Sunteți pe pagina 1din 237

Course Code: [ ] ASAP QFK

Annexure II

CERTIFICATE IN FIELD
TECHNICIAN - AC
QUALITY FRAMEWORK

course offered by

ADDITIONAL SKILL ACQUISITION


PROGRAMME
(A joint initiative of Higher Education Department and General Education Department, Government of Kerala)

In association with Manipal City & Guilds

Ver 3
Course Code: [ ] ASAP QFK

Contents
Quality Assessment Criteria ................................................................................................................................... 1
Module- 1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry .......................... 3
Module-2 : Basic theory and concepts of small RAC systems ................................................................ 26
Module-3 : Tools and key support activities in the RAC industry ......................................................... 43
Module-4 : Observing safe working environment for RAC work activities.......................................... 69
Module-5 : Plan pre-installation work activities—small commercial air conditioner systems ......... 88
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems 93
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners ........................................................................................................................................ 130
Module-8 : Effective working and customer care relationship ............................................................ 212
Course Code: [ ] ASAP QFK

Quality Assessment Criteria


Module- 1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry
Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 1 : Describe the Refrigeration and Air Conditioning industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  To understand the key aspects of the role of AC- Field Technician
4 Learning
Outcomes*  Know about the role of AC Field Technician
.
5 Methodology Video
6 Teaching – Faculty Guide, Learner Guide, Presentation De, Video
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 1 of 237
Course Code: [ ] ASAP QFK
Module- 1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry
Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 2 : Describe the Refrigeration and Air Conditioning industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Define refrigeration and air conditioning.
 Describe the need of refrigeration and air conditioning for domestic,
commercial and Industrial purposes.
 List the commonly used AC’s available in the market.
 Describe the structure of refrigeration and air conditioning industry.
4 Learning
Outcomes*  Know about Refrigeration and air conditioning.
 Understand the need of refrigeration and air conditioning for domestic,
commercial and Industrial purposes.
 Know the commonly used AC’s available in the market.
 Understand the structure of refrigeration and air conditioning industry.
5 Methodology Activities, student presentations and Instructor led training
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 2 of 237
Course Code: [ ] ASAP QFK
Module- 1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit -1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 3 : Describe the Refrigeration and Air Conditioning industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe the scope of refrigeration and air conditioning industry.
 Describe the importance of qualifications for growth considerations.
 List the main bodies and organizations within the refrigeration and air
conditioning Industry.
4 Learning
Outcomes*  Understand the scope of refrigeration and air conditioning industry.
 Know the importance of qualifications for growth considerations.
 Understand the main bodies and organizations within the refrigeration
and air conditioning Industry.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 3 of 237
Course Code: [ ] ASAP QFK
Module- 1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit -1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 4 : Describe the Refrigeration and Air Conditioning industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe the scope of refrigeration and air conditioning industry.
 Describe the importance of qualifications for growth considerations.
 List the main bodies and organizations within the refrigeration and air
conditioning Industry.
4 Learning
Outcomes*  Understand the scope of refrigeration and air conditioning industry.
 Know the importance of qualifications for growth considerations.
 Understand the main bodies and organizations within the refrigeration
and air conditioning Industry.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 4 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 5 : Describe the use of energy and its impact on the environment

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Define global warming.
 List the possible causes of global warming.
 Differentiate between the direct and indirect impact of global warming.
 Describe the changes seen in the environment due to global warming.
4 Learning
Outcomes*  Understand global warming.
 Understand the possible causes of global warming.
 Differentiate between the direct and indirect impact of global warming.
 Know the changes seen in the environment due to global warming.
5 Methodology Instructor led training , demonstration and presentations and group
activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 5 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 6 : Describe the use of energy and its impact on the environment

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe the impact of cooling systems on the environment.
 Describe the importance of efficient use of energy by cooling systems.
 Describe the types of refrigerants used.
 Explain why modern refrigerants are used in preference to CFCs and
HCFCs.
4 Learning
Outcomes*  Understand the impact of cooling systems on the environment.
 Know the importance of efficient use of energy by cooling systems.
 Know the types of refrigerants used.
 Understand why modern refrigerants are used in preference to CFCs
and HCFCs.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 6 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 7 : Identify the physical forces which have an impact on the


Refrigeration and Air Conditioning industry.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Explain the concept of pressure.
 Explain the concept of heat and the different types of heat transfer.
 Explain the concept of temperature.
 Explain the concept of thermal movement.
4 Learning
Outcomes*  Know the concept of pressure.
 Understand the concept of heat and the different types of heat transfer.
 Know the concept of temperature.
 Study the concept of thermal movement.
5 Methodology Instructor led training and group activities, Group discussion
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 7 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 8 : Identify the physical forces which have an impact on the


Refrigeration and Air Conditioning industry.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Explain the concept of work.
 Explain the concept of power (mechanical).
 List the Metric and British systems of units of measurement.
4 Learning
Outcomes*  Understand the concept of work.
 Know the concept of power (mechanical).
 Know the Metric and British systems of units of measurement
5 Methodology Instructor led training , demonstration and presentations and group
activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 8 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 9 : Working with electricity and electrical components used in the Refrigeration and
Air Conditioning industry.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe the concept and basic principles of electricity.
 Describe how electricity can be applied to a refrigeration and air
conditioning system.
4 Learning
Outcomes*  Understand the concept and basic principles of electricity.
 Know how electricity can be applied to a refrigeration and air
conditioning system
5 Methodology Instructor led training , demonstration and presentations and activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 9 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 10 : Working with electricity and electrical components used in the Refrigeration and
Air Conditioning industry.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Identify the potential hazards associated with electrical systems.
 Describe the safe practices and precautions followed while working with
electrical systems.
 Identify the types of electrical supply items required in buildings and at
construction sites.
 Identify the spare parts used in refrigeration and air conditioning.
4 Learning
Outcomes*  Understand the potential hazards associated with electrical systems.
 Know the safe practices and precautions followed while working with
electrical systems.
 Know the types of electrical supply items required in buildings and at
construction sites.
 Know the spare parts used in refrigeration and air conditioning.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 10 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 11 : Working with fuses.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Define and identify various types of fuses used in the Refrigeration and
Air Conditioning industry.
 Define fuse rating.
 Describe how to assess fuse ratings for various Refrigeration and Air
Conditioning applications.
 Describe what a cartridge fuse is.
 Describe what a miniature circuit breaker is.
4 Learning
Outcomes*  Know the various types of fuses used in the Refrigeration and Air
Conditioning industry.
 Know fuse rating.
 Know how to assess fuse ratings for various Refrigeration and Air
Conditioning applications.
 Know what a cartridge fuse is.
 Know what a miniature circuit breaker is.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 11 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 12 : Working with fuses.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe how to identify and reset a miniature circuit breaker using safe
methods.
 Describe how to identify and reset residual current devices using safe
methods.
 Describe what fuse breakdown is and the causes of fuse breakdown.
 Describe the common checks to be considered before using electrical
equipment.
4 Learning
Outcomes*  Know how to identify and reset a miniature circuit breaker using safe
methods.
 Understand how to identify and reset residual current devices using
safe methods.
 Know what fuse breakdown is and the causes of fuse breakdown.
 Know the common checks to be considered before using electrical
equipment.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 12 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 13 : Describe the Refrigeration Cycle and General AC Standards.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Explain the refrigeration cycle.
4 Learning
Outcomes*  Understand the refrigeration cycle.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 13 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 14 : Describe the Refrigeration Cycle and General AC Standards.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe the general AC standards and the specifications considered in
the Refrigeration and Air conditioning sector.
 Describe the AC standards and the specifications to be considered with
respect to refrigerant.
4 Learning
Outcomes*  Know the general AC standards and the specifications considered in the
Refrigeration and Air conditioning sector.
 Understand the AC standards and the specifications to be considered
with respect to refrigerant.
5 Methodology Instructor led training , demonstration and presentations and group
activities, presentation
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 14 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 15 : Describe the use of drawings, specifications and standards in the Refrigeration and
Air Conditioning industry.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Theory


3 Objectives  Describe the types of drawings used as aids for installation activities.
 Outline an installation work plan with a logical and structured sequence
using a simple drawing.
 Identify the specifications that are used within the refrigeration and air
conditioning industry.
4 Learning
Outcomes*  Know the types of drawings used as aids for installation activities.
 Outline an installation work plan with a logical and structured sequence
using a simple drawing.
 Know the specifications that are used within the refrigeration and air
conditioning industry.
5 Methodology Instructor led training , demonstration and presentations and group
activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment Visit the retail outlets that sell Air conditioners and make a list of different
types of AC’s available along with their features
3 days
10 Assessment N/A
method

Page 15 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 16 : Practical -1 (part).

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Identification of various types of air conditioners.
4 Learning
Outcomes*  Recognize and identify different models of various types of air
conditioners.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window room air conditioner 1
2. High wall split air conditioner 1
3. Brochure covering the following: 20
 Cassette model split air conditioner.
 Slim pac model split air conditioner.
 Floor/ceiling suspended model split air conditioner.
 Package type air conditioner.
 Ductable split air conditioner.
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 16 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 17 : Practical -1 (part) and Practical -11.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Identification of various types of air conditioners.
 Identify the different components in the refrigeration cycle.
4 Learning
Outcomes*  Recognize and identify different models of various types of air
conditioners.
 Recognize the different components of a drawing.
5 Methodology Instructor led training , demonstration and Practical exercise & feedback
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
Provide a numbered drawing showing doors, windows,
beams, pillars, glass, walls, partitions, electrical points and
furniture - 11
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 17 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 18 : Practical -2 and Practical -4.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Identify the gas cylinders used.
 Understanding temperature
4 Learning
Outcomes*  Identify different gas cylinders.
 Describe temperature.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Nitrogen 1
2. Oxygen 1
3. Acetylene 1
4. Refrigerant 1
5. LPG 1
6. Thermometer 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 18 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 19 : Practical -3 and Practical -5

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Observing and checking for pressure.
 Observation of different types of heat transfer.
4 Learning
Outcomes*  Understand pressure.
 Explain the different types of heat transfer.
5 Methodology Instructor led training , demonstration and Practical exercise & feedback
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Medium sized balloon 20
2. Foot long hose to fi t the faucet at the centre 1
3. A plastic/rubber reducer that fi ts faucet 1
4. An electric heater/stove 1
5. A small pressure cooker 1
6. A fi lled gas cylinder 1
7. Pressure gage 1
8. Electric heater/stove 1
9. Metal kettle with metal handle containing water 1
10. Stirrer to stir 1
11. Thermometer 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 19 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 20 : Practical -6 and Practical -7

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Measurement of voltage and current.
 Identifying the different ratings of fuses.
4 Learning
Outcomes*  Identify the rating of the refrigeration and air conditioning units.
 Identify the different fuse ratings.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Voltmeter 1
2. Ammeter 1
3. Wires 1
4. Variac 1
5. Wiring diagram 1
6. Fuses of different ratings 2 each
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 20 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 21 : Practical -8 and Practical -9

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Identify the different types of electrical wires.
 Identify the different types of circuit breakers.
4 Learning
Outcomes*  Recognize the color code and ratings of the electrical wire.
 Recognize the different types of circuit breakers and their ratings by
physical appearance.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Red in colour electric wire in 4, 2.5, 1.5 sq. mm 1+1+1
2. Blue in colour electric wire in 4, 2.5, 1.5 sq. mm 1+1+1
3. Green in colour electric wire in 4, 2.5, 1.5 sq. mm 1+1+1
4. Black in colour electric wire in 4, 2.5, 1.5 sq. mm 1+1+1
5. MCB of different types and ratings 2 each
6. MCCB of different types and ratings 2 each
7. ELCB of different ratings 2
8. Electrical wire As per the requirement
9. Variac 1
10. A bulb with holder 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 21 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 22 : Practical -10 and Practical -12

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Identify the different components in the refrigeration cycle.
 Identifying various building surfaces.
4 Learning
Outcomes*  Understand the different components and uses in the refrigeration
cycle.
 Understand the difference between the building surfaces relating to
refrigeration and air conditioning industry.
5 Methodology Instructor led training , demonstration and Practical exercise & feedback
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
Please refer to the practical guide for the tools required for this practical.

