SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
ENGR. Z.M.ESCAMA
Project.Supt.
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
ENGR. Z.M.ESCAMA
Project.Supt.
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.)
Date Time
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
ENGR. Z.M.ESCAMA
Project.Supt.
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. Z.ESCAMA
Project.Supt.
AHEAD
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N (2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. Z.ESCAMA
Project.Supt.
AHEAD
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. Z.ESCAMA
Project.Supt.
AHEAD
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2) & O(3)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
ENGR. R.DOMONDON
Site Manager
ENGR. K. CALIMAG
Project Manager
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JUNE 3-9,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 50 3/6/2019 10:00 PM 3rd FLOOR SLAB AREA 2
2 8000 PSI 3/8 FC @ 28days 5 4/6/2019 8:00 PM SHEARWALL AREA2
3 6000 PSI 3/4 PCD @ 28days 50 5/6/2019 10:00 PM 3rd FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 5 6/6/2019 8:00 PM SHEARWALL AREA3
5 6000 PSI 3/4 PCD @ 28days 50 7/6/2019 10:00 PM 3RD FLOOR SLAB AREA 4
6 8000 PSI 3/8 FC @ 28days 5 8/6/2019 8:00 PM SHEARWALL AREA4
7 6000 PSI 3/4 PCD @ 28days 50 9/6/2019 10:00 PM 4TH FLOOR SLAB AREA 1
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
PREPARED BY: NOTED BY:
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JUNE 10-15,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 55 10/6/2019 10:00 PM 3rd FLOOR SLAB AREA 3
2 8000 PSI 3/8 FC @ 28days 5 11/6/2019 8:00 PM SHEARWALL AREA3
3 6000 PSI 3/4 PCD @ 28days 55 06/13/2019 10:00 PM 3rd FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 5 06/14/2019 8:00 PM SHEARWALL AREA4
5 6000 PSI 3/4 PCD @ 28days 50 06/15/2019 10:00 PM 4TH FLOOR SLAB AREA 1
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JUNE 17-22,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 55 06/17/2019 10:00 PM 4TH FLOOR SLAB AREA 1
2 8000 PSI 3/8 FC @ 28days 5 06/18/2019 8:00 PM SHEARWALL AREA1
3 6000 PSI 3/4 PCD @ 28days 55 06/19/2019 10:00 PM 4TH FLOOR SLAB AREA 2
4 8000 PSI 3/8 FC @ 28days 5 06/20/2019 8:00 PM SHEARWALL AREA2
5 6000 PSI 3/4 PCD @ 28days 65 06/21/2019 10:00 PM 4TH FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 5 06/22/2019 8:00 PM SHEARWALL AREA3
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JUNE 24-29,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 65 06/24/2019 10:00 PM 4TH FLOOR SLAB AREA 3
2 8000 PSI 3/8 FC @ 28days 4.5 06/25/2019 8:00 PM ELEVATOR SHEARWALL AREA3
3 6000 PSI 3/4 PCD @ 28days 65 06/26/2019 10:00 PM 4TH FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 4.5 06/27/2019 8:00 PM ELEVATOR SHEARWALL AREA4
5 6000 PSI 3/4 PCD @ 28days 55 06/28/2019 10:00 PM 5TH FLOOR SLAB AREA 1
4 8000 PSI 3/8 FC @ 28days 4.5 06/29/2019 8:00 PM ELEVATOR SHEARWALL AREA1
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JULY 1-6,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 60 1/7/2019 10:00 PM 5TH FLOOR SLAB AREA 1
2 8000 PSI 3/8 FC @ 28days 4.5 2/7/2019 8:00 PM ELEVATOR SHEARWALL AREA1
3 6000 PSI 3/4 PCD @ 28days 60 3/7/2019 10:00 PM 5TH FLOOR SLAB AREA 2
4 8000 PSI 3/8 FC @ 28days 4.5 4/7/2019 8:00 PM ELEVATOR SHEARWALL AREA2
5 6000 PSI 3/4 PCD @ 28days 70 5/7/2019 10:00 PM 5TH FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 4.5 6/7/2019 8:00 PM ELEVATOR SHEARWALL AREA3
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JULY 8-13,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 65 8/7/2019 10:00 PM 5TH FLOOR SLAB AREA 3
2 8000 PSI 3/8 FC @ 28days 4 9/7/2019 8:00 PM ELEVATOR SHEARWALL AREA3
3 6000 PSI 3/4 PCD @ 28days 65 10/7/2019 10:00 PM 5TH FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 4 11/7/2019 8:00 PM ELEVATOR SHEARWALL AREA4
5 6000 PSI 3/4 PCD @ 28days 55 12/7/2019 10:00 PM 6TH FLOOR SLAB AREA 1
4 8000 PSI 3/8 FC @ 28days 4 07/13/2019 8:00 PM ELEVATOR SHEARWALL AREA1
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PROJECT: 8990 URBAN DECA ORTIGAS
PROJ. CODE: UDO308
BUILDING : N(2)
SUBJECT: CONCRETE SCHEDULE
JULY 15-20,2019
ONE WEEK LOOK AHEAD
SCHEDULE
No. DESIGN MIX QUANTITY (cu.m.) STRUCTURE/LOCATION
Date Time
1 6000 PSI 3/4 PCD @ 28days 60 07/15/2019 10:00 PM 6TH FLOOR SLAB AREA 2
2 8000 PSI 3/8 FC @ 28days 4 07/16/2019 8:00 PM ELEVATOR SHEARWALL AREA2
3 6000 PSI 3/4 PCD @ 28days 65 07/17/2019 10:00 PM 6TH FLOOR SLAB AREA 3
4 8000 PSI 3/8 FC @ 28days 4 07/18/2019 8:00 PM ELEVATOR SHEARWALL AREA3
5 6000 PSI 3/4 PCD @ 28days 70 07/19/2019 10:00 PM 6TH FLOOR SLAB AREA 4
4 8000 PSI 3/8 FC @ 28days 4 07/20/2019 8:00 PM ELEVATOR SHEARWALL AREA4
PLEASE NOTE THAT THE ABOVE ORDERS ARE SUBJECT TO CHANGE DEPENDING ON SITE CONDITIONS.
CHECKED BY:
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket
PUMPCRETE
concrete bucket