Name of Work : Providing Bored cast-in-situ pile Pile Foundation
REVISED DATA 2017-18
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of
locations based on the 500 mm dia pile
Cum
Volume of Concrete = 3.14 /x *0.5 x 0.5 x 8 = 4.02 /4= 1.57 m3 1.570

500mm Dia pipe

1.570 Cum Standardised concrete mix using M 30 Grade concrete in (F&B) 5756.93 9038.38

0.1570 MT Bentonite (10% concrete volume) 4000.00 628.00

8.00 Rmt Labour charges 960.00 7680.00

Total for 8 Rmt 17346.38


Total for 1 Rmt 2478.05
Moving and placing of piling equipment (1000/8) 125

Total for 1 Rmt 2603.05


Rate for 1 Cum

Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
5 km entirely with city limits

Volume of Concrete = 3.14/4 x 0.5 x 0.5 x 1 km =0.196 m3


0.196

500mm Dia pipe DATA for 1 Rmt

0.196 Cum Dismantling of RCC works it-35/38 p-24 3820.00 748.72

0.196 Cum Conveyance of dismantled materials p-35 48.10 9.43

0.196 Cum Loading or unloading charges p-35 30.10 5.90

Total for 1 Rmt 764.05

Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits

Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 27.48
stone etc.Initial Lead (0-10 km)
9.16
Km 3.00 Loading or unloading charges 30.10 90.30

For 1cum 117.78

4.20 Standardised concrete Mix M30 Grade Concrete

5.000 cum 20mm HBG Machine crushed stone jelly (7730 Kg) 1369.96 6849.80

3.300 cum 10-12mm HBG Machine crushed stone jelly (5156 Kg) 1118.46 3690.92

4.790 cum Sand (7670 Kg) 521.55 2498.22

4.000 MT Cement 5530.00 22120.00

40.000 Kg Plasticiser /Super plasticiser @ 1% of cement 38.10 1524.00

3.500 Nos Mason II 508.00 1778.00

21.200 Nos Maz I 355.00 7526.00

35.300 Nos Maz II 320.00 11296.00

Total for 10 cum 0.00 57282.94


for 1 cum 0.00 5728.29 5728.29

1.000 cum Vibrating charges 48.67 48.67

Sub Total 5776.96 5728.29


LS Add for water charges & other sundries (0.5 % of sub total LS 28.88 28.64

Foundation & Basement 5805.84 5756.93


---------------------
G.F 5939.84
F.F
S.F 5993.34
T.F
Fourth Floor 6012.84
TAMILNADU POLICE HOUSING CORPORATION LIMITED
TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
DATA

Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.45
the 450 mmxdia
x 0.45 8 =pile
4.02 /4= 1.272 m3 1.272
450mm Dia pipe
1.272 Cum RCC 1:1.5:3 (F&B) 5756.93 7322.81
0.1272 MT Bentonite (10% concrete volume) 4000.00 508.80
8.00 Rmt Labour charges 960.00 7680.00

Total for 8 Rmt 15511.61


Total for 1 Rmt 2215.94
Moving and placing of piling equipment (1000/8) 125

Total for 1 Rmt 2340.94


Rate for 1 Cum

Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.45 x 0.45 5 xkm1 km
entirely with m3
=0.159 city limits 0.159
500mm Dia pipe DATA for 1 Rmt
0.159 Cum Dismantling of RCC works 3820.00 607.38
0.159 Cum Conveyance of dismantled materials p-35 48.10 7.65
0.159 Cum Loading or unloading charges p-35 30.10 4.79

Total for 1 Rmt 619.82

Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits

Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30

For 1cum 119.16

TAMILNADU POLICE HOUSING CORPORATION LIMITED


TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
DATA

Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.40
the 400 mmxdia
x 0.40 8 =pile
4.02 /4= 1.272 m3 1.272
400mm Dia pipe
1.272 Cum RCC 1:1.5:3 (F&B) 5756.93 7322.81
0.1272 MT Bentonite (10% concrete volume) 4000.00 508.80
8.00 Rmt Labour charges 960.00 7680.00

Total for 8 Rmt 15511.61


Total for 1 Rmt 2215.94
Moving and placing of piling equipment (1000/8) 125

Total for 1 Rmt 2340.94


Rate for 1 Cum

Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.40 x 0.40 5 xkm1 km
entirely with m3
=0.129 city limits 0.126
400mm Dia pipe DATA for 1 Rmt
0.126 Cum Dismantling of RCC works 3820.00 481.32
0.126 Cum Conveyance of dismantled materials 48.10 6.06
0.126 Cum Loading or unloading charges 30.10 3.79

Total for 1 Rmt 491.17

Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits

Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30

For 1cum 119.16


For RCC
Door
Frame
Thuraiyur 5

TAMIL NADU POLICE HOUSING CORPORATION,TRICHY DIVISION

ABSTRACT

Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thurai
Trichy under Ph-XXI /3000 Quarters scheme

Sl. No. Qty. Description Rate Unit

1.1 * Earth work excavation in all soils (including refilling) 0.00

0.0 876.90 a. 0 to 2 mt. 134.60 Cum.

0.0 0.00 b. 2 to 3 mt. 140.80 Cum.

1.2 0.00 Earth work excavation in all soils (excluding refilling) 0.00 0.00
0.0 0.00 a. 0 to 2 mt. 127.20 Cum.
0.0 0.00 b. 2 to 3 mt. 133.40 Cum.
1.3 * Earth work excavation in Soft disintegrated rock (including 0.00
refilling)

0.0 609.50 a. 0 to 2 mt. 196.80 Cum.


0.0 0.00 b. 2 to 3 mt. 203.00 Cum.
1.4 0.00 Earth work excavation for Open foundation (including 0.00 0.00
refilling)
0.0 0.00 a. 0 to 2 mt. 71.00 Cum.
0.0 0.00 b. 2 to 3 mt. 77.20 Cum.
1.5 * Earth work excavation for Open foundation (excluding refilling) 0.00

0.0 438.63 a. 0 to 2 mt. 63.60 Cum.


0.0 39.48 b. 2 to 3 mt. 69.80 Cum.
0.0 0.00 c. 3 to 4 mt. 76.00 Cum.
0.0 0.00 d. 4 to 5 mt. 82.20 Cum.
1.6 * Earth work excavation for Open foundation for drains (excluding 0.00 0.00
refilling) width upto 1.25 m
0.0 120.90 a. 0 to 2 mt. 95.40 Cum.
0.0 0.00 b. 2 to 3 mt. 101.60 Cum.
1.7 0.00 Earth work excavation in Soft disintegrated rock 0.00
(Excluding refilling)
0.0 0.00 a. 0 to 2 mt. 189.40 Cum.
0.0 0.00 b. 2 to 3 mt. 195.60 Cum.
1.8 0.00 Earth work excavation in SDR for Open foundation (excluding 0.00
refilling)
0.0 0.00 a. 0 to 2 mt. 94.70 Cum.
0.0 0.00 b. 2 to 3 mt. 100.90 Cum.
1.9 0.00 Providing Driven PILES 0.00 0.00
0.0 0.00 a.300mm dia 0.00 Rmt
0.0 0.00 b.330mm dia 0.00 Rmt
0.0 0.00 c.375mm dia 0.00 Rmt
Thuraiyur 6

Sl. No. Qty. Description Rate Unit

0.0 0.00 d.400mm dia 0.00 Rmt


0.0 0.00 e.450mm dia 0.00 Rmt
0.0 0.00 f.500mm dia 0.00 Rmt
2.1 359.95 Filling sand 541.05 Cum.

2.2 0.00 Sand Gravel Mix 638.04 Cum.


2.3 0.00 Supply and filling of 40 mm Brick jelly 881.41 Cum.

2.4 0.00 Supply and filling of 20 mm Brick jelly 953.41 Cum.

2.5 0.00 Gravel soling 279.91 Cum.


2.6 6.00 Supply and filling of 40 mm HBSJ 1028.16 Cum.
2.7 6.00 Supply and filling of 20 mm HBSJ 1392.16 Cum.
3.1 180.40 C.C.1:5:10 for Foundation & Basement 3057.40 Cum.

3.2 7.20 P.C.C. 1:2:4 for Foundation & Basement and other similar works 4460.03 Cum.

3.3 0.00 P.C.C. 1:8:16 using 20 mm broken brick jelly 2721.36 Cum.
3.4 0.00 Providing WBM 125 mm consolidated thick with gravel blindage 0.00 Sqm.

3.5 0.00 Surface dressing over WBM 25 mm thick 0.00 Sqm.


3.6 0.00 Providing WBM 125 mm consolidated thick with gravel blindage 142.02 Sqm.
(IRC 63 to 45mm for 75mm thick and 37.5 to 26.5mm for 50.mm
thick)

3.7 0.00 Surface dressing over WBM 25 mm tk. 134.05 Sqm.


with pre-coated chips using 11.2mm size IRC
4.1 0.00 R.C.C. 1:2:4 Foundation and Basement 5367.91 Cum.
4.2 0.00 R.C.C. 1: 11/2: 3 Foundation and Basement 5963.49 Cum.
5.0 19.60 R.R. masonry in C.M. 1:5 Foundation and Basment 3191.19 Cum.

6.1 0.00 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of size 23 4937.90 Cum.
x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
6.2 0.00 Brick work in C.M. 1:5 (F& B) using chamber Burnt bricks of size 23 4689.80 Cum.
x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
6.3 0.00 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of size 23 0.00 Cum.
x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
6.4 0.00 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of size 22 0.00 Cum.
x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
6.5 248.50 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country bricks of 4806.92 Cum.
size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")

6.6 0.00 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country bricks 0.00 Cum.
of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
7.1 0.00 Damp Proof Course 0.00 Sqm.
in C.M. 1:4, 12 MM thick mixed with Crude oil

7.2 0.00 Supply and fixing of Bituminous filler pad, 20 mm tk. for 666.00 Sqm.
expansion joint
7.3 0.00 Damp Proof Course in C.M. 1:4, 12 MM thick mixed with #VALUE! Sqm.
Water proofing compound
Thuraiyur 7

Sl. No. Qty. Description Rate Unit

8.1 0.00 R.C.C.1:2:4 0.00 0.00


0.0 0.00 a. In Ground floor 5435.91 Cum.
0.0 0.00 b. In First floor 5569.91 Cum.
0.0 0.00 c. In Second floor 5703.91 Cum.
0.0 0.00 d. In Third floor 5837.91 Cum.
0.0 0.00 e. In Fourth floor 5971.91 Cum.
8.2 0.00 R.C.C.1: 1 1/2 :3 0.00 0.00
0.0 0.00 a. In Ground floor 6031.49 Cum.
0.0 0.00 b. In First floor 6165.49 Cum.
0.0 0.00 c. In Second floor 6299.49 Cum.
0.0 0.00 d. In Third floor 6433.49 Cum.
0.0 0.00 e. In Fourth floor 6567.49 Cum.
0.0 0.00 f. In Fifth floor 6701.49 Cum.
0.0 0.00 g. In sixth floor 6835.49 Cum.
0.0 0.00 h. In seventh floor 6969.49 Cum.
0.0 0.00 i. In eighth floor 7103.49 Cum.
0.0 0.00 j. In Ninth floor 7237.49 Cum.
0.0 0.00 k. In Tenth floor 7371.49 Cum.
0.0 0.00 l. In Eleventh floor 7505.49 Cum.
0.0 0.00 m. In Twelth floor 7639.49 Cum.
9.1 0.00 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00
x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
0.0 0.00 a. In Ground Floor 4916.34 Cum.
0.0 0.00 b. In First Floor 5006.64 Cum.
0.0 0.00 c. In Second Floor 5096.94 Cum.
0.0 0.00 d. In Third Floor 5187.24 Cum.
0.0 0.00 e. In Fourth Floor 5277.54 Cum.
9.2 0.00 Brick work in C.M. 1:6 using chamber Burnt bricks of size 23 0.00 0.00
x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
0.0 0.00 a. In Ground Floor/Stilt floor 4681.51 Cum.
0.0 0.00 b. In First Floor 4771.81 Cum.
0.0 0.00 c. In Second Floor 4862.11 Cum.
0.0 0.00 d. In Third Floor 4952.41 Cum.
0.0 0.00 e. In Fourth Floor 5042.71 Cum.
0.0 0.00 f. In Fifth floor 5133.01 Cum.
0.0 0.00 g. In sixth floor 5223.31 Cum.
0.0 0.00 h. In seventh floor 5313.61 Cum.
0.0 0.00 i. In eighth floor 5403.91 Cum.
0.0 0.00 j. In Ninth floor 5494.21 Cum.
0.0 0.00 k. In Tenth floor 5584.51 Cum.
0.0 0.00 l. In Eleventh floor 5674.81 Cum.
0.0 0.00 m. In Twelth floor 5765.11 Cum.
0.0 0.00 n. In thirteen floor 5855.41 Cum.
Thuraiyur 8

Sl. No. Qty. Description Rate Unit

9.3 0.00 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00
x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
0.0 0.00 a. In Ground Floor 0.00 Cum.
0.0 0.00 b. In First Floor 0.00 Cum.
0.0 0.00 c. In Second Floor 0.00 Cum.
0.0 0.00 d. In Third Floor 0.00 Cum.
0.0 0.00 e. In Fourth Floor 0.00 Cum.
9.4 0.00 Brick work in C.M. 1:6 using Chamber Burnt brick of size 22 0.00 0.00
x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
0.0 0.00 a. In Ground Floor 0.00 Cum.
0.0 0.00 b. In First Floor 0.00 Cum.
0.0 0.00 c. In Second Floor 0.00 Cum.
0.0 0.00 d. In Third Floor 0.00 Cum.
0.0 0.00 e. In Fourth Floor 0.00 Cum.
9.5 * Brick work in C.M. 1:6 using Kiln Burnt Country bricks of 0.00 0.00
size 22 x 11 x 7 cm ( 8 3/4" x 4 1/4" x 2 3/4")

0.0 215.40 a. In Ground Floor 4785.36 Cum.


0.0 191.10 b. In First Floor 4875.66 Cum.
0.0 203.10 c. In Second Floor 4965.96 Cum.
0.0 219.40 d. In Third Floor 5056.26 Cum.
0.0 45.00 e. In Fourth Floor 5146.56 Cum.
9.6 0.00 Brick work in C.M. 1:6 using Kiln Burnt Country bricks of 0.00 0.00
size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
0.0 0.00 a. In Ground Floor 0.00 Cum.
0.0 0.00 b. In First Floor 0.00 Cum.
0.0 0.00 c. In Second Floor 0.00 Cum.
0.0 0.00 d. In Third Floor 0.00 Cum.
0.0 0.00 e. In Fourth Floor 0.00 Cum.
10.1 0.00 Brick partition work in C.M. 1:4 0.00 0.00
Chamber Burnt brick of size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2
3/4")112 mm tk (B.P.)
0.0 0.00 a. In Foundation and basement #VALUE! Sqm.
0.0 0.00 b. In Ground Floor #VALUE! Sqm.
0.0 0.00 c. In First Floor #VALUE! Sqm.
0.0 0.00 d. In Second Floor #VALUE! Sqm.
0.0 0.00 e. In Third Floor #VALUE! Sqm.
0.0 0.00 f. In Fourth Floor #VALUE! Sqm.
10.2 0.00 Brick partition work in C.M. 1:4 using chamber Burnt bricks 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm tk (B.P.)

0.0 0.00 a. In Foundation and basement #VALUE! Sqm.


0.0 0.00 b. In Ground Floor/stilt floor #VALUE! Sqm.
0.0 0.00 c. In First Floor #VALUE! Sqm.
Thuraiyur 9

Sl. No. Qty. Description Rate Unit

0.0 0.00 d. In Second Floor #VALUE! Sqm.


0.0 0.00 e. In Third Floor #VALUE! Sqm.
0.0 0.00 f. In Fourth Floor #VALUE! Sqm.
0.0 0.00 f. In Fifth floor #VALUE! Sqm.
0.0 0.00 g. In sixth floor #VALUE! Sqm.
0.0 0.00 h. In seventh floor #VALUE! Sqm.
0.0 0.00 i. In eighth floor #VALUE! Sqm.
0.0 0.00 j. In Ninth floor #VALUE! Sqm.
0.0 0.00 k. In Tenth floor #VALUE! Sqm.
0.0 0.00 l. In Eleventh floor #VALUE! Sqm.
0.0 0.00 m. In Twelth floor #VALUE! Sqm.
0.0 0.00 n. In thirteen floor #VALUE! Sqm.
10.3 0.00 Brick partition work in C.M. 1:4 Chamber Burnt 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 110 mm tk
(B.P.)
0.0 0.00 a. In Foundation and basement 0.00 Sqm.
0.0 0.00 b. In Ground Floor 0.00 Sqm.
0.0 0.00 c. In First Floor 0.00 Sqm.
0.0 0.00 d. In Second Floor 0.00 Sqm.
0.0 0.00 e. In Third Floor 0.00 Sqm.
0.0 0.00 f. In Fourth Floor 0.00 Sqm.
10.4 0.00 Brick partition work in C.M. 1:4 0.00 0.00
Chamber Burnt brick of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4") 110 mm tk (B.P.)
0.0 0.00 a. In Foundation and basement 0.00 Sqm.
0.0 0.00 b. In Ground Floor 0.00 Sqm.
0.0 0.00 c. In First Floor 0.00 Sqm.
0.0 0.00 d. In Second Floor 0.00 Sqm.
0.0 0.00 e. In Third Floor 0.00 Sqm.
0.0 0.00 f. In Fourth Floor 0.00 Sqm.
10.5 * Brick partition work in C.M. 1:4 Kiln Burnt Country bricks of 0.00 0.00
size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 110 mm tk
(B.P.)

0.0 368.60 a. In Foundation and basement #VALUE! Sqm.


0.0 573.70 b. In Ground Floor #VALUE! Sqm.
0.0 519.10 c. In First Floor #VALUE! Sqm.
0.0 532.40 d. In Second Floor #VALUE! Sqm.
0.0 406.90 e. In Third Floor #VALUE! Sqm.
0.0 0.00 f. In Fourth Floor #VALUE! Sqm.
10.6 0.00 Brick partition work in C.M. 1:4 Kiln Burnt Country bricks of 0.00 0.00
size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 110 mm tk
0.0 0.00 a. In Foundation and basement
(B.P.) 0.00 Sqm.
0.0 0.00 b. In Ground Floor 0.00 Sqm.
Thuraiyur 10

Sl. No. Qty. Description Rate Unit

0.0 0.00 c. In First Floor 0.00 Sqm.


0.0 0.00 d. In Second Floor 0.00 Sqm.
0.0 0.00 e. In Third Floor 0.00 Sqm.
0.0 0.00 f. In Fourth Floor 0.00 Sqm.
11.1 0.00 Brick work in C.M. 1:4 Chamber Burnt brick of size 23 x 11.2 0.00 0.00
x 7 cm (9" x 4 3/8" x 2 3/4")70 mm tk (B.P.)
0.0 0.00 a. In Ground Floor #VALUE! Sqm.
0.0 0.00 b. In First Floor #VALUE! Sqm.
0.0 0.00 c. In Second Floor #VALUE! Sqm.
0.0 0.00 d. In Third Floor #VALUE! Sqm.
0.0 0.00 e. In Fourth Floor #VALUE! Sqm.
11.2 0.00 Brick work in C.M. 1:4 using chamber Burnt bricks of size 23 0.00 0.00
x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
0.0 0.00 a. In Ground Floor #VALUE! Sqm.
0.0 0.00 b. In First Floor #VALUE! Sqm.
0.0 0.00 c. In Second Floor #VALUE! Sqm.
0.0 0.00 d. In Third Floor #VALUE! Sqm.
0.0 0.00 e. In Fourth Floor #VALUE! Sqm.
11.3 0.00 Brick work in C.M. 1:4 Chamber Burnt brick: 0.00 0.00
of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)

0.0 0.00 a. In Ground Floor 0.00 Sqm.


0.0 0.00 b. In First Floor 0.00 Sqm.
0.0 0.00 c. In Second Floor 0.00 Sqm.
0.0 0.00 d. In Third Floor 0.00 Sqm.
0.0 0.00 e. In Fourth Floor 0.00 Sqm.
11.4 0.00 Brick work in C.M. 1:4 Chamber Burnt brick of size 22 x 11 x 0.00 0.00
7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)
0.0 0.00 a. In Ground Floor 0.00 Sqm.
0.0 0.00 b. In First Floor 0.00 Sqm.
0.0 0.00 c. In Second Floor 0.00 Sqm.
0.0 0.00 d. In Third Floor 0.00 Sqm.
0.0
11.5 0.00* e. In Fourth
Brick work inFloor
C.M. 1:4 Kiln Burnt Country bricks of size 22 x 0.00
0.00 Sqm.
0.00
11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)

0.0 172.90 a. In Ground Floor #VALUE! Sqm.


0.0 156.90 b. In First Floor #VALUE! Sqm.
0.0 156.90 c. In Second Floor #VALUE! Sqm.
0.0 121.00 d. In Third Floor #VALUE! Sqm.
0.0 0.00 e. In Fourth Floor #VALUE! Sqm.

11.6 0.00 Brick work in C.M. 1:4 Kiln Burnt Country bricks of size 22 x 0.00 0.00
11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 57 mm tk (B.P.)
0.0 0.00 a. In Ground Floor 0.00 Sqm.
0.0 0.00 b. In First Floor 0.00 Sqm.
Thuraiyur 11

Sl. No. Qty. Description Rate Unit

0.0 0.00 c. In Second Floor 0.00 Sqm.


0.0 0.00 d. In Third Floor 0.00 Sqm.
0.0 0.00 e. In Fourth Floor 0.00 Sqm.
12.1 * Brick partition in C.M. 1:4 using country bricks of size 22 0.00 0.00
x11x5cm 50 mm thick

0.0 44.00 a. In Ground Floor #VALUE! Sqm.

0.0 38.20 b. In First Floor #VALUE! Sqm.

0.0 39.00 c. In Second Floor #VALUE! Sqm.

0.0 27.50 d. In Third Floor #VALUE! Sqm.

0.0 0.00 e. In Fourth Floor #VALUE! Sqm.

12.2 0.00 Brick partition in C.M. 1:4 50 mm tk. (B.P.) 0.00 0.00
Kiln Burnt Country brick: 23 x 11 x 5 cm
0.0 0.00 (9"
a. Inx Ground
4 1/4" x Floor
2") 0.00 Sqm.
0.0 0.00 b. In First Floor 0.00 Sqm.
0.0 0.00 c. In Second Floor 0.00 Sqm.
0.0 0.00 d. In Third Floor 0.00 Sqm.
0.0 0.00 e. In Fourth Floor 0.00 Sqm.
0.0 0.00 0.00 0.00 0.00
13.1 451.50 Filling with Excavated Earth 22.20 Cum.

13.2 0.00 Filling with Excavated Earth Mixed with lime in the 0.00 Cum.
proporation 1:4 (one of lime & four of earth)
14.I 0.00 Precast Cupboard slab 20 mm tk. 0.00 0.00
0.0 0.00 a. In Ground floor 837.31 Sqm.
0.0 0.00 b. In First floor 840.02 Sqm.
0.0 0.00 c. In Second floor 842.73 Sqm.
0.0 0.00 d. In Third floor 845.44 Sqm.
0.0 0.00 e. In Fourth floor 848.15 Sqm.
0.0 0.00 f. In Fifth floor 850.86 Sqm.
0.0 0.00 g. In sixth floor 853.57 Sqm.
0.0 0.00 h. In seventh floor 856.28 Sqm.
0.0 0.00 i. In eighth floor 858.99 Sqm.
0.0 0.00 j. In Ninth floor 861.70 Sqm.
0.0 0.00 k. In Tenth floor 864.41 Sqm.
0.0 0.00 l. In Eleventh floor 867.12 Sqm.
14.II 0.00 Precast cupboard slab 40 mm tk. 0.00 0.00
0.0 0.00 a. In Foundation & basement 931.95 Sqm.
0.0 0.00 b. In Ground floor 934.70 Sqm.
0.0 0.00 c. In First floor 940.11 Sqm.
0.0 0.00 d. In Second floor 945.52 Sqm.
0.0 0.00 e. In Third floor 950.93 Sqm.
0.0 0.00 f. In Fourth floor 956.34 Sqm.
15.1 0.00 Cuddappa slab 20 mm tk. 0.00 0.00
Thuraiyur 12

Sl. No. Qty. Description Rate Unit

0.0 0.00 a. In Ground floor 451.56 Sqm.


0.0 0.00 b. In First floor 454.24 Sqm.
0.0 0.00 c. In Second floor 456.92 Sqm.
0.0 0.00 d. In Third floor 459.60 Sqm.
0.0 0.00 e. In Fourth floor 462.28 Sqm.
15.2 0.00 Cuddappa slab 40 mm tk. 0.00 0.00
0.0 0.00 a. In Ground floor 1325.22 Sqm.
0.0 0.00 b. In First floor 1330.58 Sqm.
0.0 0.00 c. In Second floor 1335.94 Sqm.
0.0 0.00 d. In Third floor 1341.30 Sqm.
0.0 0.00 e. In Fourth floor 1346.66 Sqm.
16.1 0.00 Precast Jally ventilator 50mm tk. 0.00 0.00
0.0 0.00 a. In Ground Floor 1684.71 Sqm.
0.0 0.00 b. In First floor 1689.75 Sqm.
0.0 0.00 c. In Second floor 1694.79 Sqm.
0.0 0.00 d. In Third floor 1699.83 Sqm.
0.0 0.00 e. In Fourth floor 1704.87 Sqm.
16.2 0.00 Supplying & fixing of Terra cotta jolly (not less than 50mm) 0.00 0.00

0.0 0.00 a. In Ground Floor 327.24 Sqm.


0.0 0.00 b. In First Floor 331.76 Sqm.
0.0 0.00 c. In Second Floor 336.28 Sqm.
0.0 0.00 d. In Third Floor 340.80 Sqm.
0.0 0.00 e. In Fourth Floor 345.32 Sqm.
16.3 0.00 Supplying & fixing of Terra cotta jolly (more than 50mm 0.00 0.00
upto 110 mm)
0.0 0.00 a. In Ground Floor 514.93 Sqm.
0.0 0.00 b. In First Floor 524.86 Sqm.
0.0 0.00 c. In Second Floor 534.79 Sqm.
0.0 0.00 d. In Third Floor 544.72 Sqm.
0.0 0.00 e. In Fourth Floor 554.65 Sqm.
17.0 0.00 Form work- Lintel (C.W. planks) 0.00 Sqm.
18.0 0.00 Form work - M.S. Sheet (slab) 0.00 Sqm.
19.0 0.00 Form work - Small quantities (M.S. Sheet) 0.00 Sqm.
20.0 0.00 Form work - Plinth beam (C.W. planks) 0.00 Sqm.
21.1 0.00 R.C.C.Door frame 0.00 0.00
0.0 0.00 a. 900 x 2100 mm 1708.84 Each
0.0 0.00 b. 700 x 2100 mm 1683.04 Each
0.0 0.00 c. 1000 x 2100 mm 1723.49 Each
21.2 * Teak wood Wrought & Put up 0.00 0.00

0.0 1.575 a. T.W. over 2 m & below 3 m 114146.00 Cum.

0.0 0.741 b. T.W. below 2 m length. 102442.00 Cum.


Thuraiyur 13

Sl. No. Qty. Description Rate Unit

21.3 0.00 PVC Door frame & shutter 1900.00 Sqm.

22.1 0.00 Teak wood panelled door shutters 0.00 0.00


0.0 0.00 a. 1000 x 2100 mm 4094.61 Sqm.
0.0 0.00 b. 900 x 2100 mm 4172.77 Sqm.
0.0 0.00 c. 700 x 2100 mm 4179.52 Sqm.
0.0 0.00 d. 1200 x 2100 mm (Single) annexure item 4677.80 Sqm.
22.2 0.00 Teak wood "Window" & Ventilator Shutter 0.00 0.00
0.0 0.00 a. Window: 135 cm ht. 2824.63 Sqm.
0.0 0.00 b. Window: 120 cm ht. 0.00 Sqm.
0.0 0.00 c. Window: 105 cm ht. 2997.68 Sqm.
0.0 0.00 d. Ventilator: (90 x 60 cm) 2223.20 Sqm.
22.3 0.00 T.W. double leaf shutters for cup board/ ward robes 0.00 Sqm.
23.1 0.00 T.W. single leaf Door shutters using 9 mm tk. phynol 0.00 Sqm.
bonded BWR plywood
0.0 0.00 a. 900 x 2100 mm 2930.58 Sqm.

23.2 0.00 Glass panels with Aluminium beedings 639.50 Sqm.

23.3 150.00 S&F of Magnetic door catches 52.00 Each

23.4 0.00 Supply and fixing of Aluminium window with 3mm thick Glass 0.00 0.00

0.0 0.00 a. 1.8 x 1.35 mt.window 12529.36 Each


0.0 0.00 b. 1.35 x 1.35 mt.window 9450.95 Each
0.0 0.00 c. 1.35 x 1.05 mt window 8138.95 Each
0.0 0.00 d. 1.2 x 1.35 mt window 7424.66 Each
0.0 0.00 e. 1.2 x 1.05 mt window #VALUE! Each
0.0 0.00 f. 1.05 x 1.35 mt window 6895.82 Each

0.0 0.00 g. 0.9 x 1.35 mt window 6365.73 Each


0.0 0.00 h. 0.9 x 1.05 mt window 5482.77 Each
0.0 0.00 i. 0.5 x 1.35 mt window 3459.15 Each
0.0 0.00 j. 0.45 x 1.35 mt window 3283.37 Each
0.0 0.00 k.0.90 x 0.60 mt.Ventilator 3800.81 Each
0.0 0.00 l. 0.60 x 0.60 mt.Ventilator 4299.61 Each

24.0 15455.90 Manufacturing & supply of steel windows (Weight basis) 58.00 Kg.

25.0 900.00 M.S.Holdfast 9.60 Each

26.0 57.30 Flooring in C.C.1:5:10 3057.40 Cum.

27.1 0.00 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum.
burnt bricks 23 x 11.2 x 7 cm.
27.2 0.00 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum.
burnt bricks 23 x 11.4 x 7.5 cm.
27.3 0.00 B.w. in C.M. 1:4 for staircase steps Chamber 0.00 Cum.
burnt bricks 23 x 11 x 7 cm.
27.4 0.00 B.w. in C.M. 1:4 for staircase steps Chamber 0.00 Cum.
burnt bricks 22 x 11 x 7 cm.
Thuraiyur 14

Sl. No. Qty. Description Rate Unit

27.5 0.00 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks #VALUE! Cum.
22 x 11 x 7 cm.
27.6 0.00 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks 0.00 Cum.
22 x 11 x 5.7 cm.
28.0 522.70 Floor plastering in C.M. 1:4, 20 mm tk. #VALUE! Sqm.

29.1 0.00 Mosaic tiles 20 cm x 20 cm x 2 cm. 0.00 Sqm.


29.2 0.00 Mosaic tiles 25 cm x 25 cm x 2 cm. 787.01 Sqm.
29.3 0.00 Floor ceramic tiles 833.48 Sqm.
29.4 0.00 Glazed tiles 937.59 Sqm.
29.5 0.00 Floor ceramic tiles (Anti-skid) 833.48 Sqm.
30.0 228.00 Ellispattern 287.70 Sqm.

31.0 63.30 Weathering course 2859.46 Cum.

32.0 0.00 Pressed tiles (23cmx23cmx20mm) mixed with Crude oil 0.00 Sqm.
32.1 0.00 Pressed tiles (23cmx23cmx20mm) mixed with Water 785.28 Sqm.
proofing compound
32.2 0.00 Pressed tiles (23cmx23cmx18mm) mixed with Water 0.00 Sqm.
proofing compound
33.0 17559.40 Plastering in C.M. 1:5, 12 mm tk. 145.84 Sqm.

34.0 1090.40 Plastering in C.M. 1:4, 12 mm tk. #VALUE! Sqm.

35.0 3816.30 Spl. Ceiling plastering in C.M. 1:3, 169.04 Sqm.


10 mm tk.

36.0 * Cement mortar Border in C.M. 1:5, 12 mm tk. 0.00 0.00

626.80 a. 150 mm wide 45.36 Rmt

0.0 2238.40 b. 75 mm wide 29.49 Rmt

0.0 930.80 c. 50 mm wide 21.94 Rmt

37.1 3832.20 White washing 3 coats (slaked) 26.25 Sqm.

37.2 0.00 Colour washing ( slaked) 0.00 Sqm.


38.1 0.00 Cement paint 121.40 Sqm.

38.2 0.00 Matt paint 111.41 Sqm.


39.0 1197.00 M.s Grills 53.60 Kg.

40.0 540.80 Painting - New "wood work" 162.42 Sqm.

41.0 2494.20 Painting - New "iron work" 96.93 Sqm.

42.0 0.00 Fabrication of Mild steel / RTS grills 0.00 0.00


(with cement slurry wash)
0.0 0.00 a. upto 16mm dia rods 62999.40 MT
0.0 0.00 b. above 16mm dia rods 62999.40 MT
43.0 0.00 Fabrication of Mild steel / RTS grills 0.00 0.00

0.0 0.00 a. upto 16mm dia rods 61875.00 MT


Thuraiyur 15

Sl. No. Qty. Description Rate Unit

0.0 0.00 b. above 16mm dia rods 61875.00 MT

44.1 0.00 PVC SWR 110 mm dia Rain water pipe 273.87 Rmt
44.2 0.00 Rain Water Harvesting using Defunct borewell method 0.00 Each

45.0 0.00 Stucco plastering 12 mm tk. 202.75 Sqm.


46.0 111.00 S & F 20 mm dia Alu. Hanger Rod 58.00 Rmt

47.0 104.00 S & F Alu Towel rail 75 cm long 95.00 Each

48.0 100.00 S & F 5 pin Coat stand 55.00 Each

49.0 546.00 S & F chromium plated 8 guage Picture Hook 1.50 Each

50.1 0.00 Precast slab 50 mm tk.in C.C. 1:3:6 0.00 Sqm.


50.2 380.00 Providing precast Kerb stone in C.C. 1:3:6, 450 x 300 x 150 mm 179.24 Rmt

50.3 61.00 Supply and planting avenue trees 262.75 Each

50.4 61.00 Providing Tree guard 649.40 Each


50.5 1.00 Supplying. Fabricating and erection of M.S Scheme Name board 13470.65 Each

51.0 0.00 HDPE water tank 700 lit capacity with ISI mark 5740.00 Each
52.0 * PVC Water supply (ASTM) 0.00 0.00
0.0 372.00 a. 32 mm dia 167.93 Rmt

0.0 2057.80 b. 25 mm dia 151.97 Rmt

0.0 0.00 c. 20 mm dia 147.19 Rmt


52.1 196.00 G.I Pipe 20mm dia for Hot water line (Fully Concealed in walls) 220.37 Rmt

53.1 0.00 Wash basin 2526.82 Each


53.2 0.00 S & F of C.I. Manhole cover 45 x 45 cm 0.00 Each
(20 kg. weight)
53.3 8.00 C.I. Steps ( 5 kg) 30.00 Each
54.0 0.00 Brass tap (with ISI mark) 191.00 Each
54.1 0.00 C.P tap long body 300.00 Each
54.2 0.00 C.P tap short body 250.00 Each
55.1 0.00 Squat Urinal 662.15 Each
55.2 0.00 Flat Back Urinal 1577.75 Each
56.1 0.00 S & F of Orissapan - in G.F. 2355.26 Each
56.2 0.00 S & F of Orissapan - other than G.F. 3736.50 Each
57.0 0.00 S & F of E.W.C.(white) 5157.70 Each
57.1 0.00 S & F of E.W.C.(colour) 5527.70 Each
58.1 0.00 PVC SWR pipe (Soil line) 0.00 0.00
0.0 0.00 a. 110 mm dia. 518.65 Rmt
0.0 0.00 b. 75 mm dia. 406.75 Rmt
Thuraiyur 16

Sl. No. Qty. Description Rate Unit

58.2 0.00 PVC Ventilating shaft with cowl 439.40 Each


59.1 0.00 Gully Trap using Chamber burnt bricks 23 x 11.2 x 7 cm. 0.00 Each

59.2 0.00 Gully Trap using chamber burnt bricks of size 1212.57 Each
23x11.4x7.5cm
59.3 0.00 Gully Trap using Chamber burnt bricks 23 x 11 x 7 cm. 0.00 Each
59.4 0.00 Gully Trap using Chamber burnt bricks 22 x 11 x 7 cm. 0.00 Each
59.5 49.00 Gully Trap using Kiln burnt country bricks 22 x 11 x 7 cm. 1212.57 Each
59.6 0.00 Gully Trap using Kiln burnt country bricks 22 x 11 x 5.7 cm. 0.00 Each

60.0 246.00 PVC Nahani trap (4way/2way) 129.20 Each

61.1 0.00 Stoneware pipe 0.00 0.00


0.0 0.00 a. 100 mm S.W. pipe 362.90 Rmt
0.0 0.00 b. 150 mm S.W. pipe 490.23 Rmt
61.2 * Stoneware pipe dry condition 0.00 0.00
0.0 30.00 a. 100 mm dia 172.33 Rmt
0.0 0.00 b. 150 mm dia 259.05 Rmt
62.1 0.00 Stoneware bend 0.00 0.00
0.0 0.00 a. 100 mm dia 96.50 Each
0.0 0.00 b. 150 mm dia 132.70 Each
62.2 * Stoneware Tee 0.00 0.00
0.0 4.00 a. 100 mm dia 121.50 Each
0.0 0.00 b. 150 mm dia 156.70 Each
63.0 0.00 32 mm dia PVC waste pipe 31.87 Each
0.0 * Electrical arrangements 0.00 0.00
64.0 0.00 a. Light point with ceiling rose 1070.00 Each
0.0 0.00 b. Light point without ceiling rose 0.00 Each
0.0 0.00 c. Calling bell point with Buzzer/Calling bell 1102.00 Each
65.0 0.00 Fan point 1126.00 Each
66.0 0.00 Staircase light point 1973.00 Each
67.0 0.00 5 amps 5 pin Plug point (Switch board itself) 540.00 Each
68.0 0.00 5 amps 5 pin Plug point (Convenient places) 752.00 Each
69.0 104.00 15 Amp. Power plug 125.00 Each

70.1 0.00 Bulk head fitting 401.00 Each


70.2 0.00 S & F of Tube light with fittings 0.00 Each

70.3 0.00 S & F of 40/ 60 w bulb 12.00 Each


70.4 0.00 S & F of plastic shade 10.00 Each
71.0 0.00 Double pole main switch 562.00 Each
72.0 308.00 Box type Fibre Fan hook 33.90 Each

73.1 46.00 6 way - D.B. 3737.00 Each


Thuraiyur 17

Sl. No. Qty. Description Rate Unit

73.2 4.00 4 way - D.B. 3000.00 Each

74.0 201.00 Charges for fixing of "Fan" 347.00 Each

75.0 0.00 Supply and delivery of Fan 0.00 0.00


0.0 0.00 a. 48" (1200 mm) 0.00 Each
0.0 0.00 b. 42" (1050 mm) 0.00 Each

76.0 110.00 8 SWG wire 18.00 Rmt

77.0 0.00 Run of main 2 wires of 1.50 Sqmm. 141.00 Rmt


77.1 0.00 Run of 2 wires of 4 sqmm with continuous earth by means of 186.00 Rmt
2.5sqmm
77.2 0.00 S & F of A/C metal clad switch 500.00 Each
77.3 154.00 S&F of TV/Telephone line Socket 75.00 Each

77.4 1736.00 S&F of 20mm dia PVC pipe for TV/Telephone line 58.07 Rmt

78.0 8.00 Earthing Station IS3043 (Type I) 2010.00 Each

78.1 0.00 Earthing Station (Type II) 0.00 Each

79.1 0.00 1 No.of 30Amps - Fuse Unit 368.00 Each

79.2 0.00 3 Nos.of 30Amps - Fuse Unit 600.00 Each


80.0 0.00 375 x 300 x 20 mm T.W. plank 592.00 Each

81.0 18.30 Meter cupboard 1959.10 Sqm

82.0 0.00 Street lights 2168.00 Each

83.0 0.00 M.S Angle 146.00 Rmt

84.0 0.00 Run of 2 wires of 4 sqmm 0.00 Rmt


85.0 0.00 Supply of G.I pipe 25mm dia 123.00 Rmt
86.0 932.50 Anti termite treatment 34.00 Sqm.

87.0 0.00 ELCB Single phase 2343.00 Each

112.0 0.00 S & F of Exsaust Fan 300 mm dia 1683.71 Each


238.0 0.00 Anticorrosive treatment for steel grills 3769.50 MT
Thuraiyur 18

Sl. No. Qty. Description Rate Unit

0.0 * ANNEXURE 0.00 0.00

14.I * Precast Cupboard slab 20 mm tk.using standardised 0.00 0.00


concrete mix M20 (annexure)
0.0 188.30 a. In Ground floor 838.75 Sqm.

0.0 176.30 b. In First floor 841.46 Sqm.

0.0 176.30 c. In Second floor 844.17 Sqm.

0.0 138.50 d. In Third floor 846.88 Sqm.

0.0 0.00 e. In Fourth floor 849.59 Sqm.


14.II * Precast cupboard slab 40 mm tkusing standardised concrete 0.00 0.00
mix M20 (annexure)

0.0 61.50 a. In Foundation & basement 934.85 Sqm.

0.0 14.30 b. In Ground floor 937.60 Sqm.

0.0 14.60 c. In First floor 943.01 Sqm.

0.0 14.60 d. In Second floor 948.42 Sqm.

0.0 10.50 e. In Third floor 953.83 Sqm.

0.0 0.00 f. In Fourth floor 959.24 Sqm.


14.I 0.00 Precast Cupboard slab 20 mm tk.using standardised 0.00 0.00
concrete mix M30 (annexure)
0.0 0.00 a. In Ground floor 848.75 Sqm.
0.0 0.00 b. In First floor 851.46 Sqm.
0.0 0.00 c. In Second floor 854.17 Sqm.
0.0 0.00 d. In Third floor 856.88 Sqm.
0.0 0.00 e. In Fourth floor 859.59 Sqm.
14.II 0.00 Precast cupboard slab 40 mm tkusing standardised concrete 0.00 0.00
mix M30 (annexure)
0.0 0.00 a. In Foundation & basement 954.85 Sqm.
0.0 0.00 b. In Ground floor 957.60 Sqm.
0.0 0.00 c. In First floor 963.01 Sqm.
0.0 0.00 d. In Second floor 968.42 Sqm.
0.0 0.00 e. In Third floor 973.83 Sqm.
0.0 0.00 f. In Fourth floor 979.24 Sqm.
0.0 0.00 Precast Jally ventilator 50mm tk.using standardised concrete 0.00 0.00
mix M30 (annexure) without vibrating charges
0.0 0.00 a. In Ground floor 1701.38 Sqm.
0.0 0.00 b. In First floor 1706.42 Sqm.
0.0 0.00 c. In Second floor 1711.46 Sqm.
0.0 0.00 d. In Third floor 1716.50 Sqm.
0.0 0.00 e. In Fourth floor 1721.54 Sqm.
Thuraiyur 19

Sl. No. Qty. Description Rate Unit

0.0 * Precast Jally ventilator 50mm tk.using standardised concrete 0.00 0.00
mix M20 (annexure) without vibrating charges
0.0 26.10 a. In Ground Floor 1682.75 Sqm.

0.0 27.50 b. In First floor 1687.79 Sqm.

0.0 25.50 c. In Second floor 1692.83 Sqm.

0.0 22.10 d. In Third floor 1697.87 Sqm.

0.0 10.50 e. In Fourth floor 1702.91 Sqm.

0.0 0.00 f. In Fifth floor 0.00 Sqm.


4.1 * Standardised concrete Mix M20 Grade Concrete 0.00 0.00

0.0 346.50 a. In Foundation and basement 5310.53 Cum

8.1 245.10 b. Ground Floor 5378.53 Cum

0.0 232.40 c. In First Floor 5512.53 Cum

0.0 233.40 d. In Second Floor 5646.53 Cum

0.0 192.80 e. In Third floor 5780.53 Cum

0.0 47.50 f.In fourth floor 5914.53 Cum

4.1.1 0.00 Standardised concrete Mix M30 Grade Concrete 0.00 0.00
0.0 0.00 a. In Foundation and basement 5805.84 Cum
0.0 0.00 b. In Ground Floor 5873.84 Cum
0.0 0.00 c. In First Floor 6007.84 Cum
0.0 0.00 d. In Second Floor 6141.84 Cum
0.0 0.00 e. In Third floor 6275.84 Cum
0.0 0.00 RCC M30 mix using hard broken stone jelly for foundation 0.00 0.00
and basement
0.0 0.00 a. Foundation & basement 5805.00 Cum
0.0 0.00 b.Stilt floor 5873.00 Cum
0.0 0.00 Cement Concrete using desing mix of grade M25 concrete 0.00 0.00

0.0 0.00 a. In Foundation and basement 5719.93 Cum.


0.0 0.00 b. In Stilt /Ground Floor 5787.93 Cum.
0.0 0.00 c. In First Floor 5921.93 Cum.
0.0 0.00 d. In Second Floor 6055.93 Cum.
0.0 0.00 e. In Third floor 6189.93 Cum.
0.0 0.00 f. In Fourth Floor 6323.93 Cum.
0.0 0.00 g. In Fifth Floor 6457.93 Cum.
0.0 0.00 h. In Sixth Floor 6591.93 Cum.
0.0 0.00 i. In Seventh Floor 6725.93 Cum.
0.0 0.00 j.in Eighth floor 6859.93 Cum.
Thuraiyur 20

Sl. No. Qty. Description Rate Unit

0.0 0.00 k.in Ninth floor 6993.93 Cum.


0.0 0.00 l.in Tenth floor 7127.93 Cum.
0.0 0.00 l. In Eleventh floor 7261.93 Cum.
0.0 0.00 m. In Twelth floor 7395.93 Cum.
0.0 0.00 n. In Thirteen floor 7529.93 Cum.
9.2 0.00 Brick work in C.M. 1:6 using chamber Burnt bricks of size 23 0.00 0.00
x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
0.0 0.00 g. In Fifth Floor 5133.01 Cum.
0.0 0.00 h. In Sixth Floor 5223.31 Cum.
0.0 0.00 i. In Seventh Floor 5313.61 Cum.
0.0 0.00 j.in Eighth floor 5403.91 Cum.
0.0 0.00 k.in Ninth floor 5494.21 Cum.
0.0 0.00 l.in Tenth floor 5584.51 0.00
10.2 0.00 Brick partition work in C.M. 1:4 using chamber Burnt bricks 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm tk (B.P.)

0.0 0.00 g. In Fifth Floor #VALUE! Cum.


0.0 0.00 h. In Sixth Floor #VALUE! Cum.
0.0 i. In Seventh Floor #VALUE! Cum.
0.0 0.00 j.in Eighth floor #VALUE! Cum.
0.0 0.00 k.in Ninth floor #VALUE! Cum.