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 22 of 237
Course Code: [ ] ASAP QFK
Module-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Unit-1 : Introduction to the Refrigeration and Air Conditioning (RAC) industry

Session 23 : Practical -13

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108

2 Theory / Practical Practical


3 Objectives  Interpret the owner’s manual/catalogue.
4 Learning
Outcomes*  Understand the different features of each model and interpret the
owner’s manual/catalogue.
5 Methodology Instructor led training , demonstration and Practical exercise & feedback
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Owner’s manual/catalogue of air conditioner 8

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment
3 days
10 Assessment
method

Page 23 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 1 : Explain cooling systems and technology

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Identify the cooling systems used in the refrigeration and air
conditioning industry.
 Describe what a compressor is and list the types of compressors used in
the refrigeration and air conditioning industry.
 Describe what a reciprocating compressor is and state the purpose of
using it.
 Describe what a rotary compressor is and state the purpose of using it.
 Describe what a scroll compressor is and state the purpose of using it.
 Describe what a condenser is and list the type of condensers used in the
refrigeration and air conditioning industry.
 Describe what an air- cooled condenser is and state the purpose of
using it.
4 Learning
Outcomes*  Know the cooling systems used in the refrigeration and air conditioning
industry.
 Know what a compressor is and understand the types of compressors
used in the refrigeration and air conditioning industry.
 Understand what a reciprocating compressor is and state the purpose of
using it.
 Know what a rotary compressor is and state the purpose of using it.
 Understand what a scroll compressor is and state the purpose• Know
what a condenser is and understand the type of condensers used in the
refrigeration and air conditioning industry.
 Understand what an air-cooled condenser is and state the purpose of
using it.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals N/A
N/A
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
ISBN:0-07-068167-8
Refrigeration, 2nd Edition, McGraw-Hill

Page 24 of 237
Course Code: [ ] ASAP QFK
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 25 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 2 : Explain cooling systems and technology

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe what a water-cooled condenser is and state the purpose of
using it.
 Describe what an evaporator is and list the types of evaporators used in
the refrigeration and air conditioning industry.
 Describe what a flooded evaporator is and state the purpose of using it.
 Describe what an expansion valve is and list the types of expansion
valves used in the refrigeration and air conditioning industry.
 Describe what a capillary expansion valve is and state the purpose of
using it.
 Describe what a thermostatic expansion valve (TEV) is and state the
purpose of using it.
4 Learning
Outcomes*  Understand what a water-cooled condenser is and state the purpose of
using it.
 Know what an evaporator is and understand the types of evaporators
used in the refrigeration and air conditioning industry.
 Understand what a flooded evaporator is and state the purpose of using
it.
 Know what an expansion valve is and understand the types of
expansion valves used in the refrigeration and air conditioning
industry.
 Understand what a capillary expansion valve is and state the purpose of
using it.
 Know what a thermostatic expansion valve (TEV) is and state the
purpose of using it.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen

Page 26 of 237
Course Code: [ ] ASAP QFK
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 27 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 3 : Define cooling science and calculations

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe four way reversing valve.
 Describe the operating principle of a four way reversing valve.
 Describe the operating principle of a small commercial refrigerating
system for chilled and frozen applications. Also list the defrosting
procedures involved.
 Describe the operating principles of small air conditioning split systems
used for cooling only and heat pumping applications.
 Describe the pressure- temperature relationship.
 Describe the properties of matter when in liquid state.
4 Learning
Outcomes*  Know four way reversing valve.
 Understand the operating principle of a four way reversing valve.
 Understand the operating principle of a small commercial refrigerating
system for chilled and frozen applications. Also know the defrosting
procedures involved.
 Know the operating principles of small air conditioning split systems
used for cooling only and heat pumping applications.
 Understand the pressure-temperature relationship.
 Know the properties of matter when in liquid state.
5 Methodology Instructor led training , demonstration and presentations and group
activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
Page 28 of 237
Course Code: [ ] ASAP QFK
N/A
10 Assessment N/A
method

Page 29 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 4 : Define cooling science and calculations

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Define a sub-cooled liquid.
 Define saturated liquid.
 Define a saturated two phase mixture.
 Describe the properties of matter when in gaseous (vaporous) state.
 Define a saturated vapor.
 Define a superheated vapor.
4 Learning
Outcomes*  Understand a sub-cooled liquid.
 Know saturated liquid.
 Know a saturated two phase mixture.
 Understand the properties of matter when in gaseous (vaporous) state.
 Know a saturated vapor.
 Understand a superheated vapor.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 30 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 5 : Identify basic cooling system electrics, electronics and controls.


Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Explain the concept of electric current.
 Explain the concept of voltage.
 Explain the concept of resistance.
 Explain the concept of conduction.
 State Ohm’s law.
 Describe a series circuit.
 Describe a parallel circuit.
 Describe the AC circuit theory.
 Describe the DC circuit theory.
 Describe a single phase induction motor.
4 Learning
Outcomes*  Understand the concept of electric current.
 Know the concept of voltage.
 Know the concept of resistance.
 Understand the concept of conduction.
 Understand Ohm’s law.
 Know a series circuit.
 Know a parallel circuit.
 Understand the AC circuit theory.
 Know the DC circuit theory.
 Know a single phase induction motor.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A

Page 31 of 237
Course Code: [ ] ASAP QFK
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 32 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 6 : Identify basic cooling system electrics, electronics and controls.


Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Explain the principles of a single phase induction motor.
 Describe a three phase induction motor.
 Describe the motor starting control circuits used in the refrigeration
and air conditioning systems.
 Describe the operating control circuits used in the refrigeration and air
conditioning systems.
 Explain the concept of thermostat.
 Explain what is meant by over current / over temperature protection.
 Explain the applications of multimeter.
 Explain the applications of megger meters.
4 Learning
Outcomes*  Understand the principles of a single phase induction motor.
 Know a three phase induction motor.
 Understand the motor starting control circuits used in the refrigeration
and air conditioning systems.
 Know the operating control circuits used in the refrigeration and air
conditioning systems.
 Know the concept of thermostat.
 Know what is meant by over current / over temperature protection.
 Understand the applications of multimeter
 Know the applications of megger meters.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third Edition,
McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration, 2nd Edition,
McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A

9 Assignment Draw a cross sectional diagram of the compressor in a chart , name it’s part
s and functions
2 days
10 Assessment method N/A
Page 33 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 7 : Practical -1

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify various types of compressors.
 Understanding the parallel and series connection in electricity.
4 Learning
Outcomes*  Identify the different types of compressors.
 Do wiring for a parallel and series connection.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Reciprocating compressor and its types- As per the requirement.
 Hermetically sealed.
 Semi-hermetically sealed.
 Open type.
2. Rotary compressor As per the requirement.
3. Scroll compressor As per the requirement.
4. Screw compressor As per the requirement.
5. Centrifugal compressor As per the requirement.
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 34 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 8 : Practical -2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Understanding the parallel and series connection in electricity.
4 Learning
Outcomes*  Do wiring for a parallel and series connection.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Air cooled condenser 1
2. Chart of water cooled condenser 1
3. Chart of evaporative condenser 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 35 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 9 : Practical -3

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify various types of condensers.
 Identify various types of evaporators.
4 Learning
Outcomes*  Identify the different types of condensers.
 Understand the different types of evaporators.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Finned evaporator 1
2. Flooded evaporator 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 36 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 10 : Practical -4

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify various components of expansion valves.
 Procedure to check the temperature using thermometer.
4 Learning
Outcomes*  Identify the different types of expansion valves.
 Check the temperature using thermometer.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Chart of hand expansion valve 1
2. Chart of automatic expansion valve 1
3. Thermostatic expansion valve 1
4. Capillary tube 1
5. Chart of fl oat valve 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment

10 Assessment
method

Page 37 of 237
Course Code: [ ] ASAP QFK
Module-2 : Basic theory and concepts of small RAC systems

Unit-2 : Basic theory and concepts of small RAC systems

Session 11 : Practical -4

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify various components of expansion valves.
 Procedure to check the temperature using thermometer.
4 Learning
Outcomes*  Identify the different types of expansion valves.
 Check the temperature using thermometer.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Chart of hand expansion valve 1
2. Chart of automatic expansion valve 1
3. Thermostatic expansion valve 1
4. Capillary tube 1
5. Chart of fl oat valve 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment

10 Assessment
method

Page 38 of 237
Course Code: [ ] ASAP QFK
Modules / Units to be tested
Module 1 - Introduction to the Refrigeration and Air Conditioning (RAC) industry
Module 2- Basic theory and concepts of small RAC systems

Session 12: Assessment of Learning [Internal]: Theory -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment: N/A

8 Resources References : N/A Links: N/A

9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 39 of 237
Course Code: [ ] ASAP QFK
Modules / Units to be tested
Module 1 - Introduction to the Refrigeration and Air Conditioning (RAC) industry
Module 2- Basic theory and concepts of small RAC systems

Session 13: Assessment of Learning [Internal]: Theory -1t Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment:
N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 40 of 237
Course Code: [ ] ASAP QFK

Modules / Units to be tested


Module 1 - Introduction to the Refrigeration and Air Conditioning (RAC) industry
Module 2- Basic theory and concepts of small RAC systems

Session 14: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor / SDE from the practical guide,
Learning Material Practical worksheets from practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical observation
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 41 of 237
Course Code: [ ] ASAP QFK
Modules / Units to be tested
 Introduction to the Refrigeration and Air Conditioning (RAC) industry
 Basic theory and concepts of small RAC systems

Session 15: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor /, Practical worksheets from
Learning Material practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical Observation
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 42 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 1 : Tools and equipment – Part 1

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  List and describe the different tools and equipment used in system
installation.
4 Learning
Outcomes*  Know and understand the different tools and equipment used in system
installation
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 43 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 2 : Tools and equipment – Part 1

