Sunteți pe pagina 1din 140

Technical information

MAN industrial Diesel engines

Service record book


Dear Customer,
Congratulations on your decision to purchase a MAN Diesel engine. These engines boast top performance
and operational reliability while requiring only a minimum of maintenance. However, to ensure faultless
operation, some checks and maintenance work are necessary at regular intervals.
This handbook provides an overview of all specified maintenance work.
Service work has to be carried out on the basis of operating hours clocked up according the checklists (pa-
ges 11 and following) by MAN-authorised workshops.
To make it easier for you to handle your new engine correctly, the following publications are available:

D Operating Instructions
D Fuels, Lubricants, Coolants for Industrial and Marine Diesel Engines
D Spare-parts catalogue
D Service record

We shall be pleased to answer your questions on aspects which cannot be clarified with these publications.
When submitting an enquiry, please always indicate the 14-digit engine number which you can find on
the form “General data” on page 3 or on the model plate on the engine.

Yours faithfully,
MAN Nutzfahrzeuge Aktiengesellschaft
Nuremberg Works

We reserve the right to make technical modifications in the course of further development.

 1999 MAN Nutzfahrzeuge Aktiengesellschaft


Reprinting, copying or translation, even in the form of excerpts, is forbidden without the written permission
of MAN. MAN expressly reserves all rights in accordance with the law on copyright.

MTDA / 05.99 51.99597-8007

1
Notes

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

2
General data

Name and address of owner

Data on engine
Engine model: Output in kW:

Works number: Date of commission:

Engine number: Engine speed in rpm:

Name of MAN agent:

Data on drive system


Type of drive system (e.g. generator, pump):

Construction number, year of construction:

Place and date of 20-60 hour service:

3
Notes

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

4
Maintenance procedure

General notes
Please note that servicing must only be carried out by an authorised MAN workshop.
After each service the workshop will confirm that the work has been correctly carried out to checklist by
stamping and signing the service booklet.
Care should be taken that all entries are complete, correct and legible.
A trial run is to be made after each service.
Notes about work and/or repairs that seem to be necessary or have been carried out can also be recorded.

Servicing for engines in continuous operation (> 3000 h / a) and in peak load oper-
ation (< 3000 h / a)
These engines are regularly serviced every 200 operating hours. Apart from this the screw cap on the cool-
ing system and the coolant are to be changed every 2 and 4 years respectively.
All servicing which must be carried out up to 10 000 operating hours and the regular servicing after 2 or 4
years are listed from page 9.

Servicing for engines for standby operation


These engines generally run for only a few operating hours annually. Servicing is therefore to be carried our
each year.
All servicing that must be regularly carried out up to 10 years is listed from page 115 onwards.

The service after 20-60 operating hours


This first service is imperative.
In the context of the first maintenance the form “General data” on page 3 is to be filled in by the
MAN-authorised workshop.

5
General notes for the workshop on care and maintenance

General:
D Exchange worn seals.
D Tighten screwed connections for which tightening torques are specified (see publication “Engineering S
Data S Setting values”), always using a torque wrench.
D Clean removed parts before refitting them, and check them for damage unless exchange is mandatory.

When checking the engine oil level or changing the engine oil
D The procedure for changing engine oil and oil filters is described in the Operating Instructions in the
chapter “Maintenance and care”.
D Keep vicinity of filler orifices and of dipsticks clean, so that no dirt can get into the oil pan.
D Caution: Do not fill up with oil beyond the max. notch on the dipstick. Overfilling causes damage to
engine.
D If loss of oil is due to leaks, ascertain and eliminate cause.

When checking the coolant level


D Top up with missing quantity of fluid, ensuring that the concentration of the antifreeze / anti-corrosion
agent is correct (see Operating Instructions, chapter “Maintenance and care” and the publication “Fuels,
Lubricants, Coolants for MAN Diesel Engines”).
D Ascertain and eliminate cause of loss of coolant.

When changing the coolant


D Drain and fill up with coolant and bleed cooling system as described in the Operating Instructions,
chapter ”Maintenance and care”.
D For antifreeze / anti-corrosion agents see publication “Fuels, Lubricants, Coolants for MAN Diesel Engi-
nes”.