11.2 0.00 Brick work in C.M. 1:4 using chamber Burnt bricks of size 23 0.00 0.00
x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)
0.0 0.00 g. In Fifth Floor #VALUE! Sqm
0.0 0.00 h. In Sixth Floor #VALUE! Sqm
0.0 0.00 i. In Seventh Floor #VALUE! Sqm
0.0 0.00 j. In Eighth floor #VALUE! Sqm
0.0 0.00 k.in Ninth floor #VALUE! Sqm

0.0 0.00 Supply and laying of Hard core layer 200mm 2796.22 Cum
0.0 0.00 Supplying and filling stonedust 136.20 Cum.
0.0 550.00 Plastering with CM 1:3, 12mm with WPC 168.63 Sqm

0.0 397.90 Supplying and filling with gravel 287.16 Cum

0.0 1.20 B.W in CM 1:4 in Superstructure in First floor #VALUE! Cum

0.0 0.00 B.W in CM 1:4 in Superstructure in second floor #VALUE! Cum


0.0 10.80 B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum
d) In Third floor

0.0 48.00 B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum


e) In fourth floor
Thuraiyur 21

Sl. No. Qty. Description Rate Unit

0.0 0.00 Earth work excavation in Loose / sandy soils (including 91.50 0.00
refilling)
0.0 0.00 Earth work excavation in Loose / sandy soils (excluding 42.50 0.00
refilling) for open foundation
0.0 0.00 Earth work excavation in Loose / sandy soils (excluding 63.75 0.00
refilling) for drain
3.8 0.00 P.C.C. 1:3:6 using 20 mm broken brick jelly 3862.79 Cum
8.4 0.00 Providing earth quake resistant for Corner walls 0.00 0.00
0.0 0.00 a. Foundation & basement 4756.41 Cum
0.0 0.00 b. Ground Floor 4824.41 Cum
0.0 0.00 c. First Floor 4958.41 Cum
0.0 0.00 d. Second Floor 5092.41 Cum
8.5 0.00 Providing earth quake resistant for Door/window Jambs 0.00 0.00

0.0 0.00 a. Ground Floor 436.22 Rmt


0.0 0.00 b. First Floor 438.52 Rmt
0.0 0.00 c. Second Floor 440.82 Rmt
1.9.3.1 0.00 Providing Bored pile using design mix M20 0.00 0.00
0.0 0.00 a.450mm dia 2250.94 Rmt
0.0 0.00 Chipping of RCC pile head to the required cut of level and 0.00 0.00
clearing way debries with an average lead of 3 km entirely
with city limits
0.0 0.00 450mm dia pile 619.82 Rmt
0.0 0.00 Conducting routine vertical compression load test CER 70000.00 Nos
No.328/2014-15
Thuraiyur 22

Sl. No. Qty. Description Rate Unit

0.0 0.00 Mobilization charges including transporting to site CER 50000.00 Set
No.328/2014-15
0.0 0.00 Red oxide plastering in CM 1:4 #VALUE! Sqm
18.1 * Formwork using M.S.Sheet 0.00 0.00

0.0 1261.30 a.For Column footings,plinth beam,Grade beam,Raftbeam,Raft slab 498.94 Sqm
etc.,
0.0 7165.62 b.Plain surfaces such as Roof slab,floorslab,Beams,lintels,lofts,sill 573.61 Sqm
slab,staircase,portico slab and other similar works

0.0 3249.10 c.For Square and rectangular columns and small quantities 688.33 Sqm

0.0 0.00 d.Vertical wall 630.97 Sqm


0.0 0.00 e.Circular column 1376.66 Sqm
0.0 75.60 f.Curved surface 860.42 Sqm

0.0 0.00 g.Double centering portico area 1147.22 Sqm


21.6 * R.C.C.Door frames of size 100 x 75mm with one edge 0.00 0.00
grooves size 't' x 20 mm using M20 grade ( with out vibrating
charges)

0.0 100.00 a. 900 x 2100 mm 1708.84 Each

0.0 0.00 c. 1200 x 2100 mm 2078.85 Each


0.0 0.00 d. 750 x 2100 mm 1683.04 0.00
0.0 0.00 c. 1000 x 2100 mm 1723.49 Each
0.0 0.00 Teak wood "Window" & Ventilator Shutter with 4mm thick 0.00 0.00
pin headed glasses
0.0 0.00 a. Window: 135 cm ht. 2824.63 Sqm.
0.0 0.00 b. Window: 120 cm ht. 0.00 Sqm.
0.0 0.00 c. Window: 105 cm ht. 2997.68 Sqm.
0.0 0.00 d. Ventilator: (90 x 60 cm) 2223.20 Sqm.
0.0 0.00 d. Ventilator: (75 x 75 cm) 2203.28 Sqm.
22.3.2 0.00 MDF board (18mm thick) double leaf shutters with TW 1924.89 Sqm
frame for cup board/ ward robes.
0.0 0.00 T.W. frame & TW styles & rails with BWR double leaf 3441.72 Sqm
shutters for cup board/ ward robes including two coat
enamel paint & one coat primer.
22.8 0.00 MDF board door shutters (35mm thick) exterior grade both 0.00 0.00
side laminated with external lipping.
0.0 0.00 a. 1000X2100mm. 2838.00 Sqm
0.0 0.00 b. 900X2100mm. 2876.47 Sqm
0.0 0.00 c.1200X2100mm. 0.00 Sqm
0.0 * TW panelled door shutter with brass fittings. 0.00 0.00

0.0 92.60 a. 1000X2100mm.(Single leaf) 5106.22 Sqm

0.0 0.00 b.1200x2400mm 0.00 0.00


0.0 0.00 a. 1200X2100mm.(Single leaf) 4396.30 Sqm
Thuraiyur 23

Sl. No. Qty. Description Rate Unit

0.0 0.00 b. 900X2100mm (over all size 900X2400mm.). 4172.77 0.00


0.0 0.00 c.1800X2400mm. 0.00 0.00
0.0 0.00 TW double leaves shutter of size with brass fittings 4926.21 Sqm
a.1800 x 2100mm
0.0 0.00 a. 1500X2100mm.(Double leaves) with Brass fittings 5232.10 Sqm
0.0 164.40 TW styles & rails with 9mm thick BWR single leaf shutters with 2930.58 Sqm
brass screws size of 900x2100 mm

0.0 0.00 TW styles & rails with 9mm thick BWR single leaf shutters 3330.03 Sqm
with brass screws size of 750x2100 mm
0.0 0.00 TW styles & rails with 9mm thick BWR single leaf shutters 2824.42 Sqm
with brass screws size of 1000 x 2100 mm
0.0 0.00 TW styles & rails with 9mm thick BWR Double leaves 0.00 Sqm
shutters with brass screws size of 1500x2100 mm
0.0 0.00 TW styles & rails with 9mm thick BWR single leaf shutters 2644.63 Sqm
with brass screws size of 1200x2100
21.5.2 157.60 Supply and Fixing Soild PVC door Shutter with frame 2670.00 Sqm

23.2.1 392.50 4mm thick pin headed Glass panels with Aluminium beedings 639.50 Sqm

0.0 0.00 Cuddappa slab 20 mm tk.for kitchen hearth slab. 0.00 0.00
0.0 0.00 a. In Ground floor 478.50 Sqm.

0.0 0.00 b. In First floor 481.18 Sqm.

0.0 0.00 c. In Second floor 483.86 Sqm.


0.0 0.00 d. In Third floor 486.54 Sqm.
0.0 0.00 e. In Fourth floor 489.22 Sqm.
0.0 0.00 Cuddappa slab 20 mm tk.for C/B slab. 0.00 0.00
0.0 0.00 a. Ground floor 451.56 Sqm.
0.0 0.00 b. In First floor 454.24 Sqm.
0.0 0.00 c. In Second floor 456.92 Sqm.
0.0 0.00 d. In Third floor 459.60 Sqm.
0.0 0.00 e. In Fourth floor 462.28 Sqm.
0.0 0.00 Cuddappa slab 40 mm tk.for C/B slab. 0.00 0.00

0.0 0.00 a. In Ground floor 480.20 Sqm.


0.0 0.00 b. In First floor 482.92 Sqm.

0.0 0.00 c. In Second floor 488.28 Sqm.


0.0 0.00 d. In Third floor 493.64 Sqm.
0.0 0.00 e. In Fourth floor 499.00 0.00
0.0 0.00 Cuddappa slab 40 mm tk.for Sunshade. 0.00 0.00
0.0 0.00 a. In Ground floor 1325.22 Sqm.
Thuraiyur 24

Sl. No. Qty. Description Rate Unit

0.0 0.00 b. In First floor 1330.58 Sqm.

0.0 0.00 c. In Second floor 1335.94 Sqm.

0.0 0.00 d. In Third floor 1341.30 Sqm.

0.0 0.00 e. In Fourth floor 1346.66 Sqm.


29.8 1583.50 Glazed tiles using Grout (Tile Joint Filler) 937.59 Sqm

0.0 0.00 Floor ceramic tiles using Grout (Tile Joint Filler). 833.48 Sqm

29.9 280.10 Floor ceramic tiles (Anti-skid) using Grout (Tile Joint Filler). 833.48 Sqm

38.4 550.00 Two coat of cement paint over one coat white cement 80.10 Sqm

38.5 0.00 Matt paint 111.41 Sqm


38.6 11437.80 One coat white cement for new walls and other similar works. 36.99 Sqm

42.0 0.00 Fabrication of Mild steel / RTS grills 62999.40 MT


(with cement slurry wash) for all sizes of rods.

43.0 149.410 Fabrication of Mild steel / RTS grills (without cement slurry) for all 61875.00 MT
sizes of rods.

44.6 291.70 PVC SWR 110 mm dia with ISI mark type- A for Rain water down 273.87 Rmt
fall pipe
50.6 252.00 Precast slab 50 mm tk.in C.C. 1:3:6 with fibre 276.97 Sqm

52.4 1066.00 20mm dia PVC water supply ASTM pipe (fully consealed in walls) 149.18 Rmt

53.4 52.00 S&F of C.I Manhole cover 60 x 60 cm (50kg weight ) 1725.00 Each

0.0 100.00 Wash Hand Basin of size 550 x 400 mm 2526.82 Each

54.3 0.00 Supplying and fixing of Brass Chromium plated screw down 191.00 Each
tap 15mm dia (heavy type not less than 430 grms weight)
with ISI mark.

56.3 0.00 S & F of Indian Water closet white glazed (Oriya type) of 2355.26 Each
size 580 x 440mm - in G.F.

56.4 0.00 S & F of Indian Water closet white glazed (Oriya type) of 3736.50 Each
size 580 x 440mm - Other than G.F.
Thuraiyur 25

Sl. No. Qty. Description Rate Unit

58.3 * PVC SWR pipe (Soil line) with ISI mark - type 'B'. 0.00 0.00

0.0 796.00 a. 110 mm dia. 518.65 Rmt

0.0 1058.50 b. 75 mm dia. 406.75 Rmt

58.4 249.00 Supplying, Laying & Concealing the 50mm dia PVC ( SWR) pipe 81.20 Rmt
with ISI mark type - 'B' with relevant specials.

58.5 1.00 PVC(SWR) pipe with ISI mark - type 'A' for Ventilating shaft with 439.40 Each
cowl

0.0 * Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990.( Ordinary)

0.0 471.00 a. Light point with ceiling rose 1070.00 Each

0.0 513.00 b. Light point without ceiling rose 1074.00 Each

0.0 50.00 c. Calling bell point with Buzzer/Calling bell 1102.00 Each

65.1 201.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 1126.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for Fan point.

66.1 35.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 1973.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for Staircase Light Point.

0.0 304.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 540.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Switch Board Itself.

68.2 250.00 Wiring with 1.5 sqmm PVC insulated single core multi strand fire 752.00 Each
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Convenient Places.

70.5 0.00 S & F of Tube light fitting (patty type ) with Electronic 496.00 Each
ballast and 36 W slim tube light
0.0 201.00 Supply and delivery of 48" (1200 mm) Fan with ISI mark with 1238.30 Each
Eletronic Dimmer

0.0 805.00 Run of 2 Wires of 4 sqmm PVC insulated single core multi strand 186.00 Rmt
fire retardant flexible copper cable with ISI mark confirming IS:
694:1990.

77.5 0.00 Run of 2 Wires of 1.5 sqmm PVC insulated single core multi 141.00 Rmt
strand fire retardant flexible copper cable with ISI mark
0.0 0.00 Run of 2 Wires
confirming of 4 sqmm PVC insulated single core multi
IS: 694:1990. 186.00 Rmt
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
0.0 585.00 4 x 4 Sq mm copper PVC insulated unsheathed single core cable 197.00 Rmt
for 3 phase EB service connection
Thuraiyur 26

Sl. No. Qty. Description Rate Unit

0.0 950.00 Run of 2 Wires of 2.5 sqmm PVC insulated single core multi strand 155.00 Rmt
fire retardant flexible copper cable with ISI mark confirming IS:
694:1990.

0.0 0.00 Run of 4 Wires of 6 sqmm PVC insulated single core multi 336.00 Rmt
strand
0.0 0.00 Run of 4 Wires of 10 sqmm PVC insulated single core multi 440.00 Rmt
strand
112.1 50.00 S & F of Exsaust Fan 225mm dia 1538.71 Each
0.0 0.00 Compact Fluoresent Lamp (CFL) 0.00 0.00
0.0 0.00 a. 14W bulb for Bath & WC 130.00 Each
0.0 0.00 b. 18w bulb for Bulk Head fittings 170.00 Each
0.0 0.00 S & F of Bulk head fitting suitable for CFL 443.00 Each

44.2 * Rain water harvesting using defunct borewell and providing 0.00 0.00
perforated cover slab
0.0 16.00 a). Providing pit 1164.91 Each

0.0 48.00 b) Augering 30cm dia 288.72 Rmt

257.1 0.00 S&F of M.S. Angle of size 35x35x5mm for staircase steps 185.36 Rmt

344.2 100.00 S&F of Bevelled edge mirror 500 x 400 x 5.5mm 355.00 Each

383.0 50.00 S&F of Cuddapah sink 600 x 600 x 200mm 944.00 Each

383.1 0.00 Providing nosing to the edges of Granite slab 235.00 Rmt
0.0 0.00 Supply and fixing of PVC water supply (ASTM) 210.88 0.00
a.50mm dia
384.0 4.00 S&F of PVC flushing cistern 1231.00 Each

385.0 0.00 S&F of cloth drying arrangement 612.20 Each


238.1 0.00 Anticorrosive treatment for window grills 2010.25 MT
0.0 58.00 Supplying and fixing of 32 AMPS Triple pole main switch 1340.00 Each

0.0 63.00 450 x 375 x 20 mm thick TW plank 990.00 Each

0.0 0.00 3 Nos.of 32Amps - Fuse Unit 600.00 Each


0.0 0.00 1 Nos.of 32Amps - Fuse Unit 368.00 Each
0.0 50.00 Supplying and delivery of Three phase ELCB/RCCB 2695.00 Each

0.0 0.00 Supply of G.I pipe 40mm dia 'B' Class 155.00 Rmt
0.0 5935.50 Plastic Emulsion PAINT including primer for outer walls 151.87 Sqm

0.0 10887.80 Two coat of OBD over one coat white cement for inner walls 75.46 Sqm

0.0 0.00 2 x 4 Sqmm Copper PVC insulated unsheathed single core 1 110.00 Rmt
KV grade cable for EB service single phase.
0.0 0.00 40 mm dia GI pipe "B"class 155.00 Rmt
0.0 0.00 1 No.of 32 Amps - Fuse Unit 368.00 Each
Thuraiyur 27

Sl. No. Qty. Description Rate Unit

0.0 0.00 P. C.C. 1:3:6 for foundation & basement using 40mm metal 3862.79 Cum

0.0 150.00 Providing PVC Tee with end cap 87.00 Each

0.0 0.00 Granite Tiles flooring (Ruby red) 1207.34 Sqm


0.0 236.40 Providing wooden Melamine polish for new wood work 997.28 Sqm

0.0 0.00 Supplying and fixing of staineless steel hand rails 4500.00 Rmt
0.0 2198.00 Vitrified Tiles flooring (ivory) 908.64 Sqm

0.0 0.00 Vitrified Tiles flooring 1084.34 Sqm


s 0.00 Concrete designer tiles flooring 1055.90 Sqm
0.0 0.00 Eurocon Tiles flooring 1055.90 Sqm
0.0 0.00 Supplying and fixing of Aluminium sliding window 0.00 0.00
0.0 0.00 a.1.80 x 1.35 (Three track) 0.00 0.00
0.0 0.00 b.1.35 x 1.35 (three track) 3873.00 0.00
0.0 0.00 a) size 1800x1350 SW1 0.00 Sqm
0.0 0.00 b)1200x1350 SW2 0.00 Sqm
0.0 0.00 supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm.
12"x12" ( for officers)
0.0 0.00 supplying and fixing of colour matt finish floor tiles of size 2433.47 Sqm.
12"x12" ( for wall tiles)
0.0 0.00 Supplying and fixing of wall panneling using Aluminium 3034.40 Sqm
frame with MDF board
4.4 0.00 Supply of material and lab ourfor Mineralfbre 915.02 Sqm
600mmx600mm Grid false ceiling work
0.0 0.00 Supplying, fabricating, erecting and fixing Gyp board false 990.00 Sqm
ceiling using perforated sheet 10mm thk
0.0 0.00 Supplying and fixing of 100mm dia GI pipe 905.00 Rmt
0.0 0.00 Supplying and fixing of Geyser (Data -SD 103) 8467.30 Each
0.0 0.00 Supplying and fixing of CP wall mixer two in one (without 3409.00 Each
telephone shower) including cost of all materials and all
labour charges etc complete.
CER No.178/13-14
0.0 0.00 Supplying and fixing of shower arm 9" long including cost of 469.42 Each
all materials and all labour charges etc. complete
CER No.178/13-14

0.0 0.00 Supplying and fixing of GM wheel valves ISI mark 0.00 0.00
0.0 0.00 a.100mm GM Gate valves 5640.00 Each
0.0 0.00 b.50mm GM Gate valves 1340.00 Each
0.0 0.00 c.32mm GM Gate valves 604.00 Each
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990. (Modular)
0.0 0.00 a. Light point with ceiling rose 1000.51 Each
0.0 0.00 b. Light point without ceiling rose 1003.51 Each
Thuraiyur 28

Sl. No. Qty. Description Rate Unit

0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 769.30 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point @
Convenient Places.
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 536.55 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point @
Switch Board Itself.
0.0 0.00 Supplying and laying of 3.5 core 70 sq.mm PVC armoured 627.40 RMT
LTUG cable (below GL)
0.0 0.00 S&F 3.5 X 70mm LTUG CABLE Above GL 435.00 RMT
0.0 0.00 S&F 3.5 X 35mm LTUG CABLE Above GL 356.00 RMT
0.0 0.00 S&F 3.5 X 25mm LTUG CABLE Above GL 317.00 RMT
0.0 0.00 S&F 2X6 Sq.mm LTUG CABLE 176.84 Rmt
0.0 0.00 Supplying and fixing of brass cable gland suitable for 3.5 293.25 Each
core 70 Sqmm PVC armoured LTUG cable SD 189
0.0 0.00 Supply & Fixing of Aluminium openable windows of size 0.00 0.00

0.0 0.00 FW 1.80 x 1.65 m 4801.98 Sqm


0.0 0.00 W 1.50 x 1.35 m 4228.87 Sqm
0.0 0.00 W 1.20 x 1.35 m 3911.50 Sqm
0.0 0.00 KW 1.20 x 1.05 m 4227.94 Sqm
0.0 0.00 W 2 .0.75 x 1.35 m 3637.07 Sqm
0.0 0.00 a. 1.50 x 1.35 mt.window 4228.87 Sqm
0.0 0.00 b. 1.35 x 1.35 mt.window 3694.20 Sqm
0.0 0.00 c 1.20 x 1.35 mt.window 3911.50 Sqm
0.0 0.00 d. 0.75 x 1.35 mt.window 3637.07 Sqm
0.0 0.00 a. 1.80 x 1.35 mt.window Three leaves 3987.65 Sqm
0.0 0.00 Aluminium window openable 1.35x1.05m (Two leaves) 3272.07 Sqm
0.0 0.00 Aluminium window openable 1.35x1.35m (Two leaves) 4141.13 Sqm
0.0 0.00 Aluminium window openable 1.2x1.35m (Two leaves) 4034.51 Sqm
0.0 0.00 0.00 0.00 Each
0.0 0.00 Supply and fixing of 100 amps TPN sheet double break 6950.00 Each
switch with HRC fuse and neutral on suitable angle iron
frame work with MS cable entry boxes and PWD
earthing(SR-14-15(p-65)
0.0 0.00 Supply and fixing of 200 amps fuse unit 634.00 Each
SRP-66
0.0 0.00 Supply and fixing of 200 amps TPN switch with HRC fuses 9470.00 Each
sheet steel double break
SRP-65, 3 ©
0.0 0.00 Supply and fixing of 250 amps cubical type panel board 123622.00 Each

0.0 0.00 Supplying and fixing of SS Soap Tray including cost of all 704.75 Each
materials and all labour charges etc complete
Thuraiyur 29

Sl. No. Qty. Description Rate Unit

0.0 0.00 Supplying and fixing of CP Angle valve Stop cock including 514.85 Each
cost of all materials and all labour charges etc complete

0.0 0.00 Supplying and fixing of 25x 3mm Copper flat 473.50 Rmt
0.0 0.00 Supply and fixing of Health faucet approved quality with ISI 952.00 Each
mark
0.0 0.00 S&F TPN 12 way DB encloser (SR-p-80) 11481.80 Each
0.0 0.00 S&F TPN 8 way DB encloser 5325.60 Each
CER No.178/2013-14
0.0 0.00 S&F TPN 6 way DB encloser 8254.60 Each
CER No.178/2013-14
0.0 0.00 S&F TPN 4 way DB encloser 6588.00 Each
CER No.178/2013-14
0.0 0.00 Supply and fixing of spot light of approved make and 593.00 Each
company with ISI CFL bulb CER No.178/13-14
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
0.0 0.00 S&F OF UPVC Windows 0.00 0.00
0.0 0.00 a) FW 900 X 2100 6300.00 Sqm
0.0 0.00 b) W 1800 X 1650 6300.00 Sqm
0.0 0.00 c) W1 1500 X 1650 6300.00 Sqm
0.0 0.00 d) W0 2400 X 1650 6300.00 Sqm
0.0 0.00 e) W2 1200 X 1650 6300.00 Sqm
0.0 0.00 f) SW 4800 X 1650 6300.00 Sqm
0.0 0.00 g) FW1 4800 X 2300 6300.00 Sqm
0.0 0.00 h) FW2 4200 X 2300 6300.00 Sqm
0.0 0.00 Supply & Fixing of MS door shutter 0.00 0.00
0.0 0.00 a)D1200 X 2400mm 8520.00 Each
0.0 0.00 Supply & Fixing of MS ventilator of size 0.00 0.00

0.0 0.00 b) V1 900 X 600mm 3752.83 Sqm


0.0 0.00 S & F of sodium vapour lamp with fitting 250watts 5654.00 Each
0.0 0.00 Supplying and fixing in position of UPVC Ventilator louvered 6500.00 Sqm
ventilator type for all sizes
Revised SR 2018-19 p-57 it-192
0.0 0.00 Supplying and fixing in position of UPVC window of 6000.00 Sqm
casement type( open) for all sizes Revised SR 2018-19 p-57
it-191
0.0 0.00 Supply and fixing of colour wash basin oval shape CER 2286.45 Each
No.178/2013-14
Thuraiyur 30

Sl. No. Qty. Description Rate Unit

0.0 0.00 Supplying and Fixing of Rolling shutters of all sizes (Gear 2240.00 Sqm
Operated)( from 8m2 to 12m2 )Annex-Vi-P-45 rev SR 18-
19 item -102-A-b
0.0 0.00 Supplying and fixing of solid core flush door shutter of 0.00 0.00
thickness 35mm
0.0 0.00 a. door size 1.200m x 2.100 (Double leaf) 2368.73 Sqm
0.0 0.00 b. door size 1.200 m x 2.400 (double Leaf) 2960.17 Sqm
0.0 0.00 c. door size 1.000 m x 2.100 (Single Leaf) 2504.54 Sqm
0.0 0.00 d. door size 0.900 m x 2.100 (Single Leaf) 2225.27 Sqm
0.0 0.00 e. door size 1.00 m x 2.400 (Single Leaf) 2499.86 Sqm
0.0 0.00 f. door size 1.50 m x 2.100 (Double leaf) 2910.85 Sqm
0.0 0.00 g door size 1.50 m x 2.40 (Double leaf) 2876.99 Sqm

0.0 0.00 h door size 1.80 m x 2.40 (Double leaf) 2676.55 Sqm
0.0 0.00 h door size 1.80 m x 2.10 (Double leaf) 2738.10 Sqm

0.0 0.00 Providing additional strutting to centering of plain surface. 24.89 Sqm

0.0 0.00 S & F of Granite slab of size 4'x2', 18 to 20mm Thick For 0.00 0.00
kitchen arrangements (jet black)
0.0 0.00 a. In Ground floor 1746.84 Sqm

0.0 0.00 b. In First floor 1748.86 Sqm

0.0 0.00 c. In Second floor 1750.20 Sqm

0.0 0.00 d. In Third floor 1751.54 Sqm

0.0 * S & F of Granite tile of size 2'x 1', 10mm Thick For kitchen 0.00 0.00
arrangements (jet black)

0.0 40.30 a. In Ground floor 951.12 Sqm

0.0 37.30 b. In First floor 952.46 Sqm

0.0 37.30 c. In Second floor 953.80 Sqm

0.0 29.00 c. In Third floor 955.14 Sqm

0.0 0.00 French window 0.00 0.00


0.0 0.00 b) 3.08 x 2.1m 2854.45 Sqm.
0.0 0.00 b. 1.35 x 2.10 mt.window 3358.02 Sqm
0.0 0.00 b. 1.35 x 1.35 mt.window 3828.85 Sqm
0.0 0.00 Aluminum Louvered ventilators 0.00 0.00
0.0 0.00 a. 0.90 x 0.60 mt ventilators 3800.81 Sqm
0.0 0.00 b. 0.60 x 0.60 mt ventilators 4299.61 Sqm
0.0 0.00 c. 0.75 x 0.60 mt ventilators 4003.84 Sqm
0.0 0.00 d. 1.0 x 0.60 mt ventilators 3800.81 Sqm
0.0 0.00 Supply & Fixing of MS door (for lockup door ) 0.00 0.00
0.0 0.00 MS door of Size 1000 x 2100mm 0.00 each
Thuraiyur 31

Sl. No. Qty. Description Rate Unit

0.0 0.00 MS door of Size 750 x 1350mm 0.00 Each


0.0 0.00 Supply & Fixing of MS ventilator of size 0.00 0.00
( lockup)

0.0 0.00 MS Ventilator of Size 1350 x 600mm 3004.33 Sqm


0.0 * MS Ventilator of Size 900 x 600mm 3752.83 Sqm
0.0 0.00 MS Ventilator of Size 600 x 600mm 3972.61 Sqm
0.0 0.00 MS Ventilator of Size 1285 x 600mm 3420.70 Sqm
0.0 0.00 Supply & Fixing of MS ventilator of size 1200 x 800 mm 3613.47 Sqm

0.0 0.00 MS ventilator of size 1000 x 800 mm 3524.29 Sqm

0.0 0.00 Supply and fixing of 19mm dia steam pipe for down rod of 61.80 Each
fan (SD 106)
0.0 0.00 Supply and fixing of SS Towel rail (75cm length) CER 405.00 Rmt
No.178/13-14
0.0 0.00 Supply and fixing of weld mesh of size 7.5x2.5cmx10gauge 325.00 Sqm
0.0 0.00 Supply and fixing of Chicken mesh 35.00 Sqm
0.0 0.00 S & F of 15mm dia Engineering Polymer Tap (long body ) for 185.00 Each
coastal area only
0.0 0.00 S & F of 15mm dia Engineering Polymer Tap short body tap 174.00 Each
for coastal area only
0.0 0.00 S & F of CFL road way lighting luminaries suitable for fixing 2219.00 Each
36w CFL lamp
0.0 0.00 Augering 30 cm dia for compound wall 217.30 Rmt
0.0 1017.60 Finshing the top of Terrace floor with one course of solar reflective 1020.82 Sqm.
Ceramic tiles without base concrete

51.
0.01 0.00* HDPE waterPressure
UPVC Non tank 200 pipe
lit capacity
of SN8 with
SDRISI
34 mark 1640.00
0.00 Each
0.00
( S 16.5) as per IS 15328/2003

0.0 238.00 a. 110 mm UPVC Non Pressure pipe 335.28 Rmt

0.0 195.00 b. 160 mm UPVC Non Pressure pipe 596.33 Rmt

0.0 * PVC Specials as per IS 10124/1982 Part II 0.00 0.00

0.0 32.00 a. 110 mm dia PVC bend (TWAD SR 17-18 P-19 S.No-4 ) 236.00 Each

0.0 24.00 b. 160 mm dia PVC bend (TWAD SR 17-18 P-19 it-1.5, S.No-4 ) 998.00 Each

0.0 * PVC Equal Tee as per BIS 7834/1975 0.00 0.00

0.0 28.00 a. 110 mm dia PVC Equal tee(TWAD SR 17-18 P-19 S.No-9 ) 289.00 Each

0.0 24.00 b. 160 mm dia PVC Equal tee(TWAD SR 17-18 P-19 S.No-9 ) 788.00 Each

0.0 14.00 S & F of Indian Water closet white glazed (Oriya type) of size 580 x 2324.43 Each
440mm with PVC SWR grade ' P' or "S' trap - in G.F.
Thuraiyur 32

Sl. No. Qty. Description Rate Unit

0.0 36.00 S & F of Indian Water closet white glazed (Oriya type) of size 580 x 3706.04 Each
440mm with PVC SWR grade ' P' or "S' trap- Other than G.F.

0.0 50.00 S & F of E.W.C.(White) 500 mm with PVC SWR grade "P" or "S" 5127.80 Each
TRAP
0.0 0.00 French window 0.00 0.00
0.0 0.00 a. FW (2.1 x 2.0 m ) 3 bay openable 2729.44 Sqm
0.0 0.00 b.FW 1 (1.80 x 2.0 m )3 bay openable 3025.63 Sqm
0.0 0.00 c. FW 2 (1.20 x 2.0 m ) 2 bay openable 3025.63 Sqm
0.0 0.00 d.FW 3 (0.75 x 2.0 m ) Single bay openable 3553.61 Sqm

0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990.
( PVC Box , Fire Retarded Box) For Coastal only

0.0 0.00 a. Light point with ceiling rose 1266.46 Each

0.0 0.00 b. Light point without ceiling rose 1269.46 Each

0.0 0.00 c. Calling bell point with Buzzer/Calling bell 1298.46 Each

0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 1316.46 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Fan point.(PVC Electrical Box )
0.0 0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 2224.56 Each
fire retardant flexible copper cable with ISI mark confirming
67.1 IS: 694:1990
0.00 Wiring forsqmm
with 1.5 Staircase
PVC Light Point.(PVC
insulated Electrical
single core multi Box )
strand 0.00 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @ Switch
0.0 0.00 Board
Wiring Itself.
with 1.5 sqmm PVC insulated single core multi strand 885.64 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @
0.0 0.00 Convenient
Supplying and Places.(PVC
fixing of 15Electrical
Amps 3 pinBoxflush
) type plug using ( 128.98 Each
PVC Box , Fire Retarded Box)

0.0 0.00 Fabrication of Mild steel / RTS grills (without cement slurry) 62159.30 MT
for all sizes of rods.(BINDING WIRE insulated with PVC)

0.0 0.00 PVC SWR 110 mm dia with ISI mark type- A for Rain water 279.36 Rmt
down fall pipe(UPVC SPECIAL CLAMP )

0.0 0.00 Supply and fixing in posistion of 6 rows of 10 guage GI 25.31 0.00
barbed wire 20 guage
Thuraiyur 33

Sl. No. Qty. Description Rate Unit

0.0 0.00 Supply ,laying & jointing the following pipes as per ASTM D 0.00 0.00
1785 of schedule 40 with UPVC Specials

0.0 0.00 a. 32 mm dia 167.93 Rmt

0.0 0.00 b. 25 mm dia 151.97 Rmt

0.0 0.00 c. 20mm dia PVC water supply ASTM pipe (fully consealed 149.18 Rmt
in walls)

0.0 0.00 Providing Colour Marble chips of size 10mm and below 254.31 Sqm
using 70.20Kgs of cement and 15 cum of Colour Marble
chips for every 10 sqm over the existing plastered surface
( For coastal area)

0.0 146.00 S & F of 15mm dia half turn CP long body tap 420.00 Each

0.0 103.00 S & F of 15mm dia half turn CP short body tap 372.00 Each

0.0 0.00 S & F of MS angle of size 50x 50x 5mm 51.40 Kg

0.0 0.00 Granite Tiles flooring in cm1:3,20mm thk sathali steel/ grey 1078.93 Sqm

0.0 0.00 Bored cast sit piles installation of vertical cast in Situ Bored 0.00 0.00
piles of following dia using Standardised concrete mix M30
Grade) as per nagapattinam data
0.00 a.500mm dia pile 2491.96 Rmt

0.00 b.450mm dia pile 2250.94 Rmt

0.00 c.400mm dia pile 2034.99 Rmt

0.00 Removing of clay from pile inlucing conveyance charges, 0.00 0.00
loading and unloading charges etc.,all complete

0.00 Chipping of RCC pile head of 500mm Dia of pile to the 0.00 0.00
required cut off level and clearing away the debris from site
with an average lead of 5 km etc.
0.00 a.500mm dia pile 764.05 Rmt

0.00 b.450mm dia pile 619.82 Rmt

0.00 c.400mm dia pile 491.17 Rmt


Thuraiyur 34

Sl. No. Qty. Description Rate Unit

0.00 Mobilization Charges inclusive of Transportation to site 40000.00 No


assembling and Dismantling the rotary pile equipment
employed for the works etc.(Qtn)
0.00 Conducting Routine vertical compression load test for bored 70000.00 No
cast in situ RCC piles of various dia by direct loading in
accordance with IS 2911(PART IV)1985 excluding cost of
0.00 pile
Falseand dismantling
ceiling the same
with plain gybsum after
board (as testing,
per PWDincludung
SR. rate 713.54 Sqm
finishing pile head etc.(CER
2017-18, Anx- VI -It- 154 -a) .no.60/2016-2017. Est Cochin
house)
0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990. (Open wiring)
0.00 a. Light point with ceiling rose 628.92 Each

0.00 b. Light point without ceiling rose 630.92 Each

0.00 Wiring with 1.5 sqmm PVC insulated single core multi strand 492.00 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @
0.00 Convenient Places.(Open
Wiring with 1.5 sqmm PVCwiring)
insulated single core multi strand 540.00 Each
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @ Switch
0.00 Board
Wiring Itself.(Open
with 1.5 sqmmwiring)
PVC insulated single core multi strand 709.72 RMT
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Fan point .(Open wiring)
0.00 TW panelled door double leaves shutter with brass fittings of 5584.12 Sqm
size . 1200X2100mm.

0.00 Providing putty to the wall 59.13 Sqm

0.00 Aluminium Partition wall 1/3 5.5mm thick glass & 2/3 3627.29 Sqm
Novapan sheet 12mm thick outer top and bottom

0.00 Supply and fixing of colour matt finish door 15 microns 4803.14 Sqm
double leaf door ( 1500 x 2100 mm)

0.00 Supply and fixing of colour matt finish door 15 microns 6362.96 Sqm
double leaf door ( 1000 x 2100 mm)

0.00 supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm
12"x12" floor tiles

0.00 supplying and fixing of colour matt finish floor tiles of size 1251.99 Sqm
12"x18" for wall tiles

54.00 Supply and fixing of 20 Amps DP plug and socket in sheet 1587.00 Each
enclosure with 32 A DP MCB in Flush with wall with earth
connection ( For AC Plug ) Legrand ( MDS) / Hager( L& T)
Equivalent/ Superior variety SD -140 2017-18
Thuraiyur 35

Sl. No. Qty. Description Rate Unit

0.00 Supply and Laying Rubber Moulded Hyraulic Pressed Paver 782.79 Sqm
Block 83 mm thick including labour charges for laying etc

#REF! #REF! #REF! #REF!

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 Supplying nd laying of 1000 x 1000 x 300mm size ms 16 swg 34310.00 Each
powder coated cable terminal box with two compartment with
necessary bus bar connected with TNEB etc.,
0.00 Supplying and fixing of 200 Amps metal clad switch with 8100.00 Each
rewirable fuse units, (Revised PWD SR 17-18/Pg.no.80 it-J
Part c)
#REF! #REF! #REF! #REF!

785.00 Supply and Laying Rubber Moulded Hyraulic Pressed Paver Block 782.79 Each
83 mm thick including labour charges for laying etc

0.00 Supplying and fixing of 250 Watts Metal halide Flood light 8095.00 Each
etc.,

0.00 d. 750 x 2100 mm 1750.23 Each

* 0.00 0.00 Each


Thuraiyur 36

LICE HOUSING CORPORATION,TRICHY DIVISION

ABSTRACT

and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thuraiyur in
y under Ph-XXI /3000 Quarters scheme

Amount

118030.74

0.00

0.00
0.00
0.00
0.00

119949.60
0.00
0.00

0.00
0.00
0.00

27896.87
2755.70
0.00
0.00
0.00

11533.86
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 37

Amount

0.00
0.00
0.00
194750.95

0.00
0.00

0.00

0.00
6168.96
8352.96
551554.96

32112.22

0.00
0.00

0.00
0.00

0.00

0.00
0.00
62547.32

0.00

0.00

0.00

0.00

1194519.62

0.00

0.00

0.00

#VALUE!
Thuraiyur 38

Amount

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 39

Amount

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1030766.54
931738.63
1008586.48
1109343.44
231595.20
0.00

0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

#VALUE!
#VALUE!
#VALUE!
Thuraiyur 40

Amount

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
Thuraiyur 41

Amount

0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.00

0.00
0.00
Thuraiyur 42

Amount

0.00
0.00
0.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00

0.00
0.00
0.00
0.00
0.00
0.00
10023.30

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 43

Amount

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

179779.95

75909.52
Thuraiyur 44

Amount

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

7800.00

0.00

0.00
0.00
0.00
0.00
#VALUE!
0.00

0.00
0.00
0.00
0.00
0.00
0.00

896442.20

8640.00

175189.02

#VALUE!

#VALUE!

0.00

0.00
Thuraiyur 45

Amount

#VALUE!
0.00

#VALUE!

0.00
0.00
0.00
0.00
0.00
65595.60

181003.82

0.00
0.00

0.00

2560862.90

#VALUE!

645107.35

28431.65

66010.42

20421.75

100595.25

0.00
0.00

0.00
64159.20

87836.74

241762.81

0.00

0.00
0.00
0.00

0.00
Thuraiyur 46

Amount

0.00

0.00
0.00

0.00
6438.00

9880.00

5500.00

819.00

0.00
68111.20

16027.75

39613.40
13470.65

0.00

62469.96

312723.87

0.00
43192.52

0.00
0.00

240.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 47

Amount

0.00
0.00

0.00

0.00
0.00
59415.93
0.00

31783.20

0.00
0.00
0.00

5169.90
0.00
0.00
0.00
0.00

486.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
13000.00

0.00
0.00

0.00
0.00
0.00
10441.20

171902.00
Thuraiyur 48

Amount

12000.00

69747.00

0.00
0.00
0.00

1980.00

0.00
0.00

0.00
11550.00

100809.52

16080.00

0.00

0.00

0.00
0.00

35851.53

0.00

0.00

0.00
0.00
31705.00

0.00

0.00
0.00
Thuraiyur 49

Amount

157936.63

148349.40

148827.17

117292.88

0.00

57493.28

13407.68

13767.95

13846.93

10015.22

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
Thuraiyur 50

Amount

43919.78

46414.23

43167.17

37522.93

17880.56

0.00

1840098.65

1318277.70

1281111.97

1317900.10

1114486.18

280940.18

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 51

Amount

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.00
0.00
92746.50

114260.96

#VALUE!

#VALUE!
#VALUE!

#VALUE!
Thuraiyur 52

Amount

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
Thuraiyur 53

Amount

0.00
#VALUE!

629313.02

4110271.29

2236453.00

0.00
0.00
65047.75

0.00

170884.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00

472835.97

0.00
0.00
Thuraiyur 54

Amount

0.00
0.00
0.00

0.00
481787.35

0.00
0.00

0.00

0.00

420792.00

251003.75

0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
Thuraiyur 55

Amount

0.00

0.00

0.00

0.00
1484673.77

0.00

233457.75

44055.00

0.00
423084.22

0.00

9244743.75

79887.88

69796.44

159025.88

89700.00

252682.00

0.00

0.00

0.00
Thuraiyur 56

Amount

412845.40

430544.88

20218.80

439.40

503970.00

550962.00

55100.00

226326.00

69055.00

164160.00

188000.00

0.00

248898.30

149730.00

0.00

0.00

115245.00
Thuraiyur 57

Amount

147250.00

0.00

0.00

76935.50
0.00
0.00
0.00
0.00

18638.56

13858.56

0.00

35500.00

47200.00

0.00
0.00

4924.00

0.00
0.00
77720.00

62370.00

0.00
0.00
134750.00

0.00
901424.39

821593.39

0.00

0.00
0.00
Thuraiyur 58

Amount

0.00

13050.00

0.00
235756.99

0.00
1997190.72

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
Thuraiyur 59

Amount

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00
Thuraiyur 60

Amount

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
Thuraiyur 61

Amount

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

38330.14

35526.76

35576.74

27699.06

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Thuraiyur 62

Amount

0.00
0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00
1038786.43

0.00

79796.64

116284.35

7552.00

23952.00

8092.00

18912.00

32542.02
Thuraiyur 63

Amount

133417.44

256390.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Thuraiyur 64

Amount

0.00

0.00

0.00

0.00

0.00

61320.00

38316.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Thuraiyur 65

Amount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

85698.00
Thuraiyur 66

Amount

0.00

#REF!

0.00

0.00

0.00

0.00

#REF!

614490.15

0.00

0.00

#VALUE!
Thuraiyur Ph-XXI

GENERAL ABSTRACT

Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development w
Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme

Sl.No. Qty Description Rate Unit

BUILDING WORKS AS PER REVISED PWD SR 2017-


1
1.00 1 No of INS Qtrs (Single , G only) #VALUE! 1 unit

2
1.00 3 Nos of SI Qtrs 3 in 1 (G+2 , ) #VALUE! 1 unit

3
1.00 40 PC/HC Qtrs (8 in 1, 5 Blocks) (G+3) #VALUE! 1 unit

4
1.00 6 Nos of PC/HC Qtrs (6 in 1, 1 Block ) (G+2) #VALUE! 1 unit

SUB - TOTAL - I Rs.

5
1.00 Over Head Water Tank 700 Litres 49 Nos #VALUE!
6
1.00 Septic tank #VALUE!
7
1.00 Sump #VALUE!
8
1.00 Plinth Projection #VALUE!
9
1.00 Paver block road #VALUE!

10
1.00 Sullage Drain #VALUE! 1 Unit

11
1.00 Storm Water Drain #VALUE!
12
1.00 Culvert #VALUE!

SUB - TOTAL - II Rs.


13
GST at 12.0% ( GST at 6% + CGST 6% )

SUB - TOTAL - III Rs.


14 Provision for three phase External Electrical LS
arrangements with panel board arrangements

15 Provision for External water supply arrangement LS


& erection of mortor including Bore well &
pumproom
Thuraiyur Ph-XXI

16 Provision for drinking water supply arrangement LS

17 Provision for Vechile shed LS

18 Provision for LED lighting arrangements LS

19 Provision for numbering and lettering LS


20 Provision for Soil Investigation LS
21 Provision for Cupboard shutters LS
22 Provision for Filling lowlying Area LS

SUB - TOTAL - IV Rs.


23 Labour Welfare fund @ 1.0%

24 Unforeseen items,Contingencies and


P.Supervision at 2.50 %

25 Supervision Charges @ 7.5%

SUB - TOTAL - V Rs.


