TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
REVISED DATA 2017-18
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of
locations based on the 500 mm dia pile
Cum
Volume of Concrete = 3.14 /x *0.5 x 0.5 x 8 = 4.02 /4= 1.57 m3 1.570
1.570 Cum Standardised concrete mix using M 30 Grade concrete in (F&B) 5756.93 9038.38
Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
5 km entirely with city limits
Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits
Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 27.48
stone etc.Initial Lead (0-10 km)
9.16
Km 3.00 Loading or unloading charges 30.10 90.30
5.000 cum 20mm HBG Machine crushed stone jelly (7730 Kg) 1369.96 6849.80
3.300 cum 10-12mm HBG Machine crushed stone jelly (5156 Kg) 1118.46 3690.92
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.45
the 450 mmxdia
x 0.45 8 =pile
4.02 /4= 1.272 m3 1.272
450mm Dia pipe
1.272 Cum RCC 1:1.5:3 (F&B) 5756.93 7322.81
0.1272 MT Bentonite (10% concrete volume) 4000.00 508.80
8.00 Rmt Labour charges 960.00 7680.00
Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.45 x 0.45 5 xkm1 km
entirely with m3
=0.159 city limits 0.159
500mm Dia pipe DATA for 1 Rmt
0.159 Cum Dismantling of RCC works 3820.00 607.38
0.159 Cum Conveyance of dismantled materials p-35 48.10 7.65
0.159 Cum Loading or unloading charges p-35 30.10 4.79
Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits
Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.40
the 400 mmxdia
x 0.40 8 =pile
4.02 /4= 1.272 m3 1.272
400mm Dia pipe
1.272 Cum RCC 1:1.5:3 (F&B) 5756.93 7322.81
0.1272 MT Bentonite (10% concrete volume) 4000.00 508.80
8.00 Rmt Labour charges 960.00 7680.00
Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.40 x 0.40 5 xkm1 km
entirely with m3
=0.129 city limits 0.126
400mm Dia pipe DATA for 1 Rmt
0.126 Cum Dismantling of RCC works 3820.00 481.32
0.126 Cum Conveyance of dismantled materials 48.10 6.06
0.126 Cum Loading or unloading charges 30.10 3.79
Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits
Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30
ABSTRACT
Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thurai
Trichy under Ph-XXI /3000 Quarters scheme
1.2 0.00 Earth work excavation in all soils (excluding refilling) 0.00 0.00
0.0 0.00 a. 0 to 2 mt. 127.20 Cum.
0.0 0.00 b. 2 to 3 mt. 133.40 Cum.
1.3 * Earth work excavation in Soft disintegrated rock (including 0.00
refilling)
3.2 7.20 P.C.C. 1:2:4 for Foundation & Basement and other similar works 4460.03 Cum.
3.3 0.00 P.C.C. 1:8:16 using 20 mm broken brick jelly 2721.36 Cum.
3.4 0.00 Providing WBM 125 mm consolidated thick with gravel blindage 0.00 Sqm.
6.1 0.00 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of size 23 4937.90 Cum.
x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
6.2 0.00 Brick work in C.M. 1:5 (F& B) using chamber Burnt bricks of size 23 4689.80 Cum.
x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
6.3 0.00 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of size 23 0.00 Cum.
x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
6.4 0.00 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of size 22 0.00 Cum.
x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
6.5 248.50 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country bricks of 4806.92 Cum.
size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
6.6 0.00 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country bricks 0.00 Cum.
of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
7.1 0.00 Damp Proof Course 0.00 Sqm.
in C.M. 1:4, 12 MM thick mixed with Crude oil
7.2 0.00 Supply and fixing of Bituminous filler pad, 20 mm tk. for 666.00 Sqm.
expansion joint
7.3 0.00 Damp Proof Course in C.M. 1:4, 12 MM thick mixed with #VALUE! Sqm.
Water proofing compound
Thuraiyur 7
9.3 0.00 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00
x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
0.0 0.00 a. In Ground Floor 0.00 Cum.
0.0 0.00 b. In First Floor 0.00 Cum.
0.0 0.00 c. In Second Floor 0.00 Cum.
0.0 0.00 d. In Third Floor 0.00 Cum.
0.0 0.00 e. In Fourth Floor 0.00 Cum.
9.4 0.00 Brick work in C.M. 1:6 using Chamber Burnt brick of size 22 0.00 0.00
x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
0.0 0.00 a. In Ground Floor 0.00 Cum.
0.0 0.00 b. In First Floor 0.00 Cum.
0.0 0.00 c. In Second Floor 0.00 Cum.
0.0 0.00 d. In Third Floor 0.00 Cum.
0.0 0.00 e. In Fourth Floor 0.00 Cum.
9.5 * Brick work in C.M. 1:6 using Kiln Burnt Country bricks of 0.00 0.00
size 22 x 11 x 7 cm ( 8 3/4" x 4 1/4" x 2 3/4")
11.6 0.00 Brick work in C.M. 1:4 Kiln Burnt Country bricks of size 22 x 0.00 0.00
11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 57 mm tk (B.P.)
0.0 0.00 a. In Ground Floor 0.00 Sqm.
0.0 0.00 b. In First Floor 0.00 Sqm.
Thuraiyur 11
12.2 0.00 Brick partition in C.M. 1:4 50 mm tk. (B.P.) 0.00 0.00
Kiln Burnt Country brick: 23 x 11 x 5 cm
0.0 0.00 (9"
a. Inx Ground
4 1/4" x Floor
2") 0.00 Sqm.
0.0 0.00 b. In First Floor 0.00 Sqm.
0.0 0.00 c. In Second Floor 0.00 Sqm.
0.0 0.00 d. In Third Floor 0.00 Sqm.
0.0 0.00 e. In Fourth Floor 0.00 Sqm.
0.0 0.00 0.00 0.00 0.00
13.1 451.50 Filling with Excavated Earth 22.20 Cum.
13.2 0.00 Filling with Excavated Earth Mixed with lime in the 0.00 Cum.
proporation 1:4 (one of lime & four of earth)
14.I 0.00 Precast Cupboard slab 20 mm tk. 0.00 0.00
0.0 0.00 a. In Ground floor 837.31 Sqm.
0.0 0.00 b. In First floor 840.02 Sqm.
0.0 0.00 c. In Second floor 842.73 Sqm.
0.0 0.00 d. In Third floor 845.44 Sqm.
0.0 0.00 e. In Fourth floor 848.15 Sqm.
0.0 0.00 f. In Fifth floor 850.86 Sqm.
0.0 0.00 g. In sixth floor 853.57 Sqm.
0.0 0.00 h. In seventh floor 856.28 Sqm.
0.0 0.00 i. In eighth floor 858.99 Sqm.
0.0 0.00 j. In Ninth floor 861.70 Sqm.
0.0 0.00 k. In Tenth floor 864.41 Sqm.
0.0 0.00 l. In Eleventh floor 867.12 Sqm.
14.II 0.00 Precast cupboard slab 40 mm tk. 0.00 0.00
0.0 0.00 a. In Foundation & basement 931.95 Sqm.
0.0 0.00 b. In Ground floor 934.70 Sqm.
0.0 0.00 c. In First floor 940.11 Sqm.
0.0 0.00 d. In Second floor 945.52 Sqm.
0.0 0.00 e. In Third floor 950.93 Sqm.
0.0 0.00 f. In Fourth floor 956.34 Sqm.
15.1 0.00 Cuddappa slab 20 mm tk. 0.00 0.00
Thuraiyur 12
23.4 0.00 Supply and fixing of Aluminium window with 3mm thick Glass 0.00 0.00
24.0 15455.90 Manufacturing & supply of steel windows (Weight basis) 58.00 Kg.
27.1 0.00 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum.
burnt bricks 23 x 11.2 x 7 cm.
27.2 0.00 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum.
burnt bricks 23 x 11.4 x 7.5 cm.
27.3 0.00 B.w. in C.M. 1:4 for staircase steps Chamber 0.00 Cum.
burnt bricks 23 x 11 x 7 cm.
27.4 0.00 B.w. in C.M. 1:4 for staircase steps Chamber 0.00 Cum.
burnt bricks 22 x 11 x 7 cm.
Thuraiyur 14
27.5 0.00 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks #VALUE! Cum.
22 x 11 x 7 cm.
27.6 0.00 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks 0.00 Cum.
22 x 11 x 5.7 cm.
28.0 522.70 Floor plastering in C.M. 1:4, 20 mm tk. #VALUE! Sqm.
32.0 0.00 Pressed tiles (23cmx23cmx20mm) mixed with Crude oil 0.00 Sqm.
32.1 0.00 Pressed tiles (23cmx23cmx20mm) mixed with Water 785.28 Sqm.
proofing compound
32.2 0.00 Pressed tiles (23cmx23cmx18mm) mixed with Water 0.00 Sqm.
proofing compound
33.0 17559.40 Plastering in C.M. 1:5, 12 mm tk. 145.84 Sqm.
44.1 0.00 PVC SWR 110 mm dia Rain water pipe 273.87 Rmt
44.2 0.00 Rain Water Harvesting using Defunct borewell method 0.00 Each
49.0 546.00 S & F chromium plated 8 guage Picture Hook 1.50 Each
51.0 0.00 HDPE water tank 700 lit capacity with ISI mark 5740.00 Each
52.0 * PVC Water supply (ASTM) 0.00 0.00
0.0 372.00 a. 32 mm dia 167.93 Rmt
59.2 0.00 Gully Trap using chamber burnt bricks of size 1212.57 Each
23x11.4x7.5cm
59.3 0.00 Gully Trap using Chamber burnt bricks 23 x 11 x 7 cm. 0.00 Each
59.4 0.00 Gully Trap using Chamber burnt bricks 22 x 11 x 7 cm. 0.00 Each
59.5 49.00 Gully Trap using Kiln burnt country bricks 22 x 11 x 7 cm. 1212.57 Each
59.6 0.00 Gully Trap using Kiln burnt country bricks 22 x 11 x 5.7 cm. 0.00 Each
77.4 1736.00 S&F of 20mm dia PVC pipe for TV/Telephone line 58.07 Rmt
0.0 * Precast Jally ventilator 50mm tk.using standardised concrete 0.00 0.00
mix M20 (annexure) without vibrating charges
0.0 26.10 a. In Ground Floor 1682.75 Sqm.
4.1.1 0.00 Standardised concrete Mix M30 Grade Concrete 0.00 0.00
0.0 0.00 a. In Foundation and basement 5805.84 Cum
0.0 0.00 b. In Ground Floor 5873.84 Cum
0.0 0.00 c. In First Floor 6007.84 Cum
0.0 0.00 d. In Second Floor 6141.84 Cum
0.0 0.00 e. In Third floor 6275.84 Cum
0.0 0.00 RCC M30 mix using hard broken stone jelly for foundation 0.00 0.00
and basement
0.0 0.00 a. Foundation & basement 5805.00 Cum
0.0 0.00 b.Stilt floor 5873.00 Cum
0.0 0.00 Cement Concrete using desing mix of grade M25 concrete 0.00 0.00
11.2 0.00 Brick work in C.M. 1:4 using chamber Burnt bricks of size 23 0.00 0.00
x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
0.0 0.00 g. In Fifth Floor #VALUE! Sqm
0.0 0.00 h. In Sixth Floor #VALUE! Sqm
0.0 0.00 i. In Seventh Floor #VALUE! Sqm
0.0 0.00 j. In Eighth floor #VALUE! Sqm
0.0 0.00 k.in Ninth floor #VALUE! Sqm
0.0 0.00 Supply and laying of Hard core layer 200mm 2796.22 Cum
0.0 0.00 Supplying and filling stonedust 136.20 Cum.
0.0 550.00 Plastering with CM 1:3, 12mm with WPC 168.63 Sqm
0.0 0.00 Earth work excavation in Loose / sandy soils (including 91.50 0.00
refilling)
0.0 0.00 Earth work excavation in Loose / sandy soils (excluding 42.50 0.00
refilling) for open foundation
0.0 0.00 Earth work excavation in Loose / sandy soils (excluding 63.75 0.00
refilling) for drain
3.8 0.00 P.C.C. 1:3:6 using 20 mm broken brick jelly 3862.79 Cum
8.4 0.00 Providing earth quake resistant for Corner walls 0.00 0.00
0.0 0.00 a. Foundation & basement 4756.41 Cum
0.0 0.00 b. Ground Floor 4824.41 Cum
0.0 0.00 c. First Floor 4958.41 Cum
0.0 0.00 d. Second Floor 5092.41 Cum
8.5 0.00 Providing earth quake resistant for Door/window Jambs 0.00 0.00
0.0 0.00 Mobilization charges including transporting to site CER 50000.00 Set
No.328/2014-15
0.0 0.00 Red oxide plastering in CM 1:4 #VALUE! Sqm
18.1 * Formwork using M.S.Sheet 0.00 0.00
0.0 1261.30 a.For Column footings,plinth beam,Grade beam,Raftbeam,Raft slab 498.94 Sqm
etc.,
0.0 7165.62 b.Plain surfaces such as Roof slab,floorslab,Beams,lintels,lofts,sill 573.61 Sqm
slab,staircase,portico slab and other similar works
0.0 3249.10 c.For Square and rectangular columns and small quantities 688.33 Sqm
0.0 0.00 TW styles & rails with 9mm thick BWR single leaf shutters 3330.03 Sqm
with brass screws size of 750x2100 mm
0.0 0.00 TW styles & rails with 9mm thick BWR single leaf shutters 2824.42 Sqm
with brass screws size of 1000 x 2100 mm
0.0 0.00 TW styles & rails with 9mm thick BWR Double leaves 0.00 Sqm
shutters with brass screws size of 1500x2100 mm
0.0 0.00 TW styles & rails with 9mm thick BWR single leaf shutters 2644.63 Sqm
with brass screws size of 1200x2100
21.5.2 157.60 Supply and Fixing Soild PVC door Shutter with frame 2670.00 Sqm
23.2.1 392.50 4mm thick pin headed Glass panels with Aluminium beedings 639.50 Sqm
0.0 0.00 Cuddappa slab 20 mm tk.for kitchen hearth slab. 0.00 0.00
0.0 0.00 a. In Ground floor 478.50 Sqm.
0.0 0.00 Floor ceramic tiles using Grout (Tile Joint Filler). 833.48 Sqm
29.9 280.10 Floor ceramic tiles (Anti-skid) using Grout (Tile Joint Filler). 833.48 Sqm
38.4 550.00 Two coat of cement paint over one coat white cement 80.10 Sqm
43.0 149.410 Fabrication of Mild steel / RTS grills (without cement slurry) for all 61875.00 MT
sizes of rods.
44.6 291.70 PVC SWR 110 mm dia with ISI mark type- A for Rain water down 273.87 Rmt
fall pipe
50.6 252.00 Precast slab 50 mm tk.in C.C. 1:3:6 with fibre 276.97 Sqm
52.4 1066.00 20mm dia PVC water supply ASTM pipe (fully consealed in walls) 149.18 Rmt
53.4 52.00 S&F of C.I Manhole cover 60 x 60 cm (50kg weight ) 1725.00 Each
0.0 100.00 Wash Hand Basin of size 550 x 400 mm 2526.82 Each
54.3 0.00 Supplying and fixing of Brass Chromium plated screw down 191.00 Each
tap 15mm dia (heavy type not less than 430 grms weight)
with ISI mark.
56.3 0.00 S & F of Indian Water closet white glazed (Oriya type) of 2355.26 Each
size 580 x 440mm - in G.F.
56.4 0.00 S & F of Indian Water closet white glazed (Oriya type) of 3736.50 Each
size 580 x 440mm - Other than G.F.
Thuraiyur 25
58.3 * PVC SWR pipe (Soil line) with ISI mark - type 'B'. 0.00 0.00
58.4 249.00 Supplying, Laying & Concealing the 50mm dia PVC ( SWR) pipe 81.20 Rmt
with ISI mark type - 'B' with relevant specials.
58.5 1.00 PVC(SWR) pipe with ISI mark - type 'A' for Ventilating shaft with 439.40 Each
cowl
0.0 * Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990.( Ordinary)
0.0 50.00 c. Calling bell point with Buzzer/Calling bell 1102.00 Each
65.1 201.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 1126.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for Fan point.
66.1 35.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 1973.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for Staircase Light Point.
0.0 304.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 540.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Switch Board Itself.
68.2 250.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 752.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Convenient Places.
70.5 0.00 S & F of Tube light fitting (patty type ) with Electronic 496.00 Each
ballast and 36 W slim tube light
0.0 201.00 Supply and delivery of 48" (1200 mm) Fan with ISI mark with 1238.30 Each
Eletronic Dimmer
0.0 805.00 Run of 2 Wires of 4 sqmm PVC insulated single core multi strand 186.00 Rmt
fire retardant flexible copper cable with ISI mark confirming IS:
694:1990.
77.5 0.00 Run of 2 Wires of 1.5 sqmm PVC insulated single core multi 141.00 Rmt
strand fire retardant flexible copper cable with ISI mark
0.0 0.00 Run of 2 Wires
confirming of 4 sqmm PVC insulated single core multi
IS: 694:1990. 186.00 Rmt
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
0.0 585.00 4 x 4 Sq mm copper PVC insulated unsheathed single core cable 197.00 Rmt
for 3 phase EB service connection
Thuraiyur 26
0.0 950.00 Run of 2 Wires of 2.5 sqmm PVC insulated single core multi strand 155.00 Rmt
fire retardant flexible copper cable with ISI mark confirming IS:
694:1990.
0.0 0.00 Run of 4 Wires of 6 sqmm PVC insulated single core multi 336.00 Rmt
strand
0.0 0.00 Run of 4 Wires of 10 sqmm PVC insulated single core multi 440.00 Rmt
strand
112.1 50.00 S & F of Exsaust Fan 225mm dia 1538.71 Each
0.0 0.00 Compact Fluoresent Lamp (CFL) 0.00 0.00
0.0 0.00 a. 14W bulb for Bath & WC 130.00 Each
0.0 0.00 b. 18w bulb for Bulk Head fittings 170.00 Each
0.0 0.00 S & F of Bulk head fitting suitable for CFL 443.00 Each
44.2 * Rain water harvesting using defunct borewell and providing 0.00 0.00
perforated cover slab
0.0 16.00 a). Providing pit 1164.91 Each
257.1 0.00 S&F of M.S. Angle of size 35x35x5mm for staircase steps 185.36 Rmt
344.2 100.00 S&F of Bevelled edge mirror 500 x 400 x 5.5mm 355.00 Each
383.0 50.00 S&F of Cuddapah sink 600 x 600 x 200mm 944.00 Each
383.1 0.00 Providing nosing to the edges of Granite slab 235.00 Rmt
0.0 0.00 Supply and fixing of PVC water supply (ASTM) 210.88 0.00
a.50mm dia
384.0 4.00 S&F of PVC flushing cistern 1231.00 Each
0.0 0.00 Supply of G.I pipe 40mm dia 'B' Class 155.00 Rmt
0.0 5935.50 Plastic Emulsion PAINT including primer for outer walls 151.87 Sqm
0.0 10887.80 Two coat of OBD over one coat white cement for inner walls 75.46 Sqm
0.0 0.00 2 x 4 Sqmm Copper PVC insulated unsheathed single core 1 110.00 Rmt
KV grade cable for EB service single phase.
0.0 0.00 40 mm dia GI pipe "B"class 155.00 Rmt
0.0 0.00 1 No.of 32 Amps - Fuse Unit 368.00 Each
Thuraiyur 27
0.0 0.00 P. C.C. 1:3:6 for foundation & basement using 40mm metal 3862.79 Cum
0.0 150.00 Providing PVC Tee with end cap 87.00 Each
0.0 0.00 Supplying and fixing of staineless steel hand rails 4500.00 Rmt
0.0 2198.00 Vitrified Tiles flooring (ivory) 908.64 Sqm
0.0 0.00 Supplying and fixing of GM wheel valves ISI mark 0.00 0.00
0.0 0.00 a.100mm GM Gate valves 5640.00 Each
0.0 0.00 b.50mm GM Gate valves 1340.00 Each
0.0 0.00 c.32mm GM Gate valves 604.00 Each
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990. (Modular)
0.0 0.00 a. Light point with ceiling rose 1000.51 Each
0.0 0.00 b. Light point without ceiling rose 1003.51 Each
Thuraiyur 28
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 769.30 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point @
Convenient Places.
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 536.55 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point @
Switch Board Itself.
0.0 0.00 Supplying and laying of 3.5 core 70 sq.mm PVC armoured 627.40 RMT
LTUG cable (below GL)
0.0 0.00 S&F 3.5 X 70mm LTUG CABLE Above GL 435.00 RMT
0.0 0.00 S&F 3.5 X 35mm LTUG CABLE Above GL 356.00 RMT
0.0 0.00 S&F 3.5 X 25mm LTUG CABLE Above GL 317.00 RMT
0.0 0.00 S&F 2X6 Sq.mm LTUG CABLE 176.84 Rmt
0.0 0.00 Supplying and fixing of brass cable gland suitable for 3.5 293.25 Each
core 70 Sqmm PVC armoured LTUG cable SD 189
0.0 0.00 Supply & Fixing of Aluminium openable windows of size 0.00 0.00
0.0 0.00 Supplying and fixing of SS Soap Tray including cost of all 704.75 Each
materials and all labour charges etc complete
Thuraiyur 29
0.0 0.00 Supplying and fixing of CP Angle valve Stop cock including 514.85 Each
cost of all materials and all labour charges etc complete
0.0 0.00 Supplying and fixing of 25x 3mm Copper flat 473.50 Rmt
0.0 0.00 Supply and fixing of Health faucet approved quality with ISI 952.00 Each
mark
0.0 0.00 S&F TPN 12 way DB encloser (SR-p-80) 11481.80 Each
0.0 0.00 S&F TPN 8 way DB encloser 5325.60 Each
CER No.178/2013-14
0.0 0.00 S&F TPN 6 way DB encloser 8254.60 Each
CER No.178/2013-14
0.0 0.00 S&F TPN 4 way DB encloser 6588.00 Each
CER No.178/2013-14
0.0 0.00 Supply and fixing of spot light of approved make and 593.00 Each
company with ISI CFL bulb CER No.178/13-14
#REF! #REF! #REF! #REF! #REF!
0.0 0.00 Supplying and Fixing of Rolling shutters of all sizes (Gear 2240.00 Sqm
Operated)( from 8m2 to 12m2 )Annex-Vi-P-45 rev SR 18-
19 item -102-A-b
0.0 0.00 Supplying and fixing of solid core flush door shutter of 0.00 0.00
thickness 35mm
0.0 0.00 a. door size 1.200m x 2.100 (Double leaf) 2368.73 Sqm
0.0 0.00 b. door size 1.200 m x 2.400 (double Leaf) 2960.17 Sqm
0.0 0.00 c. door size 1.000 m x 2.100 (Single Leaf) 2504.54 Sqm
0.0 0.00 d. door size 0.900 m x 2.100 (Single Leaf) 2225.27 Sqm
0.0 0.00 e. door size 1.00 m x 2.400 (Single Leaf) 2499.86 Sqm
0.0 0.00 f. door size 1.50 m x 2.100 (Double leaf) 2910.85 Sqm
0.0 0.00 g door size 1.50 m x 2.40 (Double leaf) 2876.99 Sqm
0.0 0.00 h door size 1.80 m x 2.40 (Double leaf) 2676.55 Sqm
0.0 0.00 h door size 1.80 m x 2.10 (Double leaf) 2738.10 Sqm
0.0 0.00 Providing additional strutting to centering of plain surface. 24.89 Sqm
0.0 0.00 S & F of Granite slab of size 4'x2', 18 to 20mm Thick For 0.00 0.00
kitchen arrangements (jet black)
0.0 0.00 a. In Ground floor 1746.84 Sqm
0.0 * S & F of Granite tile of size 2'x 1', 10mm Thick For kitchen 0.00 0.00
arrangements (jet black)
0.0 0.00 Supply and fixing of 19mm dia steam pipe for down rod of 61.80 Each
fan (SD 106)
0.0 0.00 Supply and fixing of SS Towel rail (75cm length) CER 405.00 Rmt
No.178/13-14
0.0 0.00 Supply and fixing of weld mesh of size 7.5x2.5cmx10gauge 325.00 Sqm
0.0 0.00 Supply and fixing of Chicken mesh 35.00 Sqm
0.0 0.00 S & F of 15mm dia Engineering Polymer Tap (long body ) for 185.00 Each
coastal area only
0.0 0.00 S & F of 15mm dia Engineering Polymer Tap short body tap 174.00 Each
for coastal area only
0.0 0.00 S & F of CFL road way lighting luminaries suitable for fixing 2219.00 Each
36w CFL lamp
0.0 0.00 Augering 30 cm dia for compound wall 217.30 Rmt
0.0 1017.60 Finshing the top of Terrace floor with one course of solar reflective 1020.82 Sqm.
Ceramic tiles without base concrete
51.
0.01 0.00* HDPE waterPressure
UPVC Non tank 200 pipe
lit capacity
of SN8 with
SDRISI
34 mark 1640.00
0.00 Each
0.00
( S 16.5) as per IS 15328/2003
0.0 32.00 a. 110 mm dia PVC bend (TWAD SR 17-18 P-19 S.No-4 ) 236.00 Each
0.0 24.00 b. 160 mm dia PVC bend (TWAD SR 17-18 P-19 it-1.5, S.No-4 ) 998.00 Each
0.0 28.00 a. 110 mm dia PVC Equal tee(TWAD SR 17-18 P-19 S.No-9 ) 289.00 Each
0.0 24.00 b. 160 mm dia PVC Equal tee(TWAD SR 17-18 P-19 S.No-9 ) 788.00 Each
0.0 14.00 S & F of Indian Water closet white glazed (Oriya type) of size 580 x 2324.43 Each
440mm with PVC SWR grade ' P' or "S' trap - in G.F.
Thuraiyur 32
0.0 36.00 S & F of Indian Water closet white glazed (Oriya type) of size 580 x 3706.04 Each
440mm with PVC SWR grade ' P' or "S' trap- Other than G.F.
0.0 50.00 S & F of E.W.C.(White) 500 mm with PVC SWR grade "P" or "S" 5127.80 Each
TRAP
0.0 0.00 French window 0.00 0.00
0.0 0.00 a. FW (2.1 x 2.0 m ) 3 bay openable 2729.44 Sqm
0.0 0.00 b.FW 1 (1.80 x 2.0 m )3 bay openable 3025.63 Sqm
0.0 0.00 c. FW 2 (1.20 x 2.0 m ) 2 bay openable 3025.63 Sqm
0.0 0.00 d.FW 3 (0.75 x 2.0 m ) Single bay openable 3553.61 Sqm
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990.
( PVC Box , Fire Retarded Box) For Coastal only
0.0 0.00 c. Calling bell point with Buzzer/Calling bell 1298.46 Each
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 1316.46 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Fan point.(PVC Electrical Box )
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 2224.56 Each
fire retardant flexible copper cable with ISI mark confirming
67.1 IS: 694:1990
0.00 Wiring forsqmm
with 1.5 Staircase
PVC Light Point.(PVC
insulated Electrical
single core multi Box )
strand 0.00 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @ Switch
0.0 0.00 Board
Wiring Itself.
with 1.5 sqmm PVC insulated single core multi strand 885.64 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @
0.0 0.00 Convenient
Supplying and Places.(PVC
fixing of 15Electrical
Amps 3 pinBoxflush
) type plug using ( 128.98 Each
PVC Box , Fire Retarded Box)
0.0 0.00 Fabrication of Mild steel / RTS grills (without cement slurry) 62159.30 MT
for all sizes of rods.(BINDING WIRE insulated with PVC)
0.0 0.00 PVC SWR 110 mm dia with ISI mark type- A for Rain water 279.36 Rmt
down fall pipe(UPVC SPECIAL CLAMP )
0.0 0.00 Supply and fixing in posistion of 6 rows of 10 guage GI 25.31 0.00
barbed wire 20 guage
Thuraiyur 33
0.0 0.00 Supply ,laying & jointing the following pipes as per ASTM D 0.00 0.00
1785 of schedule 40 with UPVC Specials
0.0 0.00 c. 20mm dia PVC water supply ASTM pipe (fully consealed 149.18 Rmt
in walls)
0.0 0.00 Providing Colour Marble chips of size 10mm and below 254.31 Sqm
using 70.20Kgs of cement and 15 cum of Colour Marble
chips for every 10 sqm over the existing plastered surface
( For coastal area)
0.0 146.00 S & F of 15mm dia half turn CP long body tap 420.00 Each
0.0 103.00 S & F of 15mm dia half turn CP short body tap 372.00 Each
0.0 0.00 Granite Tiles flooring in cm1:3,20mm thk sathali steel/ grey 1078.93 Sqm
0.0 0.00 Bored cast sit piles installation of vertical cast in Situ Bored 0.00 0.00
piles of following dia using Standardised concrete mix M30
Grade) as per nagapattinam data
0.00 a.500mm dia pile 2491.96 Rmt
0.00 Removing of clay from pile inlucing conveyance charges, 0.00 0.00
loading and unloading charges etc.,all complete
0.00 Chipping of RCC pile head of 500mm Dia of pile to the 0.00 0.00
required cut off level and clearing away the debris from site
with an average lead of 5 km etc.
