B Concreting Works
Portland Cement bag 40 240.00 9,600.00 9,600.00
Sub-Total 9,600.00
C Rebar Works
10mm x 6mm RSB Pc 30 138.00 4,140.00 4,140.00
9mm x 6mm RSB Pc 30 110.00 3,300.00 3,300.00
Sub-Total 7,440.00
D Form Works
Sub-Total
E Masonry Works
#16 Tie Wire Kg 6 80.00 480.00 480.00
Sub-total 480.00
F Roofing Works
Sub-total
G Tile Works
Sub-total
H Plumbing Works
Sub-Total
I. MATERIALS 28,020.00
II. LABOR
III. TOTAL COST (I II) 28,020.00
Prepared by: Recommending Approval: Approved:
PROGRAM OF WORKS
DepEd – CY 2018 - Region 02 – Schools Division of Isabela
Item I.D. Item Description % of Total Unit Quantity Total Cost Remarks
I. DIRECT COST
General Requirements
A Earthworks lot 1 10,500.00
B Concreting Works lot 1 9,600.00
C Rebar Works lot 1 7,4400.00
D Masonry Works lot 1 480.00
E