When checking for leaks of oil, coolant and fuel


D Carry out visual check of engine exterior (crankshaft, cylinder heads etc.) for emergence of oil.
D Carry out visual check of all fluid-containing parts (reservoirs, pipes, hoses) for leaks.
D Carry out visual check of pipes and hoses to see whether they are correctly routed or show chafing
marks.

Observe safety instructions in the Operating Instructions!

6
The warranty conditions

Extent of warranty
MAN warrants that within the period of the warranty all D 08 and D 28 engines components identified as
being faulty will, at MAN’s discretion, be either replaced or repaired, the warranty conditions being decisive
for this.

Repairs
For execution of the necessary work the customer has to
D grant the necessary time and opportunity,
D provide at his own expense helpers, machinery and equipment and carry out secondary work,
D perform at his own expense any work above and beyond the original extent of the order.
Depending on the kind of damage, MAN will assume to a reasonable amount both the travelling expenses
arising for authorised service technicians and the necessary dispatch costs for spare and replacement
parts. Extra costs in connection with particular travelling and dispatch expenses are to be borne by the cus-
tomer. Repairs will be performed within normal, regular working hours. Extra costs for work outside regular
working hours are to be borne by the customer.

The warranty does not include


D the exchange of wearing parts such as filters, V-belts and service products (oil, antifreeze and anti-cor-
rosion agents),
D the costs of the execution of the normal service work to be carried out at regular intervals,
D damage resulting from the use of unsuitable service products or from improper handling / operation,
D indirect costs of loss of use, of loss of time, of expenses for board and lodging, of freight charges, of fuel
and of all other consequential costs which may be incurred in connection with warranty cases,
D any damage which arises if the ”Installation instructions for industrial diesel engines” are disregarded.

7
Notes

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

8
Engines for continuous operation

9
Notes

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

10
Service according to chronological intervals

In addition to the service on the basis of operating hours clocked up the following
maintenance work according to chronological intervals are necessary:

Checklist for maintenance work

Changed (= x) after years


Changing of 2 4 6 8 10
Both valve caps on expansion tank
ÍÍÍÍ ÍÍÍÍÍ ÍÍÍÍ
Coolant
ÍÍÍÍ ÍÍÍÍÍ ÍÍÍÍ
Service work carried out after 2 years:

...............................................................................
Place: Date Stamp / signature

Service work carried out after 4 years:

...............................................................................
Place: Date Stamp / signature

Service work carried out after 6 years:

...............................................................................
Place: Date Stamp / signature

Service work carried out after 8 years:

...............................................................................
Place: Date Stamp / signature

Service work carried out after 10 years:

...............................................................................
Place: Date Stamp / signature

11
Notes

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

12
Service after 20-60 operating hours

Checklist for the maintenance work 20-60


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

13
Service after 20-60 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

14
Service after 200 operating hours

Checklist for the maintenance work 200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

15
Service after 200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

16
Service after 400 operating hours

Checklist for the maintenance work 400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Retightening of cylinder head bolts (D 28 engines only)
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

17
Service after 400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

18
Service after 600 operating hours

Checklist for the maintenance work 600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

19
Service after 600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

20
Service after 800 operating hours

Checklist for the maintenance work 800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

21
Service after 800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

22
Service after 1000 operating hours

Checklist for the maintenance work 1000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done

* not when using high-performance engine oil


Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

23
Service after 1000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

24
Service after 1200 operating hours

Checklist for the maintenance work 1200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

25
Service after 1200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

26
Service after 1400 operating hours

Checklist for the maintenance work 1400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

27
Service after 1400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

28
Service after 1600 operating hours

Checklist for the maintenance work 1600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

29
Service after 1600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

30
Service after 1800 operating hours

Checklist for the maintenance work 1800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

31
Service after 1800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

32
Service after 2000 operating hours

Checklist for the maintenance work 2000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

33
Service after 2000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

34
Service after 2200 operating hours

Checklist for the maintenance work 2200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

35
Service after 2200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

36
Service after 2400 operating hours

Checklist for the maintenance work 2400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

37
Service after 2400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

38
Service after 2600 operating hours

Checklist for the maintenance work 2600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

39
Service after 2600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

40
Service after 2800 operating hours

Checklist for the maintenance work 2800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