0.00 a.500mm dia pile 764.05 Rmt
0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 492.00 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @
0.00 Convenient Places.(Open
Wiring with 1.5 sqmm PVCwiring)
insulated single core multi strand 540.00 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @ Switch
0.00 Board
Wiring Itself.(Open
with 1.5 sqmmwiring)
PVC insulated single core multi strand 709.72 RMT
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Fan point .(Open wiring)
0.00 TW panelled door double leaves shutter with brass fittings of 5584.12 Sqm
size . 1200X2100mm.
0.00 Aluminium Partition wall 1/3 5.5mm thick glass & 2/3 3627.29 Sqm
Novapan sheet 12mm thick outer top and bottom
0.00 Supply and fixing of colour matt finish door 15 microns 4803.14 Sqm
double leaf door ( 1500 x 2100 mm)
0.00 Supply and fixing of colour matt finish door 15 microns 6362.96 Sqm
double leaf door ( 1000 x 2100 mm)
0.00 supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm
12"x12" floor tiles
0.00 supplying and fixing of colour matt finish floor tiles of size 1251.99 Sqm
12"x18" for wall tiles
54.00 Supply and fixing of 20 Amps DP plug and socket in sheet 1587.00 Each
enclosure with 32 A DP MCB in Flush with wall with earth
connection ( For AC Plug ) Legrand ( MDS) / Hager( L& T)
Equivalent/ Superior variety SD -140 2017-18
Thuraiyur 35
0.00 Supply and Laying Rubber Moulded Hyraulic Pressed Paver 782.79 Sqm
Block 83 mm thick including labour charges for laying etc
0.00 Supplying nd laying of 1000 x 1000 x 300mm size ms 16 swg 34310.00 Each
powder coated cable terminal box with two compartment with
necessary bus bar connected with TNEB etc.,
0.00 Supplying and fixing of 200 Amps metal clad switch with 8100.00 Each
rewirable fuse units, (Revised PWD SR 17-18/Pg.no.80 it-J
Part c)
#REF! #REF! #REF! #REF!
785.00 Supply and Laying Rubber Moulded Hyraulic Pressed Paver Block 782.79 Each
83 mm thick including labour charges for laying etc
0.00 Supplying and fixing of 250 Watts Metal halide Flood light 8095.00 Each
etc.,
ABSTRACT
and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thuraiyur in
y under Ph-XXI /3000 Quarters scheme
Amount
118030.74
0.00
0.00
0.00
0.00
0.00
119949.60
0.00
0.00
0.00
0.00
0.00
27896.87
2755.70
0.00
0.00
0.00
11533.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 37
Amount
0.00
0.00
0.00
194750.95
0.00
0.00
0.00
0.00
6168.96
8352.96
551554.96
32112.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
62547.32
0.00
0.00
0.00
0.00
1194519.62
0.00
0.00
0.00
#VALUE!
Thuraiyur 38
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 39
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1030766.54
931738.63
1008586.48
1109343.44
231595.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
Thuraiyur 40
Amount
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
Thuraiyur 41
Amount
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
Thuraiyur 42
Amount
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10023.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 43
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
179779.95
75909.52
Thuraiyur 44
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7800.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
896442.20
8640.00
175189.02
#VALUE!
#VALUE!
0.00
0.00
Thuraiyur 45
Amount
#VALUE!
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
65595.60
181003.82
0.00
0.00
0.00
2560862.90
#VALUE!
645107.35
28431.65
66010.42
20421.75
100595.25
0.00
0.00
0.00
64159.20
87836.74
241762.81
0.00
0.00
0.00
0.00
0.00
Thuraiyur 46
Amount
0.00
0.00
0.00
0.00
6438.00
9880.00
5500.00
819.00
0.00
68111.20
16027.75
39613.40
13470.65
0.00
62469.96
312723.87
0.00
43192.52
0.00
0.00
240.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 47
Amount
0.00
0.00
0.00
0.00
0.00
59415.93
0.00
31783.20
0.00
0.00
0.00
5169.90
0.00
0.00
0.00
0.00
486.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13000.00
0.00
0.00
0.00
0.00
0.00
10441.20
171902.00
Thuraiyur 48
Amount
12000.00
69747.00
0.00
0.00
0.00
1980.00
0.00
0.00
0.00
11550.00
100809.52
16080.00
0.00
0.00
0.00
0.00
35851.53
0.00
0.00
0.00
0.00
31705.00
0.00
0.00
0.00
Thuraiyur 49
Amount
157936.63
148349.40
148827.17
117292.88
0.00
57493.28
13407.68
13767.95
13846.93
10015.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 50
Amount
43919.78
46414.23
43167.17
37522.93
17880.56
0.00
1840098.65
1318277.70
1281111.97
1317900.10
1114486.18
280940.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 51
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
92746.50
114260.96
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Thuraiyur 52
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 53
Amount
0.00
#VALUE!
629313.02
4110271.29
2236453.00
0.00
0.00
65047.75
0.00
170884.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
472835.97
0.00
0.00
Thuraiyur 54
Amount
0.00
0.00
0.00
0.00
481787.35
0.00
0.00
0.00
0.00
420792.00
251003.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 55
Amount
0.00
0.00
0.00
0.00
1484673.77
0.00
233457.75
44055.00
0.00
423084.22
0.00
9244743.75
79887.88
69796.44
159025.88
89700.00
252682.00
0.00
0.00
0.00
Thuraiyur 56
Amount
412845.40
430544.88
20218.80
439.40
503970.00
550962.00
55100.00
226326.00
69055.00
164160.00
188000.00
0.00
248898.30
149730.00
0.00
0.00
115245.00
Thuraiyur 57
Amount
147250.00
0.00
0.00
76935.50
0.00
0.00
0.00
0.00
18638.56
13858.56
0.00
35500.00
47200.00
0.00
0.00
4924.00
0.00
0.00
77720.00
62370.00
0.00
0.00
134750.00
0.00
901424.39
821593.39
0.00
0.00
0.00
Thuraiyur 58
Amount
0.00
13050.00
0.00
235756.99
0.00
1997190.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 59
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 60
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 61
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38330.14
35526.76
35576.74
27699.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 62
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1038786.43
0.00
79796.64
116284.35
7552.00
23952.00
8092.00
18912.00
32542.02
Thuraiyur 63
Amount
133417.44
256390.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 64
Amount
0.00
0.00
0.00
0.00
0.00
61320.00
38316.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 65
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
85698.00
Thuraiyur 66
Amount
0.00
#REF!
0.00
0.00
0.00
0.00
#REF!
614490.15
0.00
0.00
#VALUE!
Thuraiyur Ph-XXI
GENERAL ABSTRACT
Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development w
Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme
2
1.00 3 Nos of SI Qtrs 3 in 1 (G+2 , ) #VALUE! 1 unit
3
1.00 40 PC/HC Qtrs (8 in 1, 5 Blocks) (G+3) #VALUE! 1 unit
4
1.00 6 Nos of PC/HC Qtrs (6 in 1, 1 Block ) (G+2) #VALUE! 1 unit
5
1.00 Over Head Water Tank 700 Litres 49 Nos #VALUE!
6
1.00 Septic tank #VALUE!
7
1.00 Sump #VALUE!
8
1.00 Plinth Projection #VALUE!
9
1.00 Paver block road #VALUE!
10
1.00 Sullage Drain #VALUE! 1 Unit
11
1.00 Storm Water Drain #VALUE!
12
1.00 Culvert #VALUE!
TOTAL Rs.
Thuraiyur Ph-XXI
GENERAL ABSTRACT
o of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at
n Trichy under Ph-XXI /3000 Quarters scheme
Amount
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1000000.00
700000.00
Thuraiyur Ph-XXI
200000.00
500000.00
500000.00
50000.00
22000.00
300000.00
250000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
50000.00
800000.00
300000.00
97000.00
263000.00
#VALUE!
TAMILNADU POLICE HOUSING CORPORATION LIMITED
TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
REVISED DATA 2017-18
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of
locations based on the 500 mm dia pile
Cum
Volume of Concrete = 3.14 /x *0.5 x 0.5 x 8 = 4.02 /4= 1.57 m3 1.570
1.570 Cum Standardised concrete mix using M 20 Grade concrete in (F&B) 5261.62 8260.74
Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
5 km entirely with city limits
Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits
Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 27.48
stone etc.Initial Lead (0-10 km)
9.16
Km 3.00 Loading or unloading charges 30.10 90.30
5.000 cum 20mm HBG Machine crushed stone jelly (7730 Kg) 1369.96 6849.80
3.300 cum 10-12mm HBG Machine crushed stone jelly (5156 Kg) 1118.46 3690.92
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.45
the 450 mmxdia
x 0.45 8 =pile
4.02 /4= 1.272 m3 1.272
450mm Dia pipe
1.272 Cum RCC 1:1.5:3 (F&B) 5261.62 6692.78
0.1272 MT Bentonite (10% concrete volume) 4000.00 508.80
8.00 Rmt Labour charges 960.00 7680.00
Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.45 x 0.45 5 xkm1 km
entirely with m3
=0.159 city limits 0.159
500mm Dia pipe DATA for 1 Rmt
0.159 Cum Dismantling of RCC works p-24 3820.00 607.38
0.159 Cum Conveyance of dismantled materials p-35 48.10 7.65
0.159 Cum Loading or unloading charges p-35 30.10 4.79
Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits
Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.40
the 400 mmxdia
x 0.40 8 =pile
4.02 /4= 1.272 m3 1.005
400mm Dia pipe
1.005 Cum RCC 1:1.5:3 (F&B) 5261.62 5287.93
0.1005 MT Bentonite (10% concrete volume) 4000.00 402.00
8.00 Rmt Labour charges 960.00 7680.00
Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.40 x 0.40 5 xkm1 km
entirely with m3
=0.129 city limits 0.126
400mm Dia pipe DATA for 1 Rmt
0.126 Cum Dismantling of RCC works 3820.00 481.32
0.126 Cum Conveyance of dismantled materials 48.10 6.06
0.126 Cum Loading or unloading charges 30.10 3.79
Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits
Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30
3690.92
2498.22
17972.50
742.95
1778.00
7526.00
11296.00
52354.39
5235.44
5235.44
26.18
5261.62
Electrical Data 2016-17 75
Open wiring for Light point with ceiling rose for flats/ houses
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable
45.00 Rmt UPVC rigid conduit pipe 19 mm / 20mm heavy duty with 49.70 1 Rmt
ISI mark
20.00 No 20 mm UPVC rigid bends 14.65 No
150.00 No Tw Plugs 347.00 1000 nos
10.00 No 20 mm PVC rigid tees 18.15 No
10.00 No PVC joint box 44.80 Dozen
0.015 Sqm Hylem sheet 3 mm thick with lamination 537.00 Sqm
10.00 No 5 amps flush type switch 15.33 No
10.00 No Ceiling rose 13.15 No
1.00 Gross Brass screws (40mm x No.6) P-74 - Item No.1c 84.10 Gross
72.00 No 19 mm MS clamp (Conduit saddles) P-75 It-3(b) 47.70 Gross
1/6 Bag Cement 342.50 Bag
10.00 No TW switch box 100 x 100 x 75 mm 16.70 No
1.00 No TW junction box 150 x 100 x 75 mm 20.10 No
0.10 Sqm 3 mm thick laminated Hylem sheet (10X0.1X0.1) 537.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 90 Rmt
cable for continuous earth connection
1/2 Litre Paint SEP 247.40 Litre
10.00 Points Labour charges LS
LS Sundries 1% on materials LS
Total for 10 Points
Rate for 1 Point
Sub - data
Light point with bakelite batern type holder for flats/ houses(Open wiring)
Electrical Data 2016-17 76
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI 49.70 Rmt
mark
10.00 No 19 mm PVC rigid bends 14.65 No
5.00 No 19 mm PVC rigid tees 18.15 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 21.50 No
5.00 No PVC round block 2.50 Each
5.00 No Ceiling rose 13.15 No
0.090 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.00 Bag Cement 342.50 Bag
6.00 No TW switch Box 150X100X65mm 20.10 Each
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable for continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 90 Rmt
cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI 49.70 Rmt
mark
20.00 No 19 mm PVC rigid bends 14.65 Dozen
10.00 No 19 mm PVC rigid tees 18.15 Dozen
1.00 No MS box 150x 100 x 75 mm 68.30 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) 38.23 No
15.00 No MS box 150x 100 x 75 mm 68.30 No
0.225 Sqm 3 mm thick laminated Hylem sheet 537.00 SQqm
1.25 Bag Cement 276.50 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single core 13.10 90 Rmt
cable for continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
Labour charges
1.00 No Maistry 539.00 No
2.00 No Wiremen Grade - I 494.00 No
3.00 No Wiremen Grade - II 467.00 No
4.00 No Helper 352.00 No
180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI 49.70 Rmt
mark
1.00 gross MS saddles 19mm 37.40 gross
300.00 Nos TW plugs 38x25x19mm 272.00 1000Nos
2.00 Gross Brass screws 38mm 84.10 gross
0.33 Bag Cement 276.50 Bag
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable for continuous earth connection
2/3 Labour charges 4336.00
Sundries
Total for 90 Metres
Rate for 1 Rmt
1179.00
2236.50
293.00
52.05
181.50
37.33
8.06
153.30
131.50
84.10
23.85
68.50
167.00
20.10
53.70
589.50
123.70
2890.67
22.07
8315.43
831.54
539.00
988.00
1401.00
1408.00
4336.00
2890.67
Electrical Data 2016-17 81
8293.36
131.50
202.00
22.11
8385.97
838.60
8293.36
131.50
29.30
153.30
504.00
172.50
201.00
16.41
8873.17
887.32
Electrical Data 2016-17 82
8315.43
167.00
53.70
842.00
411.00
12.50
9360.23
936.02
1179.00
1491.00
146.50
90.75
215.00
12.50
65.75
48.33
342.50
120.60
393.00
4336.00
8.30
8449.23
1689.85
Electrical Data 2016-17 83
1179.00
2236.50
293.00
181.50
68.30
8.06
573.45
1024.50
120.83
345.63
589.50
2890.67
28.51
9539.45
635.96
539.00
988.00
1401.00
1408.00
4336.00
2358.00
4473.00
37.40
81.60
168.20
91.25
1179.00
2890.67
11279.12
52.28
11331.40
125.90
Electrical Data 2016-17 84
11331.40
3654.00
2358.00
36.00
12663.40
140.70
Mangalore
tiles,
Lime
(1000nos.)
stone,
Rough stone, machine
Laterite,br
Bond stone, cut pressed Chamber
ick jelly,
stone, HBG, tiles, bricks,
Cement & Country wood
Sand, gravel, (2000nos) Stock
Steel Bricks, work,
surkhi, earth, Hydraulic bricks, Fly
pond
crushed stone pressed ash bricks
ash(wet/D
etc. tiles,
ry), Stone
Mosaic
dust etc.
tiles(1500
nos)
224.21 Br jelly
0 Lime
0 Wood
0 Stone dust
52.8 Lime Stone
0 Quarry rubbish
2010 - 2011 Electrical Data 88
TNHB ELECTRICAL DATA
Part -A
DATA - 1
WIRING IN CONCEALED PVC PIPE
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 1 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 No
10.00 No 19 mm PVC rigid tees 1.31 No
1.00 No MS joint box 150 x 100 x 75 mm 64.00 No
Sub - data
DATA - 2
2010 - 2011 Electrical Data 89
Light point with bakelite batern type holder for flats/ houses
DATA - 3
POINT WIRING FOR CALLING BELL / BUZZER
WITH PUSH SWITCH FOR ALL TYPE OF BUILDING
DATA - 4
FAN POINT
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
2010 - 2011 Electrical Data 90
20.00 No 19 mm PVC rigid bends 3.15 No
10.00 No 19 mm PVC rigid tees 1.31 No
10.00 No PVC junction box 19 mm 3.50 No
10.00 No Ceiling rose 15.75 No
10.00 No 5 amps flush type switch 16.17 No
10.00 No MS box 300 x 200 x 75 mm 103.90 No
0.60 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.00 No MS joint box (150 x 100 x 75 mm ) 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
LS Labour charges
LS Sundries
Total for 10 points
Rate for 1 point
MS box 300 x 200 x 75 mm
200x150x75 mm=90 90.00
A 200x150x75 mm=0.0825 0.0825
A 300x200x75 mm=0.135m2 0.135
DATA - 5
STAIRCASE LIGHT POINT
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
10.00 No 19 mm PVC rigid bends 3.15 No
5.00 No 19 mm PVC rigid tees 1.31 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 20.08 No
5.00 No Ceiling rose 15.75 No
5.00 No 19 mm PVC junction box 3.50 No
6.00 No MS box 150x 100 x 75 mm 64.00 No
0.09 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point
DATA - 6
5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES
DATA - 7
5 AMPS 5 PIN PLUG SOCKET POINT AT SWITCH BOARD ITSELF
5.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 1 Rmt
core cable
2.50 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
1.00 No 5 A 5 pin non - inter locking switch and plug ( flush type35.00 No
Labour charges
Sundries
Rate for 1 point
DATA - 8
15 AMPS POWER PLUG
DATA - 9
LIGHT POINT WITH CEILING ROSE FOR
ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE
2010 - 2011 Electrical Data 92
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 1 Rmt
ISI mark
12.00 No 19 mm PVC rigid bends 3.15 No
6.00 No 19 mm PVC rigid tees 1.31 No
1.00 No MS joint box 150 x 100 x 75 mm 64.00 No
0.015 Sqm Hylem sheet 3 mm thick with lamination 640.00 Sqm
6.00 No 5 amps flush type switch 16.17 Dozen
6.00 No Ceiling rose 15.75 No
6.00 No 19 mm PVC junction box 3.50 No
1.25 Bag Cement 260.00 Bag
6.00 No MS box 150 x 100 x 75 mm 64.00 No
0.09 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
45.00 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges LS
Sundries LS
Total for 6 Points
Rate for 1 Point
DATA - 10
LIGHT POINT WITH BAKELITE BATTERN TYPE
HOLDER FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE
DATA - 11
FAN POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
12.00 No 19 mm PVC rigid bends 3.15 No
6.00 No 19 mm PVC rigid tees 1.31 No
6.00 No PVC junction box 19 mm 3.50 No
6.00 No Ceiling rose 15.75 No
6.00 No 5 amps flush type switch 16.17 Dozen
6.00 No MS box 300 x 200 x 75 mm 103.90 No
0.36 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.00 No MS joint box (150 x 100 x 75 mm ) 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 6 points
Rate for 1 point
DATA - 12 a
STAIRCASE LIGHT POINT FOR ADMINISTRATIVE
BLOCKS AND COMMUNITY CENTRE
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
6.00 No 19 mm PVC rigid bends 3.15 No
3.00 No 19 mm PVC rigid tees 1.31 No
6.00 No 5 A flush type two way switches ( Staircase switch ) 20.08 No
3.00 No Ceiling rose 15.75 No
2010 - 2011 Electrical Data 94
3.00 No 19 mm PVC junction box 3.50 No
3.00 No MS box 150x 100 x 75 mm 64.00 No
0.054 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 3 points
Rate for 1 point
Part -B
DATA - 12
2 X1.5 Sqmm in fully concealed PVC conduit
180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
3.00 Bag Cement 260.00 Bag
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt
DATA - 13
2 X 2.5 Sq mm in fully concealed PVC conduit
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed 12.80 Rmt
S.C. cable
Sundries
DATA - 14
2 X 4 Sq mm in fully concealed PVC conduit
180.00 Rmt 4 sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
DATA - 15
4 X 4 Sq mm in fully concealed PVC conduit
360.00 4 sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
90.00 25mm dia rigid PVC pipe heavy duty with ISI heavy 28.90 Rmt
duty with ISI mark
3.00 Cement 260.00 Bag
90.00 2.5 sqmm copper PVC insulated unsheathed single 19.90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt
Labour charges ( 1.5 x Labour charges + Labour for ducting - sub data - A)
( 1.5 x 3475 ) - ( ( 522 + 724 ) / 2) 4589.50
4589.50
Part -C
DATA - 16
DATA - 17
1.00 No 16 Amps double pole main switch with fuse and 200.00 No
neutral link
1.00 No TW board of size 31x20x6 cm with brass hinge screw 62.00 No
hooks well varnished
Sundries for TW plugs,screws, wire and earth
connection etc.,
Labour charges
Rate for 1 No
0.00
Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
Total for 4 Nos
Rate for 1 no
DATA - 19
1.00 No 32 Amps double pole main switch with fuse and 455.00 No
neutral link
1.00 No TW board of size 31x20x6 cm with brass hinge screw 62.00 No
hooks well varnished
Sundries for TW plugs,screws, wire and earth
connection etc.,
Labour charges
Rate for 1 No
DATA - 18
1.00 No 4 way 16 amps, way 250 volts single phase and 504.00 No
neutral link metalic distribution board
DATA - 19
1.00 No 16 Amps triple pole main switch with fuse and neutral l 480.00 No
1.00 No TW board of size 46 x31 x 6 cm with brass hinges 130.00 No
hooks screws well varnished
Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helpers 181.00 No
Labour for 3 Nos
Rate for 1 No
DATA - 22
2010 - 2011 Electrical Data 98
Supplying and fixing of 32 amps triple pole main
switch with fuse and neutral link on a suitable
well varnished teak wood board including necessary
interconnection and earth connection cost of all
materials, etc., all complete.
1.00 No 32 Amps triple pole main switch with fuse and neutral l 800.00 No
1.00 No TW board of size 46 x31 x 6 cm with brass hinges 130.00 No
hooks screws well varnished
Sundries screw TW plugs screws wire and earth
connections.
Labour charges
Rate for Each
DATA - 20
DATA - 22
DATA - 23
FIXING OF TUBE FITTINGS SUSPENDED FROM
CEILING
Labour Charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
3.00 No Helpers 181.00 No
Total for 10 Nos
Rate for 1 No
DATA - 24
Charges for assembling and fixing of ceiling fan of
different sweep ( to be supplied by the department at
free of cost ) with necessary interconnection and
fixing of fan regulator on the existing board, etc., all
complete.
1.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 tmt
Labour Charges
Sundries
Labour charges for 5 Nos Rate for Each
1.00 No Wiremen Grade I 254.00 No
1.00 No Wiremen Grade II 240.00 No
2010 - 2011 Electrical Data 100
2.00 No Helpers 181.00 No
Total for 5 Nos
Rate for Each
Part F
DATA - 25
EARTHING & ELCB
Run of 8 SWG GI Wire
Supplying and laying of 8 SWG GI wire on walls/below
ground level with necessary 'U' nails/ earth work
excavation and re- filling etc., including cost of all
materials, all complete.
Labour charges
1.00 Wiremen Grade I 254.00 No
1.00 Helpers 181.00 No
Note:This item 30 is to run earth wire from IS:3043 earthing item 32) to be Main switch/ Panel Board/ Ma
DATA - 26
EARTHING STATION AS PER IS/3043.
Labour charges
1.00 No Wiremen Grade I 254.00 No
1.00 No Helpers 181.00 No
DATA - 30
ELCB SURFACE TEAK WOOD BOARD
2010 - 2011 Electrical Data 101
Charges for fixing single phase RCCB/ELCB ( to be
supplied by the department free of cost ) on suitable
well varnished teak wood plank with a necessary inter
connection and earth connections using copper cable
including cost of all materials, etc., all
Labour Charges
Rate for Each
DATA - 28
Charges for fixing single phase RCCB/ELCB ( to be
supplied by the department at free of cost ) on fully
concealed suitable MS BOX with a necessary inter
connection and earth connections using copper cable
including cost of all materials, re- doing the dis
Labour charges
Rate for Each
Labour Charges
1.00 Wiremen Grade I 254.00 No
3.00 Wiremen Grade II 240.00 No
1.00 Helper 181.00 No
0.50 Mason I 291.00 No
Total for 10 Nos
For 1 No
DATA - 29
ELCB ( 3 PHASE ) on surface teak wood plank
DATA - 30
DATA - 31
Supplying and delivery of Single phase ELCB/RCCB
DATA - 32
Supplying and delivery of Three phase ELCB/RCCB
DATA - 33
1 no of 32 amps Fuse unit
External Installation
Labour Charges
1.00 No Wiremen Grade I 254.00 No
2010 - 2011 Electrical Data 103
1.00 No Wiremen Grade II 240.00 No
3.00 No Helper 181.00 No
Total for 8 Nos
Rate for 1 No
DATA - 34
3 Nos of Fuse units at EB pole
Labour Charges
1.00 No Wiremen Grade I 254.00 No
1.00 No Wiremen Grade II 240.00 No
4.00 No Helper 181.00 No
Total for 8 Nos
Rate for 1 no
DATA - 35
Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
Total for 4 Nos
Rate for 1 No
DATA
Supplying and fixing of Single phase ELCB
DATA
DATA - 36
Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
Total for 3 Nos
Rate for 1 No
DATA - 37
180.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
4.00 Kg 7/20 GI stay wire 84.00 Kg
180.00 Each PVC reel insulater 0.56 Each
1.00 Kg GI wire for fixing reel insulater 84.00 Kg
Labour charges
Sundries for masonry works clamps bolts and nuts etc.,
Total for 90 Rmt
Rate for 1 Rmt
Labour charges
1.00 No Electrician Maistry 277.00 No
2.00 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
2010 - 2011 Electrical Data 105
3.00 No Helper 181.00 No
DATA - 38
SUPPLY OF GI PIPES FOR EB SERVICE
( SINGLE PHASE )
DATA - 39
Supply of MS angle for EB service ( single phase )
DATA - 40
360.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
DATA - 41
SUPPLY OF GI PIPES FOR EB SERVICE
( THREE PHASE )
2010 - 2011 Electrical Data 106
Supply of 40 mm dia GI pipe "B"class ( for the above
Data ) for passing through from top of Houses to the
MES Board to meet the EB requirement.
DATA - 42
Supply of MS angle for EB service ( single phase )
Labour Charges
1.00 No Electrician Maistry 277.00 No
1.00 No Wiremen Grade I 254.00 No
4.00 No Helper 181.00 No
DATA - 44
1.00 Gross M.S. Clamps/ Saddles 32mm It-III d p-77 68.20 Gross
300.00 No Brass screws ( 40 mm x 6 no) 78.70 Gross
300.00 No TW plugs 325.00 1000 Nos
Sundries for redoing on dismantled portion,etc.,
Labour charges
Total for 90 Rmts
For 1 Rmt
Labour charges
1.00 No Mason Ist class 291.00 No
2.00 No Wiremen Grade I 254.00 No
2010 - 2011 Electrical Data 107
3.00 No Wiremen Grade II 240.00 No
4.00 No Helper 181.00 No
Total for 1 day
For 2 day
DATA - 46
DATA - 48
DATA
DATA - 47
Charges for fixing Mercury, Sodium Vapour lamp street
light fittings ( all types ) in the existing pole with
required GI pipes 'B' class and accessories ( Street
light fittings alone will be supplied departmentally at
free of cost ).