26 Advertisement charges LS

27 Provision for EB Deposits LS


28 Provision for planning permission LS
29 Structural Design / Consultancy charges LS

30 Provision for payment to other department As per GO

TOTAL Rs.
Thuraiyur Ph-XXI

GENERAL ABSTRACT

o of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at
n Trichy under Ph-XXI /3000 Quarters scheme

Amount

AS PER REVISED PWD SR 2017-18

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

1000000.00

700000.00
Thuraiyur Ph-XXI

200000.00

500000.00

500000.00

50000.00

22000.00

300000.00

250000.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

50000.00

800000.00

300000.00

97000.00

263000.00

#VALUE!
TAMILNADU POLICE HOUSING CORPORATION LIMITED
TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
REVISED DATA 2017-18
Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of
locations based on the 500 mm dia pile
Cum
Volume of Concrete = 3.14 /x *0.5 x 0.5 x 8 = 4.02 /4= 1.57 m3 1.570

500mm Dia pipe

1.570 Cum Standardised concrete mix using M 20 Grade concrete in (F&B) 5261.62 8260.74

0.1570 MT Bentonite (10% concrete volume) 4000.00 628.00

8.00 Rmt Labour charges 960.00 7680.00

Total for 8 Rmt 16568.74


Total for 1 Rmt 2366.96
Moving and placing of piling equipment (1000/8) 125

Total for 1 Rmt 2491.96


Rate for 1 Cum

Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
5 km entirely with city limits

Volume of Concrete = 3.14/4 x 0.5 x 0.5 x 1 km =0.196 m3


0.196

500mm Dia pipe DATA for 1 Rmt

0.196 Cum Dismantling of RCC works it-35/38 p-24 3820.00 748.72

0.196 Cum Conveyance of dismantled materials p-35 48.10 9.43

0.196 Cum Loading or unloading charges p-35 30.10 5.90

Total for 1 Rmt 764.05

Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits

Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 27.48
stone etc.Initial Lead (0-10 km)
9.16
Km 3.00 Loading or unloading charges 30.10 90.30

For 1cum 117.78

Standardised concrete Mix M20 Grade Concrete

5.000 cum 20mm HBG Machine crushed stone jelly (7730 Kg) 1369.96 6849.80

3.300 cum 10-12mm HBG Machine crushed stone jelly (5156 Kg) 1118.46 3690.92

4.790 cum Sand (7670 Kg) 521.55 2498.22

3.250 MT Cement 5530.00 17972.50


Plasticiser /Super plasticiser @ .60% of cement (P57 item
19.500 Kg 38.10 742.95
NO.198
3.500 Nos Mason II 508.00 1778.00

21.200 Nos Maz I 355.00 7526.00

35.300 Nos Maz II 320.00 11296.00

Total for 10 cum 0.00 52354.39


for 1 cum 0.00 5235.44

1.000 cum Vibrating charges p-28 /103 48.67 48.67

Sub Total 0.00 5284.11


LS Add for water charges & other sundries (0.5 % of sub total LS 26.42
Foundation & Basement 5310.53
---------------------
G.F 5444.53
F.F
S.F 5498.03
T.F
Fourth Floor 5517.53
TAMILNADU POLICE HOUSING CORPORATION LIMITED
TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
DATA

Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.45
the 450 mmxdia
x 0.45 8 =pile
4.02 /4= 1.272 m3 1.272
450mm Dia pipe
1.272 Cum RCC 1:1.5:3 (F&B) 5261.62 6692.78
0.1272 MT Bentonite (10% concrete volume) 4000.00 508.80
8.00 Rmt Labour charges 960.00 7680.00

Total for 8 Rmt 14881.58


Total for 1 Rmt 2125.94
Moving and placing of piling equipment (1000/8) 125

Total for 1 Rmt 2250.94


Rate for 1 Cum

Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.45 x 0.45 5 xkm1 km
entirely with m3
=0.159 city limits 0.159
500mm Dia pipe DATA for 1 Rmt
0.159 Cum Dismantling of RCC works p-24 3820.00 607.38
0.159 Cum Conveyance of dismantled materials p-35 48.10 7.65
0.159 Cum Loading or unloading charges p-35 30.10 4.79

Total for 1 Rmt 619.82

Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits

Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30

For 1cum 119.16

TAMILNADU POLICE HOUSING CORPORATION LIMITED


TRICHY DIVISION
Name of Work : Providing Bored cast-in-situ pile Pile Foundation
DATA

Setting of Bored cast-in-situ pile equipments with all accessories and tools at each of Cum
locations=based
Volume of Concrete 3.14 /xon*0.40
the 400 mmxdia
x 0.40 8 =pile
4.02 /4= 1.272 m3 1.005
400mm Dia pipe
1.005 Cum RCC 1:1.5:3 (F&B) 5261.62 5287.93
0.1005 MT Bentonite (10% concrete volume) 4000.00 402.00
8.00 Rmt Labour charges 960.00 7680.00

Total for 8 Rmt 13369.93


Total for 1 Rmt 1909.99
Moving and placing of piling equipment (1000/8) 125

Total for 1 Rmt 2034.99


Rate for 1 Cum

Chipping of pile to the required cut off level and cleaning away the debris with an average lead of
Volume of Concrete = 3.14/4 x 0.40 x 0.40 5 xkm1 km
entirely with m3
=0.129 city limits 0.126
400mm Dia pipe DATA for 1 Rmt
0.126 Cum Dismantling of RCC works 3820.00 481.32
0.126 Cum Conveyance of dismantled materials 48.10 6.06
0.126 Cum Loading or unloading charges 30.10 3.79

Total for 1 Rmt 491.17

Removing of clay and conveyance charges,loading and unloading charges with an average lead of
3km entirely with city limits

Rough stone, Bond stone, cut stone, HBG, Sand, gravel, surkhi, earth, crushed
Km 3.00 9.62 cum 28.86
stone etc.Initial Lead (0-10 km)
Km 3.00 Loading or unloading charges 30.10 cum 90.30

For 1cum 119.16


6849.80

3690.92

2498.22

17972.50

742.95

1778.00

7526.00

11296.00

52354.39
5235.44

5235.44
26.18
5261.62
Electrical Data 2016-17 75

OPEN WIRING IN PVC PIPE

Open wiring for Light point with ceiling rose for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated unsheathed


single core 1.1 KV grade cable with continuous earth by
means of 1.5 sqmm copper PVC insulated unsheathed
single core 1.1 KV grade cable confirming to IS 694 / 1980
with ISI mark in PVC rigid conduit pipe heavy duty with
ISI mark with suitable size MS box of 16g thick concealed
and covered with 3mm thick laminated hylem sheet for
LIGHT POINT WITH CEILING ROSE controlled by 5 amps
flush type switch including citcuit mains, cost of all
materials, specials, etc., all complete,(Open wiring)

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable
45.00 Rmt UPVC rigid conduit pipe 19 mm / 20mm heavy duty with 49.70 1 Rmt
ISI mark
20.00 No 20 mm UPVC rigid bends 14.65 No
150.00 No Tw Plugs 347.00 1000 nos
10.00 No 20 mm PVC rigid tees 18.15 No
10.00 No PVC joint box 44.80 Dozen
0.015 Sqm Hylem sheet 3 mm thick with lamination 537.00 Sqm
10.00 No 5 amps flush type switch 15.33 No
10.00 No Ceiling rose 13.15 No
1.00 Gross Brass screws (40mm x No.6) P-74 - Item No.1c 84.10 Gross
72.00 No 19 mm MS clamp (Conduit saddles) P-75 It-3(b) 47.70 Gross
1/6 Bag Cement 342.50 Bag
10.00 No TW switch box 100 x 100 x 75 mm 16.70 No
1.00 No TW junction box 150 x 100 x 75 mm 20.10 No
0.10 Sqm 3 mm thick laminated Hylem sheet (10X0.1X0.1) 537.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 90 Rmt
cable for continuous earth connection
1/2 Litre Paint SEP 247.40 Litre
10.00 Points Labour charges LS
LS Sundries 1% on materials LS
Total for 10 Points
Rate for 1 Point

Labour Charges for wirnig in PVC pipe concealed

Sub - data

1.00 No Maistry 539.00 No


2.00 No Wiremen Grade - I 494.00 No
3.00 No Wiremen Grade - II 467.00 No
4.00 No Helper 352.00 No

LIGHT POINT WITH CEILING ROSE FOR


ADMINISTRATIVE BLOCKS AND COMMUNITY CENTRE
Open wiring

Light point with bakelite batern type holder for flats/ houses(Open wiring)
Electrical Data 2016-17 76

Wirng with 1.5 sqmm copper PVC insulated unsheathed


single core 1.1 KV grade cable with continuous earth by
means of 1.5 sqmm copper PVC insulated unsheathed
single core 1.1 KV grade cable confirming to IS 694 / 1980
with ISI mark in PVC rigid conduit pipe heavy duty with ISI
mark with suitable size MS box of 16g thick concealed
and covered with 3mm thick laminated hylem sheet for
LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR
FLATS/ HOUSES controlled by 5 amps flush type switch
including citcuit mains, cost of all materials, specials, etc.,
all complete,

Total for Data 1 excluding sundries


Deduct cost of ceiling rose 10 Nos
Add cost of Bakelite battern type holders 10 Nos @ Rs 20.20 / Each
Sundries
Total for 10 points
Rate for 1 points

POINT WIRING FOR CALLING BELL / BUZZER WITH


PUSH SWITCH FOR ALL TYPE OF BUILDING (OPEN
WIRING)

Wirng with 1.5 sqmm copper PVC insulated unsheathed


single core 1.1 KV grade cable with continuous earth by
means of 1.5 sqmm copper PVC insulated unsheathed
single core 1.1 KV grade cable confirming to IS 694 / 1980
with ISI mark in fully concealed PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g
thick concealed and covered with 3mm thick laminated
hylem sheet for POINT WIRING WITH CALLING
BELL/BUZZER WITH PUSH TYPE SWITCH FOR ALL TYPE OF
BUILDINGS including citcuit mains, cost of all materials,
specials, etc., all complete,(OPEN WIRING)

Total of Data 1 excluding sundries


Deduct cost of 10 Nos ceiling rose
Deduct cost of 10 Nos 19 mm PVC junction box
Deduct 10 Nos 5 A switch
Add the cost of 10 Nos Buzer/Bell @ 50.40/Each
Add the cost of 10 nos 5A type push switch @ Rs 17.25/ Each
Add the cost of 10 nos 15 x 10 x 7.5 cm TW box @ Rs 20.10/Each
Sundries
Total for 10 points
Rate for 1 point

FAN POINT FOR ADMINISTRATIVE BLOCKS AND


COMMUNITY CENTRE
Electrical Data 2016-17 77

Wirng with 1.5 sqmm copper PVC insulated unsheathed


single core 1.1 KV grade cable with continuous earth by
means of 1.5 sqmm copper PVC insulated unsheathed
single core 1.1 KV grade cable confirming to IS 694 / 1980
with ISI mark in PVC rigid conduit pipe heavy duty with
ISI mark with suitable size MS box of 16g thick concealed
and covered with 3mm thick laminated hylem sheet for
FAN POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE controlled by 5 amps flush type
switch including citcuit mains, cost of all materials,
specials, etc., all complete,(Open wiring)

Total for Data 1 excluding sundries


Deduct cost of TW Box 10X10 @ 16.70/each
Deduct cost of Hylem sheet
Add cost of TW box 12" x 8" x3" for switch and regulator 10 nos @ Rs 84.20 / Each
Hylem sheet 0.60 Sq m@ 685/Sq m
Add Sundries 1%
Total for 10 points
Rate for 1 points

STAIRCASE LIGHT POINT FOR ADMINISTRATIVE


BLOCKS AND COMMUNITY CENTRE (Open wiring)

Wirng with 1.5 sqmm copper PVC insulated unsheathed


single core 1.1 KV grade cable with continuous earth by
means of 1.5 sqmm copper PVC insulated unsheathed
single core 1.1 KV grade cable confirming to IS 694 / 1980
with ISI mark in fully concealed PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g
thick concealed and covered with 3mm thick laminated
hylem sheet for STAIRCASE LIGHT POINT FOR
ADMINISTRATIVE BLOCKS AND COMMUNITY CENTRE
controlled by 5 amps flush type switch including citcuit
mains, cost of all materials, specials, etc., all complete,
(Open wiring)

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI 49.70 Rmt
mark
10.00 No 19 mm PVC rigid bends 14.65 No
5.00 No 19 mm PVC rigid tees 18.15 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 21.50 No
5.00 No PVC round block 2.50 Each
5.00 No Ceiling rose 13.15 No
0.090 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.00 Bag Cement 342.50 Bag
6.00 No TW switch Box 150X100X65mm 20.10 Each
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable for continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point

5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES (OPEN WIRING)


Electrical Data 2016-17 78

Wirng with 1.5 sqmm copper PVC insulated unsheathed


single core 1.1 KV grade cable with continuous earth by
means of 1.5 sqmm copper PVC insulated unsheathed
single core 1.1 KV grade cable confirming to IS 694 / 1980
with ISI mark in fully concealed PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g
thick concealed and covered with 3mm thick laminated
hylem sheet for 5 amps 5 pin PLUG SOCKET POINT AT
CONVENIENT PLACES including citcuit mains, cost of all
materials, specials, etc., all complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 90 Rmt
cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI 49.70 Rmt
mark
20.00 No 19 mm PVC rigid bends 14.65 Dozen
10.00 No 19 mm PVC rigid tees 18.15 Dozen
1.00 No MS box 150x 100 x 75 mm 68.30 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) 38.23 No
15.00 No MS box 150x 100 x 75 mm 68.30 No
0.225 Sqm 3 mm thick laminated Hylem sheet 537.00 SQqm
1.25 Bag Cement 276.50 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single core 13.10 90 Rmt
cable for continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
Labour charges
1.00 No Maistry 539.00 No
2.00 No Wiremen Grade - I 494.00 No
3.00 No Wiremen Grade - II 467.00 No
4.00 No Helper 352.00 No

2 X1.5 Sqmm in fully concealed PVC conduit

Run off mains with 2 wires of 1.5 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 1.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable in
fully concealed 19 mm / 20 mm dia rigid PVC open
conduit pipe heavy duty with ISI mark including cost of all
materials, specials, etc., all complete.

180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI 49.70 Rmt
mark
1.00 gross MS saddles 19mm 37.40 gross
300.00 Nos TW plugs 38x25x19mm 272.00 1000Nos
2.00 Gross Brass screws 38mm 84.10 gross
0.33 Bag Cement 276.50 Bag
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core 13.10 Rmt
cable for continuous earth connection
2/3 Labour charges 4336.00

Sundries
Total for 90 Metres
Rate for 1 Rmt

2 X 2.5 Sq mm in fully concealed PVC conduit (open wiring)


Electrical Data 2016-17 79

Run off mains with 2 wires of 2.5 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 1.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable in
fully concealed 19 mm / 20 mm dia rigid PVC conduit pipe
heavy duty with ISI mark including cost of all materials,
specials, etc., all complete.

Total as per Data No.


180.00 Rmt Add 180 mt 2.5 Sqmm copper PVC insulated unsheathed 20.30 Rmt
S.C. cable
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed S.C. 13.10 Rmt
cable
Sundries
Total for 90 metres
Rate for 1 Rmt
Electrical Data 2016-17 80

1179.00

2236.50

293.00
52.05
181.50
37.33
8.06
153.30
131.50
84.10
23.85
68.50
167.00
20.10
53.70
589.50

123.70
2890.67
22.07
8315.43
831.54

539.00
988.00
1401.00
1408.00

4336.00

2890.67
Electrical Data 2016-17 81

8293.36
131.50
202.00
22.11
8385.97
838.60

8293.36
131.50
29.30
153.30
504.00
172.50
201.00
16.41
8873.17
887.32
Electrical Data 2016-17 82

8315.43
167.00
53.70
842.00
411.00
12.50
9360.23
936.02

1179.00

1491.00

146.50
90.75
215.00
12.50
65.75
48.33
342.50
120.60
393.00

4336.00
8.30
8449.23
1689.85
Electrical Data 2016-17 83

1179.00

2236.50

293.00
181.50
68.30
8.06
573.45
1024.50
120.83
345.63
589.50

2890.67
28.51
9539.45
635.96

539.00
988.00
1401.00
1408.00
4336.00

2358.00

4473.00

37.40
81.60
168.20
91.25
1179.00

2890.67
11279.12
52.28
11331.40
125.90
Electrical Data 2016-17 84

11331.40
3654.00

2358.00

36.00
12663.40
140.70
Mangalore
tiles,
Lime
(1000nos.)
stone,
Rough stone, machine
Laterite,br
Bond stone, cut pressed Chamber
ick jelly,
stone, HBG, tiles, bricks,
Cement & Country wood
Sand, gravel, (2000nos) Stock
Steel Bricks, work,
surkhi, earth, Hydraulic bricks, Fly
pond
crushed stone pressed ash bricks
ash(wet/D
etc. tiles,
ry), Stone
Mosaic
dust etc.
tiles(1500
nos)

(1MT) (1Cum) (1000 Nos)


0-10 6.02 60.2 9.62 96.2 8.12 81.2 10.82 108.2 13.52 135.2 6.60
10-20 5.15 111.7 8.23 178.5 6.95 150.7 9.27 200.9 11.58 251 5.66
20-40 4.43 200.3 7.09 320.3 5.97 270.1 7.97 360.3 9.96 450.2 4.87
40-80 3.82 353.1 6.65 586.3 5.15 476.1 6.86 634.7 8.60 794.2 4.21
>80 3.49 5.58 4.71 6.27 7.84 3.84

Metal 8 76.96 41 275.25 0 0 41


Sand 45 353.55 0 0 0 Mosaic 0
Rough &
Bond stone 8 76.96 20 100.45 435.6 0
Gravel 8 76.96 0
Cement 0 0 8
Steel 0 0 0
well gravel 0 0.00
Earth 0 0
0 0 0.00
0 0 60.2
0 0
0 0
0
66.00
122.6
220
388.4

224.21 Br jelly
0 Lime

0 Wood
0 Stone dust
52.8 Lime Stone
0 Quarry rubbish
2010 - 2011 Electrical Data 88
TNHB ELECTRICAL DATA

Part -A
DATA - 1
WIRING IN CONCEALED PVC PIPE

Light point with ceiling rose for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 1 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 No
10.00 No 19 mm PVC rigid tees 1.31 No
1.00 No MS joint box 150 x 100 x 75 mm 64.00 No

0.015 Sqm Hylem sheet 3 mm thick with lamination 640.00 Sqm


10.00 No 5 amps flush type switch 16.17 No
10.00 No Ceiling rose 15.75 No
10.00 No 19 mm PVC junction box 3.50 No
1.25 Bag Cement 260.00 Bag
10.00 No MS box 150 x 100 x 75 mm 64.00 No
0.15 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
45.00 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
LS Labour charges LS
LS Sundries LS

Total for 10 Points


Rate for 1 Point

Labour Charges for wirnig in PVC pipe concealed

Sub - data

1.00 No Maistry 277.00 No


2.00 No Wiremen Grade - I 254.00 No
3.00 No Wiremen Grade - II 240.00 No
4.00 No Helper 181.00 No
For Concreting work
2.00 No Mason IInd class 261.00 No
4.00 No Helpers 181.00 No

DATA - 2
2010 - 2011 Electrical Data 89
Light point with bakelite batern type holder for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

Total for Data 1 excluding sundries

Deduct cost of ceiling rose 10 Nos

Add cost of Bakelite battern type holders 10 Nos @ Rs 18.90 / Each


Sundries
Total for 10 points
Rate for 1 points

DATA - 3
POINT WIRING FOR CALLING BELL / BUZZER
WITH PUSH SWITCH FOR ALL TYPE OF BUILDING

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

Total of Data 1 excluding sundries


Deduct cost of 10 Nos ceiling rose
Deduct cost of 10 Nos 19 mm PVC junction box
Deduct 10 Nos 5 A switch
Add the cost of 10 Nos Buzer/Bell @ 47.25/Each
Add the cost of 10 nos 5A type push switch @ Rs 9.00/ Each
Add the cost of 10 nos 15 x 10 x 7.5 cm TW box @ Rs 18.90/Each
Sundries
Total for 10 points
Rate for 1 point

DATA - 4
FAN POINT
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
2010 - 2011 Electrical Data 90
20.00 No 19 mm PVC rigid bends 3.15 No
10.00 No 19 mm PVC rigid tees 1.31 No
10.00 No PVC junction box 19 mm 3.50 No
10.00 No Ceiling rose 15.75 No
10.00 No 5 amps flush type switch 16.17 No
10.00 No MS box 300 x 200 x 75 mm 103.90 No
0.60 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.00 No MS joint box (150 x 100 x 75 mm ) 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
LS Labour charges
LS Sundries
Total for 10 points
Rate for 1 point
MS box 300 x 200 x 75 mm
200x150x75 mm=90 90.00
A 200x150x75 mm=0.0825 0.0825
A 300x200x75 mm=0.135m2 0.135

DATA - 5
STAIRCASE LIGHT POINT
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
10.00 No 19 mm PVC rigid bends 3.15 No
5.00 No 19 mm PVC rigid tees 1.31 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 20.08 No
5.00 No Ceiling rose 15.75 No
5.00 No 19 mm PVC junction box 3.50 No
6.00 No MS box 150x 100 x 75 mm 64.00 No
0.09 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point

DATA - 6
5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r
2010 - 2011 Electrical Data 91
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 Dozen
10.00 No 19 mm PVC rigid tees 1.31 Dozen
1.00 No MS box 150x 100 x 75 mm 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type35.00 No
15.00 No MS box 150x 100 x 75 mm 64.00 No
0.225 Sqm 3 mm thick laminated Hylem sheet 640.00 SQqm
1.25 Bag Cement 260.00 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point

DATA - 7
5 AMPS 5 PIN PLUG SOCKET POINT AT SWITCH BOARD ITSELF

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

5.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 1 Rmt
core cable
2.50 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
1.00 No 5 A 5 pin non - inter locking switch and plug ( flush type35.00 No
Labour charges
Sundries
Rate for 1 point

DATA - 8
15 AMPS POWER PLUG

Supplying and fixing of 15 Amps 3 pin flush type


plug socket on suitable MS box of 16g thick concealed
and covered with 3 mm thick laminated hylem sheet
inclusive of all materials, etc., all complete.

1.00 No 15 Amps 3 pin flush type plug socket 56.70 No


1.00 No MS box 150 x 100 x 75mm 64.00 No
0.015 Sqm 3 mm thick laminated hulem sheet 640.00 Sqm
LS Labour charges and sundries such as cement, screws etc.,
Rate for Each

DATA - 9
LIGHT POINT WITH CEILING ROSE FOR
ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE
2010 - 2011 Electrical Data 92
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 1 Rmt
ISI mark
12.00 No 19 mm PVC rigid bends 3.15 No
6.00 No 19 mm PVC rigid tees 1.31 No
1.00 No MS joint box 150 x 100 x 75 mm 64.00 No
0.015 Sqm Hylem sheet 3 mm thick with lamination 640.00 Sqm
6.00 No 5 amps flush type switch 16.17 Dozen
6.00 No Ceiling rose 15.75 No
6.00 No 19 mm PVC junction box 3.50 No
1.25 Bag Cement 260.00 Bag
6.00 No MS box 150 x 100 x 75 mm 64.00 No
0.09 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
45.00 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges LS
Sundries LS
Total for 6 Points
Rate for 1 Point

DATA - 10
LIGHT POINT WITH BAKELITE BATTERN TYPE
HOLDER FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

Total of Data 9 excluding sundries


Deduct cost of ceiling rose 6 nos
Add cost of Bakelite battern type holders 6 nos @ 18.90/Each
Sundries
Total for 6 points
2010 - 2011 Electrical Data 93
For 1 points

DATA - 11
FAN POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
12.00 No 19 mm PVC rigid bends 3.15 No
6.00 No 19 mm PVC rigid tees 1.31 No
6.00 No PVC junction box 19 mm 3.50 No
6.00 No Ceiling rose 15.75 No
6.00 No 5 amps flush type switch 16.17 Dozen
6.00 No MS box 300 x 200 x 75 mm 103.90 No
0.36 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.00 No MS joint box (150 x 100 x 75 mm ) 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 6 points
Rate for 1 point

DATA - 12 a
STAIRCASE LIGHT POINT FOR ADMINISTRATIVE
BLOCKS AND COMMUNITY CENTRE

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
6.00 No 19 mm PVC rigid bends 3.15 No
3.00 No 19 mm PVC rigid tees 1.31 No
6.00 No 5 A flush type two way switches ( Staircase switch ) 20.08 No
3.00 No Ceiling rose 15.75 No
2010 - 2011 Electrical Data 94
3.00 No 19 mm PVC junction box 3.50 No
3.00 No MS box 150x 100 x 75 mm 64.00 No
0.054 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.25 Bag Cement 260.00 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 3 points
Rate for 1 point

Part -B

DATA - 12
2 X1.5 Sqmm in fully concealed PVC conduit

Run off mains with 2 wires of 1.5 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 1.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
in fully concealed 19 mm / 20 mm dia rigid PVC condui

180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
3.00 Bag Cement 260.00 Bag
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges

Sundries
Total for 90 Metres
Rate for 1 Rmt

DATA - 13
2 X 2.5 Sq mm in fully concealed PVC conduit

Run off mains with 2 wires of 2.5 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 1.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
in fully concealed 19 mm / 20 mm dia rigid PVC condui

Total as per Data No. 12


180.00 Rmt Add 180 mt 2.5 Sqmm copper PVC insulated 19.90 Rmt
unsheathed S.C. cable

180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed 12.80 Rmt
S.C. cable
Sundries

Total for 90 metres


2010 - 2011 Electrical Data 95
Rate for 1 Rmt

DATA - 14
2 X 4 Sq mm in fully concealed PVC conduit

Run off mains with 2 wires of 4 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 2.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
in fully concealed 19 mm / 20 mm dia rigid PVC
conduit

180.00 Rmt 4 sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark

3.00 Bag Cement 260.00 Bag


90.00 Rmt 2.5 sqmm copper PVC insulated unsheathed single 19.90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt

DATA - 15
4 X 4 Sq mm in fully concealed PVC conduit

Run off mains with 4 wires of 4 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 2.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
in fully concealed 19 mm / 20 mm dia rigid PVC
conduit

360.00 4 sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
90.00 25mm dia rigid PVC pipe heavy duty with ISI heavy 28.90 Rmt
duty with ISI mark
3.00 Cement 260.00 Bag
90.00 2.5 sqmm copper PVC insulated unsheathed single 19.90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt

Labour charges ( 1.5 x Labour charges + Labour for ducting - sub data - A)
( 1.5 x 3475 ) - ( ( 522 + 724 ) / 2) 4589.50
4589.50

Part -C

DATA - 16

WATER TIGHT BULK HEAD FITTING


2010 - 2011 Electrical Data 96

Supplying and fixing of water tight bulk head fittings


with guard suitable for 60 / 100 watts including
necessary connections, cost of materials, etc., All
complete.
1.00 No Bulk head fittings 315.00 No
Sundries
Labour charges
Total For 1 No

Labour Charges Data


2.00 No Wiremen Grade II 240.00 No
3.00 No Helper 181.00 No
Total for 15 Nos
Rate for 1 No

DATA - 17

16 AMPS DOUBLE POLE MAIN SWITCH ON TEAK


WOOD BOARD TOP MES SERVICE CONNECTION /
MOTOR PUMP( SINGLE PHASE ) SET

Supplying and fixing of 16 amps double pole main


switch with fuse and neutral link on a suitable well
varnished Teak wood board including necessary
interconnections and cost of all materials, etc., all
complete.

1.00 No 16 Amps double pole main switch with fuse and 200.00 No
neutral link
1.00 No TW board of size 31x20x6 cm with brass hinge screw 62.00 No
hooks well varnished
Sundries for TW plugs,screws, wire and earth
connection etc.,
Labour charges
Rate for 1 No
0.00

Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
Total for 4 Nos
Rate for 1 no

DATA - 19

32 AMPS DOUBLE POLE MAIN SWITCH ON TEAK


WOOD BOARD TOP MES SERVICE CONNECTION /
MOTOR PUMP( SINGLE PHASE ) SET

Supplying and fixing of 32 amps double pole main


switch with fuse and neutral link on a suitable well
varnished Teak wood board including necessary
interconnections and cost of all materials, etc., all
complete.
2010 - 2011 Electrical Data 97

1.00 No 32 Amps double pole main switch with fuse and 455.00 No
neutral link
1.00 No TW board of size 31x20x6 cm with brass hinge screw 62.00 No
hooks well varnished
Sundries for TW plugs,screws, wire and earth
connection etc.,
Labour charges
Rate for 1 No

DATA - 18

Supply and fixing 4 way 250 volt single phase with


neutral link metalic distribution board on suitable Teak
wood board etc., all complete including connections.

1.00 No 4 way 16 amps, way 250 volts single phase and 504.00 No
neutral link metalic distribution board

1.00 No T.W board of size 31 x 20x 6 cm with well varnished 62.00 No


Sundries
Labour charges as per Data No 17
Rate for Each

DATA - 19

16 AMPS TPIC ON TEAK WOOD BOARD FOR 3


PHASE MES SERVICE CONNECTION AND 3 PHASE
MOTOR PUMPSETS

Supplying and fixing of 16 amps triple pole main


switch with fuse and neutral link on a suitable well
varnished teak wood board including necessary
interconnection and earth connection cost of all
materials, etc., all complete.

1.00 No 16 Amps triple pole main switch with fuse and neutral l 480.00 No
1.00 No TW board of size 46 x31 x 6 cm with brass hinges 130.00 No
hooks screws well varnished

Sundries screw TW plugs screws wire and earth


connections.
Labour charges
Rate for Each

Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helpers 181.00 No
Labour for 3 Nos
Rate for 1 No

DATA - 22
2010 - 2011 Electrical Data 98
Supplying and fixing of 32 amps triple pole main
switch with fuse and neutral link on a suitable
well varnished teak wood board including necessary
interconnection and earth connection cost of all
materials, etc., all complete.

1.00 No 32 Amps triple pole main switch with fuse and neutral l 800.00 No
1.00 No TW board of size 46 x31 x 6 cm with brass hinges 130.00 No
hooks screws well varnished
Sundries screw TW plugs screws wire and earth
connections.
Labour charges
Rate for Each

DATA - 20

THREE PHASE DISTRIBUTION BOARD WITH 4


WAY PHASE AND 3 AMPS/WAY FUSE AND
NEUTRAL LINK FOR MES SERVICE CONNECTION
( 6 IN 1 BLOCKS )

Supplying and fixing of 1 No three phase distribution


board with 4 way/ phase and 30 A/way with neutral
link on a suitable well varnished teak wood plank
including necessary interconnections and earth
connections cost of all materials, etc., all complete.

1.00 No Three phase distribution board with 4 way/phase and 2520.00 No


32 A / Way with fuse and neutral link.

1.00 No TW plank of size 750 x 450 x 12 mm thick 299.13 No


Sundries such as screws plugs, cement, wire and earth
connection.
Labour charges
Rate for Each
TW plank of size 750 x 450 x 12 mm thick(69410+445073860.00 0.00405
DATA - 24

THREE PHASE DISTRIBUTION BOARD WITH 6


WAY PHASE AND 30 AMPS / WAY WITH FUSE AND
NEUTRAL LINK ON SUITABLE TW PLANK TOP MES
CONNECTION BOARD (FOR 12 IN 1 BLOCKS)

( For 12 flats common & pump )

As per above data


1.00 No Add for 6 way TPDB 32A/way 3360.00 No
1.00 No Less 4 way TPDB 32 A/way 2520.00 No
Sundries
Rate for Each

DATA - 22

FIXING OF TUBE LIGHT FITTINGS ON WALL /


CEILING
2010 - 2011 Electrical Data 99
Charges for assembling and fixing of flouresent
tubular lamp fittings of different types ( supplied by
the department at free of cost ) with necessary teak
wood round block of 75 mm dia 40 mm deep on walls/
ceiling including cost of materials, etc., all c

2.00 No TW round block 630.00 100 Nos


2.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 Rmts
sundries such as screws, nails etc.,
Labour charges for assembling and fixing
Rate for Each

Labour charges for 16 Nos


1.00 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
3.00 No Helpers 181.00 No
Total for 16 Nos
Rate for 1 No

DATA - 23
FIXING OF TUBE FITTINGS SUSPENDED FROM
CEILING

Charges for assembling and fixing of flouresent


tubular lampfittings of different types ( to be supplied
by the departmental at free of cost ) with necessary
heavy gauge conduit pipe with ball and socket
arrangement on teak wood round block of 75 mm dia
4

1.50 Rmt Conduit pipe 19 mm (MS) 32.50 Rmt


2.00 No Round block 75 mm dia 40 mm deep 630.00 100 Nos
2.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 Rmt
Sundries such as ball and socket arrangement, choke,
nails, screws, etc.,
Labour charges
Rate for Each

Labour Charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
3.00 No Helpers 181.00 No
Total for 10 Nos
Rate for 1 No

DATA - 24
Charges for assembling and fixing of ceiling fan of
different sweep ( to be supplied by the department at
free of cost ) with necessary interconnection and
fixing of fan regulator on the existing board, etc., all
complete.

1.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 tmt
Labour Charges
Sundries
Labour charges for 5 Nos Rate for Each
1.00 No Wiremen Grade I 254.00 No
1.00 No Wiremen Grade II 240.00 No
2010 - 2011 Electrical Data 100
2.00 No Helpers 181.00 No
Total for 5 Nos
Rate for Each
Part F
DATA - 25
EARTHING & ELCB
Run of 8 SWG GI Wire
Supplying and laying of 8 SWG GI wire on walls/below
ground level with necessary 'U' nails/ earth work
excavation and re- filling etc., including cost of all
materials, all complete.

9.50 Kg 8 SWG GI wire 84.00 Kg


0.50 Kg 'U' nails 22.00
Labour
Sundries
Tatal for 90 Rmts
For 1 Rmt

Labour charges
1.00 Wiremen Grade I 254.00 No
1.00 Helpers 181.00 No

Note:This item 30 is to run earth wire from IS:3043 earthing item 32) to be Main switch/ Panel Board/ Ma

DATA - 26
EARTHING STATION AS PER IS/3043.

Providing earthing satation using pipe electro as per IS


3043 using 40 mm dia 'B' class GI pipe strickly in
accordance with IS3043 including cost of all materials

2.50 Rmt GI pipe 40 mm 154.35 Rmt


1.00 Rmt GI pipe 20 mm 93.45 Rmt
1.00 Rmt 15 mm GI pipe 66.15 Rmt
1.00 No GI reducer 40x20mm 49.35 No
1.00 Set Funnel, GI Nuts, Bolts,Washers and check nuts. LS Set
LS Earth work excavation brick work in CM and plastering LS LS
1.00 No C.I Cover(30 x 30cm) 100.00 No
40.00 Kg Charcoal 4.00 Kg
2.00 No GI bend 15 mm dia 13.10 No
4.00 No 15 mm GI coupling 13.10 No
10.00 Kg Salt 4.00 Kg
Sundries
Labour charges
Rate for Each

Labour charges
1.00 No Wiremen Grade I 254.00 No
1.00 No Helpers 181.00 No

DATA - 30
ELCB SURFACE TEAK WOOD BOARD
2010 - 2011 Electrical Data 101
Charges for fixing single phase RCCB/ELCB ( to be
supplied by the department free of cost ) on suitable
well varnished teak wood plank with a necessary inter
connection and earth connections using copper cable
including cost of all materials, etc., all

1.00 No TW plank 200 x 150 x 20 mm 44.32 Each


Sundries such as TW plugs, screws, cement, PVC LS
insulated unsheathed copper wires and earth
connections.

Labour Charges
Rate for Each

TW Plank 73860.00 0.0006


Labour Charges
1.00 No Wire men Grade I 254.00 Each
3.00 No Wiremen Grade II 240.00 Each
Total for 10 units
Rate for 1 unit

DATA - 28
Charges for fixing single phase RCCB/ELCB ( to be
supplied by the department at free of cost ) on fully
concealed suitable MS BOX with a necessary inter
connection and earth connections using copper cable
including cost of all materials, re- doing the dis

1.00 No MS BOX with cover 300 x 200 x 100 mm 315.00 No


Sundries such as cement, 1.5Sqmm copper PVC
insulated unsheathed wire & earth connections etc.,
all complete.

Labour charges
Rate for Each

Labour Charges
1.00 Wiremen Grade I 254.00 No
3.00 Wiremen Grade II 240.00 No
1.00 Helper 181.00 No
0.50 Mason I 291.00 No
Total for 10 Nos
For 1 No

DATA - 29
ELCB ( 3 PHASE ) on surface teak wood plank

Charges for fixing three phase RCCB/ ELCB ( to be


supplied by the department to free of cost ) on
suitable well varnished teak wood plank on the wall s (
Surface ) with necessary inter connecteion and earth
connections using copper cable including cost of

1.00 No TW plank 300 x 200 x 20 mm 88.63 Each


2010 - 2011 Electrical Data 102
LS LS Sundries such as cement, 4.0 Sqmm copper PVC LS LS
insulated unsheathed wire & earth connections etc.,
all complete.
Labour Charges
Rate for Each

TW plank 300 x 200 x 20 mm 73860.00 0.0012

DATA - 30

ELCB (3 phase ) inconcealed MS Box

Charges for fixing Three phase RCCB/ELCB ( to be


supplied by the department at free of cost ) on fully
concealed suitable MS BOX with a necessary inter
connection and earth connections using copper cable
including cost of all materials, re- doing the dis

1.00 No MS BOX with cover 300 x 200 x 100 mm 315.00 No


Sundries such as cement, 1.5Sqmm copper PVC
insulated unsheathed wire & earth connections etc.,
all complete.
Labour charges
Rate for Each

DATA - 31
Supplying and delivery of Single phase ELCB/RCCB

1.00 No 25 Amps rating single phase ELCB with 10 to 25 MA 1660.00 No


sensitivity (ISI make ) (DP)

DATA - 32
Supplying and delivery of Three phase ELCB/RCCB

1.00 No 32 Amps rating Three phase ELCB with 20 to 30 MA 2040.00 No


sensitivity

DATA - 33
1 no of 32 amps Fuse unit
External Installation

Supplying and fixing 1 No 30 Amps 500 volts


grade/well porcelin fuse unit on suitable teak wood
plank to be fixed on the top of the pole / EB street
poles with necessary clamps and including cost of
materials etc., all complete.
1.00 No 32 Amps 500 V fuse units 89.00 No
1.00 No TW plank 150 x 100 x 20 mm 22.16 No
Labour charges
Sundries such as MS clamps screws etc., LS
Rate for Each

TW plank 150 x 100 x 20 73860.00 0.0003

Labour Charges
1.00 No Wiremen Grade I 254.00 No
2010 - 2011 Electrical Data 103
1.00 No Wiremen Grade II 240.00 No
3.00 No Helper 181.00 No
Total for 8 Nos
Rate for 1 No

DATA - 34
3 Nos of Fuse units at EB pole

Supplying and fixing 3 No 32 Amps 500 volts grade/


well porcelin fuse unit on suitable teak wood plank to
be fixed on the top of the pole / EB street poles with
necessary clamps and including cost of materials etc.,
all complete.
3.00 No 32 Amps 500 V fuse units 89.00 Each
1.00 No TW plank 200 x 150 x 20 mm 44.32 No
Labour charges
Sundries such as MS clamps screws etc., LS
Rate for Each

TW plank 200 x 150 x 20 mm 73860.00 0.0006

Labour Charges
1.00 No Wiremen Grade I 254.00 No
1.00 No Wiremen Grade II 240.00 No
4.00 No Helper 181.00 No
Total for 8 Nos
Rate for 1 no

DATA - 35

EB service connection Board for single phase

Supplying and fixing 1 No of 375 x 300 x 20 m thick


TW plank well varnished with 1 No 15 amps 250 volts
fuse unit and 1 No of copper earth plate of suitable
size bolts and nuta on walls for EB service connections
including cost of all materials, etc., a

1.00 No 15 Amps 260 Volts fuse unit 46.00 No


1.00 No TW plank 375 x 300 x 20 mm 166.19 No
1.00 No Earth plate ( copper ) with bolts & nuts. 25.00 LR
Labour Charges
Sundries such as TW plugs screws, etc.,
Rate for Each

TW plank 375 x 300 x 20 mm 73860.00 0.002250

Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
Total for 4 Nos
Rate for 1 No

DATA
Supplying and fixing of Single phase ELCB

1.00 No Single phase ELCB (ISI 25 Amps 30 MA) 1660.00 No


3.00 No 3 No of 30 amps MCB 141.00 No
2010 - 2011 Electrical Data 104
Labour charges ( as per data No:28)
Sundries
Rate for Single phase ELCB

DATA

Supplying and fixing of Three phase ELCB

1.00 No Three phase ELCB 2040.00 No


3.00 No 3 No of 30 amps MCB 141.00 No
Labour charges ( as per data No:30)
Sundries
Rate for Three phase ELCB

DATA - 36

EB service connection Board for Three phase

Supplying and fixing 1 No of 450 x 375 x 20 m


thick TW plank well varnished with 3 No 30 amps
500 volts fuse unit and 1 No of copper earth plate of
suitable size bolts and nuta on walls for EB service
connections including cost of all materials, etc., a

3.00 No 32 Amps 500 Volts fuse unit 89.00 No


1.00 No TW plank 450 x 375 x 20 mm 249.28 No
1.00 No Earth plate ( copper ) with bolts & nuts. 25.00 LR
Labour Charges
Sundries such as TW plugs screws, etc.,
Rate for Each

TW plank 450 x 375 x 20 mm 73860.00 0.003375

Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
Total for 3 Nos
Rate for 1 No

DATA - 37

2 x 4 Sqmm Copper PVC insulated unsheathed


single core 1 KV grade cable for EB service
single phase.

180.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
4.00 Kg 7/20 GI stay wire 84.00 Kg
180.00 Each PVC reel insulater 0.56 Each
1.00 Kg GI wire for fixing reel insulater 84.00 Kg
Labour charges
Sundries for masonry works clamps bolts and nuts etc.,
Total for 90 Rmt
Rate for 1 Rmt
Labour charges
1.00 No Electrician Maistry 277.00 No
2.00 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
2010 - 2011 Electrical Data 105
3.00 No Helper 181.00 No

DATA - 38
SUPPLY OF GI PIPES FOR EB SERVICE
( SINGLE PHASE )

Supply of 25 mm dia GI pipe "B"class ( for the above


Data ) for passing through from top of Houses to the
MES Board to meet the EB requirement.

1.00 Rmt GI pipe of 25 mm dia 121.25 Rmt


Sundries
Rate Each Rmt

DATA - 39
Supply of MS angle for EB service ( single phase )

Supply of MS angles 40 x 40 x 6 mm for above data to


support the above GI pipe and fixing the GI stay wire
service connection wires for above data

1.00 Rmt 40 x 40 x 6 mm MS angle 48.00 KG


3.25 (3.25 Kg)
Sundries
For 1 Rmt

DATA - 40

4 x 4 Sq mm copper PVC insulated unsheathed


single core cable for 3 phase EB service
connection

Run of 4 wires of 4 Sqmm copper PVC insulated


unsheathed single cosre/ 1.1 KV grade cable with one
run of 7/20 GI stay wire suspended with porcelin reel
insulater at 1.0 m C/C for support of phase and
neautral cable from the top of street pole to the hous

360.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable

4.00 Kg 7/20 GI stay wire 84.00 Kg


360.00 Each PVC reel insulater 0.56 Each
1.50 Kg GI wire for fixing reel insulater 84.00 Kg
Labour charges 1.5 times dataNo 42
Sundries for masonry works clamps bolts and nuts etc.,
Total for 90 Rmt
Rate for 1 Rmt

DATA - 41
SUPPLY OF GI PIPES FOR EB SERVICE
( THREE PHASE )
2010 - 2011 Electrical Data 106
Supply of 40 mm dia GI pipe "B"class ( for the above
Data ) for passing through from top of Houses to the
MES Board to meet the EB requirement.

1.00 Rmt GI pipe of 40 mm dia 154.35 Rmt


Sundries
Rate Each Rmt

DATA - 42
Supply of MS angle for EB service ( single phase )

Supply of MS angles 40 x 40 x 6 mm for above data to


support the above GI pipe and fixing the GI stay wire
service connection wires for above data
1.00 Rmt 40 x 40 x 6 mm MS angle 48.00 KG
3.25 (3.25 Kg)
Sundries
For 1 Rmt

Laying of U.G. Cable below Ground Level

Charges for conveying and layind=g of U.G.Cable


below ground level including earth work excavation
and refilling and providing sand cushion, brick layer
protection, etc., all complete for UG cable of sizes 4 to
25 mm and 2'/3/31/2/4 core

30.42 Cum Earth work excavation and refilling 89.87 Cum


6.10 Cum Sand 110.00 Cum
750.00 No Bricks 3625.00 1000 Nos
Labour charges
Sundries
Total for 90 Rmt
Rate for 1 Rmt

Labour Charges
1.00 No Electrician Maistry 277.00 No
1.00 No Wiremen Grade I 254.00 No
4.00 No Helper 181.00 No

DATA - 44

Fixing of UG cables on Walls / Ceiling


Charges for conveying and fixing of UG cables of sizes
4 to 25 Sqmm of 2, 3,3.5 and 4 core with necessary
MS clamps, brass screws including cost of all materials
redoing the dismantled portion, etc., all complete.

1.00 Gross M.S. Clamps/ Saddles 32mm It-III d p-77 68.20 Gross
300.00 No Brass screws ( 40 mm x 6 no) 78.70 Gross
300.00 No TW plugs 325.00 1000 Nos
Sundries for redoing on dismantled portion,etc.,
Labour charges
Total for 90 Rmts
For 1 Rmt

Labour charges
1.00 No Mason Ist class 291.00 No
2.00 No Wiremen Grade I 254.00 No
2010 - 2011 Electrical Data 107
3.00 No Wiremen Grade II 240.00 No
4.00 No Helper 181.00 No
Total for 1 day
For 2 day
DATA - 46

Specification for MV/SV lamp street light fittings

Supply and delivery of integral HP sodium/Mercury of


aluminium sheet deep drawn, treated, prewired stove
enamelled painting and inside brightended and
anodised for optimum reflection and die cast
aluminium control gear near compartments complete
with all

Specification for Flurescent Tubular lamp street light fittings

Supply and delivery of Single/ twin flurescent tubular


lamp street light fittings complete with heavy gauge
aluminium sheet fabricated canopy, treated premered
and painted with stove enamelled CRCA sheet steel
control gear cum reflection tray duly finishe

Fittings 125 WMV 250 WMV


Fittings 3255.00 3255.00
MV/SV lamps 191.00 466.00
Total Rs 3446.00 3721.00

DATA - 48

Fixing of Tube light street light fitting


Charges for fixing flurescent tubular lamp street light
fittings ( all types) in the existing street poles with a
required GI pipes 'B' class and accessories ( street
light fittings alone will be supplied departmentally at
free of cost ).

2.00 Rmt 20 mm dia GI 'B' class pipe 93.45 Rmt


2.00 pair Back lamp with bolts & nuts 35.00 pair
1.00 No 15 Amps 500 v fuse unit 50.00 Each
1.00 No TW plank for fixing the fuse unit 150 x 100 x 20 mm 22.16 Each
8.00 Rmt 2.5 Sqmm PVC insulated unsheathed copper cable 19.90 90 Rmt
1.00 No Labour charges for fixing the street light fitting with
the required accessories in the E.B pole including
connection etc., complete.
Sundries for painting the GI pipes, MS clamps, screws, LS
etc., complete in all respects.
Rate for Each

Labour charges for 3 Nos


2010 - 2011 Electrical Data 108
1.00 No Electrician Maistry 277.00 No
1.00 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
3.00 No Helper 181.00 No
Total for 3 Nos
Rate for 1 No
TW plank if 150 x 100 x 20 mm 73860.00 0.0003

DATA

Street light Fittings (single)

1.00 No Tube light fittinhs 674.00 No


1.00 No Tubular lamp 39.90 No
1.00 No Labour charges 1020.10 No
Rate for Each

DATA - 47
Charges for fixing Mercury, Sodium Vapour lamp street
light fittings ( all types ) in the existing pole with
required GI pipes 'B' class and accessories ( Street
light fittings alone will be supplied departmentally at
free of cost ).

1.50 Rmt 50 mm dia GI pipe 'B' class 198.45 Rmt


2.00 Pair Back clamps with bolts and nuts 35.00 Pair
1.00 No 15 Amps 500 V fuse unit 50.00 No
1.00 No TW plank for fixing the fuse unit of 150 x 100 x 20 mm 22.16 No
8.00 Rmt 2.5 Sqmm PVC insulated unsheathed copper cable 19.90 90 Rmt
Labour charges for fixing the street light fitting with
the required accessories in the E.B pole including
connection etc., complete.
Sundries for painting the GI pipes, MS clamps, screws, LS
etc., complete in all respects.

Rate for Each

DATA - 48
Street light service connection

Supplying and fixing of 2 Nos ( two ) of MS box of size


not less than 600 x 225, 16 g with door and lock and
key arrangements for obtaining EB service connection
for street lights with one box comprising off 1 No 30
Amps 500 V fuse units, 1 No copper eart

For TNEB Meter


1.00 No MS box 600 x 225 mm with door and lock and key 225.00 No
arrangements with necessary MS clamps to bolts &
nuts with washers.
1.00 No TW plank 600 x 225 x 20 mm 199.42 No
1.00 No 30 Amps 500 v fuse units 89.00 No
1.00 No Earth plate with brass bolts & nuts with washers 25.00 No
5.00 Rmt 20 mm dia 'B' class GI pipe 93.45 Rmt
20.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core 31.50 Rmt
cable
For control Gear
2010 - 2011 Electrical Data 109
1.00 No M.S box 600 x 225 mm with door and lock and key 225.00 No
arrangement and MS clamp with bolts & nuts with
washers.

1.00 No 32 A DPIC switch 808.00 No


1.00 No 40 A single pole MCb isolator 93.50 No
1.00 No MS enclousure for MCB 89.60 No
2010 - 2011 Electrical Data 110
1.00 No TW plank 600 x 225 x 20 mm 199.42 No
Labour charges as per data no: 48
Sundries such as MS clamps with bolts & nuts with
washers for fixing GI pipe to EB pole painting etc.,

Rate for Each


TW plank 300 x 200 x 20 mm 73860.00 0.0027
DATA - 49

SUPPLYING AND FIXING OF 20MM DIA PVC PIPE


FOR TV/TELEPHONE LINE
================================================
90.00 Mtr PVC RIGID CONDUIT PIPE 19M/20MM HEAVY DUTY 19.50 Mtr
WITH ISI

0.15 MT CEMENT 5200.00 MT


1.00 NO WIREMAN GR-I 254.00 NO
2.00 NO MASON II 261.00 NO
4.00 NO HELPER 181.00 NO
SUNDRIES FOR PVC SPECIALS & FISH WIRE ETC.,

TOTAL FOR 90RMT


RATE PER RMT

25 mm dia PVC pipe Heavy duty with ISI mark


Rate as per Above
1.00 Rmt Deduct cost of 20 m dia PVC pipe 19.50 Rmt
1.00 Rmt Add cost of 25 mm dia PVC pipe heavy duty 28.90 Rmt

DATA - 50

TV/Telephone line junction


1.00 No TW board 8" x6" 41/2" 42.00 No
0.015 Sqm Hylem sheet 640.00 Sqm
Labour charges for fixing including necessary materials LS
Rate for Each

DATA - 51

Supplying and concealing TV/Telephone socket with


top pin with suitable TW box fully concealed and
covered with 3 mm thick Hylem sheet etc., all
complete.

1.00 No TW box 4" x4" 15.70 No


0.01 Sqmm Hylem sheet 640.00 Sqm
1.00 No TV/Telephone socket 24.00 No
Labour charges including fixing etc., all complete. LS
Rate for each

DATA - 52

Supply and erection of Tubular lamp, using 65 mm dia


GI pipe 'B' class pipe with ISI mark of 6 mt length and
20 mm dia GI pipe 'B' class upto 2 mt with necessary
reducer couplings and pipe firmly fixed with MS plate
of 45 cm x 45 cm x 6 mm thick at the b

6.00 Rmt 65 mm dia GI pipe ' B' class 231.50 Rmt


2.00 Rmt 20 mm dia GI pipe ' B' class 93.45 Rmt
2010 - 2011 Electrical Data 111
1.00 No Base plate 45 cm x45 cm x 6mm thick 130.00 No
1.00 No MS box 8" x 6" with cover 90.00 No
0.238 Cum conrete 1:2:4 using 20 mm HBSJ ( 0.45 x 1.5 mt) 3500.00 Cum
LS Transportation charges welding GI reducer all LS
incidential charges, painting etc., all complete.

