3.00 Earthworks:
3.01 Excavation 70.00 CU.M. 300.00
a. Column Footings
b. Wall Footings
c. Footing Tie Beams
3.02 Backfill & Compaction 180.00 CU.M. 250.00
a. Column Footings
b. Wall Footings
c. Footing Tie Beams
d. Slabs on Fill
3.03 Gravel Bedding
3.04 Soil Poisoning 1.00 LOT
Total item 3.00
11,100.00
2,000.00
13.00 Windows:
13.01 W1 3.00 SET
13.02 W1a 1.00 SET
S
13.03 W2 1.00 SET
13.04 W3 1.00 SET
13.05 W4 3.00 SET
13.06 W5 1.00 SET
S
13.07 W6 3.00 SET
13.08 W7 6.00 SET
S
13.09 W8 1.00 SET
S
13.10 W9 2.00 SET
13.11 W10 1.00 SET
S
13.12 W11 1.00 SET
13.13 W11a 3.00 SET
13.14 W12 1.00 SET
S
13.15 W12a 1.00 SET
13.16 W13 1.00 SET
13.17 W14 3.00 SET
13.18 W15 1.00 SET
S
13.19 W16 3.00 SET
13.20 W17 6.00 SET
S
13.21 W17a 1.00 SET
S
13.22 W18 2.00 SET
13.23 W18a 1.00 SET
S
13.24 W19 1.00 SET
13.25 W19a 3.00 SET
13.26 W20 1.00 SET
S
13.27 W20a 1.00 SET
13.28 W21 1.00 SET
13.29 W22 3.00 SET
13.30 W23 1.00 SET
S
13.31 IW1 3.00 SET
13.32 IW2 6.00 SET
S
Total item 13.00 S
14.00 Ironworks:
14.01 Steel Main Stair Railing
14.02 Steel Service Stair Railing
14.03 Exterior Balcony & Roof Deck Railing w/ Tempered Glass
Total item 14.00
Unit Unit
No. Scope Of Works Quantity Unit Material Labor
15.00 Waterproofing:
15.01 Toilets
15.02 Exterior Hallways/ Balconies @ 2nd Floor
15.03 Exterior Hallways/ Balconies @ 3rd Floor
15.04 Roof Deck 1
15.05 Roof Deck 2
15.06 Damp Proofing At Slab on Fill
15.07 Tank lining for underground cistern
Total item 15.00
16.00 Electrical
16.01 Pipes and Boxes
16.02 Wires and Cables
16.03 Devices
16.04 Panel Boards & Service Entrance
16.05 Lithting Fixtures
a. 2x40w Recessed Fluorescent Fixture
b. 2x40w Surface Mounted Fluorescent Fixture
c. 150mm Dia. Recessed Pin Light
d. 150mm Dia. Surface Mounted Pin Light
e. Wall Light
f. Emergency Light
g. Ceiling Exhaust Fan
Total item 16.00
17.00 Plumbing
17.01 Sanitary Lines
17.02 Waterlines
17.03 Downspouts And Drainage
17.04 Fixtures (OFCI)
a. Water Closet
b. Urinal
c. Lavatory - Countertop
d. Lavatory - Wall Mounted
e. Lavatory Faucet
f. Kitchen Sink
g. Kitchen Faucet
h. Shower Assembly
i. Hose Bibb
j. Floor Drains
k. Balcony and Deck Drain
17.05 Grease Trap
Total item 17.00
18.00 Painting:
18.01 Exterior Walls
18.02 Interior Walls
18.03 Ceiling
18.04 Wooden Jambs And Doors
18.05 Metal Jambs and Doors
18.06 Steel Railing
18.07 Pantry Wall and Counter Cabinets
18.08 Toilet Counter Cabinets
Total item 18.00
19.00 Others:
19.01 General Cleaning
19.02 Hauling-Out Of Debris
Total item 19.00
Unit Unit
No. Scope Of Works
No. Scope Of Works Quantity Unit Material Labor
20.00 Post-Construction:
20.01 As-Built Plans
a. Architectural
b. Structural
c. Electrical
d. Sanitary
e. Mechanical
f. Fire Protection
20.02 Occupancy Certificate
20.03 Permanent Meralco Meter
20.04 Permanent Water Meter
20.05 De-Mobilization
Total item 23.00
0.00