DATA - 48
Street light service connection
DATA - 50
DATA - 51
DATA - 52
Labour Charges
0.50 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
2.00 No Helper 181.00 No
DATA - 56
Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
For 4 Nos
Rate for 1 No
DATA - 57
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 1 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 No
150.00 No Tw Plugs 325.00 1000 nos
10.00 No 19 mm PVC rigid tees 1.31 No
10.00 No PVC joint box 38.75 Dozen
0.015 Sqm Hylem sheet 3 mm thick with lamination 640.00 Sqm
10.00 No 5 amps flush type switch 16.17 No
10.00 No Ceiling rose 15.75 No
1.00 Gross Brass screws 78.70 Gross
72.00 No 19 mm MS clamp 42.50 Gross
1/6 Bag Cement 260.00 Bag
10.00 No TW switch box 100 x 100 x 75 mm 15.70 No
1.00 No TW junction box 150 x 100 x 75 mm 18.90 No
0.10 Sqm 3 mm thick laminated Hylem sheet (10X0.1X0.1) 640.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
1/2 Litre Paint 220.50 Litre
10.00 Points Labour charges LS
LS Sundries 1% on materials LS
Total for 10 Points
Rate for 1 Point
Sub - data
Light point with bakelite batern type holder for flats/ houses(Open wiring)
2010 - 2011 Electrical Data 113
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid
conduit pip
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
10.00 No 19 mm PVC rigid bends 3.15 No
5.00 No 19 mm PVC rigid tees 1.31 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 20.08 No
5.00 No PVC round block 2.50 Each
5.00 No Ceiling rose 15.75 No
0.090 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.00 Bag Cement 260.00 Bag
6.00 No TW switch Box 150X100X65mm 18.90 Each
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 Dozen
10.00 No 19 mm PVC rigid tees 1.31 Dozen
1.00 No MS box 150x 100 x 75 mm 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type35.00 No
15.00 No MS box 150x 100 x 75 mm 64.00 No
0.225 Sqm 3 mm thick laminated Hylem sheet 640.00 SQqm
1.25 Bag Cement 260.00 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
Labour charges
2010 - 2011 Electrical Data 115
1.00 No Maistry 277.00 No
2.00 No Wiremen Grade - I 254.00 No
3.00 No Wiremen Grade - II 240.00 No
4.00 No Helper 181.00 No
180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
1.00 gross MS saddles 19mm 44.60 gross
300.00 Nos TW plugs 38x25x19mm 325.00 1000Nos
2.00 Gross Brass screws 38mm 78.70 gross
0.33 Bag Cement 260.00 Bag
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
2/3 Labour charges 2229.00
Sundries
Total for 90 Metres
Rate for 1 Rmt
1152.00
877.50
63.00
13.10
64.00
9.60
161.70
157.50
35.00
325.00
640.00
96.00
576.00
3475.00
14.60
7660.00
766.00
277.00
508.00
720.00
724.00
522.00
724.00
3475.00
2010 - 2011 Electrical Data 117
7645.40
157.50
189.00
13.10
7690.00
769.00
7645.40
157.50
35.00
161.70
472.50
90.00
189.00
7.30
8050.00
805.00
1152.00
877.50
2010 - 2011 Electrical Data 118
63.00
13.10
35.00
157.50
161.70
1039.00
384.00
64.00
9.60
325.00
576.00
3475.00
7.60
8340.00
834.00
147.27
1152.00
585.00
31.50
6.55
200.80
78.75
17.50
384.00
57.60
325.00
384.00
3475.00
12.30
6710.00
1342.00
2010 - 2011 Electrical Data 119
1152.00
877.50
63.00
13.10
64.00
9.60
525.00
960.00
144.00
325.00
576.00
3475.00
5.80
8190.00
546.00
64.00
48.75
35.00
193.06
16.19
357.00
56.70
64.00
9.60
10.70
141.00
2010 - 2011 Electrical Data 120
1152.00
877.50
37.80
7.86
64.00
9.60
97.02
94.50
21.00
325.00
384.00
57.60
576.00
3475.00
15.12
7194.00
1199.00
7178.88
94.50
113.40
14.22
7212.00
2010 - 2011 Electrical Data 121
1202.00
1152.00
877.50
37.80
7.86
21.00
94.50
97.02
623.40
230.40
64.00
9.60
325.00
576.00
3475.00
16.92
7608.00
1268.00
1152.00
585.00
18.90
3.93
120.48
47.25
2010 - 2011 Electrical Data 122
10.50
192.00
34.56
325.00
384.00
3475.00
8.38
6357.00
2119.00
2304.00
1755.00
780.00
1152.00
3475.00
9466.00
11.00
9477.00
105.30
9466.00
3582.00
2304.00
11.00
10755.00
2010 - 2011 Electrical Data 123
119.50
5670.00
1755.00
780.00
1791.00
3475.00
11.00
13482.00
149.80
11340.00
2601.00
780.00
1791.00
4589.50
3.50
21105.00
234.50
g - sub data - A)
2010 - 2011 Electrical Data 124
315.00
1.80
68.20
385.00
480.00
543.00
1023.00
68.20
200.00
62.00
7.00
154.00
423.00
254.00
362.00
616.00
154.00
2010 - 2011 Electrical Data 125
455.00
62.00
7.00
154.00
678.00
504.00
62.00
7.00
154.00
727.00
480.00
130.00
7.67
205.33
823.00
254.00
362.00
616.00
205.33
2010 - 2011 Electrical Data 126
800.00
130.00
6.67
205.33
1142.00
2520.00
299.13
11.54
205.33
3036.00
299.13
3036.00
3360.00
2520.00
3876.00
2010 - 2011 Electrical Data 127
12.60
18.28
3.31
79.81
114.00
254.00
480.00
543.00
1277.00
79.81
48.75
12.60
18.28
4.67
127.70
212.00
254.00
480.00
543.00
1277.00
127.70
9.14
171.20
1.66
182.00
254.00
240.00
2010 - 2011 Electrical Data 128
362.00
856.00
171.20
798.00
11.00
435.00
16.00
1260.00
14.00
254.00
181.00
435.00
ch/ Panel Board/ Machinary
385.88
93.45
66.15
49.35
15.00
150.00
100.00
160.00
26.20
52.40
40.00
3.57
435.00
1577.00
254.00
181.00
435.00
2010 - 2011 Electrical Data 129
44.32
12.28
97.40
154.00
44.32
254.00
720.00
974.00
97.40
315.00
18.95
130.05
464.00
254.00
720.00
181.00
145.50
1300.50
130.05
88.63
2010 - 2011 Electrical Data 130
37.97
97.40
224.00
88.63
315.00
32.95
130.05
478.00
1660.00
2040.00
89.00
22.16
129.63
3.21
244.00
22.16
254.00
2010 - 2011 Electrical Data 131
240.00
543.00
1037.00
129.63
267.00
44.32
152.25
6.43
470.00
44.32
254.00
240.00
724.00
1218.00
152.25
46.00
166.19
25.00
154.00
4.81
396.00
166.19
254.00
362.00
616.00
154.00
1660.00
423.00
2010 - 2011 Electrical Data 132
464.00
0.00
2547.00
2040.00
423.00
478.00
0.00
2941.00
267.00
249.28
25.00
205.33
3.39
750.00
249.28
254.00
362.00
616.00
205.33
5670.00
336.00
100.80
84.00
1808.00
29.20
8028.00
89.20
277.00
508.00
480.00
2010 - 2011 Electrical Data 133
543.00
1808.00
121.25
0.75
122.00
156.00
0.50
156.50
11340.00
336.00
201.60
126.00
2712.00
26.40
14742.00
163.80
2010 - 2011 Electrical Data 134
154.35
0.65
155.00
156.00
0.50
156.50
2733.85
671.00
2718.75
1255.00
19.40
7398.00
82.20
277.00
254.00
724.00
1255.00
68.20
163.96
97.50
17.34
4486.00
4833.00
53.70
291.00
508.00
2010 - 2011 Electrical Data 135
720.00
724.00
2243.00
4486.00
150 WSV
3280.00
630.00
3910.00
186.90
70.00
50.00
22.16
159.20
518.00
13.84
1020.10
2010 - 2011 Electrical Data 136
277.00
254.00
480.00
543.00
1554.00
518.00
22.16
674.00
39.90
1020.10
1734.00
297.68
70.00
50.00
22.16
159.20
518.00
8.96
1126.00
225.00
199.42
89.00
25.00
467.25
630.00
2010 - 2011 Electrical Data 137
225.00
808.00
93.50
89.60
2010 - 2011 Electrical Data 138
199.42
518.00
5.81
3575.00
199.42
=========
1755.00
780.00
254.00
522.00
724.00
6.00
4041.00
44.90
44.90
19.50
28.90
54.30
42.00
9.60
4.40
56.00
15.70
6.40
24.00
5.90
52.00
1389.00
186.90
2010 - 2011 Electrical Data 139
130.00
90.00
833.00
224.70
60.00
102.40
969.00
3985.00
127.00
480.00
362.00
969.00
1270.00
102.85
15.70
15.45
154.00
1558.00
254.00
362.00
616.00
154.00
1110.00
102.85
15.70
15.45
154.00
1398.00
1200.00
168.00
1368.00
404.00
38.80
114.00
2010 - 2011 Electrical Data 140
0.20
557.00
322.00
38.80
114.00
0.20
475.00
1152.00
877.50
63.00
48.75
13.10
32.29
9.60
161.70
157.50
78.70
21.25
52.00
157.00
18.90
64.00
576.00
110.25
1486.00
9.13
5088.67
508.87
277.00
508.00
720.00
724.00
2229.00
1486.00
es(Open wiring)
2010 - 2011 Electrical Data 141
5079.54
157.50
189.00
7.63
5118.67
511.87
5079.54
157.50
35.00
161.70
450.00
90.00
180.00
13.33
5458.67
545.87
5088.67
157.00
64.00
787.00
384.00
10.00
6048.67
604.87
2010 - 2011 Electrical Data 142
1152.00
585.00
31.50
6.55
200.80
12.50
78.75
57.60
260.00
113.40
384.00
2229.00
8.90
5120.00
1024.00
S (OPEN WIRING)
1152.00
877.50
63.00
13.10
64.00
9.60
525.00
960.00
144.00
325.00
576.00
1486.00
14.80
6210.00
414.00
2010 - 2011 Electrical Data 143
277.00
508.00
720.00
724.00
2229.00
2304.00
1755.00
44.60
97.50
157.40
85.80
1152.00
1486.00
7082.30
54.30
7136.60
79.30
7136.60
3582.00
2304.00
45.80
8460.40
94.00
Revised Data 2018 -19 144
------------------------------------------------------------
SHUTTER SIZE0-.8X2.05 =1.64M2
STYLES(OVER 2M) -1X2X2.05X0.075X0.0375=0.01153
-
RAILS(BELOW 2M)- 1X3X0.8X0.15X0.0375= 0.0135
PLANKS -1X1X0.625X0.64=0.40
PLANKS -1X1X0.985X0.625=0.616 1.016M2
---------------------
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT THURAIYUR IN
TRICHY DISTRICT.
SI.
DESCRIPTION OF WORK Nos Length Breath Depth
NO
8.10 Starndardized M20 for all RCC works using20 mm
Gauge HBG Jelly etc. in Second Floor
In Fourth floor
For PC/HC Qtrs 8 in 1
Tank wall alround 1 x 40 5.44 0.10 1.00
For cover slab 1 x 40 1.46 1.46 0.10
D /F Manhole cover 1 x 40 0.60 0.60 0.10
Add Sundries
Total
In Third floor
For PC/HC Qtrs 6 in 1
Tank wall alround 1 x 6 5.38 0.10 1.00
For SI Qtrs 1 x 3 5.38 1.46 1.00
For cover slab 1 x 9 1.46 1.46 0.10
D /F Manhole cover 1 x 9 0.60 0.60 0.10
Add Sundries
Total
In First Floor
For Ins Qtrs
Tank wall alround 1 x 1 5.38 0.10 1.00
For cover slab 1 x 1 1.46 1.46 0.10
D /F Manhole cover 1 x 1 0.60 0.60 0.10
Add Sundries
Total
18.1. b. Form work for all RCC works Namely roof slab
bottom and beam bottom
For PC/HC Qtrs 8 in 1
For cover slab Bottom 1 x 50 1.04 1.04 -
Cover slab alround sides 1 x 50 5.84 - 0.10
Manhole cover 1 x 50 2.40 - 0.10
D/f Manhole cover -1 x 50 0.60 0.60
Add Sundries
Total
Total
OHT - 145
SI.
DESCRIPTION OF WORK Nos Length Breath Depth
NO
In Fourth Floor
For PC/HC Qtrs 8 in 1
Tank wall alround 1 x 40 5.38 1.00
Total
In Third floor
For PC/HC Qtrs 6 in 1
Tank wall alround 1 x 6 5.38 1.00
For SI Qtrs 1 x 3 5.38 1.00
Add Sundries
Total
In First Floor
For Ins Qtrs
Tank wall alround 1 x 1 5.38 1.00
Add Sundries
Total
OHT - 146
THURAIYUR IN
Qty
21.76
8.53
-1.44
0.05
28.90 m3
3.23
23.56
1.92
-0.32
0.01
28.40 m3
0.54
0.21
-0.04
0.09
0.80 m3
54.08
29.20
12.00
-30.00
0.02
65.30 m2
208.00
208.00 m2
OHT - 147
Qty
215.20
215.20 m3
32.28
16.14
0.08
48.50 m3
5.38
0.02
5.40 m3
208.00
54.08
0.02
262.10 m2
408.80
408.80 m2
50.00
50.00 Nos
262.10
262.10 m2
408.80
408.80 m2
7262.50
7.26
7.26 MT
2.650 M.T
OHT - 148
Sub Estimate for Paver block Road
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
Item Measurements
Description of works Nos
No. L B
Earth work excavation and depositing on
bank with initial lead of 0 m and initial lift
1.5 of 2 mts in all classes of soil and sub
soils etc complete
In front of INS and SI Qtrs 1 x 1 35.00 4.50 0.30
In b/w PC/HC Qtrs blocks 1 x 1 75.00 4.50 0.30
Approch road to PC/HC Qtrs 1 x 1 60.00 4.50 0.30
Main Entry Bell Mouth 2 x 0.5 2.00 2.00 0.30
Block Entry Bell Mouth 16 x 0.5 1.00 2.00 0.30
Add Sundries
TOTAL
Supply and filling of river sand including
all cost and conveyance of materials and
2.1 all labour charges etc ., complete .
C.C.R - 149
Item Measurements
Description of works Nos
No. L B
Approch road to PC/HC Qtrs 1 2 60.00 0.20 0.10
Main Entry Bell Mouth 2 x 2 2.00 0.20 0.10
Block Entry Bell Mouth 16 x 2 1.00 0.20 0.10
Add Sundries
TOTAL
5.10 Supplying and laying Rubber Moulded Hydraulic Pressed Paver Block 83mm thick including labo
Paver Block area
In front of INS and SI Qtrs 1 x 1.00 35.00 4.50
In b/w PC/HC Qtrs blocks 1 x 1.00 75.00 4.50
Approch road to PC/HC Qtrs 1 x 1.00 60.00 4.50
Main Entry Bell Mouth 2 x 0.5 2.00 2.00
Block Entry Bell Mouth 16 x 0.5 1.00 2.00
Add sundries
Say 785.00
Paints new work with two coats of enamel
41.0 approved paints over the one coat of
primer for over the kerb stone
C.C.R - 150
Item Measurements
Description of works Nos
No. L B
C.C.R - 151
C/HC QTRS AT
Total Qty
47.25
101.25
81.00
1.20
4.80
235.50 m 3
23.63
50.63
40.50
0.60
2.40
0.04
117.80 m 3
1.40
3.00
C.C.R - 152
Total Qty
2.40
0.16
0.64
7.60 m 3
157.50
337.50
270.00
4.00
16.00
785.00
Cum
24.50
52.50
21.00
1.40
11.20
110.60 m 2
70.00
150.00
120.00
8.00
32.00
C.C.R - 153
Total Qty
380.00 Rmt
C.C.R - 154
Sub Estimate for Septic Tank
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
Detailed Estimte
Measurements
Description of works Nos
Item No L B D/H
Earth work excavation for open foundation
2
(including refilling)
(0 to 2m depth )
i) Septic tank 1 x 1 9.16 4.69 2.00
ii) Inlet & Outlet chamber 1 x 4 1.26 1.26 0.60
iii) despension trench 1 x 3 10.00 1.00 1.00
Add Sundries
TOTAL
(2 to 3m depth )
i) Septic tank 1 x 1 9.16 4.69 0.43
Add Sundries
TOTAL
Supply and filling of river sand including
all cost and conveyance of materials
2 and all labour charges etc ., complete .
SEP - 155
Measurements
Description of works Nos
Item No L B D/H
Add Sundries
TOTAL
Plain cement concrete 1:2:4 mix using 20
mm HBG metal for foundation including all
3 cost and conveyance of materials and all
labour charges etc ., complete .
SEP - 156
Measurements
Description of works Nos
Item No L B D/H
Baffle wall 1 x 2 1.80 - 1.70
Baffle wall 1 x 2 1.80 - 1.30
TOTAL
14.II Precast slab - 40mm tk
Manhole slab 1 x 4 0.75 0.75 -
Inlet and Outlet chamber cover slab 2 x 2 0.83 0.83 -
Add Sundries
TOTAL
Kgs / m
43.00 As per Barbending Qty
Stone ware line arrangements
PVC ventilating shaft with cowl etc.,
59 1 x 1 1.00 - -
complete
Supplying and fixing of 100 mm dia
61 stoneware pipe and jointing etc ., 1 x 3 2.00 - -
complete
Stone ware pipe 100 mm dia with loose
61 1 x 3 10.00 - -
joint etc., all complete
Stone ware bend 100 mm dia etc ., all
62 2 x 2 - - -
complete
SEP - 157
Measurements
Description of works Nos
Item No L B D/H
Stoneware tee 100 mm dia etc., complete
62 2 x 2 - - -
SEP - 158
C QTRS AT
Total
Qty
85.92
3.81
30.00
0.07
119.80 m 3
18.47
0.03
18.50 m 3
4.30
0.32
7.50
0.08
12.20 m 3
6.00 m 3
6.00 m 3
4.30
0.32
SEP - 159
Total
Qty
0.08
4.70 m 3
4.30
4.30 m 3
5.89
-0.22
0.03
5.70 m 3
0.54
1.66
27.00
3.68
-1.44
-1.44
30.00 m 2
6.60
4.90
4.23
0.87
0.59
3.45
1.87
0.09
22.60 m3
SEP - 160
Total
Qty
6.12
4.68
10.80 m 2
2.25
2.76
0.09
5.10 m 2
74.40
19.60
15.23
15.76
2.64
2.69
12.24
10.80
1.08
8.64
15.26
0.06
178.40 m 2
M.T
0.57
0.554 M.T
Nos
1.00
6.00 Rmt
30.00 Rmt
4.00 Nos
SEP - 161
Total
Qty
4.00 Nos
SEP - 162
Sub Estimate for Plinth Production
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
Measurements
SI.No Description of works Nos
L B D/H
Earth work excavation and depositing on
bank with initial lead of 10 m and initial lift
1.1 of 2 mts in all classes of soil and sub
soils etc complete
For Plinth alround
i) For PC/HC Qtrs (8 in 1 Block) 2 x 3 56.61 0.30 0.45
ii)For SI Qtrs (3 in 1 Block) 1 x 1 44.00 0.30 0.45
iii)For INS Qtrs Single block 1 x 1 45.43 0.30 0.45
Pillar Portion
i) For PC/HC Qtrs 6 x 25 0.23 0.30 0.45
ii)For SI Qtrs (3 in 1 Block) 1 x 25 0.23 0.30 0.45
iii)For INS Qtrs Single block 1 x 25 0.23 0.30 0.45
Add Sundries
TOTAL
Supply and filling of river sand including
all cost and conveyance of materials and
2.1 all labour charges etc ., complete .
P.P - 163
Measurements
SI.No Description of works Nos
L B D/H
Plain cement concrete 1:5:10 mix using 40
mm HBG metal for foundation including
3.1 all cost and conveyance of materials and
all labour charges etc ., complete .
P.P - 164
Measurements
SI.No Description of works Nos
L B D/H
ii)For SI Qtrs (3 in 1 Block) 1 x 1 49.90 - 0.70
iii)For INS Qtrs Single block 1 x 1 49.82 - 0.70
Add Sundries
TOTAL
Supplying and fixing of precasted slab 50
50.6
mm thick in c.c 1 : 3: 6 etc., complete
For Plinth alround
ii) For PC/HC Qtrs 2 x 3 54.39 0.60 -
ii)For SI Qtrs (3 in 1 Block) 1 x 1 46.12 0.60 -
iii)For INS Qtrs Single block 1 x 1 47.55 0.60 -
Add Sundries
TOTAL
P.P - 165
/HC QTRS AT
Total Qty
45.85
5.94
6.13
4.66
0.78
0.78
0.06
64.20 m 3
7.64
0.99
1.02
0.78
0.13
0.13
12.55
2.25
1.64
1.69
-0.31
-0.05
-0.05
0.09
28.50 m 3
P.P - 166
Total Qty
10.19
1.32
1.36
1.04
0.17
0.17
0.05
14.30 m 3
203.80
26.40
27.26
10.35
1.73
1.73
0.03
271.30 m 2
41.85
7.49
5.46
5.63
0.07
60.50 m 3
256.20
P.P - 167
Total Qty
34.93
34.87
326.00 m 2
195.80
27.67
28.53
252.00 m 2
P.P - 168
Sub Estimate for Sullage Drain
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
SL - 169
Item Description of works Nos Measurements
No L B D/H
Deduction for pillars
Rear side of PC/HC Qtrs -2 x 35 0.23 0.60
Rear side of SI and INS Qtrs -1 x 25 0.23 0.60
Add Sundries
TOTAL
Plastering with c.m 1: 5 , 12 mm thick
including all cost and conveyance of
33.0 materials and all labour charges etc.,
complete
Outer and Top
Rear side of PC/HC Qtrs 1 x 2 60.00 - 0.715
Rear side of SI and INS Qtrs 1 x 1 46.00 - 0.715
Pillar Off set top 2 x 35 0.23 0.115
Pillar Off set top 1 x 25 0.23 0.115
Pillar Off set side 2 x 70 0.115 0.60
Pillar Off set side 2 x 25 0.115 0.60
Add Sundries
TOTAL
SL - 170
C/HC QTRS AT
Total Qty
28.80
11.04
0.06
39.90 m 3
7.20
11.04
0.06
18.30 m 3
7.20
11.04
0.06
18.30 m 3
2.22
0.79
0.09
3.10 m 3
72.00
27.60
SL - 171
Total Qty
-9.66
-3.45
0.01
86.50 m 2
85.80
32.89
1.85
0.66
9.66
3.45
0.09
134.40 m 2
144.00
55.20
199.20 m2
42.00
16.10
58.10 m 2
SL - 172
Sub Estimate for Storm water Darin
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
SL - 173
Item Description of works Nos Measurements
No L B D/H
34 Plastering in CM 1:4 - 12mm Tk
Inner 1 x 2 90.00 - 1.00
TOTAL
SL - 174
C/HC QTRS AT
Total Qty
81.00
81.00 m 3
10.80
10.80 m 3
16.20
16.20 m 3
0.11
0.09
0.20 m 3
221.40
221.40 m 2
SL - 175
Total Qty
180.00
180.00 m2
108.00
108.00 m 2
SL - 176
Sub Estimate for Under Ground Sump
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
Detailed Estimate
Measurement
Sl.No Description of work No
Length Breath Depth
Earth work excavation in all soils for
1.5
open foundation (Excluding refilling)
a. 0 to 2 mt.
Sump 3.14 x 1/4 6.66 6.66 2.00
Add Sundries
Total
b. 2 to 3 mt.
Sump 3.14 x 1/4 6.66 6.66 0.50
Add Sundries
Total
Sump - 177
Measurement
Sl.No Description of work No
Length Breath Depth
Add Sundries
Total
18.10 Form work using M.S sheet
a.For Column footings,plinth
beam,Grade beam,Raftbeam,Raft slab 1 x 3.14 5.46 - 0.25
etc.,
Add Sundries
Total
b.Plain surfaces such as Roof
slab,floorslab,Beams,lintels,lofts,sill
slab,staircase,portico slab and other
similar works
Sump ceiling 3.14 x 1/4 5.00 5.00 -
Side 1 x 3.14 5.46 - 0.15
D/f cover slab -2 x 1 0.60 0.60 -
Add sides 1 x 2 2.40 - 0.15
Add Sundries
Total
e.Circular walls
Inner wall at sump alround domestic 1 x 3.14 5.00 - 2.30
Outer wall alround 1 x 3.14 5.46 - 2.30
Add Sundries
Total
Spl. Ceiling plastering in C.M. 1:3,
35.0
10 mm tk.
Inner sump 3.14 x 1/4 5.00 5.00 -
Side wall alr inner 3.14 x 1 5.00 - 2.30
Side wall alr Outer 3.14 x 1 5.46 - 0.75
Add Sundries
Total
37.1 White washing 3 coats (slaked)
Same qty in ceiling plastering item No:35 Say
3012.00 / 1000.00
Total
43.10 As per Barbending Qty
Sump - 178
Measurement
Sl.No Description of work No
Length Breath Depth
53.4 Suppying and fixing of CI Man hole cover 1 x 2
Sump - 179
C QTRS AT
Contents
83.57
0.06
83.63 m 3
20.89
0.09
20.98 m 3
6.27
0.08
6.35 m3
4.18
0.02
4.20 m3
7.94
8.69
0.71
0.19
2.65
-0.19
4.21
0.90
25.10 m3
16.70
Sump - 180
Contents
16.70 m3
4.29
0.01
4.30 m3
23.55
2.57
-0.72
0.72
26.12 m3
36.11
39.43
0.06
75.60 m 3
23.55
36.11
12.86
72.52 m3
72.52 m2
3012.00
3012.00 Kg
3.012
3.012 M.T
1.148 M.T
8.00 Nos
Sump - 181
Contents
2.00 Nos
Sump - 182
SUB ESTIMATE FOR CULVERT (2Nos)
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
Measurements
Item NoDescription of works Nos
L B D/H
Earth work excavation and depositing on
bank with initial lead of 10 m and initial
1.0
lift of 2 mts in all classes of soil and sub
soils etc complete
For culvert. 1 x 2 6.30 2.70 1.80
L.s
TOTAL
Plain cement concrete 1:5:10 mix using
40 mm HBG metal for foundation
3.0 including all cost and conveyance of
materials and all labour charges etc .,
complete .
