Sunteți pe pagina 1din 45

-6-

Drilling
COB-114 Drilling

Drilling Phases Summary

26” HOLE SECTION


185 m MDRT to 659 m MDRT

02/ 04 February 2003

The CP N-8 shoe was collapsed, but was recover in September.

So it was decided to run a BHA to control with a R.C.J. bit at 185m, after pulled out
same, they ran a magnet but no metallic pieces were found.

It was decided to run a BHA with a 26” bit to wash down without rotation up to 185m. A
new stearable BHA was run with a motor bent at 1.83°. After attempted to pass the shoe from
181m to 185m with a WOB= 2/5t, it was pulled out to run a new BHA to washed down 1000l/mn,
250Psi and tagged the obstruction at 185m.

At this stage they decided to run a Taper Mill, hanged up at 177.60m and milled from this
depth to 189m. A new stereable BHA was ran to 189m without obstructions; they make a Gyro
and drilled to 191.70m. At this depth, as a result of high torque they decided to run a BHA with a
magnet, some few pieces of 30” casing were recovered. A new BHA was run with 26” bit rerun
for finally pass over casing and drill out to 210m.

A new BHA with a motor/sleeve 25”3/4 was ran, and drilled formation in sliding mode
taking gyro survey every 10m up to 315m, taking 3.70° inc and an azimuth of 141.28°, they
spaced out gyro survey 29m apart then 85m, sliding and rotating to the Total Depth of this
phase at 659m.

17½” HOLE SECTION


659m MDRT to 2160m MDRT

15 February to 28 February 2002

The directional 17”1/2 BHA with a PDC bit was made up and ran in hole to the top of
cement at 615m. The cement was drilled out to the casing shoe at 649m, the pocket washed
and 1 meter of new formation drilled prior the L.O.T.

The maximum pressure reached was 360 Psi for an Equivalent Mud Weight of 1.42 SG.

Then the hole was drilled to 1501m without any problem as per directional drillers
instructions. A bottom up circulation was performed prior a wiper trip to the shoe. While running
in hole only the last stand was circulated to clean the bottom. The bit continued up to 2008 m
where the rate of penetration was null. The bit was pulled out in back reaming mode from
2008m to 1947m then “wet” to the surface. The bit was in very bad shape.

6-2
COB-114 Drilling

A new BHA with a rock bit was picked up and made up then ran in hole to 1942m where
they must wash down to bottom. This bit reached TD at 2160m as per directional driller
instructions.

A wiper trip to 1881m and a “hole clean” circulation on the bottom were performed prior
to pull out the string to run the 13”3/8 casing.

The 13”3/8 casing shoe was set and cemented at 2153m without difficulties.

The new BOP’s were nipple up and tested before to pick up the 12”1/4 BHA.

12¼” HOLE SECTION


2160 m MDRT to 3190 m MDRT

01 March 2003 to 15 March 2003

After resolving the problem of inability of the wear bushing passing through the BOP
stack, the 12¼” BHA was made up and run in hole to drill out the cement and float collar from
2116 m to the shoe at 2153m.

The pocket, from 2153 to 2160m, was washed and 5 meter of new formation drilled prior
the F.I.T. The maximum pressure reached was 1938 Psi to give an Equivalent Mud Weight
equal to 1.93 SG.

Then the hole was drilled with a PDC BIT to 2614m without any problem as per
directional drillers instructions. A bottom up circulation was performed prior a wiper trip to the
shoe. While running in hole only the last stand was circulated to clean the bottom. The bit
continued up to 2776 m. The directional driller build up the angle up to 33°13. At this depth
because of a slow rate of penetration, the bit was pulled out in back reaming mode from 2776m
to 2584m then “wet” to the surface.

A new BHA with a new motor setting (1.22) was picked up and made up then ran in hole
to 2776m. This bit reached 3105m as per directional driller instructions, building up angle to
44°37. At this step, because of new provisional formation harder and a slow rate of penetration,
they pulled out this bit.

A new BHA with a rock bit and a new motor setting (0°00) was picked up then ran in hole
to 3105m where the hole was washed down to the bottom. This bit reached TD of this phase at
3190m as per directional driller instructions to reach a drift of 42°03.

The 9”5/8 casing was run and land at 3186m where it was cemented.

6-3
COB-114 Drilling

8½” HOLE SECTION


2190 m MDRT to 4117 m MDRT

22 March 2003 to 02 April 2003

A 8 ½” BHA was run to tag the cement at 3096m and to drill it out to the shoe at
3186m.

The drilling progressed from 3190m to 350m as per the Directional Drillers instructions.
Losses were recorded at 3240m, up to 7m3/hr were recorded; a 20m3 LCM pill was spotted in
response, the losses were stabilized at 2m3/h then the drilling was resumed to 3454m. The bit
was pulling out due to an over time rotation.

A new PDC bit 8½” with a new motor set bent (1.15°) was run in hole, losses were 2.5
m/hr and increased to 8 m3/hr at shoe 3190m. At 3364m, 7m3 of LCM were spotted in response
and the bit pulled back in the casing shoe.

Many LCM pills were set to cure the losses, but it was impossible to stop them, so it was
decided to drill ahead as soon as they were reduced to 2 m3/h.

6-4
COB-114 Drilling

8”½ HOLE SECTION


4730 m MDRT to 4941 m MDRT

04 January 2003 to 19 january 2003

The BHA #17 was run with a PDC bit to drill out the cement and to continue in the
formation. Once on bottom it was very difficult to rotate with the top drive which one was
stopped many times due to very high torque (> 4000 m*kg). So it was decided to pull out this
BHA to include a motor to be able to slide if it was not possible to rotate even the BHA out of the
casing.

With the same bit in the BHA #18 it was possible to drill in sliding mode the cement, the
shoe at 4720m and the formation to 4868m. But the torque was still too high to rotate so the
directional driller cannot keep the angle and this BHA was pull out to remove the stabilizers.

The new BHA #19 was made up with an insert bit and no stabilizer, once on bottom it
was possible to rotate with a normal torque around 2000 m*kg. In normal conditions, drilling
continued to 4936m where mud losses were detected. Making a flow check, the losses were
established to 6m3/h in static, it was decided to continue drilling but at 4941m the losses
reached 12m3/h while circulating and the decision to plug them was taken. It was impossible to
maintain a stable static level but, after spot 5 LCM pills, losses at 600/ 800l/h were considered
as acceptable prior to run the E-logs.

Five E-logs runs were planned: the first (APS-HNGS-MDT) was made in TLC mode ; the
second was the VSI, made inside the 5”DP ; the third one was the AIT-FMI-DSI-E ; the fourth
was the FMI-GR-DSI-AITC ; the fifth was the FMI-GR-DSI-EMS.

The new BHA #20 was decided to continue drilling to 4991mTD lossing 4m3/hr. Running
liner 7” to 4575m losing 6m3/hr. Running Completion string tubing 4.5” to 4608m monitoring on
trip tank losses 6.3m3/hr. Completion job.

6-5
COB-114 Drilling

Drilling Activities Summary


04 Feb. 2003 Install bell nipple - M/up BHA - Slip 11m of drilling line - RIH to 185m - Tag bottom, Drop
ball - Take above 0.5m core – POOH - M/up magnet w/ same string and RIH to 180m
circ 5mn w/1000 l/mn - Tag bottom twice - POOH magnet - M/up BHA 26” same string -
RIH to 180m – Cont. wash down to 185m, @ 181m - Pull out to surface - L/down jar +
bit sub and P/up new BHA w/ motor, RIH.

05 Feb 2003 Cont. M/up BHA, RIH to 180m - Attempt to pass shoe @181-185m - Hang up 184.39m -
POOH and M/up new BHA - RIH same to 174m - Wash down and Tag obscuration @
185m - P/up and attempt to work string - POOH 26” Bit f/ 185m to 30m – B/out and
L/down orienting sub f/ valve-motor - P/up taper mill assy and RIH same to 160m.

06 Feb 2003 Wash down f/ 155m & Take parameters - Hang up 177.6m & Mill to 178m - Electrical
repair on TDS due to vibration – Cont. milling to 178.90m - Repair electrical cable on
TDS due to vibration - Milling f/ 178.9m to 179.95m - Maintenance TDS - Milling f/
179.75m to 180.8m - P/up 1 5”HWDP - Repair bolts broken on pipe Mandrel due to
vibrations - Milling f/ 180.8m to 180.90m.

07 Feb 2003 Cont. milling f/ 180.6m to 182.5m - Stop milling due to TDS repairing - Resume milling
to 186.80m - Maintenance TDS and add single 5”HWDP - Milling f/ 186.8m to 189m -
POOH Taper mill f/ 189m to 77m – P/up 1 5”HWDP and 1 X-over above 8”¼DC and
hydro jar - Control 2 stabilizers and Taper mill - L/down Taper mill and RIH bit sub to
27m - Maintenance TDS – B/out bit sub + pony + 1stab + 26” Bit.

08 Feb 2003 Cont. L/out milling BHA - Clean and clear rig floor – M/up 26” drilling Assy & RIH to
132m - RIH 2 stds HWDP & L/out same from single drilling - RIH to 188m: no
obstruction - Break circ. - PJSM prior to rig up Schlumberger wire-line equipment - Gyro
data & take survey – R/down Schlumberger - Take parameters and Slide f/ 188m to
191.7m - L/down 1 HWDP - POOH 26” bit to surface and L/down same – P/up 1 X-over
and 2 5”HWDP – B/out orienting sub - RIH magnet and tag bottom w/ 5 tons - POOH
magnet and L/down same – P/up 26” Bit + Bit sub + Stab - RIH to 35m.

09 Feb 2003 M/up BHA & RIH - Rotate f/ 191.7m to 210m & back-ream 2 std twice - PJSM - POOH &
L/out BHA to 10m - L/down 26” std - M/up 2 9”½ DC - L/down bit & bit sub - P/up motor
+ float sub + orienting sub + sleeve + 26” bit - Adjust Ben Housing 1.15° and orienting
sleeve - RIH 26” bit f/ 130 to 210m - Tag bottom w/ 5 tons – R/up equipment for Gyro -
Sliding f / 210m to 225m and run Gyro survey every single drilled.

10 Feb 2003 Slide f/ 225m to 280m taking Gyro survey every single drilled - Rotate f/ 280m to 299m
- Resume sliding f/ 299m to 315m & Drill f/ 315m to 329m - Take Gyro survey – Cont.
rotating f/ 329m to 358m, Take Gyro - Slide and rotate f/ 358m to 471m taking Gyro
surveys.

11 Feb 2003 Slide and rotate f/ 471m to 650m section TD, taking Gyro surveys every 3 stds drilled -
Circulate 12000 Strks - POOH 26” Bit f/ 659m to 175m (659 to 605m: 5-10t over-pull;
605 to 491m: 10-20t over-pull) - Pump out f/ 491m to 175m; 285m: 20t over-pull -RIH f/
175 to 659m: OK – Circ. w/ mud 1.14 to hole clean - Displace hole w/ 1.20 SG
bentonitic mud.

12 Feb. 2003 POOH 26” Bit f/ 659m to surface and B/out same - Nipple down Bell Nipple & Riser and
L/out on Tender – P/up Weatherford Csg equipment & R/up same - P/up 20” Csg shoe
and RIH to 649m filling up Csg string every 3 Jnts.

