GOVERNING CODES & DESIGN CRITERIA
Address:
825 Tamarack Lane
Sunnyvale, CA
Latitude: 37.3608
Longitude: -122.0012
ASCE/SEI 7-10 Minimum Design Loads for Buildings and Other Structures
SEISMIC COEFFICIENTS
Exterior Walls-Stucco
Stucco 10 psf
Building Paper 1 psf
15/32" plywood 1.7 psf
2x6 stud @ 16" o.c 1.4 psf
6" Batt. Insulation 2 psf
5/8" Gyp Board 2.8 psf
Misc. 1.1 psf
Total 20
Interior wall
2x6 stud @ 16" o.c 1.7 psf
5/8" Gyp Board 2.8 psf
6" Batt. Insulation 1.8 psf
5/8" Gyp Board 2.8 psf
1/2” Plywood 1.5 psf
Misc 1.4 psf
12
Vertical Force Distribution
ASCE 7-10 SECTION 12.8 (EQUIVALENT LATERAL FORCE PROCEDURE)
Design Base Shear VASD= 15285 LBS. Eq 12.8-1
SDS= 1.00
SDS= 1
(0.6-0.14SDS)= 0.46
(1.0+0.14SDS)= 1.14
Floor Weight= 15
Roof Weight= 19.5
Interior Wall Weight= 12
Stucco Wall Weight= 20
rho(ρ)= 1.3
omega(Ω)= 3
8403.4528 8403.452784
7988.9139 16392.36673 0 0
SDS= 1
(0.6-0.14S DS)= 0.46
(1.0+0.14S DS)= 1.14
Floor Weight= 15
Roof Weight= 19.5
Interior Wall Weight= 12
Stucco Wall Weight= 20
rho(ρ)= 1.3
omega(Ω)= 3
0 0
Design Criteria:
* 2009 International Bldg Code
* Seismic R=6.5
* 2500 psi concrete
* Alternate Basic or Basic Load combination
* ASD Design Shear = 1025 lbs
Selected Strong-Wall® Panel Solution:
1-SSW15x10 is OK.
Notes:
- Check that wall height "H" plus curb height (above slab) will attain overall rough header opening height (top of driveway
slab to bottom of header).
Disclaimer:
It is the Designer's responsibility to verify product suitability under applicable building codes. In order to verify code listed
applications please refer to the appropriate product code reports at www.strongtie.com or contact Simpson Strong-Tie
Company Inc. at 1-800-999-5099.
Page 1 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Anchor Solution Assuming Cracked Concrete Design: Anchor Solution Assuming Uncracked Concrete Design:
SSW15x10 56 19 9.25 SSWAB1 High Strength SSW15x10 49 17 9.25 SSWAB1 High Strength
Notes:
1. Anchor Design conforms to ACI 318 Appendix D with no supplementary reinforcement and
cracked or uncracked concrete as noted.
2. Anchorage strength indicates required grade of SSWAB anchor bolt. Standard or High Strength (HS).
3. Seismic indicates Seismic Design Category C though F. Detached 1 & 2 family dwellings in SDC C may use wind
anchorage solutions. Seismic anchorage designs conform to ACI 318-08 Section D.3.3.4
4. Footing dimensions are for anchorage only. Foundation design (size and reinforcement) by Designer.
The registered design professional may specify alternate embedment, footing size or anchor bolt.
Page 2 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Page 3 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Design Criteria:
* 2009 International Bldg Code
* Seismic R=6.5
* 2500 psi concrete
* Alternate Basic or Basic Load combination
* ASD Design Shear = 2620 lbs
Selected Strong-Wall® Panel Solution:
Notes:
- Check that wall height "H" plus curb height (above slab) will attain overall rough header opening height (top of driveway
slab to bottom of header).
Disclaimer:
It is the Designer's responsibility to verify product suitability under applicable building codes. In order to verify code listed
applications please refer to the appropriate product code reports at www.strongtie.com or contact Simpson Strong-Tie
Company Inc. at 1-800-999-5099.
Page 1 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Anchor Solution Assuming Cracked Concrete Design: Anchor Solution Assuming Uncracked Concrete Design:
SSW12x8 39 13 6.875 SSWAB3/4 High Strength SSW12x8 34 12 6.875 SSWAB3/4 High Strength
SSW18x8 56 19 12.25 SSWAB1 High Strength SSW18x8 49 17 12.25 SSWAB1 High Strength
Notes:
1. Anchor Design conforms to ACI 318 Appendix D with no supplementary reinforcement and
cracked or uncracked concrete as noted.
