Address of Customer H No. 424,1st Floor Shewanta Niwas,Ashok Nagar,Village,Post Piplgaon,Tah Lakhani Dist-Bhandara (MH-441804)
Construction of Two Lanning with Paved Shoulder Road Under Package HAM Hybrid Annuity NAG-
Name of Work
132/133 Dist.Bhandara in state of Maharashtra under MRIPO on Mode.
Aggregates 20mm (50kg)10mm
(50kg),stone dust Customer Ref No. Nill,Dt 02/03/2019
Sample Description
(50kg),bitumen (VG30)(15
litre),cement filler. Sampled By Customer
Dt. of Sample Job mix design for DBM by Marshall
3/8/2019 Name of Test
Received stability test
ASTM D 6926-10/D 6927-15
Dt. of Test Conducted From 09/03/2019 Onwards Test Method & MORTH 5th Rev. Specifications
Aggregate complying with Table 500-10, Grading - 2 of MORTH Specification & Bitumen Complying with VG-30 grade of IS
73 were used for conducting the mix design.
B. BLENDING OF AGGREGATES.
Aggregates Blended By Trial & Error procedure ,for determining the designed Bitumen content,Specimens of compacted
paving mixture were prepared as per ASTM D 6926-10. The bulk specific gravitty of compacted paving mixture were
measured as per ASTM D2726.
C. SPECIFIC GRAVITY OF INDIVIDUAL INGREDIENTS.
For determining the designed Bitumen content,Specimens of compacted paving mixture were prepared as per ASTM
D6926-10. The bulk specific gravitty of compacted paving mixture were measured as per ASTM D2726. The following
graphs are plotted.
1. Percentage air voids Vs Bitumen content
2. Voids filled with Bitumen content Vs Bitumen Content
3. Stability Vs Bitumen content
4. Voids in mineral aggregate Vs Bitumen content
5. Density Vs Bitumen content
6. Flow Vs Bitumen content.
E. DETERMINATION OF OPTIMUM BITUMEN CONTENT
A bar chart has been plotted to determine the range of bitumen passing all criteria. The optimum bitumen content is
determined as guideline given in MS - 2.
P No. 1 of 10
MIX DESIGN SUMMARY OF DENSE BITUMINOUS MACADAM (G-2)
A) Sourses of Materials
Aggregate Source :- Khedepar Crusher
Bitumen Source :- Khedepar Crusher
Bitumen VG30 (Make) :- IOCL Baroda
B) MIX Proportion
Aggregate Size Percentage
20 mm 40.00
10 mm 22.00
Stone Dust 38.00
Filler Cement 1.00
P No. 2 of 10
%Blending of Aggregates
Percentage for blending
%Passing
IS SIEVE 20 mm 10 mm Dust Filler
(mm) (Cement)
Blending Graph
120.00
100.00
80.00
% PASSING
60.00
40.00
20.00
0.00
0.01 0.10 1.00 10.00
SIEVES IN MM
P No. 3 of 10
ng of Aggregates
Total % of MORTH LIMIT TABLE
Passing -500-10
MID LIMIT
85.02 83.00 71 95
70.82 68.00 56 80
46.01 46.00 38 54
35.07 35.00 28 42
13.75 14.00 7 21
4.89 5.00 2 8
ding Graph
ES IN MM
1) 20 mm 40.00%
2) 10 mm 22.00%
3) Stone Dust 37.00%
4) Filler (Cement) 1.00%
Temperature +/-100C
100.00
90.00
80.00
70.00
60.00
% PASSING
50.00
40.00
30.00
20.00
10.00
90.00
80.00
70.00
60.00
% PASSING
50.00
40.00
30.00
20.00
10.00
0.00
0.01 0.10 1.00 10.00
SIEVES IN MM
JMF Lower Limit JMF Upper Limit MORTH Lower Limit Morth Upper Limit
P No. 4 of 10
E BITUMINOUS MACADAM (G-2)
+/-100C
1.00 10.00 100.00
ES IN MM
2) Proportion of materias:-
a) 20 mm 40.00%
b) 10 mm 22.00%
c) Stone Dust 37.00%
d) Filler (cement) 1.00%
e) Bitumen(Gb)* 4.50%
Gmm = 2.621
Gse = [(100-4.50)/(100/2.621)-(4.50/1.027)]
Gse = 2.828
P No. 5 of 10
Analysis of DBM Compacted Paving Mixture (By Marshall Method) G-2
Sp. Gr. of 20 mm, 2.854 40.00%
Sp. Gr. of 10 mm, 2.835 22.00% Effective Sp. Gr. Of aggt. Gse 2.828
Sp. Gr. of Stone Dust 2.752 37.00% Bulk Sp. Gr. Of total aggt. Gsb 2.814
Sp. Gr. Of Filler Cement Apperent sp Gravity Gsa 2.903
3.13 1.00%
Sp. Gr. Of Bitumen, Gb 1.027 3.5%-5.50%
P No. 6 of 10
