Document Class: Z
TABLE OF CONTENTS
2 SCOPE....................................................................................................................................................................... 2
3 REFERENCE. ............................................................................................................................................................. 2
4 DEFINITION .............................................................................................................................................................. 2
5 PROCEDURE ............................................................................................................................................................. 3
Rev. 0 Page 1 of 18
GK002-EG-PP-001
- Arrangement Drawings
- Piping Diagram
3 REFERENCE.
3.1 RESPONSIBILITIES
Engineering Manager
Discipline Engineer
Draftsman
Rev. 0 Page 4 of 18
GK002-EG-PP-001
The Clasher facility checks any designated section against the model to
detect clash areas by using SM3D program.
Piping ISO and spool drawing shall be generated from SM3D for
fabrication.
Revised document shall be reissued in its full content. The modified areas shall
be identified as follows:
Rev. 0 Page 5 of 18
GK002-EG-PP-001
and revision number. Prior to distribution, the following shall sign off each
document:
Sub-Sequence Number
Sequence Number
Type of Document
Discipline Code
Project/ Job No.
a) Project Job No.
The Project Job No. is GK002
b) Discipline Code
Discipline indicator Code
General Arrangement GA
Hull & Structural ST
Safety/Accommodation/Outfitting AR
Drilling DL
Mechanical ME
Piping PI
Electrical & Instrument EI
Naval Architect NA
c) Type of Document
Type of document indicator Code
Rev. 0 Page 6 of 18
GK002-EG-PP-001
Purchase Specification PS
Technical Evaluation TE
Calculation and Analysis Report CS
Drawing DR
Procedure PP
Test Memo TM
500-599 Helideck
600-99 Cantilever
900-999 Other
Rev. 0 Page 7 of 18
GK002-EG-PP-001
001-099 Drawing index, general notes and other information that applies to
the complete platform.
100-199 Accommodation/ Office..
200-299 Safety
300-399 Cathodic protection/ Painting
Mechanical Drawings
200-299 Ventilation
300-399 HVAC
Piping Drawings
001-099 Piping drawing index, and other information that applies to the
complete the Rig.
700-999 Other
E&I Drawings
001-099 Electrical drawing index, general notes, legend and symbols, and
other information that applies to the complete the Rig.
700-999 Other
Drilling Drawings
001-099 Drawing index, general notes, legend and symbols, and other
information that applies to the complete the Rig.
200-999 Other
001-099 Drawing index, general notes, legend and symbols, and other
information that applies to the complete the Rig.
100-199 Drawing
200-999 Other
For documents other than drawings, a sequential number, starting with 0001
shall be used.
Rev. 0 Page 9 of 18
GK002-EG-PP-001
The IFC drawings shall be reviewed against the source engineering drawing,
relevant specification/ codes and construction requirements.
Rev. 0 Page 10 of 18
GK002-EG-PP-001
Additional dimensions.
Additional section views.
Piece mark number.
Joint details where required.
Offset values and other geometry information.
Location of girth or long seam welds in tubular
Pipe cut length.
Beam cut length.
Nesting plan for beam section, pipe, plates.
Weld maps.
Shop drawing may take the form of plate, stiff, beam cutting sheets, brace cutting
drawings, long and girth weld orientation drawings, piping isometrics, pipe
supports, electrical & instrument supports, Equipment support details…
The shop drawing will be developed from AFC drawing, to identify the name of
structural member in each layout drawing. These will be used as drawings for
completion of installation of the structure.
Rev. 0 Page 11 of 18
GK002-EG-PP-001
…..etc.
Rev. 0 Page 12 of 18
GK002-EG-PP-001
Example:
The piping shop drawing consists of ISO and pipe support drawings. These
will be used as construction drawing of piping.
Spool numbers.
Orientation of fittings.
04 or BR: Brine
23 or FD: Deluge
Example:
Rev. 0 Page 15 of 18
GK002-EG-PP-001
Example:
The pipeline of Block (BLK):
GK002-BLK01-2”-FW-001-1C1 Block 01 Pipeline of Fire Main system
Example:
The pipe support of Block (BLK):
From the IFC of E & I drawings and support typical drawings, the Engineering
team shall develop E & I shop drawings for construction, which shall include as
minimum:
“AS-BUILT” drawings are based on mark-ups from actual site fabrication &
installation
Rev. 0 Page 16 of 18
GK002-EG-PP-001
part of final documentation to be submitted to VSP. Refer flow chart Figure No.
5 for the “AS-BUILT” drawings controls flow chart.
After the drawings are approved by VSP the drawings will be issued as “AS-
BUILT” for final documentation. Drawings not approved will go through
revision and approval cycle again until the drawing is finally approved by VSP.
The IFC drawing after approval by Engineering Manager shall forward the
original copy of the IFC, shop and fabrication drawings to the Document Control
office for registration and distribution.
The original copy of the IFC drawings shall be returned to Document Control
office to be maintained on project file.
The IFC drawing’s review and approval cycle is shown in flowchart figure No. II
The Document controller shall receive and distribute the drawing in accordance
with the Document distribution Matrix.
Rev. 0 Page 17 of 18
GK002-EG-PP-001
4 RECORDS
5 ATTACHED
Rev. 0 Page 18 of 18
GK002-EG-PP-001
Rev. 0 Page 19 of 18