Define
Measure
Analyze
Improve
Control Performance
Process Power:
DMAIC—Five Step Process
Define
Control Measure
Improve Analyze
Six Sigma - The Process
Define
Measure
Analyze
Improve
Control
• At GE, the DMAIC process is utilized for quality improvement
of existing products and processes.
• A modified version of the process (DMADV) is utilized
in new product and process design.
6 DMAIC Process
Define •
•
•
Define the problem
Select cross-functional team
Define team charter
QFD
Measure 1 Select CTQ Characteristics
2 Define Performance Standards
3 Validate Measurement System
Process Mapping
Measurement Systems
Product
Benchmarking/Baselining
Analyze 4 Establish Product Capability
5 Define Performance Objectives
6 Identify Variation Sources
Yield & Sigma
Basic Quality Tools
or
Service
Control 10 Validate Measurement System
11 Determine Process Capability
12 Implement Process Controls
Control Charts
Procedures
Training
DMAIC—each step has a question
Define
What is important?
Measure
How are we doing?
Analyze
What is wrong?
Improve
Fix what’s wrong
Control
Ensure gains are maintained to
guarantee performance
Define:
Benchmark
Capability of a given process
Focus on CTQ
Measure—doing it with excellence
Review the current process
Identify key inputs and outputs
Develop baseline and entitlement metrics
Performance
Cost
Generate solutions
Implement changes
Be creative to find new ways to do things
better, cheaper, or faster
Improve—this is most critical!
Develop Action Items
Prioritize improvements
Test solutions
and controls
Refine solutions
Document solutions
Implement solutions
Control:
Lock in successes
Implement measures to keep variables
within the new operating limits
Control—sustaining your gains
Measure progress
Six Sigma…
Quality
Mgmt
Systems
Taguchi
DOE
SPC
Inspection
C
D
EFFECT
Low
Time
Six Sigma is really different!
A look into DMAIC:
Problem Process Definition
Measure to determine current Process
Capability and Control (Mean and Deviation)
How / What Methodology do we apply to
Improve
Implement Methodology / Action to Improve
Action for continuous improvement and control
Six Sigma
Qualitative Tools
--soft, yet they are very useful!
Brainstorming and affinity diagram.
Pareto analysis.
Cause-effect diagram.
Process mapping
Six Sigma
Quantitative Tools
Statistical testing.
Design for experiment.
Control chart .
Process capability .
Reliability analysis
Note: The relationship between the specific tool and the DMAIC phase is based on most likely usage as opposed to possible usage.
Tools & Templates by DMAIC Phase continued
Tool Define Measure Analyze Improve Control
Ishikawa (Fishbone) X
Measurement System Evaluation (MSE) X
Multivoting X
Pareto Chart X
Process Capability X X X X
Process Costing Tool X
Process Maps X X X X
Problem Statement/Critical Business Issue (CBI) X
Requirements Analysis X
Run Chart X X
Scatter Diagram X
Sigma Calculator X X
SIPOC Chart X
Story Board X
SWOT Analysis X
Team Charter X
Thought Process Map X
Note: The relationship between the specific tool and the DMAIC phase is based on most likely usage as opposed to possible usage.
Define - Team Charter
This is a project!
Service Impacted The timely and accurate Division & Function CitiStreet RSD
What is the focus of the Black Belt
payment of commissions and
collection of carrier payments
Pete Ferlita Telephone Number(s)
Commissions, Finance
Ext 2566
7. Benefit to Customers:
Which part of the process will
be investigated?
Who are the final customers,
Determine why certain transactions are not bridging to CAS.
Eliminate records from entering the Premium Applied Error File.
Account Executives – will be paid on time and correctly.
what benefits will they see and Commissions Team – will take less inquiry calls from AE’s
what are their most critical questioning incorrect payments.
requirements? Citistreet – will recognize all revenue due from carriers in a timely
“M” Completion
players? M – Measurement
A – Analyze
I – Improve
“A” Completion
“I” Completion
February 2003
April 2003
September 2003
C – Control “C” Completion October 2003
Project Completion October 2003
9. Support Required: Do you anticipate the need for Possible IT support.
any special capabilities,
hardware, trials, etc?
