Sunteți pe pagina 1din 482

PÜ®ÝìoPÜ ÓÜPÝìÃÜ

ÇæãàPæãà-±Ü-ÁãàX, Ÿí¨ÜÃÜá ÊÜáñÜá¤


JÙÜ-®ÝvÜá gÆ-ÓÝ-ÄWæ CÇÝTæ
¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ
2018&19®æà ÓÝ騆 ¨ÜÃÜ-WÜÙÜ ±Üqr

public works, Ports & Inland


Water Transport department
bengaluru circle, bengaluru
2018-19 Schedule of Rates
INDEX
Sl. No. Particulars Pages
From     To

1. PROCEEDINGS OF THE SUPERINTENDING ENGINEER, ...................... a c


BENGALURU CIRCLE, BENGALURU

2. GENERAL NOTES...................................................................................... d f

3. Weightage............................................................................................... g h

4. MATERIAL RATES...................................................................................... I XLVII

5. HIRE CHARGES.......................................................................................... XLVIII LII

6. LABOUR WAGES........................................................................................ LIII LXIV

CHAPTERS............................................................................................................

1.0 MORTAR...................................................................................................... 1 4

2.0 EARTH WORK FOR BUILDINGS................................................................ 5 8

3.0 ANTITERMITE TREATMENT....................................................................... 9 11

4.0 CEMENT CONCRETE................................................................................. 12 23

5.0 STONE WORK............................................................................................. 24 27

6.0 BRICK WORK.............................................................................................. 28 31

7.0 STEEL AND ALLUMINIUM WORK.............................................................. 32 47

8.0 ROOFING.................................................................................................... 48 52

9.0 WOOD WORK.............................................................................................. 53 67

10.0 WATER PROOFING..................................................................................... 68 71

11.0 DRAINAGE WORK...................................................................................... 72 78

12.0 SANITARY WORK....................................................................................... 79 91

13.0 WATER SUPPLY WORK.............................................................................. 92 102

14.0 FLOORING.................................................................................................. 103 114

15.0 FINISHING WORK....................................................................................... 115 129

16.0 REPAIRS TO BUILDINGS........................................................................... 130 135

17.0 ROADS & BRIDGES -- CARRIAGE OF MATERIALS.................................. 136 137


Sl. No. Particulars Pages
From     To

18.0 SITE CLEARANCE AND DISMANTLING.................................................... 138 142

19.0 EARTH WORK EROSION CONTROL AND DRAINAGE............................. 143 152

20.0 SUB BASES-BASES (NON-BITUMINOUS) AND SHOULDERS................. 153 157

21.0 BASE AND SURFACE COURSES.............................................................. 158 170

22.0 CONCRETE PAVEMENT............................................................................. 171 174

23.0 GEOSYNTHETIC AND REINFORCED EARTH........................................... 175 176

24.0 TRAFFIC SIGNS, MARKINGS &OTHER ROAD APPURTENANCES......... 177 194

25.0 BRIDGES - PILE FOUNDATION.................................................................. 195 200

26.0 BRIDGES - WELL FOUNDATION................................................................ 201 217

27.0 BRIDGES - OPEN FOUNDATIONS............................................................. 218 223

28.0 BRIDGES - SUB STRUCTURE................................................................... 224 229

29.0 BRIDGES - CONCRETE SUPERSTRUCTURE.......................................... 230 238

30.0 BRIDGES - RIVER TRAINING WORKS AND PROTECTION WORKS....... 239 241

31.0 EXPANSION JOINTS................................................................................... 242 244

32.0 BRIDGES - WEARING COAT & APPURTENANCES.................................. 245 247

33.0 BRIDGES - REPAIR AND REHABILITATION.............................................. 248 251

34.0 PIPE CULVERTS......................................................................................... 252 256

35.0 MAINTENANCE OF ROADS....................................................................... 257 260

36.0 REINFORCED EARTH STRUCTURE......................................................... 261 263

37.0 OTHER ITEMS............................................................................................. 264 271

38.0 INNOVATIVE ITEMS.................................................................................... 272 320

39.0 FURNISHING WORK................................................................................... 321 340

40.0 FIRE FIGHTING WORK............................................................................... 341 371

41.0 ENERGY CONSERVATION BUILDING CODE (ECBC).............................. 372 378

Drawings...................................................................................................... 379 379

Annexure - 1................................................................................................. 380 381

Material Requirement................................................................................... 382 403


PÀ£ÁðlPÀ ¸ÀPÁðgÀ
¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV, §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ

C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ EªÀgÀ PÀbÉÃj £ÀqÁªÀ½UÀ¼ÀÄ

«µÀAiÀÄ: 2018-19 £Éà ¸Á°£À ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛPÉÌ ¸ÀA§A¢ü¹zÀAvÉ ¹«¯ï zÀgÀ¥ÀnÖUÉ C£ÀĪÉÆÃzÀ£É ¤ÃqÀĪÀ §UÉÎ.