6-6
COB-114 Drilling

13 Feb. 2003 PJSM & L/out Weatherford Csg tong - Power pack and clear rig floor – R/up 5”
elevators & plate - PJSM prior to run stinger - RIH with Stinger, Tag float collar, Space
out - Install cement head – R/up cement line, Flush through with seawater - Install low
Torque and Elbow to cement head, Test line 2000Psi - Circulate SW w/ rig pumps via
cmt line-good returns - Start cement job: Pump 20m3 of spacer with rig pumps; perform
cement operation as per TFE procedure, cmt returns confirmed & displaced – B/out and
L/out circulating head - POOH 3 stds of 5” DP; circulate @ 105spm = 2000l/min. OK;
POOH 19 stds 5” - L/out jnt #48 + PJ + Csg head - Rig skidding - PJSM prior to move
Tender - R/down Schlumberger - P/up wire-line cabin – L/down 20” Csg material - R/up
material wire-line in progress.

14 Feb. 2003 Press test line to 3000Psi: OK, Press test riser + Flow head: 3000Psi - R/up lubricator +
pop, Install on flow head, Press test to 3000Psi: OK - R/down, open Swab, RIH,
Retrieve SCSSV, Pulling tool - L/out SCSSV + valve GRX 3", RIH, Retrieve junk catcher
to surface - R/up and RIH w/ 3"1/2 slick plug, Equalize PRONG and PLOG, POOH to
surface - M/up 3"6.5 pulling Prong, RIH, Latch on, Pull 212 slick plug wait 15 mins - Pull
to surface, L/out plug, R/up SCSSV, RIH, Set at 151m - R/down surface equipment on
long string - Install short string (Cob_107) - Press test riser to 3000Psi and flow head,
Install lubricator and pulling tool, Press test to 3000 Psi: OK - RIH and Recover SCSSV,
Pull to surface, L/down same - RIH and Recover Junk Catcher, Pull to surface, L/down
same, M/up Prong equalizing, pull plug - Set safety valve - Empty riser and clear rig
floor - L/down riser - Prepared skidding – Skidding - P/up riser 4"1/4, Install flow head -
Test riser to 3000 Psi, Install and test SAS to 3000Psi – Wire-line, Set injection valve,
Pull basket, Equalized Prong - Set safety valve - R/down Wire-line equipment

15 Feb. 2003 Clear rig floor of Schlumberger equipment, L/out flow head and riser - PJSM, Prepare
rig for skidding - Skid rig f/ COB105 to max south prior to move equipment , Move
tender platform - Remove slick line K-winch w/ tender crane, Move Schlumberger
electric cable f/ tender to platform, Make rig safe after operation - Skid rig to COB114,
Secure rig - PJSM, P/up riser, Nipple up riser + BOP's + C&K lines, Bell nipple complete
- R/up and test csg - Attempt press test (leak at kill line connection), Investigate leak,
Repair same, Test cmt line= 2000Psi, Test 20" csg and Blind rams = 500/1500Psi - Test
assy w/ tester cup 20" - Test annular on Cup 20"= 500Psi/5min, 1000Psi/15min - Test 5"
Rams and valve C&K lines= 500Psi/5min, 1500Psi/15min - Pull out 3 stds DP5" and
tester cup - Test I-BOP and lower I-BOP= 500Psi/5min, 1500Psi/15min - Install wear
bushing - Change saver sub on pipe handler - Change sleeve on motor, M/up bit 17"1/2
- P/up mouse hole, L/down 2 x 9"1/2 DC - Pick up power pulse + MNDC + Stab

16 Feb. 2003 Cont. M/up 17 ½” BHA - M/up orienting sub & data orientate UBHO - M/up 8”DC &
9½”DC - Stop M/up BHA & L/out jar + 3 x 6½”DC + 8”DC on tender - P/up from tender &
RIH jar and 2 x 8¼” DC – Cont. RIH with 5” HWDP & DP to 600m and take parameters -
Wash down & tag cement @ 615m,drill out same & clean out pocket to 659m - Drill 1m
of new formation to 660m & back ream stand, Wash back down to 657m & displace hole
with 1.22 SG OBM - Circulate to homogenize mud - Fill cmt line & test to 2200Psi -
Perform LOT - Drilling from 660m to 678m - Install Schlumberger for Gyro and perform
Gyro survey - Resume drilling f / 678m to 800m.

17 Feb. 2003 Drilling f/ 800m to 925m - Lost of power on top drive - Pull back to 910m - Circulate
while Electrician investigation and repair same - Work sting ensure free - Continue
drilling as per directional drillers instructions f / 925m to 1108m.

18 Feb. 2003 Drilling as per directional driller instructions f / 1108m to 1501m

19 Feb. 2003 Circulate hole clean (Q= 3100l/mn, SPP= 3200Psi) - Flow check and POOH f/ 1501m to
625m for wiper trip. - Make well safe, Monitor well on trip tank, Contruction radioactive
source operation - Slip 10m drill line, Test and Reset Crown o Matic - RIH f/ 625 to
1473m - Wash down f/ 1473m to TD, Take parameter and SCR, Tag at 1501m -
Rotating f/ 1501m to 1528m - Sliding f/ 1528m to 1539m - Rotate drill f/ 1539 to 1669m -
Sliding f/ 1669 to 1679m - Rotate f/ 1679 to 1753m.

6-7
COB-114 Drilling

20 Feb. 2003 Cont. to rotate drill f/ 1753m to 1865m - Slide f/ 1865m to 1875m - Rotate drill f/ 1875m
to 1892m - Slide f/ 1892m to 1897m - Rotate drill f/ 1897m to 1921m - Slide f/ 1921m to
1926m - Rotate drill f/ 1926m to 1949m - Slide f/ 1949m to 1956m - Rotate drill f/ 1956m
to 1967m (f/ 1965m to 1967m: difficulties to drill: stack motor and hight torque)

21 Feb. 2003 Cont. rotating f/ 1967m to 1977m - Slide f/ 1977m to 1982m - Rotate drill f/ 1982m to
2004m - Slide f/ 2004m to 2005m – Bell Nipple leaking, Pull 1 std to 1978m and work
string, repair Bell nipple leak and test prior to drill - Cont to Slide f/ 2005m to 2008m -
Work string w/ 1600l/mn - Back reaming f/ 2008m to 1947m - POOH f/ 1947m to
1325m, Pump slug (4m3), POOH f/ 1325m to 623m - Flow check, POOH f/ 623m to top
of BHA - Flow check, POOH BHA and PDC bit 17” ½ - L/out bit + motor - PJSM, Repair
Bell nipple leak.

22 Feb. 2003 M/up 17”1/2 motor + Float sub + Stab + Shot NMDC - Scribe motor (1.22 Bend), Install
and M/up Sleeve 17”1/2 - M/up bit + MWD power pulse, Test same - M/up O/sub 8”1/4
DC + jar + HWDP, RIH 5” DP to shoe @= 659m - Cont. RIH in open hole f/ 659m to
1942m - Wash and ream f/ 1942m to 2005m - Take MWD survey, Wash down, Tag
bottom at 2008m - Break in new bit, Rotate f/ 2008m to 2013m - Slide f/ 2013m to
2018m - Rotate f/ 2018m to 2033m - Slide f/ 2033m to 2039m - Rotate f/ 2039m to
2060m - Slide f/ 2060m to 2069m - Rotate f/ 2069m to 2089m - Slide f/ 2089m to 2100m
- Replace pipe handler locked sensor on top drive, Investigate on break problem -
Rotate f/ 2100m to 2116m - Slide f/ 2116m to 2122m.

23 Feb. 2003 Slide f/ 2122m to 2128m - Rotate f/ 2128m to 2160m - Work string and circ. B/up, Flow
check - POOH f/ 2160m to 1881m, Back ream f/ 1977m to 1949m - RIH back to Btm,
Circ. hole clean - Flow check, POOH f/ 2160m to 1859m - Pump slug (4m3), POOH f/
1859m to 650m - Flow check, POOH f/ 650m to 250m (Top of BHA) - Flow check,
POOH BHA - L/down 1x9"1/2DC + Orienting sub + 1xNMDC 9"1/2 + Power pulse -
L/down BHA + Bit.

24 Feb. 2003 Cont. L/out 17"1/2 BHA to tender - Clean and Clear rig floor for safety - Attempt to pull
wear bushing, No success, R/back running tool, RIH to well head, Flush, Work string
15/ 18 mns, POOH, Run back w/ running tool, Enlarge on Wear bushing, Retrieve -
B/out running tool, L/out same - Change out bails to 500 tons bails, M/up Lafleur + XO
to TDS, Install 500 tons elevators P/up, Spot Weatherford power pack, R/up mounted
slips and power tong - PJSM, P/up shoe joint, Check function, M/up float collar, Break
circ. - P/up and RIH 13"3/8 csg string, Fill each joint to 332m - Change Weatherfoerd
valve (clean rig floor) - P/up and RIH 13"3/8 csg f/ 332m to 648m - Circ. 55 m3 mud (Q=
1600l/mn, SPP= 300Psi) - P/up and RIH 13"3/8 csg f/ 648m to 1000m - Circ. 10 m3
mud (Q= 1600l/mn, SPP= 400Psi) - P/up and RIH 13"3/8 csg f/ 1000m to 1071m

25 Feb. 2003 Cont. RIH w/ 13"3/8 csg to 1500m - Break circ. 20m3 : Q= 1500l/mn, SPP= 200Psi -
Cont. RIH f/ 1500m to 2153m filling every joint, RIH w/ circ. f/ 2130m to 2153m - L/down
Weatherford head - Install Cmt head, Test line to 5000Psi, PJSM - Cic. 180m3, Started
pumping slowly - Pump 30m3 Pre-spacer @ 1600 l/mn - Cement job, Pump 64.6m3 of
Gel cmt (d= 1.5 sg), Pump 21.5m3 of Gel cmt (d= 1.90 sg) - Displacement w/ rig pump
(10350 strokes), Final pressure = 950Psi - W.O.C. Check return on Trip tank

26 Feb. 2003 Wait on cement - Empty riser - Cut casing - Nipple down BOP’s.

27 Feb. 2003 Nipple up and Test BOP's

28 Feb. 2003 Test BOB - M/up new BHA.

01 Mar. 2003 P/up 3 x 8”DC - Run to 61m - Test motor - RIH BHA and DP to 2000m - Slip and cut
drilling cable - RIH to 2115m, tag float collar, drill out cement to 2160m (shoe at 2153m)
- Drill formation f/ 2160m to 2165m, Circ. B/up, Test line and Perform a FIT: EMW= 1.93
- Drill formation: Rotating= 2165/ 2167m, 2172/ 2194m, 2204/ 2214m; Sliding= 2167/
2172m, 2194/ 2204m.

6-8
COB-114 Drilling

02 Mar. 2003 Drilling as per directional driller instructions: Rotating= 2214/ 2222m, 2236/ 2250m,
2262/ 2278m, 2288/ 2306m, 2316/ 2418m; Sliding= 2222/ 2236m, 2250/ 2262m, 2278/
2288m, 2306/ 2316m, 2418/ 2419m

03 Mar 2003 Drilling as per directional driller instructions: Sliding= 2419/ 2435m, 2446/ 2455 m,
2475/ 2490m, 2512/ 2531m, 2540/ 2549m; Rotating= 2435/ 2446m, 2455/ 2475m,
2490/ 2512m, 2531/ 2540m

04 Mar 2003 Drilling as per directional driller instructions: Sliding= 2549/ 2558m, 2568/ 2614m –
Rotating= 2558m/ 2568m - Circulation Bottom up at 2900l/mn - Wiper trip to shoe -
Maintenance TDS - RIH to bottom (2614m) – Resumed drilling as per directional driller
instructions: Rotating= 2614/ 2623m; Sliding= 2623/ 2629m.