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  List and describe the different tools and equipment used in system
installation.
4 Learning
Outcomes*  Know the range of tools and equipment used in refrigeration and air
conditioning
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 44 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 3 : Tools and equipment – Part 2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Identify what a hand operated tool is.
 Describe under what circumstances should a technician use the hand
operated tool.
 Identify what a power operated tool is.
4 Learning
Outcomes*  Know what a hand operated tool is.
 Know under what circumstances should a technician use the hand
operated tool.
 Understand what a power operated tool is
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 45 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 4 : Tools and equipment – Part 2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe under what circumstances should a technician use the power
operated tool.
 Explain what personal protective equipment is.
 List and describe the various PPE used in the refrigeration and air
conditioning industry
4 Learning
Outcomes*  Know under what circumstances a technician should use the power
operated tool.
 Know what personal protective equipment is.
 Understand and know the various PPE used in the refrigeration and air
conditioning industry.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 46 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 5 : Special tools used in refrigeration and air conditioning industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Explain what flaring is.
 Describe the types of flaring tools.
 Explain why pipe bending is required.
 Describe the types of pipe bending
4 Learning
Outcomes*  Know what flaring is.
 Understand the types of flaring tools.
 Know why pipe bending is required.
 Know the types of pipe bending tools.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 47 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 6 : Special tools used in refrigeration and air conditioning industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe what swaging is.
 Describe the types of swaging tools.
 Explain a vacuum pump and its use in refrigeration and air
conditioning industry.
4 Learning
Outcomes*  Understand what swaging is.
 Know the types of swaging tools.
 Know a vacuum pump and its use in refrigeration and air conditioning
industry.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 48 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 7 : Brazing and soldering industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe what brazing is.
 Identify and describe the types of brazing tools.
 Describe the process of brazing.
4 Learning
Outcomes*  Know what brazing is.
 Identify and know the types of brazing tools.
 Understand the process of brazing
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 49 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 8 : Brazing and soldering industry

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Explain how to store brazing equipment’s used in the refrigeration and
air conditioning industry.
 Describe the safety precautions required before, during and after
brazing operations.
 Describe what soldering is.
 Identify and describe the types of soldering tools.
 Describe the principles of soldering.
 Explain the circumstances under which soldering is used.
 Describe the safety precautions required before, during and after
soldering operations
4 Learning
Outcomes*  Know how to store brazing equipment’s used in the refrigeration and air
conditioning industry.
 Understand the safety precautions required before, during and after
brazing operations.
 Know what soldering is.
 Identify and know the types of soldering tools.
 Understand the principles of soldering.
 Know the circumstances under which soldering is used.
 Understand the safety precautions required before, during and after
soldering operations

5 Methodology Instructor led training and group activities


6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Page 50 of 237
Course Code: [ ] ASAP QFK
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 51 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 9 : Pressure Testing

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe the importance of pressure testing.
 List the types of tools used in pressure testing.
 Describe the safety precautions required before, during and after
pressure testing operation.
 Explain the gases used for pressure testing.
 Describe the steps to follow the pressure testing process
4 Learning
Outcomes*  Learners will be able to describe the process of pressure testing and its
importance.

5 Methodology Instructor led training and group activities and learner presentations and
Quizzing
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 52 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 10 : Pressure Testing

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe the importance of pressure testing.
 List the types of tools used in pressure testing.
 Describe the safety precautions required before, during and after
pressure testing operation.
 Explain the gases used for pressure testing.
 Describe the steps to follow the pressure testing process
4 Learning
Outcomes*  Learners will be able to describe the process of pressure testing and its
importance.

5 Methodology Instructor led training and group activities and learner presentations and
Quizzing
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 53 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 11 : Vacuumising

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe the importance of vacuumising.
 List the types of tools used in vacuumising.
 Describe the safety measures to be taken before, during and after
vacuumising process.
 Describe the steps to follow the vacuumising process.
4 Learning
Outcomes*  Learners will be able to describe the process of vacuumising and its
importance.

5 Methodology Instructor led training and activities and presentations


6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 54 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 12 : Vacuumising

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe the importance of vacuumising.
 List the types of tools used in vacuumising.
 Describe the safety measures to be taken before, during and after
vacuumising process.
 Describe the steps to follow the vacuumising process.
4 Learning
Outcomes*  Learners will be able to describe the process of vacuumising and its
importance.

5 Methodology Instructor led training and activities and presentations


6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 55 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-1 : Tools and key support activities in the RAC industry

Session 13 : Refrigerant Charging

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Explain the importance of refrigerant charging.
 List the types of tools used in refrigerant charging.
 Describe the safety precautions required before, during and after
the refrigerant charging operation.
 Explain the refrigerants used for refrigerant charging.
 Describe the steps to follow the refrigerant charging process.
4 Learning
Outcomes*  Learners will be able to describe the process of refrigerant charging
and its importance.

5 Methodology Instructor led training and activities and presentations


6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 56 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-1 : Tools and key support activities in the RAC industry

Session 14 : Refrigerant Charging

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Explain the importance of refrigerant charging.
 List the types of tools used in refrigerant charging.
 Describe the safety precautions required before, during and after
the refrigerant charging operation.
 Explain the refrigerants used for refrigerant charging.
 Describe the steps to follow the refrigerant charging process.
4 Learning
Outcomes*  Learners will be able to describe the process of refrigerant charging
and its importance.

5 Methodology Instructor led training and activities and presentations


6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 57 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 15 : Drilling

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe what drilling is.
 List and describe the types of drilling tools.
4 Learning
Outcomes*  Know what drilling is.
 List and understand the types of drilling tools.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 58 of 237
Course Code: [ ] ASAP QFK
Module-3 : Tools and key support activities in the RAC industry

Unit-3 : Tools and key support activities in the RAC industry

Session 16 : Drilling

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  List out the circumstances when the drilling is used.
 Describe the safety precautions required before, during and after the
drilling operation.
4 Learning
Outcomes*  List out the circumstances when the drilling is used.
 Understand the safety precautions required before, during and after the
drilling operation.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment 1. Write a short note on pipe fitting process for split air conditioners.
2. Explain the safety procedures to be followed during the pipe jointing
and fitting process
2 days
10 Assessment N/A
method

Page 59 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 17 : Practical -1(part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify the tools in a tool kit used in the refrigeration and air
conditioning industry.
4 Learning
Outcomes*  Check various tools in the kit and identify tools used in the refrigeration
and air conditioning industry.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Hand tools—hammer, screw driver, cutting plier, jumper,
Spanners - 2 each
2. Power tools—drilling machine, cutting machine, power
screw driver - 2 each
3. Special tools—tube bender, tube cutters, swaging tools - 2 each
4. Measuring tools—clamp meter, gauge manifold with
charging line, digital/analog thermometer. - 2 each
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 60 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 18 : Practical -2(part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify various types of fasteners used for different surfaces.
4 Learning
Outcomes*  Identify the types of fasteners used for different surfaces.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Screws bolts 2 each
2. Nuts 2 each
3. Washers 2 each
4. Rivets 2 each
5. Anchor fasteners 2 each
6. Wire clips 2 each
7. Cable tags 2 each
8. Royal plugs 2 each
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 61 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 19 : Practical -2 (part) and Practical -4 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Identify various types of fasteners used for different surfaces.
 Perform different types of tube bending.
4 Learning
Outcomes*  Identify the types of fasteners used for different surfaces.
 Learn how to bend a copper tube.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Screws bolts 2 each
2. Nuts 2 each
3. Washers 2 each
4. Rivets 2 each
5. Anchor fasteners 2 each
6. Wire clips 2 each
7. Cable tags 2 each
8. Royal plugs 2 each
9. Tube cutter 2
10. Tube bender—spring and standard 2
11. Copper tube 2
12. Marker pen 2
13. Measuring tape 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 62 of 237
Course Code: [ ] ASAP QFK

Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 20 : Practical -4 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Perform different types of tube bending.
4 Learning
Outcomes*  Learn how to bend a copper tube
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Tube cutter 2
2. Tube bender—spring and standard 2
3. Copper tube 2
4. Marker pen 2
5. Measuring tape 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 63 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 21 : Practical -3 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Perform flaring and swaging of different types of copper pipes (quarter,
half, three-fourth, five- eighth, three eighth inch).
4 Learning
Outcomes*  Learn how to perform flaring and swaging of different types of copper
pipes.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Flaring set 2
2. Tube cutter 2
3. Swaging tool 2
4. Copper pipe- ½ inch, ¾ inch, ¼ inch 1 length of 5m
5. Flat file-smooth 2
6. Sand paper 2 sheets
7. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 64 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 22 : Practical -3 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Perform flaring and swaging of different types of copper pipes (quarter,
half, three-fourth, five- eighth, three eighth inch
4 Learning
Outcomes*  Learn how to perform flaring and swaging of different types of copper
pipes.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Flaring set 2
2. Tube cutter 2
3. Swaging tool 2
4. Copper pipe- ½ inch, ¾ inch, ¼ inch 1 length of 5m
5. Flat file-smooth 2
6. Sand paper 2 sheets
7. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 65 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 23 : Practical -3 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Perform flaring and swaging of different types of copper pipes (quarter
half, three-fourth, five- eighth, three eighth inch).
4 Learning
Outcomes*  Learn how to perform flaring and swaging of different types of copper
pipes.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Flaring set 2
2. Tube cutter 2
3. Swaging tool 2
4. Copper pipe- ½ inch, ¾ inch, ¼ inch 1 length of 5m
5. Flat file-smooth 2
6. Sand paper 2 sheets
7. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 66 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 24 : Practical -5 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Perform joints on PVC pipes and fittings).
4 Learning
Outcomes*  Learn how to join PVC pipes and fittings
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. PVC pipes As per requirement
2. PVC fi ttings As per requirement
3. PVC solvent As per requirement
4. Cotton waste As per requirement
5. Emery paper As per requirement
6. Flat file 2
7. Measuring tape 2
8. Hacksaw blade 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 67 of 237
Course Code: [ ] ASAP QFK
Module-3 : Basic theory and concepts of small RAC systems

Unit-3 : Basic theory and concepts of small RAC systems

Session 25 : Practical -5 (part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Perform joints on PVC pipes and fittings).
4 Learning
Outcomes*  Learn how to join PVC pipes and fittings
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. PVC pipes As per requirement
2. PVC fi ttings As per requirement
3. PVC solvent As per requirement
4. Cotton waste As per requirement
5. Emery paper As per requirement
6. Flat fi le 2
7. Measuring tape 2
8. Hacksaw blade 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment

10 Assessment
method

Page 68 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 1 : General responsibilities of the employer and employee for ensuring safety and the
need for safety legislations

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  List and describe the different health and safety legislation acts
governing a work place.
 List and describe the employer’s and employee’s responsibility with
regard to health and safety at work.
 Describe control of substances hazardous to health (COSHH).
4 Learning
Outcomes*  Know and understand the different health and safety legislation acts
governing a work place.
 Know and understand the employer’s and employee’s responsibility
with regard to health and safety at work.
 Understand control of substances hazardous to health (COSHH).
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 69 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 2 : General responsibilities of the employer and employee for ensuring safety and the
need for safety legislations

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Prepare a list of these hazardous substances affecting the refrigeration
and air conditioning industry and the precautions taken while using
them.
 List the electricity at work applicable to a work place.
 List the precautionary measures for reducing the potential safety risk to
persons at work.
4 Learning
Outcomes*  Understand the hazardous substances affecting the refrigeration and air
conditioning industry and the precautions taken while using them.
 Know and list the electricity at work applicable to a work place.
 Know and list the precautionary measures for reducing the potential
safety risk to persons at work.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 70 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 3 : To follow necessary precautions and to safeguard customer’s property