2. Anchorage strength indicates required grade of SSWAB anchor bolt. Standard or High Strength (HS).
3. Seismic indicates Seismic Design Category C though F. Detached 1 & 2 family dwellings in SDC C may use wind
anchorage solutions. Seismic anchorage designs conform to ACI 318-08 Section D.3.3.4
4. Footing dimensions are for anchorage only. Foundation design (size and reinforcement) by Designer.
The registered design professional may specify alternate embedment, footing size or anchor bolt.
Page 2 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Page 3 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Design Criteria:
* 2009 International Bldg Code
* Seismic R=6.5
* 2500 psi concrete
* Alternate Basic or Basic Load combination
* ASD Design Shear = 1310 lbs
Selected Strong-Wall® Panel Solution:
1-SW24x9 is OK.
Notes:
- The combined effect of the downward vertical axial load and overturning on the compression post of the Wood Strong-
Wall® shearwall shall be evaluated by the Specifier as not to exceed the "C4" Allowable Vertical Load.
Disclaimer:
It is the Designer's responsibility to verify product suitability under applicable building codes. In order to verify code listed
applications please refer to the appropriate product code reports at www.strongtie.com or contact Simpson Strong-Tie
Company Inc. at 1-800-999-5099.
Page 1 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Notes:
1. Anchor design based on ICC-ES ESR-2611.
2. One #4 Rebar is required at top of stemwall foundations.
3. Seismic indicates Seismic Design Category C through F. Detached one- and two-family dwellings in SDC C may use wind
anchorage solutions.
4. Midwall loads apply when anchor is 1.5 le or greater from the end. For bolts acting in tension simultaneously, the minimum
bolt center-to-center spacing is 3 le.
5. Footing dimensions are for anchorage only. Foundation design (size and reinforcement) by Designer.
Page 2 of 3
SIMPSON STRONG-TIE COMPANY INC.
(800) 999-5099
5956 W. Las Positas Blvd., Pleasanton, CA 94588.
www.strongtie.com
Design Criteria:
* Stemwall - Perimeter
* 2009 International Bldg Code
* Seismic R=6.5
* 2500 psi concrete
Anchor Solution Assuming Cracked Concrete Design: Anchor Solution Assuming Uncracked Concrete Design:
Notes:
1. Anchor Design conforms to ACI 318 Appendix D assuming, ASTM A307 or ASTMF1554, Grade 36 anchor rods and no
supplementary reinforcement.
2. Seismic indicates Seismic Design Category C through F. Detached one- and two-family dwellings in SDC C may use wind
anchorage solutions. Seismic anchorage designs conform to ACI 318-08 Section D.3.3.4
3. Footing dimensions are for anchorage only. Foundation design (size and reinforcement) by Designer.
4. SWAB7/8 anchor bolt available in 18", 24", 30" or 36" length. Minimum length required = H + de + 6.5". If minimum
length exceeds 36" - Use SWAB7/8x18 with CNW7/8 coupler nut and 7/8" A36 all thread extension.
Page 3 of 3
Project: 010_825 Tamarack
Location: 1B-4 gravity
Multi-Loaded Multi-Span Beam
[2015 International Building Code(2012 NOS)]
5.25 IN x 11.875 IN x 15.17 FT
StruCalc Version 9.0.2.5 3/20/2016 11:57:32 AM
2.0E Parallam - iLevel Trus Joist
Section Adequate By: 15.1 %
Controlling Factor: Deflection
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.32 IN L/569
Dead Load 0.34 in
Total Load 0.66 IN L/276
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/240
REACTIONS t, §
Live Load 2731 lb 3573 lb
Dead Load 2901 lb 3928 lb
Total Load 5632 lb 7501 lb
Bearing Length 1.43 in 1.91 in
BEAM DATA Center
Span Length 15.17 ft
Unbraced Length-Top 0 ft
Unbraced Length-Bottom 15.17 ft
Live Load Duration Factor 1.00
Notch Depth 0.00
UNIFORM LOADS Center
MATERIAL PROPERTIES Uniform Live Load O plf
2.0E Parallam - iLevel Trus Joist Uniform Dead Load O plf
Base Values Adjusted Beam Self Weight 19 plf
Bending Stress: Fb = 2900 psi Fb' = 2903 psi Total Uniform Load 19 plf
Cd=1.00 CF=1.00
POINT LOADS - CENTER SPAN
Shear Stress: Fv = 290 psi Fv' = 290 psi
Load Number One
Cd=1.00
Live Load 550 lb
Modulus of Elasticity: E= 2000 ksi E' = 2000 ksi
Dead Load 750 lb
Comp . .L to Grain: Fe - .L = 750 psi Fe - .L• = 750 psi
Location 14.58 ft
•
Bearing Length 0.41 in 0.21 in
BEAM DATA
Span Length 11.3 ft
Unbraced Length-Top 0 ft B
Unbraced Length-Bottom 0 ft
Roof Pitch Side One: 3 :12
Roof Pitch Side Two: 3 :12
Roof Duration Factor
tlleCi!ALLl;Y LQADlt::I�
Roof Live Load: LL= 20 psf
Beam End Elevation Difference 2 ft
Roof Dead Load: DL= 20 psf
MATERIAL PROPERTIES Side 1 Rafter Length: RL1= 8 ft
#2 - Douglas-Fir-Larch Tributary Width based on half span of rafters.