05 Mar 2003 Drilling as per directional driller instructions: Sliding= 2629/ 2641m, 2651/ 2669m, 2681/
2697m, 2710/ 2725m; Rotating= 2641/ 2651m, 2669/ 2681m, 2697/ 2707m, 2707/
2710m, 2725/ 2729m.

06 Mar 2003 Drilling as per directional driller instructions: Rotating= 2726/ 2740m, 2754/ 2766m,
2772/ 2774m; Sliding= 2740/ 2754m, 2766/ 2772m, 2774/ 2775m - Circulation bottom
up – POOH to Csg shoe - Flow check and Pump slug (3 x 2m3) – Cont. POOH.

07 Mar 2003 POOH BHA to surface, L/down bit - P/up new bit + new motor - RIH BHA w/DP to
2121m - Slip 11m of drilling line - RIH BHA to bottom - Drilling as per directional driller
instructions: Sliding= 2776/ 2782m, 2798/ 2809m; Rotating= 2782/ 2798m, 2809/
2816m.

08 Mar 2003 Drilling as per directional driller instructions: Rotating= 2816/ 2830m, 2838/ 2924m,
2929/ 2947m; Sliding= 2830/ 2838m, 2924/ 2929m

09 Mar 2003 Drilling as per directional driller instructions: Rotating= 2947/ 3040m, 3042/ 3043m;
Sliding= 3040/ 3042m

10 Mar 2003 Drilling as per directional driller instructions: Rotating= 3043/ 3050m, 3054/ 3098m –
Sliding= 3050/ 3054m

11 Mar 2003 Drilling from 3098m to 3105m - Pump 3m3 low vis, 5m3 heavy pill and Circ. same, Flow
check - POOH to 2300m, Pump slug, POOH to shoe, Flow check - Maintenance TDS -
POOH, Flow check, L/down single, Cont. POOH to surface - L/down bit#10 with bit#11 -
RIH BHA, M/up Monel + Power pulse + bent sub (0 deg), Beak circulation, check MWD
- RIH with DC and HWDP filling up every 20 stds, Break circulation at top of BHA and
RIH to shoe w/DP - Slip drilling cable - RIH in open hole.

12 Mar 2003 RIH to 3012m - Reaming f/ 3012 to 3105m - Drilling f/ 3105m to 3127m.

13 Mar 2003 Drilling f/ 3127m to 3140m

14 Mar 2003 Drilling f/ 3152m to 3164m, Circ. 2500 l/min, 4100 Psi, Gas increase to 20.37%, Flow
check: OK - Drilling f/ 3165m to 3177m.

15 Mar 2003 Drilling f/ 3177m to 3188m, Repaired on pump #2 and#3 - Drilling f/3188m to 3188m.
Drilling f/ 3188m to 3190m (TD) - Circulated 2400 l/mn -Circulated 3m3 low vis pill ,
follow up 5m3 heavy pill, Flow check - Wiper trip to 2153m - Circulate B/up, Max gas =
3.14%.

16 Mar 2003 Circulate out 3m3 low-vis pill, follow up with 5m3 heavy pill – Flow check OK, POOH to
2600m, Pump slug 6m3 - POOH from 2600m to 2131m, Flow check= OK - POOH from
2131 to 286m top of BHA - Flow check= OK - POOH BHA wet - L/down NMDC + Power
pulse + bit 12 ¼” + 2 x 8” SNMDC - POOH BHA & L/down Monel + stabilizer + motor -

6-9
COB-114 Drilling

Clean floor/ housekeeping - SPJD prior R/up equipment and logs - R/up Schlumberger
equipment - Run tools to 3190m, logs DSL f/ 3190 to 2700m - A &TC GR f/ 3190m to
2153m - POOH tools – R/down tools.

17 Mar 2003 Run 9”5/8 csg f/ 588m to 1200m – Fill up each joint - @1200m, Circulated 45m3 OBM –
Cont. to run 9”5./8 csg f/ 1200 to 2180m.

18 Mar 2003 Run 9”5/8 csg f/ 2120m to 2146m - Circulate at 1800l/m - Run 9”5/8 csg f/ 2146m to
2800m - Circulate B/up at 1500 l/mn , Max gas= 10% - Run 9”5/8 csg f/ 2800m to
3186m - Release long bail elevator, B/down fill up tool “Lafleur” - M/up cement head,
connect 2” lines x 2, P/up to m/d weight - Circulated 160m3 OBM to condition mud (1.5
bottoms up) 1500 l/mn, Max gas= 6% - PJSM w/ crew and all supervisors prior to
cement job - Rig pump 30m3 of pre-flush (1.58sg), Followed up by 10m3 Dowell water
base spacer, 1.65 SG - Test cement line @ 5000Psi - Drop bottom plug - Dowell pump
33.3m3 of cement (1.90sg), Drop top plug, Dowell displace w/ 1.59m3 of fresh water -
Rig pumps displace w/ sea water - 2650 Psi end pressure, no bump - Bleed off casing
pressure, Volume return 1400l - WOC: control annulus w/ 200 Psi, monitor casing on
trip tank. .

19 Mar 2003 WOC - S.P.J.M.- Bleed off annulus pressure, open annulus, flush riser and BOP stack
w/ sea water, Bleed off platform - Disconnect riser f/ spool, P/up 13”3/8 BOP + riser and
secure same - Remove bottom guides under spider elevator, release cement head over
9”5/8 csg - Pull 9”5/8 csg and set on slips w/ 80t above cement - Attempt to release
slips of spider elevator, Stuck on csg joint, investigation in progress - Continue to
attempt to release spider slips from 9”5/8 csg= no success - Change out bails and
install slings on elevators - Install csg cutting tool on 9”5/8 csg - Cut 9”5/8 csg 16cm
above 13”5/8 flange w/ 9T over-pull - P/up and confirm cut (OK) and R/down cutting
equipment to rig floor – R/up cutting equipment and cut 9”5/8 csg under elevators –
L/out slips w/ cut csg to tender - PSSM and risk assessment – L/out remaining landing
string and clear rig floor – B/ out bottom riser adaptor and L/out same – R/up csg spool
and prepare well head, install same.

20 Mar 2003 Nipple up 11”csg spool + csg head 9”5/8, Tight belt, Pressure test= 5000 Psi - N/up
BOP stack and riser on casing head - Tightening flange and clamps, Install 2 wing
valves on csg head - Remove check valves on emergency kill line and kill line – B/down
BOP tool - M/up test assy w/ tester cap 9”5/8 - SPJM prior to pressure testing BOP -
Pressure test BOP: Test I: well head, rams, 5h upper inlet valves kill and choke, 300 Psi
and 5000Psi; Test II = annulus 300Psi and 3000Psi - B/down assy tester cap, M/up assy
tester plug - Pressure test 5” p/rams, 2 7/8 x 5” variables, choke line and kill line, BOP
valves, mud hose, 300Psi and 5000Psi - B/out assy - Leave test plug and test shear
rams via choke line, 1000Psi, 2000Psi, 3000Psi - Pull tester plug assy and L/out same -
M/up wear bushing R/tool - RIH and set wear bushing - Pull R/tool, B/out and L/out
same - Clean rig floor - PJSM - RIH w/ 5 x 8”1/4DC + 1 x 8” jar + 3 x 6”1/2DC - B/out,
clean and protect threads, L/out on tender.

21 Mar 2003 Test Manifold and pipe manifold at 5030 Psi – M/up 8”1/2 BHA - Test Motor/ MWD and
P/up 5”HWDP - RIH BHA to 840m – Working on TDS – Cont. RIH 2705m.

22 Mar 2003 RIH f/ 2705m to 3096m - Tag cmt at 3096m, Wash down, Confirm depth w/ 3t WOB -
POOH 1 stand, Rack same, slip 15m of drill line- RIH to 3096m and drill out cement to
3182m, Pump 5m3 hi-vis pill each 10m, Start to displace sea water w/ mud f/ 3176m to
3182m and Circulate until mud return to surface - Drill out shoe @ 3183m, Clean pocket
to 3190m, Flow check= OK – SPR record @ 3190m -Circulate through choke manifold
to check lines, Flow check= OK - Circulate B/up, Max gas= 8.8% - Drill 8”1/2 hole,
sliding f/ 3190m to 3250m - Experience losses @ 3240m= 7m3/hour - Pump 20m3 LCM
and Circulate – Sliding= 3192/ 3197m, 3202/ 3207m, 3212/ 3217m, 3222/ 3227m, 3232/
3237m, 3242/ 3248m, Rotating= 3197/ 3202m, 3207/ 3212m, 3217/ 3222m, 3227/
3232m, 3237/ 3242m, 3248/ 3250m.

6-10
COB-114 Drilling

23 Mar 2003 Drill f/ 3250 to 3271m, losses 8m3/hr – Gain 2m3, Flow check, Circ. B/up - Spot 7m3
LCM, Flow check no losses, POOH to shoe - Circulate, well stable - RIH to bottom - Drill
f/ 3271 to 3309m - Circulate Maxi gas= 15%, losses= 2m3/hr - Drill f/ 3309 to 3418m,
Max gas= 10%, Losses= 2m3/hr – Sliding= 3346/ 3351m, 3361/ 3366m, 3375/ 3380m,
3391/ 3396m, 3405/ 3411m; Rotating= 3338/ 3346m, 3351/ 3361m, 3366/ 3375m, 3380/
3391m, 3396/ 3405m, 3411/ 3418m.

24 Mar 2003 Drill f/ 3418 to 3454m, losses 2m3/hr - POOH to 9”5/8 shoe - Circulate B/up at shoe –
Flow check 15’, losses 2.5m3/hr - POOH bit to surface pipes wet - POOH f/ 2342 to
290m - Flow check on trip tank, losses= 2.5m3/hr - POOH BHA to surface, L/down
motor + ARC + bit - Clean & clear rig floor for safety - PJSM & P/up new 8”½ BHA, Set
motor @1.15° & RIH - Shallow test motor & MWD – Cont. RIH w/ 5”DP & HWDP.

25 Mar 2003 Continue RIH w/ 5”HWDP to 942m, top BHA, changed jar and landing sub positions in
BHA - RIH w/ 5”DP f/ 942m to 9”5/8 shoe @ 3185m, Fill up string each 600m - L/down
single, P/up 1 pop joint - Slip 9m drill line and cut excess - Circulate w/ TF on high side,
8m3/hr losses - RIH to 3366m, 8m3/hr losses - Spot 7m3 LCM, Displace at 800l/mn
max - POOH bit above 9”5/8 shoe at 3193m - Orientate TF on high side, install safety
valve & injection hose on top of string - Repair I-BOP valve on TDS, circulate at
800l/mn, 2.5m3/hr losses - Function test I-BOP: OK - RIH to 3425m - Break circulation,
wash, ream & work through full hole - Take SCRs - Drill 8”1./2 f/ 3475m to 3480m as per
directional driller instructions: Rotating: 3454/ 3470m, 3472/ 3478m, Sliding: 3470/
3472m, 3478/ 3480m.

