Sunteți pe pagina 1din 3

Muhammad Noman Saleem

Home address: A-187 Block H North Nazimabad Karachi. Contact no: +923333567690

Email address: engr.nomansaleem@gmail.com N.I.C no: 42101-0996355-7


st
Date of birth: 21 November, 1991 PEC no: ELECT/46950
Domicile: Karachi, Sindh Skype ID: nomansaleem91

EDUCATION:
September 2015- Present:

MBA Industrial Management (Weekend Program), Institute of Business Management (CBM)

August 2010- July 2014:

BS Electrical Engineering (Electronics), FAST- National University of Computer and Emerging Sciences.

WORK EXPERIENCE:

October 2014 - Present

GlaxoSmithKline (GSK) Pakistan


Designation: Instrumentation & Controls Engineer

Leading the site instrumentation and electronics team, consisting of Electronic officers & maintenance
technicians. Assigned with the additional responsibility of leading mechanical team of Otics area.
Acting as technical authority for all instrumentation and automation matters on site from production &
quality support, carrying out plant modifications and managing projects of all automation, control,
instrumentation and functional safety as well as ensuring compliance aspects.

• Provide continuing support for all automation systems on site including Utilities, including
specification/selection of process instrumentation, PLC specification & configuration.
• Leading the core maintenance activities at production floor level to ensure site perform & meet the
commercial demand.
• Conduct / review Risk Assessments, Gap analysis, SOP’s, internal audits L1 and participate in L2 & L3
audit of Quality & EHS, TP13 audit to ensure compliance with GSK standards and maintain audit
readiness.
• Compliances of Global Engineering/Quality Alerts.
• Participate in the Annual Budget and project plans and support Engineering Manager for
development of site CAPEX.
• Conduct the conditional assessment of all the equipment/ machineries & instruments for the
Site Facility Master Plan. (SFMP)
• Proactively identifies challenges/Risks & plan it accordingly through Risk Management System &
Quality Improvement Plan (QIP) platform. 
• A key part of the position involved carrying out Preventive Maintenance and Calibration of
Instruments to ensure compliance with GSK standards and maintenance and Calibration Strategies as
per GES through Computerized Maintenance Management System (CMMS)
• Provide assistance & oversees in troubleshooting complex Engineering problems and failures by
working closely with cross functional teams. Review and analyze the equipment OEE and devise plan
for improvements.
• Responsible for procuring machines electronics/electrical parts from OEM/Local market to ensure
smooth productivity & operations.
• Contribute towards GPS tools to implement effective GPS system to ensure robustness in the
processes & to ensure removal of wastes.
• Responsible to perform CSV of site Equipment’s and sustainability of their operation within their
validated parameters to achieve consistent quality and reliability as per CSQMS GSK guidelines.
Provide technical support for development of life cycle documents.
• Monitor EHS related Engineering KPIs including Machinery safety, Waste reduction, Energy efficiency
Zero Accident Promotion.
• Responsible for inspection & maintenance of addressable fire alarm system, Gas detection system
and Cargo lifts.

Hands-on experience:

• PLC’S included Fatec, Siemens S7200 and S7300, Mitsubishi & Omron.
 • HMI’s including Delta, Easy View & Siemens 
• Controlling Sensors included PT-100, Thermocouples, Fiber Optic sensor, Proximity sensor,
 ultrasonic sensor, Reflective sensor and Magnetic sensor 
• Variable Frequency Drives (VFD’S) on Danfoss, Delta, LSIS, Allen Bradley, ABB. 
 • Temperature controllers included Vertex, Eurotherm, and Rockwell Automations etc. 
• Hard wire logics based circuitries including Contactors, Relays, Timers, Solid State Relays (SSR’S) etc. 

PROJECTS:

• Production Revamp project, separate facility development of Ophthalmic Products. (Dec


2018- Ongoing)
• Refurbishment of Otics facility ( Nov 2018 – Present)
• Installation of Tip inspection unit on Brevetti ampoule inspection machine. ( March 2018)
• Process improvement & head count reduction by utilizing the laid-off machine (CAM
cartoner) for the automatic packing of the Kenalog Orabase. (Completed in December 2017)
• Installation of crowcon gas detection system in A/C Plant & Inflammable stores.(Completed
in November 2017)
• Installation of Siemens S7-300 PLC control system in Norden-702 filler machine to improve
machine OEE by 10%. (Completed in November 2017)
• Process improvement & head count reduction by installing OCV system on PRX line for
online batch variable data verification. (Completed in October 2017)
• LED lightning project for Production and Utility areas for energy conservation up to
50%.(Completed in 2017)
• Installation of the Prisma Checkweigher on the Spansules packing line as weight verification
system. (Completed in 2017)
• System Access Management implementation on every production & utilities machines under
FDA 21-CFR part 11. (Completed in 2017)
• Installation of the Schneider C-400 controller system in Norden Ointment filing & cartoner
 machines to increase the performance & reliability. (Completed in 2017)
• Up gradation of Farmomac F-47 filling machine from mechanical cam based timing system to
Encoder based timing system. (Completed in 2016)
• Up gradation of CAM-01 Cartoner machine by replacing obsoleted logic cards to Siemens S7-200 224
 PLC. (Completed in 2016)
• Up gradation of CAM-08 Cartoner machine by replacing obsoleted logic cards to Siemens S7-200 224
 PLC. (Completed in 2015)
• Up gradation of PRX Cartoner machine by replacing obsoleted logic cards to Siemens S7-200 224 PLC.
 (Completed in 2015)
• Installation & Commissioning of New Eno Sachet Packing line. (Completed in 2015) 
 • Integration of Marchesini filler and Cartoner machine through Encoder control system 
 (Completed in 2015) 

CERTIFICATIONS:

• Productivity enhancement Via Lean Manufacturing from NED University & Pakistan Engineering
Council (PEC) in 2016.

SOFTWARES:

• Microsoft Office.
 • Easy Builder Pro for HMI programming. 
• Winproladder, Semantic manager, Gx Developer, Step-7 Microwin for the PLC programming. 


QUALITIES:
• Leadership, Decision making and Managerial skills. 
 • Debugging and Trouble shooting skills. 
• Adaptable to change in environment. 

S-ar putea să vă placă și