For culvert. 1 x 2 6.30 2.70 0.23
L.S
TOTAL
Kgs / m
Total
Qty
61.24
0.06
61.30 m3
7.82
0.08
7.90 m3
1.44
1.37
0.09
2.90 m3
4.70
4.70 m3
6.48
4.86
8.21
0.05
19.60 m3
Total
Qty
1.35
0.05
1.40 m3
14.11
1.75
0.04
15.90 m2
7.66
6.37
0.07
14.10 m2
14.40 m2
MTs
15.90 m2
0.56
Total
Qty
0.912 M.T
Thuraiyur Development works PH-XXI qtrs 189
Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
1.1 Earth work excavation in all soils (including refilling) 0.00 0.00 0.00 0.00
a. 0 to 2 mt. 134.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.20 8641.32 0.00 0.00 0.00 61.30 8250.98
b. 2 to 3 mt. 140.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.2 Earth work excavation in all soils (excluding refilling) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 0 to 2 mt. 127.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 133.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(including refilling)
a. 0 to 2 mt. 196.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 203.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.4 Earth work excavation for Open foundation (including 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
a. 0 to 2 mt. 71.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 77.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.5 Earth work excavation for Open foundation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(excluding refilling)
a. 0 to 2 mt. 63.60 Cum. 0.00 0.00 0.00 0.00 0.00 119.50 7600.20 83.63 5318.87 0.00 235.50 14977.80 0.00 0.00 0.00
b. 2 to 3 mt. 69.80 Cum. 0.00 0.00 0.00 0.00 0.00 18.50 1291.30 20.98 1464.40 0.00 0.00 0.00 0.00 0.00
c. 3 to 4 mt. 76.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 4 to 5 mt. 82.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.6 Earth work excavation for Open foundation for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
drains (excluding refilling) width upto 1.25 m
a. 0 to 2 mt. 95.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.90 3806.46 81.00 7727.40 0.00
b. 2 to 3 mt. 101.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.7 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(Excluding refilling)
a. 0 to 2 mt. 189.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 195.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.8 Earth work excavation in SDR for Open foundation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(excluding refilling)
a. 0 to 2 mt. 94.70 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 100.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9 Providing Driven PILES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.300mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.330mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.375mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.400mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.450mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f.500mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1 Filling sand 541.05 Cum. 0.00 0.00 0.00 0.00 0.00 12.20 6600.81 6.35 3435.67 28.50 15419.93 120.80 65358.84 18.30 9901.22 10.80 5843.34 0.00
2.2 Sand Gravel Mix 638.04 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Supply and filling of 40 mm Brick jelly 881.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4 Supply and filling of 20 mm Brick jelly 953.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.5 Gravel soling 279.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.6 Supply and filling of 40 mm HBSJ 1028.16 Cum. 0.00 0.00 0.00 0.00 0.00 6.00 6168.96 0.00 0.00 0.00 0.00 0.00 0.00
2.7 Supply and filling of 20 mm HBSJ 1392.16 Cum. 0.00 0.00 0.00 0.00 0.00 6.00 8352.96 0.00 0.00 0.00 0.00 0.00 0.00
3.1 C.C.1:5:10 for Foundation & Basement 3057.40 Cum. 0.00 0.00 0.00 0.00 0.00 4.70 14369.78 4.20 12841.08 14.30 43720.82 7.60 23236.24 18.30 55950.42 16.20 49529.88 7.90 24153.46
3.2 P.C.C. 1:2:4 for Foundation & Basement and other 4460.03 Cum. 0.00 0.00 0.00 0.00 0.00 4.30 19178.13 0.00 0.00 0.00 0.00 0.00 2.90 12934.09
similar works
3.3 P.C.C. 1:8:16 using 20 mm broken brick jelly+B494 2721.36 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 190
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
3.4 Providing WBM 125 mm consolidated thick with gravel Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
3.5 Surface dressing over WBM 25 mm thick Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.6 Providing WBM 125 mm consolidated thick with gravel 142.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
(IRC 63 to 45mm for 75mm thick and 37.5 to 26.5mm for
50.mm thick)
3.7 Surface dressing over WBM 25 mm tk. 134.05 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with pre-coated chips using 11.2mm size IRC
4.1 R.C.C. 1:2:4 Foundation and Basement 5367.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.2 R.C.C. 1: 11/2: 3 Foundation and Basement 5963.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.0 R.R. masonry in C.M. 1:5 Foundation and Basment 3191.19 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.60 62547.32
6.1 Brick work in C.M. 1:5 (F& B) using Chamber Burnt 4937.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
6.2 Brick work in C.M. 1:5 (F& B) using chamber Burnt 4689.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
6.3 Brick work in C.M. 1:5 (F& B) using Chamber Burnt Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
6.4 Brick work in C.M. 1:5 (F& B) using Chamber Burnt Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
6.5 Brick work in C.M. 1:5 (F& B) using Kiln Burnt 4806.92 Cum. 0.00 0.00 0.00 0.00 0.00 22.60 108636.39 0.00 0.00 0.00 3.10 14901.45 41.40 199006.49 1.40 6729.69
Country bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4")
6.6 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
7.1 Damp Proof Course Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
in C.M. 1:4, 12 MM thick mixed with Crude oil
7.2 Supply and fixing of Bituminous filler pad, 20 mm tk. 666.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for expansion joint
7.3 Damp Proof Course in C.M. 1:4, 12 MM thick mixed #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
with Water proofing compound
8.1 R.C.C.1:2:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5435.91 Cum.
b. In First floor 5569.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5703.91 Cum.
d. In Third floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5837.91 Cum.
e. In Fourth floor 5971.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.2 R.C.C.1: 1 1/2 :3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 6031.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 6165.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 6299.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 6433.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 6567.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 6701.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 6835.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 6969.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 7103.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 7237.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 7371.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 7505.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 191
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
m. In Twelth floor 7639.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.1 Brick work in C.M. 1:6 using Chamber Burnt brick of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
a. In Ground Floor 4916.34 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 5006.64 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 5096.94 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 5187.24 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5277.54 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
a. In Ground Floor/Stilt floor 4681.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 4771.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 4862.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 4952.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5042.71 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 5584.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 5674.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 5765.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In thirteen floor 5855.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.3 Brick work in C.M. 1:6 using Chamber Burnt brick of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.4 Brick work in C.M. 1:6 using Chamber Burnt brick of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.5 Brick work in C.M. 1:6 using Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 7 cm ( 8 3/4" x 4 1/4" x 2
3/4")
a. In Ground Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4785.36 Cum.
b. In First Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4875.66 Cum.
c. In Second Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4965.96 Cum.
d. In Third Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5056.26 Cum.
e. In Fourth Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5146.56 Cum.
9.6 Brick work in C.M. 1:6 using Kiln Burnt Country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.1 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 23 x 11.2 x 7 cm (9" x 4 3/8"
x 2 3/4")112 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 192
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm
tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor/stilt floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 0.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In thirteen floor 25864.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.3 Brick partition work in C.M. 1:4 Chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 110 mm
tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.4 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 22 x 11 x 7 cm (8 3/4" x 4
1/4" x 2 3/4") 110 mm tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth
10.5 Brick Floorwork in C.M. 1:4 Kiln Burnt Country
partition Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
110 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 10.80 0.00 0.00 271.30 0.00 0.00 86.50 0.00 0.00 0.00
b. In Ground Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
c. In First Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
d. In Second Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
e. In Third Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
f. In Fourth Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
10.6 Brick partition work in C.M. 1:4 Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
110 mm tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.1 Brick work in C.M. 1:4 Chamber Burnt brick of size 23 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.2 x 7 cm (9" x 4 3/8" x 2 3/4")70 mm tk (B.P.)
a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 193
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.3 Brick work in C.M. 1:4 Chamber Burnt brick: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 70 mm tk
(B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.4 Brick work in C.M. 1:4 Chamber Burnt brick of size 22 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.5 Brick work in C.M. 1:4 Kiln Burnt Country bricks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70
mm tk (B.P.)
a. In Ground Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
b. In First Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
c. In Second Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
d. In Third Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.6 Brick work in C.M. 1:4 Kiln Burnt Country bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 57 mm tk
(B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.1 Brick partition in C.M. 1:4 using country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 22 x11x5cm 50 mm thick
a. In Ground Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
b. In First Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
c. In Second Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
d. In Third Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.2 Brick partition in C.M. 1:4 50 mm tk. (B.P.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kiln Burnt Country brick: 23 x 11 x 5 cm
(9" x 4 1/4" x 2")
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.1 Filling with Excavated Earth 22.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 16.70 0.00 60.50 0.00 0.00 0.00 0.00 0.00
13.2 Filling with Excavated Earth Mixed with lime in the Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proporation 1:4 (one of lime & four of earth)
Thuraiyur Development works PH-XXI qtrs 194
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
14.I Precast Cupboard slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 837.31 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 840.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 842.73 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 845.44 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 848.15 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 850.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 853.57 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 856.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 858.99 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 861.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 864.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 867.12 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation & basement 931.95 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground floor 934.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First floor 940.11 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second floor 945.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 950.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth floor 956.34 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.1 Cuddappa slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.2 Cuddappa slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.1 Precast Jally ventilator 50mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground Floor 1684.71 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1689.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1694.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1699.83 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1704.87 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.2 Supplying & fixing of Terra cotta jolly (not less than 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50mm)
a. In Ground Floor 327.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 331.76 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 336.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 340.80 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 345.32 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.3 Supplying & fixing of Terra cotta jolly (more than 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50mm upto 110 mm)
a. In Ground Floor 514.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 524.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 534.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 544.72 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 554.65 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.0 Form work- Lintel (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.0 Form work - M.S. Sheet (slab) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.0 Form work - Small quantities (M.S. Sheet) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 195
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
20.0 Form work - Plinth beam (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.1 R.C.C.Door frame 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 900 x 2100 mm 1708.84 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 700 x 2100 mm 1683.04 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.2 Teak wood Wrought & Put up 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. T.W. over 2 m & below 3 m 114146.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. T.W. below 2 m length. 102442.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.3 PVC Door frame & shutter 1900.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.1 Teak wood panelled door shutters 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1000 x 2100 mm 4094.61 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900 x 2100 mm 4172.77 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 700 x 2100 mm 4179.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1200 x 2100 mm (Single) annexure item 4677.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.2 Teak wood "Window" & Ventilator Shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3 T.W. double leaf shutters for cup board/ ward robes Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.1 T.W. single leaf Door shutters using 9 mm tk. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
phynol bonded BWR plywood
a. 900 x 2100 mm 2930.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.2 Glass panels with Aluminium beedings 639.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.3 S&F of Magnetic door catches 35.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.4 Supply and fixing of Aluminium window with 3mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thick Glass
a. 1.8 x 1.35 mt.window 12529.36 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 9450.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1.35 x 1.05 mt window 8138.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1.2 x 1.35 mt window 7424.66 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. 1.2 x 1.05 mt window #VALUE! Each 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. 1.05 x 1.35 mt window 6895.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. 0.9 x 1.35 mt window 6365.73 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. 0.9 x 1.05 mt window 5482.77 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. 0.5 x 1.35 mt window 3459.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. 0.45 x 1.35 mt window 3283.37 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.0.90 x 0.60 mt.Ventilator 3800.81 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. 0.60 x 0.60 mt.Ventilator 4299.61 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24.0 Manufacturing & supply of steel windows (Weight 58.00 Kg. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
basis)
25.0 M.S.Holdfast 9.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
26.0 Flooring in C.C.1:5:10 3057.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
27.1 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11.2 x 7 cm.
27.2 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11.4 x 7.5 cm.
27.3 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11 x 7 cm.
27.4 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 22 x 11 x 7 cm.
27.5 B.w. in C.M. 1:4 for staircase steps Kiln burnt country #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks 22 x 11 x 7 cm.
27.6 Floor
28.0 B.w. inplastering
C.M. 1:4 in
forC.M.
staircase steps
1:4, 20 mmKiln
tk. burnt country #VALUE! Cum.
Sqm. 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
#VALUE! 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 58.10 0.00
0.00 54.00 0.00
0.00 0.00
0.00
bricks 22 x 11 x 5.7 cm.
29.1 Mosaic tiles 20 cm x 20 cm x 2 cm. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.2 Mosaic tiles 25 cm x 25 cm x 2 cm. 787.01 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.3 Floor ceramic tiles 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.4 Glazed tiles 937.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.5 Floor ceramic tiles (Anti-skid) 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
30.0 Ellispattern 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
287.70 Sqm.
31.0 Weathering course 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2859.46 Cum.
Thuraiyur Development works PH-XXI qtrs 196
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
32.0 Pressed tiles (23cmx23cmx20mm) mixed with Crude oil Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
32.1 Pressed tiles (23cmx23cmx20mm) mixed with Water 785.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proofing compound
32.2 Pressed tiles (23cmx23cmx18mm) mixed with Water Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proofing compound
33.0 Plastering in C.M. 1:5, 12 mm tk. 145.84 Sqm. 0.00 0.00 0.00 0.00 0.00 178.40 0.00 0.00 326.00 0.00 0.00 134.40 0.00 221.40 0.00 15.90 0.00
34.0 Plastering in C.M. 1:4, 12 mm tk. #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 199.20 0.00 180.00 0.00 0.00
35.0 Spl. Ceiling plastering in C.M. 1:3, 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 mm tk. 169.04 Sqm.
36.0 Cement mortar Border in C.M. 1:5, 12 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 150 mm wide 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
45.36 Rmt
b. 75 mm wide 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.49 Rmt
c. 50 mm wide 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.94 Rmt
37.1 White washing 3 coats (slaked) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.90 0.00
26.25 Sqm.
37.2 Colour washing ( slaked) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.1 Cement paint 121.40 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.2 Matt paint 111.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
39.0 M.s Grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
53.60 Kg.
40.0 Painting - New "wood work" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
162.42 Sqm.
41.0 Painting - New "iron work" 96.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.60 0.00 0.00 0.00 0.00
42.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash)
a. upto 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
43.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. upto 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.1 PVC SWR 110 mm dia Rain water pipe 273.87 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.2 Rain Water Harvesting using Defunct borewell method Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
45.0 Stucco plastering 12 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
202.75 Sqm.
46.0 S & F 20 mm dia Alu. Hanger Rod 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.00 Rmt
47.0 S & F Alu Towel rail 75 cm long 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
95.00 Each
48.0 S & F 5 pin Coat stand 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.00 Each
49.0 S & F chromium plated 8 guage Picture Hook 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.50 Each
50.1 Precast slab 50 mm tk.in C.C. 1:3:6 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50.2 Providing precast Kerb stone in C.C. 1:3:6, 450 x 300 179.24 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 380.00 0.00 0.00 0.00 0.00
x 150 mm
50.3 Supply and planting avenue trees 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
262.75 Each
50.4 Providing Tree guard 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
649.40 Each
50.5 Supplying. Fabricating and erection of M.S Scheme 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Name board
13470.65 Each
51.0 HDPE water tank 700 lit capacity with ISI mark 5740.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
52.0 PVC Water supply (ASTM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 32 mm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
167.93 Rmt
b. 25 mm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
151.97 Rmt
c. 20 mm dia 147.19 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
52.1 G.I Pipe 20mm dia for Hot water line (Fully 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concealed in walls)
220.37 Rmt
53.1 Wash basin 2526.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 197
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
53.2 S & F of C.I. Manhole cover 45 x 45 cm Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(20 kg. weight)
53.3 C.I. Steps ( 5 kg) 30.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00
54 Brass tap (with ISI mark) 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.1 C.P tap long body 300.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.2 C.P tap short body 250.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.1 Squat Urinal 662.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.2 Flat Back Urinal 1577.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.1 S & F of Orissapan - in G.F. 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.2 S & F of Orissapan - other than G.F. 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 S & F of E.W.C.(white) 5157.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57.1 S & F of E.W.C.(colour) 5527.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.1 PVC SWR pipe (Soil line) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia. 518.65 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 75 mm dia. 406.75 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.2 PVC Ventilating shaft with cowl 439.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.1 Gully Trap using Chamber burnt bricks 23 x 11.2 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.2 Gully Trap using chamber burnt bricks of size 1212.57 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23x11.4x7.5cm
59.3 Gully Trap using Chamber burnt bricks 23 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.4 Gully Trap using Chamber burnt bricks 22 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.5 Gully Trap using Kiln burnt country bricks 22 x 11 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 cm. 1212.57
Each
59.6 Gully Trap using Kiln burnt country bricks 22 x 11 x 5.7 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cm.
60.0 PVC Nahani trap (4way/2way) 129.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each
61.1 Stoneware pipe 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm S.W. pipe 362.90 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm S.W. pipe 490.23 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
61.2 Stoneware pipe dry condition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 172.33 Rmt 0.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 259.05 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
62.1 Stoneware bend 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 96.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 132.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
62.2 Stoneware Tee 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 121.50 Each 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 156.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
63.0 32 mm dia PVC waste pipe 31.87 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electrical arrangements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
64.0 a. Light point with ceiling rose 1070.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Calling bell point with Buzzer/Calling bell 1102.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
65.0 Fan point 1126.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
66.0 Staircase light point 1973.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
67.0 5 amps 5 pin Plug point (Switch board itself) 540.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
68.0 5 amps 5 pin Plug point (Convenient places) 752.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
69.0 15 Amp. Power plug 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
125.00 Each
70.1 Bulk head fitting 401.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.2 S & F of Tube light with fittings Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.3 S & F of 40/ 60 w bulb 12.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.4 S & F of plastic shade 10.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
71.0 Double pole main switch 562.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
72.0 Box type Fibre Fan hook 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33.90 Each
Thuraiyur Development works PH-XXI qtrs 198
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
73.10 6 way - D.B. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3737.00 Each
73.2 4 way - D.B. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3000.00 Each
74.0 Charges for fixing of "Fan" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
347.00 Each
75.0 Supply and delivery of Fan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 48" (1200 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 42" (1050 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
76.0 8 SWG wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 Rmt
77.0 Run of main 2 wires of 1.50 Sqmm. 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
77.1 Run of 2 wires of 4 sqmm with continuous earth by 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
means of 2.5sqmm
77.2 S & F of A/C metal clad switch 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
500.00 Each
77.3 S&F of TV/Telephone line Socket 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
75.00 Each
77.4 S&F of 20mm dia PVC pipe for TV/Telephone line 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.07 Rmt
78.0 Earthing Station IS3043 (Type I) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2010.00 Each
78.1 Earthing Station (Type II) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
79.1 1 No.of 30Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
79.2 3 Nos.of 30Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
80.0 375 x 300 x 20 mm T.W. plank 592.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
81.0 Meter cupboard 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1959.10 Sqm
82.0 Street lights 2168.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
83.0 M.S Angle 146.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
84.0 Run of 2 wires of 4 sqmm Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
85.0 Supply of G.I pipe 25mm dia 123.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
86.0 Anti termite treatment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
34.00 Sqm.
87.0 ELCB Single phase 2343.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
112.0 S & F of Exsaust Fan 300 mm dia 1683.71 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.0 Anticorrosive treatment for steel grills 3769.50 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ANNEXURE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tkusing standardised 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete mix M20 (annexure)
a. In Foundation & basement 934.85 Sqm. 0.00 0.00 0.00 0.00 0.00 5.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground floor 937.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.1 Standardised concrete Mix M20 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation and basement 5310.53 Cum 0.00 0.00 0.00 0.00 0.00 5.70 0.00 25.10 0.00 0.00 0.00 0.00 0.00 4.70 0.00
b. In Stilt /Ground Floor 5378.53 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.1 c. In First Floor 5512.53 Cum 0.20 0.20 0.20 1102.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor 5646.53 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 5780.53 Cum 0.20 1.80 1.80 10404.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f.In fourth floor 5914.53 Cum 0.20 8.00 8.00 47316.24 0.00 0.00 0.00 0.00 0.00 0.00
4.2 Standardised concrete Mix M30 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation and basement 5805.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Stilt /Ground Floor 5873.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor 6007.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor 6141.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 199
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
e. In Third floor 6275.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RCC M30 mix using hard broken stone jelly for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
foundation and basement
a. Foundation & basement 5805.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.Stilt floor 5873.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cement Concrete using desing mix of grade M25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete
a. In Foundation and basement 5719.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Stilt /Ground Floor 5787.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor 5921.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor 6055.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 6189.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor 6323.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In Fifth Floor 6457.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor 6591.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor 6725.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor 6859.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor 6993.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l.in Tenth floor 7127.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 7261.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 7395.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In Thirteen floor 7529.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
g. In Fifth Floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l.in Tenth floor 5584.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm
tk (B.P.)
g. In Fifth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
g. In Fifth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
j. In Eighth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
Supply and laying of Hard core layer 200mm 2796.22 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and filling stonedust 136.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plastering with CM 1:3, 12mm with WPC 168.63 Sqm 11.00 11.00 440.00 99.00 550.00 92746.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and filling with gravel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
287.16 Cum
Thuraiyur Development works PH-XXI qtrs 200
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
B.W in CM 1:4 in Superstructure in First floor #VALUE! Cum 1.20 1.20 1.20 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
B.W in CM 1:4 in Superstructure in Second floor #VALUE! Cum 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 0.00 10.80 10.80 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
D) In third floor
B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 48.00 0.00 48.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
e) In fourth floor
Earth work excavation in Loose / sandy soils (including 91.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
Earth work excavation in Loose / sandy soils (excluding 42.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for open foundation
Earth work excavation in Loose / sandy soils (excluding 63.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for drain
3.80 P.C.C. 1:3:6 using 20 mm broken brick jelly 3862.79 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.4 Providing earth quake resistant for Corner walls 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Foundation & basement 4756.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Ground Floor 4824.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. First Floor 4958.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Second Floor 5092.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.5 Providing earth quake resistant for Door/window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jambs
a. Ground Floor 436.22 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. First Floor 438.52 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Second Floor 440.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9.3.1 Providing Bored pile using design mix M30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.450mm dia 2234.30 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head to the required cut of level 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and clearing way debries with an average lead of 3
km entirely with city limits
450mm dia pile 489.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Conducting routine vertical compression load test 70000.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.328/2014-15
Mobilization charges including transporting to site 50000.00 Set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.328/2014-15
Red oxide plastering in CM 1:4 #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
18.1 Formwork using M.S.Sheet 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.For Column footings,plinth beam,Grade 498.94 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 0.00 0.00 0.00 0.00 14.10 0.00
beam,Raftbeam,Raft slab etc.,
b.Plain surfaces such as Roof 573.61 Sqm 1.50 1.50 60.00 13.50 75.00 43020.75 30.00 0.00 26.12 0.00 0.00 0.00 0.00 0.00 14.40 0.00
slab,floorslab,Beams,lintels,lofts,sill
slab,staircase,portico slab and other similar works
c.For Square and rectangular columns and small 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
quantities
688.33 Sqm
d.Vertical wall 630.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.Circular column 1376.66 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f.Curved surface 860.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 75.60 0.00 0.00 0.00 0.00 0.00 0.00
g.Double centering portico area 1147.22 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.6 R.C.C.Door frames of size 100 x 75mm with one 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
edge grooves size 't' x 20 mm
a. 900 x 2100 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1708.84 Each
c. 1200 x 2100 mm 2078.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 750 x 2100 mm 1683.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Teak wood "Window" & Ventilator Shutter with 4mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thick pin headed glasses
a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 201
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (75 x 75 cm) 2203.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3.2 MDF board (18mm thick) double leaf shutters with TW 1924.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame for cup board/ ward robes.
T.W. frame & TW styles & rails with BWR double 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
leaf shutters for cup board/ ward robes including two
coat enamel paint & one coat primer.
3441.72 Sqm
22.8 MDF board door shutters (35mm thick) exterior grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
both side laminated with external lipping.
a. 1000X2100mm. 2838.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900X2100mm. 2876.47 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.1200X2100mm. Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW panelled door shutter with brass fittings. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1000X2100mm.(Single leaf) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5106.22 Sqm
b.1200x2400mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1200X2100mm.(Single leaf) 4396.30 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900X2100mm (over all size 900X2400mm.). 4172.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.1800X2400mm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW double leaves shutter of size 4926.21 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.1800 x 2100mm
a. 1500X2100mm.(double leaves) with Brass fittings 5232.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW styles & rails with 9mm thick BWR single leaf 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 900x2100 mm
2930.58 Sqm
TW styles & rails with 9mm thick BWR single leaf 3330.03 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 750x2100 mm
TW styles & rails with 9mm thick BWR single leaf 2824.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1000 x 2100 mm
TW styles & rails with 9mm thick BWR Double leaves Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1500x2100
TW styles & rails with 9mm thick BWR single leaf 2644.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1200x2100
21.5.2 Supply and Fixing Soild PVC door Shutter with 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame
2670.00 Sqm
23.2.1 4mm thick pin headed Glass panels with Aluminium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
beedings 639.50 Sqm
Cuddappa slab 20 mm tk.for kitchen hearth slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 478.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 481.18 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 483.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 486.54 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 489.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 20 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 202
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 482.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 488.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 493.64 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 499.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for Sunshade. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.8 Glazed tiles using Grout (Tile Joint Filler) 937.59 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Floor ceramic tiles using Grout (Tile Joint Filler). 833.48 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.9 Floor ceramic tiles (Anti-skid) using Grout (Tile Joint 833.48 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Filler).
38.4 Two coat of cement paint over one coat white cement 80.10 Sqm 11.00 11.00 440.00 99.00 550.00 44055.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.5 Matt paint 111.41 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.6 One coat white cement for new walls and other similar 36.99 Sqm 11.00 11.00 440.00 99.00 550.00 20344.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
works.
42.0 Fabrication of Mild steel / RTS grills 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash) for all sizes of rods.
43.0 Fabrication of Mild steel / RTS grills (without 61875.00 MT 0.02 0.02 0.80 0.18 1.00 61875.00 0.554 0.00 1.148 0.00 0.00 0.00 0.00 0.00 0.912 0.00
cement slurry) for all sizes of rods.
44.6 PVC SWR 110 mm dia with ISI mark type- A for 273.87 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rain water down fall pipe
50.6 Precast slab 50 mm tk.in C.C. 1:3:6 with fibre 276.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 0.00 0.00 0.00 0.00 0.00
52.4 20mm dia PVC water supply ASTM pipe (fully 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
consealed in walls)
149.18 Rmt
53.4 S&F of C.I Manhole cover 60 x 60 cm (50kg weight ) 1725.00 Each 1.00 1.00 40.00 9.00 50.00 86250.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00
Wash Hand Basin of size 550 x 400 mm 2526.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.3 Supplying and fixing of Brass Chromium plated screw 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
down tap 15mm dia (heavy type not less than 430 grms
weight) with ISI mark.
56.3 S & F of Indian Water closet white glazed (Oriya type) of 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 580 x 440mm - in G.F.
56.4 S & F of Indian Water closet white glazed (Oriya type) of 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 580 x 440mm - Other than G.F.
58.3 PVC SWR pipe (Soil line) with ISI mark - type 'B'. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia. 518.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rmt
b. 75 mm dia. 406.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rmt
58.4 Supplying, Laying & Concealing the 50mm dia PVC 81.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( SWR) pipe with ISI mark type - 'B' with relevant
specials.
Rmt
58.5 PVC(SWR) pipe with ISI mark - type 'A' for Ventilating 439.40 Each 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shaft with cowl
Thuraiyur Development works PH-XXI qtrs 203
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable
with ISI mark confirming IS: 694:1990.
( Ordinary)
a. Light point with ceiling rose 1070.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each
b. Light point without ceiling rose 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1074.00 Each
c. Calling bell point with Buzzer/Calling bell 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1102.00 Each
65.1 Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for Fan point.
1126.00 Each
66.1 Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for Staircase
Light Point.
1973.00 Each
Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for 5 amps 5 pin
plug socket point @ Switch Board Itself.
540.00 Each
68.2 Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for 5 amps 5 pin
plug socket point @ Convenient Places.
752.00 Each
70.5 S & F of Tube light fitting (patty type ) with 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electronic ballast and 36 W slim tube light
496.00 Each
Supply and delivery of 48" (1200 mm) Fan with ISI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mark with Eletronic Dimmer
1238.30 Each
Run of 2 Wires of 4 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990.
186.00 Rmt
77.5 Run of 2 Wires of 1.5 sqmm PVC insulated single core 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.
Run of 2 Wires of 4 sqmm PVC insulated single core 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.
4 x 4 Sq mm copper PVC insulated unsheathed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
single core cable for 3 phase EB service connection
197.00 Rmt
Run of 2 Wires of 2.5 sqmm PVC insulated single 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
core multi strand fire retardant flexible copper cable
with ISI mark confirming IS: 694:1990.
155.00 Rmt
Run of 4 Wires of 6 sqmm PVC insulated single core 336.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand
112.1 S & F of Exsaust Fan 225mm dia 1538.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each
Compact Fluoresent Lamp (CFL) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 14W bulb for Bath & WC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
130.00 Each
b. 18w bulb for Bulk Head fittings 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
170.00 Each
S & F of Bulk head fitting suitable for CFL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
443.00 Each
Thuraiyur Development works PH-XXI qtrs 204
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
44.2 Rain water harvesting using defunct borewell and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
providing perforated cover slab
a). Providing pit 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1164.91 Each
b) Augering 30cm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
288.72 Rmt
257.1 S&F of M.S. Angle of size 35x35x5mm for staircase 185.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
steps
344.2 S&F of Bevelled edge mirror 500 x 400 x 5.5mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
355.00 Each
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
383 S&F of Cuddapah sink 600 x 600 x 200mm
944.00 Each
383.1 Providing nosing to the edges of Granite slab 262.40 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of PVC water supply (ASTM) 210.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.50mm dia
384 S&F of PVC flushing cistern 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1231.00 Each
385 S&F of cloth drying arrangement 612.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.1 Anticorrosive treatment for window grills 2010.25 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of 32 AMPS Triple pole main 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
switch
1340.00 Each
450 x 375 x 20 mm thick TW plank 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
990.00 Each
3 Nos.of 32Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Nos.of 32Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and delivery of Three phase ELCB/RCCB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2695.00 Each
Supply of G.I pipe 40mm dia 'B' Class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plastic Emulsion PAINT including primer for outer 151.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Two coat of OBD over one coat white cement for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
inner walls
75.46 Sqm
2 x 4 Sqmm Copper PVC insulated unsheathed single 110.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
core 1 KV grade cable for EB service single phase.