1.00 No 1 No fuse unit 15 A 230 V and on suitable TW plank LS


( to house it is MS box 8" x 6") with 1 No copper
neutral link with brass bolts & nuts with Washers
(11+28+21)
8.00 Rmt 1.50 Sqmm copper PVC insulated unsheathed single 12.80
core cable.
Labour charges
Rate for Each

Labour Charges
0.50 No Wiremen Grade I 254.00 No
2.00 No Wiremen Grade II 240.00 No
2.00 No Helper 181.00 No

DATA - 56

Exhaust fan of 300 mm dia ( 12 ") sweep

1.00 No Exhaust fan of 300 mm dia 1270.00 No


Provision of hole in the wall and making good of the wal102.85 No
Clamp fixing by cheche screws bolts and nuts
including connections

Add 1 % sundries 1388.55


Labour charges for fixing
Rate for each

Labour charges
1.00 No Wiremen Grade I 254.00 No
2.00 No Helper 181.00 No
For 4 Nos
Rate for 1 No
DATA - 57

Exhaust fan of 225 mm dia ( 9 ") sweep

Exhaust fan of 225 mm dia 1110.00 No


Provision of hole in the wall and making good of the wal102.85 No
Clamp fixing by cheche screws bolts and nuts
including connections
Add 1 % sundries
Labour charges for fixing
Rate for each

Supply of ceiling fan 1200mm


1.00 No 1200mm AcC ceiling fan (without regulator) 1200.00 No
1.00 No Cost of electronic regulator 168.00 No

Tube light - Box type


1.00 No 4' tube light fitting with \electronic ballast 404.00 No
1.00 No slim tube light 36 w 38.80 No
Labour charges (as per Data 22 )
2010 - 2011 Electrical Data 112
Sundries

Tube light - Patty type


1.00 No 4' tube light fitting with \electronic ballast 322.00 No
1.00 No slim tube light 36 w 38.80 No
Labour charges (as per Data 22 )
Sundries

OPEN WIRING IN PVC PIPE

Light point with ceiling rose for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid
conduit pi

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 1 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 No
150.00 No Tw Plugs 325.00 1000 nos
10.00 No 19 mm PVC rigid tees 1.31 No
10.00 No PVC joint box 38.75 Dozen
0.015 Sqm Hylem sheet 3 mm thick with lamination 640.00 Sqm
10.00 No 5 amps flush type switch 16.17 No
10.00 No Ceiling rose 15.75 No
1.00 Gross Brass screws 78.70 Gross
72.00 No 19 mm MS clamp 42.50 Gross
1/6 Bag Cement 260.00 Bag
10.00 No TW switch box 100 x 100 x 75 mm 15.70 No
1.00 No TW junction box 150 x 100 x 75 mm 18.90 No
0.10 Sqm 3 mm thick laminated Hylem sheet (10X0.1X0.1) 640.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
1/2 Litre Paint 220.50 Litre
10.00 Points Labour charges LS
LS Sundries 1% on materials LS
Total for 10 Points
Rate for 1 Point

Labour Charges for wirnig in PVC pipe concealed

Sub - data

1.00 No Maistry 277.00 No


2.00 No Wiremen Grade - I 254.00 No
3.00 No Wiremen Grade - II 240.00 No
4.00 No Helper 181.00 No

LIGHT POINT WITH CEILING ROSE FOR


ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE Open wiring

Light point with bakelite batern type holder for flats/ houses(Open wiring)
2010 - 2011 Electrical Data 113
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid
conduit pip

Total for Data 1 excluding sundries


Deduct cost of ceiling rose 10 Nos
Add cost of Bakelite battern type holders 10 Nos @ Rs 18.90 / Each
Sundries
Total for 10 points
Rate for 1 points

POINT WIRING FOR CALLING BELL / BUZZER


WITH PUSH SWITCH FOR ALL TYPE OF BUILDING
(OPEN WIRING)

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

Total of Data 1 excluding sundries


Deduct cost of 10 Nos ceiling rose
Deduct cost of 10 Nos 19 mm PVC junction box
Deduct 10 Nos 5 A switch
Add the cost of 10 Nos Buzer/Bell @ 45.00/Each
Add the cost of 10 nos 5A type push switch @ Rs 9.00/ Each
Add the cost of 10 nos 15 x 10 x 7.5 cm TW box @ Rs 18.00/Each
Sundries
Total for 10 points
Rate for 1 point

FAN POINT FOR ADMINISTRATIVE BLOCKS AND


COMMUNITY CENTRE
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid
conduit pi

Total for Data 1 excluding sundries


Deduct cost of TW Box 10X10 @ 15.00/each
Deduct cost of Hylem sheet
Add cost of TW box 12" x 8" x3" for switch and regulator 10 nos @ Rs 78.70 /
Hylem sheet 0.60 Sq m@ 640/Sq m
Add Sundries 1%
Total for 10 points
Rate for 1 points

STAIRCASE LIGHT POINT FOR ADMINISTRATIVE


BLOCKS AND COMMUNITY CENTRE (Open wiring)
2010 - 2011 Electrical Data 114
Wirng with 1.5 sqmm copper PVC insulated
unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
10.00 No 19 mm PVC rigid bends 3.15 No
5.00 No 19 mm PVC rigid tees 1.31 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 20.08 No
5.00 No PVC round block 2.50 Each
5.00 No Ceiling rose 15.75 No
0.090 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
1.00 Bag Cement 260.00 Bag
6.00 No TW switch Box 150X100X65mm 18.90 Each
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point

5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES (OPEN WIRING)

Wirng with 1.5 sqmm copper PVC insulated


unsheathed single core 1.1 KV grade cable with
continuous earth by means of 1.5 sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully
concealed PVC r

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
20.00 No 19 mm PVC rigid bends 3.15 Dozen
10.00 No 19 mm PVC rigid tees 1.31 Dozen
1.00 No MS box 150x 100 x 75 mm 64.00 No
0.015 Sqm 3 mm thick laminated Hylem sheet 640.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type35.00 No
15.00 No MS box 150x 100 x 75 mm 64.00 No
0.225 Sqm 3 mm thick laminated Hylem sheet 640.00 SQqm
1.25 Bag Cement 260.00 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single 12.80 90 Rmt
core cable for continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
Labour charges
2010 - 2011 Electrical Data 115
1.00 No Maistry 277.00 No
2.00 No Wiremen Grade - I 254.00 No
3.00 No Wiremen Grade - II 240.00 No
4.00 No Helper 181.00 No

2 X1.5 Sqmm in fully concealed PVC conduit

Run off mains with 2 wires of 1.5 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 1.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
in fully concealed 19 mm / 20 mm dia rigid PVC condui

180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with 19.50 Rmt
ISI mark
1.00 gross MS saddles 19mm 44.60 gross
300.00 Nos TW plugs 38x25x19mm 325.00 1000Nos
2.00 Gross Brass screws 38mm 78.70 gross
0.33 Bag Cement 260.00 Bag
90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single 12.80 Rmt
core cable for continuous earth connection
2/3 Labour charges 2229.00

Sundries
Total for 90 Metres
Rate for 1 Rmt

2 X 2.5 Sq mm in fully concealed PVC conduit (open wiring)

Run off mains with 2 wires of 2.5 Sqmm copper PVC


insulated unsheathed single core 1.1KV cable wire
contuinuous earth by means of 1.5 Sqmm copper PVC
insulated unsheathed single core 1.1 KV grade cable
in fully concealed 19 mm / 20 mm dia rigid PVC condui

Total as per Data No.


180.00 Rmt Add 180 mt 2.5 Sqmm copper PVC insulated 19.90 Rmt
unsheathed S.C. cable
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed 12.80 Rmt
S.C. cable
Sundries
Total for 90 metres
Rate for 1 Rmt
2010 - 2011 Electrical Data 116

1152.00

877.50

63.00
13.10
64.00

9.60
161.70
157.50
35.00
325.00
640.00
96.00
576.00

3475.00
14.60

7660.00
766.00

277.00
508.00
720.00
724.00

522.00
724.00
3475.00
2010 - 2011 Electrical Data 117

7645.40

157.50

189.00
13.10
7690.00
769.00

7645.40
157.50
35.00
161.70
472.50
90.00
189.00
7.30
8050.00
805.00

1152.00

877.50
2010 - 2011 Electrical Data 118
63.00
13.10
35.00
157.50
161.70
1039.00
384.00
64.00
9.60
325.00
576.00

3475.00
7.60
8340.00
834.00

147.27

1152.00

585.00

31.50
6.55
200.80
78.75
17.50
384.00
57.60
325.00
384.00

3475.00
12.30
6710.00
1342.00
2010 - 2011 Electrical Data 119
1152.00

877.50

63.00
13.10
64.00
9.60
525.00
960.00
144.00
325.00
576.00

3475.00
5.80
8190.00
546.00

64.00

48.75

35.00
193.06
16.19
357.00

56.70
64.00
9.60
10.70
141.00
2010 - 2011 Electrical Data 120

1152.00

877.50

37.80
7.86
64.00
9.60
97.02
94.50
21.00
325.00
384.00
57.60
576.00

3475.00
15.12
7194.00
1199.00

7178.88
94.50
113.40
14.22
7212.00
2010 - 2011 Electrical Data 121
1202.00

1152.00

877.50

37.80
7.86
21.00
94.50
97.02
623.40
230.40
64.00
9.60
325.00
576.00

3475.00
16.92
7608.00
1268.00

1152.00

585.00

18.90
3.93
120.48
47.25
2010 - 2011 Electrical Data 122
10.50
192.00
34.56
325.00
384.00

3475.00
8.38
6357.00
2119.00

2304.00

1755.00

780.00
1152.00

3475.00
9466.00
11.00
9477.00
105.30

9466.00
3582.00

2304.00

11.00

10755.00
2010 - 2011 Electrical Data 123
119.50

5670.00

1755.00

780.00
1791.00

3475.00
11.00
13482.00
149.80

11340.00

2601.00

780.00
1791.00

4589.50
3.50
21105.00
234.50

g - sub data - A)
2010 - 2011 Electrical Data 124

315.00
1.80
68.20
385.00

480.00
543.00
1023.00
68.20

200.00

62.00

7.00

154.00
423.00

254.00
362.00
616.00
154.00
2010 - 2011 Electrical Data 125

455.00

62.00

7.00

154.00
678.00

504.00

62.00
7.00
154.00
727.00

480.00
130.00

7.67

205.33
823.00

254.00
362.00
616.00
205.33
2010 - 2011 Electrical Data 126

800.00
130.00

6.67

205.33
1142.00

2520.00

299.13
11.54

205.33
3036.00
299.13

3036.00
3360.00
2520.00

3876.00
2010 - 2011 Electrical Data 127

12.60
18.28
3.31
79.81
114.00

254.00
480.00
543.00
1277.00
79.81

48.75
12.60
18.28
4.67

127.70
212.00

254.00
480.00
543.00
1277.00
127.70

9.14
171.20
1.66
182.00
254.00
240.00
2010 - 2011 Electrical Data 128
362.00
856.00
171.20

798.00
11.00
435.00
16.00
1260.00
14.00

254.00
181.00
435.00
ch/ Panel Board/ Machinary

385.88
93.45
66.15
49.35
15.00
150.00
100.00
160.00
26.20
52.40
40.00
3.57
435.00
1577.00

254.00
181.00
435.00
2010 - 2011 Electrical Data 129

44.32
12.28

97.40
154.00

44.32

254.00
720.00
974.00
97.40

315.00
18.95

130.05
464.00

254.00
720.00
181.00
145.50
1300.50
130.05

88.63
2010 - 2011 Electrical Data 130
37.97

97.40
224.00

88.63

315.00
32.95

130.05
478.00

1660.00

2040.00

89.00
22.16
129.63
3.21
244.00

22.16

254.00
2010 - 2011 Electrical Data 131
240.00
543.00
1037.00
129.63

267.00
44.32
152.25
6.43
470.00

44.32

254.00
240.00
724.00
1218.00
152.25

46.00
166.19
25.00
154.00
4.81
396.00

166.19

254.00
362.00
616.00
154.00

1660.00
423.00
2010 - 2011 Electrical Data 132
464.00
0.00
2547.00

2040.00
423.00
478.00
0.00
2941.00

267.00
249.28
25.00
205.33
3.39
750.00

249.28

254.00
362.00
616.00
205.33

5670.00

336.00
100.80
84.00
1808.00
29.20
8028.00
89.20

277.00
508.00
480.00
2010 - 2011 Electrical Data 133
543.00
1808.00

121.25
0.75
122.00

156.00

0.50
156.50

11340.00

336.00
201.60
126.00
2712.00
26.40
14742.00
163.80
2010 - 2011 Electrical Data 134

154.35
0.65
155.00

156.00

0.50
156.50

2733.85
671.00
2718.75
1255.00
19.40
7398.00
82.20

277.00
254.00
724.00
1255.00

68.20
163.96
97.50
17.34
4486.00
4833.00
53.70

291.00
508.00
2010 - 2011 Electrical Data 135
720.00
724.00
2243.00
4486.00

150 WSV
3280.00
630.00
3910.00

186.90
70.00
50.00
22.16
159.20
518.00

13.84

1020.10
2010 - 2011 Electrical Data 136
277.00
254.00
480.00
543.00
1554.00
518.00
22.16

674.00
39.90
1020.10
1734.00

297.68
70.00
50.00
22.16
159.20
518.00

8.96

1126.00

225.00

199.42
89.00
25.00
467.25
630.00
2010 - 2011 Electrical Data 137
225.00

808.00
93.50
89.60
2010 - 2011 Electrical Data 138
199.42
518.00
5.81

3575.00
199.42

=========
1755.00

780.00
254.00
522.00
724.00
6.00

4041.00
44.90

44.90
19.50
28.90
54.30

42.00
9.60
4.40
56.00

15.70
6.40
24.00
5.90
52.00

1389.00
186.90
2010 - 2011 Electrical Data 139
130.00
90.00
833.00
224.70

60.00

102.40

969.00
3985.00

127.00
480.00
362.00
969.00

1270.00
102.85
15.70

15.45
154.00
1558.00

254.00
362.00
616.00
154.00

1110.00
102.85
15.70

15.45
154.00
1398.00

1200.00
168.00
1368.00

404.00
38.80
114.00
2010 - 2011 Electrical Data 140
0.20
557.00

322.00
38.80
114.00
0.20
475.00

1152.00

877.50

63.00
48.75
13.10
32.29
9.60
161.70
157.50
78.70
21.25
52.00
157.00
18.90
64.00
576.00

110.25
1486.00
9.13
5088.67
508.87

277.00
508.00
720.00
724.00

2229.00

1486.00
es(Open wiring)
2010 - 2011 Electrical Data 141

5079.54
157.50
189.00
7.63
5118.67
511.87

5079.54
157.50
35.00
161.70
450.00
90.00
180.00
13.33
5458.67
545.87

5088.67
157.00
64.00
787.00
384.00
10.00
6048.67
604.87
2010 - 2011 Electrical Data 142

1152.00

585.00

31.50
6.55
200.80
12.50
78.75
57.60
260.00
113.40
384.00

2229.00
8.90
5120.00
1024.00

S (OPEN WIRING)

1152.00

877.50

63.00
13.10
64.00
9.60
525.00
960.00
144.00
325.00
576.00

1486.00
14.80
6210.00
414.00
2010 - 2011 Electrical Data 143
277.00
508.00
720.00
724.00
2229.00

2304.00

1755.00

44.60
97.50
157.40
85.80
1152.00

1486.00
7082.30
54.30
7136.60
79.30

7136.60
3582.00

2304.00

45.80
8460.40
94.00
Revised Data 2018 -19 144

23.1. * S/F OF BWR PLYWOOD DOOR


SHUTTER WITH VERTICALS AND
TOP RAIL AND BOTTOM RAILS
WITH 9mm THICK MARINE GRADE
BWR PLYWOOD WITH
I.O FITTINGS AS PER SCHEDULE E

------------------------------------------------------------
SHUTTER SIZE0-.8X2.05 =1.64M2
STYLES(OVER 2M) -1X2X2.05X0.075X0.0375=0.01153
-
RAILS(BELOW 2M)- 1X3X0.8X0.15X0.0375= 0.0135

PLANKS -1X1X0.625X0.64=0.40
PLANKS -1X1X0.985X0.625=0.616 1.016M2

(a) DOOR OF SIZE 900 X2100 MM


------------------------------------------------------------
0.011530 CUM T.W.SCANTLING above 2M length 106376.00 CUM 1226.52
0.013500 CUM T.W.SCANTLING below 2M length 94672.00 CUM 1278.07
1.016000 SQM Phenol bonded BWR Plywood 9mm 387.40 SQM 393.60

1.640000 SQM LABOUR CHARGE 729.00 SQM 1195.56


2.00 NO. 6"X1/2"ALU.TOWER BOLT 54.00 NO. 108.00

3.00 NO. 5" ALU BUTT HINGES 74.70 NO. 224.10


1.00 NO. 10"X5/8" ALU. ALDROP 150.70 NO. 150.70
1.00 NO. NYLON BUSH 7.30 NO. 7.30

1.00 NO. ALU.HANDLE WITH C.P.SCREWS 6" 48.00 NO. 48.00


1.00 NO. DOOR STOPPER 43.80 NO. 43.80
58.00 Nos. Brass screw 2.25 NO. 130.50
TOTAL FOR 1.64 SQM 4806.15

---------------------

RATE PER SQM 2930.58


=========
Sub Estimate for Over Head Tank for 700 Litres Capacity (50Nos)

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT THURAIYUR IN
TRICHY DISTRICT.

SI.
DESCRIPTION OF WORK Nos Length Breath Depth
NO
8.10 Starndardized M20 for all RCC works using20 mm
Gauge HBG Jelly etc. in Second Floor

In Fourth floor
For PC/HC Qtrs 8 in 1
Tank wall alround 1 x 40 5.44 0.10 1.00
For cover slab 1 x 40 1.46 1.46 0.10
D /F Manhole cover 1 x 40 0.60 0.60 0.10
Add Sundries
Total
In Third floor
For PC/HC Qtrs 6 in 1
Tank wall alround 1 x 6 5.38 0.10 1.00
For SI Qtrs 1 x 3 5.38 1.46 1.00
For cover slab 1 x 9 1.46 1.46 0.10
D /F Manhole cover 1 x 9 0.60 0.60 0.10
Add Sundries
Total
In First Floor
For Ins Qtrs
Tank wall alround 1 x 1 5.38 0.10 1.00
For cover slab 1 x 1 1.46 1.46 0.10
D /F Manhole cover 1 x 1 0.60 0.60 0.10
Add Sundries
Total
18.1. b. Form work for all RCC works Namely roof slab
bottom and beam bottom
For PC/HC Qtrs 8 in 1
For cover slab Bottom 1 x 50 1.04 1.04 -
Cover slab alround sides 1 x 50 5.84 - 0.10
Manhole cover 1 x 50 2.40 - 0.10
D/f Manhole cover -1 x 50 0.60 0.60
Add Sundries
Total

18.1. d. Form work for vertical walls


Inner alround 1 x 50 4.16 1.00

Total

10.50 Brick Partition -110tk

OHT - 145
SI.
DESCRIPTION OF WORK Nos Length Breath Depth
NO
In Fourth Floor
For PC/HC Qtrs 8 in 1
Tank wall alround 1 x 40 5.38 1.00
Total
In Third floor
For PC/HC Qtrs 6 in 1
Tank wall alround 1 x 6 5.38 1.00
For SI Qtrs 1 x 3 5.38 1.00
Add Sundries
Total
In First Floor
For Ins Qtrs
Tank wall alround 1 x 1 5.38 1.00
Add Sundries
Total

Plastering 1:3, 12mm thick with water proof


compound

Tank wall alround 1 x 50 4.16 - 1.00


Bottom 1 x 50 1.040 1.04 -
Add Sundries
Total
33.00 Plastering 1:5,12mm thick

Outer wall alround 1 x 50 5.84 - 1.40


Add Sundries
Total
53.40 Supplying and Fixing of C.I manhole Cover
For 1 x 50 - - -
Total
38.60 One coat primer using white cement
Qty as per 32
Total
Two coat of Emulsion Paint
Qty as per 33

43.00 Fabrication of MS/RTS Rods


Qty as per - 8.1.C 58.1 x 125.00
Kg/m3
7262.50 / 1000.00

43.10 As per Barbending Qty 0.053 x 50.00

OHT - 146
THURAIYUR IN

Qty

21.76
8.53
-1.44
0.05
28.90 m3

3.23
23.56
1.92
-0.32
0.01
28.40 m3

0.54
0.21
-0.04
0.09
0.80 m3

54.08
29.20
12.00
-30.00
0.02
65.30 m2

208.00

208.00 m2

OHT - 147
Qty

215.20
215.20 m3

32.28
16.14
0.08
48.50 m3

5.38
0.02
5.40 m3

208.00
54.08
0.02
262.10 m2

408.80

408.80 m2

50.00
50.00 Nos

262.10
262.10 m2

408.80
408.80 m2

7262.50

7.26
7.26 MT
2.650 M.T

OHT - 148
Sub Estimate for Paver block Road

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.

Item Measurements
Description of works Nos
No. L B
Earth work excavation and depositing on
bank with initial lead of 0 m and initial lift
1.5 of 2 mts in all classes of soil and sub
soils etc complete
In front of INS and SI Qtrs 1 x 1 35.00 4.50 0.30
In b/w PC/HC Qtrs blocks 1 x 1 75.00 4.50 0.30
Approch road to PC/HC Qtrs 1 x 1 60.00 4.50 0.30
Main Entry Bell Mouth 2 x 0.5 2.00 2.00 0.30
Block Entry Bell Mouth 16 x 0.5 1.00 2.00 0.30
Add Sundries
TOTAL
Supply and filling of river sand including
all cost and conveyance of materials and
2.1 all labour charges etc ., complete .

In front of INS and SI Qtrs 1 x 1.00 35.00 4.50 0.15


In b/w PC/HC Qtrs blocks 1 x 1.00 75.00 4.50 0.15
Approch road to PC/HC Qtrs 1 x 1.00 60.00 4.50 0.15
Main Entry Bell Mouth 2 x 0.50 2.00 2.00 0.15
Block Entry Bell Mouth 16 x 0.50 1.00 2.00 0.15
Add Sundries
TOTAL
Plain cement concrete 1:5:10 mix using 40
mm HBG metal for foundation including
3.1 all cost and conveyance of materials and
all labour charges

for Kerb Stone


In front of INS and SI Qtrs 1 x 2 35.00 0.20 0.10
In b/w PC/HC Qtrs blocks 1 x 2 75.00 0.20 0.10

C.C.R - 149
Item Measurements
Description of works Nos
No. L B
Approch road to PC/HC Qtrs 1 2 60.00 0.20 0.10
Main Entry Bell Mouth 2 x 2 2.00 0.20 0.10
Block Entry Bell Mouth 16 x 2 1.00 0.20 0.10
Add Sundries
TOTAL
5.10 Supplying and laying Rubber Moulded Hydraulic Pressed Paver Block 83mm thick including labo
Paver Block area
In front of INS and SI Qtrs 1 x 1.00 35.00 4.50
In b/w PC/HC Qtrs blocks 1 x 1.00 75.00 4.50
Approch road to PC/HC Qtrs 1 x 1.00 60.00 4.50
Main Entry Bell Mouth 2 x 0.5 2.00 2.00
Block Entry Bell Mouth 16 x 0.5 1.00 2.00
Add sundries

Say 785.00
Paints new work with two coats of enamel
41.0 approved paints over the one coat of
primer for over the kerb stone

In front of INS and SI Qtrs 1 x 2 35.00 - 0.35


In b/w PC/HC Qtrs blocks 1 x 2 75.00 - 0.35
Approch road to PC/HC Qtrs 1 x 1 60.00 - 0.35
Main Entry Bell Mouth 2 x 1 2.00 - 0.35
Block Entry Bell Mouth 16 x 2 1.00 - 0.35
Add Sundries
TOTAL
Pre - casted kerb slabs including all cost
50.2 and conveyance of materials and all
labour charges etc., complete
In front of INS and SI Qtrs 1 x 2 35.00 - -
In b/w PC/HC Qtrs blocks 1 x 2 75.00 - -
Approch road to PC/HC Qtrs 1 x 2 60.00 - -
Main Entry Bell Mouth 2 x 2 2.00 - -
Block Entry Bell Mouth 16 x 2 1.00 - -
Add Sundries

C.C.R - 150
Item Measurements
Description of works Nos
No. L B

C.C.R - 151
C/HC QTRS AT

Total Qty

47.25
101.25
81.00
1.20
4.80

235.50 m 3

23.63
50.63
40.50
0.60
2.40
0.04
117.80 m 3

1.40
3.00

C.C.R - 152
Total Qty

2.40
0.16
0.64

7.60 m 3

157.50
337.50
270.00
4.00
16.00

785.00
Cum

24.50
52.50
21.00
1.40
11.20

110.60 m 2

70.00
150.00
120.00
8.00
32.00

C.C.R - 153
Total Qty
380.00 Rmt

C.C.R - 154
Sub Estimate for Septic Tank

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.

Detailed Estimte
Measurements
Description of works Nos
Item No L B D/H
Earth work excavation for open foundation
2
(including refilling)
(0 to 2m depth )
i) Septic tank 1 x 1 9.16 4.69 2.00
ii) Inlet & Outlet chamber 1 x 4 1.26 1.26 0.60
iii) despension trench 1 x 3 10.00 1.00 1.00
Add Sundries
TOTAL
(2 to 3m depth )
i) Septic tank 1 x 1 9.16 4.69 0.43
Add Sundries
TOTAL
Supply and filling of river sand including
all cost and conveyance of materials
2 and all labour charges etc ., complete .

i) Septic Tank 1 x 1 9.16 4.69 0.10


ii) Inlet & Outlet chamber 1 x 2 1.26 1.26 0.10
iii) Despersion Trench 1 x 3 10.00 1.00 0.25
Add Sundries
TOTAL
Supply and filling with 40 mm HBG stone
jelly filling and conveyance of materials
3 and all labour charges etc ., complete .

for despension trench 1 x 3 10.00 1.00 0.20


Supply and filling with 20 mm HBG stone
jelly filling and conveyance of materials
3 and all labour charges etc .,complete .

for despension trench 1 x 3 10.00 1.00 0.20


Plain cement concrete 1:5:10 mix using 40
mm HBG metal for foundation including all
3 cost and conveyance of materials and all
labour charges etc ., complete .

i) Septic tank 1 x 1 9.16 4.69 0.10


ii) Inlet & Outlet chamber 1 x 2 1.26 1.26 0.10

SEP - 155
Measurements
Description of works Nos
Item No L B D/H
Add Sundries
TOTAL
Plain cement concrete 1:2:4 mix using 20
mm HBG metal for foundation including all
3 cost and conveyance of materials and all
labour charges etc ., complete .

Septic tank Base 1 x 1 9.16 4.69 0.10


Add Sundries
TOTAL
Standardised concrete Mix M20 Grade
4 Concrete 20 mm HBSJ in Foundation and
Basement.
i) Septic tank slab 1 x 1 9.16 4.29 0.15
D/f Manhole cover 1 x 4 0.60 0.60 0.15
Add Sundries
TOTAL
For form works for all RCC works
18.1.b including all hire charges of materials
and all labour charges
Baffle wall Beam Bottom 1 x 2 1.80 0.15 -
Baffle wall Beam sides 2 x 2 1.80 - 0.23
Septic tank Roof slab bottom 2 x 1 7.50 1.80 -
Side alround Outer 1 x 1 24.50 - 0.15
D/f Manhole portion 2 x 2 0.60 0.60 -
Manhole portion sides alround 1 x 4 2.40 - 0.15
Add Sundries
TOTAL
Brick work with C.M 1:5 using ground
moulded country bricks including all cost
7 and conveyance of materials and all
labour charges etc., complete.

i) Septic tank - I st footing 1 x 1 24.46 0.45 0.60


ii) Septic tank - ii nd footing 1 x 1 24.02 0.34 0.60
iii) Septic tank - iii rd footing 1 x 1 23.00 0.23 0.80
Sidewall 2 x 0.5 8.40 0.45 0.23
1 x 2 2.83 0.45 0.23
Iv) Compartment Divider wall 1 x 1 7.50 0.23 2.00
iv) Inlet & Outlet chamber 2 x 2 2.26 0.23 0.90
Add Sundries
TOTAL
11 Brick partitioin wall - 110mm tk

SEP - 156
Measurements
Description of works Nos
Item No L B D/H
Baffle wall 1 x 2 1.80 - 1.70
Baffle wall 1 x 2 1.80 - 1.30
TOTAL
14.II Precast slab - 40mm tk
Manhole slab 1 x 4 0.75 0.75 -
Inlet and Outlet chamber cover slab 2 x 2 0.83 0.83 -
Add Sundries
TOTAL

Plastering with C.M 1: 5, mix 12 mm thick


including all cost and conveyance of
33 materials and all labour charges etc .,
complete.
Septic tank inner 1 x 2 18.60 - 2.00
Septic tank outer 1st footing 1 x 1 24.50 - 0.80
Iind footing 1 x 1 25.38 - 0.60
IIIrd footing 1 x 1 26.26 - 0.60
Add for offset iind 1 x 1 24.02 0.11 -
Add for offset iiird 1 x 1 24.46 0.11
Baffle wall 2 x 2 1.80 - 1.70
Baffle wall 2 x 2 1.80 - 1.50
Baffle wall beam bottom 2 x 2 1.80 0.15 -
Inlet & Outlet chamber inner 2 x 2 2.40 - 0.90
Inlet & Outlet chamber outer 2 x 2 4.24 - 0.90
L.S
TOTAL
Supply and fabrication of steel RTS / MS
rods including all cost and conveyance of
materials and all labour charges etc .,
43 including cutting pending, and placing in 5.70 @ 100.0
position etc ., complete

Kgs / m
43.00 As per Barbending Qty
Stone ware line arrangements
PVC ventilating shaft with cowl etc.,
59 1 x 1 1.00 - -
complete
Supplying and fixing of 100 mm dia
61 stoneware pipe and jointing etc ., 1 x 3 2.00 - -
complete
Stone ware pipe 100 mm dia with loose
61 1 x 3 10.00 - -
joint etc., all complete
Stone ware bend 100 mm dia etc ., all
62 2 x 2 - - -
complete

SEP - 157
Measurements
Description of works Nos
Item No L B D/H
Stoneware tee 100 mm dia etc., complete
62 2 x 2 - - -

SEP - 158
C QTRS AT

Total
Qty

85.92
3.81
30.00
0.07
119.80 m 3

18.47
0.03
18.50 m 3

4.30
0.32
7.50
0.08
12.20 m 3

6.00 m 3

6.00 m 3

4.30
0.32

SEP - 159
Total
Qty
0.08
4.70 m 3

4.30

4.30 m 3

5.89
-0.22
0.03
5.70 m 3

0.54
1.66
27.00
3.68
-1.44
-1.44

30.00 m 2

6.60
4.90
4.23
0.87
0.59
3.45
1.87
0.09
22.60 m3

SEP - 160
Total
Qty
6.12
4.68
10.80 m 2

2.25
2.76
0.09
5.10 m 2

74.40
19.60
15.23
15.76
2.64
2.69
12.24
10.80
1.08
8.64
15.26
0.06
178.40 m 2

M.T

0.57

0.554 M.T

Nos
1.00

6.00 Rmt

30.00 Rmt

4.00 Nos

SEP - 161
Total
Qty

4.00 Nos

SEP - 162
Sub Estimate for Plinth Production

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.

Measurements
SI.No Description of works Nos
L B D/H
Earth work excavation and depositing on
bank with initial lead of 10 m and initial lift
1.1 of 2 mts in all classes of soil and sub
soils etc complete
For Plinth alround
i) For PC/HC Qtrs (8 in 1 Block) 2 x 3 56.61 0.30 0.45
ii)For SI Qtrs (3 in 1 Block) 1 x 1 44.00 0.30 0.45
iii)For INS Qtrs Single block 1 x 1 45.43 0.30 0.45
Pillar Portion
i) For PC/HC Qtrs 6 x 25 0.23 0.30 0.45
ii)For SI Qtrs (3 in 1 Block) 1 x 25 0.23 0.30 0.45
iii)For INS Qtrs Single block 1 x 25 0.23 0.30 0.45
Add Sundries
TOTAL
Supply and filling of river sand including
all cost and conveyance of materials and
2.1 all labour charges etc ., complete .

For Plinth alround


i) For PC/HC Qtrs (8 in 1 Block) 2 x 3 56.61 0.30 0.075
ii)For SI Qtrs (3 in 1 Block) 1 x 1 44.00 0.30 0.075
iii)For INS Qtrs Single block 1 x 1 45.43 0.30 0.075
Pillar Portion
i) For PC/HC Qtrs 6 x 25 0.23 0.30 0.075
ii)For SI Qtrs (3 in 1 Block) 1 x 25 0.23 0.30 0.075
iii)For INS Qtrs Single block 1 x 25 0.23 0.30 0.075
Pinth production Inner
For PC/HC Qtrs 2 x 3 58.12 0.48 0.075
a) Rear side of Stair Case 2 x 3 2.495 2.00 0.075
ii)For SI Qtrs (3 in 1 Block) 1 x 1 45.510 0.48 0.075
iii)For INS Qtrs Single block 1 x 1 46.940 0.48 0.075
Deduction of Pillar Portion
i) For PC/HC Qtrs 6 x 25 0.23 0.12 0.075
ii)For SI Qtrs (3 in 1 Block) 1 x 25 0.23 0.12 0.075
iii)For INS Qtrs Single block 1 x 25 0.23 0.12 0.075
Add Sundries
TOTAL

P.P - 163
Measurements
SI.No Description of works Nos
L B D/H
Plain cement concrete 1:5:10 mix using 40
mm HBG metal for foundation including
3.1 all cost and conveyance of materials and
all labour charges etc ., complete .

For Plinth alround


i) For PC/HC Qtrs (8 in 1 Block) 2 x 3 56.61 0.30 0.10
ii)For SI Qtrs (3 in 1 Block) 1 x 1 44.00 0.30 0.10
iii)For INS Qtrs Single block 1 x 1 45.43 0.30 0.10
Pillar Portion
i) For PC/HC Qtrs 6 x 25 0.23 0.30 0.10
ii)For SI Qtrs (3 in 1 Block) 1 x 25 0.23 0.30 0.10
iii)For INS Qtrs Single block 1 x 25 0.23 0.30 0.10
Add Sundries
TOTAL
Brick work 110 mm thick with C.M 1:4
using G. moulded country bricks including all
10.5 cost and conveyance of materials and all
labour charges etc., complete.

For Plinth alround


i) For PC/HC Qtrs (8 in 1 Block) 2 x 3 56.61 - 0.60
ii)For SI Qtrs (3 in 1 Block) 1 x 1 44.00 - 0.60
iii)For INS Qtrs Single block 1 x 1 45.43 - 0.60
Pillar Portion
i) For PC/HC Qtrs 6 x 25 0.115 - 0.60
ii)For SI Qtrs (3 in 1 Block) 1 x 25 0.115 - 0.60
iii)For INS Qtrs Single block 1 x 25 0.115 - 0.60
Add Sundries
TOTAL
13.1 Filling with excavated earth
For PC/HC Qtrs 2 x 3 58.12 0.48 0.250
Rear side of Stair Case 2 x 3 2.495 2.00 0.250
ii)For SI Qtrs (3 in 1 Block) 1 x 1 45.510 0.48 0.250
iii)For INS Qtrs Single block 1 x 1 46.940 0.48 0.250
Add Sundries
TOTAL
Plastering with c.m 1: 5 , 12 mm thick
including all cost and conveyance of
33.0 materials and all labour charges etc.,
complete
For Plinth alround
ii) For PC/HC Qtrs 2 x 3 61.00 - 0.70

P.P - 164
Measurements
SI.No Description of works Nos
L B D/H
ii)For SI Qtrs (3 in 1 Block) 1 x 1 49.90 - 0.70
iii)For INS Qtrs Single block 1 x 1 49.82 - 0.70
Add Sundries
TOTAL
Supplying and fixing of precasted slab 50
50.6
mm thick in c.c 1 : 3: 6 etc., complete
For Plinth alround
ii) For PC/HC Qtrs 2 x 3 54.39 0.60 -
ii)For SI Qtrs (3 in 1 Block) 1 x 1 46.12 0.60 -
iii)For INS Qtrs Single block 1 x 1 47.55 0.60 -
Add Sundries
TOTAL

P.P - 165
/HC QTRS AT

Total Qty

45.85
5.94
6.13

4.66
0.78
0.78
0.06
64.20 m 3

7.64
0.99
1.02

0.78
0.13
0.13

12.55
2.25
1.64
1.69

-0.31
-0.05
-0.05
0.09
28.50 m 3

P.P - 166
Total Qty

10.19
1.32
1.36

1.04
0.17
0.17
0.05
14.30 m 3

203.80
26.40
27.26

10.35
1.73
1.73
0.03
271.30 m 2

41.85
7.49
5.46
5.63
0.07
60.50 m 3

256.20

P.P - 167
Total Qty

34.93
34.87

326.00 m 2

195.80
27.67
28.53

252.00 m 2

P.P - 168
Sub Estimate for Sullage Drain

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.

Item Description of works Nos Measurements


No L B D/H
Earth work excavation and depositing on
bank with initial lead of 10 m and initial lift
1.1 of 2 mts in all classes of soil and sub
soils etc complete
Rear side of PC/HC Qtrs 1 x 2 60.00 0.60 0.40
Rear side of SI and INS Qtrs 1 x 1 46.00 0.60 0.40
Add Sundries
TOTAL
2.1 Supplying and filling of Sand filling
Rear side of PC/HC Qtrs 1 x 2 60.00 0.60 0.100
Rear side of SI and INS Qtrs 1 x 1 46.00 0.60 0.40
Add Sundries
TOTAL
Plain cement concrete 1:5:10 mix using
40 mm HBG metal for foundation
3.1 including all cost and conveyance of
materials and all labour charges etc .,
complete .
Rear side of PC/HC Qtrs 1 x 2 60.00 0.60 0.10
Rear side of SI and INS Qtrs 1 x 1 46.00 0.60 0.40
Add Sundries
TOTAL
6.5 B.W in CM1:5
Pillar
Rear side of PC/HC Qtrs 2 x 35 0.23 0.23 0.60
Rear side of SI and INS Qtrs 1 x 25 0.23 0.23 0.60
Add Sundries
TOTAL

Brick work 110 mm thick with C.M 1:4


using G. moulded country bricks including
10.5 all cost and conveyance of materials and all
labour charges etc., complete.

Rear side of PC/HC Qtrs 1 x 2 60.00 - 0.60


Rear side of SI and INS Qtrs 1 x 1 46.00 - 0.60

SL - 169
Item Description of works Nos Measurements
No L B D/H
Deduction for pillars
Rear side of PC/HC Qtrs -2 x 35 0.23 0.60
Rear side of SI and INS Qtrs -1 x 25 0.23 0.60
Add Sundries
TOTAL
Plastering with c.m 1: 5 , 12 mm thick
including all cost and conveyance of
33.0 materials and all labour charges etc.,
complete
Outer and Top
Rear side of PC/HC Qtrs 1 x 2 60.00 - 0.715
Rear side of SI and INS Qtrs 1 x 1 46.00 - 0.715
Pillar Off set top 2 x 35 0.23 0.115
Pillar Off set top 1 x 25 0.23 0.115
Pillar Off set side 2 x 70 0.115 0.60
Pillar Off set side 2 x 25 0.115 0.60
Add Sundries
TOTAL

34.00 Plastering in CM 1:4 - 12mm Tk


Rear side of PC/HC Qtrs 2 x 2 60.00 - 0.60
Rear side of SI and INS Qtrs 1 x 2 46.00 - 0.60
TOTAL

Plastering with c.m 1: 4 , 20 mm thick


including all cost and conveyance of
28.0 materials and all labour charges etc.,
complete
For PC/HC Qtrs Bottom 1 x 2 60.00 0.35 -
For PC/HC Qtrs Bottom 1 x 1 46.00 0.35 -
Add Sundries
TOTAL

SL - 170
C/HC QTRS AT

Total Qty

28.80
11.04
0.06
39.90 m 3

7.20
11.04
0.06
18.30 m 3

7.20
11.04
0.06
18.30 m 3

2.22
0.79
0.09
3.10 m 3

72.00
27.60

SL - 171
Total Qty

-9.66
-3.45
0.01
86.50 m 2

85.80
32.89
1.85
0.66
9.66
3.45
0.09
134.40 m 2

144.00
55.20
199.20 m2

42.00
16.10

58.10 m 2

SL - 172
Sub Estimate for Storm water Darin

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.

Item Description of works Nos Measurements


No L B D/H
Earth work excavation and depositing on
bank with initial lead of 10 m and initial lift
1 of 2 mts in all classes of soil and sub
soils etc complete
Storm water drain 1 x 1 90.00 1.20 0.75
TOTAL

2 Supplying and filling of Sand filling


Storm water drain 1 x 1 90.00 1.20 0.100
TOTAL
Plain cement concrete 1:5:10 mix using
40 mm HBG metal for foundation
3 including all cost and conveyance of
materials and all labour charges etc .,
complete .
Storm water drain 1 x 1 90.00 1.20 0.15
Add Sundries
TOTAL
7 B.W in CM1:5
Pillar
Storm water drain 1 x 2 0.23 0.23 1.00
Add Sundries
TOTAL

Plastering with c.m 1: 5 , 12 mm thick


including all cost and conveyance of
33 materials and all labour charges etc.,
complete

Outer and Top 1 x 2 90.00 - 1.230


Add Sundries
TOTAL

SL - 173
Item Description of works Nos Measurements
No L B D/H
34 Plastering in CM 1:4 - 12mm Tk
Inner 1 x 2 90.00 - 1.00
TOTAL

Plastering with c.m 1: 4 , 20 mm thick


including all cost and conveyance of
28 materials and all labour charges etc.,
complete
Bottom 1 x 2 90.00 0.60 -
Add Sundries
TOTAL

SL - 174
C/HC QTRS AT

Total Qty

81.00
81.00 m 3

10.80
10.80 m 3

16.20

16.20 m 3

0.11
0.09
0.20 m 3

221.40

221.40 m 2

SL - 175
Total Qty

180.00
180.00 m2

108.00

108.00 m 2

SL - 176
Sub Estimate for Under Ground Sump
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.

Detailed Estimate

Measurement
Sl.No Description of work No
Length Breath Depth
Earth work excavation in all soils for
1.5
open foundation (Excluding refilling)
a. 0 to 2 mt.
Sump 3.14 x 1/4 6.66 6.66 2.00
Add Sundries
Total
b. 2 to 3 mt.
Sump 3.14 x 1/4 6.66 6.66 0.50
Add Sundries
Total

2.1 Filling sand


Sump 3.14 x 1/4 6.66 6.66 0.15
Add Sundries
Total
C.C.1:5:10 for Foundation & Basement
3.1
using 40 mm HBG metal
Sump 3.14 x 1/4 6.66 6.66 0.10
Add Sundries
Total
Standardised concrete Mix M20 Grade
4.10 Concrete 20 mm HBSJ in Foundation
and Basement.
Raft for sump 0.25 x 3.14 6.36 6.36 0.25
Walls alround Vertical 3.14 x 1 5.23 0.230 2.30
Hunch portion 30 x 30cm 3.14 x 1/2 5.00 0.30 0.30
Center circular column 1/4 x 3.14 0.30 0.30 2.30
Middle cross wall 1 x 1 5.00 0.23 2.30
D/f Center column 3.14 x 1/4 0.30 0.30 2.30
Cover slab 3.14 x 1/4 5.46 5.46 0.15
cross beam 1 x 2 5.00 0.300 0.30
Add Sundries
Total

13.1 Filling with excavated earth in F & B


Sump outside allround (Raft Portion
1 x 1 18.56 0.45 2.00
Side)

Sump - 177
Measurement
Sl.No Description of work No
Length Breath Depth
Add Sundries
Total
18.10 Form work using M.S sheet
a.For Column footings,plinth
beam,Grade beam,Raftbeam,Raft slab 1 x 3.14 5.46 - 0.25
etc.,
Add Sundries
Total
b.Plain surfaces such as Roof
slab,floorslab,Beams,lintels,lofts,sill
slab,staircase,portico slab and other
similar works
Sump ceiling 3.14 x 1/4 5.00 5.00 -
Side 1 x 3.14 5.46 - 0.15
D/f cover slab -2 x 1 0.60 0.60 -
Add sides 1 x 2 2.40 - 0.15
Add Sundries
Total
e.Circular walls
Inner wall at sump alround domestic 1 x 3.14 5.00 - 2.30
Outer wall alround 1 x 3.14 5.46 - 2.30
Add Sundries
Total
Spl. Ceiling plastering in C.M. 1:3,
35.0
10 mm tk.
Inner sump 3.14 x 1/4 5.00 5.00 -
Side wall alr inner 3.14 x 1 5.00 - 2.30
Side wall alr Outer 3.14 x 1 5.46 - 0.75
Add Sundries
Total
37.1 White washing 3 coats (slaked)
Same qty in ceiling plastering item No:35 Say

Fabrication of Mild steel / RTS grills


43.0
(with cement slurry wash)
Qty of concrete 4.1 25.10 x 120.00 Kg/m3

3012.00 / 1000.00
Total
43.10 As per Barbending Qty

53.3 Suppying and fixing of CI steps 1 x 8 - - -

Sump - 178
Measurement
Sl.No Description of work No
Length Breath Depth
53.4 Suppying and fixing of CI Man hole cover 1 x 2

Sump - 179
C QTRS AT

Contents

83.57
0.06
83.63 m 3

20.89
0.09
20.98 m 3

6.27
0.08
6.35 m3

4.18
0.02
4.20 m3

7.94
8.69
0.71
0.19
2.65
-0.19
4.21
0.90

25.10 m3

16.70

Sump - 180
Contents

16.70 m3

4.29

0.01
4.30 m3

23.55
2.57
-0.72
0.72

26.12 m3

36.11
39.43
0.06
75.60 m 3

23.55
36.11
12.86

72.52 m3

72.52 m2

3012.00
3012.00 Kg
3.012
3.012 M.T
1.148 M.T

8.00 Nos

Sump - 181
Contents

2.00 Nos

Sump - 182
SUB ESTIMATE FOR CULVERT (2Nos)

NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
Measurements
Item NoDescription of works Nos
L B D/H
Earth work excavation and depositing on
bank with initial lead of 10 m and initial
1.0
lift of 2 mts in all classes of soil and sub
soils etc complete
For culvert. 1 x 2 6.30 2.70 1.80
L.s
TOTAL
Plain cement concrete 1:5:10 mix using
40 mm HBG metal for foundation
3.0 including all cost and conveyance of
materials and all labour charges etc .,
complete .
For culvert. 1 x 2 6.30 2.70 0.23
L.S
TOTAL

Plain cement concrete 1: 2 : 4 mix using 20


mm HBG metal , including all cost and
3.0
conveyance of materials and all labour
charges etc ., complete .

For culvert bed level. 1 x 2 6.00 1.20 0.10


Bed block. 2 x 2 6.00 0.38 0.15
L.S
TOTAL

Standardised concrete Mix M20 Grade


4.0 Concrete 20 mm HBSJ in Foundation and
Basement.
For culvert. 1 x 2 6.00 1.96 0.20
L.S
TOTAL
R.R.M work in CM 1:5 including all workss
5.0
etc complete in (F&B)
For culvert. I st Footing 2 x 2 6.00 0.60 0.45
For culvert. II nd Footing 2 x 2 6.00 0.45 0.45
For culvert. II nd Footing 2 x 2 6.00 0.38 0.90
L.S
TOTAL
Measurements
Item NoDescription of works Nos
L B D/H

Brick work with C.M 1:5 using ground


moulded country bricks including all cost
7.0
and conveyance of materials and all labour
charges etc., complete.

i) for Parapet wall.


2 x 2 1.96 0.23 0.75
L.S
TOTAL

Plastering with c.m 1: 5 , 12 mm thick


including all cost and conveyance of
33.0
materials and all labour charges etc.,
complete
i) for Parapet wall.
ii) For sides. 2 x 2 1.96 1.80 -
2 x 4 0.95 0.23 -
L.S
TOTAL

For form works for all RCC works


18.0 including all hire charges of materials and
all labour charges etc., complete

a) form work for such as plinth beam.


For bed block sides 2 x 2 12.76 - 0.15
For Culvert slab 1 x 2 15.92 - 0.20
L.S
TOTAL

b) M.S Sheet centering - culvert bottom. 1 x 2 6.00 - 1.20

Kgs / m

White washing 3 coats using slaked shell


37.0
lime
Qty asper item No.33

Supply and fabrication of steel RTS / MS


rods including all cost andconveyance of
42.0 materials and all labour charges etc .,
including cutting pending, and placing in
position etc ., complete

Item No:4.1 4.70 @ 120.00


Measurements
Item NoDescription of works Nos
L B D/H
43.0 As per Barbending 2 x 0.456
QTRS AT

Total
Qty

61.24
0.06
61.30 m3

7.82
0.08
7.90 m3

1.44
1.37
0.09
2.90 m3

4.70

4.70 m3

6.48
4.86
8.21
0.05
19.60 m3
Total
Qty

1.35
0.05
1.40 m3

14.11
1.75
0.04
15.90 m2

7.66
6.37
0.07
14.10 m2

14.40 m2

MTs

15.90 m2

0.56
Total
Qty
0.912 M.T
Thuraiyur Development works PH-XXI qtrs 189

Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.