Define - Thought Process Map
Problem Statement
Assets reflected on the Travelers and CitiStreet record keeping systems are not in balance on a
daily basis. This results in daily reconciliation issues, extensive manual effort and significant
exposure to market value adjustments.
being considered? .
.
.
Are the systems functioning according to the latest specifications?
Will we have IT resources available to work on this project?
Do we need two record keeping systems?
. Do we need two transmissions (money in/money out)?
. Does Travelers need to be made aware of the daily reconciling items?
Action Plan
. Collect base line metrics.
. Conduct an As Is session in Hartford the week of 9/23/02.
. Conduct a Should Be session in E. Brunswick the week of 10/14/02.
. Implement process improvements.
. Implement a control plan.
Define - Top Level Process Map
Benefit Distributions - Top Level Map
What is the starting point
of the process? Plan Participant
requests,completes and
mails a Distribution Request
Field Office/Outside Carrier
receives the request
the process?
Mail Room (N.O.)
Benefits Area sorts by plan
DPMO
319,366
46,558
TOTAL DEFECTS 14,869
Individual Values
60
50
40 X=40.83
30
Is variation within the 20
10 LCL=11.81
normal range? 0
J F M A M J J A S O N D
40
Moving Range
30
20
mR=10.91
Is the process capable? 10
0 LRL=0
Measure - Detailed Process Map
Who are the suppliers
and customers?
What are the inputs
and outputs?
Which inputs are
controllable?
Where do we have
issues?
What impacts cycle time?
Is there a hidden factory?
What % of the steps
add value?
ADP/ACP Testing - As Is Process
Create year-end
Get data to define
Generate a packages Mail year-end
Start the testing
hardcopy census customized by packages
population
market
28 37 38 39 43 Through 52
Yes
54 55 56 53 57 Through 60 42 43 65 Through 70
C
No
No
Yes
Return original Image and send Data enter census',
information to client
the hardcopy send an electronic
Call client for with request for Information
Yes census to the copy via e-mail, and
information additional obtained?
vendor for data return the hardcopy
information or
entry to BP - ERISA
clarifications
BP - Account Management Team BP - Account Management Team 61 No 62 BP - ERISA Data Entry Vendor
CR - Case Managers CR - Case Managers
MM/SK - ERISA Specialists MM/SK - ERISA Specialists
B
64 71 Through 74 64 72 74 75 Through 79
80 81 82 83 84 85 Through 92 93 94
To
Import data to Review and scrub Data complete
Yes Page 2
ASC data in ASC and accurate?
C
Measure - Issues List
What goes wrong Data and Year End
Issues Categories
Internal Client Education Quality Control
68, 69, 70
ERISA
Workstation
81, 85, 86, 87, 88,
Tracking and
Sorting
1, 2, 4, 7, 10, 11,
Census and Plan
Connect
46, 48, 49, 50, 51,
Policy
Correct Payment
Make Request
customer requirements?
Fast Payment
Easy to Make
Return Instr.
Total Value
Assistance
Output
Inputs Weight 10 7 4 7 10 4
1 Request Form
Process
Contact 4
40
1
7
10
40
4
28
1
10
1
4
129
100 7 4 49 10 4
1
Request Form
Request Form
Phone Number
Address
10
4
40
1
1
7
1
1
4
10
7
70
1
1
10
1
1
4
174
135
100 28 28 28 70 16
2
Screen Request Guidelines
10
100
4
1
7
7
7
28
4
7
49
7
7
70
4
4
16
270
270
100 7 4 7 10 4
requirements? 3
3
Send Form
Send Form
Contact
Address
10
10
100
1
1
7
1
1
4
1
1
7
1
1
10
1
1
4
132
132
10 49 4 7 40 16
4 Fill Out Form Form 1 7 1 1 4 4 126
10 70 40 28 100 28
4 Fill Out Form Instructions 1 10 10 4 10 7 276
10
1
7
7
1
4
4
1
7
70
10
100
10
7
28
28
156
10
1
7
7
1
4
4
10
70
7
1
10
100
7
28
40
129
259
196
469
880
400
Total
Note:
Rating scale 1, 4, 7, 10
Analyze - Ishikawa (Fishbone)
(I think this is the best QM tool ever!)