40 mm dia GI pipe "B"class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 No.of 32 Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P. C.C. 1:3:6 for foundation & basement using 40mm 3862.79 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
metal
Providing PVC Tee with end cap 32mm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
87.00 Each
Granite Tiles flooring (Ruby red) 1207.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Providing wooden Melamine polish for new wood 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
997.28 Sqm
Supplying and fixing of staineless steel hand rails 4500.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Vitrified Tiles flooring (ivory) 908.64 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Vitrified Tiles flooring 1084.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concrete designer tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eurocon Tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Aluminium sliding window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) size 1800x1350 SW1 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b)1200x1350 SW2 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for officers)
supplying and fixing of colour matt finish floor tiles of size 2433.47 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for wall tiles)
Supplying and fixing of wall panneling using Aluminium 3034.40 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame with MDF board
4.4 Supply of material and lab ourfor Mineralfbre 915.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mmx600mm Grid false ceiling work
Supplying, fabricating, erecting and fixing Gyp board 990.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
false ceiling using perforated sheet 10mm thk
Thuraiyur Development works PH-XXI qtrs 205
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
Supplying and fixing of 100mm dia GI pipe 905.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Geyser (Data -SD 103) 8467.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of CP wall mixer two in one 3409.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(without telephone shower) including cost of all materials
and all labour charges etc complete.
CER No.178/13-14
Supplying and fixing of shower arm 9" long including 469.42 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cost of all materials and all labour charges etc. complete
CER No.178/13-14
Supplying and fixing of GM wheel valves ISI mark 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.100mm GM Gate valves 5640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.50mm GM Gate valves 1340.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.32mm GM Gate valves 604.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990. (Modular)
a. Light point with ceiling rose 1000.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 1003.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi 769.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin Modular plug
socket point @ Convenient Places.
Wiring with 1.5 sqmm PVC insulated single core multi 536.55 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin Modular plug
socket point @ Switch Board Itself.
Supplying and laying of 3.5 core 70 sq.mm PVC 627.40 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
armoured LTUG cable (below GL)
S&F 3.5 X 70mm LTUG CABLE Above GL 435.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 3.5 X 35mm LTUG CABLE Above GL 356.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 3.5 X 25mm LTUG CABLE Above GL 317.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 2X6 Sq.mm LTUG CABLE 176.84 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of brass cable gland suitable for 293.25 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.5 core 70 Sqmm PVC armoured LTUG cable SD 189
Supply & Fixing of Aluminium openable windows of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1.50 x 1.35 mt.window 4228.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 3694.20 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c 1.20 x 1.35 mt.window 3911.50 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 0.75 x 1.35 mt.window 3637.07 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1.80 x 1.35 mt.window Three leaves 3785.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a)70 sq.mm Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) 50 sqmm 226.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c) 35 sqmm 226.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d) 25 sqmm 212.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of 100 amps TPN sheet double break 6950.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
switch with HRC fuse and neutral on suitable angle iron
frame work with MS cable entry boxes and PWD
earthing(SR-14-15(p-65)
Supply and fixing of 200 amps fuse unit 634.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SRP-66
Supply and fixing of 200 amps TPN switch with HRC 9470.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fuses sheet steel double break
SRP-65, 3 ©
Supply and fixing of 250 amps cubical type panel board 123622.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of SS Soap Tray including cost of 704.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
all materials and all labour charges etc complete
Supplying and fixing of CP Angle valve Stop cock 514.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
including cost of all materials and all labour charges etc
complete
Supplying and fixing of 25x 3mm Copper flat 473.50 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of Health faucet approved quality with 952.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ISI mark
S&F TPN 12 way DB encloser (SR-p-80) 11481.80 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 206
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
S&F TPN 8 way DB encloser 5325.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 6 way DB encloser 8254.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 4 way DB encloser 6588.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
Conducting routine vertical compression load test 70000.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50000.00 Set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mobilization charges including transporting to site
Providing cast in situ bored piles using design mix M30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
including boring for the pile in all soil and socketing the
piles for a depth of 0.30m in all strata to carry a safe
working load not less than specified and the length of
pile to be embedded
500mm dia pile 2265.45 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head to the required cut of level 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and clearing way debries with an average lead of 3 km
entirely with city limits
500mm dia pile 565.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & Laying of paver block 628.08 SQM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F OF UPVC Windows 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) FW 900 X 2100 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) W 1800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c) W1 1500 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d) W0 2400 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e) W2 1200 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f) SW 4800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g) FW1 4800 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h) FW2 4200 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a)D1200 X 2400mm 8520.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) V1 900 X 600mm 3752.83 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of sodium vapour lamp with fitting 250watts 5654.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying, fabricating and fixing in position of UPVC 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
window/ventilator(openable) for all sizes
Supply and fixing of colour wash basin oval shape CER 2286.45 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/2013-14
Supplying and Fixing of Rolling shutters of all sizes 2430.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(manually Operated)
Supplying and fixing of solid core flush door shutter of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thickness 35mm
a. door size 1.200m x 2.100 (Double leaf) 2986.76 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. door size 1.200 m x 2.400 (double Leaf) 2960.17 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. door size 1.000 m x 2.100 (Single Leaf) 2504.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. door size 0.900 m x 2.100 (Single Leaf)
Providing additional strutting to centering of plain 2225.27
24.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
surface.
S & F of Granite slab of size 4'x2', 18 to 20mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thick For kitchen arrangements (jet black)
a. In Ground floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1746.84 Sqm
b. In First floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1748.86 Sqm
c. In Second floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1750.20 Sqm
d. In Third floor 1751.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) 3.08 x 2.1m 2854.45 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 2.10 mt.window 3358.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 3828.85 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Aluminum Louvered ventilators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 0.90 x 0.60 mt ventilators 3800.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 0.60 x 0.60 mt ventilators 4299.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 0.75 x 0.60 mt ventilators 4003.84 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 207
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
d. 1.35 x 0.60 mt ventilators 3803.43 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door (for lockup door ) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS door of Size 1000 x 2100mm 7353.65 each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS door of Size 750 x 1350mm 4794.34 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( lockup)
MS Ventilator of Size 1350 x 600mm 3297.04 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS Ventilator of Size 900 x 600mm 3752.83 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of SS Towel rail (75cm length) CER 405.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/13-14
Supply and fixing of weld mesh of size 325.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.5x2.5cmx10gauge
Supply and fixing of Chicken mesh 35.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of 15mm dia Engineering Polymer Tap (long 185.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
body ) for coastal area only
S & F of 15mm dia Engineering Polymer Tap short 174.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
body tap for coastal area only
S & F of CFL road way lighting luminaries suitable 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for fixing 36w CFL lamp
2219.00 Each
Augering 30 cm dia for compound wall 217.30 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Finshing the top of Terrace floor with one course of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
solar reflective Ceramic tiles 1020.82 Sqm.
51. 1 HDPE water tank 200 lit capacity with ISI mark 1640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UPVC Non Pressure pipe of SN8 SDR 34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( S 16.5) as per IS 15328/2003
a. 110 mm UPVC Non Pressure pipe 335.28 Rmt 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
596.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 160 mm UPVC Non Pressure pipe
Rmt
PVC Specials as per IS 10124/1982 Part II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia PVC bend (TWAD SR 17-18 236.00 Each 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-19 S.No-4 )
b. 160 mm dia PVC bend (TWAD SR 16-17 1122.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-19 S.No-4 )
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PVC Equal Tee as per BIS 7834/1975
a. 110 mm dia PVC Equal tee(TWAD SR 17-18 P-19 289.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S.No-9 )
886.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 160 mm dia PVC Equal tee(TWAD SR 16-17 P-19 Each
S.No-9 )
S & F of Indian Water closet white glazed (Oriya 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type) of size 580 x 440mm with PVC SWR grade '
P' or "S' trap - in G.F.
2324.43 Each
S & F of Indian Water closet white glazed (Oriya 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type) of size 580 x 440mm with PVC SWR grade '
P' or "S' trap- Other than G.F.
3706.04 Each
S & F of E.W.C.(White) 500 mm with PVC SWR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
grade "P" OR "S" TRAP
5127.80 Each
French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. FW (2.1 x 2.0 m ) 3 bay openable 2729.44 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.FW 1 (1.80 x 2.0 m )3 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. FW 2 (1.20 x 2.0 m ) 2 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.FW 3 (0.75 x 2.0 m ) Single bay openable 3553.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 208
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
( PVC Box , Fire Retarded Box) For Coastal only
a. Light point with ceiling rose 1266.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 1269.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Calling bell point with Buzzer/Calling bell 1298.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi 1316.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Fan point.(PVC Electrical
Box )
Wiring with 1.5 sqmm PVC insulated single core multi 2224.56 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Staircase Light Point.(PVC
Electrical Box )
67.1 Wiring with 1.5 sqmm PVC insulated single core multi 0.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Switch Board Itself.
Wiring with 1.5 sqmm PVC insulated single core multi 885.64 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Convenient Places.(PVC Electrical Box )
Supplying and fixing of 15 Amps 3 pin flush type plug 128.98 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
using ( PVC Box , Fire Retarded Box)
Fabrication of Mild steel / RTS grills (without cement 62159.30 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
slurry) for all sizes of rods.(BINDING WIRE insulated
with PVC)
PVC SWR 110 mm dia with ISI mark type- A for Rain 279.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
water down fall pipe(UPVC SPECIAL CLAMP )
Supply and fixing in posistion of 6 rows of 10 guage 25.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GI barbed wire 20 guage
Supply ,laying & jointing the following pipes as per 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ASTM D 1785 of schedule 40 with UPVC Specials
a. 32 mm dia 167.93 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 25 mm dia 151.97 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 20mm dia PVC water supply ASTM pipe (fully 149.18 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
consealed in walls)
Providing Colour Marble chips of size 10mm and below 254.31 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
using 70.20Kgs of cement and 15 cum of Colour Marble
chips for every 10 sqm over the existing plastered
surface ( For coastal area)
S & F of 15mm dia half turn CP long body tap 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
420.00 Each
S & F of 15mm dia half turn CP short body tap 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
372.00 Each
S & F of MS angle of size 50x 50x 5mm 51.40 Kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Granite Tiles flooring in cm1:3,20mm thk sathali
steel/ grey
1078.93 Sqm
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bored cast sit piles installation of vertical cast in
Situ Bored piles of following dia using RCC
1:1.5:3 a) 500mm dia
Rmt
Removing of clay from pile inlucing conveyance charges, loading
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 Cum.
and unloading charges etc.,all complete
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head of 500mm Dia of pile
to the required cut off level and clearing away the
debris from site with an average lead of 5 km etc.
Rmt
Thuraiyur Development works PH-XXI qtrs 209
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert
Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mobilization Charges inclusive of Transportation
to site assembling and Dismantling the rotary pile
equipment employed for the works etc.(Qtn)
40000.00 No
Conducting Routine vertical compression load test
for bored cast in situ RCC piles of various dia by 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
direct loading in accordance with IS 2911(PART
IV)1985 excluding cost of pile and dismantling the
same after testing, includung finishing pile head 70000.00 No
etc.(CERand.no.60/2016-2017. Est Cochin house)
1.51.1 Supply Laying Rubber Moulded Hyraulic Pressed 782.79 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 785.00 0.00 0.00 0.00 0.00
Paver Block 83 mm thick including labour charges for
laying etc
TOTAL RS. 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Thuraiyur Development works PH-XXI qtrs 210
s PC/HC QTRS with Development work at Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme
Total Development
Qty. Amount
125.50 16892.30
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
*
438.63 27896.87
39.48 2755.70
0.00 0.00
0.00 0.00
120.90 11533.86
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
196.95 106559.80
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
6.00 6168.96
6.00 8352.96
73.20 223801.68
7.20 32112.22
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 211
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
19.60 62547.32
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
68.50 329274.02
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 212
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 213
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
* 0.00 0.00
368.60 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 214
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
77.20 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 215
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 216
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
112.10 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 217
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
876.10 0.00
379.20 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
15.90 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
110.60 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
380.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 218
Total Development
Qty. Amount
0.00 0.00
8.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
30.00 5169.90
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
4.00 486.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 219
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
*
*
5.10 4767.74
0.00 0.00
*
35.50 188523.82
0.00 0.00
0.20 1102.51
0.00 0.00
1.80 10404.95
8.00 47316.24
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 220
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 0.00
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 0.00
0.00 0.00
550.00 92746.50
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 221
Total Development
Qty. Amount
1.20 #VALUE!
0.00 #VALUE!
10.80 #VALUE!
48.00 #VALUE!
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 #VALUE!
*
18.40 0.00
145.52 0.00
0.00 0.00
0.00 0.00
0.00 0.00
75.60 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 222
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 223
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
550.00 0.00
0.00 0.00
550.00 0.00
0.00 0.00
3.614 0.00
0.00 0.00
252.00 0.00
0.00 0.00
52.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1.00 0.00
Thuraiyur Development works PH-XXI qtrs 224
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 225
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 226
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 227
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 228
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
6.00 2011.68
0.00 0.00
4.00 944.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 229
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 230
Total Development
Qty. Amount
0.00 0.00
0.00 0.00
785.00 614490.15
* #VALUE!
Ph-XXI Thuraiyur 231
Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
a. 0 to 2 mt. 134.60 Cum. 40.30 5424.38 76.90 10350.74 105.70 528.50 71136.10 105.70 14227.22 751.40 101138.44 125.50 16892.30 876.90
b. 2 to 3 mt. 140.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.2 Earth work excavation in all soils (excluding refilling) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 0 to 2 mt. 127.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 133.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
(including refilling)
a. 0 to 2 mt. 196.80 Cum. 26.10 5136.48 60.80 11965.44 87.10 435.50 85706.40 87.10 17141.28 609.50 119949.60 0.00 0.00 609.50
b. 2 to 3 mt. 203.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.4 Earth work excavation for Open foundation (including 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
a. 0 to 2 mt. 71.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 77.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.5 Earth work excavation for Open foundation (excluding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
refilling)
a. 0 to 2 mt. 63.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 438.63 27896.87 438.63
b. 2 to 3 mt. 69.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.48 2755.70 39.48
c. 3 to 4 mt. 76.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 4 to 5 mt. 82.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.6 Earth work excavation for Open foundation for drains 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
(excluding refilling) width upto 1.25 m
a. 0 to 2 mt. 95.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.90 11533.86 120.90
b. 2 to 3 mt. 101.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.7 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(Excluding refilling)
a. 0 to 2 mt. 189.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 195.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.8 Earth work excavation in SDR for Open foundation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(excluding refilling)
a. 0 to 2 mt. 94.70 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 100.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9 Providing Driven PILES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.300mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.330mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.375mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.400mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.450mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f.500mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1 Filling sand 541.05 Cum. 11.20 6059.76 9.60 5194.08 23.70 118.50 64114.43 23.70 12822.89 163.00 88191.15 196.95 106559.80 359.95
2.2 Sand Gravel Mix 638.04 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Supply and filling of 40 mm Brick jelly 881.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4 Supply and filling of 20 mm Brick jelly 953.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.5 Gravel soling 279.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.6 Supply and filling of 40 mm HBSJ 1028.16 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6168.96 6.00
2.7 Supply and filling of 20 mm HBSJ 1392.16 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 8352.96 6.00
3.1 C.C.1:5:10 for Foundation & Basement 3057.40 Cum. 10.70 32714.18 11.30 34548.62 14.20 71.00 217075.40 14.20 43415.08 107.20 327753.28 73.20 223801.68 180.40
3.2 P.C.C. 1:2:4 for Foundation & Basement and other 4460.03 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 32112.22 7.20
similar works
3.3 P.C.C. 1:8:16 using 20 mm broken brick jelly 2721.36 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 232
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
3.4 Providing WBM 125 mm consolidated thick with gravel Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
3.5 Surface dressing over WBM 25 mm thick Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.6 Providing WBM 125 mm consolidated thick with gravel 142.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
(IRC 63 to 45mm for 75mm thick and 37.5 to 26.5mm for
50.mm thick)
3.7 Surface dressing over WBM 25 mm tk. 134.05 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with pre-coated chips using 11.2mm size IRC
4.1 R.C.C. 1:2:4 Foundation and Basement 5367.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.2 R.C.C. 1: 11/2: 3 Foundation and Basement 5963.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.0 R.R. masonry in C.M. 1:5 Foundation and Basment 3191.19 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.60 62547.32 19.60
6.1 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of 4937.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
6.2 Brick work in C.M. 1:5 (F& B) using chamber Burnt bricks 4689.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
6.3 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
6.4 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.5 Brick
size 22work
x 11 xin C.M.
7 cm 1:5 (F&
(8 3/4" B) using
x 4 1/4" Kiln Burnt
x 2 3/4") 4806.92 Cum. 20.00 96138.40 22.00 105752.24 23.00 115.00 552795.80 23.00 110559.16 180.00 865245.60 68.50 329274.02 248.50
Country bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4")
6.6 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
7.1 Damp Proof Course Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
in C.M. 1:4, 12 MM thick mixed with Crude oil
7.2 Supply and fixing of Bituminous filler pad, 20 mm tk. for 666.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
expansion joint
7.3 Damp Proof Course in C.M. 1:4, 12 MM thick mixed with #VALUE! Sqm. #VALUE! #VALUE! 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 #VALUE! 0.00
Water proofing compound
8.1 R.C.C.1:2:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 5435.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 5569.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 5703.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 5837.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 5971.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.2 R.C.C.1: 1 1/2 :3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 6031.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 6165.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 6299.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 6433.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 6567.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 6701.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 6835.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 6969.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 7103.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 7237.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 7371.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 7505.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 7639.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.1 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
a. In Ground Floor 4916.34 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 5006.64 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 5096.94 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 5187.24 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5277.54 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
a. In Ground Floor/Stilt floor 4681.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 4771.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 4862.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 233
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
d. In Third Floor 4952.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5042.71 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 5584.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 5674.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 5765.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In thirteen floor 5855.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.3 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.4 Brick work in C.M. 1:6 using Chamber Burnt brick of size 22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.5 Brick work in C.M. 1:6 using Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
bricks of size 22 x 11 x 7 cm ( 8 3/4" x 4 1/4" x 2
3/4")
a. In Ground Floor 4785.36 Cum. 27.10 0.00 29.30 0.00 26.50 132.50 0.00 26.50 0.00 215.40 0.00 0.00 0.00 215.40
b. In First Floor 4875.66 Cum. 5.20 0.00 29.30 0.00 26.10 130.50 0.00 26.10 0.00 191.10 0.00 0.00 0.00 191.10
c. In Second Floor 4965.96 Cum. 0.00 31.70 0.00 26.10 130.50 0.00 40.90 0.00 203.10 0.00 0.00 0.00 203.10
d. In Third Floor 5056.26 Cum. 0.00 5.90 0.00 40.90 204.50 0.00 9.00 0.00 219.40 0.00 0.00 0.00 219.40
e. In Fourth Floor 5146.56 Cum. 0.00 0.00 9.00 45.00 0.00 0.00 45.00 0.00 0.00 0.00 45.00
9.6 Brick work in C.M. 1:6 using Kiln Burnt Country bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.1 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2
3/4")112 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt bricks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In Ground Floor/stilt floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. In Fifth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
g. In sixth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
h. In seventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
i. In eighth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 234
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
j. In Ninth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
k. In Tenth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
l. In Eleventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
m. In Twelth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
n. In thirteen floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
10.3 Brick partition work in C.M. 1:4 Chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 110 mm tk
(B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.4 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4") 110 mm tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.5 Brick partition work in C.M. 1:4 Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
110 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 368.60 #VALUE! 368.60
b. In Ground Floor #VALUE! Sqm. 63.30 0.00 31.00 0.00 79.90 399.50 0.00 79.90 0.00 573.70 0.00 0.00 #VALUE! 573.70
c. In First Floor #VALUE! Sqm. 8.70 0.00 31.00 0.00 79.90 399.50 0.00 79.90 0.00 519.10 0.00 0.00 #VALUE! 519.10
d. In Second Floor #VALUE! Sqm. 0.00 53.00 0.00 79.90 399.50 0.00 79.90 0.00 532.40 0.00 0.00 #VALUE! 532.40
e. In Third Floor #VALUE! Sqm. 0.00 7.40 0.00 79.90 399.50 0.00 0.00 406.90 0.00 0.00 #VALUE! 406.90
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
10.6 Brick partition work in C.M. 1:4 Kiln Burnt Country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 110 mm tk
(B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.1 Brick work in C.M. 1:4 Chamber Burnt brick of size 23 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.2 x 7 cm (9" x 4 3/8" x 2 3/4")70 mm tk (B.P.)
a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.3 Brick work in C.M. 1:4 Chamber Burnt brick: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 235
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.4 Brick work in C.M. 1:4 Chamber Burnt brick of size 22 x 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.5 Brick work in C.M. 1:4 Kiln Burnt Country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk
(B.P.)
a. In Ground Floor #VALUE! Sqm. 16.00 0.00 11.70 0.00 24.20 121.00 0.00 24.20 0.00 172.90 0.00 0.00 #VALUE! 172.90
b. In First Floor #VALUE! Sqm. 0.00 11.70 0.00 24.20 121.00 0.00 24.20 0.00 156.90 0.00 0.00 #VALUE! 156.90
c. In Second Floor #VALUE! Sqm. 0.00 11.70 0.00 24.20 121.00 0.00 24.20 0.00 156.90 0.00 0.00 #VALUE! 156.90
d. In Third Floor #VALUE! Sqm. 0.00 0.00 24.20 121.00 0.00 0.00 121.00 0.00 0.00 #VALUE! 121.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.6 Brick work in C.M. 1:4 Kiln Burnt Country bricks of size 22 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 57 mm tk (B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.1 e. In Fourth
Brick Floor
partition in C.M. 1:4 using country bricks of size Sqm. 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 * 0.00
22 x11x5cm 50 mm thick
a. In Ground Floor #VALUE! Sqm. 5.80 0.00 5.20 0.00 5.50 27.50 0.00 5.50 0.00 44.00 0.00 0.00 #VALUE! 44.00
b. In First Floor #VALUE! Sqm. 0.00 5.20 0.00 5.50 27.50 0.00 5.50 0.00 38.20 0.00 0.00 #VALUE! 38.20
c. In Second Floor #VALUE! Sqm. 0.00 6.00 0.00 5.50 27.50 0.00 5.50 0.00 39.00 0.00 0.00 #VALUE! 39.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 5.50 27.50 0.00 0.00 27.50 0.00 0.00 #VALUE! 27.50
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
12.2 Brick partition in C.M. 1:4 50 mm tk. (B.P.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kiln Burnt Country brick: 23 x 11 x 5 cm
(9" x 4 1/4" x 2")
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.1 Filling with Excavated Earth 22.20 Cum. 23.00 0.00 36.30 0.00 52.50 262.50 0.00 52.50 0.00 374.30 0.00 77.20 1713.84 451.50
13.2 Filling with Excavated Earth Mixed with lime in the Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proporation 1:4 (one of lime & four of earth)
14.I Precast Cupboard slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 837.31 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 840.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 842.73 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 845.44 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 848.15 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 236
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
f. In Fifth floor 850.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 853.57 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 856.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 858.99 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 861.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 864.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 867.12 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation & basement 931.95 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground floor 934.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First floor 940.11 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second floor 945.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 950.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth floor 956.34 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.1 Cuddappa slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.2 Cuddappa slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.1 Precast Jally ventilator 50mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground Floor 1684.71 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1689.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1694.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1699.83 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1704.87 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.2 Supplying & fixing of Terra cotta jolly (not less than 50mm) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground Floor 327.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 331.76 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 336.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 340.80 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 345.32 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.3 Supplying & fixing of Terra cotta jolly (more than 50mm upto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
110 mm)
a. In Ground Floor 514.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 524.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 534.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 544.72 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 554.65 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.0 Form work- Lintel (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.0 Form work - M.S. Sheet (slab) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.0 Form work - Small quantities (M.S. Sheet) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20.0 Form work - Plinth beam (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 237
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
21.1 R.C.C.Door frame 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 900 x 2100 mm 1708.84 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 700 x 2100 mm 1683.04 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.2 Teak wood Wrought & Put up 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. T.W. over 2 m & below 3 m 114146.00 Cum. 0.032 0.00 0.094 0.00 0.252 1.260 0.00 0.189 0.00 1.575 0.00 0.00 0.00 1.575
b. T.W. below 2 m length. 102442.00 Cum. 0.013 0.00 0.038 0.00 0.120 0.600 0.00 0.090 0.00 0.741 0.00 0.00 0.00 0.741
21.3 PVC Door frame & shutter 1900.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.1 Teak wood panelled door shutters 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1000 x 2100 mm 4094.61 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900 x 2100 mm 4172.77 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 700 x 2100 mm 4179.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1200 x 2100 mm (Single) annexure item 4677.80 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.2 Teak wood "Window" & Ventilator Shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3 T.W. double leaf shutters for cup board/ ward robes Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.1 T.W. single leaf Door shutters using 9 mm tk. phynol Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bonded BWR plywood
a. 900 x 2100 mm 2930.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.2 Glass panels with Aluminium beedings 639.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.3 S&F of Magnetic door catches 52.00 Each 3.00 0.00 9.00 0.00 24.00 120.00 0.00 18.00 0.00 150.00 0.00 0.00 0.00 150.00
23.4 Supply and fixing of Aluminium window with 3mm thick Glass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1.8 x 1.35 mt.window 12529.36 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 9450.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1.35 x 1.05 mt window 8138.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1.2 x 1.35 mt window 7424.66 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. 1.2 x 1.05 mt window #VALUE! Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. 1.05 x 1.35 mt window 6895.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. 0.9 x 1.35 mt window 6365.73 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. 0.9 x 1.05 mt window 5482.77 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. 0.5 x 1.35 mt window 3459.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. 0.45 x 1.35 mt window 3283.37 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.0.90 x 0.60 mt.Ventilator 3800.81 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. 0.60 x 0.60 mt.Ventilator 4299.61 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24.0 Manufacturing & supply of steel windows (Weight 58.00 Kg. 367.00 0.00 1069.80 0.00 2438.10 12190.50 0.00 1828.60 0.00 15455.90 0.00 0.00 0.00 15455.90
basis)
25.0 M.S.Holdfast 9.60 Each 18.00 0.00 54.00 0.00 144.00 720.00 0.00 108.00 0.00 900.00 0.00 0.00 0.00 900.00
26.0 Flooring in C.C.1:5:10 3057.40 Cum. 5.50 0.00 5.00 0.00 7.80 39.00 0.00 7.80 0.00 57.30 0.00 0.00 0.00 57.30
27.1 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
burnt bricks 23 x 11.2 x 7 cm.
27.2 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
burnt bricks 23 x 11.4 x 7.5 cm.
27.3 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11 x 7 cm.
27.4 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 22 x 11 x 7 cm.
27.5 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
22 x 11 x 7 cm.
27.6 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 5.7 cm.
28.0 Floor plastering in C.M. 1:4, 20 mm tk. #VALUE! Sqm. 28.10 0.00 41.00 0.00 58.30 291.50 0.00 50.00 0.00 410.60 0.00 112.10 #VALUE! 522.70
29.1 Mosaic tiles 20 cm x 20 cm x 2 cm. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.2 Mosaic tiles 25 cm x 25 cm x 2 cm. 787.01 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.3 Floor ceramic tiles 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 238
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
29.4 Glazed tiles 937.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.5 Floor ceramic tiles (Anti-skid) 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
30.0 Ellispattern 287.70 Sqm. 8.00 0.00 34.00 0.00 32.50 162.50 0.00 23.50 0.00 228.00 0.00 0.00 0.00 228.00
31.0 Weathering course 2859.46 Cum. 1.10 0.00 3.30 0.00 10.40 52.00 0.00 6.90 0.00 63.30 0.00 0.00 0.00 63.30
32.0 Pressed tiles (23cmx23cmx20mm) mixed with Crude oil Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
32.1 Pressed tiles (23cmx23cmx20mm) mixed with Water proofing 785.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
compound
32.2 Pressed tiles (23cmx23cmx18mm) mixed with Water proofing Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
compound
33.0 Plastering in C.M. 1:5, 12 mm tk. 145.84 Sqm. 559.00 0.00 1141.00 0.00 2577.20 12886.00 0.00 2097.30 0.00 16683.30 0.00 876.10 127770.42 17559.40
34.0 Plastering in C.M. 1:4, 12 mm tk. #VALUE! Sqm. 19.10 0.00 42.40 0.00 111.80 559.00 0.00 90.70 0.00 711.20 0.00 379.20 #VALUE! 1090.40
35.0 Spl. Ceiling plastering in C.M. 1:3, 169.04 Sqm. 101.20 0.00 282.00 0.00 596.00 2980.00 0.00 453.10 0.00 3816.30 0.00 0.00 0.00 3816.30
10 mm tk.