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  List and describe the safety signs and notices used as precautions in the
refrigeration and air conditioning industry.
 Describe the accident prevention methods
4 Learning
Outcomes*  Understand the hazardous substances affecting the refrigeration and air
conditioning industry and the precautions taken while using them.
 Know and list the electricity at work applicable to a work place.
 Know and list the precautionary measures for reducing the potential
safety risk to persons at work.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 71 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 4 : To follow necessary precautions and to safeguard customer’s property

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  List and describe the safety signs and notices used as precautions in the
refrigeration and air conditioning industry.
 Describe the accident prevention methods.
4 Learning
Outcomes*  Understand the hazardous substances affecting the refrigeration and air
conditioning industry and the precautions taken while using them.
 Know and list the electricity at work applicable to a work place.
 Know and list the precautionary measures for reducing the potential
safety risk to persons at work.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 72 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 5 : Safety and first aid

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Explain what is meant by first aid and why is first aid important.
 Explain what a technician has to carry in his/her first aid kit.
 Explain about the need for fire fighting equipment.
 Differentiate between fire fighting equipment used for different types of
fires.
 Explain the different types of locations where the air conditioning
system needs to be installed.
4 Learning
Outcomes*  Know what is meant by first aid and why is first aid important.
 Understand what a technician has to carry in his/her first aid kit.
 Know about the need for fire fighting equipment.
 Understand the Difference between fire fighting equipment used for
different types of fires.
 Know the different types of locations where the air conditioning system
needs to be installed.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 73 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 6 : Safety and first aid

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Explain what is meant by first aid and why is first aid important.
 Explain what a technician has to carry in his/her first aid kit.
 Explain about the need for fire fighting equipment.
 Differentiate between fire fighting equipment used for different types of
fires.
 Explain the different types of locations where the air conditioning
system needs to be installed.
4 Learning
Outcomes*  Know what is meant by first aid and why is first aid important.
 Understand what a technician has to carry in his/her first aid kit.
 Know about the need for fire fighting equipment.
 Understand the Difference between fire fighting equipment used for
different types of fires.
 Know the different types of locations where the air conditioning system
needs to be installed.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 74 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 7 : Safe methods and procedures for working at heights

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Describe types/systems used for working at heights.
 Explain procedures for working at heights.
 Identify protective clothing/equipment needed while working at
heights.
4 Learning
Outcomes*  Know types/systems used for working at heights.
 Understand the procedures for working at heights.
 Identify protective clothing/equipment needed while working at
heights.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 75 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 8 : Safe methods and procedures for working at heights

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Describe types/systems used for working at heights.
 Explain procedures for working at heights.
 Identify protective clothing/equipment needed while working at
heights.
4 Learning
Outcomes*  Know types/systems used for working at heights.
 Understand the procedures for working at heights.
 Identify protective clothing/equipment needed while working at
heights.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 76 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 9 : Safe methods and procedures for ensuring electrical safety

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Describe types of protective clothing/equipment used for safely working
with electrical equipment.
 Describe the isolating switches used in single- phase and three-phase
circuits.
4 Learning
Outcomes*  Understand the types of protective clothing/equipment used for safely
working with electrical equipment.
 Know about the isolating switches used in single-phase and three-phase
circuits.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 77 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 10 : Safe methods and procedures for ensuring electrical safety

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Theory
3 Objectives  Identify the common faults in electrical tools.
 Describe the correct operation of electrical equipment.
 Describe the basic first aid for electrical injuries.
4 Learning
Outcomes*  Know and identify the common faults in electrical tools.
 Understand the correct operation of electrical equipment.
 Know about the basic first aid for electrical injuries.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment Draw a Circuit diagram of the connection from Main supply to Stabilizer
and the air conditioner
1 day
10 Assessment N/A
method

Page 78 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 11 : Practical-1

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Working with electrical tools and equipment.
4 Learning
Outcomes*  Check and clean the work area.
 Select appropriate and safe electrical tools and equipment.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Power source 2
2. Broom/vacuum 2
3. Cables with plug points 2
4. Locks for lockout 2
5. Tags for tag out 2
6. Insulation tapes/sleeve 2
7. Safety shoes 2
8. Voltage (power) detector 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 79 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 12 : Practical-2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Marking and drilling on different surfaces using safe methods.
4 Learning
Outcomes*  Mark and drill holes following safe methods.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Hammer drilling machine 2
2. Jumper 2
3. Power source 2
4. Broom/vacuum 2
5. Cables with plug points 2
6. Safety shoves 2
7. Chuck key 2
8. Marker pen/pencil 2
9. PVC sleeve 2
10. Hand gloves 2
11. Goggles 2
12. Extension ladder/step ladder/platform ladder with rubber soles.1
13. Helmet. 2
14. Measuring tape 2
15. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 80 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work Activities

Session 13 : Practical -2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Marking and drilling on different surfaces using safe methods.
4 Learning
Outcomes*  Mark and drill holes following safe methods.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Hammer drilling machine 2
2. Jumper 2
3. Power source 2
4. Broom/vacuum 2
5. Cables with plug points 2
6. Safety shoves 2
7. Chuck key 2
8. Marker pen/pencil 2
9. PVC sleeve 2
10. Hand gloves 2
11. Goggles 2
12. Extension ladder/step ladder/platform ladder with rubber soles.1
13. Helmet. 2
14. Measuring tape 2
15. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 81 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 14 : Practical -2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Marking and drilling on different surfaces using safe methods.
4 Learning
Outcomes*  Mark and drill holes following safe methods.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Hammer drilling machine 2
2. Jumper 2
3. Power source 2
4. Broom/vacuum 2
5. Cables with plug points 2
6. Safety shoves 2
7. Chuck key 2
8. Marker pen/pencil 2
9. PVC sleeve 2
10. Hand gloves 2
11. Goggles 2
12. Extension ladder/step ladder/platform ladder with rubber soles.1
13. Helmet. 2
14. Measuring tape 2
15. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 82 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 15 : Practical -3

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Compliance to health and safety legislation when brazing.
4 Learning
Outcomes*  Understand the safety measures to be taken while brazing.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
Please refer to the practical guide for the tools required for this practical.

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 83 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 16 : Practical -4(part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Understand first aid at work.
4 Learning
Outcomes*  Identify the content of the first aid kit and appropriately administer
first aid when required.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. First aid kit. 1
2. Running water
3. Clean cloth 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 84 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 17 : Practical -4(part) and Practical-5

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Understand first aid at work.
 Cleaning and storing procedures for tools.
4 Learning
Outcomes*  Identify the content of the first aid kit and appropriately administer
first aid when required.
 Describe the cleaning and maintenance procedures.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. First aid kit. 1
2. Running water
3. Clean cloth 1
4. Tool kit 1
5. Cloth and cleaning agents As per requirement
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 85 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 18 : Practical -6(part) and Practical-7

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Identify different signage.
 Identify and use different types of fire extinguisher safely
4 Learning
Outcomes*  Follow the signage at the work place.
 Identify different types of fire extinguishers.
 Identify different parts of fire extinguishers.
 Demonstrate how to operate a fire extinguisher.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Safety signage chart 1
2. Fire extinguishers Two of each type
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 86 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 19 : Practical -7(part) and Practical-8

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Identify and use different types of fire extinguisher safely.
 Evacuation procedures
4 Learning
Outcomes*  Identify different types of fire extinguishers.
 Identify different parts of fire extinguishers.
 Demonstrate how to operate a fire extinguisher.
 Understand the importance of evacuation procedures during
emergency.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Fire extinguishers Two of each type
2. A fire blanket 1
3. Wet towels to cover face As per requirement
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 87 of 237
Course Code: [ ] ASAP QFK
Module-4 : Observing safe working environment for RAC work activities

Unit-4 : Observing safe working environment for RAC work activities

Session 20 : Practical -7(part) and Practical-8

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108
2 Theory / Practical Practical
3 Objectives  Identify and use different types of fire extinguisher safely.
 Evacuation procedures
4 Learning
Outcomes*  Identify different types of fire extinguishers.
 Identify different parts of fire extinguishers.
 Demonstrate how to operate a fire extinguisher.
 Understand the importance of evacuation procedures during
emergency.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
2. Fire extinguishers Two of each type
2. A fire blanket 1
3. Wet towels to cover face As per requirement
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 88 of 237
Course Code: [ ] ASAP QFK
Module-5 : Plan pre-installation work activities—small commercial air conditioner systems

Unit-5 : Plan pre-installation work activities—small commercial air conditioner systems

Session 1 : Pre-installation work activities to be carried out

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  List and describe the job information that must be acquired before
planning an installation.
 Describe how to choose the location of a window air conditioner (AC).
 Describe how to choose the location of a split AC.
4 Learning
Outcomes*  List and understand the job information that must be acquired before
planning an installation.
 Know how to choose the location of a window air conditioner (AC).
 Understand how to choose the location of a split AC.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 89 of 237
Course Code: [ ] ASAP QFK
Module-5 : Plan pre-installation work activities—small commercial air conditioner systems

Unit-5 : Plan pre-installation work activities—small commercial air conditioner systems

Session 2 : Pre-installation work activities to be carried out

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe how to plan the drilling and chipping activities required for
routing a refrigerant pipe during installation.
 Describe how to plan the drilling and chipping activities required for
routing a drain pipe during installation.
 Identify and plan the power supply requirements for the AC unit.
 List and describe the details covered in the approvals to be obtained
from the customer before installation.
4 Learning
Outcomes*  Know how to plan the drilling and chipping activities required for
routing a refrigerant pipe during installation.
 Understand how to plan the drilling and chipping activities required for
routing a drain pipe during installation.
 Know how to Identify and plan the power supply requirements for the
AC unit.
 Know and understand the details covered in the approvals to be
obtained from the customer before installation.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment Visit a AC repairing workshop and prepare a chart on the safety precaution
nary measures taken at the premises by interviewing any senior AC
Technician
2 days
10 Assessment method N/A
Page 90 of 237
Course Code: [ ] ASAP QFK
Module-5 : Plan pre-installation work activities—small commercial air conditioner systems
Unit-5 : Plan pre-installation work activities—small commercial air conditioner systems
Session 3 : Practical -1(part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Understand drawings.
4 Learning
Outcomes*  Understand and interpret drawings.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Drawing (three views) 30

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 91 of 237
Course Code: [ ] ASAP QFK
Module-5 : Plan pre-installation work activities—small commercial air conditioner systems

Unit-5 : Plan pre-installation work activities—small commercial air conditioner systems

Session 4 : Practical -1(part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Understand drawings.
4 Learning
Outcomes*  Understand and interpret drawings.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Drawing (three views) 30

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment

10 Assessment
method

Page 92 of 237
Course Code: [ ] ASAP QFK
Modules / Units to be tested
 Tools and key support activities in the RAC industry
 Safe working environment for RAC work activities
 Plan pre-installation work activities—small commercial air conditioner systems

Session 5: Assessment of Learning [Internal]: Theory -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment: N/A