Base Values Adjusted Side 2 Rafter Length: RL2= 8 ft
Bending Stress: Fb= 900 psi Fb'= 1170 psi Tributary Width based on half span of rafters.
Cd=1.00 CF=1.30 Non-Snow Roof Loaded Area: RLA= 0 plf
Shear Stress: Fv= 180 psi Fv'= 180 psi
SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Cd=1.00
Adjusted Beam Length: Ladj = 11.48 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Beam Self Weight: BSW= 6 plf
Comp. ..L to Grain: Fe - ..L= 625 psi Fe - ..L• = 625 psi
TRAPEZOIDAL LOADS - CENTER SPAN
Controlling Moment: 1984 ft-lb Load Number One
5.65 ft from left support Left Live Load 113.1 plf
Created by combining all dead and live loads. Left Dead Load 116.6 plf
Controlling Shear: 890 lb Right Live Load 0 plf
At support. Right Dead Load 0 plf
Created by combining all dead and live loads. Load Start 0 ft
Load End 11.3 ft
Comparisons with required sections: Req'd Provided Load Length 11.3 ft
Section Modulus: 20.35 in3 30.66 in3
Area (Shear): 7.42 in2 25.38 in2
Moment of Inertia (deflection): 37.57 in4 111.15 in4
Moment: 1984 ft-lb 2989 ft-lb
Shear: 890 lb 3045 lb
Project: 010_825 Tamarack
Location: TH-1
HipNalley Beam
[2015 International Building Code(2012 NOS)]
3.5 IN x 7.25 IN x 12.7 FT (Actual 12.9 FT)
StruCalc Version 9.0.2.5 3/20/2016 11:57:32 AM
#2 - Douglas-Fir-Larch - Dry Use
Section Adequate By: 33.3%
Controlling Factor: Moment
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.22 IN L/716
Dead Load 0.24 in
Total Load 0.46 IN L/335
Live Load Deflection Criteria: L/240 Total Load Deflection Criteria: L/180
REACTIONS 8 §
Live Load 539 lb 269 lb
Dead Load 599 lb 317 lb
Total Load 1138 lb 586 lb
•
Bearing Length 0.52 in 0.27 in
BEAM DATA
Span Length 12.7 ft
Unbraced Length-Top 0 ft B
Unbraced Length-Bottom 0 ft
Roof Pitch Side One: 3 :12
Roof Pitch Side Two: 3 :12
Roof Duration Factor 1.25
tlleCi!ALLl;Y LQADlt::I�
Roof Live Load: LL= 20 psf
Beam End Elevation Difference 2.2 ft
Roof Dead Load: DL= 20 psf
MATERIAL PROPERTIES Side 1 Rafter Length: RL1= 9 ft
#2 - Douglas-Fir-Larch Tributary Width based on half span of rafters.
Base Values Adjusted Side 2 Rafter Length: RL2= 9 ft
Bending Stress: Fb= 900 psi Fb'= 1463 psi Tributary Width based on half span of rafters.