1.1 Earth work excavation in all soils (including refilling) 0.00 0.00 0.00 0.00

a. 0 to 2 mt. 134.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.20 8641.32 0.00 0.00 0.00 61.30 8250.98

b. 2 to 3 mt. 140.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1.2 Earth work excavation in all soils (excluding refilling) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 0 to 2 mt. 127.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 133.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(including refilling)

a. 0 to 2 mt. 196.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 203.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.4 Earth work excavation for Open foundation (including 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
a. 0 to 2 mt. 71.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 77.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.5 Earth work excavation for Open foundation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(excluding refilling)

a. 0 to 2 mt. 63.60 Cum. 0.00 0.00 0.00 0.00 0.00 119.50 7600.20 83.63 5318.87 0.00 235.50 14977.80 0.00 0.00 0.00

b. 2 to 3 mt. 69.80 Cum. 0.00 0.00 0.00 0.00 0.00 18.50 1291.30 20.98 1464.40 0.00 0.00 0.00 0.00 0.00
c. 3 to 4 mt. 76.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 4 to 5 mt. 82.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.6 Earth work excavation for Open foundation for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
drains (excluding refilling) width upto 1.25 m

a. 0 to 2 mt. 95.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.90 3806.46 81.00 7727.40 0.00

b. 2 to 3 mt. 101.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.7 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(Excluding refilling)
a. 0 to 2 mt. 189.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 195.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.8 Earth work excavation in SDR for Open foundation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(excluding refilling)

a. 0 to 2 mt. 94.70 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 2 to 3 mt. 100.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1.9 Providing Driven PILES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.300mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.330mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.375mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.400mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.450mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f.500mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1 Filling sand 541.05 Cum. 0.00 0.00 0.00 0.00 0.00 12.20 6600.81 6.35 3435.67 28.50 15419.93 120.80 65358.84 18.30 9901.22 10.80 5843.34 0.00

2.2 Sand Gravel Mix 638.04 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Supply and filling of 40 mm Brick jelly 881.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Supply and filling of 20 mm Brick jelly 953.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.5 Gravel soling 279.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.6 Supply and filling of 40 mm HBSJ 1028.16 Cum. 0.00 0.00 0.00 0.00 0.00 6.00 6168.96 0.00 0.00 0.00 0.00 0.00 0.00

2.7 Supply and filling of 20 mm HBSJ 1392.16 Cum. 0.00 0.00 0.00 0.00 0.00 6.00 8352.96 0.00 0.00 0.00 0.00 0.00 0.00

3.1 C.C.1:5:10 for Foundation & Basement 3057.40 Cum. 0.00 0.00 0.00 0.00 0.00 4.70 14369.78 4.20 12841.08 14.30 43720.82 7.60 23236.24 18.30 55950.42 16.20 49529.88 7.90 24153.46

3.2 P.C.C. 1:2:4 for Foundation & Basement and other 4460.03 Cum. 0.00 0.00 0.00 0.00 0.00 4.30 19178.13 0.00 0.00 0.00 0.00 0.00 2.90 12934.09
similar works

3.3 P.C.C. 1:8:16 using 20 mm broken brick jelly+B494 2721.36 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 190
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
3.4 Providing WBM 125 mm consolidated thick with gravel Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
3.5 Surface dressing over WBM 25 mm thick Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.6 Providing WBM 125 mm consolidated thick with gravel 142.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
(IRC 63 to 45mm for 75mm thick and 37.5 to 26.5mm for
50.mm thick)

3.7 Surface dressing over WBM 25 mm tk. 134.05 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with pre-coated chips using 11.2mm size IRC

4.1 R.C.C. 1:2:4 Foundation and Basement 5367.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4.2 R.C.C. 1: 11/2: 3 Foundation and Basement 5963.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.0 R.R. masonry in C.M. 1:5 Foundation and Basment 3191.19 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.60 62547.32

6.1 Brick work in C.M. 1:5 (F& B) using Chamber Burnt 4937.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")

6.2 Brick work in C.M. 1:5 (F& B) using chamber Burnt 4689.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")

6.3 Brick work in C.M. 1:5 (F& B) using Chamber Burnt Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4")

6.4 Brick work in C.M. 1:5 (F& B) using Chamber Burnt Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")

6.5 Brick work in C.M. 1:5 (F& B) using Kiln Burnt 4806.92 Cum. 0.00 0.00 0.00 0.00 0.00 22.60 108636.39 0.00 0.00 0.00 3.10 14901.45 41.40 199006.49 1.40 6729.69
Country bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4")

6.6 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")

7.1 Damp Proof Course Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
in C.M. 1:4, 12 MM thick mixed with Crude oil
7.2 Supply and fixing of Bituminous filler pad, 20 mm tk. 666.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for expansion joint

7.3 Damp Proof Course in C.M. 1:4, 12 MM thick mixed #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
with Water proofing compound

8.1 R.C.C.1:2:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5435.91 Cum.
b. In First floor 5569.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5703.91 Cum.
d. In Third floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5837.91 Cum.
e. In Fourth floor 5971.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.2 R.C.C.1: 1 1/2 :3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 6031.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In First floor 6165.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 6299.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 6433.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Fourth floor 6567.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

f. In Fifth floor 6701.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

g. In sixth floor 6835.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

h. In seventh floor 6969.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

i. In eighth floor 7103.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

j. In Ninth floor 7237.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

k. In Tenth floor 7371.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

l. In Eleventh floor 7505.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 191
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
m. In Twelth floor 7639.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9.1 Brick work in C.M. 1:6 using Chamber Burnt brick of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")

a. In Ground Floor 4916.34 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 5006.64 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 5096.94 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 5187.24 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5277.54 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")

a. In Ground Floor/Stilt floor 4681.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 4771.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 4862.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 4952.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5042.71 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 5584.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 5674.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 5765.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In thirteen floor 5855.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.3 Brick work in C.M. 1:6 using Chamber Burnt brick of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.4 Brick work in C.M. 1:6 using Chamber Burnt brick of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.5 Brick work in C.M. 1:6 using Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 7 cm ( 8 3/4" x 4 1/4" x 2
3/4")

a. In Ground Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4785.36 Cum.
b. In First Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4875.66 Cum.
c. In Second Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4965.96 Cum.
d. In Third Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5056.26 Cum.
e. In Fourth Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5146.56 Cum.
9.6 Brick work in C.M. 1:6 using Kiln Burnt Country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")

a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.1 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 23 x 11.2 x 7 cm (9" x 4 3/8"
x 2 3/4")112 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 192
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm
tk (B.P.)

a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor/stilt floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 0.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In thirteen floor 25864.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.3 Brick partition work in C.M. 1:4 Chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 110 mm
tk (B.P.)

a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.4 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 22 x 11 x 7 cm (8 3/4" x 4
1/4" x 2 3/4") 110 mm tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth
10.5 Brick Floorwork in C.M. 1:4 Kiln Burnt Country
partition Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
110 mm tk (B.P.)

a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 10.80 0.00 0.00 271.30 0.00 0.00 86.50 0.00 0.00 0.00

b. In Ground Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
c. In First Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
d. In Second Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
e. In Third Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
f. In Fourth Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
10.6 Brick partition work in C.M. 1:4 Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")
110 mm tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.1 Brick work in C.M. 1:4 Chamber Burnt brick of size 23 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.2 x 7 cm (9" x 4 3/8" x 2 3/4")70 mm tk (B.P.)

a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 193
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)

a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.3 Brick work in C.M. 1:4 Chamber Burnt brick: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 70 mm tk
(B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.4 Brick work in C.M. 1:4 Chamber Burnt brick of size 22 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)

a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.5 Brick work in C.M. 1:4 Kiln Burnt Country bricks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70
mm tk (B.P.)

a. In Ground Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
b. In First Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
c. In Second Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
d. In Third Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.6 Brick work in C.M. 1:4 Kiln Burnt Country bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 57 mm tk
(B.P.)
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.1 Brick partition in C.M. 1:4 using country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 22 x11x5cm 50 mm thick

a. In Ground Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
b. In First Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
c. In Second Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
d. In Third Floor 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#VALUE! Sqm.
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.2 Brick partition in C.M. 1:4 50 mm tk. (B.P.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kiln Burnt Country brick: 23 x 11 x 5 cm
(9" x 4 1/4" x 2")
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.1 Filling with Excavated Earth 22.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 16.70 0.00 60.50 0.00 0.00 0.00 0.00 0.00
13.2 Filling with Excavated Earth Mixed with lime in the Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proporation 1:4 (one of lime & four of earth)
Thuraiyur Development works PH-XXI qtrs 194
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
14.I Precast Cupboard slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 837.31 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 840.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 842.73 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 845.44 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 848.15 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 850.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 853.57 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 856.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 858.99 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 861.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 864.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 867.12 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation & basement 931.95 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground floor 934.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First floor 940.11 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second floor 945.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 950.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth floor 956.34 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.1 Cuddappa slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.2 Cuddappa slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.1 Precast Jally ventilator 50mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground Floor 1684.71 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In First floor 1689.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 1694.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 1699.83 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Fourth floor 1704.87 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.2 Supplying & fixing of Terra cotta jolly (not less than 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50mm)
a. In Ground Floor 327.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 331.76 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 336.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 340.80 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 345.32 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.3 Supplying & fixing of Terra cotta jolly (more than 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50mm upto 110 mm)
a. In Ground Floor 514.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 524.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 534.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 544.72 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 554.65 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.0 Form work- Lintel (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.0 Form work - M.S. Sheet (slab) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.0 Form work - Small quantities (M.S. Sheet) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 195
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
20.0 Form work - Plinth beam (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.1 R.C.C.Door frame 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 900 x 2100 mm 1708.84 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 700 x 2100 mm 1683.04 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.2 Teak wood Wrought & Put up 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. T.W. over 2 m & below 3 m 114146.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. T.W. below 2 m length. 102442.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

21.3 PVC Door frame & shutter 1900.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.1 Teak wood panelled door shutters 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1000 x 2100 mm 4094.61 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900 x 2100 mm 4172.77 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 700 x 2100 mm 4179.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1200 x 2100 mm (Single) annexure item 4677.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.2 Teak wood "Window" & Ventilator Shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3 T.W. double leaf shutters for cup board/ ward robes Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.1 T.W. single leaf Door shutters using 9 mm tk. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
phynol bonded BWR plywood
a. 900 x 2100 mm 2930.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.2 Glass panels with Aluminium beedings 639.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.3 S&F of Magnetic door catches 35.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23.4 Supply and fixing of Aluminium window with 3mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thick Glass
a. 1.8 x 1.35 mt.window 12529.36 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 9450.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1.35 x 1.05 mt window 8138.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1.2 x 1.35 mt window 7424.66 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. 1.2 x 1.05 mt window #VALUE! Each 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. 1.05 x 1.35 mt window 6895.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. 0.9 x 1.35 mt window 6365.73 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. 0.9 x 1.05 mt window 5482.77 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. 0.5 x 1.35 mt window 3459.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. 0.45 x 1.35 mt window 3283.37 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.0.90 x 0.60 mt.Ventilator 3800.81 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. 0.60 x 0.60 mt.Ventilator 4299.61 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24.0 Manufacturing & supply of steel windows (Weight 58.00 Kg. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
basis)

25.0 M.S.Holdfast 9.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26.0 Flooring in C.C.1:5:10 3057.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27.1 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11.2 x 7 cm.
27.2 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11.4 x 7.5 cm.
27.3 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11 x 7 cm.
27.4 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 22 x 11 x 7 cm.
27.5 B.w. in C.M. 1:4 for staircase steps Kiln burnt country #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks 22 x 11 x 7 cm.
27.6 Floor
28.0 B.w. inplastering
C.M. 1:4 in
forC.M.
staircase steps
1:4, 20 mmKiln
tk. burnt country #VALUE! Cum.
Sqm. 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
#VALUE! 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 58.10 0.00
0.00 54.00 0.00
0.00 0.00
0.00
bricks 22 x 11 x 5.7 cm.

29.1 Mosaic tiles 20 cm x 20 cm x 2 cm. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.2 Mosaic tiles 25 cm x 25 cm x 2 cm. 787.01 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.3 Floor ceramic tiles 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.4 Glazed tiles 937.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.5 Floor ceramic tiles (Anti-skid) 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
30.0 Ellispattern 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
287.70 Sqm.
31.0 Weathering course 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2859.46 Cum.
Thuraiyur Development works PH-XXI qtrs 196
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
32.0 Pressed tiles (23cmx23cmx20mm) mixed with Crude oil Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
32.1 Pressed tiles (23cmx23cmx20mm) mixed with Water 785.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proofing compound

32.2 Pressed tiles (23cmx23cmx18mm) mixed with Water Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proofing compound

33.0 Plastering in C.M. 1:5, 12 mm tk. 145.84 Sqm. 0.00 0.00 0.00 0.00 0.00 178.40 0.00 0.00 326.00 0.00 0.00 134.40 0.00 221.40 0.00 15.90 0.00

34.0 Plastering in C.M. 1:4, 12 mm tk. #VALUE! Sqm. 0.00 0.00 0.00 0.00 #VALUE! 0.00 0.00 0.00 0.00 199.20 0.00 180.00 0.00 0.00

35.0 Spl. Ceiling plastering in C.M. 1:3, 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 mm tk. 169.04 Sqm.
36.0 Cement mortar Border in C.M. 1:5, 12 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 150 mm wide 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
45.36 Rmt
b. 75 mm wide 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.49 Rmt
c. 50 mm wide 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.94 Rmt
37.1 White washing 3 coats (slaked) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.90 0.00
26.25 Sqm.
37.2 Colour washing ( slaked) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.1 Cement paint 121.40 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.2 Matt paint 111.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
39.0 M.s Grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
53.60 Kg.
40.0 Painting - New "wood work" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
162.42 Sqm.
41.0 Painting - New "iron work" 96.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.60 0.00 0.00 0.00 0.00

42.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash)
a. upto 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
43.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. upto 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.1 PVC SWR 110 mm dia Rain water pipe 273.87 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.2 Rain Water Harvesting using Defunct borewell method Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
45.0 Stucco plastering 12 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
202.75 Sqm.
46.0 S & F 20 mm dia Alu. Hanger Rod 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.00 Rmt
47.0 S & F Alu Towel rail 75 cm long 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
95.00 Each
48.0 S & F 5 pin Coat stand 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.00 Each
49.0 S & F chromium plated 8 guage Picture Hook 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.50 Each
50.1 Precast slab 50 mm tk.in C.C. 1:3:6 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

50.2 Providing precast Kerb stone in C.C. 1:3:6, 450 x 300 179.24 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 380.00 0.00 0.00 0.00 0.00
x 150 mm

50.3 Supply and planting avenue trees 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
262.75 Each
50.4 Providing Tree guard 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
649.40 Each
50.5 Supplying. Fabricating and erection of M.S Scheme 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Name board
13470.65 Each
51.0 HDPE water tank 700 lit capacity with ISI mark 5740.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

52.0 PVC Water supply (ASTM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 32 mm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
167.93 Rmt
b. 25 mm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
151.97 Rmt
c. 20 mm dia 147.19 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

52.1 G.I Pipe 20mm dia for Hot water line (Fully 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concealed in walls)
220.37 Rmt
53.1 Wash basin 2526.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 197
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
53.2 S & F of C.I. Manhole cover 45 x 45 cm Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(20 kg. weight)
53.3 C.I. Steps ( 5 kg) 30.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00
54 Brass tap (with ISI mark) 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.1 C.P tap long body 300.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.2 C.P tap short body 250.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.1 Squat Urinal 662.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.2 Flat Back Urinal 1577.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56.1 S & F of Orissapan - in G.F. 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.2 S & F of Orissapan - other than G.F. 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 S & F of E.W.C.(white) 5157.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57.1 S & F of E.W.C.(colour) 5527.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

58.1 PVC SWR pipe (Soil line) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia. 518.65 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 75 mm dia. 406.75 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.2 PVC Ventilating shaft with cowl 439.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.1 Gully Trap using Chamber burnt bricks 23 x 11.2 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.2 Gully Trap using chamber burnt bricks of size 1212.57 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23x11.4x7.5cm

59.3 Gully Trap using Chamber burnt bricks 23 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.4 Gully Trap using Chamber burnt bricks 22 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.5 Gully Trap using Kiln burnt country bricks 22 x 11 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 cm. 1212.57
Each
59.6 Gully Trap using Kiln burnt country bricks 22 x 11 x 5.7 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cm.

60.0 PVC Nahani trap (4way/2way) 129.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each
61.1 Stoneware pipe 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm S.W. pipe 362.90 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm S.W. pipe 490.23 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
61.2 Stoneware pipe dry condition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 100 mm dia 172.33 Rmt 0.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 150 mm dia 259.05 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

62.1 Stoneware bend 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 96.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 132.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

62.2 Stoneware Tee 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 121.50 Each 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 156.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

63.0 32 mm dia PVC waste pipe 31.87 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electrical arrangements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
64.0 a. Light point with ceiling rose 1070.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Calling bell point with Buzzer/Calling bell 1102.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
65.0 Fan point 1126.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
66.0 Staircase light point 1973.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
67.0 5 amps 5 pin Plug point (Switch board itself) 540.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
68.0 5 amps 5 pin Plug point (Convenient places) 752.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
69.0 15 Amp. Power plug 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
125.00 Each
70.1 Bulk head fitting 401.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.2 S & F of Tube light with fittings Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.3 S & F of 40/ 60 w bulb 12.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.4 S & F of plastic shade 10.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
71.0 Double pole main switch 562.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

72.0 Box type Fibre Fan hook 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33.90 Each
Thuraiyur Development works PH-XXI qtrs 198
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
73.10 6 way - D.B. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3737.00 Each
73.2 4 way - D.B. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3000.00 Each
74.0 Charges for fixing of "Fan" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
347.00 Each
75.0 Supply and delivery of Fan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 48" (1200 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 42" (1050 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
76.0 8 SWG wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 Rmt
77.0 Run of main 2 wires of 1.50 Sqmm. 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
77.1 Run of 2 wires of 4 sqmm with continuous earth by 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
means of 2.5sqmm
77.2 S & F of A/C metal clad switch 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
500.00 Each
77.3 S&F of TV/Telephone line Socket 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
75.00 Each
77.4 S&F of 20mm dia PVC pipe for TV/Telephone line 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.07 Rmt
78.0 Earthing Station IS3043 (Type I) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2010.00 Each
78.1 Earthing Station (Type II) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
79.1 1 No.of 30Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

79.2 3 Nos.of 30Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
80.0 375 x 300 x 20 mm T.W. plank 592.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

81.0 Meter cupboard 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1959.10 Sqm
82.0 Street lights 2168.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
83.0 M.S Angle 146.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
84.0 Run of 2 wires of 4 sqmm Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
85.0 Supply of G.I pipe 25mm dia 123.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
86.0 Anti termite treatment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
34.00 Sqm.
87.0 ELCB Single phase 2343.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

112.0 S & F of Exsaust Fan 300 mm dia 1683.71 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.0 Anticorrosive treatment for steel grills 3769.50 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ANNEXURE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tkusing standardised 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete mix M20 (annexure)

a. In Foundation & basement 934.85 Sqm. 0.00 0.00 0.00 0.00 0.00 5.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In Ground floor 937.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.1 Standardised concrete Mix M20 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Foundation and basement 5310.53 Cum 0.00 0.00 0.00 0.00 0.00 5.70 0.00 25.10 0.00 0.00 0.00 0.00 0.00 4.70 0.00

b. In Stilt /Ground Floor 5378.53 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8.1 c. In First Floor 5512.53 Cum 0.20 0.20 0.20 1102.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Second Floor 5646.53 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Third floor 5780.53 Cum 0.20 1.80 1.80 10404.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

f.In fourth floor 5914.53 Cum 0.20 8.00 8.00 47316.24 0.00 0.00 0.00 0.00 0.00 0.00

4.2 Standardised concrete Mix M30 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Foundation and basement 5805.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In Stilt /Ground Floor 5873.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In First Floor 6007.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Second Floor 6141.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 199
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
e. In Third floor 6275.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCC M30 mix using hard broken stone jelly for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
foundation and basement

a. Foundation & basement 5805.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b.Stilt floor 5873.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cement Concrete using desing mix of grade M25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete

a. In Foundation and basement 5719.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In Stilt /Ground Floor 5787.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In First Floor 5921.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Second Floor 6055.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Third floor 6189.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

f. In Fourth Floor 6323.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

g. In Fifth Floor 6457.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

h. In Sixth Floor 6591.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

i. In Seventh Floor 6725.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

j.in Eighth floor 6859.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

k.in Ninth floor 6993.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

l.in Tenth floor 7127.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

l. In Eleventh floor 7261.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

m. In Twelth floor 7395.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

n. In Thirteen floor 7529.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
g. In Fifth Floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l.in Tenth floor 5584.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm
tk (B.P.)
g. In Fifth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)

g. In Fifth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
j. In Eighth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
Supply and laying of Hard core layer 200mm 2796.22 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and filling stonedust 136.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Plastering with CM 1:3, 12mm with WPC 168.63 Sqm 11.00 11.00 440.00 99.00 550.00 92746.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and filling with gravel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
287.16 Cum
Thuraiyur Development works PH-XXI qtrs 200
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
B.W in CM 1:4 in Superstructure in First floor #VALUE! Cum 1.20 1.20 1.20 #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00

B.W in CM 1:4 in Superstructure in Second floor #VALUE! Cum 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00

B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 0.00 10.80 10.80 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
D) In third floor

B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 48.00 0.00 48.00 #VALUE! #VALUE! 0.00 0.00 0.00 0.00 0.00 0.00
e) In fourth floor

Earth work excavation in Loose / sandy soils (including 91.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
Earth work excavation in Loose / sandy soils (excluding 42.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for open foundation
Earth work excavation in Loose / sandy soils (excluding 63.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for drain
3.80 P.C.C. 1:3:6 using 20 mm broken brick jelly 3862.79 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.30 P.C.C. 1:4:8 using 40 mm broken brick jelly #VALUE! Cum

8.4 Providing earth quake resistant for Corner walls 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. Foundation & basement 4756.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Ground Floor 4824.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. First Floor 4958.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Second Floor 5092.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.5 Providing earth quake resistant for Door/window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jambs
a. Ground Floor 436.22 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. First Floor 438.52 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Second Floor 440.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9.3.1 Providing Bored pile using design mix M30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.450mm dia 2234.30 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head to the required cut of level 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and clearing way debries with an average lead of 3
km entirely with city limits
450mm dia pile 489.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Conducting routine vertical compression load test 70000.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.328/2014-15
Mobilization charges including transporting to site 50000.00 Set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.328/2014-15
Red oxide plastering in CM 1:4 #VALUE! Sqm 0.00 0.00 0.00 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
18.1 Formwork using M.S.Sheet 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a.For Column footings,plinth beam,Grade 498.94 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 4.30 0.00 0.00 0.00 0.00 0.00 14.10 0.00
beam,Raftbeam,Raft slab etc.,

b.Plain surfaces such as Roof 573.61 Sqm 1.50 1.50 60.00 13.50 75.00 43020.75 30.00 0.00 26.12 0.00 0.00 0.00 0.00 0.00 14.40 0.00
slab,floorslab,Beams,lintels,lofts,sill
slab,staircase,portico slab and other similar works

c.For Square and rectangular columns and small 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
quantities
688.33 Sqm
d.Vertical wall 630.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.Circular column 1376.66 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

f.Curved surface 860.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 75.60 0.00 0.00 0.00 0.00 0.00 0.00

g.Double centering portico area 1147.22 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.6 R.C.C.Door frames of size 100 x 75mm with one 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
edge grooves size 't' x 20 mm

a. 900 x 2100 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1708.84 Each
c. 1200 x 2100 mm 2078.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 750 x 2100 mm 1683.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Teak wood "Window" & Ventilator Shutter with 4mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thick pin headed glasses

a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 201
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. Ventilator: (75 x 75 cm) 2203.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3.2 MDF board (18mm thick) double leaf shutters with TW 1924.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame for cup board/ ward robes.
T.W. frame & TW styles & rails with BWR double 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
leaf shutters for cup board/ ward robes including two
coat enamel paint & one coat primer.

3441.72 Sqm
22.8 MDF board door shutters (35mm thick) exterior grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
both side laminated with external lipping.

a. 1000X2100mm. 2838.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900X2100mm. 2876.47 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.1200X2100mm. Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW panelled door shutter with brass fittings. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 1000X2100mm.(Single leaf) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5106.22 Sqm
b.1200x2400mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1200X2100mm.(Single leaf) 4396.30 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 900X2100mm (over all size 900X2400mm.). 4172.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c.1800X2400mm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW double leaves shutter of size 4926.21 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.1800 x 2100mm

a. 1500X2100mm.(double leaves) with Brass fittings 5232.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TW styles & rails with 9mm thick BWR single leaf 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 900x2100 mm

2930.58 Sqm
TW styles & rails with 9mm thick BWR single leaf 3330.03 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 750x2100 mm

TW styles & rails with 9mm thick BWR single leaf 2824.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1000 x 2100 mm

TW styles & rails with 9mm thick BWR Double leaves Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1500x2100

TW styles & rails with 9mm thick BWR single leaf 2644.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1200x2100

21.5.2 Supply and Fixing Soild PVC door Shutter with 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame
2670.00 Sqm
23.2.1 4mm thick pin headed Glass panels with Aluminium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
beedings 639.50 Sqm
Cuddappa slab 20 mm tk.for kitchen hearth slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 478.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 481.18 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 483.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 486.54 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 489.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 20 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 202
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 482.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 488.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 493.64 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 499.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for Sunshade. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.8 Glazed tiles using Grout (Tile Joint Filler) 937.59 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Floor ceramic tiles using Grout (Tile Joint Filler). 833.48 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

29.9 Floor ceramic tiles (Anti-skid) using Grout (Tile Joint 833.48 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Filler).

38.4 Two coat of cement paint over one coat white cement 80.10 Sqm 11.00 11.00 440.00 99.00 550.00 44055.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

38.5 Matt paint 111.41 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

38.6 One coat white cement for new walls and other similar 36.99 Sqm 11.00 11.00 440.00 99.00 550.00 20344.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
works.

42.0 Fabrication of Mild steel / RTS grills 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash) for all sizes of rods.

43.0 Fabrication of Mild steel / RTS grills (without 61875.00 MT 0.02 0.02 0.80 0.18 1.00 61875.00 0.554 0.00 1.148 0.00 0.00 0.00 0.00 0.00 0.912 0.00
cement slurry) for all sizes of rods.

44.6 PVC SWR 110 mm dia with ISI mark type- A for 273.87 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rain water down fall pipe
50.6 Precast slab 50 mm tk.in C.C. 1:3:6 with fibre 276.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 0.00 0.00 0.00 0.00 0.00

52.4 20mm dia PVC water supply ASTM pipe (fully 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
consealed in walls)
149.18 Rmt
53.4 S&F of C.I Manhole cover 60 x 60 cm (50kg weight ) 1725.00 Each 1.00 1.00 40.00 9.00 50.00 86250.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00

Wash Hand Basin of size 550 x 400 mm 2526.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

54.3 Supplying and fixing of Brass Chromium plated screw 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
down tap 15mm dia (heavy type not less than 430 grms
weight) with ISI mark.

56.3 S & F of Indian Water closet white glazed (Oriya type) of 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 580 x 440mm - in G.F.

56.4 S & F of Indian Water closet white glazed (Oriya type) of 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 580 x 440mm - Other than G.F.

58.3 PVC SWR pipe (Soil line) with ISI mark - type 'B'. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 110 mm dia. 518.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rmt
b. 75 mm dia. 406.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rmt
58.4 Supplying, Laying & Concealing the 50mm dia PVC 81.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( SWR) pipe with ISI mark type - 'B' with relevant
specials.
Rmt
58.5 PVC(SWR) pipe with ISI mark - type 'A' for Ventilating 439.40 Each 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shaft with cowl
Thuraiyur Development works PH-XXI qtrs 203
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable
with ISI mark confirming IS: 694:1990.
( Ordinary)

a. Light point with ceiling rose 1070.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each
b. Light point without ceiling rose 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1074.00 Each
c. Calling bell point with Buzzer/Calling bell 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1102.00 Each
65.1 Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for Fan point.

1126.00 Each
66.1 Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for Staircase
Light Point.
1973.00 Each
Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for 5 amps 5 pin
plug socket point @ Switch Board Itself.

540.00 Each
68.2 Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990 for 5 amps 5 pin
plug socket point @ Convenient Places.

752.00 Each
70.5 S & F of Tube light fitting (patty type ) with 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electronic ballast and 36 W slim tube light
496.00 Each
Supply and delivery of 48" (1200 mm) Fan with ISI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mark with Eletronic Dimmer
1238.30 Each
Run of 2 Wires of 4 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with
ISI mark confirming IS: 694:1990.
186.00 Rmt
77.5 Run of 2 Wires of 1.5 sqmm PVC insulated single core 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.

Run of 2 Wires of 4 sqmm PVC insulated single core 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.

4 x 4 Sq mm copper PVC insulated unsheathed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
single core cable for 3 phase EB service connection

197.00 Rmt
Run of 2 Wires of 2.5 sqmm PVC insulated single 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
core multi strand fire retardant flexible copper cable
with ISI mark confirming IS: 694:1990.
155.00 Rmt
Run of 4 Wires of 6 sqmm PVC insulated single core 336.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand

Run of 4 Wires of 10 sqmm PVC insulated single core


440.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand

112.1 S & F of Exsaust Fan 225mm dia 1538.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each
Compact Fluoresent Lamp (CFL) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 14W bulb for Bath & WC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
130.00 Each
b. 18w bulb for Bulk Head fittings 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
170.00 Each
S & F of Bulk head fitting suitable for CFL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
443.00 Each
Thuraiyur Development works PH-XXI qtrs 204
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
44.2 Rain water harvesting using defunct borewell and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
providing perforated cover slab

a). Providing pit 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1164.91 Each
b) Augering 30cm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
288.72 Rmt
257.1 S&F of M.S. Angle of size 35x35x5mm for staircase 185.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
steps
344.2 S&F of Bevelled edge mirror 500 x 400 x 5.5mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
355.00 Each
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
383 S&F of Cuddapah sink 600 x 600 x 200mm
944.00 Each
383.1 Providing nosing to the edges of Granite slab 262.40 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply and fixing of PVC water supply (ASTM) 210.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.50mm dia
384 S&F of PVC flushing cistern 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1231.00 Each
385 S&F of cloth drying arrangement 612.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.1 Anticorrosive treatment for window grills 2010.25 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and fixing of 32 AMPS Triple pole main 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
switch
1340.00 Each
450 x 375 x 20 mm thick TW plank 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
990.00 Each
3 Nos.of 32Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 Nos.of 32Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and delivery of Three phase ELCB/RCCB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2695.00 Each
Supply of G.I pipe 40mm dia 'B' Class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Plastic Emulsion PAINT including primer for outer 151.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Two coat of OBD over one coat white cement for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
inner walls
75.46 Sqm
2 x 4 Sqmm Copper PVC insulated unsheathed single 110.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
core 1 KV grade cable for EB service single phase.

40 mm dia GI pipe "B"class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 No.of 32 Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

P. C.C. 1:3:6 for foundation & basement using 40mm 3862.79 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
metal

Providing PVC Tee with end cap 32mm dia 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
87.00 Each
Granite Tiles flooring (Ruby red) 1207.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Providing wooden Melamine polish for new wood 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
997.28 Sqm
Supplying and fixing of staineless steel hand rails 4500.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Vitrified Tiles flooring (ivory) 908.64 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Vitrified Tiles flooring 1084.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Concrete designer tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eurocon Tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and fixing of Aluminium sliding window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a) size 1800x1350 SW1 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b)1200x1350 SW2 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for officers)
supplying and fixing of colour matt finish floor tiles of size 2433.47 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for wall tiles)
Supplying and fixing of wall panneling using Aluminium 3034.40 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame with MDF board
4.4 Supply of material and lab ourfor Mineralfbre 915.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mmx600mm Grid false ceiling work
Supplying, fabricating, erecting and fixing Gyp board 990.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
false ceiling using perforated sheet 10mm thk
Thuraiyur Development works PH-XXI qtrs 205
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
Supplying and fixing of 100mm dia GI pipe 905.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Geyser (Data -SD 103) 8467.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of CP wall mixer two in one 3409.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(without telephone shower) including cost of all materials
and all labour charges etc complete.
CER No.178/13-14
Supplying and fixing of shower arm 9" long including 469.42 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cost of all materials and all labour charges etc. complete
CER No.178/13-14

Supplying and fixing of GM wheel valves ISI mark 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a.100mm GM Gate valves 5640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.50mm GM Gate valves 1340.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.32mm GM Gate valves 604.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990. (Modular)

a. Light point with ceiling rose 1000.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 1003.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi 769.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin Modular plug
socket point @ Convenient Places.

Wiring with 1.5 sqmm PVC insulated single core multi 536.55 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin Modular plug
socket point @ Switch Board Itself.

Supplying and laying of 3.5 core 70 sq.mm PVC 627.40 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
armoured LTUG cable (below GL)
S&F 3.5 X 70mm LTUG CABLE Above GL 435.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 3.5 X 35mm LTUG CABLE Above GL 356.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 3.5 X 25mm LTUG CABLE Above GL 317.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 2X6 Sq.mm LTUG CABLE 176.84 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of brass cable gland suitable for 293.25 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.5 core 70 Sqmm PVC armoured LTUG cable SD 189

Supply & Fixing of Aluminium openable windows of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 1.50 x 1.35 mt.window 4228.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 1.35 x 1.35 mt.window 3694.20 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c 1.20 x 1.35 mt.window 3911.50 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. 0.75 x 1.35 mt.window 3637.07 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 1.80 x 1.35 mt.window Three leaves 3785.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a)70 sq.mm Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) 50 sqmm 226.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c) 35 sqmm 226.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d) 25 sqmm 212.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of 100 amps TPN sheet double break 6950.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
switch with HRC fuse and neutral on suitable angle iron
frame work with MS cable entry boxes and PWD
earthing(SR-14-15(p-65)
Supply and fixing of 200 amps fuse unit 634.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SRP-66
Supply and fixing of 200 amps TPN switch with HRC 9470.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fuses sheet steel double break
SRP-65, 3 ©
Supply and fixing of 250 amps cubical type panel board 123622.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and fixing of SS Soap Tray including cost of 704.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
all materials and all labour charges etc complete

Supplying and fixing of CP Angle valve Stop cock 514.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
including cost of all materials and all labour charges etc
complete
Supplying and fixing of 25x 3mm Copper flat 473.50 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of Health faucet approved quality with 952.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ISI mark
S&F TPN 12 way DB encloser (SR-p-80) 11481.80 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 206
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
S&F TPN 8 way DB encloser 5325.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 6 way DB encloser 8254.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 4 way DB encloser 6588.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14

Supply and fixing of spot light of approved make and


593.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
company with ISI CFL bulb CER No.178/13-14

Conducting routine vertical compression load test 70000.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

50000.00 Set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mobilization charges including transporting to site

Providing cast in situ bored piles using design mix M30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
including boring for the pile in all soil and socketing the
piles for a depth of 0.30m in all strata to carry a safe
working load not less than specified and the length of
pile to be embedded
500mm dia pile 2265.45 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head to the required cut of level 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and clearing way debries with an average lead of 3 km
entirely with city limits
500mm dia pile 565.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & Laying of paver block 628.08 SQM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F OF UPVC Windows 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) FW 900 X 2100 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) W 1800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c) W1 1500 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d) W0 2400 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e) W2 1200 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f) SW 4800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g) FW1 4800 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h) FW2 4200 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a)D1200 X 2400mm 8520.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b) V1 900 X 600mm 3752.83 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of sodium vapour lamp with fitting 250watts 5654.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying, fabricating and fixing in position of UPVC 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
window/ventilator(openable) for all sizes
Supply and fixing of colour wash basin oval shape CER 2286.45 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/2013-14
Supplying and Fixing of Rolling shutters of all sizes 2430.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(manually Operated)
Supplying and fixing of solid core flush door shutter of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thickness 35mm
a. door size 1.200m x 2.100 (Double leaf) 2986.76 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. door size 1.200 m x 2.400 (double Leaf) 2960.17 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. door size 1.000 m x 2.100 (Single Leaf) 2504.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. door size 0.900 m x 2.100 (Single Leaf)
Providing additional strutting to centering of plain 2225.27
24.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
surface.

S & F of Granite slab of size 4'x2', 18 to 20mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thick For kitchen arrangements (jet black)

a. In Ground floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1746.84 Sqm
b. In First floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1748.86 Sqm
c. In Second floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1750.20 Sqm
d. In Third floor 1751.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) 3.08 x 2.1m 2854.45 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 1.35 x 2.10 mt.window 3358.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 1.35 x 1.35 mt.window 3828.85 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Aluminum Louvered ventilators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 0.90 x 0.60 mt ventilators 3800.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 0.60 x 0.60 mt ventilators 4299.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 0.75 x 0.60 mt ventilators 4003.84 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 207
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
d. 1.35 x 0.60 mt ventilators 3803.43 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door (for lockup door ) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MS door of Size 1000 x 2100mm 7353.65 each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MS door of Size 750 x 1350mm 4794.34 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( lockup)

MS Ventilator of Size 1350 x 600mm 3297.04 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MS Ventilator of Size 900 x 600mm 3752.83 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of SS Towel rail (75cm length) CER 405.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/13-14

Supply and fixing of weld mesh of size 325.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.5x2.5cmx10gauge
Supply and fixing of Chicken mesh 35.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of 15mm dia Engineering Polymer Tap (long 185.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
body ) for coastal area only

S & F of 15mm dia Engineering Polymer Tap short 174.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
body tap for coastal area only

S & F of CFL road way lighting luminaries suitable 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for fixing 36w CFL lamp
2219.00 Each
Augering 30 cm dia for compound wall 217.30 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Finshing the top of Terrace floor with one course of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
solar reflective Ceramic tiles 1020.82 Sqm.
51. 1 HDPE water tank 200 lit capacity with ISI mark 1640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UPVC Non Pressure pipe of SN8 SDR 34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( S 16.5) as per IS 15328/2003

a. 110 mm UPVC Non Pressure pipe 335.28 Rmt 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

596.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 160 mm UPVC Non Pressure pipe
Rmt
PVC Specials as per IS 10124/1982 Part II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia PVC bend (TWAD SR 17-18 236.00 Each 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-19 S.No-4 )

b. 160 mm dia PVC bend (TWAD SR 16-17 1122.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-19 S.No-4 )

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PVC Equal Tee as per BIS 7834/1975

a. 110 mm dia PVC Equal tee(TWAD SR 17-18 P-19 289.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S.No-9 )

886.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 160 mm dia PVC Equal tee(TWAD SR 16-17 P-19 Each
S.No-9 )
S & F of Indian Water closet white glazed (Oriya 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type) of size 580 x 440mm with PVC SWR grade '
P' or "S' trap - in G.F.
2324.43 Each
S & F of Indian Water closet white glazed (Oriya 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type) of size 580 x 440mm with PVC SWR grade '
P' or "S' trap- Other than G.F.
3706.04 Each
S & F of E.W.C.(White) 500 mm with PVC SWR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
grade "P" OR "S" TRAP
5127.80 Each
French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. FW (2.1 x 2.0 m ) 3 bay openable 2729.44 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b.FW 1 (1.80 x 2.0 m )3 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. FW 2 (1.20 x 2.0 m ) 2 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d.FW 3 (0.75 x 2.0 m ) Single bay openable 3553.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Thuraiyur Development works PH-XXI qtrs 208
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
( PVC Box , Fire Retarded Box) For Coastal only

a. Light point with ceiling rose 1266.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. Light point without ceiling rose 1269.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. Calling bell point with Buzzer/Calling bell 1298.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wiring with 1.5 sqmm PVC insulated single core multi 1316.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Fan point.(PVC Electrical
Box )

Wiring with 1.5 sqmm PVC insulated single core multi 2224.56 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Staircase Light Point.(PVC
Electrical Box )

67.1 Wiring with 1.5 sqmm PVC insulated single core multi 0.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Switch Board Itself.

Wiring with 1.5 sqmm PVC insulated single core multi 885.64 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Convenient Places.(PVC Electrical Box )

Supplying and fixing of 15 Amps 3 pin flush type plug 128.98 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
using ( PVC Box , Fire Retarded Box)

Fabrication of Mild steel / RTS grills (without cement 62159.30 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
slurry) for all sizes of rods.(BINDING WIRE insulated
with PVC)

PVC SWR 110 mm dia with ISI mark type- A for Rain 279.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
water down fall pipe(UPVC SPECIAL CLAMP )

Supply and fixing in posistion of 6 rows of 10 guage 25.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GI barbed wire 20 guage

Supply ,laying & jointing the following pipes as per 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ASTM D 1785 of schedule 40 with UPVC Specials

a. 32 mm dia 167.93 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 25 mm dia 151.97 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. 20mm dia PVC water supply ASTM pipe (fully 149.18 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
consealed in walls)

Providing Colour Marble chips of size 10mm and below 254.31 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
using 70.20Kgs of cement and 15 cum of Colour Marble
chips for every 10 sqm over the existing plastered
surface ( For coastal area)

S & F of 15mm dia half turn CP long body tap 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
420.00 Each
S & F of 15mm dia half turn CP short body tap 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
372.00 Each
S & F of MS angle of size 50x 50x 5mm 51.40 Kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Granite Tiles flooring in cm1:3,20mm thk sathali
steel/ grey
1078.93 Sqm
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bored cast sit piles installation of vertical cast in
Situ Bored piles of following dia using RCC
1:1.5:3 a) 500mm dia
Rmt
Removing of clay from pile inlucing conveyance charges, loading
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 Cum.
and unloading charges etc.,all complete

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head of 500mm Dia of pile
to the required cut off level and clearing away the
debris from site with an average lead of 5 km etc.
Rmt
Thuraiyur Development works PH-XXI qtrs 209
Description Rate Unit Septic tank
OHT 700 LITRES Sump Plinth Protection Paver Block for road Sullage drain Storm water Drain Culvert

OHT 700 Litre 6 PC/HC &


( 1 No qty
1 Ins G only 8 PC/HC G +3
3 SI G +2
TOTAL QTY Amt

Qty 1 No Qty 1 No Qty 5 Blks Qty 9 Nos Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount Qty. Amount
Sl. No.
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mobilization Charges inclusive of Transportation
to site assembling and Dismantling the rotary pile
equipment employed for the works etc.(Qtn)
40000.00 No
Conducting Routine vertical compression load test
for bored cast in situ RCC piles of various dia by 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
direct loading in accordance with IS 2911(PART
IV)1985 excluding cost of pile and dismantling the
same after testing, includung finishing pile head 70000.00 No
etc.(CERand.no.60/2016-2017. Est Cochin house)
1.51.1 Supply Laying Rubber Moulded Hyraulic Pressed 782.79 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 785.00 0.00 0.00 0.00 0.00
Paver Block 83 mm thick including labour charges for
laying etc

TOTAL RS. 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Thuraiyur Development works PH-XXI qtrs 210

s PC/HC QTRS with Development work at Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme
Total Development

Qty. Amount

125.50 16892.30

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
*

438.63 27896.87

39.48 2755.70

0.00 0.00

0.00 0.00

120.90 11533.86

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
196.95 106559.80

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
6.00 6168.96

6.00 8352.96

73.20 223801.68

7.20 32112.22

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 211

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

19.60 62547.32

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

68.50 329274.02

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 212

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 213

Total Development

Qty. Amount

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
* 0.00 0.00

368.60 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 214

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
77.20 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 215

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Thuraiyur Development works PH-XXI qtrs 216

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00
112.10 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 217

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

876.10 0.00

379.20 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

15.90 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

110.60 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

380.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 218

Total Development

Qty. Amount

0.00 0.00

8.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

30.00 5169.90

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

4.00 486.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 219

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

*
*

5.10 4767.74

0.00 0.00
*

35.50 188523.82

0.00 0.00

0.20 1102.51

0.00 0.00

1.80 10404.95

8.00 47316.24

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 220

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 0.00

0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 #VALUE!
0.00 0.00

0.00 0.00

550.00 92746.50

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 221

Total Development

Qty. Amount

1.20 #VALUE!

0.00 #VALUE!

10.80 #VALUE!

48.00 #VALUE!

