Page 1 of 1 Comment Sheet 1905-PMRCL-REV-00876 TO P4B01-GUT-CV-BAS-PP4-DDN-2000 1905-PMRCL-REV-00878 Document P4B01-GUT-CV-BAS-PP4-DGG-2001 Date of 24-05-19 Submission No: Number: P4B01-GUT-CV-BAS-PP4-DGG-2002 Review: Stage Received General Note Drawing Revision: B01 Design GLMTPL/TCPL Document Title: Gate: from: DDC Ref. No: DDC Ref. Reviewed by: Structure UG 18-05-19 Date: Doc No. / Drawing No: Rev Reviewer / GC Comments Document Status
1) The datum used shall be with respect to mean sea level.
2) Separate method statement to be submitted for concrete placing and casting etc , maximum temperature mentioned for concreting shall be as per contractual requirement. 3) Add a note related to backfill. No backfill is permitted until the concrete of the complete section of the structure has reached their design strength. 4) Grade of concrete for permanent RC column to be mentioned. 5) Method statement for temp formwork/propping under suspended concrete work and construction of masonry work etc to be provided. P4B01-GUT-CV-BAS- 6) Maximum Cementous content to be in accordance with the contract specification. PP4-DDN-2000 7) Waterproofing specification to be mentioned as per contractual requirement. Don’t just refer P4B01-GUT-CV-BAS- B01 contract document. PP4-DGG-2001 8) Fire resistance of the UG structures shall be comply with the contract specification and to be C P4B01-GUT-CV-BAS- mentioned in the drawing. PP4-DGG-2002 9) Clear cover for secant pile, retaining wall , all other temporary structures and above ground structure (ancillary building etc) to be provided. 10) Tensile strength of coupler, thread shall be as per requirement and to be ensured in the method statement. 11) Mention note “these notes do not cover temporary works. To be referred separate drawings.” 12) Contractor to follow the construction sequence as per approved sequence drawing. All works shall comply with the engineer’s specifications. 13) Please add a note related to Instrumentation & monitoring to refer separate drawing 14) Please add a note related to loading “All construction loads shall be limited to the loads shown in the relevant construction sequence drawing.” 15) No excavation to take place under the slab or loading until the concrete has reached its 28 days design strength or as advised by the designers. 16) Please add note related to concrete repair for example - structural crack and contractor to provide method statement. 17) Please add note related to post construction core drilling and any measures to be taken care of strength. 18) Please add note related to structural steel works, stainless steel, welding, weld testing etc. 19) If embedded pipe dia is more than 300mm how stirrups will be adjusted? 20) Welding, healing or rebending of steel reinforcement bar shall not be permitted without Engineer’s approval. 21) Lap length of reinforcement (for grade < M40 if any structures) to be mentioned as per codal provision. 22) Is this general note drawing applicable for entire UGC01 including bored tunnel and NATM? 23) Check the revision history and check the title, specify applicable structure like Cut & Cover Structures/UG Station.
Document Status: A: Approved B. Approved with comments C: Revision required as per comments D: Rejected with major revisions required