Cd=1.25 CF=1.30 Non-Snow Roof Loaded Area: RLA= 0 plf
Shear Stress: Fv= 180 psi Fv'= 225 psi
SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Cd=1.25
Adjusted Beam Length: Ladj = 12.89 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Beam Self Weight: BSW= 6 plf
Comp . ..L to Grain: Fe_ ..L= 625 psi Fe - ..L• = 625 psi
TRAPEZOIDAL LOADS - CENTER SPAN
Controlling Moment: 2804 ft-lb Load Number One
6.35 ft from left support Left Live Load 127.3 plf
Created by combining all dead and live loads. Left Dead Load 131.2 plf
Controlling Shear: 1121 lb Right Live Load 0 plf
At support. Right Dead Load 0 plf
Created by combining all dead and live loads. Load Start 0 ft
Load End 12.7 ft
Comparisons with required sections: Req'd Provided Load Length 12.7 ft
Section Modulus: 23.01 in3 30.66 in3
Area (Shear): 7.47 in2 25.38 in2
Moment of Inertia (deflection): 59.64 in4 111.15 in4
Moment: 2804 ft-lb 3737 ft-lb
Shear: 1121 lb 3806 lb
Project: 010_825 Tamarack
Location: GT-1
Multi-Loaded Multi-Span Beam
[2015 International Building Code(2012 NOS)]
7.0 IN x 11.875 IN x 24.0 FT
StruCalc Version 9.0.2.5 3/20/2016 11:57:33 AM
2.0E Parallam - iLevel Trus Joist
Section Adequate By: 13.3%
Controlling Factor: Deflection
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.48 IN L/600
Dead Load 0.58 in
Total Load 1.06 IN L/272
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/240
REACTIONS t, §
Live Load 1200 lb 1427 lb
Dead Load 1512 lb 1739 lb
Total Load 2712 lb 3166 lb
Bearing Length 0.52 in 0.60 in
BEAM DATA Center
Span Length 24 ft
Unbraced Length-Top 0 ft
Unbraced Length-Bottom 24 ft
Live Load Duration Factor 1.00
Notch Depth 0.00
UNIFORM LOADS Center
MATERIAL PROPERTIES Uniform Live Load O plf
2.0E Parallam - iLevel Trus Joist Uniform Dead Load O plf
Base Values Adjusted Beam Self Weight 26 plf
Bending Stress: Fb = 2900 psi Fb' = 2903 psi Total Uniform Load 26 plf
Cd=1.00 CF=1.00
POINT LOADS - CENTER SPAN
Shear Stress: Fv = 290 psi Fv' = 290 psi
Load Number One
Cd=1.00
Live Load 600 lb
Modulus of Elasticity: E= 2000 ksi E' = 2000 ksi
Dead Load 600 lb
Comp. .L to Grain: Fe - .L = 750 psi Fe - .L• = 750 psi
Location 8.75 ft
•
Bearing Length 0.34 in 0.18 in
BEAM DATA
Span Length 12 ft
Unbraced Length-Top 0 ft B
Unbraced Length-Bottom 0 ft
Roof Pitch Side One: 3 :12
Roof Pitch Side Two: 3 :12
Roof Duration Factor 1.25
tlleCi!ALLl;Y LQADlt::I�
Roof Live Load: LL= 20 psf
Beam End Elevation Difference 2.1 ft
Roof Dead Load: DL= 15 psf
MATERIAL PROPERTIES Side 1 Rafter Length: RL1= 8.5 ft
1.9E Microllam - iLevel Trus Joist Tributary Width based on half span of rafters.
Base Values Adjusted Side 2 Rafter Length: RL2= 8.5 ft
Bending Stress: Fb= 2600 psi Fb'= 3614 psi Tributary Width based on half span of rafters.
Cd=1.25 CF=1.11 Non-Snow Roof Loaded Area: RLA= 0 plf
Shear Stress: Fv= 285 psi Fv'= 356 psi
SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Cd=1.25
Adjusted Beam Length: Ladj = 12.18 ft
Modulus of Elasticity: E= 1900 ksi E'= 1900 ksi
Beam Self Weight: BSW= 6 plf
Comp . ..L to Grain: Fe_ ..L= 750 psi Fe - ..L• = 750 psi
TRAPEZOIDAL LOADS - CENTER SPAN
Controlling Moment: 2089 ft-lb Load Number One
6.0 ft from left support Left Live Load 120.2 plf
Created by combining all dead and live loads. Left Dead Load 92.9 plf
Controlling Shear: 881 lb Right Live Load 0 plf
At support. Right Dead Load 0 plf
Created by combining all dead and live loads. Load Start 0 ft
Load End 12 ft
Comparisons with required sections: Req'd Provided Load Length 12 ft
Section Modulus: 6.94 in3 17.65 in3