26 Mar 2003 Drilling f/ 3480m to 3519m as per directional driller instructions: Rotating: 3480/ 3483m,
3500/ 3503m - Mud losses: f/ 2.5m3 to 3.2m3/h - Rotate drilling f/ 3519m to 3524m -
Pump 13m3 LCM and displace - Flow check losses 7m3/h - POOH f/ 3524m to 3188m.
Flow check losses 4m3/h - POOH f/ 3188m to 2435m - Flow check on trip tank 8m3/h -
RIH f/ 2435m to 3163m - Monitor well and Repair Bell nipple leak - Fill well – Cont. RIH
f/ 3163m to 3367m.

27 Mar 2003 Spot 7m3 LCM @ 3366m, displacement 1500l/mn and 800l/mn, Flow check: Losses =
6m3/hr - POOH to 9”5/8 csg shoe - Flow check: Losses= 6m3/hr - Mix LCM - RIH to
3366m - Spot 7m3 LCM pill - POOH to shoe - Flow check: Losses= 5m3/hr - POOH
from shoe to top HWDP – Flow check: Losses= 5.7m3/hr while tripping - Circulate to
clean and check MWD – Flow check: Losses= 4.5m3/hr - POOH 21 stands HWDP + jar
- Rack BHA + Power pulse + NMDC, B/out bit + stabilizer – L/out same - M/up new
BHA, M/up bit + motor & Adjust stabilizer - Test motor + function test Andergauge, Set in
7”¾ position - P/up ARC w/ new memory, RIH, Scribe memory – Cont. RIH w/ MWD &
NMDC - Test MWD – Cont. RIH at controlled speed w/ HWDP, jar and 5”DP - Fill string
every 600m to 3164m - Flow check: Losses= 6.5m/hr - Slip 13m drilling line - Losses
while RIH = 18-19m3/hr.

28 Mar 2003 RHI f/ shoe 9”5/8 to 3366,m - Fill up string - Spot 8m3 of LCM pill - Flow 1500 l/min to
800 l/min - POOH to shoe 9”5/8. - Orientate GTF on hight side, Circulate B/up: mud
losses 3m3/hr - RIH to bottom, Ream 2 last stands to bottom @=3524m - Drilling f/
3524m to 3652m, Losses = 2.5m3/hr.

29 Mar 2003 Drilling (rotary and sliding) f/ 3652m to 3785m.

30 Mar 2003 Drilling (rotary and sliding) f/ 3785m to 3833m – Circ. B/up at 1800 l/mn - Flow check:
Losses= 2m3/hr - POOH bit f/ 3833m to 3169m - Flow check: Losses= 2m3/hr -
Continue POOH to top of BHA - Flow check: Losses= 2.5m3/hr - POOH 5”HWDP and
5”DP – L/down MWD + Motor + Stab + Bit - Clean rig floor for safety - Prepare to P/up
new BHA – P/up MWD tool repaired, confirm communication to Unit - RIH MWD – P/up
ADN with 8”¼ Stab. and M/up to string confirm communication to HMIT - Clear rig floor -
P/up and install Radio Active source in AND tool, RIH.

6-11
COB-114 Drilling

31 Mar 2003 Run BHA with 2 stands 5”DP to 100m, Circulate - Test MWD - Run 30 stands of 5”DP to
942m, F/up string - Run with 5”HWDP to 1106m – R/up and M/up Hydro jar -RIH with 5”
HWDP to 1190m and with 5”DP to csg shoe, F/up string every 600m - Slip 10m of
drilling line, Adjust and check Crow-o-matic - General greasing on TDS - RIH in open
hole, Ream last stand, Tag bottom at 3833m - Flush bottom 3 times, make up bit with 4T
- Drilling f/ 3833m t 3934m as per directional driller instructions rotary and sliding.

01 Apr 2003 Drilling as per directional driller instructions rotary and sliding f/ 3934m to 4001m - MWD
failure - MWD representative fault find - Circulate reciprocate pipe – Cont. fault find
MWD Failure: no success – Cont. drilling f/ 4001m to 4058m, Losses= 2.2m3/hr.

02 Apr 2003 Cont. Drilling f/ 4058m to 4117m - Circulate for geological sample - Flow check and
POOH f/ 4117m to 3964m - Back reaming f/ 3964m to 3195m for AND Logging - Flow
check at shoe: Losses= 1.5m3.

03 Apr 2003 RIH f/ 3195m to bottom - Circulate B/up, Losses 2m3/hr - Flow check on TT: Losses=
2.3m3/hr - POOH to 3163m, Flow check and cont. POOH to 941m (top of BHA) – Cont.
POOH to top of DC - Recover nuclear source – L/down 6”½ NMDC - Dump AND and
ARC memories, L/down Power pulse + ARC + STAB + Float sub + Motor + Bit - Install
TLC bushing - Prepare and P/up material in Schlumberger basket – R/up Logging tool -
Install Sheave Schlumberger in mast - Tools function test.

04 Apr 2003 Cont. with function tests of Schlumberger tools - Install X-over, hold PJSM and Risk
assessment for radio active source, erect safety barriers - Install radioactive source -
RIH with 5”DP to 2776m - RIH to 3067m, Circulate every stand 1000 l/mn due to
inclination – P/up one string stab + side entry sub, Connected 1 stand of 5”DP - Install
sheave - RIH PWCH for tool testing, attempt to latch: no success. POOH PWCH at
2800m and RIH PWCH with circulation - Attempt to latch - POOH PWCH at 2800m and
RIH same - Attempt to latch: no success - POOH PWCH at 2800m and RIH same,
Latch: OK - Disconnected and POOH PWCH at 200m - Disconnected 1 stand 5”DP and
side entry sub - Control PWCH on surface - RIH wet connector in pumping -
Disconnected and POOH PWCH at 200m - Disconnected 1 stand 5”DP + side entry sub
+ stab - POOH logging tools f/ 3067m to 2834m.

05 Apr 2003 POOH w/ Schlumberger logging tools to surface as per program, Monitor TT: Losses= 2
m3/h - Risk assessment, Clear rig floor, Schlumberger rep. remove radioactive source -
POOH logging tools - Schlumberger fault find tool failure, Monitor well on TT: Losses= 2
m3/h - Change out logging tool to back up tool, Function test same - Risk assessment,
Clear rig floor, Erect barrier, Schlumberger rep. install radioactive source - RIH to
3067m logging string as per program, Fill up string every 10 stds (drift all 5"DP).

06 Apr 2003 Cont. RIH f/ 3067m to 3096m. Slip 19m drilling line, Reset Crow-o-matic, Circulate 1000
l/min - P/back 1 std - Install stab + side entry sub, R/up lower sheave - Schlumberger
RIH - Latch to wet PWCH, Function test: Bad connection found between tools - Unlatch
PWCH and pull to surface - Disconnect side entry sub, L/out PWCH and lower sheave -
POOH w/ 5”DP f/ 3067m to 2863m, Circulate at 1000 l/min - Cont. POOH w/ 5”DP to
2716m - Install string stab - M/up PWCH, Function test, Install side entry sub, RIH.
PJSM - Install clamp on cable side entry sub, Pull test to 3000 lbs - RIH logging string to
3297m - POOH logging string f/ 3297m to 2778m - Unlatch PWCH and POOH PWCH to
200m.

07 Apr 2003 PJSM, Schlumberger cont. POOH w/ PWCH, L/out side entry sub + Stab + Lower
sheave. Flow check, POOH f/ 2778m to logging tool then surface - PJSM, Risk
assessment, Clear rig floor, Schlumberger rep - Remove radioactive source monitor well
on TT: Losses= 2m3/hr - B/out and L/out all Schlumberger logging tool and send to
tender – Clean and clear rig floor for safety, RIH 5”DP to 145m prior to change out rams
for well control purpose - PJSM, Install VBR 4”½x7”, Continue fill up the well - POOH 5
stds 5”DP - Recover wear bushing - P/up and RIH test assy - Modification test assy -
Test BOP to 500 and 5000 psi - L/down test assy, Install XO and hose for TDS testing -

6-12
COB-114 Drilling

Test rotary nose + upper I-BOP + lower I-BOP to 500 and 5000 psi - Reinstall wear
bushing.

09 Apr 2003 Install wear busing, POOH R/ tool, L/out same - M/up 8”½ assy (Bit + Near Bit + 1 x 6”½
DC), RIH - P/up ARC, M/up to string, MWD rep. Program ARC tool - M/up Power pulse
to ARC, Check communication - Cont. RIH MNDC + 1 std 5”DP, Commence shallow
test MWD - Cont RIH w/ 5”HWDP to 3060m, Filling pipes every 600m - Draw work
water cooling pipe work broken, Isolated draw work and change out, Monitor well on TT:
Losses= 2m3/hr - Cont RIH to 3167m, Connect TDS - Hold PJSM, Slip and cut drill line,
Reset Crow-o-matic, Clean and clear rig floor - Reaming f/3178m to 3330m - RIH f/
3330m to 3375m - Reaming f/ 3375m to 3867m.

10 April 2003 Clean and clear rig floor for safety, PJSM prior Schlumberger job - P/up Schlumberger
logging tool and function test - Fault finding, (probe failed) - P/up tool string and remove
faulty probe - M/up probe to string and function test: OK - RIH logging tool and 5" DP,
filling every stands to 2345m, Average losses 2.5m3/hrs. - PJSM prior RIH logging
string from 2345m to 2450m, with drift 2.5”, Back Flow - Circulation at 2450m: 1000l/mn
SPP 4000psi - RIH logging tools from 2450 to 2798m, Back Flow - Circulation to cure
unbalanced well 2000 l/mn, SPP 1300psi - RIH from 2798m to 3062m, Fill up string
every 5 Stds - RIH PWCH, Circulation as per Schlumberger instructions, Latch on, Test
tool functions - Pull test on cable setting with 3000 lbs – Cont. RIH logging tools from
3062 to 3355m, fill up string every 5 stds.

11 April 2003 PJSM, Cont. Schlumberger logging operation f/ 3355 to 4110m - Circulation at 4110m:
Q= 1200l/mn, SPP= 850psi - Flow check, POOH Schlumberger logging tools taking
pressure reading - Excessive back flow, Connect TDS, Circ.: Q= 1200l/mn, SPP=
850psi - Clean and Clear rlg floor for safety – POOH logging tools and pressure test as
per Schlumberger instructions f/ 4012m to 3476m (Connect TDS every std for back
flow)

6-13
COB-114 Drilling

Bit Record

BIT Nb 1 2 3 4R 5R 6R

Diameter In 26” 26” 26” 26” 26” 26”

BHA Nb 10 11 12 11 14 15

Bit maker Security Security W-ford Security Security Secutity

Bit type S3SJ4 XN1C Taper mill XN1C 3SJ4 XN1C

Serial Nb 742648 742648 350 742648 734854 742648

Nozzles /32’ 3x24+1x22 3x24+1x22 3x24+1x22 Open 3x24+1x22

TFA In2 1.6966 1.6966 1.6966 3.1416 1.6966

IACD code 1-1-1 1-1-1-S 1-1-1-S 1-1-1 1-1-1-S

Depth IN m 184 185 177.6 188 191.7 210

Depth OUT m 186 185 189 191.7 210 659

Meters drilled m 2 0 11.4 3.7 18.3 449

Pumping time hr 0.82 1.5 36.9 2.74 7.3 30.5


Time ON
hr 0.55 1 20 2.0 5.35 26.1
bottom
Average ROP m/hr 3.6 0.6 1.8 3.4 17.2
WOB
T 0.5 0.5 0.1/0.5 2.5 1/3.5 1/5
min/Max
Flow Maxi l/mn 1500 1200 1000 2400 2000 3500