41
Service after 2800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

42
Service after 3000 operating hours

Checklist for the maintenance work 3000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done

* not when using high-performance engine oil


Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

43
Service after 3000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

44
Service after 3200 operating hours

Checklist for the maintenance work 3200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

45
Service after 3200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

46
Service after 3400 operating hours

Checklist for the maintenance work 3400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

47
Service after 3400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

48
Service after 3600 operating hours

Checklist for the maintenance work 3600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

49
Service after 3600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

50
Service after 3800 operating hours

Checklist for the maintenance work 3800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

51
Service after 3800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

52
Service after 4000 operating hours

Checklist for the maintenance work 4000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt idler pulley, replacing if necessary
V-belt tension, retightening if necessary V-belt(s)
Clearance of engine water pump bearing
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

53
Service after 4000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

54
Service after 4200 operating hours

Checklist for the maintenance work 4200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

55
Service after 4200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

56
Service after 4400 operating hours

Checklist for the maintenance work 4400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

57
Service after 4400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

58
Service after 4600 operating hours

Checklist for the maintenance work 4600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

59
Service after 4600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

60
Service after 4800 operating hours

Checklist for the maintenance work 4800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

61
Service after 4800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

62
Service after 5000 operating hours

Checklist for the maintenance work 5000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done

* not when using high-performance engine oil


Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

63
Service after 5000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

64
Service after 5200 operating hours

Checklist for the maintenance work 5200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

65
Service after 5200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

66
Service after 5400 operating hours

Checklist for the maintenance work 5400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

67
Service after 5400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

68
Service after 5600 operating hours

Checklist for the maintenance work 5600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

69
Service after 5600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

70
Service after 5800 operating hours

Checklist for the maintenance work 5800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

71
Service after 5800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

72
Service after 6000 operating hours

Checklist for the maintenance work 6000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Injectors, replacing if necessary (see following page)
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

73
Service after 6000 operating hours

Opening pressure of injection nozzles

Cylin- Opening Remarks


der pressure (tightness, jet pattern)
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
7 bar
8 bar
9 bar
10 bar
11 bar
12 bar

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

74
Service after 6200 operating hours

Checklist for the maintenance work 6200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

75
Service after 6200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

76
Service after 6400 operating hours

Checklist for the maintenance work 6400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

77
Service after 6400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

78
Service after 6600 operating hours

Checklist for the maintenance work 6600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

79
Service after 6600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

80
Service after 6800 operating hours

Checklist for the maintenance work 6800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

81
Service after 6800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

82
Service after 7000 operating hours

Checklist for the maintenance work 7000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done

* not when using high-performance engine oil


Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

83
Service after 7000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

84
Service after 7200 operating hours

Checklist for the maintenance work 7200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

85
Service after 7200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

86
Service after 7400 operating hours

Checklist for the maintenance work 7400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

87
Service after 7400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

88
Service after 7600 operating hours

Checklist for the maintenance work 7600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

89
Service after 7600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

90
Service after 7800 operating hours

Checklist for the maintenance work 7800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

91
Service after 7800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

92
Service after 8000 operating hours

Checklist for the maintenance work 8000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt idler pulley, replacing if necessary
V-belt tension, retightening if necessary V-belt(s)
Clearance of engine water pump bearing
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Ort Datum Stempel / Unterschrift

93
Service after 8000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

94
Service after 8200 operating hours

Checklist for the maintenance work 8200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

95
Service after 8200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

96
Service after 8400 operating hours

Checklist for the maintenance work 8400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

97
Service after 8400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

98
Service after 8600 operating hours

Checklist for the maintenance work 8600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

99
Service after 8600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

100
Service after 8800 operating hours

Checklist for the maintenance work 8800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

101
Service after 8800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

102
Service after 9000 operating hours

Checklist for the maintenance work 9000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done

* not when using high-performance engine oil


Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

103
Service after 9000 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

104
Service after 9200 operating hours

Checklist for the maintenance work 9200


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

105
Service after 9200 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

106
Service after 9400 operating hours

Checklist for the maintenance work 9400


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

107
Service after 9400 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

108
Service after 9600 operating hours

Checklist for the maintenance work 9600


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

109
Service after 9600 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

110
Service after 9800 operating hours

Checklist for the maintenance work 9800


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil *
Engine oil cartridge(s) *
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
* not when using high-performance engine oil
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

111
Service after 9800 operating hours

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

112
Service after 10 000 operating hours

Checklist for the maintenance work 10 000


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary
Compression (see following page)

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective number of operating hours has been clocked up, the aforementioned maintenance
work is to be carried out by an MAN-authorised workshop. In addition please note the seperately listed
maintenance work in chronological intervals, see page 11.

