Documente Academic
Documente Profesional
Documente Cultură
Grade 11
July 12, 2016
I. Objectives:
At the end of the lesson the learner should:
1. Identify the different qualifications that need to be checked whenever receiving the
materials from the property custodian.
2. Discuss the different qualifications that need to be checked whenever receiving the
materials from the property custodian.
3. Appreciate the importance of checking the materials received against job requirements.
II. Subject Matter:
a. Topic: Checking of Materials Received Against Job Requirements
b. Material: Laptop, presentation, forms
c. References:
d. LC Code Number: TLE_ICTS9-12CNIa-1
III. Procedures:
A. Preparation
1. Checking of Attendance
2. Motivation
The teacher will present different forms needed in checking materials received in the
requisition of materials and purchased materials.
B. Presentation:
The teacher will discuss the Proper and correct materials to be used in order to complete a
job requirement.
These materials are often asked from the property custodian through a Materials
Requisition Form. This form contains all the specifications of a material to be requested
including the quantity needed. Failure to comply with this form may result in delays in
receiving the materials or worse, receiving materials that are not fit to the job requirement.
The student will complete the different template in obtaining materials needed.
This is an official paper in the form of a printed document on which a request is made.
Name:
Project:
Classification:
Purpose:
No Quantity Unit Description Unit Price Total Price
Below is a sample purchase requisition form. For standard materials, little information other than the stock
number may be needed and for other purchases requests, it may be necessary to give particular
descriptions, blueprints, catalog numbers, weights, standards, brand names, exact quantities to order, and
suggested prices. One copy remains with the originating employee, and the original is sent to the
purchasing department for execution of the request
Prepared by:
RAMON Y. OBLIGAR, JR.
Teacher III, Computer Hardware Servicing
Senior High School
Victorias National High School
IV. Assessment:
Direction: Choose the letter of the best answer. Write the letter(s) only.
1. Which of the following must be accomplished to receive materials for a job requirement?
a. Manager’s Recommendation form c. Procurement Request Form
b. Materials Requisition Form d. Procurement Request Form
2. Which of the following materials is a best fit for a job requirement that requires transfer of
electricity?
a. Coaxial Cable c. Ethernet Cable
b. Data Cable d. Power Cable
5. Which of the following must be indicated in order to ensure that the materials will not run out?
a. Grade c. Quantity
b. Quality d. Specification
6. When is the right time to check whether the given materials are correct?
a. After getting back to the work station c. Immediately after receiving the materials
b. After the completion of the job requirement d. When already using the material
7. A worker failed to check the materials immediately and discovered that an incorrect version of a
software was given during the completion of a job requirement. What action must he do?
a. Download the correct version c. Return it and ask for the correct version
b. Install it anyway d. Skip the installation
8. What must be done in order to indicate the correct specifications in the materials requisition
form?
a. Check the job requirement’s plans c. Estimate the contents of the request
b. Copy the data from an old request d. Inspect the work area
9. What can happen if an incorrect category of a data cable is used in completing a job
requirement?
a. Malware infiltration c. short circuiting
b. No change is visible d. slower data transfer rate
10. What must be done if the requested material is not readily available?
a. Customize a material c. Purchase the material
b. Find a substitute for the material d. Remove it from the request
V. Assignment:
What are the common Occupational Health and Safety (OHS) policies and
procedures that must be followed when installing devices, systems, networking devices
and peripherals?
Prepared by:
RAMON Y. OBLIGAR, JR.
Teacher III, Computer Hardware Servicing
Senior High School
Victorias National High School
Prepared by:
RAMON Y. OBLIGAR, JR.
Teacher III, Computer Hardware Servicing
Senior High School
Victorias National High School