Sunteți pe pagina 1din 1

2A POLE CLAMP

MESSENGER WIRE 6M CONTRACTOR:

CONCRETE POLE (10.0m)


STRAIGHT SUSPENSION CLAMP TECHNOLOGY AND
INDUSTRIAL SUPPLIES,
INC.
Rm 2B Dona Sebastiana Bldg., #1767 Evangelista
St., Barangay Bangkal, Makati City

Date:
Surveyed/Designed by : HECTOR S. SAN JUAN
MESSENGER WIRE 6M OSP SURVEYOR/CAD OPERATOR

Date:
GUY GRIP 6M Checked by : ABNER M. BURAYAG
GUY GRIP 6M OSP Engineer

Date:
AMOR T. ESPINOSA
Noted by :
INSULATOR STRAIN MESSENGER WIRE 6M OSP Team Leader

CA POLE CLAMP Date:


Recommended by : RANEL M. ESPINOSA
OSP Engineering Head

PROJECT TITLE
OUTSIDE PLANT DESIGN
PROVINCE OF LAGUNA AND QUEZON
SAN PABLO TO LUCBAN
96C FOC(FIG. 8) BACKBONE PROJECT
CABLE TIE CABLE TIE
PROPOSED CATENARY CONSTRUCTION
AT LILIW BRIDGE
DETAILED PLAN
STRAIGHT SUSPENSION CLAMP AS PLAN

Revision Date
- - -
1.50m

- - -

- - -

OWNER/PROPONENT:

CATENARY CONSTRUCTION DETAILS


NOT TO SCALE
CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
Date:
Surveyed/Designed by : MARK WILL BONIFACIO
OSP Engineer

Date:
Checked by: JAEMI DEMISON
OSP Team Leader

Date:
Noted by: ALDRIN SAPULPAYA
OSP Planning & Engineering Head

Date:
Recommended by: EDWIN C. MABITAZAN
Engineering Head

Work Order No. Sheet Content Sheet No.

4
4

S-ar putea să vă placă și