Cost In % of well
Cost Group Thousands costs
Pre-drill survey, including sea bed cores 145,000
Post-drill survey using ROV to certify sea bed clear 100,000
Rig mob/demob 270 5.1
Rig positioning 8 0.2
Casing 570 10.8
Well heads 180 3.4
Rig costs 1400 26.6
Drilling Equipment rental 50 0.9
Fishing Tools 9 0.2
Drill bits 140 2.7
Mud 220 4.2
Cementing 170 3.2
Electric Logging 320 6.1
MWD 14 0.3
20" Casing
13 3/8" Casing
9 5/8" Casing.
cost in
Fixed thousands
Total
cost in
Daily items thousands
Rig 165,000
Drilling Equipment Rental 31,500
Mud logging 5,000
Supply Boats
Standby Boats
Helicopters
Diving/ROV
Storage onshore Transport
Contract staff
Base Office O/H
MWD
Total
cost in
Fixed items thousands
Total
% of well
costs
160 4
270 5.1
570 10.9
180 3.4
140 2.7
170 3.2
320 6.1
60 1.1
100 1.9
1970 38
1400 26.6
50 0.9
160 3
370 7
160 3
212 4
130 2.5
26 0.5
250 4.8
41 0.8
14 0.3
3053 58
Cost group
Fixed
Site survey
Rig mob demob
well head
conductor and casing
rock bits
core heads and services
cementation
transport
electric logging
disposal
accommodation
well engineering
daily item
Rig rates
Mud engineering
mud logging
fuel
tool rental
water supply
site supervision
site geologist
overheads
Pressure Gradients
Depth
Pressure in
Formation BRT mts BRT in ft BMSL mts BMSL in ft Pressure PPG
Sea Level 20 66 0 0 0
Padang (Loss circulation) 874 2867 852 2795 1,297.30 8.70
Lalang (sst interval) 1272 4172 1250 4100 2,128.10 9.81
Lalang (sst interval) 1371 4497 1349 4425 2,265.10 9.69
Riau Sandstone 1509 4950 1487 4877 2,239.90 8.70
Riau Sandstone 1543 5061 1521 4989 2,290.40 8.70
Riau Sandstone 1673 5487 1651 5415 2,483.40 8.70
Riau Sandstone 1727 5665 1705 5592 2,593.50 8.80
Minas formation 1864 6114 1842 6042 2,766.90 8.70
Minas formation 1881 6170 1859 6098 2,692.10 8.39
Minas formation 1957 6419 1935 6347 2,904.90 8.70
Formation Tops
Lime packstone.
Production in Lalang
D enhanced by
extensive fracture
1890 150 Minas porosity.
Black fetid shales with
disseminated pyrite
throughout. High
source potential. Data
1930-1980 200 Pekanbaru from Lalang D
9.2
Pore Pore
Pressure Equivalent Fracture pressure
psi/ft Mud Weight Pressure grad
Column E 900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
Pressure Gradients
Pressure Gradients
Depth
Pore Equivalen
Pressure Pressure t Mud Fracture
Formation BRT mts BRT in ft Pressure in PPG psi/ft Weight Pressure
1000
2000
Depth in ft
3000
Pore Pressure psi/ft
4000
Fracture Pressure in MWT
5000
6000
7000
On Downwards
176.7277
292.5276
489.1264
568.3843
804.1408
916.5183
Phases
Pre-spud preparation
Drilling top hole
Run and set surface casing
drill
core
drill
Cement Calculations
Surface
Cement Calculations
13 3/8" cas17" Hole 100% excess