Area (Shear): 3.71 in2 19.25 in2
Moment of Inertia (deflection): 35.38 in4 48.53 in4
Moment: 2089 ft-lb 5314 ft-lb
Shear: 881 lb 4572 lb
Project: 010_825 Tamarack
Location: HDR-1
Multi-Span Roof Beam
[2015 International Building Code(2012 NOS)]
3.5 IN x 7.25 IN x 8.0 FT
StruCalc Version 9.0.2.5 3/20/2016 11:57:35 AM
#2 - Douglas-Fir-Larch - Dry Use
Section Adequate By: 20.7%
Controlling Factor: Moment
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.07 IN L/1425
Dead Load 0.09 in
Total Load 0.16 IN L/599
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/240
REACTIONS t, §
Live Load 520 lb 520 lb
Dead Load 718 lb 718 lb
Total Load 1238 lb 1238 lb
Bearing Length 0.57 in 0.57 in
BEAM DATA Center
Span Length 8 ft
Unbraced Length-Top O ft
Unbraced Length-Bottom 8 ft
Roof Pitch 3 :12
Roof Duration Factor 1.00
ROOF LOADING Center
Notch Depth 0.00
Roof Live Load RLL = 20 psf
MATERIAL PROPERTIES Roof Dead Load RDL = 20 psf
#2 - Douglas-Fir-Larch Roof Tributary Width Side One TW1 = 4.5 ft
Base Values Adjusted Roof Tributary Width Side Two TW2 = 2 ft
Bending Stress: Fb = 900 psi Fb' = 1170 psi Wall Load WALL = 40 plf
Cd=1.00 CF=1.30 Non-Snow Roof Loaded Area RLA =
Shear Stress: Fv = 180 psi Fv' = 180 psi
BEAM LOADING Center
Cd=1.00
Total Live Load 130 plf
Modulus of Elasticity: E= 1600 ksi E' = 1600 ksi
Total Dead Load (Adjusted for Roof Pitch) 174 plf
Comp . .l. to Grain: Fe - .l. = 625 psi Fe - .l.• = 625 psi
Beam Self Weight 6 plf
Total Load 310 plf
Controlling Moment: 2476 ft-lb
4.0 Ft from left support of span 2 (Center Span)
Created by combining all dead loads and live loads on span(s) 2
Controlling Shear: -1238 lb
At right support of span 2 (Center Span)
Created by combining all dead loads and live loads on span(s) 2
I I
FOOTING CALCULATIONS
Bearing Calculations:
Ultimate Bearing Pressure: Qu = 1552 psf
Effective Allowable Soil Bearing Pressure: Qe = 1400 psf
Width Required: Wreq = 1.48 in2
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1 = 0 lb
8 in
n
I
n
I
Allowable Beam Shear: Vc1 = 3656 lb
Transverse Direction: 3 in
1
Bending Calculations:
Factored Moment: Mu = 1487 in-lb --
Nominal Moment Strength: Mn = O in-lb I I
1.333333 ft
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.48 in
Steel Required Based on Moment: As{1) = 0.01 in2 EQQII�� LQACI��
Min. Code Req'd Reinf. Shrink.ffemp. {ACl-10.5.4)As{2) = 0.17 in2 Live Load: PL = 1227 lb
Controlling Reinforcing Steel: As-reqd = 0.17 in2 Dead Load: PD = 69 3 lb
Selected Reinforcement: Trans: #S's@ 18.0 in. o.c. Total Load: PT = 2069 lb
Reinforcement Area Provided: As = 0.2 in2 Ultimate Factored Load: Pu = 29 74 lb
Development Length Calculations:
· LOAD CALCULATOR
Development Length Required: Ld = 15 n
Tributary Width � ead Lo d Live Load
Development Length Supplied;. Ld-sup = 1 n
T/"\ = 1.3 ft2 DL = 20 ps Roof: LL = 20 psf
Longitudinal Direction: TA = 15 ft2 DL = 15 ps Second Floor: LL = 40 psf
Reinforcement CalculationsTA = 15 ft2 DL = 15 ps First Floor: LL = 40 psf
Min. Code Req'd Reinf. Shrink.ffemp. {ACl-10.5.4): As(2) = 0.23 in2
Controlling Reinforcing Steel: As-reqd = 0.23 in2
Selected Reinforcement: Longitudinal: (2) Cont. #5 Bars
Reinforcement Area Provided: As = 0.61 in2
Project: 010_825 Tamarack
Location: B-2
Multi-Loaded Multi-Span Beam
[2015 International Building Code(2012 NOS)]
5.25 IN x 11.875 IN x 18.66 FT (11.3 + 7.3)
StruCalc Version 9.0.2.5 3/20/2016 11:57:39 AM
2.0E Parallam - iLevel Trus Joist
Section Adequate By: 52.9%
Controlling Factor: Shear
