At left end
From ETABS, Mu= -28.174KNm
= 28.174KNm
Calculation of Ast:
Mu= 0.87*fy*Ast*(d-0.42Xumax)
28.174*106 = 0.87*500*Ast*(515-
0.42*236.9)
On solving we get,
Ast = 253.241mm2
At mid span
From ETABS, Mu = 20.7KNm
Calculation of Ast:
Mu= 0.87*fy*Ast*(d-0.42Xumax)
20.7*106 = 0.87*500*Ast*(515-
0.42*236.9)
On solving we get,
Ast = 186.06mm2
At right end
From ETABS, Mu= -38.78KNm
= 38.78KNm
Calculation of Ast:
Mu= 0.87*fy*Ast*(d-0.42Xumax)
38.78*106 = 0.87*500*Ast*(515-
0.42*236.9)
On solving we get,
Ast = 348.573mm2
Summary of reinforcement:
Left end Mid span Right end
Top(16mm) 2 2 2
Bottom(16mm) 2 2 2
5) Shear Check
IS 13920: Shear reinforcement design:
Clause 6.2.1 Minimun two bars should be continuous at top and
bottom
6) Shear design:
From ETABS, Vu = 34.985KN
τv =Vu/bd
= 34.985*103/(200*317)
= 0.552N/mm2
Then,
% of steel = 100Ast/bd
= (402.123/200*317)*100
= 0.634%
IS 456:2000 Vuc = τc * bd
Clause 40.4 = 0.523*200*317
= 33.158KN
Then,
Vus = Vu – Vuc
= 34.98-33.158
= 1.822KN
Let us provide 8mm 2-legged stirrups
π∗8∗8
Asv = 2 * =100.53mm2
4
Now,
0.87∗fy∗Asv∗d
IS 13920: Vus =
Sv
Clause 6.3.5
0.87∗500∗100.53∗317
Sv=
1.822∗1000
= 7608.44mm
7) Deflection check:
= 43.56
L
()
d
available = (4900/317)
L
= 15.457< ()
d
permissible (OK)
Development length:
8)
Checking development length at the maximum shear of
the continuous beam
Development length, LD≤1.3 Mi/V+Lo
Development length, LD = (Φ*₆s)/( 4τbd)
= (20*0.87*500)/(4*1.12*1.6)
= 1132.81mm
Mi= 0.87*fy*Ast*d*(1- Ast*fy/bdfck)
=0.87*500*628.32(515– (628.32*500)/(350*20))
=65.175KNm
V =34.985KN
Then,
1.3Mi/V = 1.3*65.175/34.985 *1000
= 2421.8mm > LD (OK)