SSP Maxi Psi 250 255 140 600 250 1750

RPM min/Maxi 35 35 52 39 35 436

Cumul RPM krev 86 21 682


1-2-WT-G-
Grading 6-4-NO-TD
Comments

6-14
COB-114 Drilling

BIT Nb 7 8 9 10 11

Diameter In 17”1/2 17”1/2 12”1/4 12”1/4 12”¼

BHA Nb 18 19 20 21 22

Bit maker VAREL HUGHES VAREL HUGHES HUGHES

Bit type SKS76 MX1 MKS59G2 MXC 18 NX28DX

Serial Nb CP6642B IL63JX CP6669C C71DH G90DX


3 x Open + 3 x 24 +
Nozzles /32’ 9 x 18 9 x 16 3x22
1 x 22 1 x 16
TFA In2 2.2365 2.7274 1.7667 1.5217 1.1136

IACD code 1-1-1 4-1-7 5-2-7

Depth IN m 659 2008 2160 2776 3105

Depth OUT m 2008 2160 2776 3105 3190

Meters drilled m 1349 152 616 329 85

Pumping time hr 103.6 26.8 117 87.4 83.1


Time ON
hr 72.7 13.0 82.9 73.6 72.2
bottom
Average ROP m/hr 18.6 11.7 7.4 4.5 1.2
WOB
T 1/ 10 1/ 6 1/ 8 5/ 20 2/ 16
min/Maxi
Flow Maxi l/mn 3500 2900 2850 2600 2500

SSP Maxi Psi 3560 3500 4100 4150 4100

RPM min/Maxi 170/ 260 170/ 260 70/ 130 70/135 70/135

Cumul RPM krev 1116 172 554 381 363


5-8-BT-A-X- 2-1-WT-A-1- 0-2-BT-G-X- 3-8-BT-C-E- 1-2-BT-G-E-
Grading 2-CT-PR 0-NO-TD 2-JD-PR 6-LT-TQ 3-WT-TD
End of
Comments Slow ROP 17”1/2 TD Slow ROP Slow ROP
phase

6-15
COB-114 Drilling

BIT Nb 12 13 14 15

Diameter In 8”1/2 8”1/2 8”1/2 8”1/2

BHA Nb 23 24 25 26

Bit maker SMITH Christensen REED HUGHES

Bit type 10MFPSR HCM606 EHP51AK MX 20

Serial Nb MJ5331 56756 ER5501 6013114

Nozzles /32’ Open 6 x 16 Open 3 x 24

TFA In2 2.3562 1.1778 2.3562 1.3254

IACD code 4-3-7-X M-3-2-3 5-1-7-W 5-1-7

Depth IN m 3190 3454 3524 3833

Depth OUT m 3454 3524 3833 4117

Meters drilled m 264 70 309 284

Pumping time hr 43.5 16.2 54.9 64


Time ON
hr 24.3 13.4 37.6 39
bottom
Average ROP m/hr 10.6 5.2 8.2 7.3
WOB
T 2/ 8 2/ 4 2/ 12 2/ 12
min/Maxi
Flow Maxi l/mn 1900 1800 1850 1850

SSP Maxi Psi 2100 2200 2450 2450

RPM min/Maxi 160/ 270 160/ 260 160/ 280 160/ 280

Cumul RPM krev 568 342 762 877


3-5-BT-G-E- 0-2-WT-G-X- 4-8-LT-G-E- 1-1-WT-A-E-
Grading 2-LT-RIG 1-JD-TQ 3-BT-HR 1-NO-TD
Comments

