Documente Academic
Documente Profesional
Documente Cultură
Page 1 of 4
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 320 GC EXCAVATOR KTN
Configuration: 320 GC Excavator KTN00001-UP (MACHINE) POWERED BY C4.4 Engine
i06943948
Specification
Table 1
"Swing Speed and Swing Drift on a Slope"
Swing Time (seconds)
Item New Service Limit Actual
Right Swing
3.5 or less 4.6 or less
Left Swing
Swing Drift mm (inch)
Item New Service Limit Actual
Right Swing
0 0
Left Swing
Introduction
Measuring the swing speed on a slope will determine if there is a need to check the swing motor and
the anti-reaction valve. Measuring the swing drift on a slope will determine if there is a need to check
the swing parking brake.
Note: The engine speed and/or the machine configuration that is used during this test can affect the
results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 7/14/2019
320 GC Excavator KTN00001-UP (MACHINE) POWERED BY C4.4 Engine(M008523... Page 2 of 4
the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks" for
the machine configurations that were used for this test.
Note: The relief valve pressure settings must be set to the relief valve pressure specification before
performing this operational check. Refer to Testing and Adjusting, "Specifications".
Required Tools
Table 2
Required Tools
Description Qty
Measuring Tape 1
Stopwatch 1
Test Procedure
Swing Speed on a Slope
Illustration 1 g06192050
3. Position the implements at maximum reach and close the work tool. Position the work tool
above the ground so that the work tool will not come in contact with any obstacles.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 7/14/2019
320 GC Excavator KTN00001-UP (MACHINE) POWERED BY C4.4 Engine(M008523... Page 3 of 4
Illustration 2 g06192085
4. Position the upper structure at position (A). The upper structure should be at a 90 degree angle
to the lower structure. Refer to Illustration 2.
5. Measure the time that is required to swing the upper structure from position (A) to position (B).
6. Position the upper structure at position (C). The upper structure should be at a 90 degree angle
to the lower structure.
7. Measure the time that is required to swing the upper structure from position (C) to position (B).
1. Position the upper structure at position (A). The upper structure should be at a 90 degree angle
to the lower structure. Refer to Illustration 2.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 7/14/2019
320 GC Excavator KTN00001-UP (MACHINE) POWERED BY C4.4 Engine(M008523... Page 4 of 4
Illustration 3 g06236078
(D) Upper frame
(E) Undercarriage frame
(F) Marking
2. To indicate the relationship of the two positions, put a mark (F) on the inner race and the outer
race of the swing bearing. Refer to Illustration 3.
4. Leave the machine in this position for 3 minutes. Measure the swing drift on the circumference
of the swing bearing.
6. Position the upper structure at position (C). The upper structure should be at a 90 degree angle
to the lower structure. Refer to Illustration 2.
Copyright 1993 - 2019 Caterpillar Inc. Sun Jul 14 13:13:41 UTC+0700 2019
All Rights Reserved.
Private Network For SIS Licensees.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 7/14/2019