DEFLECTIONS Center Right LOADING DIAGRAM
Live Load 0.13 IN L/1061 -0.03 IN L/2784
Dead Load 0.06 in -0.01 in
Total Load 0.18 IN L/737 -0.04 IN L/2024
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/240
REACTIONS t, § .Q
Live Load 3331 lb 12359 lb 1283 lb
Dead Load 1468 lb 11002 lb 45 lb
Total Load 4799 lb 23361 lb 1328 lb
Uplift (1.5 F.S) 0 lb 0 lb -1030 lb
Bearing Length 1.22 in 5.93 in 0.34 in
BEAM DATA Center Right
Span Length 11.33 ft 7.33 ft
Unbraced Length-Top 0 ft 0 ft
Unbraced Length-Bottom 11.33 ft 7.33 ft
Live Load Duration Factor 1.00
Ut::!IEOBM LOADS Center Right
Notch Depth 0.00
Uniform Live Load 0 plf 0 plf
MATERIAL PROPERTIES Uniform Dead Load 0 plf 0 plf
2.0E Parallam - iLevel Trus Joist Beam Self Weight 19 plf 19 plf
Base Values Adjusted Total Uniform Load 19 plf 19 plf
Bending Stress: Fb= 2900 psi Fb'= 2853 psi
POINT LOADS - RIGHT SPAN
Cd=1.00 C/=0.98 CF=1.00
Load Number One*
Shear Stress: Fv= 290 psi Fv'= 290 psi
Live Load 3921 lb
Cd=1.00
Dead Load 6706 lb
Modulus of Elasticity: E= 2000 ksi E'= 2000 ksi
Location 0 ft
Comp. .L to Grain: Fe_ .L= 750 psi Fe - .L• = 750 psi
TRAPEZOIDAL LOADS - CENTER SPAN
Controlling Moment: -13430 ft-lb Load Number One Two Three
11.33 Ft from left support of span 2 (Center Span) Left Live Load 580 plf 360 plf 347 plf
Created by combining all dead loads and live loads on span(s) 2, 3 Left Dead Load 218 plf 135 plf 232 plf
Controlling Shear: -7881 lb Right Live Load 580 plf 360 plf 347 plf
11.0 Ft from left support of span 2 (Center Span) Right Dead Load 218 plf 135 plf 232 plf
Created by combining all dead loads and live loads on span(s) 2, 3 Load Start 0 ft 8.25 ft 4 ft
Load End 8.25 ft 11.33 ft 11.33 ft
Comparisons with required sections: Reg'd Provided Load Length 8.25 ft 3.08 ft 7.33 ft
Section Modulus: 56.48 in3 123.39 in3 RIGHT SPAN
Area (Shear): 40.76 in2 62.34 in2 Load Number One Two
Moment of Inertia (deflection): 248.64 in4 732.62 in4 Left Live Load 360 plf 347 plf
Moment: -13430 ft-lb 29340 ft-lb Left Dead Load 135 plf 232 plf
Shear: -7881 lb 12053 lb Right Live Load 360 plf 347 plf
Right Dead Load 135 plf 232 plf
Load Start 0 ft 0 ft
Load End 7.33 ft 2.33 ft
Load Length 7.33 ft 2.33 ft
Project: 010_825 Tamarack
Location: F-2
Footing
[2015 International Building Code{2012 NDS)]
Footing Size: 3.5 FT x 3.5 FT x 18.00 IN
StruCalc Version 9.0.2.5 3/20/2016 11:57:39 AM
Reinforcement: #5 Bars@ 8.00 IN. O.C. E/W I (5) min.
Section Footing Design Adequate
I
Bearing Calculations:
Ultimate Bearing Pressure: Qu = 1133 psf
Effective Allowable Soil Bearing Pressure: Qe = 1275 psf
Required Footing Area: Areq = 10.88 sf
Area Provided: A= 12.25 sf 18 in
Baseplate Bearing:
Bearing Required: Bear = 20626 lb
Allowable Bearing: Bear-A = 83566 lb
Beam Shear Calculations (One Way Shear):
3 in
Beam Shear: Vu1 = 3407 lb
Allowable Beam Shear: Vc1 = 44297 lb
f-- --------
-3.Sft- - - - - - - - - -
---,
Punching Shear Calculations (Two Way Shear):
Critical Perimeter: Bo = 78.25 in
Punching Shear: Vu2 = 16152 lb FOOTING LOADING
Allowable Punching Shear {ACI 11-35): vc2-a = 247588 lb Live Load: PL = 9944 lb*
Allowable Punching Shear {ACI 11-36): vc2-b = 379160 lb Dead Load: PD = 3930 lb*
Allowable Punching Shear {ACI 11-37): vc2-c = 165059 lb Total Load: PT = 13874 lb*
Controlling Allowable Punching Shear: vc2 = 165059 lb Ultimate Factored Load: Pu = 20626 lb
Bending Calculations: Weight to resist uplift w/ 1.5 F.S.: U.R. = 1776 lb
Factored Moment: Mu = 108289 in-lb * Load obtained from Load Tracker. See Summary Report for details.