8 Resources References : N/A Links: N/A

9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 93 of 237
Course Code: [ ] ASAP QFK
Modules / Units to be tested
Module 3: Tools and key support activities in the RAC industry
Module 4: Safe working environment for RAC work activities
Module 5: Plan pre-installation work activities—small commercial air conditioner systems

Session 6: Assessment of Learning [Internal]: Theory -1t Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment:
N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 94 of 237
Course Code: [ ] ASAP QFK

Modules / Units to be tested


Module 3: Tools and key support activities in the RAC industry
Module 4: Safe working environment for RAC work activities
Module 5: Plan pre-installation work activities—small commercial air conditioner systems

Session 7: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor / SDE from the practical guide,
Learning Material Practical worksheets from practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical Observation
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 95 of 237
Course Code: [ ] ASAP QFK
Modules / Units to be tested
Module 3: Tools and key support activities in the RAC industry
Module 4: Safe working environment for RAC work activities
Module 5: Plan pre-installation work activities—small commercial air conditioner systems

Session 8: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor /, Practical worksheets from
Learning Material practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical Observation
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 96 of 237
Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 1 : Identify the necessities to prepare a work location for the installation of systems
and components

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe a pre-installation sheet and list the contents of a typical pre-
installation sheet.
 List the safety provisions required for installation.
 List the tools and equipment required during installation.
 List the areas at a site which need to be safeguarded prior to
commencement of work.
4 Learning
Outcomes*  Understand a pre-installation sheet and list the contents of a typical
pre-installation sheet.
 Know and list the safety provisions required for installation.
 Know and list the tools and equipment required during installation.
 Understand and list.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 97 of 237
Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 2 : Identify the necessities to prepare a work location for the installation of systems
and components

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Identify the existing input services at the installation site.
 Describe the procedure to unpack and remove system components
before moving it to the desired work location.
 List and describe the checks required after unpacking a window AC
system, as per the manufacturer’s recommendations.
 List and describe the checks required after unpacking a split AC system,
as per the manufacturer’s recommendations.
 List and describe the steps to be taken on receiving a wrong or damaged
unit.
4 Learning
Outcomes*  Know and identify the existing input services at the installation site.
 Understand the procedure to unpack and remove system components
before moving it to the desired work location.
 Know and understand the checks required after unpacking a window
AC system, as per the manufacturer’s recommendations.
 Know and understand the checks required after unpacking a split AC
system, as per the manufacturer’s recommendations.
 Know and understand the steps to be taken on receiving a wrong or
damaged unit.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Page 98 of 237
Course Code: [ ] ASAP QFK
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 99 of 237
Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 3 : Installation of systems and components

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Identify the steps taken to fix different components of a window AC.
 Identify the steps taken to fix different components of a split AC.
 Identify the steps taken for drilling and chipping at different parts of
the site while installing a split AC.
4 Learning
Outcomes*  Understand the steps taken to fix different components of a window AC.
 Know and identify the steps taken to fix different components of a split
AC.
 Understand and identify the steps taken for drilling and chipping at
different parts of the site while installing a split AC.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 100 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 4 : Installation of systems and components

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  List the piping activities done during the installation of a split AC.
 Identify the different means of connecting indoor/outdoor units of a
split AC.
 Identify the cleaning activities involved after an installation.
4 Learning
Outcomes*  Know and list the piping activities done during the installation of a split
AC.
 Know and identify the different means of connecting indoor/outdoor
units of a split AC.
 Understand and identify the cleaning activities involved after an
installation.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 101 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems
Unit-6 : Installation and commissioning work activities—small commercial air conditioner
systems
Session 5 : Pre-commission checks and tests on the system
Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Identify and check the power supply source for a window AC.
 Identify and check the power supply source for a split AC.
 Describe how to check whether all valves open correctly and how to
check for leaks in different valves and connections for a split
AC.
4 Learning  Know how to identify and check the power supply source for a
Outcomes* Window AC.
 Know how to identify and check the power supply source for a split AC.
 Understand how to check whether all valves open correctly
and how to check for leaks in different valves and connections for a
split AC.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 102 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 6 : Pre-commission checks and tests on the system

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe how to check whether all valves open correctly and how to
check for leaks in different valves and connections for a split AC.
 Describe the basic checks performed for a window AC.
 Describe the basic checks performed for a split AC.
4 Learning
Outcomes*  Know how to check whether all valves open correctly and how to check
for leaks in different valves and connections for a split AC.
 Understand the basic checks performed for a window AC.
 Know the basic checks performed for a split AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 103 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems
Unit-6 : Installation and commissioning work activities—small commercial air conditioner
systems
Session 7 : How to commission a system

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe how to switch on the unit to commission a system.
 Identify the different checks to be performed on the system settings.
 List the different performance criteria to be considered while checking
the performance of a system.
4 Learning
Outcomes*  Understand how to switch on the unit to commission a system.
 Know and identify the different checks to be performed on the system
settings.
 Understand the different performance criteria to be considered while
checking the performance of a system.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 104 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 8 : How to commission a system

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Theory


3 Objectives  Describe the options to be covered while demonstrating the use of
system to the customer.
 Describe how to prepare / obtain the performance report for a system
and explain how to obtain an acknowledgement for the customer.
4 Learning
Outcomes*  Understand the options to be covered while demonstrating the use of
system to the customer.
 Know how to prepare / obtain the performance report for a system and
explain how to obtain an acknowledgement for the customer.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment Visit any Industry / Large Hotels where the commercial air conditioners are
put in use. Interview the maintenance engineer or supervisor and make a
list of periodic maintenance activities done by them.
3 days
10 Assessment N/A
method

Page 105 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 9 : Practical -1

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Data Sheet 10
2. Measuring Tape As per requirement
3. Tester As per requirement
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 106 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 10 : Practical -2

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
Please refer to the practical guide for the tools required for this practical.

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 107 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 11 : Practical -3

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 108 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 12 : Practical -4

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 109 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 13 : Practical -5

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 110 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 14 : Practical -6

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 111 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 15 : Practical -7

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 112 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 16 : Practical -8

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 113 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 17 : Practical -9

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 114 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 18 : Practical -10

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 115 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 19 : Practical -11

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 116 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 20 : Practical -12

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
9 Assignment N/A
N/A
10 Assessment
method

Page 117 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 21 : Practical -13

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 118 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 22 : Practical -14

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 119 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 23 : Practical -15

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 120 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 24 : Practical -16

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 121 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 25 : Practical -17

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 122 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 26 : Practical -18

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 123 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 27 : Practical -19

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 124 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 28 : Practical -20

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 125 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 29 : Practical -21

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 126 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 30 : Practical -22

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment
N/A
10 Assessment
method

Page 127 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 31 : Practical -23

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 128 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 32 : Practical -24

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 129 of 237


Course Code: [ ] ASAP QFK
Module-6 : Installation and commissioning work activities—small commercial air conditioner
systems

Unit-6 : Installation and commissioning work activities—small commercial air conditioner


systems

Session 33 : Practical -24(Part)

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3108 ELE/N3109

2 Theory / Practical Practical


3 Objectives  Learn how to install the AC and commission the same.
4 Learning
Outcomes*  Install and commission the AC.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 130 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 1 : Identifying, disassembling and assembling the parts of a window air conditioner
Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Identify the different parts of a window air conditioner.
 Describe how to disassemble the different parts of a window air
conditioner.
4 Learning  Identify and disassemble the parts of window and split air conditioners.
Outcomes*
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 131 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 2 : Identifying, disassembling and assembling the parts of a window air conditioner
(contd.) Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Describe how to assemble the different parts of a window air
conditioner.

4 Learning  Assemble the parts of window and split air conditioners.


Outcomes*
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 132 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 3 : Identifying, disassembling and assembling the parts of a split air conditioner—part
1
Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Identify the different parts of a split air conditioner.
 Describe how to disassemble the different parts of an indoor unit of a
split air conditioner.
 Describe how to assemble the different parts of an indoor unit of a split
air conditioner.
4 Learning  Assemble a split air conditioner.
Outcomes*
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 133 of 237


Course Code: [ ] ASAP QFK

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 4 : Identifying, disassembling and assembling the parts of a split air conditioner—part
1(Contd.)
Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Assemble the different parts of an indoor unit of a split air conditioner.

4 Learning  Assemble the indoor unit of a split air conditioner.


Outcomes*
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 134 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 5 : Identifying, disassembling and assembling the parts of a split air conditioner—part
2
Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Describe how to disassemble the different parts of an outdoor unit of a
split air conditioner.

4 Learning  Assemble the outdoor unit of a split air conditioner.


Outcomes*

5 Methodology Group activity, Instructor led training , demonstration and presentations


and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 135 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 6 : Identifying, disassembling and assembling the parts of a split air conditioner—part
2(Contd.)
Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Assemble how to assemble the different parts of an outdoor unit of a
split air conditioner.

4 Learning  Assemble the outdoor unit of a split air conditioner.


Outcomes*
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 136 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 7 : Preventive maintenance of window and split air conditioners— part 1


Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Identify, disassemble and assemble the parts of window and split air
conditioners.
 Carry out the preventive maintenance of window and split air
conditioners.
4 Learning
Outcomes*  Procedures of preventive maintenance of window and split air
conditioners.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 137 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 8 : Preventive maintenance of window and split air conditioners (Contd.)

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain the process of cleaning and checks for split air conditioners for
dry service.
 Explain the process of cleaning and checks for split air conditioners for
wet service.
 Explain the cleaning activities performed after maintenance of air
conditioner.
4 Learning  Know the cleaning and checking procedures of a split air conditioner.
Outcomes*

5 Methodology Instructor led training and group activities


6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 138 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 9 : Identification of various problems in window and split air conditioners— part 1

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Identify and explain the various problems and causes in window air
conditioners for which repair has to be carried out—part 1.
4 Learning
Outcomes*  Understand troubleshooting and repair of window and split air
conditioners.
 Carry out troubleshooting and repairs of window and split air
conditioners.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 139 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 10 : Identification of various problems in window and split air conditioners— part 1
(Contd.)

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Identify and explain the various problems and causes in window air
conditioners for which repair has to be carried out
4 Learning
Outcomes*  Understand troubleshooting and repair of window air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 140 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 11 : Identification of various problems in window and split air conditioners— part 2

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Identify and explain the various problems and causes in split air
conditioners, for which repair has to be carried out
4 Learning
Outcomes*  Understand troubleshooting and repair of window and split air
conditioners.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 141 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 12 : Identification of various problems in window and split air conditioners— part 2
(Contd.)

