4.3 Continuous survey system (CS) 4.4 Planned maintenance survey system for
machinery (PMS)
4.3.1 The request by the Owner for admission to the con-
tinuous survey system will be considered by the Society and 4.4.1 A planned maintenance survey system may be con-
agreement depends on the type and age of hull and sidered as an alternative to the continuous survey system for
machinery. This system may apply to the class renewal sur- machinery and is limited to components and systems cov-
vey of hull (CSH), machinery (CSM) or other installations ered by it. When such a system approved by the Society is
such as refrigerating installations (CSR) covered by an addi- implemented, a survey system other than those normally
tional class notation. adopted and with intervals different from those of the con-
tinuous survey system as detailed in [4.3] may be accepted.
4.3.2 When the continuous survey system is applied,
appropriate notations as indicated in [4.3.1] are entered in
4.4.2 The conditions for approval of the planned mainte-
the Register.
nance survey system, the determination of survey item
intervals and the general scope of surveys are detailed in
4.3.3 Units subject to the continuous survey system are pro-
Pt A, Ch 2, App 1 of the Ship Rules.
vided with lists of items to be surveyed under this system.
4.3.4 For items inspected under the continuous survey sys- 4.4.3 When the planned maintenance survey system is
tem, the following requirements generally apply: applied, the notation PMS is entered in the Register.
• the interval between two consecutive surveys of each
4.4.4 The Chief Engineer shall be the responsible person
item is not to exceed five years
onboard in charge of the PMS.
• the items are to be surveyed in rotation, so far as practi-
cable ensuring that approximately equivalent portions The conditions related to Chief Engineer's inspections
are examined each year within the scope of PMS are given in Pt A, Ch 2, App 2 of
the Ship Rules.
• the Society may credit for continuous survey results of
inspections carried out before the admission to the con- Items surveyed by this authorised Chief Engineer will be
tinuous survey scheme subject to the confirmatory survey as detailed in Pt A, Ch 2,
App 2 of the Ship Rules.
• each item is to be surveyed at one time, as far as practi-
cable; the Society may, however, allow possible repair Documentation on overhauls of items covered by the PMS
work to be carried out within a certain period. are to be reported and signed by the Chief Engineer.
4.3.9 For laid-up units, specific requirements given in [8.1] 5.2.1 An intermediate survey, where applicable, is to be
apply. carried out within the window from three months before the
second to three months after the third anniversary date.
4.3.10 The continuous survey system may be discontinued
at any time at the discretion of the Society, or at the request 5.2.2 The intermediate survey is not applicable to units
of the Owner, and a specific arrangement devised. with class symbol II.