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Source : Date of Sampling :

Location : Date of Testing :


Type of
: Tested by :
Material
Sample No. : Wt. of Material (gms) :

Weight of material %
IS sieve % Cumulative %
retained Weight
(mm) weight retained Passing
(gms) retained

4.75

2.00

0.425

0.075

Soil Classification

Gravel (Soil Particles > 4.75mm) : %

Sand (Soil Particles < 4.75 & > 0.075mm) : %

Silt & Clay (Soil Particles < 0.075mm) : %

Contractor Rep. Consultant Rep.

Maximum Dry Density & Optimum Moisture Content of Soils


IS: 2720 (Part-8)

PROJECT FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT


NAME JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Source : Date of Sampling :


Location : Date of Testing :
Sample No. : Type of material :
Mould No. : Tested by :
Volume of mould (V): Weight of mould (m1) :
Description Test 1 Test 2 Test 3 Test 4 Test 5 Test 6
Wt. of mould + material in gms (m2)
Weight of material in gms m3 = (m2-m1)
Wet Density in gm/cc γ b = m3 / V
Container No.
Weight of container (W1)
Weight of container + wet material (W2)
Weight of container + dry material (W3)
Weight of water ( W2- W3)
Weight of dry material ( W3 - W1)
Moisture Content (%)
Dry Density (gm/cc)

MDD= gm/cc OMC= %

Contractor Rep. Consultant Rep.


FREE SWELLING INDEX OF SOILS
IS: 2720 Part – 40

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT


PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.

CLIENT Haryana State Road And Bridge Development Corporation Ltd.

Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.

Contractor M/S NAGI BUILDER PVT. LTD.

Source : Date of Sampling :

Location : Date of Testing :

Layer : Type of Material :

Sample No. : Tested By :

Description Test 1 Test 2 Average

Weight of the soil sample(gms)

The volume of soil specimen read from the


graduated cylinder containing distilled water ( Vd )cc

The volume of soil specimen read from the


graduated cylinder containing kerosene ( Vk )cc

( Vd - Vk )
Free Swell Index = x100%
Vk

Specified Limit : Maximum 50% for Embankment and Sub grade

Contractor Rep. Consultant Rep.

5
6
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

RFI No. : Date of Testing :


Chainage : Bulk density of Sand (y s) :
Layer : Source of Material :
Width (mtr) : MDD (gm/cc) :
Cylinder No. : OMC (%) :
Moisture Metre No. : Tested By :

Description Test 1 Test 2 Test 3 Test 4 Test 5 Test 6

Representing Test Chainage


Offsets from center line (m )
Weight of material from hole (Ww) gms
Weight of sand+cylinder before pouring (W1) gm
Weight of sand+cylinder after pouring (WF) gm
Weight of sand in hole Wb=W1-WF-W2

Wt.of Sand in Cone (W2)

b=Wb/ γs
Volume of materials γ
gm/cc
Wet Density wd ₌
Ww / Y b

Moisture meter reading in %

Corrected Moisture Content in % (w)

d/ (1+
Field Dry Density r γ d = w
W/100 )
% of Compaction obtained

Avg. compaction obtained (%) : Mean Density :


Standard Deviation : Density as per acceptance criteria check :

Required Compaction:
Remarks :

Consultant Rep.
Contractor Rep.

7
FIELD DRY DENSITY (SAND REPLACEMENT METHOD)
IS: 2720 (Part 28)1974

8
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)

Haryana State Road And Bridge Development Corporation Ltd.


CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

DAILY LAB PROGRAMME


Date:
SR.NO. DESCRIPTION REMARKS

Contractor Rep. Consultant Rep.

SIEVE ANALYSIS FOR COARSE AGGREGATES

9
(IS: 383-1970)
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.

CLIENT Haryana State Road And Bridge Development Corporation Ltd.

Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.

Contractor M/S NAGI BUILDER PVT. LTD.

