SOP FOR CEP PUMP START /STOP/CHANGE OVER /ISOLATION
PROCEDURE
Check the condenser hot well level is normal
Ensure the feeder is normalized and push button released condition Check the suction valve, balancing valve, discharge isolation valve is open condition Ensure the minimum recirculation isolation and control valve is open condition Ensure the hot well level control valves close and isolation valve is open condition Ensure the line drains and vents are closed Check the bearing oil level is normal Start the pump in local/remote mode and check the direction of rotation. To check the current ,vibration , pressure, ∆p and bearing temp If all the parameters are normal gradually open the hot well level control valve to maintain the hot well level Adjust the level control valve and recirculation control valve to maintain the header pressure 12 kg/cm2 and hot well level 350mm. Record the pressure, vibration, current, ∆p and bearing temp
AUTO MODE SELECTION
Check the stand by pump suction ,discharge and balancing valves are open Ensure the standby pump feeder normalized condition All the parameters of the running pump is normal select the standby pump in auto mode
PUMP CHANGEOVER PROCEDURE
change the standby pump in auto mode to manual mode check the standby pump feeder normalized condition check the standby pump suction valve, discharge and balancing valve open condition start the standby pump in remote / local mode and check the direction of rotation check the pressure, current, vibration, ∆p and bearing temp If all the parameters are normal stop the previous running pump. select the standby pump in auto mode from manual mode PUMP STOP PROCEDURE Both the CEP pump can be stopped, if the STG stopped and the hot well temp nearer to atmospheric temp. Ensure the above mentioned conditions are satisfied stop the pump
PUMP ISOLATION PROCEDURE
Ensure the pump stopped condition Check the feeder was isolated and LOTO applied Close the suction ,discharge and balancing valve Open the pump drain valve