Nominal Moment Strength: Mn = 1121608 in-lb
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 1.03 in
Steel Required Based on Moment: As{1) = 0.14 in2
Min. Code Req'd Reinf. Shrink./Temp. (ACl-10.5.4): As{2) = 1.36 in2
Controlling Reinforcing Steel: As-reqd = 1.36 in2
Selected Reinforcement: #S's@ 8.0 in. o.c. e/w (5) Min.
Reinforcement Area Provided: As = 1.53 in2
Development Length Calculations:
Development Length Required: Ld = 15 in
Development Length Supplied: Ld-sup = 18 in
Note: Plain concrete adequate for bending,
therefore adequate development length not required.
Project: 010_825 Tamarack
Location: F-1
Footing
[2015 International Building Code{2012 NDS)]
Footing Size: 4.25 FT x 4.25 FT x 18.00 IN
StruCalc Version 9.0.2.5 3/20/2016 11:57:40 AM
Reinforcement: #5 Bars@ 8.00 IN. O.C. E/W I (6) min.
Section Adequacy N/A
Bearing Calculations:
Ultimate Bearing Pressure:
Effective Allowable Soil Bearing Pressure:
Required Footing Area:
Area Provided:
Baseplate Bearing:
Bearing Required:
Allowable Bearing:
Beam Shear Calculations (One Way Shear):
Beam Shear:
Allowable Beam Shear:
C---- --------
-4.25ft- - - - - - - - - -
---j
Punching Shear Calculations (Two Way Shear):
Critical Perimeter: Bo = 78.25 in
Punching Shear: Vu2 = 28071 lb FOOTING LOADING
Allowable Punching Shear {ACI 11-35): vc2-a = 247588 lb Live Load: PL = 12359 lb
Allowable Punching Shear {ACI 11-36): vc2-b = 379160 lb Dead Load: PD = 10949 lb
Allowable Punching Shear {ACI 11-37): vc2-c = 165059 lb Total Load: PT = 23308 lb
Controlling Allowable Punching Shear: vc2 = 165059 lb Ultimate Factored Load: Pu = 32913 lb
Bending Calculations: Weight to resist uplift w/ 1.5 F.S.: U.R. = 2619 lb
Factored Moment: Mu = 209822 in-lb
Nominal Moment Strength: Mn = 1346532 in-lb
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 1.02 in
Steel Required Based on Moment: As{1) = 0.28 in2
Min. Code Req'd Reinf. Shrink./Temp. (ACl-10.5.4): As{2) = 1.65 in2
Controlling Reinforcing Steel: As-reqd = 1.65 in2
Selected Reinforcement: #S's@ 8.0 in. o.c. e/w (6) Min.
Reinforcement Area Provided: As = 1.84 in2
Development Length Calculations:
Development Length Required: Ld= 15 in
Development Length Supplied: Ld-sup = 22.5 in
Note: Plain concrete adequate for bending,
therefore adequate development length not required.
Project: 010_825 Tamarack
Location: F-4
Footing
[2015 International Building Code{2012 NDS)]
Footing Size: 3.0 FT x 3.0 FT x 18.00 IN
StruCalc Version 9.0.2.5 3/20/2016 11:57:40 AM
Reinforcement: #5 Bars@ 9.00 IN. O.C. E/W I (4) min.