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 #VALUE!
*

18.40 0.00

145.52 0.00

0.00 0.00

0.00 0.00
0.00 0.00

75.60 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 222

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 223

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

550.00 0.00

0.00 0.00

550.00 0.00

0.00 0.00

3.614 0.00

0.00 0.00

252.00 0.00

0.00 0.00

52.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 0.00
Thuraiyur Development works PH-XXI qtrs 224

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 225

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 226

Total Development

Qty. Amount

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 227

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 228

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

6.00 2011.68

0.00 0.00

4.00 944.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 229

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
Thuraiyur Development works PH-XXI qtrs 230

Total Development

Qty. Amount

0.00 0.00

0.00 0.00

785.00 614490.15

* #VALUE!
Ph-XXI Thuraiyur 231

Name of work : Construction of 1 No of INS and 3 Nos SI and 46 Nos PC/HC QTRS with Development work at Thuraiyur in Trichy under Ph-XXI /3000 Quarters scheme

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

1.1 Earth work excavation in all soils (including refilling) 0.00 * * *

a. 0 to 2 mt. 134.60 Cum. 40.30 5424.38 76.90 10350.74 105.70 528.50 71136.10 105.70 14227.22 751.40 101138.44 125.50 16892.30 876.90

b. 2 to 3 mt. 140.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1.2 Earth work excavation in all soils (excluding refilling) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 0 to 2 mt. 127.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 133.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
(including refilling)
a. 0 to 2 mt. 196.80 Cum. 26.10 5136.48 60.80 11965.44 87.10 435.50 85706.40 87.10 17141.28 609.50 119949.60 0.00 0.00 609.50
b. 2 to 3 mt. 203.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.4 Earth work excavation for Open foundation (including 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
a. 0 to 2 mt. 71.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 77.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.5 Earth work excavation for Open foundation (excluding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
refilling)
a. 0 to 2 mt. 63.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 438.63 27896.87 438.63

b. 2 to 3 mt. 69.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.48 2755.70 39.48
c. 3 to 4 mt. 76.00 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 4 to 5 mt. 82.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.6 Earth work excavation for Open foundation for drains 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
(excluding refilling) width upto 1.25 m
a. 0 to 2 mt. 95.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.90 11533.86 120.90

b. 2 to 3 mt. 101.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.7 Earth work excavation in Soft disintegrated rock 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(Excluding refilling)
a. 0 to 2 mt. 189.40 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 195.60 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.8 Earth work excavation in SDR for Open foundation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(excluding refilling)
a. 0 to 2 mt. 94.70 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 2 to 3 mt. 100.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9 Providing Driven PILES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.300mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.330mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.375mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.400mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e.450mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f.500mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1 Filling sand 541.05 Cum. 11.20 6059.76 9.60 5194.08 23.70 118.50 64114.43 23.70 12822.89 163.00 88191.15 196.95 106559.80 359.95

2.2 Sand Gravel Mix 638.04 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Supply and filling of 40 mm Brick jelly 881.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Supply and filling of 20 mm Brick jelly 953.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.5 Gravel soling 279.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.6 Supply and filling of 40 mm HBSJ 1028.16 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6168.96 6.00

2.7 Supply and filling of 20 mm HBSJ 1392.16 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 8352.96 6.00

3.1 C.C.1:5:10 for Foundation & Basement 3057.40 Cum. 10.70 32714.18 11.30 34548.62 14.20 71.00 217075.40 14.20 43415.08 107.20 327753.28 73.20 223801.68 180.40

3.2 P.C.C. 1:2:4 for Foundation & Basement and other 4460.03 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 32112.22 7.20
similar works
3.3 P.C.C. 1:8:16 using 20 mm broken brick jelly 2721.36 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 232

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

3.4 Providing WBM 125 mm consolidated thick with gravel Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
3.5 Surface dressing over WBM 25 mm thick Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.6 Providing WBM 125 mm consolidated thick with gravel 142.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
blindage
(IRC 63 to 45mm for 75mm thick and 37.5 to 26.5mm for
50.mm thick)
3.7 Surface dressing over WBM 25 mm tk. 134.05 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with pre-coated chips using 11.2mm size IRC
4.1 R.C.C. 1:2:4 Foundation and Basement 5367.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.2 R.C.C. 1: 11/2: 3 Foundation and Basement 5963.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.0 R.R. masonry in C.M. 1:5 Foundation and Basment 3191.19 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.60 62547.32 19.60

6.1 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of 4937.90 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")

6.2 Brick work in C.M. 1:5 (F& B) using chamber Burnt bricks 4689.80 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")

6.3 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4")

6.4 Brick work in C.M. 1:5 (F& B) using Chamber Burnt brick of Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.5 Brick
size 22work
x 11 xin C.M.
7 cm 1:5 (F&
(8 3/4" B) using
x 4 1/4" Kiln Burnt
x 2 3/4") 4806.92 Cum. 20.00 96138.40 22.00 105752.24 23.00 115.00 552795.80 23.00 110559.16 180.00 865245.60 68.50 329274.02 248.50
Country bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4")

6.6 Brick work in C.M. 1:5 (F& B) using Kiln Burnt Country Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bricks of size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")

7.1 Damp Proof Course Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
in C.M. 1:4, 12 MM thick mixed with Crude oil
7.2 Supply and fixing of Bituminous filler pad, 20 mm tk. for 666.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
expansion joint
7.3 Damp Proof Course in C.M. 1:4, 12 MM thick mixed with #VALUE! Sqm. #VALUE! #VALUE! 0.00 #VALUE! #VALUE! 0.00 0.00 0.00 #VALUE! 0.00
Water proofing compound
8.1 R.C.C.1:2:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 5435.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 5569.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 5703.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 5837.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 5971.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.2 R.C.C.1: 1 1/2 :3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 6031.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 6165.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 6299.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 6433.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 6567.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 6701.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 6835.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 6969.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 7103.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 7237.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 7371.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 7505.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 7639.49 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.1 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 11.2 x 7 cm (9" x 4 3/8" x 2 3/4")
a. In Ground Floor 4916.34 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 5006.64 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 5096.94 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 5187.24 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5277.54 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
a. In Ground Floor/Stilt floor 4681.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 4771.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 4862.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 233

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

d. In Third Floor 4952.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 5042.71 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fifth floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 5584.51 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 5674.81 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m. In Twelth floor 5765.11 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
n. In thirteen floor 5855.41 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.3 Brick work in C.M. 1:6 using Chamber Burnt brick of size 23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 11 x 7 cm (9" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.4 Brick work in C.M. 1:6 using Chamber Burnt brick of size 22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.5 Brick work in C.M. 1:6 using Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
bricks of size 22 x 11 x 7 cm ( 8 3/4" x 4 1/4" x 2
3/4")

a. In Ground Floor 4785.36 Cum. 27.10 0.00 29.30 0.00 26.50 132.50 0.00 26.50 0.00 215.40 0.00 0.00 0.00 215.40

b. In First Floor 4875.66 Cum. 5.20 0.00 29.30 0.00 26.10 130.50 0.00 26.10 0.00 191.10 0.00 0.00 0.00 191.10

c. In Second Floor 4965.96 Cum. 0.00 31.70 0.00 26.10 130.50 0.00 40.90 0.00 203.10 0.00 0.00 0.00 203.10

d. In Third Floor 5056.26 Cum. 0.00 5.90 0.00 40.90 204.50 0.00 9.00 0.00 219.40 0.00 0.00 0.00 219.40

e. In Fourth Floor 5146.56 Cum. 0.00 0.00 9.00 45.00 0.00 0.00 45.00 0.00 0.00 0.00 45.00

9.6 Brick work in C.M. 1:6 using Kiln Burnt Country bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4")

a. In Ground Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.1 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 23 x 11.2 x 7 cm (9" x 4 3/8" x 2
3/4")112 mm tk (B.P.)
a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt bricks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm tk (B.P.)

a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In Ground Floor/stilt floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. In Fifth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
g. In sixth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
h. In seventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
i. In eighth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 234

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

j. In Ninth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
k. In Tenth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
l. In Eleventh floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
m. In Twelth floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
n. In thirteen floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
10.3 Brick partition work in C.M. 1:4 Chamber Burnt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
brick of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 110 mm tk
(B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.4 Brick partition work in C.M. 1:4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chamber Burnt brick of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x
2 3/4") 110 mm tk (B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.5 Brick partition work in C.M. 1:4 Kiln Burnt Country 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
bricks of size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4")
110 mm tk (B.P.)

a. In Foundation and basement #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 368.60 #VALUE! 368.60

b. In Ground Floor #VALUE! Sqm. 63.30 0.00 31.00 0.00 79.90 399.50 0.00 79.90 0.00 573.70 0.00 0.00 #VALUE! 573.70

c. In First Floor #VALUE! Sqm. 8.70 0.00 31.00 0.00 79.90 399.50 0.00 79.90 0.00 519.10 0.00 0.00 #VALUE! 519.10

d. In Second Floor #VALUE! Sqm. 0.00 53.00 0.00 79.90 399.50 0.00 79.90 0.00 532.40 0.00 0.00 #VALUE! 532.40

e. In Third Floor #VALUE! Sqm. 0.00 7.40 0.00 79.90 399.50 0.00 0.00 406.90 0.00 0.00 #VALUE! 406.90

f. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
10.6 Brick partition work in C.M. 1:4 Kiln Burnt Country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size 22 x 11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 110 mm tk
(B.P.)
a. In Foundation and basement Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.1 Brick work in C.M. 1:4 Chamber Burnt brick of size 23 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.2 x 7 cm (9" x 4 3/8" x 2 3/4")70 mm tk (B.P.)

a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)

a. In Ground Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
b. In First Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
c. In Second Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
d. In Third Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.3 Brick work in C.M. 1:4 Chamber Burnt brick: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11 x 7 cm (9" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)

a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 235

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.4 Brick work in C.M. 1:4 Chamber Burnt brick of size 22 x 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk (B.P.)

a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.5 Brick work in C.M. 1:4 Kiln Burnt Country bricks of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
size 22 x 11 x 7 cm (8 3/4" x 4 1/4" x 2 3/4") 70 mm tk
(B.P.)

a. In Ground Floor #VALUE! Sqm. 16.00 0.00 11.70 0.00 24.20 121.00 0.00 24.20 0.00 172.90 0.00 0.00 #VALUE! 172.90

b. In First Floor #VALUE! Sqm. 0.00 11.70 0.00 24.20 121.00 0.00 24.20 0.00 156.90 0.00 0.00 #VALUE! 156.90

c. In Second Floor #VALUE! Sqm. 0.00 11.70 0.00 24.20 121.00 0.00 24.20 0.00 156.90 0.00 0.00 #VALUE! 156.90

d. In Third Floor #VALUE! Sqm. 0.00 0.00 24.20 121.00 0.00 0.00 121.00 0.00 0.00 #VALUE! 121.00

e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.6 Brick work in C.M. 1:4 Kiln Burnt Country bricks of size 22 x 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 x 5.7 cm (8 3/4" x 4 1/4" x 2 1/4") 57 mm tk (B.P.)

a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.1 e. In Fourth
Brick Floor
partition in C.M. 1:4 using country bricks of size Sqm. 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 * 0.00
22 x11x5cm 50 mm thick

a. In Ground Floor #VALUE! Sqm. 5.80 0.00 5.20 0.00 5.50 27.50 0.00 5.50 0.00 44.00 0.00 0.00 #VALUE! 44.00

b. In First Floor #VALUE! Sqm. 0.00 5.20 0.00 5.50 27.50 0.00 5.50 0.00 38.20 0.00 0.00 #VALUE! 38.20

c. In Second Floor #VALUE! Sqm. 0.00 6.00 0.00 5.50 27.50 0.00 5.50 0.00 39.00 0.00 0.00 #VALUE! 39.00

d. In Third Floor #VALUE! Sqm. 0.00 0.00 5.50 27.50 0.00 0.00 27.50 0.00 0.00 #VALUE! 27.50

e. In Fourth Floor #VALUE! Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
12.2 Brick partition in C.M. 1:4 50 mm tk. (B.P.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kiln Burnt Country brick: 23 x 11 x 5 cm
(9" x 4 1/4" x 2")
a. In Ground Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.1 Filling with Excavated Earth 22.20 Cum. 23.00 0.00 36.30 0.00 52.50 262.50 0.00 52.50 0.00 374.30 0.00 77.20 1713.84 451.50

13.2 Filling with Excavated Earth Mixed with lime in the Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
proporation 1:4 (one of lime & four of earth)
14.I Precast Cupboard slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 837.31 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In First floor 840.02 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 842.73 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 845.44 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Fourth floor 848.15 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 236

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

f. In Fifth floor 850.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. In sixth floor 853.57 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In seventh floor 856.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In eighth floor 858.99 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. In Ninth floor 861.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k. In Tenth floor 864.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. In Eleventh floor 867.12 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Foundation & basement 931.95 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In Ground floor 934.70 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In First floor 940.11 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Second floor 945.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Third floor 950.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

f. In Fourth floor 956.34 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.1 Cuddappa slab 20 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.2 Cuddappa slab 40 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.1 Precast Jally ventilator 50mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground Floor 1684.71 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In First floor 1689.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 1694.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 1699.83 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Fourth floor 1704.87 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16.2 Supplying & fixing of Terra cotta jolly (not less than 50mm) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground Floor 327.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 331.76 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 336.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 340.80 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 345.32 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.3 Supplying & fixing of Terra cotta jolly (more than 50mm upto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
110 mm)
a. In Ground Floor 514.93 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First Floor 524.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second Floor 534.79 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third Floor 544.72 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth Floor 554.65 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.0 Form work- Lintel (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.0 Form work - M.S. Sheet (slab) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.0 Form work - Small quantities (M.S. Sheet) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20.0 Form work - Plinth beam (C.W. planks) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 237

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

21.1 R.C.C.Door frame 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 900 x 2100 mm 1708.84 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 700 x 2100 mm 1683.04 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.2 Teak wood Wrought & Put up 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. T.W. over 2 m & below 3 m 114146.00 Cum. 0.032 0.00 0.094 0.00 0.252 1.260 0.00 0.189 0.00 1.575 0.00 0.00 0.00 1.575

b. T.W. below 2 m length. 102442.00 Cum. 0.013 0.00 0.038 0.00 0.120 0.600 0.00 0.090 0.00 0.741 0.00 0.00 0.00 0.741

21.3 PVC Door frame & shutter 1900.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.1 Teak wood panelled door shutters 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1000 x 2100 mm 4094.61 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900 x 2100 mm 4172.77 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 700 x 2100 mm 4179.52 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1200 x 2100 mm (Single) annexure item 4677.80 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.2 Teak wood "Window" & Ventilator Shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3 T.W. double leaf shutters for cup board/ ward robes Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.1 T.W. single leaf Door shutters using 9 mm tk. phynol Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bonded BWR plywood
a. 900 x 2100 mm 2930.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.2 Glass panels with Aluminium beedings 639.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.3 S&F of Magnetic door catches 52.00 Each 3.00 0.00 9.00 0.00 24.00 120.00 0.00 18.00 0.00 150.00 0.00 0.00 0.00 150.00

23.4 Supply and fixing of Aluminium window with 3mm thick Glass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 1.8 x 1.35 mt.window 12529.36 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 9450.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1.35 x 1.05 mt window 8138.95 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1.2 x 1.35 mt window 7424.66 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. 1.2 x 1.05 mt window #VALUE! Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
f. 1.05 x 1.35 mt window 6895.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g. 0.9 x 1.35 mt window 6365.73 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. 0.9 x 1.05 mt window 5482.77 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. 0.5 x 1.35 mt window 3459.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j. 0.45 x 1.35 mt window 3283.37 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.0.90 x 0.60 mt.Ventilator 3800.81 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l. 0.60 x 0.60 mt.Ventilator 4299.61 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24.0 Manufacturing & supply of steel windows (Weight 58.00 Kg. 367.00 0.00 1069.80 0.00 2438.10 12190.50 0.00 1828.60 0.00 15455.90 0.00 0.00 0.00 15455.90
basis)

25.0 M.S.Holdfast 9.60 Each 18.00 0.00 54.00 0.00 144.00 720.00 0.00 108.00 0.00 900.00 0.00 0.00 0.00 900.00

26.0 Flooring in C.C.1:5:10 3057.40 Cum. 5.50 0.00 5.00 0.00 7.80 39.00 0.00 7.80 0.00 57.30 0.00 0.00 0.00 57.30

27.1 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
burnt bricks 23 x 11.2 x 7 cm.
27.2 B.w. in C.M. 1:4 for staircase steps Chamber #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
burnt bricks 23 x 11.4 x 7.5 cm.
27.3 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 23 x 11 x 7 cm.
27.4 B.w. in C.M. 1:4 for staircase steps Chamber Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
burnt bricks 22 x 11 x 7 cm.
27.5 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
22 x 11 x 7 cm.
27.6 B.w. in C.M. 1:4 for staircase steps Kiln burnt country bricks Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 x 11 x 5.7 cm.
28.0 Floor plastering in C.M. 1:4, 20 mm tk. #VALUE! Sqm. 28.10 0.00 41.00 0.00 58.30 291.50 0.00 50.00 0.00 410.60 0.00 112.10 #VALUE! 522.70

29.1 Mosaic tiles 20 cm x 20 cm x 2 cm. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.2 Mosaic tiles 25 cm x 25 cm x 2 cm. 787.01 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.3 Floor ceramic tiles 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 238

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

29.4 Glazed tiles 937.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.5 Floor ceramic tiles (Anti-skid) 833.48 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
30.0 Ellispattern 287.70 Sqm. 8.00 0.00 34.00 0.00 32.50 162.50 0.00 23.50 0.00 228.00 0.00 0.00 0.00 228.00

31.0 Weathering course 2859.46 Cum. 1.10 0.00 3.30 0.00 10.40 52.00 0.00 6.90 0.00 63.30 0.00 0.00 0.00 63.30

32.0 Pressed tiles (23cmx23cmx20mm) mixed with Crude oil Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

32.1 Pressed tiles (23cmx23cmx20mm) mixed with Water proofing 785.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
compound
32.2 Pressed tiles (23cmx23cmx18mm) mixed with Water proofing Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
compound
33.0 Plastering in C.M. 1:5, 12 mm tk. 145.84 Sqm. 559.00 0.00 1141.00 0.00 2577.20 12886.00 0.00 2097.30 0.00 16683.30 0.00 876.10 127770.42 17559.40

34.0 Plastering in C.M. 1:4, 12 mm tk. #VALUE! Sqm. 19.10 0.00 42.40 0.00 111.80 559.00 0.00 90.70 0.00 711.20 0.00 379.20 #VALUE! 1090.40

35.0 Spl. Ceiling plastering in C.M. 1:3, 169.04 Sqm. 101.20 0.00 282.00 0.00 596.00 2980.00 0.00 453.10 0.00 3816.30 0.00 0.00 0.00 3816.30
10 mm tk.
36.0 Cement mortar Border in C.M. 1:5, 12 mm tk. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. 150 mm wide 45.36 Rmt 56.00 0.00 120.20 0.00 75.10 375.50 0.00 75.10 0.00 626.80 0.00 0.00 0.00 626.80

b. 75 mm wide 29.49 Rmt 121.00 0.00 246.00 0.00 311.90 1559.50 0.00 311.90 0.00 2238.40 0.00 0.00 0.00 2238.40

c. 50 mm wide 21.94 Rmt 62.00 0.00 159.00 0.00 118.30 591.50 0.00 118.30 0.00 930.80 0.00 0.00 0.00 930.80

37.1 White washing 3 coats (slaked) 26.25 Sqm. 101.20 0.00 282.00 0.00 596.00 2980.00 0.00 453.10 0.00 3816.30 0.00 15.90 417.38 3832.20

37.2 Colour washing ( slaked) Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.1 Cement paint 121.40 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.2 Matt paint 111.41 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
39.0 M.s Grills 53.60 Kg. 67.00 0.00 80.00 0.00 175.00 875.00 0.00 175.00 0.00 1197.00 0.00 0.00 0.00 1197.00

40.0 Painting - New "wood work" 162.42 Sqm. 9.90 0.00 31.60 0.00 86.50 432.50 0.00 66.80 0.00 540.80 0.00 0.00 0.00 540.80

41.0 Painting - New "iron work" 96.93 Sqm. 33.00 0.00 88.00 0.00 391.70 1958.50 0.00 304.10 0.00 2383.60 0.00 110.60 10720.46 2494.20

42.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash)
a. upto 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
43.0 Fabrication of Mild steel / RTS grills 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. upto 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. above 16mm dia rods 61875.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.1 PVC SWR 110 mm dia Rain water pipe 273.87 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44.2 Rain Water Harvesting using Defunct borewell method Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

45.0 Stucco plastering 12 mm tk. 202.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

46.0 S & F 20 mm dia Alu. Hanger Rod 58.00 Rmt 5.00 0.00 14.00 0.00 16.00 80.00 0.00 12.00 0.00 111.00 0.00 0.00 0.00 111.00

47.0 S & F Alu Towel rail 75 cm long 95.00 Each 3.00 0.00 9.00 0.00 16.00 80.00 0.00 12.00 0.00 104.00 0.00 0.00 0.00 104.00

48.0 S & F 5 pin Coat stand 55.00 Each 2.00 0.00 6.00 0.00 16.00 80.00 0.00 12.00 0.00 100.00 0.00 0.00 0.00 100.00

49.0 S & F chromium plated 8 guage Picture Hook 1.50 Each 26.00 0.00 60.00 0.00 80.00 400.00 0.00 60.00 0.00 546.00 0.00 0.00 0.00 546.00

50.1 Precast slab 50 mm tk.in C.C. 1:3:6 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50.2 Providing precast Kerb stone in C.C. 1:3:6, 450 x 300 179.24 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 380.00 68111.20 380.00
x 150 mm

50.3 Supply and planting avenue trees 262.75 Each 2.00 0.00 3.00 0.00 10.00 50.00 0.00 6.00 0.00 61.00 0.00 0.00 0.00 61.00

50.4 Providing Tree guard 649.40 Each 2.00 0.00 3.00 0.00 10.00 50.00 0.00 6.00 0.00 61.00 0.00 0.00 0.00 61.00

50.5 Supplying. Fabricating and erection of M.S Scheme 13470.65 Each 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00
Name board
51.0 HDPE water tank 700 lit capacity with ISI mark 5740.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 239

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

52.0 PVC Water supply (ASTM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. 32 mm dia 167.93 Rmt 16.00 0.00 66.00 0.00 50.00 250.00 0.00 40.00 0.00 372.00 0.00 0.00 0.00 372.00

b. 25 mm dia 151.97 Rmt 65.00 0.00 177.00 0.00 315.60 1578.00 0.00 237.80 0.00 2057.80 0.00 0.00 0.00 2057.80

c. 20 mm dia 147.19 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

52.1 G.I Pipe 20mm dia for Hot water line (Fully Concealed 220.37 Rmt 3.00 0.00 9.00 0.00 32.00 160.00 0.00 24.00 0.00 196.00 0.00 0.00 0.00 196.00
in walls)
53.1 Wash basin 2526.82 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

53.2 S & F of C.I. Manhole cover 45 x 45 cm Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(20 kg. weight)
53.3 C.I. Steps ( 5 kg) 30.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 240.00 8.00

54 Brass tap (with ISI mark) 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.1 C.P tap long body 300.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.2 C.P tap short body 250.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.1 Squat Urinal 662.15 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55.2 Flat Back Urinal 1577.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56.1 S & F of Orissapan - in G.F. 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.2 S & F of Orissapan - other than G.F. 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57 S & F of E.W.C.(white) 5157.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
57.1 S & F of E.W.C.(colour) 5527.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

58.1 PVC SWR pipe (Soil line) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 110 mm dia. 518.65 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 75 mm dia. 406.75 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.2 PVC Ventilating shaft with cowl 439.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.1 Gully Trap using Chamber burnt bricks 23 x 11.2 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.2 Gully Trap using chamber burnt bricks of size 23x11.4x7.5cm 1212.57 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

59.3 Gully Trap using Chamber burnt bricks 23 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.4 Gully Trap using Chamber burnt bricks 22 x 11 x 7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

59.5 Gully Trap using Kiln burnt country bricks 22 x 11 x 7 1212.57 Each 5.00 0.00 8.00 0.00 6.00 30.00 0.00 6.00 0.00 49.00 0.00 0.00 0.00 49.00
cm.
59.6 Gully Trap using Kiln burnt country bricks 22 x 11 x 5.7 cm. Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

60.0 PVC Nahani trap (4way/2way) 129.20 Each 4.00 0.00 12.00 0.00 40.00 200.00 0.00 30.00 0.00 246.00 0.00 0.00 0.00 246.00
61.1 Stoneware pipe 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm S.W. pipe 362.90 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm S.W. pipe 490.23 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
61.2 Stoneware pipe dry condition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *

a. 100 mm dia 172.33 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 5169.90 30.00

b. 150 mm dia 259.05 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

62.1 Stoneware bend 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 100 mm dia 96.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 150 mm dia 132.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

62.2 Stoneware Tee 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
a. 100 mm dia 121.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 486.00 4.00
b. 150 mm dia 156.70 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

63.0 32 mm dia PVC waste pipe 31.87 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Electrical arrangements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 240

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

64.0 a. Light point with ceiling rose 1070.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Calling bell point with Buzzer/Calling bell 1102.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
65.0 Fan point 1126.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
66.0 Staircase light point 1973.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
67.0 5 amps 5 pin Plug point (Switch board itself) 540.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
68.0 5 amps 5 pin Plug point (Convenient places) 752.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
69.0 15 Amp. Power plug 125.00 Each 3.00 0.00 9.00 0.00 16.00 80.00 0.00 12.00 0.00 104.00 0.00 0.00 0.00 104.00

70.1 Bulk head fitting 401.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.2 S & F of Tube light with fittings Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.3 S & F of 40/ 60 w bulb 12.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70.4 S & F of plastic shade 10.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
71.0 Double pole main switch 562.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

72.0 Box type Fibre Fan hook 33.90 Each 8.00 0.00 24.00 0.00 48.00 240.00 0.00 36.00 0.00 308.00 0.00 0.00 0.00 308.00

73.10 6 way - D.B. 3737.00 Each 0.00 0.00 8.00 40.00 0.00 6.00 0.00 46.00 0.00 0.00 0.00 46.00

73.2 4 way - D.B. 3000.00 Each 1.00 0.00 3.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00

74.0 Charges for fixing of "Fan" 347.00 Each 5.00 0.00 12.00 0.00 32.00 160.00 0.00 24.00 0.00 201.00 0.00 0.00 0.00 201.00

75.0 Supply and delivery of Fan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 48" (1200 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 42" (1050 mm) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
76.0 8 SWG wire 18.00 Rmt 10.00 0.00 10.00 0.00 15.00 75.00 0.00 15.00 0.00 110.00 0.00 0.00 0.00 110.00

77.0 Run of main 2 wires of 1.50 Sqmm. 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
77.1 Run of 2 wires of 4 sqmm with continuous earth by means of 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.5sqmm
77.2 S & F of A/C metal clad switch 500.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
77.3 S&F of TV/Telephone line Socket 75.00 Each 4.00 0.00 12.00 0.00 24.00 120.00 0.00 18.00 0.00 154.00 0.00 0.00 0.00 154.00

77.4 S&F of 20mm dia PVC pipe for TV/Telephone line 58.07 Rmt 20.00 0.00 60.00 0.00 288.00 1440.00 0.00 216.00 0.00 1736.00 0.00 0.00 0.00 1736.00

78.0 Earthing Station IS3043 (Type I) 2010.00 Each 1.00 0.00 1.00 0.00 1.00 5.00 0.00 1.00 0.00 8.00 0.00 0.00 0.00 8.00

78.1 Earthing Station (Type II) Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
79.1 1 No.of 30Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

79.2 3 Nos.of 30Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
80.0 375 x 300 x 20 mm T.W. plank 592.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

81.0 Meter cupboard 1959.10 Sqm 0.30 0.00 1.00 0.00 3.00 15.00 0.00 2.00 0.00 18.30 0.00 0.00 0.00 18.30

82.0 Street lights 2168.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
83.0 M.S Angle 146.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
84.0 Run of 2 wires of 4 sqmm Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
85.0 Supply of G.I pipe 25mm dia 123.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
86.0 Anti termite treatment 34.00 Sqm. 83.50 0.00 73.20 0.00 129.30 646.50 0.00 129.30 0.00 932.50 0.00 0.00 0.00 932.50

87.0 ELCB Single phase 2343.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

112.0 S & F of Exsaust Fan 300 mm dia 1683.71 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.0 Anticorrosive treatment for steel grills 3769.50 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ANNEXURE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *

14.I Precast Cupboard slab 20 mm tk.using 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
standardised concrete mix M20 (annexure)

a. In Ground floor 838.75 Sqm. 12.00 0.00 10.10 0.00 27.70 138.50 0.00 27.70 0.00 188.30 0.00 0.00 188.30

b. In First floor 841.46 Sqm. 0.00 10.10 0.00 27.70 138.50 0.00 27.70 0.00 176.30 0.00 0.00 0.00 176.30

c. In Second floor 844.17 Sqm. 0.00 10.10 0.00 27.70 138.50 0.00 27.70 0.00 176.30 0.00 0.00 176.30

d. In Third floor 846.88 Sqm. 0.00 0.00 27.70 138.50 0.00 0.00 138.50 0.00 0.00 138.50

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 241

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

e. In Fourth floor 849.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

14.II Precast cupboard slab 40 mm tkusing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
standardised concrete mix M20 (annexure)

a. In Foundation & basement 934.85 Sqm. 5.00 0.00 2.80 0.00 8.10 40.50 0.00 8.10 0.00 56.40 0.00 5.10 4767.74 61.50

b. In Ground floor 937.60 Sqm. 0.70 0.00 1.00 0.00 2.10 10.50 0.00 2.10 0.00 14.30 0.00 0.00 14.30

c. In First floor 943.01 Sqm. 0.00 2.00 0.00 2.10 10.50 0.00 2.10 0.00 14.60 0.00 0.00 14.60

d. In Second floor 948.42 Sqm. 0.00 2.00 0.00 2.10 10.50 0.00 2.10 0.00 14.60 0.00 0.00 0.00 14.60

e. In Third floor 953.83 Sqm. 0.00 0.00 2.10 10.50 0.00 0.00 10.50 0.00 0.00 0.00 10.50

f. In Fourth floor 959.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.I Precast Cupboard slab 20 mm tk.using standardised 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete mix M30 (annexure)
a. In Ground floor 848.75 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 851.46 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 854.17 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 856.88 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 859.59 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.II Precast cupboard slab 40 mm tkusing standardised 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete mix M30 (annexure)

a. In Foundation & basement 954.85 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground floor 957.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First floor 963.01 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second floor 968.42 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Third floor 973.83 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. In Fourth floor 979.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Precast Jally ventilator 50mm tk.using standardised concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mix M30 (annexure) without vibrating charges
a. In Ground floor 1701.38 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1706.42 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1711.46 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1716.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1721.54 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Precast Jally ventilator 50mm tk.using 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
standardised concrete mix M20 (annexure) without
vibrating charges

a. In Ground Floor 1682.75 Sqm. 1.00 0.00 1.10 0.00 4.00 20.00 0.00 4.00 0.00 26.10 0.00 0.00 0.00 26.10

b. In First floor 1687.79 Sqm. 2.00 0.00 1.50 0.00 4.00 20.00 0.00 4.00 0.00 27.50 0.00 0.00 0.00 27.50

c. In Second floor 1692.83 Sqm. 0.00 1.50 0.00 4.00 20.00 0.00 4.00 0.00 25.50 0.00 0.00 0.00 25.50

d. In Third floor 1697.87 Sqm. 0.00 0.00 4.00 20.00 0.00 2.10 0.00 22.10 0.00 0.00 0.00 22.10

e. In Fourth floor 1702.91 Sqm. 0.00 0.00 2.10 10.50 0.00 0.00 10.50 0.00 0.00 0.00 10.50

f. In Fifth floor 0.00 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.1 Standardised concrete Mix M20 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. In Foundation and basement 5310.53 Cum 12.50 0.00 27.90 0.00 45.10 225.50 0.00 45.10 0.00 311.00 0.00 35.50 188523.82 346.50

8.1 b. Ground Floor 5378.53 Cum 19.20 0.00 23.70 0.00 33.70 168.50 0.00 33.70 0.00 245.10 0.00 0.00 0.00 245.10

c. In First Floor 5512.53 Cum 5.10 0.00 23.70 0.00 33.90 169.50 0.00 33.90 0.00 232.20 0.00 0.20 1102.51 232.40

d. In Second Floor 5646.53 Cum 0.00 28.10 0.00 33.90 169.50 0.00 35.80 0.00 233.40 0.00 0.00 0.00 233.40

e. In Third floor 5780.53 Cum 0.00 4.10 0.00 35.80 179.00 0.00 7.90 0.00 191.00 0.00 1.80 10404.95 192.80

f.In fourth floor 5914.53 Cum 0.00 0.00 7.90 39.50 0.00 0.00 39.50 0.00 8.00 47316.24 47.50

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 242

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

4.1.1 Standardised concrete Mix M30 Grade Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Foundation and basement 5805.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In Ground Floor 5873.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In First Floor 6007.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Second Floor 6141.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Third floor 6275.84 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCC M30 mix using hard broken stone jelly for 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
foundation and basement

a. Foundation & basement 5805.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b.Stilt floor 5873.00 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cement Concrete using desing mix of grade M25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
concrete

a. In Foundation and basement 5719.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. In Stilt /Ground Floor 5787.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In First Floor 5921.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Second Floor 6055.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Third floor 6189.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

f. In Fourth Floor 6323.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

g. In Fifth Floor 6457.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

h. In Sixth Floor 6591.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

i. In Seventh Floor 6725.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

j.in Eighth floor 6859.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

k.in Ninth floor 6993.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

l.in Tenth floor 7127.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

l. In Eleventh floor 7261.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

m. In Twelth floor 7395.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

n. In Thirteen floor 7529.93 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9.2 Brick work in C.M. 1:6 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3")
g. In Fifth Floor 5133.01 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h. In Sixth Floor 5223.31 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i. In Seventh Floor 5313.61 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
j.in Eighth floor 5403.91 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
k.in Ninth floor 5494.21 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
l.in Tenth floor 5584.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.2 Brick partition work in C.M. 1:4 using chamber Burnt bricks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
of size 23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 114 mm tk (B.P.)

g. In Fifth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
h. In Sixth Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
i. In Seventh Floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! *
j.in Eighth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
k.in Ninth floor #VALUE! Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
11.2 Brick work in C.M. 1:4 using chamber Burnt bricks of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 x 11.4 x 7.5 cm (9" x 4 1/2"x 3") 75 mm tk (B.P.)

g. In Fifth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 243

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

h. In Sixth Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
i. In Seventh Floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
j. In Eighth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
k.in Ninth floor #VALUE! Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
Supply and laying of Hard core layer 200mm 2796.22 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and filling stonedust 136.20 Cum. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Plastering with CM 1:3, 12mm with WPC 168.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 550.00 92746.50 550.00

Supplying and filling with gravel 287.16 Cum 52.00 0.00 42.90 0.00 50.50 252.50 0.00 50.50 0.00 397.90 0.00 0.00 0.00 397.90

B.W in CM 1:4 in Superstructure in First floor #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.20 #VALUE! 1.20

B.W in CM 1:4 in Superstructure in second floor #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00
B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.80 #VALUE! 10.80
d) In Third floor

B.W in CM 1:4 in Superstructure for OHT #VALUE! Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 #VALUE! 48.00
e) In fourth floor

Earth work excavation in Loose / sandy soils (including 91.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling)
Earth work excavation in Loose / sandy soils (excluding 42.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for open foundation

Earth work excavation in Loose / sandy soils (excluding 63.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
refilling) for drain

3.80 P.C.C. 1:3:6 using 20 mm broken brick jelly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3862.79 Cum
4.80 P.C.C. 1:4:8 using 40 mm broken brick jelly
#VALUE! Cum
8.4 Providing earth quake resistant for Corner walls 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Foundation & basement 4756.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Ground Floor 4824.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. First Floor 4958.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Second Floor 5092.41 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.5 Providing earth quake resistant for Door/window Jambs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. Ground Floor 436.22 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. First Floor 438.52 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Second Floor 440.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.9.3.1 Providing Bored pile using design mix M20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a.450mm dia 2250.94 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chipping of RCC pile head to the required cut of level and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clearing way debries with an average lead of 3 km entirely
with city limits
450mm dia pile 619.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Conducting routine vertical compression load test CER 70000.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.328/2014-15
Mobilization charges including transporting to site CER
No.328/2014-15
50000.00 Set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Red oxide plastering in CM 1:4 #VALUE! Sqm #VALUE! #VALUE! 0.00 #VALUE! #VALUE! 0.00 #VALUE! 0.00 #VALUE! 0.00
18.1 Formwork using M.S.Sheet 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *

a.For Column footings,plinth beam,Grade 498.94 Sqm 85.90 42858.95 144.80 72246.51 168.70 843.50 420855.89 168.70 84171.18 1242.90 620132.53 18.40 9180.50 1261.30
beam,Raftbeam,Raft slab etc.,

b.Plain surfaces such as Roof 573.61 Sqm 218.10 125104.34 447.50 256690.48 1102.50 5512.50 3162025.13 842.00 482979.62 7020.10 4026799.56 145.52 83471.73 7165.62
slab,floorslab,Beams,lintels,lofts,sill
slab,staircase,portico slab and other similar works

c.For Square and rectangular columns and small 688.33 Sqm 109.50 75372.14 273.50 188258.26 493.30 2466.50 1697765.95 399.60 275056.67 3249.10 2236453.00 0.00 0.00 3249.10
quantities

d.Vertical wall 630.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e.Circular column 1376.66 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 244

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

f.Curved surface 860.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.60 65047.75 75.60
g.Double centering portico area 1147.22 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21.6 R.C.C.Door frames of size 100 x 75mm with one 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
edge grooves size 't' x 20 mm using M20 grade
( with out vibrating charges)

a. 900 x 2100 mm 1708.84 Each 2.00 3417.68 6.00 10253.04 16.00 80.00 136707.20 12.00 20506.08 100.00 170884.00 0.00 0.00 100.00

c. 1200 x 2100 mm 2078.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 750 x 2100 mm 1683.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. 1000 x 2100 mm 1723.49 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Teak wood "Window" & Ventilator Shutter with 4mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thick pin headed glasses

a. Window: 135 cm ht. 2824.63 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Window: 120 cm ht. Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. Window: 105 cm ht. 2997.68 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. Ventilator: (90 x 60 cm) 2223.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. Ventilator: (75 x 75 cm) 2203.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22.3.2 MDF board (18mm thick) double leaf shutters with TW frame 1924.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for cup board/ ward robes.
T.W. frame & TW styles & rails with BWR double leaf 3441.72 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters for cup board/ ward robes including two coat
enamel paint & one coat primer.
22.8 MDF board door shutters (35mm thick) exterior grade both 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
side laminated with external lipping.

a. 1000X2100mm. 2838.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 900X2100mm. 2876.47 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.1200X2100mm. Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW panelled door shutter with brass fittings. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. 1000X2100mm.(Single leaf) 5106.22 Sqm 1.90 9701.82 5.60 28594.83 14.80 74.00 377860.28 11.10 56679.04 92.60 472835.97 0.00 0.00 92.60

b.1200x2400mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1200X2100mm.(Single leaf) 4396.30 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 900X2100mm (over all size 900X2400mm.). 4172.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c.1800X2400mm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TW double leaves shutter of size with brass fittings 4926.21 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.1800 x 2100mm

a. 1500X2100mm.(Double leaves) with Brass fittings 5232.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2000X2400mm.(Double leaves) with Brass fittings 4458.21 Sqm

TW panelled door double leaves shutter with brass fittings of 5584.12 Sqm
size . 1200X2100mm.( Crime & Traffic)

TW panelled door double leaves shutter with brass fittings of 4698.76 Sqm
size . 2000X2100mm.

TW styles & rails with 9mm thick BWR single leaf 2930.58 Sqm 3.30 9670.91 9.90 29012.74 26.30 131.50 385371.27 19.70 57732.43 164.40 0.00 0.00 0.00 164.40
shutters with brass screws size of 900x2100 mm

TW styles & rails with 9mm thick BWR single leaf shutters 3330.03 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with brass screws size of 750x2100 mm

TW styles & rails with 9mm thick BWR single leaf shutters 2824.42 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with brass screws size of 1000 x 2100 mm

TW styles & rails with 9mm thick BWR Double leaves Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
shutters with brass screws size of 1500x2100 mm

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 245

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

TW styles & rails with 9mm thick BWR single leaf shutters 2644.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with brass screws size of 1200x2100

21.5.2 Supply and Fixing Soild PVC door Shutter with frame 2670.00 Sqm 3.20 8544.00 9.50 25365.00 25.20 126.00 336420.00 18.90 50463.00 157.60 0.00 0.00 157.60

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 246

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

23.2.1 4mm thick pin headed Glass panels with Aluminium 639.50 Sqm 11.00 7034.50 36.50 23341.75 60.00 300.00 191850.00 45.00 28777.50 392.50 0.00 0.00 0.00 392.50
beedings

Cuddappa slab 20 mm tk.for kitchen hearth slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 478.50 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 481.18 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 483.86 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 486.54 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 489.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 20 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. Ground floor 451.56 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 454.24 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 456.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d. In Third floor 459.60 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. In Fourth floor 462.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for C/B slab. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. In Ground floor 480.20 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 482.92 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. In Second floor 488.28 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 493.64 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 499.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cuddappa slab 40 mm tk.for Sunshade. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. In Ground floor 1325.22 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1330.58 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1335.94 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. In Third floor 1341.30 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. In Fourth floor 1346.66 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.8 Glazed tiles using Grout (Tile Joint Filler) 937.59 Sqm 26.00 24377.34 85.50 80163.95 256.00 1280.00 1200115.20 192.00 180017.28 1583.50 0.00 0.00 0.00 1583.50

Floor ceramic tiles using Grout (Tile Joint Filler). 833.48 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.9 Floor ceramic tiles (Anti-skid) using Grout (Tile Joint 833.48 Sqm 5.50 4584.14 17.00 14169.16 44.80 224.00 186699.52 33.60 28004.93 280.10 0.00 0.00 0.00 280.10
Filler).

38.4 Two coat of cement paint over one coat white cement 80.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 550.00 44055.00 550.00

38.5 Matt paint 111.41 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
38.6 One coat white cement for new walls and other similar 36.99 Sqm 280.30 10368.30 326.00 12058.74 1775.30 8876.50 328341.74 1405.00 51970.95 10887.80 0.00 550.00 20344.50 11437.80
works.
42.0 Fabrication of Mild steel / RTS grills 62999.40 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(with cement slurry wash) for all sizes of rods.

43.0 Fabrication of Mild steel / RTS grills (without cement 61875.00 MT 4.941 305724.38 11.1540 690153.75 22.441 112.205 6942684.38 17.496 1082565.00 145.796 0.00 3.6140 223616.25 149.410
slurry) for all sizes of rods.

44.6 PVC SWR 110 mm dia with ISI mark type- A for Rain 273.87 Rmt 7.50 2054.03 28.40 7777.91 43.50 217.50 59566.73 38.30 10489.22 291.70 0.00 0.00 0.00 291.70
water down fall pipe

50.6 Precast slab 50 mm tk.in C.C. 1:3:6 with fibre 276.97 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 69796.44 252.00

52.4 20mm dia PVC water supply ASTM pipe (fully 149.18 Rmt 17.00 2536.06 60.00 8950.80 172.00 860.00 128294.80 129.00 19244.22 1066.00 0.00 0.00 0.00 1066.00
consealed in walls)

53.4 S&F of C.I Manhole cover 60 x 60 cm (50kg weight ) 1725.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 89700.00 52.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 247

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

Wash Hand Basin of size 550 x 400 mm 2526.82 Each 2.00 5053.64 6.00 15160.92 16.00 80.00 202145.60 12.00 30321.84 100.00 0.00 0.00 0.00 100.00

54.3 Supplying and fixing of Brass Chromium plated screw 191.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
down tap 15mm dia (heavy type not less than 430 grms
weight) with ISI mark.

56.3 S & F of Indian Water closet white glazed (Oriya type) of size 2355.26 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
580 x 440mm - in G.F.

56.4 S & F of Indian Water closet white glazed (Oriya type) of size 3736.50 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
580 x 440mm - Other than G.F.

58.3 PVC SWR pipe (Soil line) with ISI mark - type 'B'. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. 110 mm dia. 518.65 Rmt 12.00 6223.80 30.00 15559.50 129.00 645.00 334529.25 109.00 56532.85 796.00 0.00 0.00 0.00 796.00

b. 75 mm dia. 406.75 Rmt 20.00 8135.00 25.50 10372.13 173.00 865.00 351838.75 148.00 60199.00 1058.50 0.00 0.00 0.00 1058.50

58.4 Supplying, Laying & Concealing the 50mm dia PVC 81.20 Rmt 11.00 893.20 8.00 649.60 40.00 200.00 16240.00 30.00 2436.00 249.00 0.00 0.00 0.00 249.00
( SWR) pipe with ISI mark type - 'B' with relevant
specials.

58.5 PVC(SWR) pipe with ISI mark - type 'A' for Ventilating 439.40 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 439.40 1.00
shaft with cowl

Wiring with 1.5 sqmm PVC insulated single core 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
multi strand fire retardant flexible copper cable
with ISI mark confirming IS: 694:1990.( Ordinary)

a. Light point with ceiling rose 1070.00 Each 12.00 12840.00 21.00 22470.00 76.00 380.00 406600.00 58.00 62060.00 471.00 0.00 0.00 0.00 471.00

b. Light point without ceiling rose 1074.00 Each 10.00 10740.00 31.00 33294.00 82.00 410.00 440340.00 62.00 66588.00 513.00 0.00 0.00 0.00 513.00

c. Calling bell point with Buzzer/Calling bell 1102.00 Each 1.00 1102.00 3.00 3306.00 8.00 40.00 44080.00 6.00 6612.00 50.00 0.00 0.00 0.00 50.00

65.1 Wiring with 1.5 sqmm PVC insulated single core multi 1126.00 Each 5.00 5630.00 12.00 13512.00 32.00 160.00 180160.00 24.00 27024.00 201.00 0.00 0.00 0.00 201.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Fan point.

66.1 Wiring with 1.5 sqmm PVC insulated single core multi 1973.00 Each 2.00 3946.00 4.00 7892.00 5.00 25.00 49325.00 4.00 7892.00 35.00 0.00 0.00 0.00 35.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for Staircase Light Point.

Wiring with 1.5 sqmm PVC insulated single core multi 540.00 Each 7.00 3780.00 21.00 11340.00 48.00 240.00 129600.00 36.00 19440.00 304.00 0.00 0.00 0.00 304.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Switch Board Itself.

68.2 Wiring with 1.5 sqmm PVC insulated single core multi 752.00 Each 5.00 3760.00 15.00 11280.00 40.00 200.00 150400.00 30.00 22560.00 250.00 0.00 0.00 0.00 250.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990 for 5 amps 5 pin plug socket
point @ Convenient Places.

70.5 S & F of Tube light fitting (patty type ) with Electronic ballast 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and 36 W slim tube light
496.00 Each
Supply and delivery of 48" (1200 mm) Fan with ISI 1238.30 Each 5.00 6191.50 12.00 14859.60 32.00 160.00 198128.00 24.00 29719.20 201.00 0.00 0.00 0.00 201.00
mark with Eletronic Dimmer

Run of 2 Wires of 4 sqmm PVC insulated single core 186.00 Rmt 23.00 4278.00 78.00 14508.00 124.00 620.00 115320.00 84.00 15624.00 805.00 0.00 0.00 0.00 805.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 248

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

77.5 Run of 2 Wires of 1.5 sqmm PVC insulated single core multi 141.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.

Run of 2 Wires of 4 sqmm PVC insulated single core 186.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
multi strand fire retardant flexible copper cable with ISI
mark confirming IS: 694:1990.

4 x 4 Sq mm copper PVC insulated unsheathed single 197.00 Rmt 20.00 3940.00 105.00 20685.00 80.00 400.00 78800.00 60.00 11820.00 585.00 0.00 0.00 0.00 585.00
core cable for 3 phase EB service connection

Run of 2 Wires of 2.5 sqmm PVC insulated single core multi 155.00 Rmt 19.00 2945.00 57.00 8835.00 152.00 760.00 117800.00 114.00 17670.00 950.00 0.00 0.00 0.00 950.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.

Run of 4 Wires of 6 sqmm PVC insulated single core multi 336.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand

Run of 4 Wires of 10 sqmm PVC insulated single core multi


440.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand

112.1 S & F of Exsaust Fan 225mm dia 1538.71 Each 1.00 1538.71 3.00 4616.13 8.00 40.00 61548.40 6.00 9232.26 50.00 0.00 0.00 0.00 50.00

Compact Fluoresent Lamp (CFL) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 14W bulb for Bath & WC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
130.00 Each
b. 18w bulb for Bulk Head fittings 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
170.00 Each
S & F of Bulk head fitting suitable for CFL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
443.00 Each
44.2 Rain water harvesting using defunct borewell and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *
providing perforated cover slab

a). Providing pit 1164.91 Each 2.00 2329.82 2.00 2329.82 2.00 10.00 11649.10 2.00 2329.82 16.00 0.00 0.00 0.00 16.00

b) Augering 30cm dia 288.72 Rmt 6.00 1732.32 6.00 1732.32 6.00 30.00 8661.60 6.00 1732.32 48.00 0.00 0.00 0.00 48.00

257.1 S&F of M.S. Angle of size 35x35x5mm for staircase steps 185.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

344.2 S&F of Bevelled edge mirror 500 x 400 x 5.5mm 355.00 Each 2.00 710.00 6.00 2130.00 16.00 80.00 28400.00 12.00 4260.00 100.00 0.00 0.00 0.00 100.00

383 S&F of Cuddapah sink 600 x 600 x 200mm 944.00 Each 1.00 944.00 3.00 2832.00 8.00 40.00 37760.00 6.00 5664.00 50.00 0.00 0.00 0.00 50.00

383.1 Providing nosing to the edges of Granite slab 235.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply and fixing of PVC water supply (ASTM) 210.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.50mm dia
384 S&F of PVC flushing cistern 1231.00 Each 1.00 1231.00 3.00 3693.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00

385 S&F of cloth drying arrangement 612.20 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
238.1 Anticorrosive treatment for window grills 2010.25 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and fixing of 32 AMPS Triple pole main 1340.00 Each 2.00 2680.00 4.00 5360.00 9.00 45.00 60300.00 7.00 9380.00 58.00 0.00 0.00 0.00 58.00
switch
450 x 375 x 20 mm thick TW plank 990.00 Each 2.00 1980.00 3.00 2970.00 10.00 50.00 49500.00 8.00 7920.00 63.00 0.00 0.00 0.00 63.00

3 Nos.of 32Amps - Fuse Unit 600.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Nos.of 32Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and delivery of Three phase ELCB/RCCB 2695.00 Each 1.00 2695.00 3.00 8085.00 8.00 40.00 107800.00 6.00 16170.00 50.00 0.00 0.00 0.00 50.00

Supply of G.I pipe 40mm dia 'B' Class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plastic Emulsion PAINT including primer for outer walls 151.87 Sqm 289.50 43966.37 423.90 64377.69 892.20 4461.00 677492.07 761.10 115588.26 5935.50 0.00 0.00 0.00 5935.50

Two coat of OBD over one coat white cement for inner 75.46 Sqm 280.30 21151.44 326.00 24599.96 1775.30 8876.50 669820.69 1405.00 106021.30 10887.80 0.00 0.00 0.00 10887.80
walls

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 249

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

2 x 4 Sqmm Copper PVC insulated unsheathed single core 1 110.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KV grade cable for EB service single phase.

