All events and issues which either cause, appear to cause, or have the potential to
cause delay should be recorded by the contractor including:
� Extension of time claim should contain Cause & Effect for each event
� Consideration needs to be given to who owns the float in the schedule and the
effect this has on the revised Completion Date
� Delay analysis
There are four groups categorizing most of the recognized extension of time (EOT)
assessment techniques:
A- Impressionistic.
B- Simplistic.
C- Prospective analysis.
D- Retrospective analysis.