36.0 Cement mortar Border in C.M. 1:5, 12 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. 150 mm wide 45.36 Rmt 56.00 0.00 120.20 0.00 75.10 375.50 0.00 75.10 0.00 626.80 0.00 0.00 0.00 626.80
b. 75 mm wide 29.49 Rmt 121.00 0.00 246.00 0.00 311.90 1559.50 0.00 311.90 0.00 2238.40 0.00 0.00 0.00 2238.40
c. 50 mm wide 21.94 Rmt 62.00 0.00 159.00 0.00 118.30 591.50 0.00 118.30 0.00 930.80 0.00 0.00 0.00 930.80
37.1 White washing 3 coats (slaked) 26.25 Sqm. 101.20 0.00 282.00 0.00 596.00 2980.00 0.00 453.10 0.00 3816.30 0.00 15.90 417.38 3832.20
37.2 Colour washing ( slaked) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.1 Cement paint 121.40 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.2 Matt paint 111.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
39.0 M.s Grills 53.60 Kg. 67.00 0.00 80.00 0.00 175.00 875.00 0.00 175.00 0.00 1197.00 0.00 0.00 0.00 1197.00
40.0 Painting - New "wood work" 162.42 Sqm. 9.90 0.00 31.60 0.00 86.50 432.50 0.00 66.80 0.00 540.80 0.00 0.00 0.00 540.80
41.0 Painting - New "iron work" 96.93 Sqm. 33.00 0.00 88.00 0.00 391.70 1958.50 0.00 304.10 0.00 2383.60 0.00 110.60 10720.46 2494.20
42.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash)
a. upto 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
43.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. upto 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.1 PVC SWR 110 mm dia Rain water pipe 273.87 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.2 Rain Water Harvesting using Defunct borewell method Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
45.0 Stucco plastering 12 mm tk. 202.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
46.0 S & F 20 mm dia Alu. Hanger Rod 58.00 Rmt 5.00 0.00 14.00 0.00 16.00 80.00 0.00 12.00 0.00 111.00 0.00 0.00 0.00 111.00
47.0 S & F Alu Towel rail 75 cm long 95.00 Each 3.00 0.00 9.00 0.00 16.00 80.00 0.00 12.00 0.00 104.00 0.00 0.00 0.00 104.00
48.0 S & F 5 pin Coat stand 55.00 Each 2.00 0.00 6.00 0.00 16.00 80.00 0.00 12.00 0.00 100.00 0.00 0.00 0.00 100.00
49.0 S & F chromium plated 8 guage Picture Hook 1.50 Each 26.00 0.00 60.00 0.00 80.00 400.00 0.00 60.00 0.00 546.00 0.00 0.00 0.00 546.00
50.1 Precast slab 50 mm tk.in C.C. 1:3:6 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50.2 Providing precast Kerb stone in C.C. 1:3:6, 450 x 300 179.24 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 380.00 68111.20 380.00
x 150 mm
50.3 Supply and planting avenue trees 262.75 Each 2.00 0.00 3.00 0.00 10.00 50.00 0.00 6.00 0.00 61.00 0.00 0.00 0.00 61.00
50.4 Providing Tree guard 649.40 Each 2.00 0.00 3.00 0.00 10.00 50.00 0.00 6.00 0.00 61.00 0.00 0.00 0.00 61.00
50.5 Supplying. Fabricating and erection of M.S Scheme 13470.65 Each 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00
Name board
51.0 HDPE water tank 700 lit capacity with ISI mark 5740.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 239
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
52.0 PVC Water supply (ASTM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. 32 mm dia 167.93 Rmt 16.00 0.00 66.00 0.00 50.00 250.00 0.00 40.00 0.00 372.00 0.00 0.00 0.00 372.00
b. 25 mm dia 151.97 Rmt 65.00 0.00 177.00 0.00 315.60 1578.00 0.00 237.80 0.00 2057.80 0.00 0.00 0.00 2057.80
c. 20 mm dia 147.19 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
52.1 G.I Pipe 20mm dia for Hot water line (Fully Concealed 220.37 Rmt 3.00 0.00 9.00 0.00 32.00 160.00 0.00 24.00 0.00 196.00 0.00 0.00 0.00 196.00
in walls)
53.1 Wash basin 2526.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
53.2 S & F of C.I. Manhole cover 45 x 45 cm Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(20 kg. weight)
53.3 C.I. Steps ( 5 kg) 30.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 240.00 8.00
54 Brass tap (with ISI mark) 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.1 C.P tap long body 300.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.2 C.P tap short body 250.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.1 Squat Urinal 662.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.2 Flat Back Urinal 1577.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.1 S & F of Orissapan - in G.F. 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.2 S & F of Orissapan - other than G.F. 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 S & F of E.W.C.(white) 5157.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57.1 S & F of E.W.C.(colour) 5527.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.1 PVC SWR pipe (Soil line) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia. 518.65 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 75 mm dia. 406.75 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.2 PVC Ventilating shaft with cowl 439.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.1 Gully Trap using Chamber burnt bricks 23 x 11.2 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.2 Gully Trap using chamber burnt bricks of size 23x11.4x7.5cm 1212.57 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.3 Gully Trap using Chamber burnt bricks 23 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.4 Gully Trap using Chamber burnt bricks 22 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.5 Gully Trap using Kiln burnt country bricks 22 x 11 x 7 1212.57 Each 5.00 0.00 8.00 0.00 6.00 30.00 0.00 6.00 0.00 49.00 0.00 0.00 0.00 49.00
cm.
59.6 Gully Trap using Kiln burnt country bricks 22 x 11 x 5.7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
60.0 PVC Nahani trap (4way/2way) 129.20 Each 4.00 0.00 12.00 0.00 40.00 200.00 0.00 30.00 0.00 246.00 0.00 0.00 0.00 246.00
61.1 Stoneware pipe 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm S.W. pipe 362.90 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm S.W. pipe 490.23 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
61.2 Stoneware pipe dry condition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
a. 100 mm dia 172.33 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 5169.90 30.00
b. 150 mm dia 259.05 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
62.1 Stoneware bend 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 96.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 132.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
62.2 Stoneware Tee 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
a. 100 mm dia 121.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 486.00 4.00
b. 150 mm dia 156.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
63.0 32 mm dia PVC waste pipe 31.87 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electrical arrangements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 240
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
64.0 a. Light point with ceiling rose 1070.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Calling bell point with Buzzer/Calling bell 1102.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
65.0 Fan point 1126.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
66.0 Staircase light point 1973.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
67.0 5 amps 5 pin Plug point (Switch board itself) 540.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
68.0 5 amps 5 pin Plug point (Convenient places) 752.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
69.0 15 Amp. Power plug 125.00 Each 3.00 0.00 9.00 0.00 16.00 80.00 0.00 12.00 0.00 104.00 0.00 0.00 0.00 104.00
70.1 Bulk head fitting 401.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.2 S & F of Tube light with fittings Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.3 S & F of 40/ 60 w bulb 12.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.4 S & F of plastic shade 10.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
71.0 Double pole main switch 562.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
72.0 Box type Fibre Fan hook 33.90 Each 8.00 0.00 24.00 0.00 48.00 240.00 0.00 36.00 0.00 308.00 0.00 0.00 0.00 308.00
73.10 6 way - D.B. 3737.00 Each 0.00 0.00 8.00 40.00 0.00 6.00 0.00 46.00 0.00 0.00 0.00 46.00
73.2 4 way - D.B. 3000.00 Each 1.00 0.00 3.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00
74.0 Charges for fixing of "Fan" 347.00 Each 5.00 0.00 12.00 0.00 32.00 160.00 0.00 24.00 0.00 201.00 0.00 0.00 0.00 201.00
75.0 Supply and delivery of Fan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 48" (1200 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 42" (1050 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
76.0 8 SWG wire 18.00 Rmt 10.00 0.00 10.00 0.00 15.00 75.00 0.00 15.00 0.00 110.00 0.00 0.00 0.00 110.00
77.0 Run of main 2 wires of 1.50 Sqmm. 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
77.1 Run of 2 wires of 4 sqmm with continuous earth by means of 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.5sqmm
77.2 S & F of A/C metal clad switch 500.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
77.3 S&F of TV/Telephone line Socket 75.00 Each 4.00 0.00 12.00 0.00 24.00 120.00 0.00 18.00 0.00 154.00 0.00 0.00 0.00 154.00
77.4 S&F of 20mm dia PVC pipe for TV/Telephone line 58.07 Rmt 20.00 0.00 60.00 0.00 288.00 1440.00 0.00 216.00 0.00 1736.00 0.00 0.00 0.00 1736.00
78.0 Earthing Station IS3043 (Type I) 2010.00 Each 1.00 0.00 1.00 0.00 1.00 5.00 0.00 1.00 0.00 8.00 0.00 0.00 0.00 8.00
78.1 Earthing Station (Type II) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
79.1 1 No.of 30Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
79.2 3 Nos.of 30Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
80.0 375 x 300 x 20 mm T.W. plank 592.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
81.0 Meter cupboard 1959.10 Sqm 0.30 0.00 1.00 0.00 3.00 15.00 0.00 2.00 0.00 18.30 0.00 0.00 0.00 18.30
82.0 Street lights 2168.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
83.0 M.S Angle 146.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
84.0 Run of 2 wires of 4 sqmm Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
85.0 Supply of G.I pipe 25mm dia 123.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
86.0 Anti termite treatment 34.00 Sqm. 83.50 0.00 73.20 0.00 129.30 646.50 0.00 129.30 0.00 932.50 0.00 0.00 0.00 932.50
87.0 ELCB Single phase 2343.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
112.0 S & F of Exsaust Fan 300 mm dia 1683.71 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.0 Anticorrosive treatment for steel grills 3769.50 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.I Precast Cupboard slab 20 mm tk.using 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
standardised concrete mix M20 (annexure)
a. In Ground floor 838.75 Sqm. 12.00 0.00 10.10 0.00 27.70 138.50 0.00 27.70 0.00 188.30 0.00 0.00 188.30
b. In First floor 841.46 Sqm. 0.00 10.10 0.00 27.70 138.50 0.00 27.70 0.00 176.30 0.00 0.00 0.00 176.30
c. In Second floor 844.17 Sqm. 0.00 10.10 0.00 27.70 138.50 0.00 27.70 0.00 176.30 0.00 0.00 176.30
d. In Third floor 846.88 Sqm. 0.00 0.00 27.70 138.50 0.00 0.00 138.50 0.00 0.00 138.50
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 241
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
e. In Fourth floor 849.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tkusing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
standardised concrete mix M20 (annexure)
a. In Foundation & basement 934.85 Sqm. 5.00 0.00 2.80 0.00 8.10 40.50 0.00 8.10 0.00 56.40 0.00 5.10 4767.74 61.50
b. In Ground floor 937.60 Sqm. 0.70 0.00 1.00 0.00 2.10 10.50 0.00 2.10 0.00 14.30 0.00 0.00 14.30
c. In First floor 943.01 Sqm. 0.00 2.00 0.00 2.10 10.50 0.00 2.10 0.00 14.60 0.00 0.00 14.60
d. In Second floor 948.42 Sqm. 0.00 2.00 0.00 2.10 10.50 0.00 2.10 0.00 14.60 0.00 0.00 0.00 14.60
e. In Third floor 953.83 Sqm. 0.00 0.00 2.10 10.50 0.00 0.00 10.50 0.00 0.00 0.00 10.50
f. In Fourth floor 959.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.I Precast Cupboard slab 20 mm tk.using standardised 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete mix M30 (annexure)
a. In Ground floor 848.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 851.46 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 854.17 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 856.88 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 859.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tkusing standardised 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete mix M30 (annexure)
a. In Foundation & basement 954.85 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground floor 957.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First floor 963.01 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second floor 968.42 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 973.83 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth floor 979.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Precast Jally ventilator 50mm tk.using standardised concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mix M30 (annexure) without vibrating charges
a. In Ground floor 1701.38 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1706.42 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1711.46 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1716.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1721.54 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Precast Jally ventilator 50mm tk.using 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
standardised concrete mix M20 (annexure) without
vibrating charges
a. In Ground Floor 1682.75 Sqm. 1.00 0.00 1.10 0.00 4.00 20.00 0.00 4.00 0.00 26.10 0.00 0.00 0.00 26.10
b. In First floor 1687.79 Sqm. 2.00 0.00 1.50 0.00 4.00 20.00 0.00 4.00 0.00 27.50 0.00 0.00 0.00 27.50
c. In Second floor 1692.83 Sqm. 0.00 1.50 0.00 4.00 20.00 0.00 4.00 0.00 25.50 0.00 0.00 0.00 25.50
d. In Third floor 1697.87 Sqm. 0.00 0.00 4.00 20.00 0.00 2.10 0.00 22.10 0.00 0.00 0.00 22.10
e. In Fourth floor 1702.91 Sqm. 0.00 0.00 2.10 10.50 0.00 0.00 10.50 0.00 0.00 0.00 10.50
f. In Fifth floor 0.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.1 Standardised concrete Mix M20 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. In Foundation and basement 5310.53 Cum 12.50 0.00 27.90 0.00 45.10 225.50 0.00 45.10 0.00 311.00 0.00 35.50 188523.82 346.50
8.1 b. Ground Floor 5378.53 Cum 19.20 0.00 23.70 0.00 33.70 168.50 0.00 33.70 0.00 245.10 0.00 0.00 0.00 245.10
c. In First Floor 5512.53 Cum 5.10 0.00 23.70 0.00 33.90 169.50 0.00 33.90 0.00 232.20 0.00 0.20 1102.51 232.40
d. In Second Floor 5646.53 Cum 0.00 28.10 0.00 33.90 169.50 0.00 35.80 0.00 233.40 0.00 0.00 0.00 233.40
e. In Third floor 5780.53 Cum 0.00 4.10 0.00 35.80 179.00 0.00 7.90 0.00 191.00 0.00 1.80 10404.95 192.80
f.In fourth floor 5914.53 Cum 0.00 0.00 7.90 39.50 0.00 0.00 39.50 0.00 8.00 47316.24 47.50
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 242
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
4.1.1 Standardised concrete Mix M30 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation and basement 5805.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor 5873.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor 6007.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor 6141.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 6275.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RCC M30 mix using hard broken stone jelly for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
foundation and basement
a. Foundation & basement 5805.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.Stilt floor 5873.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cement Concrete using desing mix of grade M25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete
a. In Foundation and basement 5719.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Stilt /Ground Floor 5787.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor 5921.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor 6055.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 6189.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor 6323.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In Fifth Floor 6457.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor 6591.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor 6725.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor 6859.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor 6993.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l.in Tenth floor 7127.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 7261.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 7395.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In Thirteen floor 7529.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
g. In Fifth Floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l.in Tenth floor 5584.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt bricks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm tk (B.P.)
g. In Fifth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
h. In Sixth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
i. In Seventh Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! *
j.in Eighth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
k.in Ninth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
g. In Fifth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 243
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
h. In Sixth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
i. In Seventh Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
j. In Eighth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
k.in Ninth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
Supply and laying of Hard core layer 200mm 2796.22 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and filling stonedust 136.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plastering with CM 1:3, 12mm with WPC 168.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 550.00 92746.50 550.00
Supplying and filling with gravel 287.16 Cum 52.00 0.00 42.90 0.00 50.50 252.50 0.00 50.50 0.00 397.90 0.00 0.00 0.00 397.90
B.W in CM 1:4 in Superstructure in First floor #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.20 #VALUE! 1.20
B.W in CM 1:4 in Superstructure in second floor #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.80 #VALUE! 10.80
d) In Third floor
B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 #VALUE! 48.00
e) In fourth floor
Earth work excavation in Loose / sandy soils (including 91.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
Earth work excavation in Loose / sandy soils (excluding 42.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for open foundation
Earth work excavation in Loose / sandy soils (excluding 63.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for drain
3.80 P.C.C. 1:3:6 using 20 mm broken brick jelly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3862.79 Cum
4.80 P.C.C. 1:4:8 using 40 mm broken brick jelly
#VALUE! Cum
8.4 Providing earth quake resistant for Corner walls 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Foundation & basement 4756.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Ground Floor 4824.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. First Floor 4958.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Second Floor 5092.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.5 Providing earth quake resistant for Door/window Jambs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Ground Floor 436.22 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. First Floor 438.52 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Second Floor 440.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9.3.1 Providing Bored pile using design mix M20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.450mm dia 2250.94 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head to the required cut of level and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clearing way debries with an average lead of 3 km entirely
with city limits
450mm dia pile 619.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Conducting routine vertical compression load test CER 70000.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.328/2014-15
Mobilization charges including transporting to site CER
No.328/2014-15
50000.00 Set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Red oxide plastering in CM 1:4 #VALUE! Sqm #VALUE! #VALUE! 0.00 #VALUE! #VALUE! 0.00 #VALUE! 0.00 #VALUE! 0.00
18.1 Formwork using M.S.Sheet 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
a.For Column footings,plinth beam,Grade 498.94 Sqm 85.90 42858.95 144.80 72246.51 168.70 843.50 420855.89 168.70 84171.18 1242.90 620132.53 18.40 9180.50 1261.30
beam,Raftbeam,Raft slab etc.,
b.Plain surfaces such as Roof 573.61 Sqm 218.10 125104.34 447.50 256690.48 1102.50 5512.50 3162025.13 842.00 482979.62 7020.10 4026799.56 145.52 83471.73 7165.62
slab,floorslab,Beams,lintels,lofts,sill
slab,staircase,portico slab and other similar works
c.For Square and rectangular columns and small 688.33 Sqm 109.50 75372.14 273.50 188258.26 493.30 2466.50 1697765.95 399.60 275056.67 3249.10 2236453.00 0.00 0.00 3249.10
quantities
d.Vertical wall 630.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.Circular column 1376.66 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 244
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
f.Curved surface 860.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.60 65047.75 75.60
g.Double centering portico area 1147.22 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.6 R.C.C.Door frames of size 100 x 75mm with one 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
edge grooves size 't' x 20 mm using M20 grade
( with out vibrating charges)
a. 900 x 2100 mm 1708.84 Each 2.00 3417.68 6.00 10253.04 16.00 80.00 136707.20 12.00 20506.08 100.00 170884.00 0.00 0.00 100.00
c. 1200 x 2100 mm 2078.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 750 x 2100 mm 1683.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Teak wood "Window" & Ventilator Shutter with 4mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thick pin headed glasses
a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (75 x 75 cm) 2203.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3.2 MDF board (18mm thick) double leaf shutters with TW frame 1924.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for cup board/ ward robes.
T.W. frame & TW styles & rails with BWR double leaf 3441.72 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters for cup board/ ward robes including two coat
enamel paint & one coat primer.
22.8 MDF board door shutters (35mm thick) exterior grade both 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
side laminated with external lipping.
a. 1000X2100mm. 2838.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900X2100mm. 2876.47 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.1200X2100mm. Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW panelled door shutter with brass fittings. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. 1000X2100mm.(Single leaf) 5106.22 Sqm 1.90 9701.82 5.60 28594.83 14.80 74.00 377860.28 11.10 56679.04 92.60 472835.97 0.00 0.00 92.60
b.1200x2400mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1200X2100mm.(Single leaf) 4396.30 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900X2100mm (over all size 900X2400mm.). 4172.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.1800X2400mm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW double leaves shutter of size with brass fittings 4926.21 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.1800 x 2100mm
a. 1500X2100mm.(Double leaves) with Brass fittings 5232.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW panelled door double leaves shutter with brass fittings of 5584.12 Sqm
size . 1200X2100mm.( Crime & Traffic)
TW panelled door double leaves shutter with brass fittings of 4698.76 Sqm
size . 2000X2100mm.
TW styles & rails with 9mm thick BWR single leaf 2930.58 Sqm 3.30 9670.91 9.90 29012.74 26.30 131.50 385371.27 19.70 57732.43 164.40 0.00 0.00 0.00 164.40
shutters with brass screws size of 900x2100 mm
TW styles & rails with 9mm thick BWR single leaf shutters 3330.03 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with brass screws size of 750x2100 mm
TW styles & rails with 9mm thick BWR single leaf shutters 2824.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with brass screws size of 1000 x 2100 mm
TW styles & rails with 9mm thick BWR Double leaves Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1500x2100 mm
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 245
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
TW styles & rails with 9mm thick BWR single leaf shutters 2644.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with brass screws size of 1200x2100
21.5.2 Supply and Fixing Soild PVC door Shutter with frame 2670.00 Sqm 3.20 8544.00 9.50 25365.00 25.20 126.00 336420.00 18.90 50463.00 157.60 0.00 0.00 157.60
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 246
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
23.2.1 4mm thick pin headed Glass panels with Aluminium 639.50 Sqm 11.00 7034.50 36.50 23341.75 60.00 300.00 191850.00 45.00 28777.50 392.50 0.00 0.00 0.00 392.50
beedings
Cuddappa slab 20 mm tk.for kitchen hearth slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 478.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 481.18 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 483.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 486.54 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 489.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 20 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 480.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 482.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 488.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 493.64 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 499.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for Sunshade. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.8 Glazed tiles using Grout (Tile Joint Filler) 937.59 Sqm 26.00 24377.34 85.50 80163.95 256.00 1280.00 1200115.20 192.00 180017.28 1583.50 0.00 0.00 0.00 1583.50
Floor ceramic tiles using Grout (Tile Joint Filler). 833.48 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.9 Floor ceramic tiles (Anti-skid) using Grout (Tile Joint 833.48 Sqm 5.50 4584.14 17.00 14169.16 44.80 224.00 186699.52 33.60 28004.93 280.10 0.00 0.00 0.00 280.10
Filler).
38.4 Two coat of cement paint over one coat white cement 80.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 550.00 44055.00 550.00
38.5 Matt paint 111.41 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.6 One coat white cement for new walls and other similar 36.99 Sqm 280.30 10368.30 326.00 12058.74 1775.30 8876.50 328341.74 1405.00 51970.95 10887.80 0.00 550.00 20344.50 11437.80
works.
42.0 Fabrication of Mild steel / RTS grills 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash) for all sizes of rods.
43.0 Fabrication of Mild steel / RTS grills (without cement 61875.00 MT 4.941 305724.38 11.1540 690153.75 22.441 112.205 6942684.38 17.496 1082565.00 145.796 0.00 3.6140 223616.25 149.410
slurry) for all sizes of rods.
44.6 PVC SWR 110 mm dia with ISI mark type- A for Rain 273.87 Rmt 7.50 2054.03 28.40 7777.91 43.50 217.50 59566.73 38.30 10489.22 291.70 0.00 0.00 0.00 291.70
water down fall pipe
50.6 Precast slab 50 mm tk.in C.C. 1:3:6 with fibre 276.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 69796.44 252.00
52.4 20mm dia PVC water supply ASTM pipe (fully 149.18 Rmt 17.00 2536.06 60.00 8950.80 172.00 860.00 128294.80 129.00 19244.22 1066.00 0.00 0.00 0.00 1066.00
consealed in walls)
53.4 S&F of C.I Manhole cover 60 x 60 cm (50kg weight ) 1725.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 89700.00 52.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 247
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
Wash Hand Basin of size 550 x 400 mm 2526.82 Each 2.00 5053.64 6.00 15160.92 16.00 80.00 202145.60 12.00 30321.84 100.00 0.00 0.00 0.00 100.00
54.3 Supplying and fixing of Brass Chromium plated screw 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
down tap 15mm dia (heavy type not less than 430 grms
weight) with ISI mark.
56.3 S & F of Indian Water closet white glazed (Oriya type) of size 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
580 x 440mm - in G.F.
56.4 S & F of Indian Water closet white glazed (Oriya type) of size 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
580 x 440mm - Other than G.F.
58.3 PVC SWR pipe (Soil line) with ISI mark - type 'B'. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. 110 mm dia. 518.65 Rmt 12.00 6223.80 30.00 15559.50 129.00 645.00 334529.25 109.00 56532.85 796.00 0.00 0.00 0.00 796.00
b. 75 mm dia. 406.75 Rmt 20.00 8135.00 25.50 10372.13 173.00 865.00 351838.75 148.00 60199.00 1058.50 0.00 0.00 0.00 1058.50
58.4 Supplying, Laying & Concealing the 50mm dia PVC 81.20 Rmt 11.00 893.20 8.00 649.60 40.00 200.00 16240.00 30.00 2436.00 249.00 0.00 0.00 0.00 249.00
( SWR) pipe with ISI mark type - 'B' with relevant
specials.
58.5 PVC(SWR) pipe with ISI mark - type 'A' for Ventilating 439.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 439.40 1.00
shaft with cowl
Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
multi strand fire retardant flexible copper cable
with ISI mark confirming IS: 694:1990.( Ordinary)
a. Light point with ceiling rose 1070.00 Each 12.00 12840.00 21.00 22470.00 76.00 380.00 406600.00 58.00 62060.00 471.00 0.00 0.00 0.00 471.00
b. Light point without ceiling rose 1074.00 Each 10.00 10740.00 31.00 33294.00 82.00 410.00 440340.00 62.00 66588.00 513.00 0.00 0.00 0.00 513.00
c. Calling bell point with Buzzer/Calling bell 1102.00 Each 1.00 1102.00 3.00 3306.00 8.00 40.00 44080.00 6.00 6612.00 50.00 0.00 0.00 0.00 50.00
65.1 Wiring with 1.5 sqmm PVC insulated single core multi 1126.00 Each 5.00 5630.00 12.00 13512.00 32.00 160.00 180160.00 24.00 27024.00 201.00 0.00 0.00 0.00 201.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Fan point.
66.1 Wiring with 1.5 sqmm PVC insulated single core multi 1973.00 Each 2.00 3946.00 4.00 7892.00 5.00 25.00 49325.00 4.00 7892.00 35.00 0.00 0.00 0.00 35.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Staircase Light Point.
Wiring with 1.5 sqmm PVC insulated single core multi 540.00 Each 7.00 3780.00 21.00 11340.00 48.00 240.00 129600.00 36.00 19440.00 304.00 0.00 0.00 0.00 304.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Switch Board Itself.
68.2 Wiring with 1.5 sqmm PVC insulated single core multi 752.00 Each 5.00 3760.00 15.00 11280.00 40.00 200.00 150400.00 30.00 22560.00 250.00 0.00 0.00 0.00 250.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Convenient Places.
70.5 S & F of Tube light fitting (patty type ) with Electronic ballast 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and 36 W slim tube light
496.00 Each
Supply and delivery of 48" (1200 mm) Fan with ISI 1238.30 Each 5.00 6191.50 12.00 14859.60 32.00 160.00 198128.00 24.00 29719.20 201.00 0.00 0.00 0.00 201.00
mark with Eletronic Dimmer
Run of 2 Wires of 4 sqmm PVC insulated single core 186.00 Rmt 23.00 4278.00 78.00 14508.00 124.00 620.00 115320.00 84.00 15624.00 805.00 0.00 0.00 0.00 805.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 248
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
77.5 Run of 2 Wires of 1.5 sqmm PVC insulated single core multi 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
Run of 2 Wires of 4 sqmm PVC insulated single core 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.