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain how to obtain the required approvals from the customer before
troubleshooting and repair is done.
 Describe a field failure report.
 Explain how to obtain the required approvals from the customer before
troubleshooting and repair is done.
 Explain how to protect customers’ property at different work locations,
prior to work commencing.
4 Learning
Outcomes*
 Various procedures of servicing a split air conditioner.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 142 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 13: Understand troubleshooting and repair of window and split air conditioners— part 1

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  List and check the safety provisions required while troubleshooting and
repairing the air conditioner unit.
 List and check the tools and equipment required for troubleshooting
and repairing the air- conditioned unit.
 Explain troubleshooting and repair procedure of a compressor in
window or split air conditioners.
4 Learning
Outcomes*  Understand and carry out troubleshooting and repair of window and
split air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 143 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 14: Understand troubleshooting and repair of window and split air conditioners— part 1

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain troubleshooting and repair procedure of a condenser in window
or split air conditioners.
 Explain troubleshooting and repair procedure of an evaporator in
window or split air conditioners.
4 Learning
Outcomes*  Understand and carry out troubleshooting and repair of window and
split air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 144 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 15: Troubleshooting and repair of window and split air conditioners— part 2

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain troubleshooting and repair procedure of a capillary tube in
window or split air conditioners.
 Explain troubleshooting and repair procedure of a drier in window or
split air conditioners.
 Explain troubleshooting and repair procedure of a condenser fan in
window or split air conditioners.
4 Learning
Outcomes*  Understand and carry out troubleshooting and repair of window and
split air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 145 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 16: Troubleshooting and repair of window and split air conditioners— part 2

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain troubleshooting and repair procedure of an evaporator
fan/blower in window or split air conditioners.
 Explain troubleshooting and repair procedure of a thermostat in
window or split air conditioners.
 Explain troubleshooting and repair procedure of a relay in window or
split air conditioners.
4 Learning
Outcomes*  Understand and carry out troubleshooting and repair of window and
split air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 146 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 17 : Troubleshooting and repair of window and split air conditioners— part 3

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain troubleshooting and repair procedure of a start capacitor in
window or split air conditioner.
 Explain troubleshooting and repair procedure of a run capacitor in
window or split air conditioner.
 Explain troubleshooting and repair procedure of a fan motor in window
or split air conditioner.
 Explain troubleshooting and repair procedure of a front panel in
window or split air conditioner.
 Explain troubleshooting and repair procedure of an on board circuit in
window or split air conditioner.
4 Learning
Outcomes*  Understand and carry out troubleshooting and repair of window and
split air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 147 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 18 : Troubleshooting and repair of window and split air conditioners— part 3

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain the wiring circuit of a window air conditioner.
 Explain the wiring circuit of a split air conditioner
4 Learning
Outcomes*  Explain the wiring circuit of a window air conditioner.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 148 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 19 : Troubleshooting and repair of window and split air conditioners — part 4

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain the troubleshooting and repair procedure of interconnecting
refrigerant piping for split air conditioners.
4 Learning
Outcomes*  Understand troubleshooting of interconnecting refrigerant piping for
split air conditioners.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 149 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 20 : Troubleshooting and repair of window and split air conditioners — part 4 (Contd.)

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Theory
3 Objectives  Explain the cleaning activities performed after completion of the repair
activity.
 Explain how to obtain the performance report for the system and an
acknowledgement from the customer.
4 Learning
Outcomes*  Procedure to culminate a service call.
5 Methodology Group activity, Instructor led training , demonstration and presentations
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment Prepare a flow chart of AC installation process
1 day
10 Assessment N/A
method

Page 150 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 21 : Practical: Disassembly of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassembling parts of window air conditioner.
4 Learning
Outcomes*  Disassembling of parts.
 Recognition of different parts.
 Usage of tools.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 151 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 22 : Practical: Disassembly of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassembling parts of window air conditioner.
4 Learning
Outcomes*  Disassembling of parts.
 Recognition of different parts.
 Usage of tools.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 152 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 23 : Practical: Assembly of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Assembling parts of window air conditioner.
4 Learning
Outcomes*  Assembling of Widow Air-conditioner parts.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 153 of 237


Course Code: [ ] ASAP QFK

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 24 : Practical:Assembly of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Assembling parts of window air conditioner.
4 Learning
Outcomes*  Assembling of Widow air- conditioner parts.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 154 of 237


Course Code: [ ] ASAP QFK

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 25 : Practical: Disassembly of split air conditioners.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassembling indoor and outdoor units of a split air conditioner.
4 Learning
Outcomes*  Disassembling of parts.
 Recognition of different parts.
 Usage of tools.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double ended spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
Page 155 of 237
Course Code: [ ] ASAP QFK
N/A
10 Assessment
method

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 26 : Practical: Disassembly of split air conditioners.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassembling indoor and outdoor units of a split air conditioner.
4 Learning
Outcomes*  Disassembling of parts.
 Recognition of different parts.
 Usage of tools.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double ended spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A

Page 156 of 237


Course Code: [ ] ASAP QFK
N/A
10 Assessment
method

Page 157 of 237


Course Code: [ ] ASAP QFK

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 27: Practical:Assembly of split air conditioner

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Assemble parts of split air conditioner
4 Learning
Outcomes*  Assemble parts of split air conditioner.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 158 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 28: Practical:Assembly of split air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Assemble parts of split air conditioner
4 Learning
Outcomes*  Assemble parts of split air conditioner.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 159 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 29: Practical:Dry service of window air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Dry service of window air conditioner.
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 160 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 30: Practical:Dry service of window air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Dry service of window air conditioner.
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 161 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 31: Practical: Dry service of split air conditioners.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Dry service of window air conditioner.
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 162 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 32: Practical:Dry service of window split air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Dry service of window air conditioner.
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 163 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 33: Practical:Wet service of window air conditioners

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassemble and conduct wet service of window air conditioner
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 164 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 34: Practical: Wet service of window air conditioners

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassemble and conduct wet service of window air conditioner
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Window air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 165 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 35: Practical: Wet service of split air conditioners

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassemble and conduct wet service of split air conditioner
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 166 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 36: Practical:Wet service of split air conditioners

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassemble and conduct wet service of split air conditioner.
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 167 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 37: Practical:Wet service of split air conditioners

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Disassemble and conduct wet service of split air conditioner
4 Learning
Outcomes*  Disassembling the unit.
 Proper cleaning steps being followed.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Split air conditioner 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Allen key 2
8. Double end spanner set 2
9. Tester 2
10. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 168 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 38: Practical:Checking the compressor electrically and mechanically for window and spilt
air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To check the compressor electrically and mechanically for window and
spilt air conditioner.
4 Learning
Outcomes*  Checking the compressor for possible defects electrically.
 Checking the compressor for possible defects mechanically.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Compressor 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Pressure gauge 2
8. Brazing set 2
9. Charging line 2
10. Hand shut off valve 4
11. Copper pipes—¼” 2m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 169 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 39: Practical: Checking the compressor electrically and mechanically for window and spilt
air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To check the compressor electrically and mechanically for window and
spilt air conditioner.
4 Learning
Outcomes*  Checking the compressor for possible defects electrically.
 Checking the compressor for possible defects mechanically.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Compressor 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Pressure gauge 2
8. Brazing set 2
9. Charging line 2
10. Hand shut off valve 4
11. Copper pipes—¼” 2m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 170 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Session 40: Practical: Checking the compressor electrically and mechanically for window and spilt
air conditioner.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To check the compressor electrically and mechanically for window and
spilt air conditioner.
4 Learning
Outcomes*  Checking the compressor for possible defects electrically.
 Checking the compressor for possible defects mechanically.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Compressor 2
2. Multimeter 2
3. Screw driver 2
4. Cutting plier 2
5. Cotton waste 1 lot
6. Emery paper 2 sheets
7. Pressure gauge 2
8. Brazing set 2
9. Charging line 2
10. Hand shut off valve 4
11. Copper pipes—¼” 2m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 171 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 41 : Practical:Check condenser for leakage of window and spilt air conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To detect the defect in the condenser and find suitability of usage in the
air conditioner system.
4 Learning
Outcomes*  Check for leakage in the condenser.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Condenser 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Pressure gauge 2
7. Welding set 2
8. Charging line 2
9. Hand shut off valve 4
10. Leak testing tank 1
11. Nitrogen cylinder with valves 2
12. ¼” copper tube 2m
13. Flare nuts 4
14. Flaring tool 2
15. Swaging tool 2
16. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A

Page 172 of 237


Course Code: [ ] ASAP QFK
10 Assessment
method

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 42 : Practical: Check condenser for leakage of window and spilt air conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To detect the defect in the condenser and find suitability of usage in the
air conditioner system.
4 Learning
Outcomes*  Check for leakage in the condenser.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Condenser 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Pressure gauge 2
7. Welding set 2
8. Charging line 2
9. Hand shut off valve 4
10. Leak testing tank 1
11. Nitrogen cylinder with valves 2
12. ¼” copper tube 2m
13. Flare nuts 4
14. Flaring tool 2
15. Swaging tool 2
16. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
N/A
Page 173 of 237
Course Code: [ ] ASAP QFK
9 Assignment N/A
10 Assessment
method

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 43 : Check condenser for leakage of window and spilt air conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To detect the defect in the condenser and find suitability of usage in the
air conditioner system.
4 Learning
Outcomes*  Check for leakage in the condenser.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Condenser 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Pressure gauge 2
7. Welding set 2
8. Charging line 2
9. Hand shut off valve 4
10. Leak testing tank 1
11. Nitrogen cylinder with valves 2
12. ¼” copper tube 2m
13. Flare nuts 4
14. Flaring tool 2
15. Swaging tool 2
16. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A

Page 174 of 237


Course Code: [ ] ASAP QFK
9 Assignment N/A
N/A
10 Assessment
method

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 44 : Check evaporator for leakage of window and spilt air conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To detect the defect in the evaporator and find suitability of usage in the
air conditioner system.
4 Learning
Outcomes*  Check for leakage in the evaporator
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Evaporator 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Pressure gauge 2
7. Welding set 2
8. Charging line 2
9. Hand shut off valve 4
10. Leak testing tank 1
11. Nitrogen cylinder with valves 2
12. ¼” copper tube 2m
13. Flare nuts 4
14. Flaring tool 2
15. Swaging tool 2
16. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Page 175 of 237


Course Code: [ ] ASAP QFK
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 45 : Check evaporator for leakage of window and spilt air conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To detect the defect in the evaporator and find suitability of usage in the
air conditioner system.
4 Learning
Outcomes*  Check for leakage in the evaporator.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Evaporator 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Pressure gauge 2
7. Welding set 2
8. Charging line 2
9. Hand shut off valve 4
10. Leak testing tank 1
11. Nitrogen cylinder with valves 2
12. ¼” copper tube 2m
13. Flare nuts 4
14. Flaring tool 2
15. Swaging tool 2
16. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
ISBN:0-07-068167-8
2nd Edition, McGraw-Hill

Page 176 of 237


Course Code: [ ] ASAP QFK
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 177 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 46 : Check evaporator for leakage of window and spilt air conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To detect the defect in the evaporator and find suitability of usage in the
air conditioner system.
4 Learning
Outcomes*  Check for leakage in the evaporator.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Evaporator 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Pressure gauge 2
7. Welding set 2
8. Charging line 2
9. Hand shut off valve 4
10. Leak testing tank 1
11. Nitrogen cylinder with valves 2
12. ¼” copper tube 2m
13. Flare nuts 4
14. Flaring tool 2
15. Swaging tool 2
16. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 178 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 47 : Check blockage of capillary tube

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Confirm there is no blockage of capillary tube.
4 Learning
Outcomes*  To check for blockage of the capillary tube.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Capillary tube 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Nitrogen cylinder with valves 2
7. Brazing set 2
8. Hand shut off valve 2
9. Copper pipe—¼” 1m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 179 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 48 : Check blockage of capillary tube