6-16
COB-114 Drilling

Drilling Assembly Record

BHA Nb Phase diameter Bit diameter


10 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

LANDING SUB 6¼ 2 15/16 0.64 107.21

X -Over 6¼ 3 0.55 106.57

3XDC6”½ 6 5/16 2 7/8 0.61 27.77

X-Over 7 3/4 2¾ 0.89 78.25

DC8”¼ 8 3/16 2 13/16 9.35 77.36

JAR 8 3 9.79 68.01

3XDC8”¼ 8¼ 2 13/16 27.65 58.22

X-Over 23/4 7 3/4 0.93 30.57

2XDC9”½ 9½ 3 18.62 29.64

ORIENTING SUB 9½ 3.00 0.66 11.02

FLOAT SUB 9½ 0.55 10.36

Mud Motor 9½ 6.25 9.24 9.81

26”BIT 26” 0.57

6-17
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


11 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

LANDING SUB 6¼ 2 15/16 0.64 116.38

1HWDP 5” 3 9.18 115.74

X -Over 6¼ 3 0.55 106.57

3XDC6”½ 6 5/16 2 7/8 0.61 27.77

X-Over 7 3/4 2¾ 0.89 78.25

DC8”¼ 8 3/16 2 13/16 9.35 77.36

JAR 8 3 9.79 68.01

3XDC8”¼ 8¼ 2 13/16 27.65 58.22

X-Over 23/4 7 3/4 0.93 30.57

2XDC9”½ 9½ 3 18.62 29.64

ORIENTING SUB 9½ 3.00 0.66 11.02

FLOAT SUB 9½ 0.55 10.36

Mud Motor 9½ 2 7/825 9.24 9.81

26”BIT 26” 0.57

6-18
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


12 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

LANDING SUB 6¼ 2 15/16 0.64 107.20

1HWDP 5” 6½ 3 9.18 115.74

XO 6¼ 3 0.55 106.56

3XDC 6½ 6 5/16 2 7/8 9.26 87.50

XO 7 ¾- 2 3/4 0.89 78.24

DC 8¼ 6 5/16 2 7/8 27.7 87.50

JAR 8 3 9.79 68.00

3XDC 8¼ 8¼- 2 13/16 9.37 27.65

XO 7 ¾- 2 3/4 0.93 30.56

2 x DC 9½ 9 5/8- 3 1/16 18.61 29.63

ORIENTING SUB 9½ 37/8 0.66 11.02

FLOAT SUB 9½ 3” 0.55 10.36

Mud Motor 9½ 2 7/8 9.24 9.81

26”bit 26’ 0.57 0.57

6-19
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


13 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

LANDING SUB 6¼ 2 15/16 0.64 115.04

1HWDP 5” 6½ 3” 9.18 114.40

XO 6¼ 3” 0.55 105.22

DC 6½ 6 5/16 2 7/8 27.77 104.67

XO 7¾ 2¾ 0.89 76.90

DC 8¼ 8 3/16 2 13/16 9.35 76.01

JAR(new) 8” 3” 9.80 66.68

3XDC 8¼ 8¼ 2 13/16 27.65 56.86

BUMPER SUB 7¾ 3 1/16 1.50 29.21

XO 7¾ 2¾ 0.93 27.71

1DC 9½ 9 5/8 3 1/16 9.44 26.78

STAB 26” 9 3/4 3” 2.36 `17.34

1DC 9½ 9½ 3 1/8 9.17 14.98

STAB 26” 9 5/16 3” 2.30 5.81

PONY DC 9½ 9 5/8 2 3/4 0.58 3.51

BIT SUB 9½ 2 3/4 0.91 2.93

TAPER MILL 26” 8” 2 13/16 2.02 2.02

6-20
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


14 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

LANDING SUB 6¼ 2 15/16 0.61 116.37

1 HWDP 5” 6½ 3” 9.18 115.76

XO 6¼ 3” 0.55 106.58

3 x DC 6½ 6 5/16 2 7/8 27.77 106.03

XO 7¾ 2¾ 0.89 78.26

DC8¼ 8 3/16 2 13/16 9.35 77.37

JAR 8” 3” 9.80 68.02

3 x DC 8¼ 8¼ 2 13/16 27.65 58.22

XO 7¾ 2¾ 0.93 30.57

2 x DC 9½ 9 5/8 3 1/16 18.62 29.64

ORIENTING SUB 9½ 3 7/8 0.66 11.02

FLOAT SUB 9½ 3” 0.55 10.36

MOTOR 9½ 2 7/16 9.24 9.81

BIT 0.57 0.57

6-21
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


16 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

HWDP 5” 111.39

LANDING SUB 6¼ 2 15/16 0.61 111.39

1HWDP 5” 6½ 3” 9.18 110.78

XO 6¼ 3” 0.55 101.60

DC 6½ 6 5/16 2 7/8 27.77 101.05

XO 7¾ 2¾ 0.89 73.28

DC 8¼ 8 3/16 2 13/16 9.35 72.39

JAR(new) 8” 3” 9.80 63.04

DC 8¼ 8 3/16 2 13/16 27.65 53.24

XO 7¾ 2¾ 0.93 25.59

STAB 26” 9 5/16 3” 2.30 24.66

1DC 9½ 9 5/8 3 1/16 9.45 22.36

STAB 26” 9¾ 3” 2.36 12.91

1DC 9½ 9½ 3 1/8 9.17 10.55

BIT SUB 9½ 2 7/8 0.81 1.38

BIT 26” rerun 0.57 0.57

6-22
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


17 26” 26”
Total
le
n
Description O.D I.D Length
g
t
h

LANDING SUB 6¼ 2 15/16 0.61 116.51

1 HWDP 5” 6½ 3” 9.18 115.90

XO 6¼ 3” 0.55 106.72

3 x DC 6½ 6 5/16 2 7/8 27.77 106.17

XO 7¾ 2¾ 0.89 78.40

DC8¼ 8 3/16 2 13/16 9.35 77.51

JAR 8” 3” 9.80 68.16

3 x DC 8¼ 8¼ 2 13/16 27.65 58.36

XO 7¾ 2¾ 0.93 30.71

2 x DC 9½ 9 5/8 3 1/16 18.62 29.78

ORIENTING SUB 9½ 3 7/8 0.66 11.16

FLOAT SUB 9½ 3” 0.55 10.50

MOTOR 9½ 2 7/16 9.38 9.95

BIT 26” 0.57

6-23
COB-114 Drilling

BHA Nb Phase diameter. Bit diameter


18 17”1/2 17”1/2
Total
le
n
Description O.D I.D Length
g
t
h

Landing sub. 6’1/2 2”5/8 0.65 108.3

5” HWDP 6”5/8 3” 9.07 107.65

X/ O 6”1/4 3”1/4 0.83 98.58

2 x 8”1/4 DC 8” 2”7/8 18.58 97.75

Jar 8” 3” 9.75 79.17

3 x 8”1/4 DC 8” 2”13/16 27.65 69.42

X/ O 9”1/2 2”3/4 0.93 41.77

1 x 9”1/2 DC 9”1/2 3”1/8 9.17 40.84

Orienting Sub 9”1/2 3”7/8 0.66 31.67

NMDC 9”1/2 3” 9.42 31.01

MWD 9”1/2 3”1/2 8.51 21.59

NMDC 9”1/2 3”1/4 1.02 13.08

17” Stab. 9”1/2 3” 1.63 12.06

Float sub 9”1/2 3” 0.55 10.43

Mud Motor 9”7/16 2”3/8 9.38 9.88

17”1/2 Bit 8”3/4 0.50

6-24
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


19 17”1/2 17”1/2
Total
le
n
Description O.D I.D Length
g
t
h

Landing sub. 6’1/2 2”5/8 0.65 108.3

5” HWDP 6”5/8 3” 9.07 107.65

X/ O 6”1/4 3”1/4 0.83 98.58

2 x 8”1/4 DC 8” 2”7/8 18.58 97.75

Jar 8” 3” 9.75 79.17

3 x 8”1/4 DC 8” 2”13/16 27.65 69.42

X/ O 9”1/2 2”3/4 0.93 41.77

1 x 9”1/2 DC 9”1/2 3”1/8 9.17 40.84

Orienting Sub 9”1/2 3”7/8 0.66 31.67

NMDC 9”1/2 3” 9.42 31.01

MWD 9”1/2 3”1/2 8.51 21.59

NMDC 9”1/2 3”1/4 1.02 13.08

17” Stab. 9”1/2 3” 1.63 12.06

Float sub 9”1/2 3” 0.55 10.43

Mud Motor 9”7/16 2”3/8 9.38 9.88

17”1/2 Bit 8”3/4 0.50

6-25
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


20 17”1/2 17”1/2
Total
le
n
Description O.D I.D Length
g
t
h

17 x 5” HWDP 5” 3” 154.89 284.58

X/ O 6”1/4 3” 0.61 129.69

1 x 5” HWDP 5” 3” 9.14 129.08

X/ O 6”1/4 2”13/16 0.86 119.94

3 x 6”1/4 DC 6”1/4 2”13/16 27.72 119.08

X/ O 6”1/4 2”13/16 0.79 91.36

X/ O 7”1/4 3” 0.59 90.57

2 x 8” DC 8” 2”13/16 18.89 89.98

Jar 8” 3” 9.77 71.09

3 x 8”1/4 DC 8”1/4 2”13/16 28.33 61.32

NMDC 8” 3” 9.42 32.99

MWD 8” 3” 8.47 23.57

SNMDC 8” 3” 2.61 15.10

12”1/4 Stab. 8”5/16 2”13/16 2.45 12.49

Float sub 8” 2”13/16 0.46 10.04

Mud Motor 9”5/8 3” 9.24 9.58

12”1/4 Bit 0.34

6-26
COB-114 Drilling

6-27
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


21 17”1/2 17”1/2
Total
le
n
Description O.D I.D Length
g
t
h

17 x 5” HWDP 5” 3” 154.89 285.10

X/ O 6”1/4 3” 0.61 130.21

1 x 5” HWDP 5” 3” 9.14 129.56

X/ O 6”1/4 2”13/16 0.86 120.42

3 x 6”1/4 DC 6”1/4 2”13/16 27.72 119.56

X/ O 6”1/4 2”13/16 0.79 91.84

X/ O 7”1/4 3” 0.59 91.05

2 x 8”1/4 DC 8” 2”13/16 18.89 90.46

Jar 8” 3” 9.78 71.57

3 x 8” DC 8”1/4 2”13/16 28.33 61.79

NMDC 8” 3” 9.42 33.46

MWD 8” 3” 8.47 24.04

SNMDC 8” 3” 2.61 15.57

12”1/4 Stab. 8”5/16 2”13/16 2.45 12.96

Float sub 8” 2”13/16 0.46 10.04

Mud Motor 9”5/8 3” 9.72 10.05

12”1/4 Bit 12”1/4 0.34

6-28
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


22 12¼" 12¼"
Total
le
n
Description O.D I.D Length
g
t
h
Landing sub 6¼” 3” 0.65 131.47

1 x 5”HWDP 6¼” 2”13/16 9.14 130.82

X/ O 6¼” 2”13/16 0.86 121.68

3 x 6”½ DC 6¼” 2”13/16 27.72 120.82

2 x X-over 6”1/4 3” 0.59/0.79 93.10

3 x 8”DC 8” 2”13/16 18.89 91.72

Hydro jar 8” 3” 9.78 72.83

3 x 8”DC 8.25” 2”13/16 28.33 63.05

1 x 8”NMDC 8” 2”7/8 9.42 34.72

Power Pulse HF 8”15/32 2”7/8 8.47 25.30

2 x 8”SNMDC 8” 2”13/16 1.36/2.61 16.83

Stab 12”1/8 8”5/16 2”13/16 2.35 12.86

8” Float Sub 8” 3” 0.46 10.51

Motor (0.00 deg ) 9” 9.72 10.05

12 ¼” Bit 12”1/4 0.39

6-29
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


23 12¼" 12¼"
Total
le
n
Description O.D I.D Length
g
t
h
9 x 5”HWDP 5” 3” 86.40 304.53

Hydraulic jar 6 ½” 6”1/2 3” 9.86 218.13

18 x 5” HWDP 5” 3” 172.80 208.27

NMDC 6 ½” 6”1/2 2”13/16 9.60 35.47

Power pulse 6 ¾” 6”3/4 2”7/8 8.94 25.87

ARC 6” 6”1/2 2”13/32 6.00 16.93

Stabilizer 8”3/8” 6”1/2 2”13/16 1.76 10.93

Float sub 6½” 6”1/2 2”13/16 0.69 9.17

Motor (1°50) 8”3/8 8.08 8.48

8½” insert bit 8”1/2 2.25” 0.40 0.40

6-30
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


24 8½" 8½"
Total
le
n
Description O.D I.D Length
g
t
h
8 x 5”HWDP 5” 3” 73.23 941.68

Landing sub 6”1/4 2”5/8 0.65 868.45

1 x 5”HWDP 5” 3” 9.17 867.80

JAR 6”1/2 3” 9.86 858.63

18 x 5”HWDP 6”1/2 3” 164.03 848.77

69 x 5” DP 6”9/16 3” 649.88 684.74

1 x 6”½NMDC 6”1/2 3” 9.05 34.86

Power Pulse 6”7/8 2.8125 8.85 25.81

ARC-6 6”7/8 2.812 5.85 16.96

8”1/4 Stab 6”9/16 2.8125 1.95 11.01

Float sub 6”1/2 2.75 0.69 9.06

Motor (1.15°) 6”3/4 8.08 8.37

8½” Bit 8”1/2 0.29

6-31
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


25 12¼" 12¼"
Total
le
n
Description O.D(m) I.D(m) Length
g
t
h
8 x 5”HWDP 5” 3” 73.23 942.59

Landing sub 6”1/4 2”5/8 0.65 868.45

1 x 5”HWDP 5” 3” 9.17 867.80

JAR 6”1/2 3” 9.86 858.63

18 x 5”HWDP 5” 3” 164.03 848.77

69 x 5”DP 5” 3” 649.88 684.74

1 x 6”½NMDC 6”1/2 3” 9.05 34.86

Power Pulse 6”7/8 2”13/16 8.85 25.81

ARC-6 6”7/8 2”13/16 5.85 16.96

8”1/4 Stab 6”9/16 2”13/16 2.89 11.92

Float sub 6”1/2 2”3/4 0.69 9.06

Motor (1.15°) 6”3/4 8.08 8.37

8½” Bit 8”1/2 0.26

6-32
COB-114 Drilling

BHA Nb Phase diameter Bit diameter


26 8 ½” 8½”
Total
le
n
Description O.D I.D Length
g
t
h
8 x 5”HWDP 5” 3” 73.23 1199.78

Landing sub 6”1/4 2”5/8 0.65 1126.55

1 x 5”HWDP 5” 3” 9.17 1125.90

JAR 6”1/2 3” 9.86 1116.73

18 x 5”HWDP 5” 3” 164.03 1106.87

96 x 5”DP 5” 3” 902.17 942.84

1 x 6½”NMDC 6.5 3” 9.05 40.67

AND w/ 8”1/4 STAB 4”5/8 2”3/4 6.19 31.62

ARC-6 6”7/8 2”13/16 6.33 17.10

8.25 Stab 6”9/16 2”13/16 1.76 10.77

Float sub 6”1/2 2”3/4 0.69 9.01

Motor (1.15°) 6”3/4 8.08 8.32

8½” Bit 8.5 0.24

6-33
COB-114 Drilling

Mud Record

26” Hole

Date 05/ 02 06/ 02 07/ 02 08/02 09/ 02 10/ 02 11/ 02

No rapport 13 14 15 16 17 18 19

Depth 186 186 185 191 225 471 659

Type Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly

M.W.
1.04 1.05 1.05 1.05 1.07 1.14 1.14
(sg)

F.V. 65 63 66 85 55 56 61

P.V. 16 15 13 14 12 10 14

Y.P.
30 30 40 40 26 30 34
(lbs/100ft2)
Gel 0
15 14 18 19 12 16 16
(lbs/100ft2)
Gel 10
25 25 27 32 21 26 32
(lbs/100ft2)

Fann 600 62 60 66 68 66 58 62

Fann 300 46 45 53 54 53 43 48

Fann 200 43 42 48 50 48 39 43

Fann 100 38 37 40 38 40 32 35

Oil/ Water
- - -
(%)
HPHT Filt .
- - -
(ml/30mn)
Sand
-
(%)

6-34
COB-114 Drilling

17”1/2 hole

Date 17/ 02 18/ 02 19/ 02 20/ 02 21/ 02 22/ 02 23/ 02

No rapport 25 26 27 28 29 30 31

Depth 969 1336 1599 1947 2008 2120 2160

Type Carbo-drill Carbo-drill Carbo-drill Carbo-drill Carbo-drill Carbo-drill Carbo-drill

M.W.
1.12 1.23 1.22 1.23 1.25 1.30 1.30
(sg)

F.V. 76 85 80 80 70 78 80

P.V. 38 39 40 40 44 45 44

Y.P.
22 23 22 20 18 20 20
(lbs/100ft2)
Gel 0
25 21 18 18 14 19 18
(lbs/100ft2)
Gel 10
49 50 49 50 50 51 50
(lbs/100ft2)

Fann 600 98 101 102 100 106 110 108

Fann 300 60 62 62 60 62 65 64

Fann 200 45 44 43 44 46 49 48

Fann 100 31 29 27 29 28 30 30

HPHT Filt .
3.0 3.8 3.6 4.0 3.5 3.3 3.2
(ml/30mn
Water
24 23 23 23 22 21 21
(%)
Oil
59 61 61 60 61 62 62
(%)
Solids
17 16 16 17 17 17 17
(%)

6-35
COB-114 Drilling

12”¼ hole

Date 01/ 03 02/ 03 03/ 03 04/ 03 05/ 03 06/ 03 07/ 03 08/ 03 09/ 03

No rapport 37 38 39 40 41 42 43 44 45

Depth 2213 2405 2461 2623 2721 2776 2808 2915 3018

Type Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill

M.W.
1.35 1.34 1.35 1.35 1.39 1.40 1.45 1.50 1.55
(sg)

F.V. 97 100 83 73 94 105 78 84 94

P.V. 38 40 38 39 46 45 49 48 50

Y.P.
20 23 23 19 22 25 22 22 24
(lbs/100ft2)
Gel 0
16 18 19 15 21 24 26 26 28
(lbs/100ft2)
Gel 10
37 41 44 43 48 51 52 50 54
(lbs/100ft2)

Fann 600 96 103 99 97 114 115 120 118 124

Fann 300 58 63 61 58 68 70 71 70 74

Fann 200 41 41 42 38 43 52 43 51 56

Fann 100 26 36 26 19 29 33 29 32 35

HPHT Filt .
2.8 3.1 2.8 2.6 2.4 2.8 3.2 2.8 2.6
(ml/30mn
Water
21 21 18 16 16 16 16 16 17
(%)
Oil
61 62 64 66 64 63 63 62 59
(%)
Solids
18 17 18 18 20 21 21 22 24
(%)

6-36
COB-114 Drilling

12”1/4 hole

Date 10/ 03 11/ 03 12/03 13/03 14/ 03 15/03 16/03 17/03 18/03

No rapport 46 47 48 49 50 51 52 53 54

Depth 3077 3100 3127 3152 3177 3190 3190 3190 3190

Type Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill Carbo-Drill

M.W.
1.55 1.55 1.55 1.55 1.58 1.58 1.58 1.58 1.58
(sg)

