FIELD INSULATION RESISTANCE TEST RECORD

PROJECT NAME :
LOCATION :
NAME OF BUILDING : SITE ADMIN OFFICE BUILDING - 2F MEASURING INSTRUMENT
PANEL NAME : LMCP-D01-04 (N) NAME OF INSTRUMENT
MEASURING DATE MAKER
WEATHER FINE TYPE AND NUMBER 3005A
TESTED BY INSTRUMENT REGISTER NO. W0368527
CHECKED BY
MEASURING SCOPE INSULATION RESISTANCE ( MΩ )
CIRCUIT NO. OF
PHASE TO PHASE PHASE TO NEUTRAL PHASE TO EARTH RESULT
NO. POLE BREAKER NAME/ NUMBER CABLE SIZE
R-S S-T R-T R-N S-N T-N R-E S-E T-E N-E
1 1P+N EXF-01-20 (0.25KW) XLPE/SWA/LSFH 2 x 4mm2 - - - OL - - OL - - OL GOOD
+E. CU/LSFH 1 x 4mm2
2 3P EXF-01-21 (0.55KW) XLPE/SWA/LSFH 4c x 4mm2 OL OL OL - - - OL OL OL - GOOD
+E. CU/LSFH 1c x 4mm2
3 1P+N INF-01-20 (0.37KW) XLPE/SWA/LSFH 2 x 4mm2 - - - - OL - - OL - OL GOOD
+E. CU/LSFH 1 x 4mm2
4 3P+N Spare - - - - - - - - - -
5 1P+N MD-18 XLPE/SWA/LSFH 2 x 2.5mm2 - - - - OL - - OL - OL GOOD
+E. CU/LSFH 1 x 2.5mm2
6 1P+N MD-19 XLPE/SWA/LSFH 2 x 2.5mm2 - - - OL - - OL - - OL GOOD
+E. CU/LSFH 1 x 2.5mm2
7 3P+N Spare - - - - - - - - - -
8 3P+N Spare - - - - - - - - - -

OL : OVER LIMIT
RESULT : GOOD
COMMENTS :-
INSPECTION BY WITHNESS BY CHECK BY APPROVED BY

Date : Date : Date : Date :