Which of the process
inputs are likely to
contribute to the
problem?
click
Percent
60
Count
most to our defects?
40
500
Which root causes 20
should we focus 0 0
on first? Defect
Count 484 263 183 143 140 92 91 61 31 22 11 9 13
Percent 31 17 12 9 9 6 6 4 2 1 1 1 1
Cum% 31 48 60 70 79 85 90 94 96 98 99 99 100
Analyze - FMEA
How can our product,
service or process fail?
Where should we
Reason Codes
3 .
focus our efforts to 2
Does the
measurement
system contribute to
the variation?
Is the measurement
system adequate?
1. Enter information (# More than two raters Yes
of questions, # of raters,
Two raters only No
category values) in
column below
2. Then enter data in 3. Once worksheet contains
indicated worksheet: data, appropriate calculations
RAW DATA will appear below
Multiple Raters (> 2)
2 n k
nm x ij2
Number of questions n= 20 sum x ij = 180 2
Categories 1 P nm ( m 1) p j q j
j 1
2 R
3
4
5 Two Raters
P Pchance
6 Pobserved = observed
7 Pchance = 1 Pchance Koverall or individual =
8
9
10
11 Kappacategory for > 2 raters
x m x
n
12 Category Kappa
ij ij
i 1
13 category 1 P 1
nm ( m 1) p j q j
14 R 1
15
Improve – by using DOE
Which of the
Hardship Withdrawals DOE Data Matrix
improvement ideas StdOrder RunOrder
12 1
Checklist
1
Instructions
1
Language
-1
Sample
1
C*I C*L C*S
1 -1 1
I*L
-1
I*S
1
L*S
-1
Complete Withdrawals
18
identified with 7
16
2
3
-1
1
1
1
1
1
-1
1
-1
1
-1
1
1
1
1
1
-1
1
-1
1
13
19
other tools 11
10
4
5
-1
1
1
-1
-1
-1
1
1
-1
-1
1
-1
-1
1
-1
1
1
-1
-1
-1
16
18
8 6 1 1 1 -1 1 1 -1 1 -1 -1 17
represent the 15
5
7
8
-1
-1
1
-1
1
1
1
-1
-1
1
-1
-1
-1
1
1
-1
1
1
1
-1
16
14
largest payback 4
1
9
10
1
-1
1
-1
-1
-1
-1
-1
1
1
-1
1
-1
1
-1
1
-1
1
1
1
16
11
13 11 -1 -1 1 1 1 -1 -1 -1 -1 1 14
14
12
13
-1
1
1
-1
-1
1
-1
1
-1
-1
1
1
1
1
-1
-1
-1
-1
1
1
11
18
CBI? 2
6
14
15
1
1
-1
-1
-1
1
-1
-1
-1
-1
-1
1
-1
-1
1
-1
1
1
1
-1
15
16
9 16 -1 -1 -1 1 1 1 -1 1 -1 -1 15
improvements A
A:
B:
C:
Checklist
Instructions
Language
D
work in concert to CD
C
B
D: Sample
result? BCD
AD
BC
AC
ABCD
ABC
AB
0 1 2 3
Improve - Action Items
Action Item Description: Develop and implement a process to establish product profitability expectations and to track
Which of the and evaluate financial performance against the expectations.
Expected Benefits: Ensure that the profitability expectation is positive prior to committing to the product.
validated Key Deliverables: Standard unit costs; Data capture process; P&L Model.
Appraisal Criteria: P&L model is implemented that meets with the approval of Finance. P&L model serves the
needs of the Product Review Team, Product Review Board and Post Mortem Team.
improvements are Team Members
we going to Name (*-Action Item Owner, &-Backup, +-Mentor)
* Ralph Winnicker
Organization - Location
Operations Quality
Skill Set or Knowledge Expected
schedule?
model.
Recent Accomplishments:
Date Description
10/11 Reviewed data elements of the current Pricing Model with Glenn, and outlined a plan to develop a stripped-down version
How will we know 10/22
for use with the Product Specification Template (AI 7).
Glenn developed a stripped-down version. We determined that too much “off template” detail was required to develop the
Product P&L. We decided to utilize the new Pricing Model (currently being developed), and to modify it to reflect Product-
that the Action Item 11/4
level versus Case-level data.
