Documente Academic
Documente Profesional
Documente Cultură
1. Organization Profile
2. Technology from IRE’s R&D
3. Guidelines for Road Preservation
4. Guidelines for Waste & Sub Standard
Material
2
Organization profile
Organizational Structure of MPWH
MINISTRY OF
PWH
Secretary of ARD
“Company Profile”
Video of IRE
“Company Profile”
Video of IRE
7 7
Role of R&D
8
Road Pavement R&D Division
• Accelerated Pavement Test
• Scanning Electron Microscope (SEM)
• Energy Dispersive Xray Detector (EDS)
• Skid Resistance Test
• Pavement Condition Survey
• Asphalt Testing Laboratory
• Soil & Aggregate Testing Laboratory
• Asphalt Mixture Testing Laboratory:
• Pavement Survey Equipment:
• FWD (falling weight deflectometer)
• Roughness meter- Skid tester (Mu-meter)
Accelerated
Pavement Test
• Many others
Bridge Structure R&D Division
• Non-Destructive Test
• Schmidt Hammer Test
• Metal Hardness Test
• Ultrasonic Pulse Velocity Test
• Rebar Scanning Test
• Half Cell Potential Test
• Bolt Tension Test
• Thickness Gauge
www.pusjatan.pu.go.id
Services
• Road and Bridge Research and Development
• Technical and Construction Management
• Standard and Guidelines Development
• Technology transfer
• Technology Dissemination
• Technology Consultancy and Assistancy
• E-learning
• Advisory services
• Laboratory testing
• Technical advisory
• Survey and Investigation
Prototipe/
Pilot Project
Standard/
Implementation/
Guideline/
Industry
Specification
PRODUCT OF R&D:
STANDARDS & GUIDELINES
SNI
STANDARDS & 268 books
11%
GUIDELINES
DEVELOPED BY
IRE Guidelines
25% Spesifikasi Jalan
dan Jembatan
Bridge Structure
Road Geotechnical
23%
Road Traffic
COOPERATION 4
PARTNERS* NATIONAL
GOVT
PT. MRT BBPJN VII
PT. PERTAMINA –
Semarang
3
WIKA BITUMEN PT. INTI
PT. INDOCEMENT
PT. PERFORMA ALAM
14
PT. RISET PERKEBUNAN
LESTARI
NUSANTARA
NILIM
UNSW
PT. GREEN PLANET
INDONESIA
PRIVATE PT. AMARTA KARYA
PT. PANAIRSAN
PRATAMA
PT. BUKAKA TEKNIK
PT. PRAJNA MARGA
SOLUSI 22
UTAMA PT. JMTM
LOCAL GOVT
5 SURAKARTA
BANDUNG
BUTON
CIANJUR CIREBON
5
BANTEN
BANYUMAS
UNIVERSITY PEKALONGAN
WAKATOBI NTB KALTENG BATU
UNHAS
UDINUS UNSRI UNDIP ASSOCIATION BALI SUMBA BARAT BUTON SELATAN
SUMUT SIDOARJO
* Existing cooperation
TRIANGULAR“KSST”
Indonesia,
COOPERATION
TECHNICAL ADVISORY SERVICES
Number of services
116
115 IDENTIFIED PROBLEMS
78
Bridge
71 Structure
Combination
64 31%
24%
BENEFIT RECIPIENTS
Geotechical
Pavement 17%
19% Traffic
Engineering
9%
DG of Highway Local Government Central Government
SOE Toll Operators Consultants
Contractors Producer
Technology from IRE’s R&D
Foamed Mortar for Road Embankment
+ =
CONSTRUCTION OF ANTAPANI FLY OVER
Construction of 400 m flyover in
Bandung (in only 6 month)
Construction of fly
over in the city of
Bandung
combining,
Corrugated Steel
Arch with Cellular
Lightweight
Concrete
22
VISUAL INSPECTION FOR BRIDGES
Bridge Visual Inspection
using mobile phones/gadget
Invi J is a tools in
Bridge Inspection,
which utilises
mobile gadget and
information
technology, rather
than paper forms
and conventional
procedures in
reporting the result
of surveys
23
EXCLUSIVE STOPPING SPACE FOR
MOTORCYCLE
Exclusive stopping space in an
intersection for motorcycle in urban area
To increase the
capacity of
intersection in
urban area, by
managing the
motorcycles in front
of big vehicles
24
INSTANT ROAD PATCH
Instant road patch, with simple tools
easy, fast and quality application
To increase the
speed and quality
in pavement
maintenance from
pot holes
25
Road Preservation
Concept of road preservation
Optimum road preservation with appropriate
methods
PREVENTIVE Patching
MAINTENANCE Thin Overlay
MAINTENANCE &
REHABILITATION
Minimum Recommended Condition
BENEFIT
Extended Pavement Life
RECONSTRUCTION Due to preventive maintenance
PAVEMENT AGE
Flexible pavement preservation
Pedoman Pelaksanaan Pengabutan untuk Pemeliharaan Perkerasan Beraspal
1 (SE Menteri PUPR No. 19/SE/M/2015)
FOG SEAL
28
Rigid pavement preservation
Pedoman Penutupan Ulang Sambungan dan Penutupan Retak pada
1 Perkerasan Kaku (SE Menteri PUPR No 16/SE/M/2015)
JOINT AND CRACK SEALING
Pedoman Penambalan Dangkal Perkerasan beton Bersambung
2 Tanpa Tulangan(SE Menteri PUPR No 29/SE/M/2015)
PARTIAL DEPTH REPAIR
Penambalan Penuh Perkerasan Beton Bersambung Tanpa
3 Tulangan (Pd 04-2016-B)
FULL DEPTH REPAIR
Pedoman Penjahitan Melintang pada Pemeliharaan Perkerasan
4 Kaku (SE Menteri PUPR No 06/SE/M/2016)
CROSS STITCHING
Pedoman Restorasi Penyaluran Beban pada Perkerasan Kaku (SE
Menteri PUPR No 05/SE/M/2016)
5 DOWEL RETROFIT
Pedoman Penstabilan dan Pengembalian Elevasi Pelat Beton dengan
6 Cara Grouting pada Perkerasan Kaku 27/SE/M/2015)
SLAB STABILIZATION AND JACKING - GROUTING
29
Rehabilitation & Reconstruction
Available guidelines
No Guidelines Scope
1 Manual Desain Perkerasan (SE Dirjen Bina • Design of Asphalt Pavement Structure
Marga No 04/SE/Db/2017) • Design of Concrete Pavement Structure
• Design of Asphalt Pavement Overlay
30
Waste and sub standard Materials
Waste materials
SNI 03-6863-2002 Metode pengambilan contoh dan pengujian abu
1 terbang atau pozolan alam sebagai mineral pencampur dalam beton
semen portland SAMPLING FOR FLY ASH
32
Sub standard materials
TEKNOLOGI MATERIAL LOKAL
Sand base
Lime cement road base
stabilization
Find us on:
: pusjatan : pusjatan : infopusjatan : pusjatan