C2
Bottom Excavation Line
A1
Grout
A/G coating
ha1
225mm HPP
Depth 1.0
Paving 100 x Screed Concrete
S
Thickness Rock Soil
Membrane: 1.4mm min. multilayer composite HDPE
100 500 50 C1
D
Blinding Concrete
150 550 100
250 650 200 C1
0 0 0 <- for gravel areas
See JI 2.1.2 Don't Delete!!! -> Unit 340
Dist of Ground Pedestal Footing Excavation Depth
Grade Bottom of Ground Bottom of
Water Level Soil Paving
Paving Elevation Subgrade Water Level Width Length Ht Ht A/G Ht U/G Length Width Thickness From HPP From Excavation
Area Equipment No. Qty. from GL Classification Thickness
(HPP) Elevation Elevation Elevation
(GWL) (A1) (A2) (Hpa) (ha1) (h2) (C) (D) (h3) (Df) Subgrade
(Paved/Unpaved) m m mm m m m m m m m m m m m m m
- STR 1 3 Unpaved 100.000 2.000 Soil 0 100.000 98.000 1.200 1.200 1.300 0.300 1.000 1.800 1.800 0.400 1.500 1.500 98.500
- STR 2 4 Unpaved 100.000 2.000 Soil 0 100.000 98.000 0.300 0.300 1.100 0.300 0.800 1.000 1.000 0.300 1.200 1.200 98.800
Total 7
Note:
1. Inputs provided are in Blue fonts.
0.13 m³
24.00 kN/m³
STR 1 3.02 kN
Item Unit Description Qty. Remarks 3024.00 N
Excavation cu.m - 57.56 308.26 kg
Backfill cu.m - 44.58 Weight of 1 ped block type for shelter = 0.31 tons
Disposal cu.m - 12.97
Concrete cu.m 40 Mpa 9.50
Rebar ton Corrugated bars (460 Mpa) 1.14
Marine plywood pc 19mm - 4'x8' 9.50
Wood batten pc 50x50 - 4m 14.00
Anchor Bolt pc M20 x 300mm 12.00
Above Ground Coating sqm Primer : Penerating Silane Siloxane
4.32 Hydrophobic
Above Ground Coating sqm Intermediate : Acrylic Polymer
4.32
Coating (150 microns)
Above Ground Coating sqm Finish : Acrylic Polymer Coating
4.32 (150 microns)
Underground Coating sqm 1.5mm thk waterproof membrane
39.89
Underground Coating sqm 3.5mm impregnated fiber board
32.33
PE Sheet sqm Polyethylene Membrane 17.28
Non Shrink Grout cu.m 0.13
ASTM C 1107, Minimum Compressive Strength 60 N/mm2 at 28 days
Blinding Concrete cu.m 25MPa 1.30
Screed Concrete cu.m 25MPa 0.29