F.V. 72 72 76 71 74 64 67 64 67

P.V. 44 47 48 41 42 40 40 40 40

Y.P.
21 20 20 22 20 16 15 15 14
(lbs/100ft2)
Gel 0
23 25 23 22 22 15 14 14 14
(lbs/100ft2)
Gel 10
49 54 49 46 47 36 36 36 35
(lbs/100ft2)

Fann 600 109 114 116 104 104 96 95 95 94

Fann 300 65 67 68 63 62 56 55 55 54

Fann 200 49 49 47 44 41 39 39 39 38

Fann 100 31 29 29 27 26 24 23 23 22

HPHT Filt .
2.6 3.7 2.7 2.6 2.6 2.4 2.6 2.6 2.6
(ml/30mn
Water
15 13 18 18 19 18 18 18 18
(%)
Oil
61 62 82 82 81 82 82 82 82
(%)
Solids
24 25 23 25 26 26 25 25 25
(%)

6-37
COB-114 Drilling

8”1/2 hole

Date 22/ 30 23/ 03 24/ 03 25/ 03 26/ 30 27/ 03 28/ 03 29/ 03

No rapport 58 59 60 61 62 63 64 65

Depth 3250 3418 3454 3480 3524 3524 3652 3785

Type Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly Gel/Poly

M.W. 1.05 1.05 1.05 1.05


1.03 1.04 1.05 1.05
(sg)

F.V. 53 64 64 61 61 61 69 60

P.V. 16 21 22 18 18 18 20 21

Y.P.
18 26 24 22 22 22 25 22
(lbs/100ft2)
Gel 0
4 5 5 4 4 4 6 4
(lbs/100ft2)
Gel 10
9 8 9 7 7 7 12 7
(lbs/100ft2)

Fann 600 50 68 68 58 58 58 65 64

Fann 300 34 47 46 40 40 40 45 43

Fann 200 25 38 37 32 32 32 36 34

Fann 100 18 25 25 21 21 21 26 22

HPHT Filt .
5.4 6 6 6 5 5 5 5
(ml/30mn
Water
97 96 95 96 96 96 96 96
(%)
Oil
--- --- --- --- --- --- --- ---
(%)
Solids
3 4 5 4 4 4 4 4
(%)

6-38
COB-114 Drilling

8”1/2 hole

Date 30/ 03 31/ 03 01/ 04 02/ 04

No rapport 66 67 68 69

Depth 3833 3934 4058 4117

Type Gel/Poly Gel/Poly Gel/Poly Gel/Poly

M.W.
1.06 1.05 1.06 1.06
(sg)

F.V. 61 59 60 60

P.V. 24 20 20 20

Y.P.
24 20 20 20
(lbs/100ft2)
Gel 0
2 4 3 3
(lbs/100ft2)
Gel 10
7 6 5 5
(lbs/100ft2)

Fann 600 72 60 60 60

Fann 300 48 40 40 40

Fann 200 38 29 20 29

Fann 100 26 20 19 19

HPHT Filt .
5 5 4.3 4.3
(ml/30mn
Water
96 96 96 96
(%)
Oil
--- --- --- ---
(%)
Solids
4 4 4 4
(%)

6-39
COB-114 Drilling

Deviation Record: 26” section


MD Incl Azim TVD TVD VSec N/-S E/-W DLS
(m) (°) (°) (m RKB) m MSL (m) (m) (m) (°/30m)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23.70 0.06 99.81 23.70 -3.30 -0.01 -0.00 0.01 0.08
33.10 0.24 32.44 33.10 6.10 0.00 0.01 0.03 0.71
43.10 0.26 5.30 43.10 16.10 0.04 0.05 0.04 0.36
52.70 0.27 355.34 52.70 25.70 0.08 0.10 0.04 0.15
62.20 0.25 23.92 62.20 35.20 0.12 0.14 0.05 0.41
71.80 0.16 23.52 71.80 44.80 0.14 0.17 0.06 0.28
81.40 0.17 8.11 81.40 54.40 0.16 0.20 0.07 0.14
90.90 0.18 19.25 90.90 63.90 0.19 0.23 0.08 0.11
100.50 0.16 358.33 100.50 73.50 0.21 0.25 0.08 0.20
110.10 0.19 6.41 110.10 83.10 0.24 0.28 0.08 0.12
119.70 0.24 24.46 119.70 92.70 0.27 0.32 0.09 0.26
129.30 0.24 23.73 129.30 102.30 0.30 0.35 0.11 0.01
138.80 0.29 17.71 138.80 111.80 0.33 0.39 0.12 0.18
148.40 0.31 347.92 148.40 121.40 0.38 0.44 0.13 0.49
158.00 0.53 315.18 158.00 131.00 0.44 0.50 0.09 0.99
167.60 1.30 316.57 167.60 140.60 0.58 0.61 -0.02 2.41
171.80 1.64 315.79 171.80 144.80 0.68 0.69 -0.09 2.43
193.00 1.00 46.10 193.00 166.00 1.20 -1.20 1.20 0.00
202.00 0.99 37.69 202.00 175.00 1.40 -1.30 1.30 0.20
212.00 0.93 67.18 212.00 185.00 0.80 -1.4 1.4 0.46
221.00 1.07 91.04 221.00 194.00 -0.00 -1.4 1.6 0.48
229.00 1.39 105.5 229.00 202.00 -0.6 -1.4 1.8 0.55
243.00 2.49 127.52 243.00 216.00 -1.5 -1.1 2.2 0.88
257.00 2.89 126.72 257.00 230.00 -1.7 -0.2 3.3 0.30
272.00 3.2 133.02 271.90 244.90 -2.2 -0.8 3.3 0.30
287.00 2.94 130.84 286.90 259.90 -2.5 -0.3 3.9 0.19
300.00 3.36 141.78 299.90 272.90 -3.5 -0.8 4.4 0.56
314.00 3.79 141.28 313.90 286.90 -4.0 -1.5 4.9 0.24
330.00 3.69 139.44 329.80 302.80 -4.6 -2.3 5.6 0.08
345.00 4.04 139.4 344.80 317.80 -5.2 -3 6.2 0.25
360.00 3.02 136.55 359.80 332.80 -5.6 -3.7 6.8 0.69
374.00 2.35 138.04 373.80 346.80 -6.2 -4.2 7.3 0.48
384.00 2.24 135.44 383.80 356.80 -6.3 -4.5 7.5 0.15
394.00 2.03 133.33 393.70 366.70 -6.3 -4.8 7.8 0.22
403.00 1.84 133.73 402.70 375.70 -6.5 -5 8 0.21
412.00 1.77 129.83 411.70 384.70 -6.2 -5.2 8.2 0.16
421.00 1.89 129.78 420.70 393.70 -6.4 -5.3 8.5 0.13
430.00 1.76 126.73 429.70 402.70 -6.2 -5.5 8.7 0.18
439.00 1.85 123.66 438.70 411.70 -5.9 -5.7 8.9 0.15
448.00 2.13 121.19 447.70 420.70 -5.8 -5.9 9.2 0.32
467.00 1.94 129.22 466.70 439.70 -7.3 -6.2 9.7 0.17
477.00 1.89 132.32 476.70 449.70 -8.0 -6.5 10 0.12
486.00 1.91 130.68 485.70 458.70 -7.9 -6.7 10.2 0.06
496.00 2.07 130.41 495.70 468.70 -8.1 -6.9 10.5 0.16

6-40
COB-114 Drilling

MD Incl Azim TVD TVD VSec N/-S E/-W DLS


(m) (°) (°) (m RKB) m MSL (m) (m) (m) (°/30m)
505.00 2.16 129.92 504.70 477.70 -8.3 -7.1 10.7 0.10
515.00 2.18 129.11 514.70 487.70 -8.4 -7.3 11 0.03
524.00 2.28 128.45 523.70 496.70 -8.4 -7.6 11.3 0.11
534.00 2.38 126.96 533.70 506.70 -8.4 -7.8 11.6 0.11
543.00 2.33 127.8 542.70 515.70 -8.8 -8 11.9 0.07
553.00 1.35 128.88 552.60 525.60 -9.2 -8.2 12.2 0.98
562.00 1.29 127.15 561.60 534.60 -9.0 -8.4 12.3 0.08
571.00 1.24 130.16 570.60 543.60 -9.7 -8.5 12.5 0.09
581.00 0.83 118.12 580.60 553.60 -7.2 -8.6 12.6 0.46
590.00 0.64 112.35 589.60 562.60 -5.8 -8.6 12.7 0.12
599.00 0.57 104.15 598.60 571.60 -3.8 -8.7 12.8 0.12
608.00 0.59 109.17 607.60 580.60 -5.1 -8.7 12.9 0.06
618.00 0.75 103.88 617.60 590.60 -3.80 -8.7 13 0.17
627.00 0.92 101.96 626.60 599.60 -3.30 -8.8 13.1 0.19
636.00 1.02 100.31 635.60 608.60 -2.90 -8.8 13.3 0.11
645.00 1.22 100.55 644.60 617.60 -2.90 -8.8 13.5 0.22