4 x 4 Sq mm copper PVC insulated unsheathed single 197.00 Rmt 20.00 3940.00 105.00 20685.00 80.00 400.00 78800.00 60.00 11820.00 585.00 0.00 0.00 0.00 585.00
core cable for 3 phase EB service connection
Run of 2 Wires of 2.5 sqmm PVC insulated single core multi 155.00 Rmt 19.00 2945.00 57.00 8835.00 152.00 760.00 117800.00 114.00 17670.00 950.00 0.00 0.00 0.00 950.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
Run of 4 Wires of 6 sqmm PVC insulated single core multi 336.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand
112.1 S & F of Exsaust Fan 225mm dia 1538.71 Each 1.00 1538.71 3.00 4616.13 8.00 40.00 61548.40 6.00 9232.26 50.00 0.00 0.00 0.00 50.00
Compact Fluoresent Lamp (CFL) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 14W bulb for Bath & WC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
130.00 Each
b. 18w bulb for Bulk Head fittings 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
170.00 Each
S & F of Bulk head fitting suitable for CFL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
443.00 Each
44.2 Rain water harvesting using defunct borewell and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
providing perforated cover slab
a). Providing pit 1164.91 Each 2.00 2329.82 2.00 2329.82 2.00 10.00 11649.10 2.00 2329.82 16.00 0.00 0.00 0.00 16.00
b) Augering 30cm dia 288.72 Rmt 6.00 1732.32 6.00 1732.32 6.00 30.00 8661.60 6.00 1732.32 48.00 0.00 0.00 0.00 48.00
257.1 S&F of M.S. Angle of size 35x35x5mm for staircase steps 185.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
344.2 S&F of Bevelled edge mirror 500 x 400 x 5.5mm 355.00 Each 2.00 710.00 6.00 2130.00 16.00 80.00 28400.00 12.00 4260.00 100.00 0.00 0.00 0.00 100.00
383 S&F of Cuddapah sink 600 x 600 x 200mm 944.00 Each 1.00 944.00 3.00 2832.00 8.00 40.00 37760.00 6.00 5664.00 50.00 0.00 0.00 0.00 50.00
383.1 Providing nosing to the edges of Granite slab 235.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of PVC water supply (ASTM) 210.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.50mm dia
384 S&F of PVC flushing cistern 1231.00 Each 1.00 1231.00 3.00 3693.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00
385 S&F of cloth drying arrangement 612.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.1 Anticorrosive treatment for window grills 2010.25 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of 32 AMPS Triple pole main 1340.00 Each 2.00 2680.00 4.00 5360.00 9.00 45.00 60300.00 7.00 9380.00 58.00 0.00 0.00 0.00 58.00
switch
450 x 375 x 20 mm thick TW plank 990.00 Each 2.00 1980.00 3.00 2970.00 10.00 50.00 49500.00 8.00 7920.00 63.00 0.00 0.00 0.00 63.00
3 Nos.of 32Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Nos.of 32Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and delivery of Three phase ELCB/RCCB 2695.00 Each 1.00 2695.00 3.00 8085.00 8.00 40.00 107800.00 6.00 16170.00 50.00 0.00 0.00 0.00 50.00
Supply of G.I pipe 40mm dia 'B' Class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plastic Emulsion PAINT including primer for outer walls 151.87 Sqm 289.50 43966.37 423.90 64377.69 892.20 4461.00 677492.07 761.10 115588.26 5935.50 0.00 0.00 0.00 5935.50
Two coat of OBD over one coat white cement for inner 75.46 Sqm 280.30 21151.44 326.00 24599.96 1775.30 8876.50 669820.69 1405.00 106021.30 10887.80 0.00 0.00 0.00 10887.80
walls
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 249
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
2 x 4 Sqmm Copper PVC insulated unsheathed single core 1 110.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KV grade cable for EB service single phase.
40 mm dia GI pipe "B"class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 No.of 32 Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P. C.C. 1:3:6 for foundation & basement using 40mm metal 3862.79 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Providing PVC Tee with end cap 87.00 Each 3.00 261.00 9.00 783.00 24.00 120.00 10440.00 18.00 1566.00 150.00 0.00 0.00 0.00 150.00
Granite Tiles flooring (Ruby red) 1207.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Providing wooden Melamine polish for new wood work 997.28 Sqm 4.80 4786.94 14.200 14161.38 37.80 189.00 188485.92 28.40 28322.75 236.40 0.00 0.00 0.00 236.40
Supplying and fixing of staineless steel hand rails 4500.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Vitrified Tiles flooring (ivory) 908.64 Sqm 58.20 52882.85 148.00 134478.72 346.40 1732.00 1573764.48 259.80 236064.67 2198.00 0.00 0.00 0.00 2198.00
Vitrified Tiles flooring 1084.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
s Concrete designer tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eurocon Tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Aluminium sliding window
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.1.80 x 1.35 (Three track) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.1.35 x 1.35 (three track) 3873.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) size 1800x1350 SW1 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b)1200x1350 SW2 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for officers)
supplying and fixing of colour matt finish floor tiles of size 2433.47 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for wall tiles)
Supplying and fixing of wall panneling using Aluminium 3034.40 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame with MDF board
4.4 Supply of material and lab ourfor Mineralfbre 915.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mmx600mm Grid false ceiling work
Supplying, fabricating, erecting and fixing Gyp board false 990.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ceiling using perforated sheet 10mm thk
Supplying and fixing of 100mm dia GI pipe 905.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Geyser (Data -SD 103) 8467.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of CP wall mixer two in one (without 3409.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
telephone shower) including cost of all materials and all
labour charges etc complete.
CER No.178/13-14
Supplying and fixing of shower arm 9" long including cost of 469.42 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
all materials and all labour charges etc. complete
CER No.178/13-14
Supplying and fixing of GM wheel valves ISI mark 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.100mm GM Gate valves 5640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.50mm GM Gate valves 1340.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.32mm GM Gate valves 604.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990. (Modular)
a. Light point with ceiling rose 1000.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 1003.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand 769.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point
@ Convenient Places.
Wiring with 1.5 sqmm PVC insulated single core multi strand 536.55 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point
@ Switch Board Itself.
Supplying and laying of 3.5 core 70 sq.mm PVC armoured 627.40 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LTUG cable (below GL)
S&F 3.5 X 70mm LTUG CABLE Above GL 435.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 250
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
S&F 3.5 X 35mm LTUG CABLE Above GL 356.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 3.5 X 25mm LTUG CABLE Above GL 317.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 2X6 Sq.mm LTUG CABLE 176.84 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of brass cable gland suitable for 3.5 293.25 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
core 70 Sqmm PVC armoured LTUG cable SD 189
Supply & Fixing of Aluminium openable windows of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FW 1.80 x 1.65 m 4801.98 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
W 1.50 x 1.35 m 4228.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
W 1.20 x 1.35 m 3911.50 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KW 1.20 x 1.05 m 4227.94 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
W 2 .0.75 x 1.35 m 3637.07 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1.50 x 1.35 mt.window 4228.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 3694.20 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c 1.20 x 1.35 mt.window 3911.50 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 0.75 x 1.35 mt.window 3637.07 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cochin House
a. 1.80 x 1.35 mt.window Three leaves 3987.65 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of SS Soap Tray including cost of all 704.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
materials and all labour charges etc complete
Supplying and fixing of CP Angle valve Stop cock including 514.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cost of all materials and all labour charges etc complete
Supplying and fixing of 25x 3mm Copper flat 473.50 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of Health faucet approved quality with ISI 952.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mark
S&F TPN 12 way DB encloser (SR-p-80) 11481.80 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F TPN 8 way DB encloser 5325.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 6 way DB encloser 8254.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 4 way DB encloser 6588.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
Supply and fixing of spot light of approved make and 593.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
company with ISI CFL bulb CER No.178/13-14
S&F OF UPVC Windows 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) FW 900 X 2100 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) W 1800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c) W1 1500 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d) W0 2400 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e) W2 1200 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f) SW 4800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g) FW1 4800 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h) FW2 4200 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a)D1200 X 2400mm 8520.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) V1 900 X 600mm 3752.83 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of sodium vapour lamp with fitting 250watts 5654.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 251
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
Supplying and fixing in position of UPVC Ventilator louvered 6500.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ventilator type for all sizes
Revised SR 2018-19 p-57 it-192
Supplying and fixing in position of UPVC window of 6000.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
casement type( open) for all sizes Revised SR 2018-19 p-57
it-191
Supply and fixing of colour wash basin oval shape CER 2286.45 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/2013-14
Supplying and Fixing of Rolling shutters of all sizes (Gear 2240.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operated)( from 8m2 to 12m2 )Annex-Vi-P-45 rev SR 18-19
item -102-A-b
Supplying and fixing of solid core flush door shutter of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thickness 35mm
a. door size 1.200m x 2.100 (Double leaf) 2368.73 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. door size 1.200 m x 2.400 (double Leaf) 2960.17 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. door size 1.000 m x 2.100 (Single Leaf) 2504.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. door size 0.900 m x 2.100 (Single Leaf) 2225.27 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. door size 1.00 m x 2.400 (Single Leaf) 2499.86 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. door size 1.50 m x 2.100 (Double leaf) 2910.85 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g door size 1.50 m x 2.40 (Double leaf) 2876.99 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h door size 1.80 m x 2.40 (Double leaf) 2676.55 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h door size 1.80 m x 2.10 (Double leaf) 2738.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Providing additional strutting to centering of plain surface. 24.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of Granite slab of size 4'x2', 18 to 20mm Thick For 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
kitchen arrangements (jet black)
a. In Ground floor 1746.84 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1748.86 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1750.20 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.
S& In F
Third floor
of Granite tile of size 2'x 1', 10mm Thick For 1751.54 Sqm 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 * 0.00
kitchen arrangements (jet black)
a. In Ground floor 951.12 Sqm 3.00 2853.36 2.50 2377.80 5.80 29.00 27582.48 5.80 5516.50 40.30 38330.14 0.00 0.00 40.30
b. In First floor 952.46 Sqm 0.00 2.50 2381.15 5.80 29.00 27621.34 5.80 5524.27 37.30 35526.76 0.00 0.00 37.30
c. In Second floor 953.80 Sqm 0.00 2.50 2384.50 5.80 29.00 27660.20 5.80 5532.04 37.30 35576.74 0.00 0.00 37.30
c. In Third floor 955.14 Sqm 0.00 0.00 5.80 29.00 27699.06 0.00 29.00 27699.06 0.00 0.00 29.00
French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) 3.08 x 2.1m 2854.45 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 2.10 mt.window 3358.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 3828.85 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.50 x 2.00 mt.window sankar nagar DSP 2735.88 Sqm
Aluminum Louvered ventilators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 0.90 x 0.60 mt ventilators 3800.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 0.60 x 0.60 mt ventilators 4299.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 0.75 x 0.60 mt ventilators 4003.84 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1.0 x 0.60 mt ventilators 3800.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door (for lockup door ) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS door of Size 1000 x 2100mm 0.00 each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS door of Size 750 x 1350mm 0.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( lockup)
MS Ventilator of Size 1350 x 600mm 3004.33 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS Ventilator
MS VentilatorofofSize
Size 900
600 x 600mm
x 600mm 3752.83
3972.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * 0.00
MS Ventilator of Size 1285 x 600mm 3420.70 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 1200 x 800 mm 3613.47 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 252
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
MS ventilator of size 1000 x 800 mm 3524.29 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of 19mm dia steam pipe for down rod of fan 61.80 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(SD 106)
Supply and fixing of SS Towel rail (75cm length) CER 405.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/13-14
Supply and fixing of weld mesh of size 7.5x2.5cmx10gauge 325.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of Chicken mesh 35.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of 15mm dia Engineering Polymer Tap (long body ) 185.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for coastal area only
S & F of 15mm dia Engineering Polymer Tap short body 174.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
tap for coastal area only
S & F of CFL road way lighting luminaries suitable for fixing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36w CFL lamp
2219.00 Each
Augering 30 cm dia for compound wall 217.30 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Finshing the top of Terrace floor with one course of 1020.82 Sqm. 94.00 95957.08 95.00 96977.90 138.10 690.50 704876.21 138.10 140975.24 1017.60 1038786.43 0.00 0.00 1017.60
solar reflective Ceramic tiles without base concrete
51. 1 HDPE water tank 200 lit capacity with ISI mark 1640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UPVC Non Pressure pipe of SN8 SDR 34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
( S 16.5) as per IS 15328/2003
a. 110 mm UPVC Non Pressure pipe 335.28 Rmt 20.00 6705.60 32.00 10728.96 30.00 150.00 50292.00 30.00 10058.40 232.00 77784.96 6.00 2011.68 238.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 253
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
b. 160 mm UPVC Non Pressure pipe 596.33 Rmt 10.00 5963.30 5.00 2981.65 30.00 150.00 89449.50 30.00 17889.90 195.00 116284.35 0.00 0.00 195.00
PVC Specials as per IS 10124/1982 Part II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
a. 110 mm dia PVC bend (TWAD SR 17-18 P-19 236.00 Each 2.00 472.00 2.00 472.00 4.00 20.00 4720.00 4.00 944.00 28.00 6608.00 4.00 944.00 32.00
S.No-4 )
b. 160 mm dia PVC bend (TWAD SR 17-18 P-19 it-1.5, 998.00 Each 0.00 0.00 4.00 20.00 19960.00 4.00 3992.00 24.00 23952.00 0.00 0.00 24.00
S.No-4 )
PVC Equal Tee as per BIS 7834/1975 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
a. 110 mm dia PVC Equal tee(TWAD SR 17-18 P-19 289.00 Each 2.00 578.00 2.00 578.00 4.00 20.00 5780.00 4.00 1156.00 28.00 8092.00 0.00 0.00 28.00
S.No-9 )
788.00 0.00 0.00 20.00 15760.00 3152.00 24.00 18912.00 0.00 0.00 24.00
b. 160 mm dia PVC Equal tee(TWAD SR 17-18 P-19
Each 4.00 4.00
S.No-9 )
S & F of Indian Water closet white glazed (Oriya type) 2324.43 Each 1.00 2324.43 1.00 2324.43 2.00 10.00 23244.30 2.00 4648.86 14.00 32542.02 0.00 0.00 14.00
of size 580 x 440mm with PVC SWR grade ' P' or "S'
trap - in G.F.
S & F of Indian Water closet white glazed (Oriya type) 3706.04 Each 0.00 2.00 7412.08 6.00 30.00 111181.20 4.00 14824.16 36.00 133417.44 0.00 0.00 36.00
of size 580 x 440mm with PVC SWR grade ' P' or "S'
trap- Other than G.F.
S & F of E.W.C.(White) 500 mm with PVC SWR grade 5127.80 Each 1.00 5127.80 3.00 15383.40 8.00 40.00 205112.00 6.00 30766.80 50.00 256390.00 0.00 0.00 50.00
"P" or "S" TRAP
French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. FW (2.1 x 2.0 m ) 3 bay openable 2729.44 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.FW 1 (1.80 x 2.0 m )3 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. FW 2 (1.20 x 2.0 m ) 2 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.FW 3 (0.75 x 2.0 m ) Single bay openable 3553.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
( PVC Box , Fire Retarded Box) For Coastal only
a. Light point with ceiling rose 1266.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 1269.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Calling bell point with Buzzer/Calling bell 1298.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand 1316.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Fan point.(PVC Electrical Box )
Wiring with 1.5 sqmm PVC insulated single core multi strand 2224.56 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Staircase Light Point.(PVC Electrical Box
)
67.1 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @ Switch
Board Itself.
Wiring with 1.5 sqmm PVC insulated single core multi strand 885.64 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @
Convenient Places.(PVC Electrical Box )
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 254
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
Supplying and fixing of 15 Amps 3 pin flush type plug using 128.98 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( PVC Box , Fire Retarded Box)
Fabrication of Mild steel / RTS grills (without cement 62159.30 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
slurry) for all sizes of rods.(BINDING WIRE insulated
with PVC)
PVC SWR 110 mm dia with ISI mark type- A for Rain water 279.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
down fall pipe(UPVC SPECIAL CLAMP )
Supply and fixing in posistion of 6 rows of 10 guage GI 25.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
barbed wire 20 guage
Supply ,laying & jointing the following pipes as per 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ASTM D 1785 of schedule 40 with UPVC Specials
a. 32 mm dia 167.93 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 25 mm dia 151.97 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 20mm dia PVC water supply ASTM pipe (fully consealed in 149.18 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
walls)
Providing Colour Marble chips of size 10mm and below 254.31 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
using 70.20Kgs of cement and 15 cum of Colour Marble
chips for every 10 sqm over the existing plastered
surface ( For coastal area)
S & F of 15mm dia half turn CP long body tap 420.00 Each 2.00 840.00 6.00 2520.00 24.00 120.00 50400.00 18.00 7560.00 146.00 61320.00 0.00 0.00 146.00
S & F of 15mm dia half turn CP short body tap 372.00 Each 5.00 1860.00 6.00 2232.00 16.00 80.00 29760.00 12.00 4464.00 103.00 38316.00 0.00 0.00 103.00
S & F of MS angle of size 50x 50x 5mm 51.40 Kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Granite Tiles flooring in cm1:3,20mm thk sathali steel/ grey 1078.93 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bored cast sit piles installation of vertical cast in Situ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bored piles of following dia using Standardised concrete
mix M30 Grade) as per nagapattinam data
a.500mm dia pile 2491.96 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.450mm dia pile 2250.94 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.400mm dia pile 2034.99 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Removing of clay from pile inlucing conveyance 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
charges, loading and unloading charges etc.,all 0.00
complete
Chipping of RCC pile head of 500mm Dia of pile to the 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
required cut off level and clearing away the debris from
site with an average lead of 5 km etc.
a.500mm dia pile 764.05 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.450mm dia pile 619.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.400mm dia pile 491.17 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mobilization Charges inclusive of Transportation to site 40000.00 No 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
assembling and Dismantling the rotary pile equipment
employed for the works etc.(Qtn)
Conducting Routine vertical compression load test for 70000.00 No 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bored cast in situ RCC piles of various dia by direct
loading in accordance with IS 2911(PART IV)1985
excluding cost of pile and dismantling the same after
testing, includung finishing pile head etc.(CER
.no.60/2016-2017. Est Cochin house)
False ceiling with plain gybsum board (as per PWD SR. rate 2017-18, 713.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Anx- VI -It- 154 -a)
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990. (Open wiring)
a. Light point with ceiling rose 628.92 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 630.92 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand fire 492.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Convenient
Places.(Open wiring)
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 255
Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+
Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)
Wiring with 1.5 sqmm PVC insulated single core multi strand fire 540.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Switch Board
Itself.(Open wiring)
Wiring with 1.5 sqmm PVC insulated single core multi strand fire 709.72 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for Fan point .(Open wiring)
TW panelled door double leaves shutter with brass fittings of 5584.12 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size . 1200X2100mm.
Providing putty to the wall 59.13 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Aluminium Partition wall 1/3 5.5mm thick glass & 2/3 3627.29 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Novapan sheet 12mm thick outer top and bottom
Supply and fixing of colour matt finish door 15 microns 4803.14 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
double leaf door ( 1500 x 2100 mm)
Supply and fixing of colour matt finish door 15 microns 6362.96 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
double leaf door ( 1000 x 2100 mm)
supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" floor tiles
supplying
Supply andand fixing
fixing of
ofcolour matt finish
20 Amps DP plugfloorand
tiles socket
of size in 1251.99
1587.00 Sqm
Each 2.00 0.00
3174.00 6.00 0.00
9522.00 8.00 0.00
40.00 0.00
63480.00 6.00 0.00
9522.00 0.00
54.00 0.00
85698.00 0.00
0.00 0.00
0.00 0.00
54.00
12"x18" for wall tiles
sheet enclosure with 32 A DP MCB in Flush with wall
with earth connection ( For AC Plug ) Legrand ( MDS) /
Hager( L& T) Equivalent/ Superior variety SD -140
2017-18
Supply and Laying Rubber Moulded Hyraulic Pressed Paver 782.79 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Block 83 mm thick including labour charges for laying etc
Supplying nd laying of 1000 x 1000 x 300mm size ms 16 swg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
powder coated cable terminal box with two compartment with
necessary bus bar connected with TNEB etc., 34310.00 Each
Supplying and fixing of 200 Amps metal clad switch 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with rewirable fuse units, (Revised PWD SR 17- 8100.00 Each
18/Pg.no.80 it-J Part c)
Supply and Laying Rubber Moulded Hyraulic Pressed 782.79 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 785.00 614490.15 785.00
Paver Block 83 mm thick including labour charges for
laying etc
Supplying and fixing of 250 Watts Metal halide Flood light etc., 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8095.00 Each
c. 1000 x 2100 mm 1750.23 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 256
Total Qty.
(Buildg.+ Dev.)
Amount
118030.74
0.00
0.00
0.00
0.00
119949.60
0.00
0.00
0.00
0.00
27896.87
2755.70
0.00
0.00
11533.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
194750.95
0.00
0.00
0.00
0.00
6168.96
8352.96
551554.96
32112.22
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 257
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
62547.32
0.00
0.00
0.00
0.00
1194519.62
0.00
0.00
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 258
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1030766.54
931738.63
1008586.48
1109343.44
231595.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 259
Total Qty.
(Buildg.+ Dev.)
Amount
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 260
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10023.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 261
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 262
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
179779.95
75909.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7800.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
896442.20
8640.00
175189.02
#VALUE!
#VALUE!
0.00
0.00
#VALUE!
0.00
#VALUE!
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 263
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
65595.60
181003.82
0.00
0.00
0.00
2560862.90
#VALUE!
645107.35
28431.65
66010.42
20421.75
100595.25
0.00
0.00
0.00
64159.20
87836.74
241762.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6438.00
9880.00
5500.00
819.00
0.00
68111.20
16027.75
39613.40
13470.65
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 264
Total Qty.
(Buildg.+ Dev.)
Amount
62469.96
312723.87
0.00
43192.52
0.00
0.00
240.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59415.93
0.00
31783.20
0.00
0.00
0.00
5169.90
0.00
0.00
0.00
0.00
486.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 265
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13000.00
0.00
0.00
0.00
0.00
0.00
10441.20
171902.00
12000.00
69747.00
0.00
0.00
0.00
1980.00
0.00
0.00
0.00
11550.00
100809.52
16080.00
0.00
0.00
0.00
0.00
35851.53
0.00
0.00
0.00
0.00
31705.00
0.00
0.00
0.00
157936.63
148349.40
148827.17
117292.88
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 266
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
57493.28
13407.68
13767.95
13846.93
10015.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43919.78
46414.23
43167.17
37522.93
17880.56
0.00
1840098.65
1318277.70
1281111.97
1317900.10
1114486.18
280940.18
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 267
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 268
Total Qty.
(Buildg.+ Dev.)
Amount
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
92746.50
114260.96
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
629313.02
4110271.29
2236453.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 269
Total Qty.
(Buildg.+ Dev.)
Amount
65047.75
0.00
170884.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
472835.97
0.00
0.00
0.00
0.00
0.00
0.00
481787.35
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 270
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
420792.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 271
Total Qty.
(Buildg.+ Dev.)
Amount
251003.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1484673.77
0.00
233457.75
44055.00
0.00
423084.22
0.00
9244743.75
79887.88
69796.44
159025.88
89700.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 272
Total Qty.
(Buildg.+ Dev.)
Amount
252682.00
0.00
0.00
0.00
412845.40
430544.88
20218.80
439.40
503970.00
550962.00
55100.00
226326.00
69055.00
164160.00
188000.00
0.00
248898.30
149730.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 273
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
115245.00
147250.00
0.00
0.00
76935.50
0.00
0.00
0.00
0.00
18638.56
13858.56
0.00
35500.00
47200.00
0.00
0.00
4924.00
0.00
0.00
77720.00
62370.00
0.00
0.00
134750.00
0.00
901424.39
821593.39
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 274
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
13050.00
0.00
235756.99
0.00
1997190.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 275
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 276
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38330.14
35526.76
35576.74
27699.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 277
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1038786.43
0.00
79796.64
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 278
Total Qty.
(Buildg.+ Dev.)
Amount
116284.35
7552.00
23952.00
8092.00
18912.00
32542.02
133417.44
256390.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 279
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
61320.00
38316.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 280
Total Qty.
(Buildg.+ Dev.)
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
85698.00
0.00
0.00
0.00
614490.15
0.00
0.00
#VALUE!
file:///conversion/tmp/scratch/427787888.xls
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
GENERAL ABSTRACT
BUILDING WORKS
DEVELOPMENT WORKS
5 1.00 Over Head Water Tank 700 Litres 49 Nos #VALUE! 1unit
20 LS Provision for Unforseen item and contingencies charges@2.5% As per PWD Norms
TOTAL Rs.
Say #VALUE!
1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
CHY DISTRICT.
GENERAL ABSTRACT
Amount
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
15000.00
500000.00
Amount
250000.00
500000.00
150000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
13000.00
800000.00
500000.00
150000.00
53000.00
50000.00
#VALUE!
Lakhs
Electrical Data 2016-2017
285
Part -A
DATA - 1
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH CEILING ROSE controlled by 5 amps flush
type switch including citcuit mains, cost of all materials, specials,
etc., all complete,
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable (P-86 13.10 Rmt
it-2/b)
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark p-89 16.30 1 Rmt
part -I IX-1 b
0.015 Sqm Hylem sheet 3 mm thick with lamination p-90 it-7a part-I 537.00 Sqm
0.15 Sqm 3 mm thick laminated Hylem sheet p-83 it-7a part-I 537.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection (P-79 it-2/b)
LS Labour charges LS
LS Sundries LS
Sub - data
Electrical Data 2016-2017
286
DATA - 2
Light point with bakelite batern type holder for flats/ houses
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR
FLATS/ HOUSES controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,
Add cost of Bakelite battern type holders 10 Nos @ Rs 15.80 / Each p-77, it-22
Sundries
DATA - 3
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy
Total of Data duty with
1 excluding ISI mark with suitable size MS box of
sundries
16g thick concealed and covered with 3mm thick laminated hylem
sheet for
Deduct POINT
cost WIRING
of 10 WITH rose
Nos ceiling CALLING BELL/BUZZER WITH PUSH
TYPE SWITCH FOR ALL TYPE OF BUILDINGS including citcuit mains,
cost of all materials, specials, etc., all complete,
Deduct cost of 10 Nos 19 mm PVC junction box
Add the cost of 10 nos 15 x 10 x 7.5 cm TW box @ Rs 15.70/Each p-91, X-c part -j
Sundries
DATA - 4
FAN POINT
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for FAN POINT controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable (P-86 13.10 90 Rmt
it-2/b)
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark p-89 16.30 Rmt
part -I IX-1 b
20.00 No 19 mm PVC rigid bends - p-89 part -I IX-2b 2.60 No
10.00 No 19 mm PVC rigid tees (p-90 4b, 13.05/12=1.09) 1.09 No
10.00 No 19 mm PVC junction box ( p-90,6-b( 35.10/12=2.93) 2.93 No
10.00 No Ceiling rose p-77 it-24 13.15 No
10.00 No 5 amps flush type switch p-72, Part-C,1 a ( 184/12=15.33) 15.33 No
10.00 No MS box 200 x 150 x 75 mm part- f1c p-87 87.00 No
0.60 Sqm 3 mm thick laminated Hylem sheet p-83 it-7a part-I 537.00 Sqm
DATA - 5
STAIRCASE LIGHT POINT
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for STAIRCASE LIGHT POINT controlled by 5 amps flush type
switch including citcuit mains, cost of all materials, specials, etc., all
complete,
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
10.00 No 19 mm PVC rigid bends 2.60 No
5.00 No 19 mm PVC rigid tees 1.09 No
Electrical Data 2016-2017
288
10.00 No 5 A flush type two way switches ( Staircase switch )part c-b p-79 19.08 No
5.00 No Ceiling rose 13.15 No
5.00 No 19 mm PVC junction box 2.93 No
6.00 No MS box 150x 100 x 75 mm 53.50 No
0.09 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.25 Bag Cement 276.50 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point
DATA - 6
5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for 5 amps 5 pin PLUG SOCKET POINT AT CONVENIENT PLACES
including citcuit mains, cost of all materials, specials, etc., all
complete,
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 90 Rmt
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
20.00 No 19 mm PVC rigid bends 2.60 Dozen
10.00 No 19 mm PVC rigid tees 1.09 Dozen
1.00 No MS box 150x 100 x 75 mm 53.50 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) part - c (I a) 38.23 No
+ part - d (I a)( Rs. 184/12 + 22.90) p-79+84 part d a
15.00 No MS box 150x 100 x 75 mm 53.50 No
0.225 Sqm 3 mm thick laminated Hylem sheet 537.00 SQqm
1.25 Bag Cement 276.50 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
DATA - 7
5 AMPS 5 PIN PLUG SOCKET POINT AT SWITCH BOARD ITSELF
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for 5 amps 5 pin PLUG SOCKET POINT AT SWITCH BOARD ITSELF
including citcuit mains, cost of all materials, specials, etc., all
complete,
5.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 1 Rmt
2.50 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
1.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) part - c (I a) 38.23 No
+ part - d (I a)( Rs. 207/12 + 28.20) p-72+77
Labour charges
Sundries
Rate for 1 point
Electrical Data 2016-2017
289
DATA - 8
15 AMPS POWER PLUG
1.00 No 15 Amps 3 pin flush type plug socket Part-D1 b p-84 51.70 No
1.00 No MS box 150 x 100 x 75mm 53.50 No
0.015 Sqm 3 mm thick laminated hulem sheet 537.00 Sqm
LS Labour charges and sundries such as cement, screws etc.,
Rate for Each
DATA - 9
LIGHT POINT WITH CEILING ROSE FOR ADMINISTRATIVE
BLOCKS AND COMMUNITY CENTRE
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH CEILING ROSE FOR ADMINISTRATIVE
BLOCKS AND COMMUNITYCENTRE controlled by 5 amps flush type
switch including citcuit mains, cost of all materials, specials, etc., all
complete,
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 1 Rmt
12.00 No 19 mm PVC rigid bends 2.60 No
6.00 No 19 mm PVC rigid tees 1.09 No
1.00 No MS joint box 150 x 100 x 75 mm 53.50 No
0.015 Sqm Hylem sheet 3 mm thick with lamination 537.00 Sqm
6.00 No 5 amps flush type switch 15.33 Dozen
6.00 No Ceiling rose 13.15 No
6.00 No 19 mm PVC junction box 2.93 No
1.25 Bag Cement 276.50 Bag
6.00 No MS box 150 x 100 x 75 mm 53.50 No
0.09 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
45.00 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges LS
Sundries LS
Total for 6 Points
DATA - 10
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR
ADMINISTRATIVE BLOCKS AND COMMUNITYCENTRE controlled by 5
amps flush type switch including citcuit mains, cost of all materials,
specials, etc., all complete,
Add cost of Bakelite battern type holders 6 nos @ 15.80/Each9 (New item 22-p-77)
Sundries
DATA - 11
FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE controlled by 5 amps flush type switch including citcuit
mains, cost of all materials, specials, etc., all complete,
DATA - 12 a
STAIRCASE LIGHT POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE
Electrical Data 2016-2017
291
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for STAIRCASE LIGHT POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,
Part -B
DATA - 12
Run off mains with 2 wires of 1.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.