Service done by

...............................................................................
Place Data Stamp / Signature

113
Service after 10 000 operating hours

Compression pressures of cylinders

Cylin- Compression Remarks


der pressure
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
7 bar
8 bar
9 bar
10 bar
11 bar
12 bar

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

114
Engines for standby operation

115
Notes

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

116
Service for standby engines 1 year after commissioning

Checklist for the maintenance work 1 year


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Retightening of cylinder head bolts (D 28 engines only)
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

117
Service after 1 year

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

118
Service for standby engines 2 years after commissioning

Checklist for the maintenance work 2 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)
Both valve caps on expansion tank

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

119
Service after 2 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

120
Service for standby engines 3 years after commissioning

Checklist for the maintenance work 3 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

121
Service after 3 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

122
Service for standby engines 4 years after commissioning

Checklist for the maintenance work 4 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Injectors, replacing if necessary (see following page)
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)
Both valve caps on expansion tank
Coolant

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

123
Service after 4 years

Opening pressure of injection nozzles

Cylin- Opening Remarks


der pressure (tightness, jet pattern)
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
7 bar
8 bar
9 bar
10 bar
11 bar
12 bar

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

124
Service for standby engines 5 years after commissioning

Checkliste für die Wartungsarbeiten 5 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

125
Service after 5 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

126
Service for standby engines 6 years after commissioning

Checklist for the maintenance work 6 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)
Both valve caps on expansion tank

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

127
Service after 6 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

128
Service for standby engines 7 years after commissioning

Checklist for the maintenance work 7 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

129
Service after 7 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

130
Service for standby engines 8 years after commissioning

Checklist for the maintenance work 8 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Injectors, replacing if necessary (see following page)
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)
Both valve caps on expansion tank
Coolant

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

131
Service after 8 years

Opening pressure of injection nozzles

Cylin- Opening Remarks


der pressure (tightness, jet pattern)
1 bar
2 bar
3 bar
4 bar
5 bar
6 bar
7 bar
8 bar
9 bar
10 bar
11 bar
12 bar

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

132
Service for standby engines 9 years after commissioning

Checklist for the maintenance work 9 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Servicing the air cleaner (earlier if severe operating conditions demand it)

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

133
Service after 9 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

134
Service for standby engines 10 years after commissioning

Checklist for the maintenance work 10 years


Checking of Checked = x / Data
Engine exterior for loss of oil and coolant
Coolant level
Concentration of antifreeze / anti-corrosion agents
Engine oil level
Engine alarms, emergency stop device, overspeed protection
Functioning of instruments
Coolant preheating, function, setting
Coolant hoses for leaks
Fuel lines for leaks
V-belt tension, retightening if necessary V-belt(s)
Draining water from auxiliary fuel filter
Valve clearance, setting if necessary
Water hose clamps, pipe connections and bolts for security,
retightening if necessary

Changing of
Engine oil
Engine oil cartridge(s)
Fuel filter
Servicing the air cleaner (earlier if severe operating conditions demand it)
Both valve caps on expansion tank

Cleaning of
Fuel pre-filter

Test run
done
Once the respective operating time has been clocked up, the aforementioned maintenance work is to be
carried out by an MAN-authorised workshop.

Service done by

...............................................................................
Place Data Stamp / Signature

135
Service after 10 years

Remarks: ............................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

.............................................................................................................................................

136
MAN Nutzfahrzeuge Aktiengesellschaft
Vogelweiherstraße 33 Telefon (0911) 420-0
D-90441 Nürnberg Telefax (0911) 420-1967
Telex 6 22 291 mn d

GB Printed in Germany TDA-N 51.99597-8007

S-ar putea să vă placă și