Section Footing Design Adequate
I
FOOTING CALCULATIONS
Bearing Calculations:
Ultimate Bearing Pressure: Qu = 1238 psf
Effective Allowable Soil Bearing Pressure: Qe = 1275 psf
Required Footing Area: Areq = 8.74 sf
18 in
Area Provided: A= 9.00 sf
Baseplate Bearing:
Bearing Required: Bear = 15353 lb
Allowable Bearing: Bear-A = 83566 lb
Beam Shear Calculations (One Way Shear):
3 in
Beam Shear: Vu1 = 1679 lb
Allowable Beam Shear: Vc1 = 37969 lb
Punching Shear Calculations (Two Way Shear):
Critical Perimeter: Bo = 78.25 in
Punching Shear: Vu2 = 10820 lb FOOTING LOADING
Allowable Punching Shear {ACI 11-35): vc2-a = 247588 lb Live Load: PL = 4969 lb
Allowable Punching Shear {ACI 11-36): vc2-b = 379160 lb Dead Load: PD = 6169 lb
Allowable Punching Shear {ACI 11-37): vc2-c = 165059 lb Total Load: PT = 11138 lb
Controlling Allowable Punching Shear: vc2 = 165059 lb Ultimate Factored Load: Pu = 15353 lb
Bending Calculations: Weight to resist uplift w/ 1.5 F.S.: U.R. = 1305 lb
Factored Moment: Mu = 69089 in-lb
Nominal Moment Strength: Mn = 899562 in-lb
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.96 in
Steel Required Based on Moment: As{1) = 0.09 in2
Min. Code Req'd Reinf. Shrink./Temp. (ACl-10.5.4): As{2) = 1.17 in2
Controlling Reinforcing Steel: As-reqd = 1.17 in2
Selected Reinforcement: #S's@ 9.0 in. o.c. e/w (4) Min.
Reinforcement Area Provided: As = 1.23 in2
Development Length Calculations:
Development Length Required: Ld = 15 in
Development Length Supplied: Ld-sup = 15 in
Note: Plain concrete adequate for bending,
therefore adequate development length not required.
Project: 010_825 Tamarack
Location: F-3
Footing
[2015 International Building Code{2012 NDS)]
Footing Size: 3.5 FT x 3.5 FT x 18.00 IN
StruCalc Version 9.0.2.5 3/20/2016 11:57:40 AM
Reinforcement: #5 Bars@ 8.00 IN. O.C. E/W I (5) min.
Section Footing Design Adequate
I
Bearing Calculations:
Ultimate Bearing Pressure: Qu = 1038 psf
Effective Allowable Soil Bearing Pressure: Qe = 1275 psf
Required Footing Area: Areq = 9.97 sf
Area Provided: A= 12.25 sf 18 in
Baseplate Bearing:
Bearing Required: Bear = 17410 lb
Allowable Bearing: Bear-A = 83566 lb
Beam Shear Calculations (One Way Shear):
3 in
Beam Shear: Vu1 = 2876 lb
Allowable Beam Shear: Vc1 = 44297 lb
f-- --------
-3.Sft- - - - - - - - - -
---,
Punching Shear Calculations (Two Way Shear):
Critical Perimeter: Bo = 78.25 in
Punching Shear: Vu2 = 13633 lb FOOTING LOADING
Allowable Punching Shear {ACI 11-35): vc2-a = 247588 lb Live Load: PL = 5387 lb*
Allowable Punching Shear {ACI 11-36): vc2-b = 379160 lb Dead Load: PD = 7326 lb*
Allowable Punching Shear {ACI 11-37): vc2-c = 165059 lb Total Load: PT = 12713 lb*
Controlling Allowable Punching Shear: vc2 = 165059 lb Ultimate Factored Load: Pu = 17410 lb
Bending Calculations: Weight to resist uplift w/ 1.5 F.S.: U.R. = 1776 lb
Factored Moment: Mu = 91405 in-lb * Load obtained from Load Tracker. See Summary Report for details.
Nominal Moment Strength: Mn = 1121608 in-lb
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 1.03 in
Steel Required Based on Moment: As{1) = 0.12 in2
Min. Code Req'd Reinf. Shrink./Temp. (ACl-10.5.4): As{2) = 1.36 in2
Controlling Reinforcing Steel: As-reqd = 1.36 in2
Selected Reinforcement: #S's@ 8.0 in. o.c. e/w (5) Min.
Reinforcement Area Provided: As = 1.53 in2
Development Length Calculations:
Development Length Required: Ld = 15 in
Development Length Supplied: Ld-sup = 18 in
Note: Plain concrete adequate for bending,
therefore adequate development length not required.
Project: 010_825 Tamarack
Location: P-1
Column
[2015 International Building Code(2012 NOS)]
3.5 IN x 5.5 IN x 9.0 FT
StruCalc Version 9.0.2.5 3/20/2016 11:57:40 AM
#1 - Douglas-Fir-Larch - Dry Use
Section Adequate By: 45.0%
Bending Stress (Y-Y Axis): Fby = 1000 psi Fby' = 1300 psi
Cd=1.00 CF=1.30
Modulus of Elasticity: E = 1700 ksi E' = 1700 ksi
Note:
1. All design provisions are based on the NDS 2005 edition
2. Holes may not occur within the center 1/3 or 12" of either end of the compression posts.