CMM Level 3

Assessment
of Xavor Pakistan.
Conducted By:
Bilal Farooq
Muhammad Adil
Raja
Rabnawaz
Gondal
Aimal Tariq
Rextin
Saadiya Waheed
Introduction of Xavor

 Business consultancy and enterprise information


technology solutions.
 Business & IT Consulting.
 Solution Delivery.
 Maintenance and Platforms.
Organisation Chart Xavor
Pakistan Pvt Ltd
Imran Shah
President Xavor
Corporation

Aamir Matin
CEO Xavor
Pakistan

User Configrati System Project SQA Software


Experienc on Administr Managem (Process, Delivery Administr
e Managem aion nt Testing) ation
ent

Imran Tahir Khan Aamir Aamir Maaz Muhammad Rafique


Hussain Mehmood Matin Mehmood Asjad Raja DBA
Tailoring Procedure

 Examine each activity in the KPA to decide the


relevance of the practice to the organization.

 For each activity, record decides whether to accept,


expand, tailor, or exclude the activity.
 Role Mapping
 Score

 Revise/Tailor the questionnaire accordingly.


Assessment Procedure
 First Question of Requirements Management (RM1)
 Common Feature: Commitment To Perform(C1)

Artifactual
Req't List of Key Activities How Satisfied / Not Satisfied
Evidence 0 1 2 3 4 5 6 7 8 9 10

KPA: Requirements
Management Practices

RM 1 Does there exist any written Software System We were shown the Software
(C1) policy at organizational level Requirements System Requirements Policy
for the management of the Policy Document Document. The document depited
software system copmany's serious commitment
requirements? towards the Software System
Requirements Management
Assessment Results
Analysis of our Assessment
 Level 2

 Requirements Management KPA


 Software Project Planning Practices
 Software Project Tracking & Oversight Practices
 Software Product engineering
 Software Quality Assurance
 Software Configuration Management
Analysis of our Assessment
 Level 3

 Organization Process Focus


 Organization Process Definition
 Training Program
 Integrated software management
 Inter-group Coordination
 Peer Reviews
Recommendations - Level 3
 Problem: - lack of experience in the CM department
 Solution: - Formal training of all personnel in the CM
department.
 Problem: - No measurements of the configuration process are
taken.
 Solution: - Measurements must be taken because it is a
necessary part of CMM. If Xavor does not start taking
measurements of its CM process, it will most probably fail to attain
CMM certifications.
 Problem: - A record of Peer Reviews is not kept. The
information is reviewed and discarded.
 Solution: - The organization should log peer reviews along with
the project and team member details to effectively measure the
team’s performance.
Recommendations - Level 4

 Make a survey in their organization to see which


processes are being or not being measured
quantitatively.
 Make an organizational wide database in which
measurement are recorded.
 Start quantitative analysis during their planning and
development phases.
 Launch a pilot project in which the organization tests
and uses rigorous statistical methods.
Conclusion
KPA Score
Requirements Management 83.3%
Software Project Planning Practices 84%

Software Project Tracking & Oversight 88.6%


Practices
Software Quality Assurance 65%

Software Configuration Management 86.43%

Organization Process Focus 79%

Organization Process Definition 82%

Training Program 67%


Integrated software management 75%

Software Product engineering 80%

Inter-group Coordination 85%


Peer Review 75%
Questions