NILKANTH M HATTE CRM2 CCL-2 SAP ID- 3294 ,DOJ: 15-10-2011

During general inscpection found that Finish coater A Catenary Sensor proper feedback not coming than clean sensor.
During general inscpection found BR-2 Break feedback not come than check found airvalve close condition than open the valve
During preventive maint, found alkali spray pump was not ready checked found it's water level low than water line valve open a
during shift activity, exit crane MH up operation not working than check found it's rotory limit switch feedback open than prop

Training Needs
Technical
PLC
Drive
ACB
Overhead cranes.

Behaviour
Communication skill
creative problem solving
Time management skill
House keeping

Rating

A+
A
B
C
D
Date Prevention
10.02.18 To prevent the stoppage of line.
05.01.18 To prevent the breakdown.
21.11.17 To prevent the breakdown.
20.10.17 To prevent the breakdown.

Feb-18
Jan-18
Nov-17
Oct-17
1
2
3
4

1
2
3
4

1
2
3
4
PRASANTA DUTTA CRM2 CCL-2 SAP ID- 3393,EMP ID-301H ,DOJ: 5-12-2011

Hot well pump 1,2&3 was working in manual mode and water overflow,pump running many times without water pumping the
During running line, found Entry crane& Exit crane problem occur due to master controller many times so changed master con
During general inscpection found that all spare and running lunder burnner was not working properly then repaired all lunder
During running line, found that HF furnace many times trip then changed flow switch.

Training Needs
Technical
PLC
Drive
ACB
Overhead cranes.

Behaviour
Communication skill
creative problem solving
Time management skill
House keeping

Rating

A+
A
B
C
D
Date Prevention
10.06.17 To prevent pump damage&wastage water
18.08.17 To prevent the breakdown
13.01.18 To prevent the stoppage of line
27.03.18 To prevent material divert
1
2
3
4

A
1
2
3
4

B
1
2
3
4
PREETAM KUMAR SAHU CRM2 CGL5 SAP ID- 6621 ,DOJ: 09-12-16

During general inscpection found the streering 3 start push button Switch NO element not working, then changed NO element
During general inscpection found that Br3 motor fan was not running,so changed it's capacitor & started the fan.
During preventive maint,HBR glow heater terminal lug was burn . So changed it.
during shift activity, entry crane MH master controller was not working ,so changed master controller.

Training Needs
Technical
PLC
SCADA
Drive
Overhead cranes.

Behaviour
Technical presentation
documentation (SAP)
creative problem solving
Time management skill

Rating

A+
A ✓
B
C
D
Date Prevention
30.06.17 To prevent the stoppage of line.
26.10.17 To prevent the breakdown.
13.03.18 To prevent the breakdown.
19.01.18 To prevent the breakdown.
1
2
3
4

1
2
3
4

1
2
3
4
SHYAM JAISHWAL CRM2 CGL5 SAP ID- 6495 ,DOJ: 12-10-16

During general inscpection found that por 1 lubrication pump pressure feed back was not healthy then changed pressure switc
During general inscpection found that exit accumulator motor fan was creating abnormal sound,so repalced the fan
During preventive maint, found alkali spray pump was not ready due to control supply problem then changed relay.
during shift activity, exit crane MH break contactor was charring ,so changed the contactor.

Training Needs
Technical
PLC ✓
Drive ✓
ACB
Overhead cranes.

Behaviour
Communication skill
creative problem solving
Time management skill
House keeping

Rating

A+ ✓
A
B
C
D
Date Prevention
03.02.18 To prevent the stoppage of line.
12.01.18 To prevent the breakdown.
25.11.17 To prevent the breakdown.
24.10.17 To prevent the breakdown.
1
2
3
4

1
2
3
4

1
2
3
4
AJIT KUMAR BEHERA CRM2 CGL5 EMP ID-290J ,DOJ: 01-01-13

During general inscpection found that pmp crane MH contactor was charring so changed contactor.
During general inscpection found that GL pot crane coner switch problem then so given tighteness.
During preventive maint, found hot air dryer was not ready due to relay was not working ,so changed
during shift activity, entry crane MH break contactor was charring ,so changed the contactor.

Training Needs
Technical
PLC ✓
Drive ✓
ACB ✓
Overhead cranes. ✓

Behaviour
Communication skill
creative problem solving
Time management skill
House keeping

Rating

A+ ✓
A
B
C
D
Date Prevention
12.06.17 To prevent the breakdown
4.10.17 To prevent the breakdown
18.01.18 To prevent the breakdown
20.02.18 To prevent the stoppage of line
1
2
3
4

1
2
3
4

1
2
3
4
BHARAT LAL BARETH CRM2 CGL5 EMP ID-291P ,DOJ: 13-06-17

During general inscpection found that por 1 motor fan was not running,so changed it's capacitor & started the fan
During general inscpection found that por 1 motor fan was creating abnormal sound,so repalced the fan
During preventive maint, found shed light mCB got sparking ,so tightened the screw of mcb.
during shift activity, GL POT Crane main contactor was not pick ,so given tightness NO element.

Training Needs
Technical
PLC ✓
Drive ✓
ACB ✓
Overhead cranes. ✓

Behaviour
Communication skill
creative problem solving
Time management skill
House keeping

Rating

A+ ✓
A
B
C
D
Date Prevention
11.10.17 To prevent the motor
24.12.17 To prevent the breakdown
02.01.18 To prevent the breakdown
12.03.18 To prevent the breakdown
1
2
3
4

1
2
3
4

1
2
3
4
YOGESH TIWARI CRM2 CGL5 EMP ID-290J ,DOJ: 01-01-13

Training Needs
Technical

Behaviour

Rating

A+
A
B
C
D
Date Prevention