2 PCC
Foundation 6 5 5 0.33 49.50
Flooring 1 18.5 28.5 0.33 173.99
Ramp 1 6 8.5 0.33 16.83
TOTAL 240.32 6.81
3 RCC
Footings 6 5 5 1 150.00
Columns 6 1 0.75 21 94.50
Plinth Beam 1 97 0.75 1 72.75
Belt 1 97 0.75 0.5 36.38
Lintel 1 97 0.75 1 72.75
Lof 1 40.5 1.5 0.25 15.19
Sunshade 5 4.5 1.5 0.25 8.44
1 11 1.5 0.25 4.13
Syntex tank slab 1 5 5 0.33 8.25
Syntex tank column 1 0.75 0.75 13 7.31
syntex tank footing 1 4 4 0.75 12.00
TOTAL 481.69 13.64
4 Brickwork
Basement 1 91 0.75 1.5 102.38
Upto lintel 1 91 0.75 7 477.75
Deduct door -1 7 0.75 7 -36.75
-1 3 0.75 7 -15.75
-6 3 0.75 4 -54.00
Above lintel 1 91 0.75 7 477.75
TOTAL 951.38 26.94
5 Plastering
Inner walls 1 94 15 1410.00
Lof 2 40.5 1.5 121.50
Syntex tank slab 2 5 5 50.00
Syntex tank column 1 7 3 21.00
Outer walls 1 100 18 1800.00
Sunshades 10 4.5 1.5 67.50
1 11 1.5 16.50
TOTAL 3486.50 98.74
6 Soil Filling
Footing pits 6 5 5 5 750.00
Deduct Footings -6 5 5 1 -150.00
-6 5 5 0.33 -49.50
Deduct Columns -6 1 0.75 5 -22.50
Basement filling 1 18.5 28.5 3 1581.75
Ramp 1 6 8.5 1.5 76.50
TOTAL 2186.25
Deduct existing soil -750.00
TOTAL 1436.25 40.68
8 Joineries
Maindoor 1 7 7 49
Backdoor 1 3 7 21
Windows 6 3 4 72
TOTAL 142
TOTAL
7 77.77 240
90 400 800
41 455 13500
56 622
1450
12 93
925
10MM 12MM
17
12
5
6
3
5
8
4
7
1.5
17 51.5
6.5 9.5
110.5 489.25 911.45
50
45572.5