Graphical Representation of volumetric Parameters vs binder contents for DBM mix by Marshall Method test
Bitumen % Air
Content % Density %VMA %VFB Flow Stability (Kg)
Voids
C o m p a c t e d o f M ix D e n s it y (g m /c c )
100.00
90.00
%of VFB
80.00
70.00
60.00
50.00
40.00
2.540
30.00
2.530
2.520
20.00
2.510
10.00
2.500 0.00
2.490 3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
2.480
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
% of Bitumen Content
% of Bitumen Content
10.00 6.5
Flow in mm
% Air Voids
6.0
9.00
5.5
8.00
5.0
7.00
4.5
6.00 4.0
5.00 3.5
4.00 3.0
2.5
3.00
2.0
2.00
1.5
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
% Of Bitumen Content
% Of Bitumen Content
Stability In( kn)
18.00
17.50 2300.00
% VMA
17.00 2100.00
16.50 1900.00
16.00 1700.00
15.50 1500.00
1300.00
15.00
1100.00
14.50
900.00
14.00
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50 700.00
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50
% Of Bitumen Content
% of Bitumen content
P No. 7 of 10
Analysis of DBM Compacted Paving Mixture (By Marshall Metho
Sp. Gr. of 20 mm, 2.854 40.00% Proving Ring Factor : 7.921 kg
Sp. Gr. of 10 mm, 2.835 22.00%
Sp. Gr. of Stone Dust 2.752 37.00%
Cement (Filler) 3.13 1.00%
Sp. Gr. Of Bitumen, Gb 1.027 4.45%
Max. sp.Gr.of
Bulk Sp. Avg. Sp. Effective
% of Weight in Weight in Weight in air Bulk Sample Effective Sp. Asphalt
% of Agg Gr. of Gr. Of Bitumen
Bitumen air water SSD Volume (loose) (GMM) Gravity of Mix Absorption
Specimen Specimen Content
Practical
Sr. No Mould No
Pba=100 x
Wa Gse= (100-
Ps=100- Wssd - (( Gse- Pbe=Pb-
Pb Wa Ww Wssd (Wssd- Gmb Gmm Pb)/((100/Gmm)-
Pb Ww Gsb )/ (PbaxPs)/100
Ww) (Pb/Gb))
(GsbxGse)x Gb
1 4.45 95.55 2 1270.4 766.4 1271.2 504.8 2.517 2.515 2.623 2.828 0.18 4.277
1 4.45 95.55 2.515 2.623 2.828 0.18 4.277
P No. 8 of 10
l Method) on 4.45% Bitumen Content
Effective Sp. Gr. Of aggt. Gse 2.828
Bulk Sp. Gr. Of total aggt. Gsb 2.814
Asphaltic Absorption Pba 0.18
Average
Voids in Mineral Voids filled with Correlatio Av. Flow
Air Voids Reading Stability (kg) Stability Flow (mm)
Aggregate Bitumen n factor (mm)
(kg)
Designation Designation
lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Sample No-1
18662
Cumulative % Passing
100.00
100.00
100.00
99.84
16.41
1.53
0.00
0.00
0.00
Sample No-2
19434
Cumulative % Passing
100.00
100.00
100.00
99.64
15.32
0.74
0.00
0.00
0.00
Sample No-3
22642
Cumulative % Passing
100.00
100.00
100.00
99.98
15.02
0.42
0.00
0.00
0.00
lane/2-lane with paved shoulder configuration of Saptagram-Kalna -
West-Bengal Km 0.00 Ch to Km 34.00 Ch (District-Hugli)
CONTRACTOR
Weight of Sample in
1 W1 ( gms )
Water
Average Water
11 %
Absorption
Remarks :-
Passing
Too Low
3.95 % To 4.60 %
AIR VOIDS 3.95 3.95% to 5.20%
VFB
3.50 3.60 3.65 3.70 3.75 3.80 3.85 3.90 3.95 4.00 4.05 4.10 4.15 4.20 4.25 4.30 4.35 4.40 4.45 4.50 4.55 4.60 4.65 4.70 4.75 4.80 4.85 4.90 4.95 5.00 5.05 5.10 5.15 5.20 5.25 5.30 5.35 5.40 5.45 5.50
% of Bitumen Content
Note:As per graph all criteria belongs on Bitumen contents 3.95% to 4.60 %
P No. 9 of 10
DBM WITH BITUMEN VG-30 (G-2)
CALCULATIONS FOR QUANTITY OF BITUMEN AND AGGREGATE PER BATCH
% by wt of
Material Size mm aggreates
20 mm 40.00 % Aggregate : 95.55 %
10 mm 22.00 % Bitumen Content : 4.45 %
Stone Dust 37.00 %
Filler (Cement) 1.00 % Total : 100 %
* % by wt of Total mix
Mixing Laying And Rolling Temperature Requirement in 0C As per Morth Table no 500-2
Bitumen Bitumen
Aggregates Mixed Material
Viscosity Temperatur Laying Temperature *Rolling Temperature Remark
Temperature Temperature
Grade e
Prepared By Verified by
P No. 10 of 10