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Confirm there is no blockage of capillary tube.
4 Learning
Outcomes*  To check for blockage of the capillary tube.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Capillary tube 2
2. Screw driver 2
3. Cutting plier 2
4. Cotton waste 1 lot
5. Emery paper 2
6. Nitrogen cylinder with valves 2
7. Brazing set 2
8. Hand shut off valve 2
9. Copper pipe—¼” 1m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 180 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 49 : Check blockage of drier and fixing of new drier for window and split air
conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Confirm there is no blockage of drier.
4 Learning
Outcomes*  To check for blockage of drier and replacing it to a new one.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Drier 2
2. Spanner 2
3. Copper pipe—¼” 1m
4. Nitrogen cylinder with regulators 2
5. Charging line 2
6. Straight connectors 2
7. Flaring tool 2
8. Swaging tool 2
9. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 181 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 50 : Check blockage of drier and fixing of new drier for window and split air
conditioner

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Confirm there is no blockage of drier.
4 Learning
Outcomes*  To check for blockage of drier and replacing it to a new one.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Drier 2
2. Spanner 2
3. Copper pipe—¼” 1m
4. Nitrogen cylinder with regulators 2
5. Charging line 2
6. Straight connectors 2
7. Flaring tool 2
8. Swaging tool 2
9. Hammer 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 182 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 51 : Check the performance of condenser fan

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of condenser fan.
4 Learning
Outcomes*  Check the working of condenser fan.
 Confirm proper balancing while working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Condenser fan 2
2. Fan motor 2
3. T Alan key 2
4. Cotton waste 1 lot
5. Power supply 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 183 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 52 : Check the performance of condenser fan

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of condenser fan.
4 Learning
Outcomes*  Check the working of condenser fan.
 Confirm proper balancing while working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Condenser fan 2
2. Fan motor 2
3. T Alan key 2
4. Cotton waste 1 lot
5. Power supply 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 184 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 53 : Check the performance of condenser fan

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of condenser fan.
4 Learning
Outcomes*  Check the working of condenser fan.
 Confirm proper balancing while working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Condenser fan 2
2. Fan motor 2
3. T Alan key 2
4. Cotton waste 1 lot
5. Power supply 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 185 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 54 : Check the performance of evaporator fan

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of evaporator fan.
4 Learning
Outcomes*  Check the working of evaporator fan.
 Confirm proper balancing while working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Evaporator fan 2
2. Fan motor 2
3. T Alan key 2
4. Cotton waste 1 lot
5. Power supply 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 186 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 55 : Check the performance of evaporator fan

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of evaporator fan.
4 Learning
Outcomes*  Check the working of evaporator fan.
 Confirm proper balancing while working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Evaporator fan 2
2. Fan motor 2
3. T Alan key 2
4. Cotton waste 1 lot
5. Power supply 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 187 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 56 : Check the performance of evaporator fan

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of evaporator fan.
4 Learning
Outcomes*  Check the working of evaporator fan.
 Confirm proper balancing while working.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Evaporator fan 2
2. Fan motor 2
3. T Alan key 2
4. Cotton waste 1 lot
5. Power supply 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 188 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 57 : Check the working of thermostat.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check the performance of the thermostat.
4 Learning
Outcomes*  To check the working of thermostat.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Thermostat 5
2. Multimeter 3
3. Emery paper 2
4. Cotton waste 1 lot
5. Ice 2 small blocks
6. Thermometer 3
7. Insulation tape 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 189 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 58 : Test the relay for function.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Test the relay for function and Confirm whether all are working.
4 Learning
Outcomes*  Test the relay.
 Confirm whether all points are working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Relay 5
2. Multimeter 3
3. Emery paper 2
4. Cotton waste 1 lot
5. Single core wire 2m
6. Power supply 4
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 190 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 59 : Test the relay for function.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Test the relay for function and Confirm whether all are working.
4 Learning
Outcomes*  Test the relay.
 Confirm whether all points are working.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Relay 5
2. Multimeter 3
3. Emery paper 2
4. Cotton waste 1 lot
5. Single core wire 2m
6. Power supply 4
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 191 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 60 : Test working of start capacitor.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Test performance of start capacitor.
4 Learning
Outcomes*  To test the working of start capacitor.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Start capacitor 5
2. Megar 3
3. Multimeter 3
4. Emery paper 2
5. Cotton waste 1 lot
6. Single core wire 2m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 192 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 61 : Test working of start capacitor.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Test performance of start capacitor.
4 Learning
Outcomes*  To test the working of start capacitor..
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Start capacitor 5
2. Megar 3
3. Multimeter 3
4. Emery paper 2
5. Cotton waste 1 lot
6. Single core wire 2m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 193 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 62 : Test working of run capacitor.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Test performance of run capacitor.
4 Learning
Outcomes*  To test the working of run capacitor.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Start capacitor 5
2. Megar 3
3. Multimeter 3
4. Emery paper 2
5. Cotton waste 1 lot
6. Single core wire 2m
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 194 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 63: Check the working of fan motor.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check for working of fan motor.
4 Learning
Outcomes*  To check for working of fan motor. Tools required.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Fan motor 4
2. Fan capacitor 4
3. Power supply 3
4. Multimeter 3
5. Screw driver 4
6. Cutting plier 4
7. Insulation tape 3
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 195 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 64: Check the working of fan motor.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check for working of fan motor.
4 Learning
Outcomes*  To check for working of fan motor. Tools required.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Fan motor 4
2. Fan capacitor 4
3. Power supply 3
4. Multimeter 3
5. Screw driver 4
6. Cutting plier 4
7. Insulation tape 3
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 196 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 65: Check the working of fan motor.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Check for working of fan motor.
4 Learning
Outcomes*  to check for working of fan motor. Tools required.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Fan motor 4
2. Fan capacitor 4
3. Power supply 3
4. Multimeter 3
5. Screw driver 4
6. Cutting plier 4
7. Insulation tape 3
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 197 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 66: Fixing of front panel of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To remove and refit the front panel of window air conditioner
4 Learning
Outcomes*  Understand how front panel has to be fixed properly.
 Understand the locking points in the panel.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Front panel—window 2
2. Front panel—split 2
3. Screw driver 2
4. Cutting plier 2
5. Screws 1 lot
6. Cotton waste 1 lot
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 198 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 67: Fixing of front panel of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To remove and refit the front panel of window air conditioner
4 Learning
Outcomes*  Understand how front panel has to be fixed properly.
 Understand the locking points in the panel.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Front panel—window 2
2. Front panel—split 2
3. Screw driver 2
4. Cutting plier 2
5. Screws 1 lot
6. Cotton waste 1 lot
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 199 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 68: Fixing of front panel of window air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To remove and refit the front panel of window air conditioner
4 Learning
Outcomes*  Understand how front panel has to be fixed properly.
 Understand the locking points in the panel.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Front panel—window 2
2. Front panel—split 2
3. Screw driver 2
4. Cutting plier 2
5. Screws 1 lot
6. Cotton waste 1 lot
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 200 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 69: Perform the wiring of a split air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Perform the wiring of a split air conditioner.
4 Learning
Outcomes*  Read the wiring diagram.
 Understand connecting different electrical parts.
 Check the wiring diagram as per specific cations.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Wires—single core 1m
2. Wire—3 core 1m
3. Relay 5
4. Start capacitor 5
5. Run capacitor 5
6. Fan capacitor 5
7. Compressor 2
8. Fan motor 5
9. Condensing unit 2
10. Switches 5
11. Indoor unit 2
12. Insulation tape 5
13. Multimeter 3
14. Fasten clips 50
15. Soldering iron 3
16. Soldering wax 1 box
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration, 2nd
Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A

9 Assignment N/A
N/A

10 Assessment
method

Page 201 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 70: Perform the wiring of a split air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Perform the wiring of a split air conditioner.
4 Learning
Outcomes*  Read the wiring diagram.
 Understand connecting different electrical parts.
 Check the wiring diagram as per specific cations.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Wires—single core 1m
2. Wire—3 core 1m
3. Relay 5
4. Start capacitor 5
5. Run capacitor 5
6. Fan capacitor 5
7. Compressor 2
8. Fan motor 5
9. Condensing unit 2
10. Switches 5
11. Indoor unit 2
12. Insulation tape 5
13. Multimeter 3
14. Fasten clips 50
15. Soldering iron 3
16. Soldering wax 1 box
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment method

Page 202 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 71: Perform the wiring of a split air conditioner.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Perform the wiring of a split air conditioner
4 Learning
Outcomes*  Read the wiring diagram.
 Understand connecting different electrical parts.
 Check the wiring diagram as per specific cations.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Wires—single core 1m
2. Wire—3 core 1m
3. Relay 5
4. Start capacitor 5
5. Run capacitor 5
6. Fan capacitor 5
7. Compressor 2
8. Fan motor 5
9. Condensing unit 2
10. Switches 5
11. Indoor unit 2
12. Insulation tape 5
13. Multimeter 3
14. Fasten clips 50
15. Soldering iron 3
16. Soldering wax 1 box
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning, Third
Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and Refrigeration,
2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A

Page 203 of 237


Course Code: [ ] ASAP QFK
10 Assessment method

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and


split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 72: Pressure testing of interconnecting copper pipes.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To remove and re-fit the front panel of window air conditioner.
4 Learning
Outcomes*  Pressure test the interconnecting copper wires.
 Tools required.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Copper pipe—¼” 2m
2. Copper pipe—1/2” 2m
3. Charging line 2
4. Hand shut off valve 2
5. Nitrogen cylinder with valves 2
6. Pressure gauge 2
7. Copper brazing rod 2
8. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 204 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 73: Pressure testing of interconnecting copper pipes.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  To remove and re-fit the front panel of window air conditioner.
4 Learning
Outcomes*  Pressure test the interconnecting copper wires.
 Tools required.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Copper pipe—¼” 2m
2. Copper pipe—1/2” 2m
3. Charging line 2
4. Hand shut off valve 2
5. Nitrogen cylinder with valves 2
6. Pressure gauge 2
7. Copper brazing rod 2
8. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 205 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 74: Pressure testing of interconnecting copper pipes.

