REPORT ON IMPLANT TRAINIG IN

GEM BUILDERS ANDPROMOTORS

STUDENT’S DETAILS:
A.ABDUL ASIK-720316103001

BIBIN B-720316103005

KRISHNAJITH T.K-720316103008

RAJESH-720316103014

C.VISHNU-720316103023
AKNOWLEGEMENT
Gem builders is a well-known real estate development company based in Chennai. The portfolio of the
company includes construction of residential, commercial and educational properties. As an
environmental initiative, the developer utilizes only eco-friendly material and concepts in its projects.
Top Green Valleys Projects: Riviera in Valasaravakkam, Chennai comprising 18 units of 2 and 3 BHK
apartments with sizes ranging from 1,100 sq. ft. to 1,450 sq. ft.

GVSPL is promoted by Mr.Mohammed shafi.This company is now 15 years of its promising work.

This companies main head office is situatedin Chennai Alwarpet.It is organized by


Mr.Chandrasekhar.The green valley promoters had tie up with Gvspl for many new projects
CONTENTS:
1.GVSPL APPARTMENTS

2. Gem builders Specifications

3. Gem builders Amenities

4. BEAM WORKS:

5. SURVEYING FOR PLASTERING WORK

6. BRICK WORK

7. CONCRETE MIXTURE

8. CONCLUSION
GVSPL APPARTMENT:

The Green County was in process of building two G+4 Appartments accommodating 24 flats in eachof
them and 25 individual villas and 29 row houses in total of 5 acres.All the G+4 flats are 2BHK with fully
completed according two customers needs.

Here is the plan of block A

Each flat is of 1150sq.ft.Each flat is individual and walk space is large for easy of work
Gem builders Specifications

Structure & Elevation


 Seismic compliant RCC framed structure
 Apartments – stilt + 4 floors, villas – ground + 2 floors and row houses – ground + 1
floor
 200 mm thick brick work for external walls and 100 mm thick for internal walls
 Facade as per architect’s design with external texture and weather shield emulsion paint
 Vastu compliance

Staircase, Lobby & Lift


 Granite flooring
 Putty with emulsion paint for walls
 Hand rails in combination of stainless steel top and MS verticals
 Granite cladding for lift facia for apartment
 1 no. 16-passenger capacity lift Johnson or equivalent make for each block

Gem builders Amenities


 Lift
 GYM
 Park
 Security
 Clubhouse
 Visitor Parking
 Multipurpose Hall
 Large Open space
 Solar Energy
 Large Clubhouse
 Aerobics Room
 Vaastu Compliant
 Intercom Facility
 Kids Play Area
 Power Backup
 Water Storage
 Outdoor Tennis Courts
 Rainwater Harvesting
 Indoor Games Room
 Earthquake Resistant
 Private Terrace /Garden
 Rainwater Harvesting
 Jogging and Strolling Track

Interior Specifications

Flooring
Master Bedroom:
Wooden Flooring
Living/Dining:
Vitrified tiles
Balcony:
Anti skid ceramic tiles
Kitchen:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Other Bedroom:
Vitrified tiles

Walls
Exterior:
Emulsion Paint
Interior:
Emulsion Paint

Kitchen:
Designer Tiles Dado
Toilets:
Designer Tiles Dado
Fittings
Kitchen:
Stainless Steel Sink with CP Fittings
Toilets:
Provision for Geyser
Others
Points:
Living
Switches:
Modular Switches
Wiring:
Concealed copper wiring
Windows:
UPVC windows
Frame Structure:
RCC framed structure

BEAM WORKS:
All steels were high quality and high resistance steels were used

16mm and 10 mm and 8mm rods were used in the beam structure

These works were done within 1 day .For one apartment it took near 10 to 12 hour to finish this work by
more than 15 workers and one site engineer and one mason

All the steels were loaded up by using working elevator .nearly 25 tons of steels were used for the
beams and column structures

All steel rods were transported from Chennai .Gem builders is famous for its quality of building.

As the property is JV bond all the appartments are unique in its own quality

The top floor of the apartment is also done by heavy load bearing structure for any future extensions
The following plan shows the plan for cutting of beams for block A:

SURVEYING FOR PLASTERING WORK


The surveying work is carried out before the brick work Is laid.The plastering work should be of same
thickness throughout the building for this purpose the surveying team plays a major role in marking the
points

The surveying is carrired out by using Total station.Total station records the points from the stationary
points.

This instrument is used by experienced engineers

Three of them were working in this surveying team one was recording the points and the other was
carrying the prism and to mark the points and the other one was checking the points which were
marked.

The surveying work is done in the initial stage only one layer of brick work is done.

BRICK WORK:

The bricks used are concrete bricks of size 200*50

The pattern used in laying of bricks is English bond


The cement mix is used for 2 inches between the brick work for proper strength

English bond is rarely used for sales buildings

Sill beams are used at 4 feet from the floor level it gives a great support for the load bearings

Sill beams will give support for wall and brick work
CONCRETE MIXTURE

Here the site usesM25 for most purposes its 1:2:4 ratio

The M25 proportion takes 40 mins for setting time and 1 day for proper setting

The mixture is allowed to set on the are for one day and it is watered daily for the reactions to take
place to make it more strength.

The mixture is mixed in a mixer named RM1800


CONCLUSION:

The Gem builders constructions were doing a promising project in the centre of the city and we got a
chance to make a visit at their site and to travel a week with skilled engineers and to gain a little
knowledge in our own field.More than subject knowledge practical knowledge will be helpful in our
field.

Thank you for this opportunity to share all my thoughts .