Sierra Support Services Group RA-006-FIBRE-CT

RISK ASSESSMENT FOR: - R/A – 6. Manual Handling


Location/Task: The carrying, lifting, of stock, materials and supplies

Assessed By: Approved By: Stephen Bassett

Date of
Oct-14 Revise By: 1 Year Version No. 001
Assessment:

Potential for Harm (Accidents) Means of Minimising Harm (Accidents)

High risk of back injuries, musculo-  Basic Manual handling training will be provided to all staff.
skeletal injury and other strains
 Avoid manual handling when possible.
from lifting, carrying and handling a
wide variety of material, including  Ensure that you are able to see over the load you are carrying.
parts and equipment required for  Use mechanical tools where possible to avoid the risk. Make sure the load is secured properly.
fibre installation and material
 Ensure that manual handling operations are carried out in the correct manner.
handling.
 Do not lift or handle anything of excessive weight. Use a two man lift for large, heavy or
unusual loads as required.
 Assistance should be requested where heavy items need to be moved.
 Ensure people are physically fit enough to carry out the specified tasks.
 When lifting, ensure that you have a good balanced stance, get a good hand grip on the load
and use your legs to lift.
 Where mechanical devices are provided to assist in moving items, they must be used.

RA-006-FIBRE-CT Controller:
Rev No. 1.0 Rev Issue Date: October 2014
SHEQ
Uncontrolled if printed or copied Page 1 of 2
Sierra Support Services Group RA-006-FIBRE-CT

RISK ASSESSMENT FOR: - R/A – 6. Manual Handling


 Check the weight of an item before lifting it. Most products show the weight of the item on the
packaging.
Employees are to be supplied with the appropriate clothing which does not interfere with their
manual handling tasks including the use of mechanical aids.

PPE Required  Safety shoes / boots & high vis vests and gloves if applicable.

General Recommendations  All staff are to be provided with manual handling training prior to commencing on the contract.
This training is specific to the job role.

Responsibility for Control  Sierra management for overall work procedures and work practices.
 Responsibility of all employees and contractors.

RA-006-FIBRE-CT Controller:
Rev No. 1.0 Rev Issue Date: October 2014
SHEQ
Uncontrolled if printed or copied Page 2 of 2