Documente Academic
Documente Profesional
Documente Cultură
2010. 8. 24
Function
Location
Suburbanization
• Early 1990s
• Housing-Oriented Sub.
• First-Dev. Then Transport
• Road-Oriented Tran. Pol.
100%
1 7 .3 % 1 4 .5 % 1 3 .1 %
Modal Split 90%
5 3 .4 %
50%
40%
30%
20% 3 5 .4 %
2 9 .3 % 3 2 .9 %
10%
0%
Yr 1996 Yr 2002 Yr 2006
8000
Ulsan
7000
3000
Daegu
2000
Busan
1000
Seoul
0
0 1000 2000 3000 4000 5000 6000 7000 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Y ear
Traffic Congestion Cost(Unit: Billion KWR, $1=1,000KWR)
Development
Location
Plan
Unjeong Stn.
6
4 5
BRT-A 1
BRT
BRT-B
7
3 2
Source:Kho(2006)
Source:Kho(2006)
III. Bus Rapid Transit Policy in the Seoul Metropolitan Areas
Source:Kho(2006)
Source:Kho(2006)
III. Bus Rapid Transit Policy in the Seoul Metropolitan Areas
Non-residential use
Development Density
High-density
Rail station
residential use Low-density residential use
Underground
Distance
Walking-
Available
Distance
Current
Plan(2008) • Housing Supply Plan for 160,000 HHs in the Rail Station Area until Yr. 2018
• Long-term rental housing for 30,000 HHs (Low-income group, the elderly, etc)
• Incentives: releasing such regulations as FAR, Height for development through
upzoning
III. Bus Rapid Transit Policy in the Seoul Metropolitan Areas
BRTPlans
BRT Line Line Plans BRT Routes
BRT Routes and Plans
and Plans BRT in Constructing
1) Kyungbu
1) Kyungbu Exp. (40.2km)
Exp. (40.2km)
E 2) Bundang Urb. Exp. (9.8km) Chungra Chunho Nangok
2)XBundang Urb. Exp. (9.8km)
3) Olympic
3)POlympic Urb.
Urb. Exp. Exp. (40.7km)
(40.7km) BRT BRT BRT
4)RNorth4)Kangbyun
North Kangbyun Urb.
Urb. Exp. Exp. (65.4km)
(65.4km)
5)EKyungin
5) Kyungin Exp. (13.8km)
Exp. (13.8km)
S 6)Exp.
6) Ansan Ansan Exp. (29.8km)
(29.8km) Const. 2007 2006 2005
S 7) Chuncheun Exp. (14.8km)
7)WChuncheun Exp. (14.8km) Period ~2012 ~2010 ~2009
8) Phochun
8)APhochun Exp. (53.4km)
Exp. (53.4km)
9)YMunsan Exp. (22.1km)
9) Munsan Exp. (22.1km)
10) Kanghwa
10) Kanghwa Exp. (17.4km)
Exp. (17.4km)
Length 18.2㎞ 10.5㎞ 3.1㎞
11) National
11) National Road
Road No.1 No.1 (14.8km)
(14.8km) Total
A 125.5 62.3 25.3
12) Suwon~Sadang
12) Suwon~Sadang Road (30.0km)
Road (30.0km)
R 13) National Support Road No.23 (18.8km) Cost
13)
(73.5) (24.9) (17.1)
T National Support Road No.23 (18.8km) (B KWR)
14) 14) Sungnam
E Sungnam Road (22.2km)
Road (22.2km)
R Chunho
15) 15) Chunho Road (13.4km)
Road (13.4km)
16)I Seoul~Chuncheun
16) Seoul~Chuncheun Road (20.2km)
Develo Seoul
A
Road (20.2km) SMTA SMTA
17) National
17) National Road
Road No.3 No.3 (7.6km)
(7.6km) -per City
L 18) Tongil Road (29.5km)
18) Tongil Road (29.5km) Operating
Operating
19)
R Susak19)Road
Susak(19.5km)
Road (19.5km) Constructing
Constructing Note: The cost of ‘( )’is financed by the
O National
20) 20) National Road(25.5km)
Road No.48 No.48 (25.5km) Planning central government; SMTA=Seoul
Planning
A 21) Seoul~Incheon Road (19.2km)
21) Seoul~Incheon Road (19.2km) Metropolitan Transportation Association
D 22) Chungra~Hwagok
22) Chungra~Hwagok Road (18.2km)
Road (18.2km)
III. Bus Rapid Transit Policy in the Seoul Metropolitan Areas
Opening in 2006
24-hour operating on the
arterial road
Total Length = 15.6km
Travel time decreased
up to 11 min. for bus and
3 min. for car
III. Bus Rapid Transit Policy in the Seoul Metropolitan Areas
Punctuality
Deviation from Deviation from Safety
Dist T-time
Line Schedule Schedule
(km) (min) • Number of Traffic Accident
(Bus_min) (Car_min)
Thanks !