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Locating tools in the respective location and keeping service Centre
clean.
4 Learning
Outcomes*  Locate all tools at the respective area.
 Keep the service area clean.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Copper pipe—¼” 2m
2. Copper pipe—1/2” 2m
3. Charging line 2
4. Hand shut off valve 2
5. Nitrogen cylinder with valves 2
6. Pressure gauge 2
7. Copper brazing rod 2
8. Brazing set 2
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 206 of 237


Course Code: [ ] ASAP QFK
Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and
split air conditioners

Unit-1 : Maintenance, troubleshooting and repair of air conditioning systems—window and split
air conditioners

Session 75: Fill the service report. Duration : 1 hr


Sn. Particulars Description
1 NOS Code ELE/N3109
2 Theory / Practical Practical
3 Objectives  Understand to write service report.
4 Learning
Outcomes*  Fill the service report.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Service report As per requirement

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment

10 Assessment
method

Page 207 of 237


Course Code: [ ] ASAP QFK
Modules / Units to be tested

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and split air
conditioners

Session 76: Assessment of Learning [Internal]: Theory -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3109

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment: N/A

8 Resources References : N/A Links: N/A

9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 208 of 237


Course Code: [ ] ASAP QFK
Modules / Units to be tested

Module-7 : Maintenance, troubleshooting and repair of air conditioning systems—window and split air
conditioners

Session 77: Assessment of Learning [Internal]: Theory -1t Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3109

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment:
N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 209 of 237


Course Code: [ ] ASAP QFK

Modules / Units to be tested

Module-7: Maintenance, troubleshooting and repair of air conditioning systems—window and split air
conditioners

Session 78: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3109

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor / SDE from the practical guide,
Learning Material Practical worksheets from practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical observation
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 210 of 237


Course Code: [ ] ASAP QFK
Modules / Units to be tested

Module-7: Maintenance, troubleshooting and repair of air conditioning systems—window and split air
conditioners

Session 79: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N3109

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor /, Practical worksheets from
Learning Material practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical Observation
method

Page 211 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 1 : The importance of personal presentation and the techniques to succeed in one’s
role

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  List and describe the grooming habits necessary for proper personal
presentation.
 Explain the importance of maintaining hygiene both for oneself and at
the work place.
 Describe the importance of maintaining etiquettes.
 Describe the importance of understanding corporate etiquette
4 Learning
Outcomes*  Know and understand the grooming habits necessary for proper
personal presentation.
 Understand the importance of maintaining hygiene both for oneself and
at the work place.
 Know the importance of maintaining etiquettes.
 Know the importance of understanding corporate etiquette.
5 Methodology Group activity, Instructor led training , demonstration , Practical exercise
and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 212 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 2 : The importance of personal presentation and the techniques to succeed in


one’s role

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Explain the importance of the technician being the successful face of the
company.
 List the different roles played by an employee.
 Explain the importance of self - esteem.
 Describe what an employer expects from the employees.
 Describe what the customers’ expectations are.
 Explain why customers are important for an organization.
4 Learning
Outcomes*  Understand the importance of the technician being the successful face
of the company.
 Know about the different roles played by an employee.
 Understand the importance of self - esteem.
 Know what an employer expects from the employees.
 Understand what the customers’ expectations are.
 Know why customers are important for an organization.
5 Methodology Group activity, Instructor led training , presentations and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 213 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 3 : Teamwork

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Define team work.
 Describe the importance of team work.
 Outline the qualities of a team player.
4 Learning
Outcomes*  Understand team work.
 Know the importance of team work.
 Know and outline the qualities of a team player.
5 Methodology Group activity, Instructor led training , presentations and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 214 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 4 : Teamwork

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe the value of trust in a team.
 Describe the different stages of team building
4 Learning
Outcomes*  Understand the value of trust in a team.
 Know the different stages of team building.
5 Methodology Group activity, Instructor led training , presentations and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 215 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 5 : Time management.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe the principles of time management.
4 Learning
Outcomes*  Understand the principles of time management.
5 Methodology Group activity, Instructor led training , presentations and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 216 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 6 : Time management.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe the importance of prioritizing tasks and activities.
 Describe the importance of multitasking.
 Describe the importance of extending.
4 Learning
Outcomes*  Understand the importance of prioritizing tasks and activities.
 Know the importance of multitasking.
 Understand the importance of extending
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 217 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 7 : Importance of attitude at work.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Define attitude.
 Differentiate between types of attitude.
 Explain the importance of Positive attitude.
4 Learning
Outcomes*  Understand attitude.
 Understand the difference between types of attitude.
 Know the importance of positive attitude.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 218 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 8 : Importance of attitude at work.

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Explain the importance of self - esteem.
 Explain the importance of positive employee attitude in the workplace.
4 Learning
Outcomes*  Know the importance of self - esteem.
 Understand the importance of positive employee attitude in the
workplace.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 219 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 9 : Importance of active and good listening skills

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Differentiate between hearing and listening.
 Describe the elements and types of listening.
4 Learning
Outcomes*  Know the difference between hearing and listening.
 Understand the elements and types of listening.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 220 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 10 : Importance of active and good listening skills

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe the benefits of good listening skills.
 Describe the different criteria for effective listening.
 Describe the barriers to active listening.
 Demonstrate improved listening skills.
4 Learning
Outcomes*  Know the benefits of good listening skills.
 Understand the different criteria for effective listening.
 Know the barriers to active listening.
 Know and demonstrate improved listening skills.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 221 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 11 : Importance of good and effective and appropriate communication skills

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe communication and its significance.
 Describe the processes of effective communication.
4 Learning
Outcomes*  Understand communication and its significance.
 Know the processes of effective communication.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 222 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 12 : Importance of good and effective and appropriate communication skills

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe the methods of communication.
 Describe the different communication techniques.
 Describe the different styles of communication.
 Identify the types of job information that may be requested at a
workplace.
4 Learning
Outcomes*  Understand the methods of communication.
 Understand the different communication techniques.
 Know the different styles of communication.
 Know and identify the types of job information that may be requested at
a workplace.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 223 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 13 : Body language

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Identify facial expressions in terms of body language.
 Identify postures in terms of body language.
 Identify gestures in terms of body language.
 Identify assertive, non - assertive and aggressive body languages.
4 Learning
Outcomes*  Understand the facial expressions in terms of body language.
 Know about the postures in terms of body language.
 Understand the gestures in terms of body language.
 Know the assertive, non - assertive and aggressive body languages
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 224 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 14 : Importance of good customer service

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  Describe customer service.
 Describe the importance of customer service.
4 Learning
Outcomes*  Understand customer service.
 Know the importance of customer service.
5 Methodology Group activity, Instructor led training , presentations and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 225 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 15 : Checks to be carried out and the methods of dealing customer complaints

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  List and describe the checks performed during work activities to ensure
customer satisfaction.
 Identify what a service report is.
4 Learning
Outcomes*  Know and understand the checks performed during work activities to
ensure customer satisfaction.
 Know what a service report is.
5 Methodology Group activity, Instructor led training , presentations and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment N/A
method

Page 226 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 16 : Checks to be carried out and the methods of dealing customer complaints

Duration : 1 hr.
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory


3 Objectives  List the causes for customer complaints.
 Identify the actions taken to respond to customer complaints.
 Identify the steps taken to solve customer complaints
4 Learning
Outcomes*  Understand the causes for customer complaints.
 Know the actions taken to respond to customer complaints.
 Understand the steps taken to solve customer complaints.
5 Methodology Instructor led training and group activities
6 Teaching – Faculty Guide, Learner Guide, Presentation Deck.
Learning Material
7 Facilities
Theory Material:
LCD Projector, Laptop/Desk top, White Board, Marker, Duster, Flip Charts
Session Plan
Practical’s Practical exercise / assignment:
N/A
Teaching-learning material:
N/A
Equipment:
N/A

8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang
Links: N/A
9 Assignment  Write a short note on customer relationship management
 Visit any AC service station and observe – how the AC
technicians interact with the customers, and make notes of
the same with your comments on correct methodologies that
they need to adopt.

3 days
10 Assessment N/A
method

Page 227 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 17 : Practical -1 (part).

Duration : 1 hr
Sn. Particulars Description

1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Practical


3 Objectives  Customer interaction.
4 Learning
Outcomes*  Demonstrate appropriate customer interaction.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Role play 1 - 1
2. Role play 2 - 1
3. Role play 3 - 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment N/A
N/A
10 Assessment
method

Page 228 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 18 : Practical -1 (part).

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Practical


3 Objectives  Customer interaction.
4 Learning
Outcomes*  Demonstrate appropriate customer interaction.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Role play 1 - 1
2. Role play 2 - 1
3. Role play 3 - 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment

10 Assessment
method

Page 229 of 237


Course Code: [ ] ASAP QFK
Module-8 : Effective working and customer care relationship

Unit-1 : Effective working and customer care relationship

Session 19 : Practical -1 (part).

Duration : 1 hr
Sn. Particulars Description
1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Practical


3 Objectives  Customer interaction.
4 Learning
Outcomes*  Demonstrate appropriate customer interaction.
5 Methodology Instructor led training and Practical exercise
6 Teaching – Practical Guide
Learning Material
7 Facilities
Theory Material:
Tools and materials as per practical guide
Practicals Practical exercise / assignment:
N/A
Teaching-learning material:
Pencil/pen, A4 sheets
Equipment:
1. Role play 1 - 1
2. Role play 2 - 1
3. Role play 3 - 1
8 Resources References:
Resource Access information
Text books
Basic Refrigeration and Air Conditioning,
Third Edition, McGraw-Hill ISBN: 978-0-07-049500-5
P.N. Ananthanarayanan
Refrigeration and Air Conditioning
Eastern Economy Edition
ISBN:978-81-203-2671-2
PHI Learning Private Limited
Ahmadul Ameen
Handbook of Air Conditioning and
Refrigeration, 2nd Edition, McGraw-Hill ISBN:0-07-068167-8
Shan K. Wang

Links: N/A
9 Assignment

10 Assessment
method

Page 230 of 237


Course Code: [ ] ASAP QFK
Modules / Units to be tested
Module-8 : Effective working and customer care relationship

Session 20: Assessment of Learning [Internal]: Theory -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment: N/A

8 Resources References : N/A Links: N/A

9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 231 of 237


Course Code: [ ] ASAP QFK
Modules / Units to be tested

Module-8 : Effective working and customer care relationship

Session 21: Assessment of Learning [Internal]: Theory -1t Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Theory

3 Objectives To assess the Knowledge and understanding of the modules and units

4 Learning NA
Outcomes*

5 Methodology Pen / Pencil paper theory test

6 Teaching – Question paper


Learning Material

7 Facilities

Theory Question papers and answer booklets

Practicals N /A

N/A

Equipment:
N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 232 of 237


Course Code: [ ] ASAP QFK

Modules / Units to be tested

Module-8 : Effective working and customer care relationship

Session 22 Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor / SDE from the practical guide,
Learning Material Practical worksheets from practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Type of test : Paper –Pen / pencil test
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types of
frames.

Page 233 of 237


Course Code: [ ] ASAP QFK
Modules / Units to be tested

Module-8 : Effective working and customer care relationship

Session 23: Assessment of Learning [Internal]: Practical Test -1 Duration: 1 hr


Sn. Particulars Description

1 NOS Code ELE/N9901 ELE/N3101

2 Theory / Practical Practical

3 Objectives To assess the ability to apply the Knowledge and understanding

4 Learning NA
Outcomes*

5 Methodology Practical observation

6 Teaching – Any one Practical Task selected by assessor /, Practical worksheets from
Learning Material practical guide

7 Facilities

Theory

Practicals Practical guide

N/A

N/A

8 Resources References : N/A

Links: N/A
9 Assignment Illustrative assignments for trainees

N/A

Duration of assignments [no. of days]:


10 Assessment Practical observation
method

* Guidelines for writing learning outcomes: Take a teaching point (Concept / Principle / Skill) and prefix an action
verb to the teaching point: An action verb specifies an observable and assessable change in the knowledge level or
skill performance of the trainee (eg. Define, Distinguish, Describe, Solve a problem, Perform a skill). Examples of
learning outcomes for a Theory Session on welding: On completion of the session, the trainee will be able to -
List safety precautions for gas welding; Describe procedures of gas welding; Distinguish between the three types
of frames.

Page 234 of 237


Course Code: [ ] ASAP QFK

Page 235 of 237

S-ar putea să vă placă și