40 mm dia GI pipe "B"class 155.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 No.of 32 Amps - Fuse Unit 368.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

P. C.C. 1:3:6 for foundation & basement using 40mm metal 3862.79 Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Providing PVC Tee with end cap 87.00 Each 3.00 261.00 9.00 783.00 24.00 120.00 10440.00 18.00 1566.00 150.00 0.00 0.00 0.00 150.00

Granite Tiles flooring (Ruby red) 1207.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Providing wooden Melamine polish for new wood work 997.28 Sqm 4.80 4786.94 14.200 14161.38 37.80 189.00 188485.92 28.40 28322.75 236.40 0.00 0.00 0.00 236.40

Supplying and fixing of staineless steel hand rails 4500.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vitrified Tiles flooring (ivory) 908.64 Sqm 58.20 52882.85 148.00 134478.72 346.40 1732.00 1573764.48 259.80 236064.67 2198.00 0.00 0.00 0.00 2198.00
Vitrified Tiles flooring 1084.34 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
s Concrete designer tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eurocon Tiles flooring 1055.90 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Aluminium sliding window
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a.1.80 x 1.35 (Three track) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.1.35 x 1.35 (three track) 3873.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) size 1800x1350 SW1 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b)1200x1350 SW2 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for officers)
supplying and fixing of colour matt finish floor tiles of size 2433.47 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" ( for wall tiles)
Supplying and fixing of wall panneling using Aluminium 3034.40 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
frame with MDF board
4.4 Supply of material and lab ourfor Mineralfbre 915.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mmx600mm Grid false ceiling work
Supplying, fabricating, erecting and fixing Gyp board false 990.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ceiling using perforated sheet 10mm thk

Supplying and fixing of 100mm dia GI pipe 905.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of Geyser (Data -SD 103) 8467.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of CP wall mixer two in one (without 3409.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
telephone shower) including cost of all materials and all
labour charges etc complete.
CER No.178/13-14
Supplying and fixing of shower arm 9" long including cost of 469.42 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
all materials and all labour charges etc. complete
CER No.178/13-14

Supplying and fixing of GM wheel valves ISI mark 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a.100mm GM Gate valves 5640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.50mm GM Gate valves 1340.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.32mm GM Gate valves 604.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990. (Modular)
a. Light point with ceiling rose 1000.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 1003.51 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand 769.30 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point
@ Convenient Places.

Wiring with 1.5 sqmm PVC insulated single core multi strand 536.55 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin Modular plug socket point
@ Switch Board Itself.

Supplying and laying of 3.5 core 70 sq.mm PVC armoured 627.40 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LTUG cable (below GL)
S&F 3.5 X 70mm LTUG CABLE Above GL 435.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 250

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

S&F 3.5 X 35mm LTUG CABLE Above GL 356.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 3.5 X 25mm LTUG CABLE Above GL 317.00 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F 2X6 Sq.mm LTUG CABLE 176.84 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supplying and fixing of brass cable gland suitable for 3.5 293.25 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
core 70 Sqmm PVC armoured LTUG cable SD 189

Supply & Fixing of Aluminium openable windows of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

FW 1.80 x 1.65 m 4801.98 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
W 1.50 x 1.35 m 4228.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
W 1.20 x 1.35 m 3911.50 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KW 1.20 x 1.05 m 4227.94 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
W 2 .0.75 x 1.35 m 3637.07 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. 1.50 x 1.35 mt.window 4228.87 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.35 x 1.35 mt.window 3694.20 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c 1.20 x 1.35 mt.window 3911.50 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 0.75 x 1.35 mt.window 3637.07 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cochin House
a. 1.80 x 1.35 mt.window Three leaves 3987.65 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Aluminium window openable 1.35x1.05m (Two leaves) 3272.07


Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Aluminium window openable 1.35x1.35m (Two leaves)


4141.13 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Aluminium window openable 1.2x1.35m (Two leaves)


4034.51 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of 100 amps TPN sheet double break 6950.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
switch with HRC fuse and neutral on suitable angle iron
frame work with MS cable entry boxes and PWD
earthing(SR-14-15(p-65)
Supply and fixing of 200 amps fuse unit 634.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SRP-66
Supply and fixing of 200 amps TPN switch with HRC fuses 9470.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
sheet steel double break
SRP-65, 3 ©
Supply and fixing of 250 amps cubical type panel board 123622.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supplying and fixing of SS Soap Tray including cost of all 704.75 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
materials and all labour charges etc complete

Supplying and fixing of CP Angle valve Stop cock including 514.85 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cost of all materials and all labour charges etc complete

Supplying and fixing of 25x 3mm Copper flat 473.50 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of Health faucet approved quality with ISI 952.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mark
S&F TPN 12 way DB encloser (SR-p-80) 11481.80 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S&F TPN 8 way DB encloser 5325.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 6 way DB encloser 8254.60 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
S&F TPN 4 way DB encloser 6588.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CER No.178/2013-14
Supply and fixing of spot light of approved make and 593.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
company with ISI CFL bulb CER No.178/13-14
S&F OF UPVC Windows 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a) FW 900 X 2100 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) W 1800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c) W1 1500 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d) W0 2400 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e) W2 1200 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f) SW 4800 X 1650 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g) FW1 4800 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h) FW2 4200 X 2300 6300.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door shutter 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a)D1200 X 2400mm 8520.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b) V1 900 X 600mm 3752.83 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of sodium vapour lamp with fitting 250watts 5654.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 251

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

Supplying and fixing in position of UPVC Ventilator louvered 6500.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ventilator type for all sizes
Revised SR 2018-19 p-57 it-192

Supplying and fixing in position of UPVC window of 6000.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
casement type( open) for all sizes Revised SR 2018-19 p-57
it-191
Supply and fixing of colour wash basin oval shape CER 2286.45 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/2013-14
Supplying and Fixing of Rolling shutters of all sizes (Gear 2240.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operated)( from 8m2 to 12m2 )Annex-Vi-P-45 rev SR 18-19
item -102-A-b

Supplying and fixing of solid core flush door shutter of 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
thickness 35mm
a. door size 1.200m x 2.100 (Double leaf) 2368.73 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. door size 1.200 m x 2.400 (double Leaf) 2960.17 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. door size 1.000 m x 2.100 (Single Leaf) 2504.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. door size 0.900 m x 2.100 (Single Leaf) 2225.27 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
e. door size 1.00 m x 2.400 (Single Leaf) 2499.86 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
f. door size 1.50 m x 2.100 (Double leaf) 2910.85 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
g door size 1.50 m x 2.40 (Double leaf) 2876.99 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h door size 1.80 m x 2.40 (Double leaf) 2676.55 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h door size 1.80 m x 2.10 (Double leaf) 2738.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Providing additional strutting to centering of plain surface. 24.89 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

S & F of Granite slab of size 4'x2', 18 to 20mm Thick For 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
kitchen arrangements (jet black)
a. In Ground floor 1746.84 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. In First floor 1748.86 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c. In Second floor 1750.20 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d.
S& In F
Third floor
of Granite tile of size 2'x 1', 10mm Thick For 1751.54 Sqm 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 * 0.00
kitchen arrangements (jet black)

a. In Ground floor 951.12 Sqm 3.00 2853.36 2.50 2377.80 5.80 29.00 27582.48 5.80 5516.50 40.30 38330.14 0.00 0.00 40.30

b. In First floor 952.46 Sqm 0.00 2.50 2381.15 5.80 29.00 27621.34 5.80 5524.27 37.30 35526.76 0.00 0.00 37.30

c. In Second floor 953.80 Sqm 0.00 2.50 2384.50 5.80 29.00 27660.20 5.80 5532.04 37.30 35576.74 0.00 0.00 37.30

c. In Third floor 955.14 Sqm 0.00 0.00 5.80 29.00 27699.06 0.00 29.00 27699.06 0.00 0.00 29.00

French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) 3.08 x 2.1m 2854.45 Sqm. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 1.35 x 2.10 mt.window 3358.02 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 1.35 x 1.35 mt.window 3828.85 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. 1.50 x 2.00 mt.window sankar nagar DSP 2735.88 Sqm
Aluminum Louvered ventilators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

a. 0.90 x 0.60 mt ventilators 3800.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 0.60 x 0.60 mt ventilators 4299.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. 0.75 x 0.60 mt ventilators 4003.84 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
d. 1.0 x 0.60 mt ventilators 3800.81 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS door (for lockup door ) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS door of Size 1000 x 2100mm 0.00 each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS door of Size 750 x 1350mm 0.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Fixing of MS ventilator of size 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( lockup)

MS Ventilator of Size 1350 x 600mm 3004.33 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MS Ventilator
MS VentilatorofofSize
Size 900
600 x 600mm
x 600mm 3752.83
3972.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * 0.00

MS Ventilator of Size 1285 x 600mm 3420.70 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Fixing of MS ventilator of size 1200 x 800 mm 3613.47 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 252

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

MS ventilator of size 1000 x 800 mm 3524.29 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply and fixing of 19mm dia steam pipe for down rod of fan 61.80 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(SD 106)

Supply and fixing of SS Towel rail (75cm length) CER 405.00 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No.178/13-14

Supply and fixing of weld mesh of size 7.5x2.5cmx10gauge 325.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply and fixing of Chicken mesh 35.00 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S & F of 15mm dia Engineering Polymer Tap (long body ) 185.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
for coastal area only

S & F of 15mm dia Engineering Polymer Tap short body 174.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
tap for coastal area only
S & F of CFL road way lighting luminaries suitable for fixing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36w CFL lamp
2219.00 Each
Augering 30 cm dia for compound wall 217.30 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Finshing the top of Terrace floor with one course of 1020.82 Sqm. 94.00 95957.08 95.00 96977.90 138.10 690.50 704876.21 138.10 140975.24 1017.60 1038786.43 0.00 0.00 1017.60
solar reflective Ceramic tiles without base concrete

51. 1 HDPE water tank 200 lit capacity with ISI mark 1640.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UPVC Non Pressure pipe of SN8 SDR 34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *
( S 16.5) as per IS 15328/2003

a. 110 mm UPVC Non Pressure pipe 335.28 Rmt 20.00 6705.60 32.00 10728.96 30.00 150.00 50292.00 30.00 10058.40 232.00 77784.96 6.00 2011.68 238.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 253

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

b. 160 mm UPVC Non Pressure pipe 596.33 Rmt 10.00 5963.30 5.00 2981.65 30.00 150.00 89449.50 30.00 17889.90 195.00 116284.35 0.00 0.00 195.00

PVC Specials as per IS 10124/1982 Part II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 * *

a. 110 mm dia PVC bend (TWAD SR 17-18 P-19 236.00 Each 2.00 472.00 2.00 472.00 4.00 20.00 4720.00 4.00 944.00 28.00 6608.00 4.00 944.00 32.00
S.No-4 )

b. 160 mm dia PVC bend (TWAD SR 17-18 P-19 it-1.5, 998.00 Each 0.00 0.00 4.00 20.00 19960.00 4.00 3992.00 24.00 23952.00 0.00 0.00 24.00
S.No-4 )

PVC Equal Tee as per BIS 7834/1975 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *

a. 110 mm dia PVC Equal tee(TWAD SR 17-18 P-19 289.00 Each 2.00 578.00 2.00 578.00 4.00 20.00 5780.00 4.00 1156.00 28.00 8092.00 0.00 0.00 28.00
S.No-9 )

788.00 0.00 0.00 20.00 15760.00 3152.00 24.00 18912.00 0.00 0.00 24.00
b. 160 mm dia PVC Equal tee(TWAD SR 17-18 P-19
Each 4.00 4.00
S.No-9 )

S & F of Indian Water closet white glazed (Oriya type) 2324.43 Each 1.00 2324.43 1.00 2324.43 2.00 10.00 23244.30 2.00 4648.86 14.00 32542.02 0.00 0.00 14.00
of size 580 x 440mm with PVC SWR grade ' P' or "S'
trap - in G.F.

S & F of Indian Water closet white glazed (Oriya type) 3706.04 Each 0.00 2.00 7412.08 6.00 30.00 111181.20 4.00 14824.16 36.00 133417.44 0.00 0.00 36.00
of size 580 x 440mm with PVC SWR grade ' P' or "S'
trap- Other than G.F.

S & F of E.W.C.(White) 500 mm with PVC SWR grade 5127.80 Each 1.00 5127.80 3.00 15383.40 8.00 40.00 205112.00 6.00 30766.80 50.00 256390.00 0.00 0.00 50.00
"P" or "S" TRAP

French window 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
a. FW (2.1 x 2.0 m ) 3 bay openable 2729.44 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b.FW 1 (1.80 x 2.0 m )3 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. FW 2 (1.20 x 2.0 m ) 2 bay openable 3025.63 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d.FW 3 (0.75 x 2.0 m ) Single bay openable 3553.61 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

e. FW (1.07 x 2.10 m ) 2 bay openable 3149.03 Sqm

Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990.
( PVC Box , Fire Retarded Box) For Coastal only

a. Light point with ceiling rose 1266.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. Light point without ceiling rose 1269.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. Calling bell point with Buzzer/Calling bell 1298.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wiring with 1.5 sqmm PVC insulated single core multi strand 1316.46 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Fan point.(PVC Electrical Box )

Wiring with 1.5 sqmm PVC insulated single core multi strand 2224.56 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for Staircase Light Point.(PVC Electrical Box
)

67.1 Wiring with 1.5 sqmm PVC insulated single core multi strand 0.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @ Switch
Board Itself.

Wiring with 1.5 sqmm PVC insulated single core multi strand 885.64 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fire retardant flexible copper cable with ISI mark confirming
IS: 694:1990 for 5 amps 5 pin plug socket point @
Convenient Places.(PVC Electrical Box )

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 254

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

Supplying and fixing of 15 Amps 3 pin flush type plug using 128.98 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
( PVC Box , Fire Retarded Box)

Fabrication of Mild steel / RTS grills (without cement 62159.30 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
slurry) for all sizes of rods.(BINDING WIRE insulated
with PVC)

PVC SWR 110 mm dia with ISI mark type- A for Rain water 279.36 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
down fall pipe(UPVC SPECIAL CLAMP )

Supply and fixing in posistion of 6 rows of 10 guage GI 25.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
barbed wire 20 guage
Supply ,laying & jointing the following pipes as per 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ASTM D 1785 of schedule 40 with UPVC Specials
a. 32 mm dia 167.93 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

b. 25 mm dia 151.97 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

c. 20mm dia PVC water supply ASTM pipe (fully consealed in 149.18 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
walls)
Providing Colour Marble chips of size 10mm and below 254.31 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
using 70.20Kgs of cement and 15 cum of Colour Marble
chips for every 10 sqm over the existing plastered
surface ( For coastal area)

S & F of 15mm dia half turn CP long body tap 420.00 Each 2.00 840.00 6.00 2520.00 24.00 120.00 50400.00 18.00 7560.00 146.00 61320.00 0.00 0.00 146.00

S & F of 15mm dia half turn CP short body tap 372.00 Each 5.00 1860.00 6.00 2232.00 16.00 80.00 29760.00 12.00 4464.00 103.00 38316.00 0.00 0.00 103.00

S & F of MS angle of size 50x 50x 5mm 51.40 Kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Granite Tiles flooring in cm1:3,20mm thk sathali steel/ grey 1078.93 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bored cast sit piles installation of vertical cast in Situ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bored piles of following dia using Standardised concrete
mix M30 Grade) as per nagapattinam data

a.500mm dia pile 2491.96 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.450mm dia pile 2250.94 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.400mm dia pile 2034.99 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Removing of clay from pile inlucing conveyance 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
charges, loading and unloading charges etc.,all 0.00
complete
Chipping of RCC pile head of 500mm Dia of pile to the 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
required cut off level and clearing away the debris from
site with an average lead of 5 km etc.

a.500mm dia pile 764.05 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b.450mm dia pile 619.82 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c.400mm dia pile 491.17 Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mobilization Charges inclusive of Transportation to site 40000.00 No 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
assembling and Dismantling the rotary pile equipment
employed for the works etc.(Qtn)

Conducting Routine vertical compression load test for 70000.00 No 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bored cast in situ RCC piles of various dia by direct
loading in accordance with IS 2911(PART IV)1985
excluding cost of pile and dismantling the same after
testing, includung finishing pile head etc.(CER
.no.60/2016-2017. Est Cochin house)

False ceiling with plain gybsum board (as per PWD SR. rate 2017-18, 713.54 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Anx- VI -It- 154 -a)
Wiring with 1.5 sqmm PVC insulated single core multi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
strand fire retardant flexible copper cable with ISI mark
confirming IS: 694:1990. (Open wiring)

a. Light point with ceiling rose 628.92 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b. Light point without ceiling rose 630.92 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wiring with 1.5 sqmm PVC insulated single core multi strand fire 492.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Convenient
Places.(Open wiring)

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 255

Sl. No. Description Rate Unit 1 No INS Qtrs single blk (G SI Qtrs 3 in 1 (G+2) 8 No. of PC/HC Qtrs 6 in 1 PC/HC Qtrs Total Main building Total Dev. Qty. Total Q
only) ( G+3) ( G+2) (Buildg.+

Qty. Amount Qty. for 1 blk (8 Qty. for 5 blk Amount Qty. Amount Qty. Amount Qty Amount Qty
in 1 G+3)

Wiring with 1.5 sqmm PVC insulated single core multi strand fire 540.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for 5 amps 5 pin plug socket point @ Switch Board
Itself.(Open wiring)
Wiring with 1.5 sqmm PVC insulated single core multi strand fire 709.72 RMT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
retardant flexible copper cable with ISI mark confirming IS:
694:1990 for Fan point .(Open wiring)
TW panelled door double leaves shutter with brass fittings of 5584.12 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
size . 1200X2100mm.
Providing putty to the wall 59.13 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Aluminium Partition wall 1/3 5.5mm thick glass & 2/3 3627.29 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Novapan sheet 12mm thick outer top and bottom

Supply and fixing of colour matt finish door 15 microns 4803.14 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
double leaf door ( 1500 x 2100 mm)

Supply and fixing of colour matt finish door 15 microns 6362.96 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
double leaf door ( 1000 x 2100 mm)

supplying and fixing of colour matt finish floor tiles of size 1025.55 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12"x12" floor tiles

supplying
Supply andand fixing
fixing of
ofcolour matt finish
20 Amps DP plugfloorand
tiles socket
of size in 1251.99
1587.00 Sqm
Each 2.00 0.00
3174.00 6.00 0.00
9522.00 8.00 0.00
40.00 0.00
63480.00 6.00 0.00
9522.00 0.00
54.00 0.00
85698.00 0.00
0.00 0.00
0.00 0.00
54.00
12"x18" for wall tiles
sheet enclosure with 32 A DP MCB in Flush with wall
with earth connection ( For AC Plug ) Legrand ( MDS) /
Hager( L& T) Equivalent/ Superior variety SD -140
2017-18

Supply and Laying Rubber Moulded Hyraulic Pressed Paver 782.79 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Block 83 mm thick including labour charges for laying etc
Supplying nd laying of 1000 x 1000 x 300mm size ms 16 swg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
powder coated cable terminal box with two compartment with
necessary bus bar connected with TNEB etc., 34310.00 Each

Supplying and fixing of 200 Amps metal clad switch 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with rewirable fuse units, (Revised PWD SR 17- 8100.00 Each
18/Pg.no.80 it-J Part c)

Supply and Laying Rubber Moulded Hyraulic Pressed 782.79 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 785.00 614490.15 785.00
Paver Block 83 mm thick including labour charges for
laying etc

Supplying and fixing of 250 Watts Metal halide Flood light etc., 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8095.00 Each

21.6 R.C.C.Door frames of size 100 x 75mm with one


edge grooves size 't' x 20 mm ( with out M20 or
M30 grade old data )

a. 900 x 2100 mm 1734.67 Each

c. 1200 x 2100 mm 2124.47 Each

d. 750 x 2100 mm 1707.81

c. 1000 x 2100 mm 1750.23 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 Each #VALUE! #VALUE! 0.00 #VALUE! #VALUE! * #VALUE! #VALUE! *

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 256

Total Qty.
(Buildg.+ Dev.)

Amount

118030.74

0.00

0.00

0.00
0.00

119949.60

0.00
0.00

0.00
0.00

27896.87

2755.70
0.00
0.00

11533.86

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
194750.95

0.00
0.00

0.00

0.00
6168.96

8352.96

551554.96

32112.22

0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 257

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00
0.00

0.00

0.00
0.00

62547.32

0.00

0.00

0.00

0.00
1194519.62

0.00

0.00

0.00

#VALUE!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 258

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1030766.54

931738.63

1008586.48

1109343.44

231595.20

0.00

0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 259

Total Qty.
(Buildg.+ Dev.)

Amount

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00

0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 260

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!
0.00

0.00
0.00
0.00
0.00
0.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00

0.00
0.00
0.00
0.00
0.00
0.00
10023.30

0.00
0.00

0.00

0.00

0.00

0.00

0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 261

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 262

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
0.00
0.00

179779.95

75909.52

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
7800.00

0.00

0.00
0.00
0.00
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
896442.20

8640.00

175189.02

#VALUE!
#VALUE!

0.00

0.00
#VALUE!

0.00
#VALUE!

0.00
0.00
0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 263

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
65595.60

181003.82

0.00

0.00

0.00

2560862.90

#VALUE!

645107.35

28431.65

66010.42

20421.75

100595.25

0.00
0.00
0.00
64159.20

87836.74

241762.81

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

6438.00

9880.00

5500.00

819.00

0.00
68111.20

16027.75

39613.40

13470.65

0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 264

Total Qty.
(Buildg.+ Dev.)

Amount

62469.96

312723.87

0.00

43192.52

0.00

0.00

240.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

59415.93

0.00

31783.20
0.00

0.00

0.00

5169.90

0.00

0.00

0.00

0.00

486.00

0.00

0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 265

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
0.00
0.00
0.00
0.00
0.00
13000.00

0.00
0.00
0.00
0.00
0.00

10441.20

171902.00

12000.00

69747.00

0.00
0.00
0.00
1980.00

0.00
0.00
0.00
11550.00

100809.52

16080.00

0.00
0.00

0.00
0.00

35851.53

0.00
0.00

0.00
0.00
31705.00

0.00

0.00

0.00

157936.63

148349.40

148827.17

117292.88

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 266

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

57493.28

13407.68

13767.95

13846.93

10015.22

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

43919.78

46414.23

43167.17

37522.93

17880.56

0.00

1840098.65

1318277.70

1281111.97

1317900.10

1114486.18

280940.18

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 267

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!
#VALUE!

#VALUE!
#VALUE!
0.00

#VALUE!
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 268

Total Qty.
(Buildg.+ Dev.)

Amount

#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00

0.00

92746.50

114260.96

#VALUE!

#VALUE!
#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
#VALUE!

629313.02

4110271.29

2236453.00

0.00

0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 269

Total Qty.
(Buildg.+ Dev.)

Amount

65047.75
0.00

170884.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00
0.00

472835.97

0.00
0.00

0.00

0.00
0.00

0.00

481787.35

0.00

0.00

0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 270

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

420792.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 271

Total Qty.
(Buildg.+ Dev.)

Amount

251003.75

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
1484673.77

0.00
233457.75

44055.00

0.00
423084.22

0.00

9244743.75

79887.88

69796.44

159025.88

89700.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 272

Total Qty.
(Buildg.+ Dev.)

Amount

252682.00

0.00

0.00

0.00

412845.40

430544.88

20218.80

439.40

503970.00

550962.00

55100.00

226326.00

69055.00

164160.00

188000.00

0.00

248898.30

149730.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 273

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

115245.00

147250.00

0.00

0.00

76935.50

0.00

0.00

0.00

0.00

18638.56

13858.56

0.00

35500.00

47200.00

0.00

0.00

4924.00

0.00
0.00

77720.00

62370.00

0.00
0.00
134750.00

0.00
901424.39

821593.39

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 274

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

0.00

0.00

13050.00

0.00
235756.99

0.00

1997190.72
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00
file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 275

Total Qty.
(Buildg.+ Dev.)

Amount

0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 276

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

38330.14

35526.76

35576.74

27699.06

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 277

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

1038786.43

0.00

79796.64

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 278

Total Qty.
(Buildg.+ Dev.)

Amount

116284.35

7552.00

23952.00

8092.00

18912.00

32542.02

133417.44

256390.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 279

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

61320.00

38316.00

0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00

file:///conversion/tmp/scratch/427787888.xls
Ph-XXI Thuraiyur 280

Total Qty.
(Buildg.+ Dev.)

Amount

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
85698.00

0.00

0.00

0.00

614490.15

0.00

0.00

#VALUE!

file:///conversion/tmp/scratch/427787888.xls
NAME OF WORK : CONSTRUCTION OF 1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
THURAIYUR IN TRICHY DISTRICT.
GENERAL ABSTRACT

Sl.No. Qty Description Rate Unit

BUILDING WORKS

1 1.00 1 No of INS Qtrs (Single , G only) #VALUE! 1 unit

2 1.00 3 Nos of SI Qtrs 3 in 1 (G+2 , ) #VALUE! 1 unit

3 1.00 40 PC/HC Qtrs (8 in 1, 5 Blocks) (G+3) #VALUE! 1 unit

4 1.00 6 Nos of PC/HC Qtrs (6 in 1, 1 Block ) (G+2) #VALUE! 1 unit

SUB - TOTAL - I Rs.

DEVELOPMENT WORKS

5 1.00 Over Head Water Tank 700 Litres 49 Nos #VALUE! 1unit

6 1.00 Septic tank #VALUE! 1unit

7 1.00 Sump #VALUE! 1unit

8 1.00 Plinth Projection #VALUE! 1unit

9 1.00 Paver block road #VALUE! 1unit

10 1.00 Sullage Drain #VALUE! 1unit

11 1.00 Storm Water Drain #VALUE! 1unit

12 1.00 Culvert #VALUE! 1unit

SUB - TOTAL - II Rs.

13 LS Provision for Soil Investigation LS

14 LS Provision for External water supply arrangements,and Bore well LS


Sl.No. Qty Description Rate Unit

15 LS Provision for Filling lowlying Area LS

16 LS Provision for LED Lighting LS

17 LS Provision for Portable Water connection LS

SUB - TOTAL - III Rs.

18 LS GST at 12.0% ( GST at 6% + CGST 6% ) As per PWD Norms

SUB - TOTAL - IV Rs.

19 LS Provision for Labour Welfare fund @1% As per PWD Norms

20 LS Provision for Unforseen item and contingencies charges@2.5% As per PWD Norms

21 LS Provision for Supervision Charges @ 7.5% As per PWD Norms

22 LS Provision for Foundation Stone laying & Innagural function LS

23 LS Provision for External Electrical arrangements & EB Deposit LS

24 LS Provision for Planning Permission and Payment to local bodies LS

25 LS Provision for Numbering and Lettering and Purchasing Locks LS

26 LS Provision for Advertisment charges LS

27 LS Structural Design charges LS

TOTAL Rs.

Say #VALUE!
1No INS 3 SI QTRS AND 46 NOS PC/HC QTRS AT
CHY DISTRICT.
GENERAL ABSTRACT

Amount

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

15000.00

500000.00
Amount

250000.00

500000.00

150000.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

13000.00

800000.00

500000.00

150000.00

53000.00

50000.00

#VALUE!

Lakhs
Electrical Data 2016-2017
285

Tamil Nadu Police Housing Corporation


TNHB ELECTRICAL DATA 2018-2019

Part -A
DATA - 1

WIRING IN CONCEALED PVC PIPE

Light point with ceiling rose for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH CEILING ROSE controlled by 5 amps flush
type switch including citcuit mains, cost of all materials, specials,
etc., all complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable (P-86 13.10 Rmt
it-2/b)
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark p-89 16.30 1 Rmt
part -I IX-1 b

20.00 No 19 mm PVC rigid bends - p-89 part -I IX-2b 2.60 No

10.00 No 19 mm PVC rigid tees (p-90 4b, 13.05/12=1.09) 1.09 No

1.00 No MS joint box 150 x 100 x 75 mm p-87 vi-b pat -f 53.50 No

0.015 Sqm Hylem sheet 3 mm thick with lamination p-90 it-7a part-I 537.00 Sqm

10.00 No 5 amps flush type switch p-72, Part-C,1 a ( 184/12=15.33) 15.33 No

10.00 No Ceiling rose p-77 it-24 13.15 No

10.00 No 19 mm PVC junction box ( p-90,6-b( 35.10/12=2.93) 2.93 No

1.25 Bag Cement 276.50 Bag

10.00 No MS box 150 x 100 x 75 mm p-80 vi-b pat -f 53.50 No

0.15 Sqm 3 mm thick laminated Hylem sheet p-83 it-7a part-I 537.00 Sqm

45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection (P-79 it-2/b)

LS Labour charges LS

LS Sundries LS

Total for 10 Points

Rate for 1 Point

Labour Charges for wirnig in PVC pipe concealed

Sub - data
Electrical Data 2016-2017
286

1.00 No Electrical Maistry 539.00 No

2.00 No Wiremen Grade - I 494.00 No

3.00 No Wiremen Grade - II 467.00 No

4.00 No Electrical HELPERp-14 it-97 352.00 No

For Concreting work

2.00 No Mason IInd class 508.00 No

4.00 No Electrical HELPERp-14 it-97 352.00 No

DATA - 2

Light point with bakelite batern type holder for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR
FLATS/ HOUSES controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,

Total for Data 1 excluding sundries

Deduct cost of ceiling rose 10 Nos

Add cost of Bakelite battern type holders 10 Nos @ Rs 15.80 / Each p-77, it-22

Sundries

Total for 10 points

Rate for 1 points

DATA - 3

POINT WIRING FOR CALLING BELL / BUZZER WITH PUSH


SWITCH FOR ALL TYPE OF BUILDING

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy
Total of Data duty with
1 excluding ISI mark with suitable size MS box of
sundries
16g thick concealed and covered with 3mm thick laminated hylem
sheet for
Deduct POINT
cost WIRING
of 10 WITH rose
Nos ceiling CALLING BELL/BUZZER WITH PUSH
TYPE SWITCH FOR ALL TYPE OF BUILDINGS including citcuit mains,
cost of all materials, specials, etc., all complete,
Deduct cost of 10 Nos 19 mm PVC junction box

Deduct 10 Nos 5 A switch


Electrical Data 2016-2017
287

Add the cost of 10 Nos Buzer/Bell @ 39.50/Each it-26a p-77

Add the cost of 10 nos 5A type push switch @ Rs 9.00/ Each

Add the cost of 10 nos 15 x 10 x 7.5 cm TW box @ Rs 15.70/Each p-91, X-c part -j

Sundries

Total for 10 points

Rate for 1 point

DATA - 4
FAN POINT
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for FAN POINT controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable (P-86 13.10 90 Rmt
it-2/b)
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark p-89 16.30 Rmt
part -I IX-1 b
20.00 No 19 mm PVC rigid bends - p-89 part -I IX-2b 2.60 No
10.00 No 19 mm PVC rigid tees (p-90 4b, 13.05/12=1.09) 1.09 No
10.00 No 19 mm PVC junction box ( p-90,6-b( 35.10/12=2.93) 2.93 No
10.00 No Ceiling rose p-77 it-24 13.15 No
10.00 No 5 amps flush type switch p-72, Part-C,1 a ( 184/12=15.33) 15.33 No
10.00 No MS box 200 x 150 x 75 mm part- f1c p-87 87.00 No
0.60 Sqm 3 mm thick laminated Hylem sheet p-83 it-7a part-I 537.00 Sqm

1.00 No MS joint box (150 x 100 x 75 mm ) 53.50 No


0.015 Sqm 3 mm thick laminated Hylem sheet p-83 it-7a part-I 537.00 Sqm
1.25 Bag Cement 276.50 Bag
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection (P-79 it-2/b)
LS Labour charges
LS Sundries
Total for 10 points
Rate for 1 point
MS box 300 x 200 x 75 mm
200x150x75 mm=90 90.00
A 200x150x75 mm=0.0825 0.0825
A 300x200x75 mm=0.135m2 0.135

DATA - 5
STAIRCASE LIGHT POINT
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for STAIRCASE LIGHT POINT controlled by 5 amps flush type
switch including citcuit mains, cost of all materials, specials, etc., all
complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
10.00 No 19 mm PVC rigid bends 2.60 No
5.00 No 19 mm PVC rigid tees 1.09 No
Electrical Data 2016-2017
288

10.00 No 5 A flush type two way switches ( Staircase switch )part c-b p-79 19.08 No
5.00 No Ceiling rose 13.15 No
5.00 No 19 mm PVC junction box 2.93 No
6.00 No MS box 150x 100 x 75 mm 53.50 No
0.09 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.25 Bag Cement 276.50 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point

DATA - 6
5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for 5 amps 5 pin PLUG SOCKET POINT AT CONVENIENT PLACES
including citcuit mains, cost of all materials, specials, etc., all
complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 90 Rmt
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
20.00 No 19 mm PVC rigid bends 2.60 Dozen
10.00 No 19 mm PVC rigid tees 1.09 Dozen
1.00 No MS box 150x 100 x 75 mm 53.50 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) part - c (I a) 38.23 No
+ part - d (I a)( Rs. 184/12 + 22.90) p-79+84 part d a
15.00 No MS box 150x 100 x 75 mm 53.50 No
0.225 Sqm 3 mm thick laminated Hylem sheet 537.00 SQqm
1.25 Bag Cement 276.50 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point

DATA - 7
5 AMPS 5 PIN PLUG SOCKET POINT AT SWITCH BOARD ITSELF

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for 5 amps 5 pin PLUG SOCKET POINT AT SWITCH BOARD ITSELF
including citcuit mains, cost of all materials, specials, etc., all
complete,

5.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 1 Rmt
2.50 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt

1.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) part - c (I a) 38.23 No
+ part - d (I a)( Rs. 207/12 + 28.20) p-72+77
Labour charges
Sundries
Rate for 1 point
Electrical Data 2016-2017
289

DATA - 8
15 AMPS POWER PLUG

Supplying and fixing of 15 Amps 3 pin flush type plug socket on


suitable MS box of 16g thick concealed and covered with 3 mm thick
laminated hylem sheet inclusive of all materials, etc., all complete.

1.00 No 15 Amps 3 pin flush type plug socket Part-D1 b p-84 51.70 No
1.00 No MS box 150 x 100 x 75mm 53.50 No
0.015 Sqm 3 mm thick laminated hulem sheet 537.00 Sqm
LS Labour charges and sundries such as cement, screws etc.,
Rate for Each

DATA - 9
LIGHT POINT WITH CEILING ROSE FOR ADMINISTRATIVE
BLOCKS AND COMMUNITY CENTRE

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH CEILING ROSE FOR ADMINISTRATIVE
BLOCKS AND COMMUNITYCENTRE controlled by 5 amps flush type
switch including citcuit mains, cost of all materials, specials, etc., all
complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 1 Rmt
12.00 No 19 mm PVC rigid bends 2.60 No
6.00 No 19 mm PVC rigid tees 1.09 No
1.00 No MS joint box 150 x 100 x 75 mm 53.50 No
0.015 Sqm Hylem sheet 3 mm thick with lamination 537.00 Sqm
6.00 No 5 amps flush type switch 15.33 Dozen
6.00 No Ceiling rose 13.15 No
6.00 No 19 mm PVC junction box 2.93 No
1.25 Bag Cement 276.50 Bag
6.00 No MS box 150 x 100 x 75 mm 53.50 No
0.09 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
45.00 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges LS
Sundries LS
Total for 6 Points

Rate for 1 Point

DATA - 10

LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR


ADMINISTRATIVE BLOCKS AND COMMUNITY CENTRE
Electrical Data 2016-2017
290

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR
ADMINISTRATIVE BLOCKS AND COMMUNITYCENTRE controlled by 5
amps flush type switch including citcuit mains, cost of all materials,
specials, etc., all complete,

Total of Data 9 excluding sundries

Deduct cost of ceiling rose 6 nos

Add cost of Bakelite battern type holders 6 nos @ 15.80/Each9 (New item 22-p-77)

Sundries

Total for 6 points


For 1 points

DATA - 11
FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY
CENTRE controlled by 5 amps flush type switch including citcuit
mains, cost of all materials, specials, etc., all complete,

90.00 Rmt 13.10 Rmt


1.5 sqmm copper PVC insulated unsheathed single core cable
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt

12.00 No 19 mm PVC rigid bends 2.60 No


6.00 No 19 mm PVC rigid tees 1.09 No
6.00 No PVC junction box 19 mm 2.93 No
6.00 No Ceiling rose 13.15 No
6.00 No 5 amps flush type switch 15.33 Dozen
6.00 No MS box 200 x 150 x 75 mm 87.00 No
0.36 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.00 No MS joint box (150 x 100 x 75 mm ) 53.50 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.25 Bag Cement 276.50 Bag
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection
Labour charges
Sundries
Total for 6 points
Rate for 1 point

DATA - 12 a
STAIRCASE LIGHT POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE
Electrical Data 2016-2017
291

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for STAIRCASE LIGHT POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,

90.00 Rmt 13.10 Rmt


1.5 sqmm copper PVC insulated unsheathed single core cable
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt

6.00 No 19 mm PVC rigid bends 2.60 No


3.00 No 19 mm PVC rigid tees 1.09 No
6.00 No 5 A flush type two way switches ( Staircase switch ) 19.08 No
3.00 No Ceiling rose 13.15 No
3.00 No 19 mm PVC junction box 2.93 No
3.00 No MS box 150x 100 x 75 mm 53.50 No
0.054 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.25 Bag Cement 276.50 Bag
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection
Labour charges
Sundries
Total for 3 points
Rate for 1 point

Part -B

DATA - 12

2 X1.5 Sqmm in fully concealed PVC conduit

Run off mains with 2 wires of 1.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt

90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt

3.00 Bag Cement 276.50 Bag

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection

Labour charges

Sundries
Total for 90 Metres
Rate for 1 Rmt

DATA - 13
2 X 2.5 Sq mm in fully concealed PVC conduit
Electrical Data 2016-2017
292

Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

Total as per Data No. 12


180.00 Rmt Add 180 mt 2.5 Sqmm copper PVC insulated unsheathed S.C. cable p- 20.30 Rmt
86, it- 2 c
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed S.C. cable 13.10 Rmt

Sundries

Total for 90 metres


Rate for 1 Rmt

DATA - 14
2 X 4 Sq mm in fully concealed PVC conduit

Run off mains with 2 wires of 4 Sqmm copper PVC insulated


unsheathed single core 1.1KV cable wire contuinuous earth by means
of 2.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

180.00 Rmt 4 sqmm copper PVC insulated unsheathed single core cable,P-86 it-2- 32.20 Rmt
d
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt

3.00 Bag Cement 276.50 Bag


90.00 Rmt 2.5 sqmm copper PVC insulated unsheathed single core cable for 20.30 Rmt
continuous earth connectionp-79, it- 2 c

Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt

DATA - 15
4 X 4 Sq mm in fully concealed PVC conduit

Run off mains with 4 wires of 4 Sqmm copper PVC insulated


unsheathed single core 1.1KV cable wire contuinuous earth by means
of 2.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

360.00 4 sqmm copper PVC insulated unsheathed single core cable,P-86 it-2- 32.20 Rmt
d
90.00 25mm dia rigid PVC pipe heavy duty with ISI heavy duty with ISI mark 24.20 Rmt
part -I 1c P-89, Part -I
3.00 Cement 276.50 Bag
90.00 2.5 sqmm copper PVC insulated unsheathed single core cable for 20.30 Rmt
continuous earth connection (p-86, it- 2 c)
Labour charges
Sundries
Total for 90 Metres
Rate for 1 Rmt

Labour charges ( 1.5 x Labour charges + Labour for ducting - sub data - A)
Electrical Data 2016-2017
293

( 1.5 x 5914) - ( (888 +1232 ) / 2) 8928.00


8928.00

Part -C

DATA - 16

WATER TIGHT BULK HEAD FITTING

Supplying and fixing of water tight bulk head fittings with guard
suitable for 60 / 100 watts including necessary connections, cost of
materials, etc., All complete.
1.00 No Bulk head fittings P-77 it-22 263.40 No
Sundries
Labour charges
Total For 1 No

Labour Charges Data


2.00 No Wiremen Grade II 467.00 No
3.00 No Helper 352.00 No
Total for 15 Nos
Rate for 1 No

DATA - 17

16 AMPS DOUBLE POLE MAIN SWITCH ON TEAK WOOD BOARD


TOP MES SERVICE CONNECTION / MOTOR PUMP( SINGLE
PHASE ) SET

Supplying and fixing of 16 amps double pole main switch with fuse
and neutral link on a suitable well varnished Teak wood board
including necessary interconnections and cost of all materials, etc.,
all complete.

1.00 No 16 Amps double pole main switch with fuse and neutral link 200.00 No
1.00 No TW board of size 31x20x6 cm with brass hinge screw hooks well 81.35 No
varnished (as per PWD Elec. Data)
Sundries for TW plugs,screws, wire and earth connection etc.,
Labour charges
Rate for 1 No

Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
Total for 4 Nos
Rate for 1 no

DATA - 19

32 AMPS DOUBLE POLE MAIN SWITCH ON TEAK WOOD BOARD


TOP MES SERVICE CONNECTION / MOTOR PUMP( SINGLE
PHASE ) SET
Electrical Data 2016-2017
294

Supplying and fixing of 32 amps double pole main switch with fuse
and neutral link on a suitable well varnished Teak wood board
including necessary interconnections and cost of all materials, etc.,
all complete.

1.00 No 32 Amps double pole main switch with fuse and neutral link 455.00 No

1.00 No TW board of size 31x20x6 cm with brass hinge screw hooks well 81.35 No
varnished

Sundries for TW plugs,screws, wire and earth connection etc.,

Labour charges
Rate for 1 No

DATA - 18

Supply and fixing 4 way 250 volt single phase with neutral link
metalic distribution board on suitable Teak wood board etc., all
complete including connections.

1.00 No 4 way 16 amps, way 250 volts single phase and neutral link metalic 439.00 No
distribution board p-81 7a

1.00 No T.W board of size 31 x 20x 6 cm with well varnished 81.35 No


Sundries
Labour charges as per Data No 17
Rate for Each

DATA - 19

16 AMPS TPIC ON TEAK WOOD BOARD FOR 3 PHASE MES


SERVICE CONNECTION AND 3 PHASE MOTOR PUMPSETS

Supplying and fixing of 16 amps triple pole main switch with fuse and
neutral link on a suitable well varnished teak wood board including
necessary interconnection and earth connection cost of all materials,
etc., all complete.

1.00 No 16 Amps triple pole main switch with fuse and neutral link 480.00 No

1.00 No TW board of size 46 x31 x 6 cm with brass hinges hooks screws well 130.00 No
varnished

Sundries screw TW plugs screws wire and earth connections.

Labour charges
Rate for Each

Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helpers 352.00 No
Labour for 3 Nos
Rate for 1 No

DATA - 22
Electrical Data 2016-2017
295

Supplying and fixing of 32 amps triple pole main switch with


fuse and neutral link on a suitable well varnished teak wood board
including necessary interconnection and earth connection cost of all
materials, etc., all complete.

1.00 No 32 Amps triple pole main switch with fuse and neutral link 800.00 No

1.00 No TW board of size 46 x31 x 6 cm with brass hinges hooks screws well 130.00 No
varnished

Sundries screw TW plugs screws wire and earth connections.

Labour charges

Rate for Each

DATA - 20

THREE PHASE DISTRIBUTION BOARD WITH 4 WAY PHASE AND


3 AMPS/WAY FUSE AND NEUTRAL LINK FOR MES SERVICE
CONNECTION ( 6 IN 1 BLOCKS )

Supplying and fixing of 1 No three phase distribution board with 4


way/ phase and 30 A/way with neutral link on a suitable well
varnished teak wood plank including necessary interconnections and
earth connections cost of all materials, etc., all complete.

1.00 No Three phase distribution board with 4 way/phase and 32 A / Way with 2190.00 No
fuse and neutral link. P-81 8d

1.00 No TW plank of size 750 x 450 x 12 mm thick 383.77 No

Sundries such as screws plugs, cement, wire and earth connection.

Labour charges

Rate for Each

TW plank of size 750 x 450 x 12 mm thick(86987+7770) p-20+P-31 94757.00 0.00405


it-143 labour charge

DATA - 24

THREE PHASE DISTRIBUTION BOARD WITH 6 WAY PHASE AND


30 AMPS / WAY WITH FUSE AND NEUTRAL LINK ON SUITABLE
TW PLANK TOP MES CONNECTION BOARD (FOR 12 IN 1
BLOCKS)

( For 12 flats common & pump )

As per above data

1.00 No Add for 6 way TPDB 32A/way p-81, 8e 2925.00 No

1.00 No Less 4 way TPDB 32 A/way p-81, 8d 2190.00 No


Electrical Data 2016-2017
296

Sundries

Rate for Each

DATA - 22

FIXING OF TUBE LIGHT FITTINGS ON WALL / CEILING

Charges for assembling and fixing of flouresent tubular lamp fittings


of different types ( supplied by the department at free of cost ) with
necessary teak wood round block of 75 mm dia 40 mm deep on walls/
ceiling including cost of materials, etc., all complete.

2.00 No TW round block P-91 Part -J -X- F 527.00 100 Nos

2.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 Rmts

sundries such as screws, nails etc.,

Labour charges for assembling and fixing

Rate for Each

Labour charges for 16 Nos


1.00 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
3.00 No Helpers 352.00 No
Total for 16 Nos
Rate for 1 No

DATA - 23
FIXING OF TUBE FITTINGS SUSPENDED FROM CEILING

Charges for assembling and fixing of flouresent tubular lampfittings of


different types ( to be supplied by the departmental at free of cost )
with necessary heavy gauge conduit pipe with ball and socket
arrangement on teak wood round block of 75 mm dia 40 mm deep
suspended from ceiling etc., including cost of all materials, etc.,

1.50 Rmt Conduit pipe 19 mm (MS) (heavy gauge)p-81 Part-H 1-b 27.20 Rmt
2.00 No Round block 75 mm dia 40 mm deep 527.00 100 Nos
2.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 Rmt
Sundries such as ball and socket arrangement, choke, nails, screws,
etc.,
Labour charges
Rate for Each

Labour Charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
3.00 No Helpers 352.00 No
Total for 10 Nos
Rate for 1 No

DATA - 24
Charges for assembling and fixing of ceiling fan of different sweep
( to be supplied by the department at free of cost ) with necessary
interconnection and fixing of fan regulator on the existing board, etc.,
all complete.
Electrical Data 2016-2017
297

1.00 Rmt 0.5 Sqmm copper twin core flex wire 914.10 100 tmt
Labour Charges

Sundries

Labour charges for 5 Nos Rate for Each

1.00 No Wiremen Grade I 494.00 No


1.00 No Wiremen Grade II 467.00 No
2.00 No Helpers 352.00 No
Total for 5 Nos

Rate for Each


Part F

DATA - 25
EARTHING & ELCB
Run of 8 SWG GI Wire
Supplying and laying of 8 SWG GI wire on walls/below ground level
with necessary 'U' nails/ earth work excavation and re- filling etc.,
including cost of all materials, all complete.

9.50 Kg 8 SWG GI wire (Part- E, 3 -c P-84) 79.70 Kg


0.50 Kg 'U' nails (SD-74 ,17-18) 19.22
Labour
Sundries
Tatal for 90 Rmts
For 1 Rmt

Labour charges
1.00 Wiremen Grade I 494.00 No
1.00 Helpers 352.00 No

Note:This item 30 is to run earth wire from IS:3043 earthing item 32) to be Main switch/ Panel Board/ Machinary

DATA - 26
EARTHING STATION AS PER IS/3043.

Providing earthing satation using pipe electro as per IS 3043 using 40


mm dia 'B' class GI pipe strickly in accordance with IS3043 including
cost of all materials

2.50 Rmt GI pipe 40 mm P-46 ,118-iii 153.90 Rmt


1.00 Rmt GI pipe 20 mm P-46 ,118-vi 93.10 Rmt
1.00 Rmt 15 mm GI pipeP-46 ,118-VII 65.90 Rmt
1.00 No GI reducer 32x25mmP-47 ,119 F-iii 49.10 No
1.00 Set Funnel, GI Nuts, Bolts,Washers and check nuts. LS Set
LS Earth work excavation brick work in CM and plastering LS LS
1.00 No C.I Cover(30 x 30cm) 100.00 No
40.00 Kg Charcoal SD 233 (92.55/20.32 = 5.87) 4.55 Kg
2.00 No GI bend 15 mm diaP-47 ,119-c vi 12.90 No
4.00 No 15 mm GI coupling P-47 ,119-E vi 12.90 No
10.00 Kg Salt (SD 233, 17-18) 3.49 Kg
Sundries
Labour charges
Rate for Each

Labour charges
1.00 No Wiremen Grade I 494.00 No
1.00 No Helpers 352.00 No

DATA - 30
ELCB SURFACE TEAK WOOD BOARD
Electrical Data 2016-2017
298

Charges for fixing single phase RCCB/ELCB ( to be supplied by the


department free of cost ) on suitable well varnished teak wood plank
with a necessary inter connection and earth connections using
copper cable including cost of all materials, etc., all complete.

