Sunteți pe pagina 1din 4

7/23/2019 MSME Parameter

MINISTRY OF (http://msme.gov.in/)
MICRO, QUALITY
SMALL & COUNCIL
MEDIUM (https://zed.org.in) OF INDIA
ENTERPRISES (http://www.qcin.org)
Dashboard (Https://Msme.Zedcs.Com/Dashboard) FAQs (Https://Msme.Zedcs.Com/Faqs)

Glossary (Https://Msme.Zedcs.Com/Glossary) Contact Us (Https://Msme.Zedcs.Com/Contactus)

ZED ID: ZEDQCIA001444

Choose your Parameters Proceed


There are 20 pre-selected mandatory parameters. Please select minimum 10 relevant optional
parameters applicable to your unit and click proceed to take Online Self-Assessment.

Mandatory Parameters (20/20) | * All are Mandatory Optional Parameters (0/30) | * Minimum 10 Required

A2: Process Capability Assessment and Enhancement

Realize the process potential, stabilizing and continuously improving process performance

A4: Waste Management

Work place design for reducing Muda, Mura, Muri (3M) in operations

A5: Safe Working Environment

Planning for implementation for safe working of all processes and personnel

C1: Swachh Workplace

Create a clean, tidy, organized and cheerful workplace for improving productivity by involving all

https://msme.zedcs.com/osa/parameter/ 1/4
7/23/2019 MSME Parameter

C2: Daily Works Management


MINISTRY OF (http://msme.gov.in/)
MICRO,
Create a continually improving workplace for enhancing quality, productivity and safety by QUALITY
involving all on daily basis
SMALL & COUNCIL
MEDIUM (https://zed.org.in) OF INDIA
ENTERPRISES (http://www.qcin.org)

C3: Planned Maintenance

Scheduled maintenance at fixed intervals, ensuring that the equipment or item is operating reliably at reduced cost
and downtime

E2: Timely Delivery

Adherence to delivery timelines

F1: Technology Selection and Continual Upgradation

Design, develop & upgrade or source technology commensurate with product design that meets environmental
regulations on a consistent basis and continually enhances environmental performance

F2: Systems for Abatement of Effluent, Emissions and Wastes

Design plant & equipment and processes as a an integral part of manufacturing or service delivery systems so as to
eliminate, reduce, treat or dispose effluents / emissions and solid wastes

F3: Systems for Energy Efficiency

Design plant & equipment, layouts, buildings, practices, monitoring mechanisms to reduce energy consumption, and to
make manufacturing, transportation and storage systems energy efficient when compared to baseline energy
consumption levels

F4: Systems for Natural Resource Conservation

Design or select processes that eliminate or reduce natural resource use and substitute conventional energy sources
with renewable sources

https://msme.zedcs.com/osa/parameter/ 2/4
7/23/2019 MSME Parameter

G1: Installation of Environmental Protection and Measuring Systems


MINISTRY OF (http://msme.gov.in/)
MICRO, QUALITY
Install&plant & equipment, monitoring mechanisms required to eliminate, reduce, treat or dispose effluents/emissions
SMALL COUNCIL
and solid wastes as per design for every new process
MEDIUM or product line
(https://zed.org.in) OF INDIA
ENTERPRISES (http://www.qcin.org)

H1: Planned Maintenance of Environmental Management Systems

Ensure the maintenance of equipment installed for environmental control to keep them operational with lowest
downtime

O1: Outgoing Quality Performance Level

Outgoing (customer end) quality performance level / % improvement

O2: In Process Quality Performance Level

In-house quality performance level / % improvement

P2: Scrap (% of Gross Sales)

Calculation of amount of scrap generated as a % of total sales

Q1: Optimal Use of Natural Resources

Optimal use of natural resources

Q2: Energy Performance

Energy performance

https://msme.zedcs.com/osa/parameter/ 3/4
7/23/2019 MSME Parameter

Q3: Environmental Performance, Air/Effluent, Solid Wastes


MINISTRY OF (http://msme.gov.in/)
MICRO, QUALITY
Environmental
SMALL & performance – air/effluent / solid wastes / renewable resource use
COUNCIL
MEDIUM (https://zed.org.in) OF INDIA
ENTERPRISES (http://www.qcin.org)

R2: Operating Profit/ % Improvement (Measured as Gross Profit)

Operating profit/ % improvement

Proceed

© ZED | QCI 2017 All Rights Reserved

https://msme.zedcs.com/osa/parameter/ 4/4

S-ar putea să vă placă și