3764/2
TEKNOLOGI KEJURUTERAAN
Kertas 2
Ogos
SKEMA PEMARKAHAN
13m
Advantages :
i. Simple 1
Ringkas
ii. Cheaper 1
Murah
1(c) 2m
3m
20m
Soalan No. 2
Soalan Jawapan Markah
2
(a) Procedure of investment cast
Figure
Figure
1+1+1
(b)
(i)
(creating mould/tree pattern/removing wax/ pouring metal) + lebelling
1
(ii) 1
- the mould for the wax patterns is prepared
1+1
- melt wax is injected to the mould
- the wax pattern is moved from the mould when cooled
1+1
- few patterns is attached to a sprue to shape pattern tree
- tree pattern is placed inside the mould box
1
- refectory material is used to pour over the tree pattern and
1+1+1
left for a while to solidify
1
- wax is moved out by heating the mould to create cavity
(iii) 1+1
- molten metal is pour trough the sprue until full
- leave to cool
1
- product is acquire by breaking the mould
1
1
Max 12
marks
Senaraikan:
Carburetor, piston, etc yang diterima
2
4 advantages of investment casting
- high product accuracy 1
- no/little finishing require 1
- complex shape can be cast 1
- free from defects 1
- able to produce thin product with holes 1
Total marks
20
Soalan No. 3
a)
b)
8m
20m
Marking Reduced level = 2 X 1m
Chainage = 2 X 1m
Plotting profile = point 1 X 1m (max – 8m)
Graph lines 3 X 1
Total
Soalan No. 4
Wall area of P = px l 1m
= [ 10 x 12 ] + [ 2 x 5 ] + [ 4 x 4 ] m2 1m
= 120 + 10 + 16 m2
= 146 m2 1m
Open Terrace
Area of R = px l
= [ 9 x 5 ] + [ 5 x 4 ] + [ 10 x 4 ] m2 1m
= 45 + 20 + 40 m2
= 105 m2 1m
= RM 70,080.00 + RM 29,400.00 1m
= RM 99,480.00. 2m
13m
1m
3
Cost of the column = Volume of column x Cost rate / m 1m
= 0.7 m3 x RM 350.00/m3. 2m
= RM 245.00 7m
Soalan No. 5
5.
(a) L N Simbol dan label
PB Start-1m
RC coil-1m
OR-1m
2 RC contactor-2m
CB PB Start JOG-1m
PB Stop OR C coil-1m
RC Sambungan betul
-1m
RC
Jumlah = 8m
JOG
C
RC
(b) 1m
-When the start push button PB (Start) is pressed 1m
-the relay control coil (RC) becomes electromagnetic.
1m
-All normally open contactors RC is closed. 1m + 1m
-Contact coil C will become electromagnetic / to start the motor.
1m
-Although the start push button PB (Start) is released, 1m + 1m
-the motors keeps running / due to the holding circuit.
1m + 1m
-When the stop push button PB (Stop) is pressed, / motor stops running.
-To start jogging operation, stop push button PB(Stop) needs to be pressed 1m
first,
-to make sure the coil RC lose its electromagnetic. 1m
-Press push button JOG step by step / to rotate the motor step by step 1m + 1m
movement.
Mana-mana 8m
Jumlah = 8m
Soalan No. 6
Modification
Used correct arrangement of brick wall installation and / avoid 1m + 1m
continuous vertical joints of brick.
Gunakan kaedah susunan bata yang betul iaitu berlapis dan
berlekap dan / elakkan sambungan tegak secara berterusan
Used the correct proportion of mortar. 1m
Menggunakan campuran mortar yang betul.
To strengthen the brick wall. 1m
Untuk menguatkan dinding bata.
To present crack on the wall. 1m
Untuk mengelakkan kertkan pada dinding
Disusun secara berlapis dan berlekap. 1m
[Mana-mana 3 penyataan yang betul-3m]
Modification
Build a strip foundation concrete or (ground beam) under the 1m
brick wall.
Bina assas jalur konkrit atau rasuk bumi dibawah dinding bata.
Build pad footing under the column. 1m
Bina asas dibawah tiang.
Incorrect proportion of mortar. 1m
Bancuhan campuran r yang tidak betul.
1m
Incorrect method of placing the mortar.
Kaedah meletakkan mortar salah.
1m
To support small and light load
Untuk menangung beban yang kecil dan ringan. 1m
To prevent the brick wall collapse
Untuk mengelakkan daripada dinding bata runtuh.
[Mana-mana 3 penyataan yang betul-3m]
2m
5m
1m
Lakaran dan label- 2m
1m
Problem 3 : Bricks are broken and bond-off from boundary column.
Bata pecah dan ikatannya terkeluar dari tiang tembok.
Modification 1m
Used the correct proportion of mortar.
Menggunakan campuran mortar yang betul. 1m
Install galvanized iron fish tail wall cramp to each four layer of
brick wall to the column.
Pasang tambatan keluli setiap 4 lapisan bata ke tiang
Fixed nail at column to each four layer of brick layer
Pasang paku pada tiang di setiap 4 lapisan dinding bata.
To acquire stronger joining between brick wall and column.
Untuk mendapatkan cengkaman yang lebih kuat di antara
dinding bata dan tiang.
[Mana-mana 3 penyataan yang betul-3m]
2m
5m
15m
S6(b) 1m
1m
Lakaran – 2m 1m
3m
1. Strecher Bonding / Ikatan Sisi Bata
S6(c) 2. Flemish Bonding / Ikatan Flemish
3. English Bonding / Ikatan Inggeris 1m
4. English Yard Bonding / Ikatan Taman Inggeris 1m
2m
[ mana-mana tiga yang betul ]
20 m
1. Stability / Kestabilan
2. Strength / Kekuatan
3. Water Resistance / Tahan Cuaca
4. Fire Resistance / Rintangan Kebakaran
5. Sound absorption / Serap Bunyi
[ mana-mana 2 yang betul ]
Soalan No. 7
Appendix 4
7(a). Lampiran 4
Litar kawalan
Hidraulik Suitably Reason
Hidraulic control Kesesuaian Alasan
circuit
Mana-mana 3 jawapan
Mana-mana 3 jawapan
Mana-mana 3 jawapan
Skema markah:
Jumlah : 12 markah
No.
Soalan Jawapan Markah
7.(b).
* Jika tuil digunakan hanya satu sahaja akan dipasang pada injap
kawalan arah manakala spring dipasang pada sebelahnya. 8 markah
Jum : 20 markah