1.00 No TW plank 200 x 150 x 20 mm 56.85 Each


Sundries such as TW plugs, screws, cement, PVC insulated LS
unsheathed copper wires and earth connections.

Labour Charges
Rate for Each

TW Plank 94757.00 0.0006


Labour Charges
1.00 No Wire men Grade I 494.00 Each
3.00 No Wiremen Grade II 467.00 Each
Total for 10 units
Rate for 1 unit

DATA - 28
Charges for fixing single phase RCCB/ELCB ( to be supplied by the
department at free of cost ) on fully concealed suitable MS BOX with a
necessary inter connection and earth connections using copper cable
including cost of all materials, re- doing the disturbed portion etc., all
complete.

1.00 No MS BOX with cover 300 x 200 x 100 mm ( Part- F, P-87 it- d) 263.00 No
Sundries such as cement, 1.5Sqmm copper PVC insulated
unsheathed wire & earth connections etc., all complete.

Labour charges
Rate for Each

Labour Charges
1.00 Wiremen Grade I 494.00 No
3.00 Wiremen Grade II 467.00 No
1.00 Helper 352.00 No
0.50 Mason I ( it-28/37 A ,p-12) 567.00 No
Total for 10 Nos
For 1 No

DATA - 29
ELCB ( 3 PHASE ) on surface teak wood plank

Charges for fixing three phase RCCB/ ELCB ( to be supplied by the


department to free of cost ) on suitable well varnished teak wood
plank on the wall s ( Surface ) with necessary inter connecteion and
earth connections using copper cable including cost of all materials,
etc., all complete.

1.00 No TW plank 300 x 200 x 20 mm 113.71 Each


LS LS Sundries such as cement, 4.0 Sqmm copper PVC insulated LS LS
unsheathed wire & earth connections etc., all complete.

Labour Charges
Rate for Each

TW plank 300 x 200 x 20 mm 94757.00 0.0012

DATA - 30

ELCB (3 phase ) inconcealed MS Box


Electrical Data 2016-2017
299

Charges for fixing Three phase RCCB/ELCB ( to be supplied by the


department at free of cost ) on fully concealed suitable MS BOX with a
necessary inter connection and earth connections using copper cable
including cost of all materials, re- doing the disturbed portion etc., all
complete.

1.00 No MS BOX with cover 300 x 200 x 100 mm 263.00 No


Sundries such as cement, 1.5Sqmm copper PVC insulated
unsheathed wire & earth connections etc., all complete.
Labour charges
Rate for Each

DATA - 31
Supplying and delivery of Single phase ELCB/RCCB

1.00 No 25 Amps rating single phase ELCB with 10 to 25 MA sensitivity (ISI 1440.00 No
make ) (DP) P-94 9-b havells

DATA - 32
Supplying and delivery of Three phase ELCB/RCCB

1.00 No 32 Amps rating Three phase ELCB with 20 to 30 MA sensitivity (P-94 1775.00 No
10-a)

DATA - 33
1 no of 32 amps Fuse unit
External Installation

Supplying and fixing 1 No 30 Amps 500 volts grade/well porcelin fuse


unit on suitable teak wood plank to be fixed on the top of the pole /
EB street poles with necessary clamps and including cost of materials
etc., all complete.

1.00 No 32 Amps 500 V fuse units P-81 6-b 80.70 No


1.00 No TW plank 150 x 100 x 20 mm 28.43 No
Labour charges
Sundries such as MS clamps screws etc., LS
Rate for Each

TW plank 150 x 100 x 20 94757.00 0.0003

Labour Charges
1.00 No Wiremen Grade I 494.00 No
1.00 No Wiremen Grade II 467.00 No
3.00 No Helper 352.00 No
Total for 8 Nos
Rate for 1 No

DATA - 34
3 Nos of Fuse units at EB pole

Supplying and fixing 3 No 32 Amps 500 volts grade/ well porcelin fuse
unit on suitable teak wood plank to be fixed on the top of the pole /
EB street poles with necessary clamps and including cost of materials
etc., all complete.
3.00 No 32 Amps 500 V fuse units P-81 6-b 80.70 Each
1.00 No TW plank 200 x 150 x 20 mm 56.85 No
Labour charges
Sundries such as MS clamps screws etc., LS
Rate for Each

TW plank 200 x 150 x 20 mm 94757.00 0.0006

Labour Charges
1.00 No Wiremen Grade I 494.00 No
1.00 No Wiremen Grade II 467.00 No
Electrical Data 2016-2017
300

4.00 No Helper 352.00 No


Total for 8 Nos
Rate for 1 no

DATA - 35

EB service connection Board for single phase

Supplying and fixing 1 No of 375 x 300 x 20 m thick TW plank well


varnished with 1 No 15 amps 250 volts fuse unit and 1 No of copper
earth plate of suitable size bolts and nuta on walls for EB service
connections including cost of all materials, etc., all complete.

1.00 No 16 Amps 250 Volts fuse unit (P-81 6-a 45.60 No


1.00 No TW plank 375 x 300 x 20 mm 213.20 No
1.00 No Earth plate ( copper ) with bolts & nuts. 25.00 LR
Labour Charges
Sundries such as TW plugs screws, etc.,
Rate for Each
TW plank 375 x 300 x 20 mm 94757.00 0.002250
Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
Total for 4 Nos
Rate for 1 No

DATA
Supplying and fixing of Single phase ELCB

1.00 No Single phase ELCB (ISI 25 Amps 30 MA)P-94 9-b 1440.00 No


3.00 No 3 No of 30 amps MCB ( Part-L, P-93 6-a havells) 122.00 No
Labour charges ( as per data No:28)
Sundries
Rate for Single phase ELCB

DATA

Supplying and fixing of Three phase ELCB

1.00 No Three phase ELCB P-94 10 a 1775.00 No


3.00 No 3 No of 30 amps MCB ( Part-L, P-93 6-a havells) 122.00 No
Labour charges ( as per data No:30)
Sundries
Rate for Three phase ELCB

DATA - 36

EB service connection Board for Three phase

Supplying and fixing 1 No of 450 x 375 x 20 m thick TW plank well


varnished with 3 No 30 amps 500 volts fuse unit and 1 No of copper
earth plate of suitable size bolts and nuta on walls for EB service
connections including cost of all materials, etc., all complete.

3.00 No 32 Amps 500 Volts fuse unit 80.70 No

1.00 No TW plank 450 x 375 x 20 mm 319.80 No

1.00 No Earth plate ( copper ) with bolts & nuts. 25.00 LR

Labour Charges

Sundries such as TW plugs screws, etc.,


Rate for Each

TW plank 450 x 375 x 20 mm 94757.00 0.003375


Electrical Data 2016-2017
301

Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
Total for 3 Nos
Rate for 1 No

DATA - 37

2 x 4 Sqmm Copper PVC insulated unsheathed single core 1


KV grade cable for EB service single phase.

180.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core cableP-79 2 d 32.20 Rmt

4.00 Kg 7/20 GI stay wire 89.70 Kg

180.00 Each PVC reel insulater 0.56 Each

1.00 Kg GI wire for fixing reel insulater 89.70 Kg

Labour charges

Sundries for masonry works clamps bolts and nuts etc.,

Total for 90 Rmt

Rate for 1 Rmt

Labour charges
1.00 No Electrician Maistry 539.00 No
2.00 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
3.00 No Helper 352.00 No

DATA - OF
SUPPLY 38 GI PIPES FOR EB SERVICE ( SINGLE PHASE
)

Supply of 25 mm dia GI pipe "B"class ( for the above Data ) for


passing through from top of Houses to the MES Board to meet the EB
requirement.P-44 118 V
1.00 Rmt GI pipe of 25 mm dia (P-46 118 V) 120.80 Rmt
Sundries
Rate Each Rmt

DATA - 39
Supply of MS angle for EB service ( single phase )

Supply of MS angles 40 x 40 x 6 mm for above data to support the


above GI pipe and fixing the GI stay wire service connection wires for
above data
1.00 Rmt 40 x 40 x 6 mm MS angle (P-87 part -G) 43.90 KG
3.25 (3.25 Kg)
Sundries
For 1 Rmt

DATA - 40

4 x 4 Sq mm copper PVC insulated unsheathed single core


cable for 3 phase EB service connection
Electrical Data 2016-2017
302

Run of 4 wires of 4 Sqmm copper PVC insulated unsheathed single


cosre/ 1.1 KV grade cable with one run of 7/20 GI stay wire
suspended with porcelin reel insulater at 1.0 m C/C for support of
phase and neautral cable from the top of street pole to the
houses/blocks including all materials, etc., all complatet for EB
service connections, including labour charges for fixing GI wires and
MS angles

360.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core cableP-79 2 d 32.20 Rmt

4.00 Kg 7/20 GI stay wire 89.70 Kg


360.00 Each PVC reel insulater 0.56 Each
1.50 Kg GI wire for fixing reel insulater 89.70 Kg
Labour charges 1.5 times dataNo 42
Sundries for masonry works clamps bolts and nuts etc.,
Total for 90 Rmt
Rate for 1 Rmt

DATA - 41
SUPPLY OF GI PIPES FOR EB SERVICE ( THREE
PHASE )

Supply of 40 mm dia GI pipe "B"class ( for the above Data ) for


passing through from top of Houses to the MES Board to meet the EB
requirement.
1.00 Rmt GI pipe of 40 mm dia (P-46 118 -iii) 153.90 Rmt
Sundries
Rate Each Rmt
DATA - 42
Supply of MS angle for EB service ( single phase )

Supply of MS angles 40 x 40 x 6 mm for above data to support the


above GI pipe and fixing the GI stay wire service connection wires for
above data
1.00 Rmt 40 x 40 x 6 mm MS angle (P-87 part -G) 43.90 KG
3.25 (3.25 Kg)
Sundries
For 1 Rmt

Laying of U.G. Cable below Ground Level

Charges for conveying and layind=g of U.G.Cable below ground level


including earth work excavation and refilling and providing sand
cushion, brick layer protection, etc., all complete for UG cable of sizes
4 to 25 mm and 2'/3/31/2/4 core

30.42 Cum Earth work excavation and refilling(63.60+63.6+(22.20/3) 134.60 Cum


6.10 Cum SAND FOR MORTAR sl.100 p19 168.00 Cum
750.00 No Bricks p15/ 5a 5130.00 1000 Nos
Labour charges
Sundries
Total for 90 Rmt
Rate for 1 Rmt

Labour Charges
1.00 No Electrician Maistry 539.00 No
1.00 No Wiremen Grade I 494.00 No
4.00 No Helper 352.00 No

DATA - 44

Fixing of UG cables on Walls / Ceiling


Electrical Data 2016-2017
303

Charges for conveying and fixing of UG cables of sizes 4 to 25 Sqmm


of 2, 3,3.5 and 4 core with necessary MS clamps, brass screws
including cost of all materials redoing the dismantled portion, etc., all
complete.

1.00 Gross M.S. Clamps/ Saddles 32mm (It- 3d p-92,part-L ) 57.10 Gross

300.00 No Brass screws ( 40 mm x 6 no) P-92 Part-L 1-c 65.90 Gross

300.00 No TW plugs 1 1/2x 1'x2"( part-J 1-e P-84 ) 272.00 1000 Nos

Sundries for redoing on dismantled portion,etc.,

Labour charges

Total for 90 Rmts

For 1 Rmt

Labour charges

1.00 No Mason Ist class 567.00 No

2.00 No Wiremen Grade I 494.00 No

3.00 No Wiremen Grade II 467.00 No

4.00 No Helper 352.00 No

Total for 1 day

For 2 day

DATA - 46

Specification for MV/SV lamp street light fittings

Supply and delivery of integral HP sodium/Mercury of aluminium


sheet deep drawn, treated, prewired stove enamelled painting and
inside brightended and anodised for optimum reflection and die cast
aluminium control gear near compartments complete with all
accessories like copper wire, round ballast,capacitor,
ignitor,connection box etc., and all pre wired upto terminal block
porcelin lamp holder and acrylic cover with rubber gas for effective
protection from water entry all complete suitable for 150/200 watts
HP SV/ MV lamp.

Specification for Flurescent Tubular lamp street light fittings

Supply and delivery of Single/ twin flurescent tubular lamp street light
fittings complete with heavy gauge aluminium sheet fabricated
canopy, treated premered and painted with stove enamelled CRCA
sheet steel control gear cum reflection tray duly finished glossy white
for optimum reflection with clear ribbed acrylic bowl fixed aluminium
frame with gasket lining secured to canopy by means of hinges on
one side and toggle catches on the other side for effective pritection
against dust and water entry, all prewired upto the terminal block
complete with all accessories, such as copper wire round ballast
capacitor, starter etc., with side entry mounting confirming to IS

Fittings 125 WMV 250 WMV


Fittings P-74 /6 b, c/92 c and a 2970.00 2970.00
MV/SV lamps P-74/6 b 166.00 405.00
Electrical Data 2016-2017
304

Total Rs 3136.00 3375.00

DATA - 48

Fixing of Tube light street light fitting


Charges for fixing flurescent tubular lamp street light fittings ( all
types) in the existing street poles with a required GI pipes 'B' class
and accessories ( street light fittings alone will be supplied
departmentally at free of cost ).

2.00 Rmt GI pipe of 20 mm dia (P-46 118 -iv) 93.10 Rmt

2.00 pair Back lamp with bolts & nuts 35.00 pair

1.00 No 16 Amps 500 v fuse unit p-81 6a 45.60 Each

1.00 No TW plank for fixing the fuse unit 150 x 100 x 20 mm 28.43 Each

8.00 Rmt 2.5 Sqmm PVC insulated unsheathed copper cable 20.30 90 Rmt

1.00 No Labour charges for fixing the street light fitting with the required
accessories in the E.B pole including connection etc., complete.
Sundries for painting the GI pipes, MS clamps, screws, etc., complete LS
in all respects.

Rate for Each

Labour charges for 3 Nos


1.00 No Electrician Maistry 539.00 No
1.00 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
3.00 No Helper 352.00 No
Total for 3 Nos
Rate for 1 No
TW plank if 150 x 100 x 20 mm 94757.00 0.0003

DATA

Street light Fittings (single)

1.00 No Tube light fittings P-74 ,11a-An-VII 614.00 No

1.00 No Tubular lamp P-73 ,4b 34.40 No

1.00 No Labour charges 1516.00 No

Sundries

Rate for Each

DATA - 47

Charges for fixing Mercury, Sodium Vapour lamp street light fittings
( all types ) in the existing pole with required GI pipes 'B' class and
accessories ( Street light fittings alone will be supplied
departmentally at free of cost ).

1.50 Rmt GI pipe B class of 50 mm dia (P-46 118 -ii) 197.80 Rmt

2.00 Pair Back clamps with bolts and nuts 35.00 Pair

1.00 No 15 Amps 500 V fuse unit p-74 6a 45.60 No

1.00 No TW plank for fixing the fuse unit of 150 x 100 x 20 mm 28.43 No

8.00 Rmt 2.5 Sqmm PVC insulated unsheathed copper cable 20.30 90 Rmt
Electrical Data 2016-2017
305

Labour charges for fixing the street light fitting with the required
accessories in the E.B pole including connection etc., complete.

Sundries for painting the GI pipes, MS clamps, screws, etc., complete LS


in all respects.

Rate for Each

DATA - 48

Street light service connection

Supplying and fixing of 2 Nos ( two ) of MS box of size not less than
600 x 225, 16 g with door and lock and key arrangements for
obtaining EB service connection for street lights with one box
comprising off 1 No 30 Amps 500 V fuse units, 1 No copper earth
plate with required brass bolts and nuts with washers on a suitable
size TE plank of 20 mm thick for fixing EB meter and other box
comprising of 1 No 32 Amps DPIC, 1 No 40 Amps, single pole MCB
isolator with connections. MS sheet steel enclousures, for controlling
the street lights on suitable size TW plank of 20 mm thick and
including necessary bolts and nuts in the TNEB pole with washers and
run of 4 wires of 4 Sqmm copper PVC insulated unsheathed single
core / cable in 20 mm dia 'B' grade class GI pipes with ISI mark with
necessary MS clamp with bolts and nuts with washers from the top of
E.B street pole to the MS box and including painting of MS box and GI
pipes, inter connections and including cost is all materials and labour,
to meet the requirement of TNEB and as directed by the department
officers.

For TNEB Meter


1.00 No MS box 300 x 200x100 mm with door and lock and key arrangements 263.00 No
with necessary MS clamps to bolts & nuts with washers. P- 87 d part-F

1.00 No TW plank 600 x 225 x 20 mm 255.84 No


1.00 No 32 Amps 500 v fuse units 80.70 No
1.00 No Earth plate with brass bolts & nuts with washers 25.00 No
5.00 Rmt 20 mm dia 'B' class GI pipe p-46 it-118 iv 93.10 Rmt
20.00 Rmt 4 Sqmm copper PVC insulated unsheathed single core cable 32.20 Rmt
For control Gear
1.00 No M.S box 600 x 225 mm with door and lock and key arrangement and 263.00 No
MS clamp with bolts & nuts with washers.

1.00 No 32 A DPIC switch p-79 2d, Part-C 735.00 No


1.00 No 40 A single pole MCb isolator 93.50 No
1.00 No MS enclousure for MCB 89.60 No
1.00 No TW plank 600 x 225 x 20 mm 255.84 No
Labour charges as per data no: 48
Sundries such as MS clamps with bolts & nuts with washers for fixing
GI pipe to EB pole painting etc.,

Rate for Each

TW plank 300 x 200 x 20 mm 94757.00 0.0027


DATA - 49

SUPPLYING AND FIXING OF 20MM DIA PVC PIPE FOR


TV/TELEPHONE LINE
================================================
90.00 Mtr PVC RIGID CONDUIT PIPE 19M/20MM HEAVY DUTY WITH ISI 16.30 Mtr
Electrical Data 2016-2017
306

0.15 MT CEMENT 5530.00 MT


1.00 NO WIREMAN GR-I 494.00 NO
2.00 NO MASON II 508.00 NO
4.00 NO HELPER 352.00 NO
SUNDRIES FOR PVC SPECIALS & FISH WIRE ETC.,

TOTAL FOR 90RMT


RATE PER RMT

25 mm dia PVC pipe Heavy duty with ISI mark


Rate as per Above
1.00 Rmt Deduct cost of 20 m dia PVC pipe 16.30 Rmt
1.00 Rmt Add cost of 25 mm dia PVC pipe heavy dutyp-89 part -I c 24.20 Rmt

DATA - 50

TV/Telephone line junction


1.00 No TW board 8" x6" x3" (p-91, part-j/b) 35.10 No
0.015 Sqm Hylem sheet 537.00 Sqm
Labour charges for fixing including necessary materials LS
Rate for Each

DATA - 51

Supplying and concealing TV/Telephone socket with top pin with


suitable TW box fully concealed and covered with 3 mm thick Hylem
sheet etc., all complete.

1.00 No TW board 4" x4" x3" (p-91, part-j/d) 13.05 No


0.01 Sqmm Hylem sheet 537.00 Sqm
1.00 No TV/Telephone socket 49.50 No
Labour charges including fixing etc., all complete. LS
Rate for each

DATA - 52

Supply and erection of Tubular lamp, using 65 mm dia GI pipe 'B' class
pipe with ISI mark of 6 mt length and 20 mm dia GI pipe 'B' class upto
2 mt with necessary reducer couplings and pipe firmly fixed with MS
plate of 45 cm x 45 cm x 6 mm thick at the bottom and MS box with
8" x 6" with locking arrangements fixed with lamp post for providing
looping in and loopin out connection to the street light fittings and
supply and fixing of 15 Amps fuse unit and 15 Amps copper neautral
link plate with brass bolts & nuts including concreting using C.C 1:2:4
using 20 mm HBSJ for 1.2 mt below Ground level and 0.3 mt above
Ground level and a diameter of 45 cm with necessary earthing civil
loop including labour charges for fixing the street light fittings. Earth
work excavation, 2 coats of painting over 1 coat of Anti corrosion
painting, welding inter connection using 1.5 sqmm copper cable etc.,
all complete and as directed by the departmental officers.

6.00 Rmt 65 mm dia GI pipe ' B' class p-46,118-i 230.80 Rmt
2.00 Rmt 20 mm dia 'B' class GI pipe p-46 it-118 iv 93.10 Rmt
1.00 No Base plate 45 cm x45 cm x 6mm thick 130.00 No
1.00 No MS box 8" x 6" with cover p-87 Fc 87.00 No
Electrical Data 2016-2017
307

0.238 Cum conrete 1:2:4 using 20 mm HBSJ ( 0.45 x 1.5 mt) 4600.00 Cum
LS Transportation charges welding GI reducer all incidential charges, LS
painting etc., all complete.

1.00 No 1 No fuse unit 15 A 230 V and on suitable TW plank ( to house it is MS LS


box 8" x 6") with 1 No copper neutral link with brass bolts & nuts with
Washers (11+28+21)

8.00 Rmt 1.50 Sqmm copper PVC insulated unsheathed single core cable. 13.10

Labour charges
Rate for Each
Labour Charges
0.50 No Wiremen Grade I 494.00 No
2.00 No Wiremen Grade II 467.00 No
2.00 No Helper 352.00 No

DATA - 56

Exhaust fan of 300 mm dia ( 12 ") sweep

1.00 No Exhaust fan of 300 mm dia ( Part- B 2 b p-74 1155.00 No


Provision of hole in the wall and making good of the wall 197.00 No
Clamp fixing by cheche screws bolts and nuts including connections
( as per SD-114, Elec Data 2017-18)

Add 1 % sundries 1370.50


Labour charges for fixing
Rate for each

Labour charges
1.00 No Wiremen Grade I 494.00 No
2.00 No Helper 352.00 No
For 4 Nos
Rate for 1 No

DATA - 57

Exhaust fan of 225 mm dia ( 9 ") sweep

Exhaust fan of 225 mm dia ( Part- B 2 a p-74 1010.00 No


Provision of hole in the wall and making good of the wall 197.00 No
Clamp fixing by cheche screws bolts and nuts including connections
( as per SD-114, Elec Data 2017-18)
Add 1 % sundries
Labour charges for fixing
Rate for each

Supply of ceiling fan 1200mm

1.00 No 1200mm A.C ceiling fan (without regulator)( Part- B 1 a p-78 1090.00 No

1.00 No Cost of electronic regulator( Part- B 1 d p-78 148.30 No

Rate for each

Tube light - Box type


1.00 No 4' tube light fitting with \electronic ballast P-74 7 b 431.00 No

1.00 No slim tube light 36 w P-73 4 c 33.60 No


Electrical Data 2016-2017
308

Labour charges (as per Data 22 )

Sundries

Rate for each

Tube light - Patty type


1.00 No 4' tube light fitting with \electronic ballast p-77 it-20 c 269.00 No

1.00 No fan 33.60 No

Labour charges (as per Data 22 )

Sundries

Rate for each

OPEN WIRING IN PVC PIPE

Open wiring for Light point with ceiling rose for flats/ houses

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g thick
concealed and covered with 3mm thick laminated hylem sheet for
LIGHT POINT WITH CEILING ROSE controlled by 5 amps flush type
switch including citcuit mains, cost of all materials, specials, etc., all
complete,(Open wiring)

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 1 Rmt
20.00 No 19 mm PVC rigid bends 2.60 No
150.00 No Tw Plugs (p 91 p J e) 272.00 1000 nos
10.00 No 19 mm PVC rigid tees 1.09 No
10.00 No PVC joint box ( Part- I ,p90 6b) 35.10 Dozen
0.015 Sqm Hylem sheet 3 mm thick with lamination 537.00 Sqm
10.00 No 5 amps flush type switch 15.33 No
10.00 No Ceiling rose 13.15 No
1.00 Gross Brass screws 40mm p92 L 1c 65.90 Gross
72.00 No 19 mm MS clamp 47.70 Gross
1/6 Bag Cement 276.50 Bag
10.00 No TW switch box 100 x 100 x 75 mm p91 jd 13.05 No
1.00 No TW junction box 150 x 100 x 75 mm p-91 j c 15.70 No
0.10 Sqm 3 mm thick laminated Hylem sheet (10X0.1X0.1) 537.00 Sqm
45.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
1/2 Litre Paint SEP p-44 it-117 211.00 Litre
10.00 Points Labour charges LS
LS Sundries 1% on materials LS
Total for 10 Points
Rate for 1 Point

Labour Charges for wirnig in PVC pipe concealed

Sub - data

1.00 No Maistry 539.00 No


Electrical Data 2016-2017
309

2.00 No Wiremen Grade - I 494.00 No


3.00 No Wiremen Grade - II 467.00 No
4.00 No Helper 352.00 No

LIGHT POINT WITH CEILING ROSE FOR ADMINISTRATIVE


BLOCKS AND COMMUNITY CENTRE Open wiring

Light point with bakelite batern type holder for flats/ houses(Open wiring)

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g thick
concealed and covered with 3mm thick laminated hylem sheet for
LIGHT POINT WITH BAKELITE BATTERN TYPE HOLDER FOR FLATS/
HOUSES controlled by 5 amps flush type switch including citcuit
mains, cost of all materials, specials, etc., all complete,

Total for Data 1 excluding sundries


Deduct cost of ceiling rose 10 Nos
Add cost of Bakelite battern type holders 10 Nos @ Rs 15.80 / Each p-77, it-22
Sundries
Total for 10 points
Rate for 1 points

POINT WIRING FOR CALLING BELL / BUZZER WITH PUSH


SWITCH FOR ALL TYPE OF BUILDING (OPEN WIRING)

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for POINT WIRING WITH CALLING BELL/BUZZER WITH PUSH
TYPE SWITCH FOR ALL TYPE OF BUILDINGS including citcuit mains,
cost of all materials, specials, etc., all complete,(OPEN WIRING)

Total of Data 1 excluding sundries


Deduct cost of 10 Nos ceiling rose
Deduct cost of 10 Nos 19 mm PVC junction box
Deduct 10 Nos 5 A switch
Add the cost of 10 Nos Buzer/Bell @ 39.50/Each p77 28a
Add the cost of 10 nos 5A type push switch ( 184/12=15.33) @ Rs 15.33/ Each p79 C a
Add the cost of 10 nos 15 x 10 x 7.5 cm TW box @ Rs15.70/Each p-91 J c
Sundries
Total for 10 points
Rate for 1 point

FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY


CENTRE
Electrical Data 2016-2017
310

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in PVC rigid conduit pipe
heavy duty with ISI mark with suitable size MS box of 16g thick
concealed and covered with 3mm thick laminated hylem sheet for
FAN POINT FOR ADMINISTRATIVE BLOCKS AND COMMUNITY CENTRE
controlled by 5 amps flush type switch including citcuit mains, cost of
all materials, specials, etc., all complete,(Open wiring)

Total for Data 1 excluding sundries


Deduct cost of TW Box 10X10 @ 16.70/each
Deduct cost of Hylem sheet
Add cost of TW box 12" x 8" x3" for switch and regulator 10 nos @ Rs
66.00 / Each p-91,part J a
Hylem sheet 0.60 Sq m@ 685/Sq m p-90 ,7 a
Add Sundries 1%
Total for 10 points
Rate for 1 points

STAIRCASE LIGHT POINT FOR ADMINISTRATIVE BLOCKS AND


COMMUNITY CENTRE (Open wiring)
Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for STAIRCASE LIGHT POINT FOR ADMINISTRATIVE BLOCKS AND
COMMUNITY CENTRE controlled by 5 amps flush type switch including
citcuit mains, cost of all materials, specials, etc., all complete,(Open
wiring)

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
30.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
10.00 No 19 mm PVC rigid bends 2.60 No
5.00 No 19 mm PVC rigid tees 1.09 No
10.00 No 5 A flush type two way switches ( Staircase switch ) 19.08 No
5.00 No PVC round block 2.50 Each
5.00 No Ceiling rose 13.15 No
0.090 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
1.00 Bag Cement 276.50 Bag
6.00 No TW switch Box 150X100X65mm 15.70 Each
30.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection
Labour charges
Sundries
Total for 5 points
Rate for 1 point

5 AMPS 5 PIN PLUG SOCKET POINT AT CONVENIENT PLACES (OPEN WIRING)

Wirng with 1.5 sqmm copper PVC insulated unsheathed single core
1.1 KV grade cable with continuous earth by means of 1.5 sqmm
copper PVC insulated unsheathed single core 1.1 KV grade cable
confirming to IS 694 / 1980 with ISI mark in fully concealed PVC rigid
conduit pipe heavy duty with ISI mark with suitable size MS box of
16g thick concealed and covered with 3mm thick laminated hylem
sheet for 5 amps 5 pin PLUG SOCKET POINT AT CONVENIENT PLACES
including citcuit mains, cost of all materials, specials, etc., all
complete,

90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 90 Rmt
Electrical Data 2016-2017
311

45.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
20.00 No 19 mm PVC rigid bends 2.60 Dozen
10.00 No 19 mm PVC rigid tees 1.09 Dozen
1.00 No MS box 150x 100 x 75 mm 53.50 No
0.015 Sqm 3 mm thick laminated Hylem sheet 537.00 Sqm
15.00 No 5 A 5 pin non - inter locking switch and plug ( flush type ) 38.23 No
15.00 No MS box 150x 100 x 75 mm 53.50 No
0.225 Sqm 3 mm thick laminated Hylem sheet 537.00 SQqm
1.25 Bag Cement 276.50 Bag
45.00 Sqm 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 90 Rmt
continuous earth connection
Labour charges
Sundries
Total for 15 points
Rate for 1 point
Labour charges
1.00 No Maistry 539.00 No
2.00 No Wiremen Grade - I 494.00 No
3.00 No Wiremen Grade - II 467.00 No
4.00 No Helper 352.00 No

2 X1.5 Sqmm in fully concealed PVC conduit

Run off mains with 2 wires of 1.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC open
conduit pipe heavy duty with ISI mark including cost of all materials,
specials, etc., all complete.

180.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable 13.10 Rmt
90.00 Rmt PVC rigid conduit pipe 19 mm / 20mm heavy duty with ISI mark 16.30 Rmt
1.00 gross MS saddles 19mm p-92 part- L 3b 37.40 gross
300.00 Nos TW plugs 38x25x19mm p84 J e 272.00 1000Nos
2.00 Gross Brass screws 38mm 65.90 gross

0.33 Bag Cement 276.50 Bag


90.00 Rmt 1.5 sqmm copper PVC insulated unsheathed single core cable for 13.10 Rmt
continuous earth connection
2/3 Labour charges 4336.00

Sundries
Total for 90 Metres
Rate for 1 Rmt

2 X 2.5 Sq mm in fully concealed PVC conduit (open wiring)

Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

Total as per Data No.


Electrical Data 2016-2017
312

180.00 Rmt Add 180 mt 2.5 Sqmm copper PVC insulated unsheathed S.C. cable 20.30 Rmt
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed S.C. cable 13.10 Rmt
Sundries
Total for 90 metres
Rate for 1 Rmt

2 X 4 Sq mm in fully concealed PVC conduit (open wiring)

Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

Total as per Data No.


180.00 Rmt Add 180 mt 4 Sqmm copper PVC insulated unsheathed S.C. cable p- 32.20 Rmt
86 2c
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed S.C. cable 13.10 Rmt
Sundries
Total for 90 metres
Rate for 1 Rmt

4 X 10 Sq mm in fully concealed PVC conduit (open wiring)

Run off mains with 2 wires of 2.5 Sqmm copper PVC insulated
unsheathed single core 1.1KV cable wire contuinuous earth by means
of 1.5 Sqmm copper PVC insulated unsheathed single core 1.1 KV
grade cable in fully concealed 19 mm / 20 mm dia rigid PVC conduit
pipe heavy duty with ISI mark including cost of all materials, specials,
etc., all complete.

Total as per Data No.


360.00 Rmt Add 180 mt 10 Sqmm copper PVC insulated unsheathed S.C. cable 71.60 Rmt
part E-2 -F
180.00 Rmt Deduct 1.5 Sqmm copper PVC insulated unsheathed S.C. cable 32.20 Rmt
Sundries
Total for 90 metres
Rate for 1 Rmt
Electrical Data 2016-2017
313

Supplying and laying of 1000 x 1000 x 300mm size


ms 16 swg powder coated cable terminal box with
two compartment with necessary bus bar connected
with TNEB etc.,
Qty. Description Rate Unit

DATA - A Panel for 1 services Police station


Length = 3.3ft. Height =3.3 ft. Depth = 1.ft.
Requirement of 16 SWG MS sheet :
Front and back 1x2x3.3x3.3 = 21.78sq.ft. 41.58
Top and bottom 1x2x3.3x 1.0 = 6.6 sq.ft.
Between bus 1 x 2 x 3.3x 1.0 = 6.6 sq.ft.
Two sides 1x2x3.3x 1.0 = 6.6 sq.ft.
Total = 41.58 sqft

Wastage 10% = 4.158sqft


Total = 45.738 sqft
in kgm 45.738 x 1.17 = 53.513 kgm
53.513 kg Cost of MS sheet Part -G P-87 SR -2018-19 43.90 kg
Requirement of angle iron:
Channel size 75mm x 40mm
1.5' x 2 x1 = 3 kgm
Angle size - 40 x 40 x 6mm
1metre = 3.25kgm
Total angle iron required=(1x 3+6x0.3)= 4.80 mtr

4.8 x 3.25 = 15.60kgm


Total steel required = 15.60+ 3.0=18.60 kg
18.60 kg Cost of angle iron 43.90 kg
Copper requirement:
Copper bus by 25mm x 3mm copper Flats for phases
and neutral
1x2' x 4x .22 =1.76 kgm
Inter connection between 300 A cut out and bus
2' x 4 x 0.22 =1.76 kgm
Inter connection between 63 A fuse units 3 phase and netural link and bus by no.8 SWG
copper
2' x 3 x 8 = 48/20 = 2.4 kg
Between bus & 32 A DP by No.8 copper
between bus and fuse unit (single phase )

2'x 2=4/20=0.2 kgm

Total copper required: 1.76 + 1.76kgm+ 2.4kgm =5.92 kgm

5.92 kg Cost copper (P-81 Revised SR-17-18) 443.00 kg


5.92 kg Tin coating of copper 10.00 kg

Requirment of GI Flats for earth bus


Sixe proposed 25mm x3mm GI flat
1.5' x 2+ 3' x 1 =22.2 ft =6.0 mtr
6.0 mtrs x 0.6 kg /mtr =3.60kg
3.60 kg 25mm x3mm GI flat p-86 it -3 c 79.70 kg
Incomers & outgoings
3.00 Nos. 200 A fuse units (P-81 Revised SR-18-19,it-6e) 526.00 Each
1.00 Nos. 100 A fuse units (P-81 Revised SR-18-19,it-6 d) 325.00 Each
1.00 Nos. 100 A neutral link 325.00 Each
800 Amp Interconnection charges 1.00 Amp
Electrical Data 2016-2017
314

6mm thick Hylam sheet for fixing energy metrs


0.45 x .60x 1.0= 0.270 sqm
0.27 m2 Cost of hylum sheet (P-83 Revised SR-18-19,it-7 a 537*2=1074) 1074.00 m2
9.00 Nos Insulators 20.00 each
2.00 set LED pilot lamps 280.00 set
5.00 m 1 sqmm PVC copper cable (Revised P-86 SR-18-19 it-2a) 8.30 m
53.513 kg MS sheet fabrication charges (P-33 SR-18-19 it-167) 31.50 kg
18.600 kg Angle Iron fabrication charges (P-33 SR-18-19) 31.50 kg
12.00 Nos MCB / Fuse units/ Pilot lamp fixing charges ( Ele SD-159 labour ) 1130.22 Each
83.16 sq.ft. Painting with primer & suitable colour 10.00 Sq.ft
24.0 Mtrs. 6 Sq.mm. single core PVC copper cables for connection between fuse units and meter and 47.70 Mtr.
between meter and 32A TPN MCB (P-86 SR-18-19 it-2e)
Lettering charges
Total
Sundries 2% such as bolts, nuts, washers, insulation tape, PVC sleeves etc.

Add: VAT @ 14.5%


Transport charges
Erection charges
Electrical Data 2016-2017
315

1179.00

733.50

52.00

10.90

53.50

8.06

153.30

131.50

29.30

345.63

535.00

80.55

589.50

6760.00

38.26

10700.00

1070.00
Electrical Data 2016-2017
316

539.00

988.00

1401.00

1408.00

1016.00

1408.00

6760.00

10661.74

131.50

158.00

51.76

10740.00

1074.00

10661.74

131.50

29.30

153.30
Electrical Data 2016-2017
317

395.00

90.00

157.00

30.36

11020.00

1102.00

1179.00

733.50

52.00
10.90
29.30
131.50
153.30
870.00
322.20

53.50
8.06
345.63
589.50

6760.00
21.60
11259.99
1126.00

147.27

1179.00
489.00
26.00
5.45
Electrical Data 2016-2017
318

190.80
65.75
14.65
321.00
48.33
345.63
393.00

6760.00
26.39
9865.00
1973.00

1179.00
733.50
52.00
10.90
53.50
8.06
573.45

802.50
120.83
345.63
589.50

6760.00
51.17
11280.04
752.00

65.50
40.75

38.23

375.56
19.96
540.00
Electrical Data 2016-2017
319

51.70
53.50
8.06
11.74
125.00
2250.00

1179.00
733.50
31.20
6.54
53.50
8.06
91.98
78.90
17.58
345.63
321.00
48.33
589.50

6760.00
43.29
10308.01

1718.00
Electrical Data 2016-2017
320

10264.72

78.90

94.80

33.38

10314.00
1719.00

1179.00

733.50

31.20
6.54
17.58
78.90
91.98
522.00
193.32
53.50
8.06
345.63
589.50

6760.00
39.27
10649.98
1775.00

0.78
Electrical Data 2016-2017
321

1179.00

489.00

15.60
3.27
114.48
39.45
8.79
160.50
29.00
345.63
393.00

6760.00
17.29
9555.01
3185.00

2358.00

1467.00

829.50

1179.00

6760.00
12593.50
96.50
12690.00
141.00
Electrical Data 2016-2017
322

12593.50
3654.00

2358.00

60.50

13950.00
155.00

5796.00

1467.00

829.50
1827.00

6760.00
60.50
16740.00
186.00

11592.00

2178.00

829.50
1827.00

8928.00
25.50
25380.00
282.00
Electrical Data 2016-2017
323

263.40
4.93
132.67
401.00

934.00
1056.00
1990.00
132.67

200.00
81.35

9.15
299.50
590.00

494.00
704.00
1198.00
299.50
Electrical Data 2016-2017
324

455.00

81.35

9.15

299.50
845.00

439.00

81.35
10.15
299.50
830.00

480.00

130.00

12.67

399.33
1022.00

494.00
704.00
1198.00
399.33
Electrical Data 2016-2017
325

800.00

130.00

10.67

399.33

1340.00

2190.00

383.77

26.90

399.33

3000.00

383.77

3000.00

2925.00

2190.00
Electrical Data 2016-2017
326

2.00

3737.00

7474.00

10.54

18.28

7.93

155.25

192.00

494.00
934.00
1056.00
2484.00
155.25

40.80
10.54
18.28
5.98

248.40
324.00

494.00
934.00
1056.00
2484.00
248.40
Electrical Data 2016-2017
327

9.14
333.00

4.86

347.00

494.00
467.00
704.00
1665.00

333.00

757.15
9.61
846.00
7.24
1620.00
18.00

494.00
352.00
846.00

384.75
93.10
65.90
49.10
15.00
150.00
100.00
182.00
25.80
51.60
34.90
11.85
846.00
2010.00

494.00
352.00
846.00
Electrical Data 2016-2017
328

56.85
14.65

189.50
261.00

56.85

494.00
1401.00
1895.00
189.50

263.00
20.95

253.05
537.00

494.00
1401.00
352.00
283.50
2530.50
253.05

113.71
41.79

189.50
345.00

113.71
Electrical Data 2016-2017
329

263.00
34.95

253.05
551.00

1440.00

1775.00

80.70
28.43
252.13
6.74
368.00

28.43

494.00
467.00
1056.00
2017.00
252.13

242.10
56.85
296.13
4.92
600.00

56.85

494.00
467.00
Electrical Data 2016-2017
330

1408.00
2369.00
296.13

45.60
213.20
25.00
299.50
8.70
592.00
213.20

494.00
704.00
1198.00
299.50

1440.00
366.00
537.00

2343.00

1775.00
366.00
551.00
3.00
2695.00

242.10

319.80

25.00

399.33

3.77
990.00

319.80
Electrical Data 2016-2017
331

494.00
704.00
1198.00
399.33

5796.00

358.80

100.80

89.70

3517.00

38.00

9900.30

110.00

539.00
988.00
934.00
1056.00
3517.00

120.80
2.20
123.00

142.68

2.32
145.00
Electrical Data 2016-2017
332

11592.00

358.80
201.60
134.55
5275.50
167.55
17730.00
197.00

153.90
1.10
155.00

142.68

3.32
146.00

4094.53
1024.80
3847.50
2441.00
112.17
11520.00
128.00

539.00
494.00
1408.00
2441.00
Electrical Data 2016-2017
333

57.10

137.29

81.60

63.36

8728.00

9067.35

100.75

567.00

988.00

1401.00

1408.00

4364.00

8728.00

150 WSV
2850.00
548.00
Electrical Data 2016-2017
334

3398.00

186.20

70.00

45.60

28.43

162.40

1007.67

15.70

1516.00

539.00
494.00
934.00
1056.00
3023.00
1007.67
28.43

614.00

34.40

1516.00

3.60

2168.00

296.70

70.00

45.60

28.43

162.40
Electrical Data 2016-2017
335

1007.67

14.20

1625.00

263.00

255.84
80.70
25.00
465.50
644.00

263.00

735.00
93.50
89.60
255.84
1007.67
9.35

4188.00

255.84

1467.00
Electrical Data 2016-2017
336

829.50
494.00
1016.00
1408.00
50.50

5265.00
58.50

58.50
16.30
24.20
66.40

35.10
8.06
5.84
49.00

13.05
5.37
49.50
7.08
75.00

1384.80
186.20
130.00
87.00
Electrical Data 2016-2017
337

1094.80
226.30

60.00

104.80

1885.00
5160.00

247.00
934.00
704.00
1885.00

1155.00
197.00
18.50

13.71
299.50
1683.71

494.00
704.00
1198.00
299.50

1010.00
197.00
18.50

13.71
299.50
1538.71

1090.00

148.30

1238.30

431.00

33.60
Electrical Data 2016-2017
338

192.00

1.40

658.00

269.00

33.60

192.00

1.40

496.00

1179.00
733.50
52.00
40.80
10.90
29.25
8.06
153.30
131.50
65.90
23.85
55.30
130.50
15.70
53.70
589.50

105.50
2890.67
20.29
6289.22
628.92

539.00
Electrical Data 2016-2017
339

988.00
1401.00
1408.00

4336.00

2890.67

6268.93
131.50
158.00
13.79
6309.22
630.92

6268.93
131.50
29.30
153.30
395.00
153.30
157.00
39.09
6699.22
669.92
Electrical Data 2016-2017
340

6289.22
130.50
53.70
660.00

322.20
10.01
7097.23
709.72

4258.32

1179.00
489.00
26.00
5.45
190.80
12.50
65.75
48.33
276.50
94.20
393.00

4336.00
8.47
7125.00
1425.00

1179.00
Electrical Data 2016-2017
341

733.50
52.00
10.90
53.50
8.06
573.45
802.50
120.83
345.63
589.50

2890.67
20.43
7379.97
492.00

539.00
988.00
1401.00
1408.00
4336.00

2358.00
1467.00
37.40
81.60
131.80

91.25
1179.00

2890.67
8236.72
52.28
8289.00
92.10

8289.00
Electrical Data 2016-2017
342

3654.00
2358.00
36.00
9621.00
106.90

8289.00
5796.00

2358.00
36.00
11763.00
130.70

8289.00
25776.00

5796.00
36.00
28305.00
314.50
Electrical Data 2016-2017
343

Amount

2349.22

816.54

2622.56
59.20

286.92

1578.00
325.00
325.00
800.00
Electrical Data 2016-2017
344

289.98
180.00
560.00
41.50
1685.66
585.90
13562.64
831.60
1144.80

200.00
28244.52
564.89
28809.41

1500.00
4000.00
34309.41
(OR)
34310.00
345

TOTAL RS.
RATE FOR 1.013 SQM

1.00 NO. FITTER Ist CLASS


1.00 NO. MAZDOOR Ist CLASS
0.50 NO. CARPENTER II CLASS

Aluminium Ventilator 0.90x0.60m


4.6740 kg Aluminium section
0.5400 sqm glass 4mm pin headed
0.5400 sqm labbour charges

Rate / Sqm

Aluminium luvered Ventilator 0.60x0.60m


3.739 kg Aluminium section
0.360 sqm glass 4mm pin headed

#REF!

Rate / Sqm

1.00 Sqm Cuddappah slab


0.75 No. Mason Ist
0.75 No. Mazdoor Ist
0.50 No. StonecutterII
L.S Packing with C.M., Scaffolding
and Polishing etc.,
Total for one sqm

G.F
F.F
S.F
T.F

Providing CUDDAPPAH SLAB for cupboard


wardrobe, shelves, kitchen sinks,
hearth slab and sunshade etc., for the
following thickness including cost of
Cuddappah slab and labour charges for
fixing in position etc., all complete
(Both sides polished)
-----------------------------------------------------------------------------
A. 40mm Thick slab:-
==================
10.000 Sqm Cuddappah slab
1.000 No. Mason Ist
1.000 No. Mazdoor Ist
L.S Packing with C.M., Scaffolding
and Polishing etc.,
Total for Ten sqm
346

Rate for one SQM


G.F
F.F
S.F
T.F
FOURTH FLOOR
347

3684.35
3637.07 Sqm

501.00 NO. 501.00


355.00 NO. 355.00
508.00 NO. 254.00

Data based on Police Acadamy


321.00 kg 1500.35
209.90 kg 113.35
1067.00 kg 576.18
2189.88
4055.33

Data based on Police Acadamy


321.00 kg 1200.22
209.90 kg 75.56

1926.02

4280.04

376.00 Sqm 376.00


567.00 Each 425.25
355.00 Each 266.25
403.00 Each 201.50
L.S 53.50
--------------------
1322.50
--------------------
1322.50 2.72 1325.22
- 5.36 1330.58
1325.22 5.36 1335.94
1330.58 5.36 1341.30

-----------------

376.00 Sqm 3760.00


567.00 Each 567.00
355.00 Each 355.00
0.00 L.S 120.00
--------------------
4802.00
--------------------
348

480.20
2.72 10.43 482.92
5.36 19.44 488.28
5.36 19.44 493.64
5.36 19.44 499.00
5.36 1.32 504.36
84367.00 144.38 12180907.46
151826.00 496.00 75305696.00
216270.00 1238.30 267807141.00
48000.00 347.00 16656000.00
17572.00 282.00 4955304.00
32310.00 600.00 19386000.00
11400.00 130.00 1482000.00
139518.00 443.00 61806474.00
139426.00 75.46 10521085.96
81100.00 470100608.42
47880.00 10000.00
155353.00 20000.00
2615.00 28000.00
22746.00 470158608.42
6180.00 56419033.01
1620.00 526577641.43
2190.00 5265776.41
10146.00 13164441.04
6144.00 39493927.89
988.00 584501786.77 ###
352.00
1488.00
1476.00 0.00
8778.00 0.00
5472.00 0.00
912.00 0.00
450.00 1523313891.28
12084.00 6600.00
2514.00 1523320491.28
1592.00 182798458.95
2576.00 1706118950.23
1482.00 17061189.50
1798.00 42652973.76
66000.00 127959006.29
26250.00 1893792119.78 ###
2538.00
375480.00
88060.00
30000.00
21075.60
8650.40
250.00

1836929.00

220431.48
2057360.48

20573.60

20573.60

102892.32

2201400.00
2201400.00
0.00

S-ar putea să vă placă și