Sunteți pe pagina 1din 49

PROJECT: 8990 URBAN DECA ORTIGAS

PROJ. CODE: UDO308


BUILDING : N (2)

SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 230 1/21/19 8:00 PM


2 4000 PSI 3/4 PCD @ 28days 23 1/23/19 9:00 PM
3 4000 PSI 3/4 PCD @ 28days 40 1/26/19 10:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: CHECKED BY:

ENGR. F.DE LOS ANGELES III


Field Engr.
STRUCTURE/LOCATION PLACEMENT METHOD

Towercrane foundation& pilecap pumpcrete


Foundation/pilecap concrete bucket
Foundation/pilecap concrete bucket

ENDING ON SITE CONDITIONS.

ENGR. Z.M.ESCAMA
Project.Supt.
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)

SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 23 4/2/2019 8:00 PM


2 4000 PSI 3/4 PCD @ 28days 46 1/31/19 9:00 PM
3 4000 PSI 3/4 PCD @ 28days 25 2/2/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: CHECKED BY:

ENGR. F.DE LOS ANGELES III


Field Engr.
STRUCTURE/LOCATION PLACEMENT METHOD

Foundation/pilecap concrete bucket


Foundation/pilecap concrete bucket
Foundation/pilecap concrete bucket

ENDING ON SITE CONDITIONS.

ENGR. Z.M.ESCAMA
Project.Supt.
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)

SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 8000 PSI 3/8 FC @ 28days 10 4/2/2019 8:00 PM


2 4000 PSI 3/4 PCD @ 28days 20 5/2/2019 9:00 PM
3 4000 PSI 3/4 PCD @ 28days 23 6/2/2019 8:00 PM
4 4000 PSI 3/4 PCD @ 28days 47 7/2/2019 8:00 PM
5 4000 PSI 3/4 PCD @ 28days 40 8/2/2019 8:00 PM
6 4000 PSI 3/4 PCD @ 28days 20 9/2/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: CHECKED BY:

ENGR. F.DE LOS ANGELES III


Field Engr.
STRUCTURE/LOCATION PLACEMENT METHOD

SHEARWALL concrete bucket


Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring

ENDING ON SITE CONDITIONS.

ENGR. Z.M.ESCAMA
Project.Supt.
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 45 11/2/2019 8:00 PM


2 4000 PSI 3/4 PCD @ 28days 23 12/2/2019 9:00 PM
3 4000 PSI 3/4 PCD @ 28days 42 02/13/2019 8:00 PM
4 4000 PSI 3/4 PCD @ 28days 20 02/14/2019 9:00 PM
5 8000 PSI 3/8 FC @ 28days 10 02/14/2019 8:00 PM
6 4000 PSI 3/4 PCD @ 28days 37 02/15/2019 8:00 PM
7 8000 PSI 3/8 FC @ 28days 16 02/16/2019 8:00 PM
8 4000 PSI 3/4 PCD @ 28days 45 02/16/2019 9:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. Z.ESCAMA
Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

Foundation/pilecap Direct Pouring


Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring
SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 47 02/18/2019 8:00 PM


2 8000 PSI 3/8 FC @ 28days 7 02/19/2019 8:00 PM
3 4000 PSI 3/4 PCD @ 28days 45 02/19/2019 9:00 PM
4 4000 PSI 3/4 PCD @ 28days 47 02/20/2019 9:00 PM
5 8000 PSI 3/8 FC @ 28days 7 02/21/2019 8:00 PM
6 4000 PSI 3/4 PCD @ 28days 45 02/21/2019 8:00 PM
7 4000 PSI 3/4 PCD @ 28days 52 02/22/2019 9:00 PM
8 8000 PSI 3/8 FC @ 28days 6 02/23/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. Z.ESCAMA
Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