Reviewed the new Pricing Model, and scoped out changes required to make it Product-level.
Who is responsible
to take the
actions?
Control - Control Charts
What are the
Percent of Transactions Rejected
performance
trends? 40
Individual Values
UCL=34.92
30
X=20.42
Are we holding the 20
10
LCL=11.81
gains from our 0
process 20
URL=17.82
improvements?
Moving Range
10
mR=5.45
required?
Control/Reaction Plan for Distributions
Out of Control Measurement
Process step Condition Measurement Frequency Probable Cause What to Check Actions to Take Responsible When
1 Screen Reason Code Recycle Daily/Weekly Screening New hires/transfers Train/retrain Field Office and HELPLINE New hires or transfers join the
Request for 1,3,5,6,11,12,14, Database, personnel not or changes made? personnel. Management. area or process changes are
Distribution 16,18,19 or 20 pareto and trained Guidelines and Update guidelines Marketing. made
Form exceeds 10% DPMO chart Screening checklists up to and checklists. Field Office and HELPLINE New plan introduced or plan
and DPMO target personnel do not date? Enforce use of talk Management. changes made
exceeded by 5% have adequate Talk sheets used? sheets. Daily
guidelines.
2 Send Reason Code Recycle Daily/Weekly Fulfillment New hires/transfers Train /retrain Field Office and HELPLINE New hires or transfers join the
Distribution 5,11, or 19 Database, personnel not or changes made? personnel. Management area or process changes are
Package exceeds 10% pareto and trained. Procedures Enforce use of Field Office and HELPLINE made.
and DPMO target DPMO chart Fulfillment distributed to all procedures. Management. Daily
exceeded by 5% procedures not personnel? Update procedures. Field Administrative New Plan introduced or Plan
understood or not Procedures up to Update address Services and HELPLINE changes made.
used. date? information on Management Plan participant changes
System address is Address updates system. Benefit Distributions residence.
incorrect. need to be Processors
processed?
3 Plan Reason Code Recycle Daily/Weekly Instructions may be Current instructions Maintain current Field Office and HELPLINE New Plan introduced or Plan
Participant 2,4,5,8,9,10,13, Database, complex, unclear, or and forms sent? inventory of Management. changes made.
Completes 15, 17,19 or 20 pareto and may not have been Instructions and instructions and Marketing and Field New Plan introduced or Plan
the exceeds 10% DPMO chart sent with the forms up to date? forms. Administrative Services changes made.
Distribution and DPMO target package. Update instructions
Forms exceeded by 5% and forms.
4 Plan Reason Code 4, Recycle Daily/Weekly Plan Participant was Return envelope Maintain current Field Office and HELPLINE New Plan introduced or Plan
Participant 11, or 19 Database, not provided with and instructions inventory of Management. changes made.
Returns the exceeds 10% pareto and return instructions. sent? envelopes and Marketing and Field New Plan introduced or Plan
Distribution and DPMO target DPMO chart Plan participant was Return envelope instructions. Administrative Services changes made.
Forms as exceeded by 5% provided incorrect and instructions up Update envelopes
directed return instructions. to date? and instructions.
5 Benefits Kappa Score is MSE for 3 January, July Benefit distribution New hires/transfers Train/retrain Benefit Distributions New hires or transfers join the
Distribution lower than .7 Raters and 20 processors not or changes made? Personnel. Management area or process changes are
Department Transactions trained. Rating guidelines Enforce use of rating Benefit Distributions made
reviews and Different processors being used? guidelines. Management Daily
processes using different Reason codes being Enforce use of Benefit Distributions January and July, annually.
the request criteria. used? reason codes. Management
Control - Business Impact (ABM)
What is the business ABM Cost Model Per Repair Non-Financial
Mail &
Phone Cost Market Risk
Rework
Manpower Cash Flow
• Test design
Validate • Scale-up
WHAT IS DESIGN FOR SIX SIGMA
(DFSS)?
MARKET
RESEARCH
DESIGN
PRODUCTION
LOGISTICS
DISTRIBUTION
DMADV SERVICE
SALES
CUSTOMERS