Sample No. : Date of Sampling :

Source : Date of Testing :

Location : Sampled By : :

Proposed Use : Tested By :

Wt. of Sample Taken (gms) :

Weight Cum. % Specified Limits


IS Sieve % weight Cum. %
retained weight
(mm) retained passing
(gms) retained Combined 20 mm 10 mm

40.0 100 100 …

20.0 95 --100 85--100 …

12.5 … … 100

10.0 25--55 0--20 85—100

4.75 0--10 0--5 0—20

2.36 .. .. 0—5

Pan .. .. ..

Remarks :

10
Contractor Rep. Consultant Rep.

Dispatch Slip of Concrete & Pour Record Details

PROJECT FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT


NAME JHAJJAR (PACKAGE NO ………………………)

Haryana State Road And Bridge Development Corporation Ltd.


CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Location : Date :

Structure Details : Grade of Concrete :

Segment : Total Qty. of concrete : m3 Theoretical

Vehicle No. : Batch Size :

Ingredients ( per m3 )

Cement---------------------- Quantity--------------------------------------

Sand------------------------- Cumulative Quantity----------------------

C.A.20 mm----------------- Dispatch Time------------------------------

C.A.10 mm----------------- Slump at Plant------------------------------

Water------------------------- Ambient Temp.-----------------------------

Admixture------------------ Concrete Temp. at Plant-----------------

W/C Ratio------------------

Arrival Time at Site--------------------- Slump at Site--------------------- Concrete Temp. at Site----------------

Taken Cube------------------------------ Pouring Start--------------------- Pouring Close-----------------------------

Remarks :

11
Contractor Rep. Consultant Rep.

SILT CONTENT IN SAND

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT


PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)

Haryana State Road And Bridge Development Corporation Ltd.

CLIENT Haryana State Road And Bridge Development Corporation Ltd.

Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.

Contractor M/S NAGI BUILDER PVT. LTD.

Sample No. : Date of Sampling :

Location : Date of Testing :

Source : Type of Materials :

Trial No. 1 2 Remarks

Total Weight of Sample (gm)


Weight Retained of Sample after Wash of 75 mic.
Sieve (gm)
Weight Passing of Sample after Wash of 75 mic.
Sieve (gm)
Silt Content, %

Average. %

Acceptance criteria specified: _________________________________________________

Remarks :

12
Contractor Rep. Consultant Rep.

Compressive Strength of Concrete Cubes


IS: 516
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Location : Date of Casting :

Structure : Date of Testing :

Component : Water-cement ratio :

Grade of Concrete : % Admixtur (If any) :

Cement Content (Kg/m3) : Area (mm2) :

Quantity of Concrete (m3) : Age in Days :

Avg.
SL. Cube Weight Density Load Strength
Strength Remarks
No No. (gms) (gm/cc) (KN) (N/mm2)
(N/mm2)
1

8
9
10

13
11

12

Required Strength: N/mm2 Average achieved Strength: N/mm2


Remarks:

Contractor Rep. Consultant Rep.

SPECIFIC GRAVITY OF COARSE AGGREGATES


IS: 2386 (Part 3) 1963

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO


PROJECT NAME 21.300 DISTRICT
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Sample No. :
Date of Sampling :

Type of Material : Date of Testing :

Source : Sampled By :

Proposed Use : Tested By :

Description Units Test 1 Test 2 Average

Weight of surface saturated aggregate in


gms
water (A)
Weight of surface saturated aggregate in
gms
air (B)

Weight of oven dried sample in air ( C ) gms

14
Specific gravity on oven dried basis C/(B-A) -

Specific gravity on SSD basis B/(B-A) -

Apparent Specific gravity C/(C-A) -

Water absorption (B-C)/C x 100 %


Remarks:

Contractor Rep. Consultant Rep.