Foundation/pilecap Direct Pouring


SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
SHEARWALL concrete bucket

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 45 02/25/2019 9:00 PM


2 8000 PSI 3/8 FC @ 28days 7 02/26/2019 8:00 PM
3 4000 PSI 3/4 PCD @ 28days 23 02/27/2019 9:00 PM
4 4000 PSI 3/4 PCD @ 28days 42 02/28/2019 9:00 PM
5 8000 PSI 3/8 FC @ 28days 7 1/3/2019 8:00 PM
6 4000 PSI 3/4 PCD @ 28days 45 2/3/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. Z.ESCAMA
Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

Foundation/pilecap Direct Pouring


SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 50 4/3/2019 9:00 PM


2 4000 PSI 3/4 PCD @ 28days 46 5/3/2019 9:00 PM
3 4000 PSI 3/4 PCD @ 28days 25 6/3/2019 9:00 PM
4 8000 PSI 3/8 FC @ 28days 8 7/3/2019 8:00 PM
5 4000 PSI 3/4 PCD @ 28days 40 7/3/2019 9:00 PM
6 4000 PSI 3/4 PCD @ 28days 50 8/3/2019 8:00 PM
7 4000 PSI 3/4 PCD @ 28days 46 9/3/2019 9:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

Foundation/pilecap Direct Pouring


Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
SHEARWALL concrete bucket
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring
Foundation/pilecap Direct Pouring

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 4000 PSI 3/4 PCD @ 28days 55 03/18/2019 9:00 PM


2 8000 PSI 3/8 FC @ 28days 8 03/19/2019 8:00 PM
3 4000 PSI 3/4 PCD @ 28days 25 03/19/2019 9:00 PM
4 4000 PSI 3/4 PCD @ 28days 45 03/20/2019 9:00 PM
5 8000 PSI 3/8 FC @ 28days 8 03/21/2019 10:00 PM
6 8000 PSI 3/8 FC @ 28days 6 03/22/2019 9:00 PM
7 4000 PSI 3/4 PCD @ 28days 20 03/23/2019 9:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

Foundation/pilecap Bldg.3 Direct Pouring


SHEARWALL bldg.2 concrete bucket
Foundation/pilecap Bldg.3 Direct Pouring
Foundation/pilecap Bldg.3 Direct Pouring
SHEARWALL bldg.2 concrete bucket
SHEARWALL bldg.3 Direct Pouring
Foundation/pilecap Bldg.3 Direct Pouring

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 3000 PSI 3/4 PCD @ 28days 105 4/15/2019 9:00 PM


2 8000 PSI 3/8 FC @ 28days 6 04/16/2019 8:00 PM
3 3000 PSI 3/4 PCD @ 28days 90 4/17/2019 10:00 AM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

SLAB ON GRADE GRND.FLR.AREA 2 PUMPCRETE


SHEARWALL concrete bucket
SLAB ON GRADE GRND.FLR.AREA 3 PUMPCRETE

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 3000 PSI 3/4 PCD @ 28days 90 4/23/2019 10:00 PM


2 3000 PSI 3/4 PCD @ 28days 110 4/25/2019 10:00 PM
3 3000 PSI 3/4 PCD @ 28days 120 4/27/2019 10:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

SLAB ON GRADE GRND.FLR.AREA 1 PUMPCRETE


SLAB ON GRADE GRND.FLR.AREA 2 PUMPCRETE
SLAB ON GRADE GRND.FLR.AREA 3 PUMPCRETE

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 3000 PSI 3/4 PCD @ 28days 150 04/30/2019 10:00 PM


2 6000 PSI 3/4 PCD @ 28days 100 2/5/2019 10:00 PM
3 6000 PSI 3/4 PCD @ 28days 120 4/5/2019 10:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

SLAB ON GRADE GRND.FLR.AREA 3&4 PUMPCRETE


2ND FLOOR SLAB AREA 1 PUMPCRETE
2ND FLOOR SLAB AREA 2 PUMPCRETE

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 3000 PSI 3/4 PCD @ 28days 150 6/5/2019 9:00 PM


2 6000 PSI 3/4 PCD @ 28days 100 8/5/2019 10:00 PM
3 6000 PSI 3/4 PCD @ 28days 120 10/5/2019 10:00 PM
4 8000 PSI 3/8 FC @ 28days 6 11/5/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