180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt
DATA - 13
2 X 2.5 Sq mm in fully concealed PVC conduit
Electrical Data 2016-2017
292
Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.
Sundries
DATA - 14
2 X 4 Sq mm in fully concealed PVC conduit
180.00 Rmt 4 sqmm copper PVC insulated unsheathed single core cable,P-86 it-2- 32.20 Rmt
d
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt
DATA - 15
4 X 4 Sq mm in fully concealed PVC conduit
360.00 4 sqmm copper PVC insulated unsheathed single core cable,P-86 it-2- 32.20 Rmt
d
90.00 25mm dia rigid PVC pipe heavy duty with ISI heavy duty with ISI mark 24.20 Rmt
part -I 1c P-89, Part -I
3.00 Cement 276.50 Bag
90.00 2.5 sqmm copper PVC insulated unsheathed single core cable for 20.30 Rmt
continuous earth connection (p-86, it- 2 c)
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt
Labour charges ( 1.5 x Labour charges + Labour for ducting - sub data - A)
Electrical Data 2016-2017
293
Part -C
DATA - 16
Supplying and fixing of water tight bulk head fittings with guard
suitable for 60 / 100 watts including necessary connections, cost of
materials, etc., All complete.
1.00 No Bulk head fittings P-77 it-22 263.40 No
Sundries
Labour charges
Total For 1 No
DATA - 17
Supplying and fixing of 16 amps double pole main switch with fuse
and neutral link on a suitable well varnished Teak wood board
including necessary interconnections and cost of all materials, etc.,
all complete.
1.00 No 16 Amps double pole main switch with fuse and neutral link 200.00 No
1.00 No TW board of size 31x20x6 cm with brass hinge screw hooks well 81.35 No
varnished (as per PWD Elec. Data)
Sundries for TW plugs,screws, wire and earth connection etc.,
Labour charges
Rate for 1 No
Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
Total for 4 Nos
Rate for 1 no
DATA - 19
Supplying and fixing of 32 amps double pole main switch with fuse
and neutral link on a suitable well varnished Teak wood board
including necessary interconnections and cost of all materials, etc.,
all complete.
1.00 No 32 Amps double pole main switch with fuse and neutral link 455.00 No
1.00 No TW board of size 31x20x6 cm with brass hinge screw hooks well 81.35 No
varnished
Labour charges
Rate for 1 No
DATA - 18
Supply and fixing 4 way 250 volt single phase with neutral link
metalic distribution board on suitable Teak wood board etc., all
complete including connections.
1.00 No 4 way 16 amps, way 250 volts single phase and neutral link metalic 439.00 No
distribution board p-81 7a
DATA - 19
Supplying and fixing of 16 amps triple pole main switch with fuse and
neutral link on a suitable well varnished teak wood board including
necessary interconnection and earth connection cost of all materials,
etc., all complete.
1.00 No 16 Amps triple pole main switch with fuse and neutral link 480.00 No
1.00 No TW board of size 46 x31 x 6 cm with brass hinges hooks screws well 130.00 No
varnished
Labour charges
Rate for Each
Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helpers 352.00 No
Labour for 3 Nos
Rate for 1 No
DATA - 22
Electrical Data 2016-2017
295
1.00 No 32 Amps triple pole main switch with fuse and neutral link 800.00 No
1.00 No TW board of size 46 x31 x 6 cm with brass hinges hooks screws well 130.00 No
varnished
Labour charges
DATA - 20
1.00 No Three phase distribution board with 4 way/phase and 32 A / Way with 2190.00 No
fuse and neutral link. P-81 8d
Labour charges
DATA - 24
Sundries
DATA - 22
2.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 Rmts
DATA - 23
FIXING OF TUBE FITTINGS SUSPENDED FROM CEILING
1.50 Rmt Conduit pipe 19 mm (MS) (heavy gauge)p-81 Part-H 1-b 27.20 Rmt
2.00 No Round block 75 mm dia 40 mm deep 527.00 100 Nos
2.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 Rmt
Sundries such as ball and socket arrangement, choke, nails, screws,
etc.,
Labour charges
Rate for Each
Labour Charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
3.00 No Helpers 352.00 No
Total for 10 Nos
Rate for 1 No
DATA - 24
Charges for assembling and fixing of ceiling fan of different sweep
( to be supplied by the department at free of cost ) with necessary
interconnection and fixing of fan regulator on the existing board, etc.,
all complete.
Electrical Data 2016-2017
297
1.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 tmt
Labour Charges
Sundries
DATA - 25
EARTHING & ELCB
Run of 8 SWG GI Wire
Supplying and laying of 8 SWG GI wire on walls/below ground level
with necessary 'U' nails/ earth work excavation and re- filling etc.,
including cost of all materials, all complete.
Labour charges
1.00 Wiremen Grade I 494.00 No
1.00 Helpers 352.00 No
Note:This item 30 is to run earth wire from IS:3043 earthing item 32) to be Main switch/ Panel Board/ Machinary
DATA - 26
EARTHING STATION AS PER IS/3043.
Labour charges
1.00 No Wiremen Grade I 494.00 No
1.00 No Helpers 352.00 No
DATA - 30
ELCB SURFACE TEAK WOOD BOARD
Electrical Data 2016-2017
298
Labour Charges
Rate for Each
DATA - 28
Charges for fixing single phase RCCB/ELCB ( to be supplied by the
department at free of cost ) on fully concealed suitable MS BOX with a
necessary inter connection and earth connections using copper cable
including cost of all materials, re- doing the disturbed portion etc., all
complete.
1.00 No MS BOX with cover 300 x 200 x 100 mm ( Part- F, P-87 it- d) 263.00 No
Sundries such as cement, 1.5Sqmm copper PVC insulated
unsheathed wire & earth connections etc., all complete.
Labour charges
Rate for Each
Labour Charges
1.00 Wiremen Grade I 494.00 No
3.00 Wiremen Grade II 467.00 No
1.00 Helper 352.00 No
0.50 Mason I ( it-28/37 A ,p-12) 567.00 No
Total for 10 Nos
For 1 No
DATA - 29
ELCB ( 3 PHASE ) on surface teak wood plank
Labour Charges
Rate for Each
DATA - 30
DATA - 31
Supplying and delivery of Single phase ELCB/RCCB
1.00 No 25 Amps rating single phase ELCB with 10 to 25 MA sensitivity (ISI 1440.00 No
make ) (DP) P-94 9-b havells
DATA - 32
Supplying and delivery of Three phase ELCB/RCCB
1.00 No 32 Amps rating Three phase ELCB with 20 to 30 MA sensitivity (P-94 1775.00 No
10-a)
DATA - 33
1 no of 32 amps Fuse unit
External Installation
Labour Charges
1.00 No Wiremen Grade I 494.00 No
1.00 No Wiremen Grade II 467.00 No
3.00 No Helper 352.00 No
Total for 8 Nos
Rate for 1 No
DATA - 34
3 Nos of Fuse units at EB pole
Supplying and fixing 3 No 32 Amps 500 volts grade/ well porcelin fuse
unit on suitable teak wood plank to be fixed on the top of the pole /
EB street poles with necessary clamps and including cost of materials
etc., all complete.
3.00 No 32 Amps 500 V fuse units P-81 6-b 80.70 Each
1.00 No TW plank 200 x 150 x 20 mm 56.85 No
Labour charges
Sundries such as MS clamps screws etc., LS
Rate for Each
Labour Charges
1.00 No Wiremen Grade I 494.00 No
1.00 No Wiremen Grade II 467.00 No
Electrical Data 2016-2017
300
DATA - 35
DATA
Supplying and fixing of Single phase ELCB
DATA
DATA - 36
Labour Charges
Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
Total for 3 Nos
Rate for 1 No
DATA - 37
180.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core cableP-79 2 d 32.20 Rmt
Labour charges
Labour charges
1.00 No Electrician Maistry 539.00 No
2.00 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
3.00 No Helper 352.00 No
DATA - OF
SUPPLY 38 GI PIPES FOR EB SERVICE ( SINGLE PHASE
)
DATA - 39
Supply of MS angle for EB service ( single phase )
DATA - 40
360.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core cableP-79 2 d 32.20 Rmt
DATA - 41
SUPPLY OF GI PIPES FOR EB SERVICE ( THREE
PHASE )
Labour Charges
1.00 No Electrician Maistry 539.00 No
1.00 No Wiremen Grade I 494.00 No
4.00 No Helper 352.00 No
DATA - 44
1.00 Gross M.S. Clamps/ Saddles 32mm (It- 3d p-92,part-L ) 57.10 Gross
300.00 No TW plugs 1 1/2x 1'x2"( part-J 1-e P-84 ) 272.00 1000 Nos
Labour charges
For 1 Rmt
Labour charges
For 2 day
DATA - 46
Supply and delivery of Single/ twin flurescent tubular lamp street light
fittings complete with heavy gauge aluminium sheet fabricated
canopy, treated premered and painted with stove enamelled CRCA
sheet steel control gear cum reflection tray duly finished glossy white
for optimum reflection with clear ribbed acrylic bowl fixed aluminium
frame with gasket lining secured to canopy by means of hinges on
one side and toggle catches on the other side for effective pritection
against dust and water entry, all prewired upto the terminal block
complete with all accessories, such as copper wire round ballast
capacitor, starter etc., with side entry mounting confirming to IS
DATA - 48
2.00 pair Back lamp with bolts & nuts 35.00 pair
1.00 No TW plank for fixing the fuse unit 150 x 100 x 20 mm 28.43 Each
8.00 Rmt 2.5 Sqmm PVC insulated unsheathed copper cable 20.30 90 Rmt
1.00 No Labour charges for fixing the street light fitting with the required
accessories in the E.B pole including connection etc., complete.
Sundries for painting the GI pipes, MS clamps, screws, etc., complete LS
in all respects.
DATA
Sundries
DATA - 47
Charges for fixing Mercury, Sodium Vapour lamp street light fittings
( all types ) in the existing pole with required GI pipes 'B' class and
accessories ( Street light fittings alone will be supplied
departmentally at free of cost ).
1.50 Rmt GI pipe B class of 50 mm dia (P-46 118 -ii) 197.80 Rmt
2.00 Pair Back clamps with bolts and nuts 35.00 Pair
1.00 No TW plank for fixing the fuse unit of 150 x 100 x 20 mm 28.43 No
8.00 Rmt 2.5 Sqmm PVC insulated unsheathed copper cable 20.30 90 Rmt
Electrical Data 2016-2017
305
Labour charges for fixing the street light fitting with the required
accessories in the E.B pole including connection etc., complete.
DATA - 48
Supplying and fixing of 2 Nos ( two ) of MS box of size not less than
600 x 225, 16 g with door and lock and key arrangements for
obtaining EB service connection for street lights with one box
comprising off 1 No 30 Amps 500 V fuse units, 1 No copper earth
plate with required brass bolts and nuts with washers on a suitable
size TE plank of 20 mm thick for fixing EB meter and other box
comprising of 1 No 32 Amps DPIC, 1 No 40 Amps, single pole MCB
isolator with connections. MS sheet steel enclousures, for controlling
the street lights on suitable size TW plank of 20 mm thick and
including necessary bolts and nuts in the TNEB pole with washers and
run of 4 wires of 4 Sqmm copper PVC insulated unsheathed single
core / cable in 20 mm dia 'B' grade class GI pipes with ISI mark with
necessary MS clamp with bolts and nuts with washers from the top of
E.B street pole to the MS box and including painting of MS box and GI
pipes, inter connections and including cost is all materials and labour,
to meet the requirement of TNEB and as directed by the department
officers.
DATA - 50
DATA - 51
DATA - 52
Supply and erection of Tubular lamp, using 65 mm dia GI pipe 'B' class
pipe with ISI mark of 6 mt length and 20 mm dia GI pipe 'B' class upto
2 mt with necessary reducer couplings and pipe firmly fixed with MS
plate of 45 cm x 45 cm x 6 mm thick at the bottom and MS box with
8" x 6" with locking arrangements fixed with lamp post for providing
looping in and loopin out connection to the street light fittings and
supply and fixing of 15 Amps fuse unit and 15 Amps copper neautral
link plate with brass bolts & nuts including concreting using C.C 1:2:4
using 20 mm HBSJ for 1.2 mt below Ground level and 0.3 mt above
Ground level and a diameter of 45 cm with necessary earthing civil
loop including labour charges for fixing the street light fittings. Earth
work excavation, 2 coats of painting over 1 coat of Anti corrosion
painting, welding inter connection using 1.5 sqmm copper cable etc.,
all complete and as directed by the departmental officers.
6.00 Rmt 65 mm dia GI pipe ' B' class p-46,118-i 230.80 Rmt
2.00 Rmt 20 mm dia 'B' class GI pipe p-46 it-118 iv 93.10 Rmt
1.00 No Base plate 45 cm x45 cm x 6mm thick 130.00 No
1.00 No MS box 8" x 6" with cover p-87 Fc 87.00 No
Electrical Data 2016-2017
307
0.238 Cum conrete 1:2:4 using 20 mm HBSJ ( 0.45 x 1.5 mt) 4600.00 Cum
LS Transportation charges welding GI reducer all incidential charges, LS
painting etc., all complete.
8.00 Rmt 1.50 Sqmm copper PVC insulated unsheathed single core cable. 13.10
Labour charges
Rate for Each
Labour Charges
0.50 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
2.00 No Helper 352.00 No
DATA - 56
Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
For 4 Nos
Rate for 1 No
DATA - 57
1.00 No 1200mm A.C ceiling fan (without regulator)( Part- B 1 a p-78 1090.00 No
Sundries
Sundries
Open wiring for Light point with ceiling rose for flats/ houses
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g thick
concealed and covered with 3mm thick laminated hylem sheet for
LIGHT POINT WITH CEILING ROSE controlled by 5 amps flush type
switch including citcuit mains, cost of all materials, specials, etc., all
complete,(Open wiring)
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 1 Rmt
20.00 No 19 mm PVC rigid bends 2.60 No
150.00 No Tw Plugs (p 91 p J e) 272.00 1000 nos
10.00 No 19 mm PVC rigid tees 1.09 No
10.00 No PVC joint box ( Part- I ,p90 6b) 35.10 Dozen
0.015 Sqm Hylem sheet 3 mm thick with lamination 537.00 Sqm
10.00 No 5 amps flush type switch 15.33 No
10.00 No Ceiling rose 13.15 No
1.00 Gross Brass screws 40mm p92 L 1c 65.90 Gross
72.00 No 19 mm MS clamp 47.70 Gross
1/6 Bag Cement 276.50 Bag
10.00 No TW switch box 100 x 100 x 75 mm p91 jd 13.05 No
1.00 No TW junction box 150 x 100 x 75 mm p-91 j c 15.70 No
0.10 Sqm 3 mm thick laminated Hylem sheet (10X0.1X0.1) 537.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
1/2 Litre Paint SEP p-44 it-117 211.00 Litre
10.00 Points Labour charges LS
LS Sundries 1% on materials LS
Total for 10 Points
Rate for 1 Point
Sub - data
Light point with bakelite batern type holder for flats/ houses(Open wiring)
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g thick
concealed and covered with 3mm thick laminated hylem sheet for
LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR FLATS/
HOUSES controlled by 5 amps flush type switch including citcuit
mains, cost of all materials, specials, etc., all complete,
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for POINT WIRING WITH CALLING BELL/BUZZER WITH PUSH
TYPE SWITCH FOR ALL TYPE OF BUILDINGS including citcuit mains,
cost of all materials, specials, etc., all complete,(OPEN WIRING)
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g thick
concealed and covered with 3mm thick laminated hylem sheet for
FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY CENTRE
controlled by 5 amps flush type switch including citcuit mains, cost of
all materials, specials, etc., all complete,(Open wiring)
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
10.00 No 19 mm PVC rigid bends 2.60 No
5.00 No 19 mm PVC rigid tees 1.09 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 19.08 No
5.00 No PVC round block 2.50 Each
5.00 No Ceiling rose 13.15 No
0.090 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.00 Bag Cement 276.50 Bag
6.00 No TW switch Box 150X100X65mm 15.70 Each
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for 5 amps 5 pin PLUG SOCKET POINT AT CONVENIENT PLACES
including citcuit mains, cost of all materials, specials, etc., all
complete,
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 90 Rmt
Electrical Data 2016-2017
311
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
20.00 No 19 mm PVC rigid bends 2.60 Dozen
10.00 No 19 mm PVC rigid tees 1.09 Dozen
1.00 No MS box 150x 100 x 75 mm 53.50 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) 38.23 No
15.00 No MS box 150x 100 x 75 mm 53.50 No
0.225 Sqm 3 mm thick laminated Hylem sheet 537.00 SQqm
1.25 Bag Cement 276.50 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
Labour charges
1.00 No Maistry 539.00 No
2.00 No Wiremen Grade - I 494.00 No
3.00 No Wiremen Grade - II 467.00 No
4.00 No Helper 352.00 No
Run off mains with 2 wires of 1.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC open
conduit pipe heavy duty with ISI mark including cost of all materials,
specials, etc., all complete.
180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
1.00 gross MS saddles 19mm p-92 part- L 3b 37.40 gross
300.00 Nos TW plugs 38x25x19mm p84 J e 272.00 1000Nos
2.00 Gross Brass screws 38mm 65.90 gross
Sundries
Total for 90 Metres
Rate for 1 Rmt
Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.
180.00 Rmt Add 180 mt 2.5 Sqmm copper PVC insulated unsheathed S.C. cable 20.30 Rmt
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed S.C. cable 13.10 Rmt
Sundries
Total for 90 metres
Rate for 1 Rmt
Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.
Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.
1179.00
733.50
52.00
10.90
53.50
8.06
153.30
131.50
29.30
345.63
535.00
80.55
589.50
6760.00
38.26
10700.00
1070.00
Electrical Data 2016-2017
316
539.00
988.00
1401.00
1408.00
1016.00
1408.00
6760.00
10661.74
131.50
158.00
51.76
10740.00
1074.00
10661.74
131.50
29.30
153.30
Electrical Data 2016-2017
317
395.00
90.00
157.00
30.36
11020.00
1102.00
1179.00
733.50
52.00
10.90
29.30
131.50
153.30
870.00
322.20
53.50
8.06
345.63
589.50
6760.00
21.60
11259.99
1126.00
147.27
1179.00
489.00
26.00
5.45
Electrical Data 2016-2017
318
190.80
65.75
14.65
321.00
48.33
345.63
393.00
6760.00
26.39
9865.00
1973.00
1179.00
733.50
52.00
10.90
53.50
8.06
573.45
802.50
120.83
345.63
589.50
6760.00
51.17
11280.04
752.00
65.50
40.75
38.23
375.56
19.96
540.00
Electrical Data 2016-2017
319
51.70
53.50
8.06
11.74
125.00
2250.00
1179.00
733.50
31.20
6.54
53.50
8.06
91.98
78.90
17.58
345.63
321.00
48.33
589.50
6760.00
43.29
10308.01
1718.00
Electrical Data 2016-2017
320
10264.72
78.90
94.80
33.38
10314.00
1719.00
1179.00
733.50
31.20
6.54
17.58
78.90
91.98
522.00
193.32
53.50
8.06
345.63
589.50
6760.00
39.27
10649.98
1775.00
0.78
Electrical Data 2016-2017
321
1179.00
489.00
15.60
3.27
114.48
39.45
8.79
160.50
29.00
345.63
393.00
6760.00
17.29
9555.01
3185.00
2358.00
1467.00
829.50
1179.00
6760.00
12593.50
96.50
12690.00
141.00
Electrical Data 2016-2017
322
12593.50
3654.00
2358.00
60.50
13950.00
155.00
5796.00
1467.00
829.50
1827.00
6760.00
60.50
16740.00
186.00
11592.00
2178.00
829.50
1827.00
8928.00
25.50
25380.00
282.00
Electrical Data 2016-2017
323
263.40
4.93
132.67
401.00
934.00
1056.00
1990.00
132.67
200.00
81.35
9.15
299.50
590.00
494.00
704.00
1198.00
299.50
Electrical Data 2016-2017
324
455.00
81.35
9.15
299.50
845.00
439.00
81.35
10.15
299.50
830.00
480.00
130.00
12.67
399.33
1022.00
494.00
704.00
1198.00
399.33
Electrical Data 2016-2017
325
800.00
130.00
10.67
399.33
1340.00
2190.00
383.77
26.90
399.33
3000.00
383.77
3000.00
2925.00
2190.00
Electrical Data 2016-2017
326
2.00
3737.00
7474.00
10.54
18.28
7.93
155.25
192.00
494.00
934.00
1056.00
2484.00
155.25
40.80
10.54
18.28
5.98
248.40
324.00
494.00
934.00
1056.00
2484.00
248.40
Electrical Data 2016-2017
327
9.14
333.00
4.86
347.00
494.00
467.00
704.00
1665.00
333.00
757.15
9.61
846.00
7.24
1620.00
18.00
494.00
352.00
846.00
384.75
93.10
65.90
49.10
15.00
150.00
100.00
182.00
25.80
51.60
34.90
11.85
846.00
2010.00
494.00
352.00
846.00
Electrical Data 2016-2017
328
56.85
14.65
189.50
261.00
56.85
494.00
1401.00
1895.00
189.50
263.00
20.95
253.05
537.00
494.00
1401.00
352.00
283.50
2530.50
253.05
113.71
41.79
189.50
345.00
113.71
Electrical Data 2016-2017
329
263.00
34.95
253.05
551.00
1440.00
1775.00
80.70
28.43
252.13
6.74
368.00
28.43
494.00
467.00
1056.00
2017.00
252.13
242.10
56.85
296.13
4.92
600.00
56.85
494.00
467.00
Electrical Data 2016-2017
330
1408.00
2369.00
296.13
45.60
213.20
25.00
299.50
8.70
592.00
213.20
494.00
704.00
1198.00
299.50
1440.00
366.00
537.00
2343.00
1775.00
366.00
551.00
3.00
2695.00
242.10
319.80
25.00
399.33
3.77
990.00
319.80
Electrical Data 2016-2017
331
494.00
704.00
1198.00
399.33
5796.00
358.80
100.80
89.70
3517.00
38.00
9900.30
110.00
539.00
988.00
934.00
1056.00
3517.00
120.80
2.20
123.00
142.68
2.32
145.00
Electrical Data 2016-2017
332
11592.00
358.80
201.60
134.55
5275.50
167.55
17730.00
197.00
153.90
1.10
155.00
142.68
3.32
146.00
4094.53
1024.80
3847.50
2441.00
112.17
11520.00
128.00
539.00
494.00
1408.00
2441.00
Electrical Data 2016-2017
333
57.10
137.29
81.60
63.36
8728.00
9067.35
100.75
567.00
988.00
1401.00
1408.00
4364.00
8728.00
150 WSV
2850.00
548.00
Electrical Data 2016-2017
334
3398.00
186.20
70.00
45.60
28.43
162.40
1007.67
15.70
1516.00
539.00
494.00
934.00
1056.00
3023.00
1007.67
28.43
614.00
34.40
1516.00
3.60
2168.00
296.70
70.00
45.60
28.43
162.40
Electrical Data 2016-2017
335
1007.67
14.20
1625.00
263.00
255.84
80.70
25.00
465.50
644.00
263.00
735.00
93.50
89.60
255.84
1007.67
9.35
4188.00
255.84
1467.00
Electrical Data 2016-2017
336
829.50
494.00
1016.00
1408.00
50.50
5265.00
58.50
58.50
16.30
24.20
66.40
35.10
8.06
5.84
49.00
13.05
5.37
49.50
7.08
75.00
1384.80
186.20
130.00
87.00
Electrical Data 2016-2017
337
1094.80
226.30
60.00
104.80
1885.00
5160.00
247.00
934.00
704.00
1885.00
1155.00
197.00
18.50
13.71
299.50
1683.71
494.00
704.00
1198.00
299.50
1010.00
197.00
18.50
13.71
299.50
1538.71
1090.00
148.30
1238.30
431.00
33.60
Electrical Data 2016-2017
338
192.00
1.40
658.00
269.00
33.60
192.00
1.40
496.00
1179.00
733.50
52.00
40.80
10.90
29.25
8.06
153.30
131.50
65.90
23.85
55.30
130.50
15.70
53.70
589.50
105.50
2890.67
20.29
6289.22
628.92
539.00
Electrical Data 2016-2017
339
988.00
1401.00
1408.00
4336.00
2890.67
6268.93
131.50
158.00
13.79
6309.22
630.92
6268.93
131.50
29.30
153.30
395.00
153.30
157.00
39.09
6699.22
669.92
Electrical Data 2016-2017
340
6289.22
130.50
53.70
660.00
322.20
10.01
7097.23
709.72
4258.32
1179.00
489.00
26.00
5.45
190.80
12.50
65.75
48.33
276.50
94.20
393.00
4336.00
8.47
7125.00
1425.00
1179.00
Electrical Data 2016-2017
341
733.50
52.00
10.90
53.50
8.06
573.45
802.50
120.83
345.63
589.50
2890.67
20.43
7379.97
492.00
539.00
988.00
1401.00
1408.00
4336.00
2358.00
1467.00
37.40
81.60
131.80
91.25
1179.00
2890.67
8236.72
52.28
8289.00
92.10
8289.00
Electrical Data 2016-2017
342
3654.00
2358.00
36.00
9621.00
106.90
8289.00
5796.00
2358.00
36.00
11763.00
130.70
8289.00
25776.00
5796.00
36.00
28305.00
314.50
Electrical Data 2016-2017
343
Amount
2349.22
816.54
2622.56
59.20
286.92
1578.00
325.00
325.00
800.00
Electrical Data 2016-2017
344
289.98
180.00
560.00
41.50
1685.66
585.90
13562.64
831.60
1144.80
200.00
28244.52
564.89
28809.41
1500.00
4000.00
34309.41
(OR)
34310.00
345
TOTAL RS.
RATE FOR 1.013 SQM
Rate / Sqm
#REF!
Rate / Sqm
G.F
F.F
S.F
T.F
3684.35
3637.07 Sqm
1926.02
4280.04
-----------------
480.20
2.72 10.43 482.92
5.36 19.44 488.28
5.36 19.44 493.64
5.36 19.44 499.00
5.36 1.32 504.36
84367.00 144.38 12180907.46
151826.00 496.00 75305696.00
216270.00 1238.30 267807141.00
48000.00 347.00 16656000.00
17572.00 282.00 4955304.00
32310.00 600.00 19386000.00
11400.00 130.00 1482000.00
139518.00 443.00 61806474.00
139426.00 75.46 10521085.96
81100.00 470100608.42
47880.00 10000.00
155353.00 20000.00
2615.00 28000.00
22746.00 470158608.42
6180.00 56419033.01
1620.00 526577641.43
2190.00 5265776.41
10146.00 13164441.04
6144.00 39493927.89
988.00 584501786.77 ###
352.00
1488.00
1476.00 0.00
8778.00 0.00
5472.00 0.00
912.00 0.00
450.00 1523313891.28
12084.00 6600.00
2514.00 1523320491.28
1592.00 182798458.95
2576.00 1706118950.23
1482.00 17061189.50
1798.00 42652973.76
66000.00 127959006.29
26250.00 1893792119.78 ###
2538.00
375480.00
88060.00
30000.00
21075.60
8650.40
250.00
1836929.00
220431.48
2057360.48
20573.60
20573.60
102892.32
2201400.00
2201400.00
0.00