SPECIFIC GRAVITY OF FINE AGGREGATEST
IS: 2386 (Part 3) 1963

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO


PROJECT NAME 21.300 DISTRICT
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Sample No. : Date of Sampling :

Type of Material : Date of Testing :

Source : Sampled By :

Proposed Use : Tested By :

Description Units Test 1 Test 2 Average

Weight of saturated surface dry sample


gms
(A)

15
Weight of pycnometer filled with sample
gms
and filled with distilled water ( B)

Weight of pycnometer filled with distilled


gms
water ( C )

Weight of oven dried sample ( D ) gms

Specific gravity on oven dried basis D/A-


-
(B-C)

Specific gravity on SSD basis A/ A-(B-C) -

Apparent Specific gravity D/ D-(B-C) -

Water absorption (A-D)/D x 100 %

Remarks:

Contractor Rep. Consultant Rep.

FINENESS OF CEMENT
(IS:4031-Part I)

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO


PROJECT NAME 21.300 DISTRICT
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Sample No. : Date of Sampling :

Brand Name : Date of Testing :

16
Cement Grade : Sampled By :

Week No. : Tested By :

Description Units Test 1 Test 2 Test 3

Weight of Cement Taken, A (gm)

Weight of Cement retained on 90 micron


(gm)
sieve ,B

Percentage of Cement retained (B/A)*100 (%)

Average % of Fineness of Cement (%)

Specification Limit (%)

Remarks:

Contractor Rep. Consultant Rep.

CONSISTENCY, INITIAL & FINAL SETTING TIME OF CEMENT


(IS:4031-Part-4&5)

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO


PROJECT NAME 21.300 DISTRICT
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.

17
Contractor M/S NAGI BUILDER PVT. LTD.

Sample No. : Date of Sampling :


Brand Name : Date of Testing :
Cement Grade : Sampled By :
Week No. : Tested By :
CONSISTENCY OF CEMENT

Weight of Cement %of Water Volume of Needle Penetration


Test No.
(gm) Taken Water(ml) (mm)

CONSISTENCY OF CEMENT
INITIAL & FINAL SETTING TIME
Weight of %of Water Volume of Needle Penetration
Sr. No. Total Time
Cement (gm) Taken Water(ml) (mm)

Note : % of Water Taken for Initial & Final Setting Time = P*0.85 , P= Consistency of Cement
Description Unit Result Specification Limit

Standard Consistency of Cement % -

Initial Setting Time Minutes > 30 Min

Final Setting Time Minutes < 600 Min

Final Setting Time : Time at which the needle makes an impression on the test block while
attachment fails to do so after adding of water to cement

Contractor Rep. Consultant Rep.

SIEVE ANALYSIS OF GRANULAR SUB-BASE


MORT&H TABLE 400-2 (GRADING 1)

18
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)

Haryana State Road And Bridge Development Corporation Ltd.


CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Date of
Sample No. : :
Sampling
Date of
Source : :
Testing

Location : Tested By :

Layer : Weight of sample(gms) :

Weight of % Specified Limits


%
IS Sieve material Cumulative
Weight % Passing
(mm) retained weight
retained Lower Upper
(gms) retained

75.0 100 100

26.5 55 75

4.75 10 30

0.075 0 10

Remarks :

Contractor Rep. Consultant Rep.

19
SIEVE ANALYSIS OF WET MIX MACADAM
MORT&H TABLE 400-11

FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300


PROJECT NAME DISTRICT
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.

Sample Date of
: :
No. Sampling
Date of
Source : :
Testing

Location : Tested By :

Weight of
Layer : :
sample (gms)
Weight of % Specified Limits
IS Sieve material % Weight Cumulative
% Passing
(mm) retained retained weight
Lower Upper
(gms) retained

53.00 100 100

45.00 95 100

22.40 60 80

11.20 40 60

4.75 25 40

2.36 15 30

0.600 8 22

20
0.075 0 8
Remarks :

Contractor Rep. Consultant Rep.

21