Pt A, Ch 2, Sec 1

SECTION 1 GENERAL PROVISIONS CONCERNING SURVEYS

1 General principles of surveys 1.2.2 When a survey becomes overdue during a voyage,
the following applies:
1.1 Survey types a) In the case of a class renewal survey, the Society may
grant an extension to allow for completion of this survey
1.1.1 Classed units are submitted to surveys for the mainte-
provided there is documented agreement to such an
nance of class. These surveys include the class renewal sur-
extension prior to the expiry date of the Certificate of
vey, intermediate and annual survey, bottom survey (either
Classification, adequate arrangements have been made
survey in dry condition or in-water survey), propeller shaft
for the attendance of the Surveyor at the first port of call
survey, boiler survey, and surveys for the maintenance of
and the Society is satisfied that there is technical justifi-
additional class notations, where applicable. Such surveys
cation for such an extension. Such an extension will be
are carried out at the intervals and under the conditions laid
granted only until arrival at the first port of call after the
down in this Section. In addition to the above periodical
expiry date of the Certificate of Classification.
surveys, units are to be submitted to occasional surveys
whenever the circumstances so require; refer to [6]. However, if owing to “exceptional circumstances”, the
Note 1: For the terminology related to surveys, refer to Pt A, Ch 2, class renewal survey cannot be completed at the first
Sec 2, [2.2] of the Ship Rules. port of call, the Society may grant an extension, but the
total period of extension shall in no case be longer than
1.1.2 For the requirements related to the extent, determina- three months after the original limit date of the class
tion of locations and acceptance criteria of thickness meas- renewal survey.
urements, reference is made to Ch 2, App 1.
b) In the case of annual and intermediate surveys, no post-
1.1.3 Where there are no specific survey requirements for ponement is granted. Such surveys are to be completed
additional class notations assigned to a unit, equipment within their prescribed windows.
and/or arrangements related to these additional class nota-
tions are to be examined, as applicable, to the Surveyor’s c) In the case of all other periodical surveys and recom-
satisfaction at each class renewal survey for the class. mendations, extension of class may be granted until the
arrival of the unit at the port of destination.
The surveys are to be carried out in accordance with the rel-
evant requirements in order to confirm that the hull,
machinery, equipment and appliances comply with the 1.3 Extension of scope of survey
applicable Rules and will remain in satisfactory condition
based on the understanding and assumptions mentioned in 1.3.1 The Society and/or its Surveyors may extend the
Ch 1, Sec 1, [3.3]. scope of the provisions in the present Chapter, which set
Where the conditions for the maintenance of the class, serv- forth the technical requirements for surveys, whenever and
ice notations and additional class notations are not com- so far as considered necessary, or modify them in the case
plied with, the class and/or the service notation and/or the of special units or systems.
additional class notations as appropriate will be suspended
and/or withdrawn in accordance with the applicable Rules 1.3.2 The extent of any survey also depends upon the con-
given in Pt A, Ch 2, Sec 3 of the Ship Rules. dition of the unit and its equipment. Should the Surveyor
Note 1: It is understood that requirements for surveys apply to have any doubt as to the maintenance or condition of the
those items that are required according to the Rules or, even if not unit or its equipment, or be advised of any deficiency or
required, are fitted on board. damage which may affect the class, then further examina-
tion and testing may be conducted as considered necessary.
1.1.4 Unless otherwise specified, any periodical survey
other than bottom survey and propeller shaft survey may be
effected by carrying out partial surveys at different times to 1.4 General procedure of survey
be agreed upon with the Society, provided that each partial
survey is adequately extensive. The splitting of a survey into 1.4.1 The general procedure of survey consists in:
partial surveys is to be such as not to impair its effectiveness.
• an overall examination of the parts of the unit covered
1.2 Change of periodicity, postponement or by the rule requirements
advance of surveys • checking selected items covered by the rule require-
ments
1.2.1 The Society reserves the right, after due considera-
tion, to change the periodicity, postpone or advance sur- • attending tests and trials where applicable and deemed
veys, taking into account particular circumstances. necessary by the Surveyor.