SLAB ON GRADE GRND.FLR.AREA 3&4 PUMPCRETE


2ND FLOOR SLAB AREA 1 PUMPCRETE
2ND FLOOR SLAB AREA 2 PUMPCRETE
SHEARWALL concrete bucket

ENDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 6000 PSI 3/4 PCD @ 28days 120 05/15/2019 10:00 PM


2 8000 PSI 3/8 FC @ 28days 6 05/16/2019 8:00 PM
3 6000 PSI 3/4 PCD @ 28days 110 05/17/2019 10:00 PM
4 8000 PSI 3/8 FC @ 28days 6 05/18/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

2ND FLOOR SLAB AREA 2 PUMPCRETE


SHEARWALL AREA1 concrete bucket
2ND FLOOR SLAB AREA 3 PUMPCRETE
SHEARWALL AREA2 concrete bucket

NDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

ONE WEEK LOOK AHEAD


SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time

1 6000 PSI 3/4 PCD @ 28days 90 05/20/2019 10:00 PM


2 8000 PSI 3/8 FC @ 28days 6 05/21/2019 8:00 PM
3 6000 PSI 3/4 PCD @ 28days 100 05/22/2019 10:00 PM
4 8000 PSI 3/8 FC @ 28days 6 05/23/2019 8:00 PM
5 6000 PSI 3/4 PCD @ 28days 90 05/24/2019 10:00 PM
6 8000 PSI 3/8 FC @ 28days 6 05/25/2019 8:00 PM

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:

ENGR.W.SANTOS/ F.DE LOS ANGELES III


Field Engr.

CHECKED BY:

ENGR. ZAI ESCAMA


Project.Supt.
AHEAD

STRUCTURE/LOCATION PLACEMENT METHOD

2ND FLOOR SLAB AREA 3 PUMPCRETE


SHEARWALL AREA2 concrete bucket
2ND FLOOR SLAB AREA 4 PUMPCRETE
SHEARWALL AREA3 concrete bucket
3RD FLOOR SLAB AREA 1 PUMPCRETE
SHEARWALL AREA4 concrete bucket

NDING ON SITE CONDITIONS.

ENGR. R.DOMONDON
Site Manager

ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JUNE 3-9,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 50 3/6/2019 10:00 PM 3rd FLOOR SLAB AREA 2
2 8000 PSI 3/8 FC @ 28days 5 4/6/2019 8:00 PM SHEARWALL AREA2
3 6000 PSI 3/4 PCD @ 28days 50 5/6/2019 10:00 PM 3rd FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 5 6/6/2019 8:00 PM SHEARWALL AREA3
5 6000 PSI 3/4 PCD @ 28days 50 7/6/2019 10:00 PM 3RD FLOOR SLAB AREA 4
6 8000 PSI 3/8 FC @ 28days 5 8/6/2019 8:00 PM SHEARWALL AREA4
7 6000 PSI 3/4 PCD @ 28days 50 9/6/2019 10:00 PM 4TH FLOOR SLAB AREA 1

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
PREPARED BY: NOTED BY:

ENGR.A. SENIDO ENGR. R.DOMONDON


Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JUNE 10-15,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 55 10/6/2019 10:00 PM 3rd FLOOR SLAB AREA 3
2 8000 PSI 3/8 FC @ 28days 5 11/6/2019 8:00 PM SHEARWALL AREA3
3 6000 PSI 3/4 PCD @ 28days 55 06/13/2019 10:00 PM 3rd FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 5 06/14/2019 8:00 PM SHEARWALL AREA4
5 6000 PSI 3/4 PCD @ 28days 50 06/15/2019 10:00 PM 4TH FLOOR SLAB AREA 1

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:


ENGR.A. SENIDO ENGR. R.DOMONDON
Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JUNE 17-22,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 55 06/17/2019 10:00 PM 4TH FLOOR SLAB AREA 1
2 8000 PSI 3/8 FC @ 28days 5 06/18/2019 8:00 PM SHEARWALL AREA1
3 6000 PSI 3/4 PCD @ 28days 55 06/19/2019 10:00 PM 4TH FLOOR SLAB AREA 2
4 8000 PSI 3/8 FC @ 28days 5 06/20/2019 8:00 PM SHEARWALL AREA2
5 6000 PSI 3/4 PCD @ 28days 65 06/21/2019 10:00 PM 4TH FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 5 06/22/2019 8:00 PM SHEARWALL AREA3

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:


ENGR.A. SENIDO ENGR. R.DOMONDON
Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JUNE 24-29,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 65 06/24/2019 10:00 PM 4TH FLOOR SLAB AREA 3
2 8000 PSI 3/8 FC @ 28days 4.5 06/25/2019 8:00 PM ELEVATOR SHEARWALL AREA3
3 6000 PSI 3/4 PCD @ 28days 65 06/26/2019 10:00 PM 4TH FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 4.5 06/27/2019 8:00 PM ELEVATOR SHEARWALL AREA4
5 6000 PSI 3/4 PCD @ 28days 55 06/28/2019 10:00 PM 5TH FLOOR SLAB AREA 1
4 8000 PSI 3/8 FC @ 28days 4.5 06/29/2019 8:00 PM ELEVATOR SHEARWALL AREA1

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:


ENGR.A. SENIDO ENGR. R.DOMONDON
Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JULY 1-6,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 60 1/7/2019 10:00 PM 5TH FLOOR SLAB AREA 1
2 8000 PSI 3/8 FC @ 28days 4.5 2/7/2019 8:00 PM ELEVATOR SHEARWALL AREA1
3 6000 PSI 3/4 PCD @ 28days 60 3/7/2019 10:00 PM 5TH FLOOR SLAB AREA 2
4 8000 PSI 3/8 FC @ 28days 4.5 4/7/2019 8:00 PM ELEVATOR SHEARWALL AREA2
5 6000 PSI 3/4 PCD @ 28days 70 5/7/2019 10:00 PM 5TH FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 4.5 6/7/2019 8:00 PM ELEVATOR SHEARWALL AREA3

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:


ENGR.A. SENIDO ENGR. R.DOMONDON
Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JULY 8-13,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 65 8/7/2019 10:00 PM 5TH FLOOR SLAB AREA 3
2 8000 PSI 3/8 FC @ 28days 4 9/7/2019 8:00 PM ELEVATOR SHEARWALL AREA3
3 6000 PSI 3/4 PCD @ 28days 65 10/7/2019 10:00 PM 5TH FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 4 11/7/2019 8:00 PM ELEVATOR SHEARWALL AREA4
5 6000 PSI 3/4 PCD @ 28days 55 12/7/2019 10:00 PM 6TH FLOOR SLAB AREA 1
4 8000 PSI 3/8 FC @ 28days 4 07/13/2019 8:00 PM ELEVATOR SHEARWALL AREA1

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:


ENGR.A. SENIDO ENGR. R.DOMONDON
Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE

JULY 15-20,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time

1 6000 PSI 3/4 PCD @ 28days 60 07/15/2019 10:00 PM 6TH FLOOR SLAB AREA 2
2 8000 PSI 3/8 FC @ 28days 4 07/16/2019 8:00 PM ELEVATOR SHEARWALL AREA2
3 6000 PSI 3/4 PCD @ 28days 65 07/17/2019 10:00 PM 6TH FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 4 07/18/2019 8:00 PM ELEVATOR SHEARWALL AREA3
5 6000 PSI 3/4 PCD @ 28days 70 07/19/2019 10:00 PM 6TH FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 4 07/20/2019 8:00 PM ELEVATOR SHEARWALL AREA4

PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.

PREPARED BY: NOTED BY:


ENGR.A. SENIDO ENGR. R.DOMONDON
Field Engr. Site Manager

CHECKED BY:

ENGR. ZAI ESCAMA ENGR. K. CALIMAG


Project.Supt. Project Manager
PLACEMENT METHOD

PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket

S-ar putea să vă placă și