6-41
COB-114 Drilling

Deviation Record: 17”1/2 section


MD Incl Azim TVD TVD VSec N/-S E/-W DLS
(m) (°) (°) (m RKB) m MSL (m) (m) (m) (°/30m)
669.00 1.52 91.5 668.00 641.00 -0.40 8.90 14.00 0.15
683.00 2.07 122.25 682.60 655.60 -9.10 -9.00 14.40 0.78
696.00 2.50 127.89 695.00 668.00 -10.80 -9.30 14.90 0.37
713.00 3.37 140.67 712.60 685.60 -14.20 -9.90 15.50 0.64
726.00 3.94 143.3 725.60 698.60 -15.40 -10.60 16.00 0.46
754.00 3.35 154.72 753.50 726.50 -18.80 -12.10 16.90 0.33
782.00 5.83 156.7 781.40 754.40 -20.90 -14.10 17.80 0.89
809.00 7.11 161.88 802.80 775.80 -24.10 -17.00 18.90 0.52
838.00 7.64 159.46 837.00 810.00 -26.90 -20.50 20.10 0.21
866.00 7.98 164.9 864.70 837.70 -31.00 -24.10 21.30 0.29
894.00 8.17 168.11 892.50 865.50 934.90 -27.90 22.20 0.17
922.00 8.89 170.59 920.20 893.20 -38.90 -32.00 22.90 0.29
950.00 9.43 174.13 947.80 920.80 -43.10 -36.40 23.50 0.29
979.00 10.35 174.65 976.40 949.40 -47.70 -41.40 24.00 0.32
1007.00 11.78 173.91 1003.80 976.80 -52.70 -46.70 24.60 0.51
1035.00 13.73 174.89 1031.20 1004.20 -58.90 -52.90 25.20 0.70
1062.00 17.97 172.47 1057.30 1030.30 -64.40 -59.50 25.90 0.51
1091.00 16.64 171.28 1085.20 1058.20 -71.70 -67.40 27.00 0.59
1119.00 18.23 172.42 1111.90 1084.90 -80.70 -75.70 28.20 0.58
1147.00 19.00 171.54 1138.50 1111.50 -88.50 -84.50 29.50 0.29
1175.00 20.87 172.3 1164.80 1137.80 -98.00 -94.00 30.80 0.67
1203.00 22.54 173.64 1190.80 1163.80 -108.20 -104.20 32.00 0.63
1231.00 24.60 171.96 1216.00 1189.00 -118.90 -115.40 33.40 0.78
12159.00 25.15 171.83 1241.90 1214.90 -130.40 -127.00 35.10 0.20
1287.00 24.65 172.18 1267.30 1240.30 -142.10 -138.70 36.70 0.19
1315.00 24.48 172.69 1292.70 1265.70 -153.60 -150.20 38.30 0.16
1343.00 24.19 172.15 1318.20 1291.20 -164.90 -161.70 39.90 0.11
1371.00 24.19 172.15 1343.80 1316.80 -176.20 -173.00 41.40 0.11
1399.00 25.01 173.2 1369.20 1342.20 -188.10 -184.60 42.90 0.33
1426.00 25.19 173.45 1393.70 1366.70 -199.60 -196.00 44.30 0.09
1455.00 24.77 172.78 1420.00 1393.00 -211.40 -208.10 45.70 0.17
1482.00 24.48 173.69 1444.50 1417.50 -222.90 219.30 47.10 0.18
1511.00 24.04 173.52 1471.00 1444.00 -234.60 -231.10 48.40 0.15
1539.00 24.97 173.50 1496.40 1469.40 -246.10 -242.70 49.70 0.33
1567.00 24.84 173.69 1521.80 1494.80 -257.40 -254.40 51.00 0.05
1595.00 24.39 174.32 1547.30 1520.30 -269.70 -266.00 52.20 0.19
1623.00 24.07 174.13 1572.80 1545.80 -281.00 -277.40 53.40 0.12
1651.00 23.64 174.58 1598.40 1571.40 -292.50 -288.70 54.50 0.17
1707.00 24.22 173.48 1649.60 1622.60 -314.40 -311.30 56.90 0.13
1735.00 23.45 173.41 1675.20 1648.20 -325.70 322.50 58.20 0.28
1763.00 23.49 173..84 1700.90 1673.90 -336.90 333.60 59.40 0.06
1791.00 23.17 174.01 1726.60 1699.60 -348.00 -344.60 60.60 0.12
1819.00 22.92 174.34 1752.40 1725.40 -359.50 -355.50 61.70 0.10
1847.00 22.21 174.57 1778.20 1751.20 -369.90 366.20 62.70 0.26
1875.00 20.53 173.02 1804.30 1777.30 -378.90 376.40 63.80 0.63

6-42
COB-114 Drilling

MD Incl Azim TVD TVD VSec N/-S E/-W DLS


(m) (°) (°) (m RKB) m MSL (m) (m) (m) (°/30m)
1903.00 19.79 171.63 1830.60 1803.60 -387.20 -385.90 65.10 0.31
1931.00 18.58 170.16 1857.00 1830.00 -394.70 -395.00 66.60 0.47
1959.00 17.13 168.01 1883.70 1856.70 -400.20 -403.40 68.20 0.57
1987.00 16.96 168.66 1910.50 1883.50 -409.20 -411.50 69.80 0.09
2014.00 15.84 169.45 1936.40 1909.40 -417.80 -419.00 71.30 0.42
2042.00 14.38 169.92 1963.40 1936.40 -425.10 -426.10 72.60 0.52
2070.00 12.69 170.37 1990.60 1963.60 -432.60 -432.60 73.70 0.60
2099.00 10.63 170.14 2019.00 1992.00 -439.40 -438.40 74.70 0.71
2127.00 8.69 170.47 2046.60 2019.60 -443.00 -443.00 75.40 0.69
2142.00 8.32 169.22 2061.50 2034.50 -445.60 445.20 75.80 0.28

6-43
COB-114 Drilling

Deviation Record: 12”1/4 section


MD Incl Azim TVD TVD VSec N/-S E/-W DLS
(m) (°) (°) (m RKB) m MSL (m) (m) (m) (°/30m)
2173.00 8.05 171.59 2092.10 2065.10 -451.10 449.50 76.60 0.14
2202.00 7.13 171.38 2120.90 2093.90 -454.70 453.30 77.10 0.32
2230.00 5.36 173.72 2148.70 2121.70 -460.10 456.40 77.50 0.64
2259.00 3.81 175.93 2177.60 2150.60 -464.00 458.70 77.70 0.54
2286.00 2.87 174.88 2204.60 2177.60 -464.90 460.20 77.90 0.35
2313.00 1.64 172.26 2231.60 2204.60 -463.60 461.30 78.00 0.46
2341.00 1.35 184.46 2259.60 2232.60 -467.10 462.00 78.00 0.15
2369.00 1.57 178.59 2287.50 2260.50 -469.10 462.70 78.00 0.09
2398.00 1.63 187.08 2316.50 2289.50 -466.50 463.50 78.00 0.08
2427.00 0.90 252.46 2345.50 2318.50 -141.80 464.00 77.70 0.52
2455.00 2.16 314.71 2373.50 2346.50 330.70 463.70 77.10 0.68
2483.00 3.77 327.95 2401.50 2374.50 -397.30 462.60 76.20 0.62
2509.00 5.05 332.69 2427.40 2400.40 -414.90 460.80 75.30 0.51
2538.00 7.52 332.69 2456.20 2429.20 -412.20 458.00 73.80 0.85
2566.00 10.20 333.75 2483.90 2456.90 -412.40 454.10 71.90 0.96
2594.00 14.35 333.59 2511.20 2484.20 -406.70 448.80 69.20 1.48
2622.00 17.74 334.97 2538.10 2511.10 -404.80 441.80 65.90 1.22
2650.00 21.38 337.39 2564.50 2537.50 -404.00 433.30 62.10 21.38
2678.00 24.88 338.21 2590.00 2563.00 -396.50 423.10 58.00 1.26
2706.00 27.93 338.90 2615.30 2588.30 -387.10 411.50 53.40 1.09
2734.00 30.57 339.99 2639.80 2612.80 -377.40 398.70 48.60 0.96
2762.00 33.13 339.96 2663.60 2636.60 -363.80 384.80 43.60 0.91
2790.00 35.64 340.32 2686.70 2659.70 -350.20 369.90 38.20 0.90
2818.00 38.43 340.60 2709.00 2682.00 -355.00 354.00 32.50 1.00
2846.00 40.77 341.19 2730.60 2703.60 -320.20 337.20 26.70 0.85
2874.00 41.26 341.81 2751.70 2724.70 -304.40 319.70 20.90 0.23
2903.00 41.73 342.52 2773.40 2746.40 -287.90 301.40 15.00 0.23
2932.00 42.37 349.15 2795.00 2768.00 -277.80 282.60 10.20 1.55
2961.00 42.82 341.36 2816.30 2789.30 -249.90 263.70 5.30 1.82
2990.00 43.36 341.88 2837.50 2810.50 232.70 244.90 1.00 0.22
3019.00 43.96 342.22 2858.50 2831.50 -215.20 225.80 7.20 0.22
3049.00 44.37 341.51 2880.00 2853.00 -195.80 206.00 13.70 0.21
3078.00 44.72 340.88 2900.70 2873.70 -177.40 186.70 20.20 0.19
3107.00 45.01 340.95 2921.20 2894.20 -160.20 167.40 26.90 0.10
3136.00 43.72 340.90 2942.00 2915.00 -143.60 148.20 33.50 0.44
3168.00 42.03 340.71 2965.40 2938.40 -134.00 127.70 40.70 0.53

6-44
COB-114 Drilling

Deviation Record: 8”1/2 section


MD Incl Azim TVD TVD VSec N/-S E/-W DLS
(m) (°) (°) (m RKB) m MSL (m) (m) (m) (°/30m)
3199.00 42.24 340.71 2988.50 2961.50 -86.48 -109.61 -50.91 3.10
3228.00 47.02 343.76 3009.13 2982.13 -66.12 -90.21 -57.10 5.42
3257.00 50.35 347.32 3028.28 3001.28 -44.43 -69.12 -62.52 4.42
3274.00 53.34 344.79 3038.78 3011.78 -31.13 -56.16 -65.75 6.34
3286.00 55.15 343.83 3045.79 3018.79 -21.41 -46.78 -68.38 4.93
-27.00
3301.00 56.88 342.46 3054.18 3027.18 -8.99 -34.88 -71.99 4.14
3316.00 58.54 340.97 3062.19 3035.19 3.69 -22.84 -75.97 4.17
3330.00 59.02 340.11 3069.45 3042.45 15.66 -11.55 -79.96 1.88
3345.00 59.51 339.89 3077.11 3050.11 28.56 0.56 -84.37 1.05
3359.00 60.75 339.62 3084.09 3057.09 40.69 11.95 -88.57 2.70
-27.00
3374.00 62.15 339.67 3091.25 3064.25 53.87 24.31 -93.15 2.80
3389.00 63.50 339.70 3098.11 3071.11 67.21 36.82 -97.79 2.70
3403.00 64.07 339.93 3104.29 3077.29 79.77 48.61 -102.12 1.30
3420.00 66.18 339.86 3111.44 3084.44 95.19 63.09 -107.42 3.73
3432.00 67.10 339.73 3116.20 3089.20 106.21 73.43 -111.22 2.32
-27.00
3448.00 68.84 339.51 3122.20 3095.20 121.03 87.33 -116.39 3.28
3462.00 70.27 339.54 3127.09 3100.09 134.15 99.62 -120.98 3.06
3477.00 71.25 339.77 3132.03 3105.03 148.31 112.90 -125.90 2.01
3491.00 71.78 339.83 3136.47 3109.47 161.59 125.36 -130.49 1.14
3520.00 73.08 340.04 3145.23 3118.23 189.23 151.33 -139.97 1.36
-27.00
3549.00 74.60 340.19 3153.30 3126.30 217.08 177.52 -149.45 1.58
3578.00 76.00 339.43 3160.65 3133.65 245.13 203.85 -159.13 1.64
3606.00 76.97 339.66 3167.20 3140.20 272.35 229.36 -168.64 1.07
3636.00 78.25 339.38 3173.64 3146.64 301.65 256.80 -178.89 1.31
3665.00 77.62 338.61 3179.70 3152.70 329.99 283.28 -189.06 1.02
-27.00
3680.00 76.90 338.48 3183.00 3156.00 344.61 296.90 -194.41 1.46
3694.00 77.40 338.37 3186.12 3159.12 358.25 309.59 -199.43 1.10
3724.00 77.59 338.80 3192.61 3165.61 387.52 336.86 -210.12 0.46
3752.00 77.26 339.55 3198.71 3171.71 414.84 362.40 -219.84 0.86
3782.00 77.50 339.05 3205.26 3178.26 444.11 389.78 -230.19 0.54
-27.00
3811.00 78.08 340.52 3211.40 3184.40 472.45 416.38 -239.98 1.60
3817.00 77.61 340.26 3212.66 3185.66 478.32 421.91 -241.95 2.67
3845.00 74.98 340.96 3219.30 3192.30 505.52 447.56 -250.98 2.91
3874.00 75.51 342.00 3226.68 3199.68 533.56 474.15 -259.89 1.18
3903.00 76.90 343.68 3233.60 3206.60 561.70 501.06 -268.19 2.22
-27.00
3933.00 76.82 340.60 3240.42 3213.42 590.90 528.87 -277.15 3.00
3940.00 76.93 339.96 3242.01 3215.01 597.71 535.28 -279.45 2.71
3963.00 76.99 340.33 3247.20 3220.20 620.12 556.36 -287.06 0.48