G¯ÉèÃR: 1. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ) ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ PÀZÉÃj
DzÉñÀ ¸ÀA.ªÀÄÄC:¸ÀAPÀzÀ:¸ÁPÉÆÃ:¸ÀEA-4:2017-18 ¢£ÁAPÀ : 29-05-2017
2. PÁ¥ÁEA:UÀÄt¨sÀgÀªÀ¸É «¨sÁUÀ, ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ CzsÀåPÀëvÉAiÀÄ°è £ÀqÉzÀ zÀgÀ¥ÀnÖ vÀAiÀiÁjPÁ
G¥À ¸À«ÄwAiÀÄ ¸À¨sÉ ¢£ÁAPÀ : 26-06-2017, 09-08-2017 ªÀÄvÀÄÛ 17-10-2017
3. ¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀA.¦qÀ§Äèöår 65 DgïrJ¥sï 2018 ¢£ÁAPÀ 26-03-2018
4. ¸ÀPÁðgÀzÀ PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ, «PÁ¸À ¸ËzsÀ ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ
CzsÀåPÀëvÉAiÀÄ°è ¢£ÁAPÀ : 30-07-2018 gÀAzÀÄ 2018-19£Éà ¸Á°£À zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ¥ÀæPÀn¸ÀĪÀ §UÉÎ
£ÀqɸÀ¯ÁzÀ ¸À¨sÉ £ÀqÁªÀ½
5. ¸ÀPÁðgÀzÀ ¥ÀvÀæ ¸ÀA.¦qÀ§Äèöår 65 DgïrJ¥sï 2017 ¢£ÁAPÀ : 04-09-2018
6. ¢: 18-09-2018 gÀAzÀÄ ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ) ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ
CzsÀåPÀëvÉAiÀÄ°è £ÀqÉzÀ 2018-19£Éà ¸Á°£À zÀgÀ¥ÀnÖ ¸À¨sÉAiÀÄ £ÀqÁªÀ½UÀ¼ÀÄ
7. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ ........................................................................

* * * * *

¥Àæ¸ÁÛªÀ£É:
G¯ÉèÃR (1) gÀ ¥ÀæPÁgÀ ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ) ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ PÀZÉÃj DzÉñÀzÀAvÉ zÀgÀ¥ÀnÖ
vÀAiÀiÁj¸ÀĪÀ ¸ÀA§AzsÀ G¥À¸À«ÄwAiÀÄ£ÀÄß gÀa¸À¯ÁVgÀÄvÀÛzÉ. ¸ÀzÀj G¥À ¸À«ÄwAiÀÄ G¯ÉèÃR (2)gÀ°ègÀĪÀAvÉ C£ÉÃPÀ ¸À¨sÉUÀ¼À£ÀÄß £Àqɹ
ºÀ®ªÁgÀÄ ªÀiÁ¥ÁðqÀÄUÀ¼À£ÀÄß ªÀiÁqÀ¯ÁV zÀgÀ¥ÀnÖAiÀÄ°è C¼ÀªÀr¹PÉƼÀÄîªÀ ¸ÀA§AzsÀ ²¥sÁgÀ¸ÀÄìUÀ¼À£ÀÄß ªÀiÁrgÀÄvÀÛzÉ.

G¯ÉèÃR (3) gÀ°è zÀg¥À nÀ ÖAiÀÄ£ÀÄß ¥ÀPæ n


À ¸ÀĪÀ ¸ÀA§Azs,À C¢üÃPÀëPÀ C©üAiÀÄAvÀgg
À ÄÀ , («£Áå¸À) ¸ÀA¥ÀPð
À ªÀÄvÀÄÛ PÀlÖqU
À ¼
À ÄÀ (zÀ) ¨ÉAUÀ¼Æ
À gÀÄ
gÀªÀgÀ £ÉÃvÀÈvÀézÀ°è E¯ÁSÉAiÀÄ C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, «±ÉõÁ¢üPÁjUÀ¼ÀÄ DyðPÀ E¯ÁSÉ ºÁUÀÆ C¥ÀgÀ ªÁtÂdå DAiÀÄÄPÀÛgÀ£ÉÆß¼ÀUÉÆAqÀ
¸À«ÄwAiÀÄ£ÀÄß ¸ÀÈf¹ ªÀgÀ¢AiÀÄ£ÀÄß ¤ÃqÀ®Ä ¸ÀÆa¸À¯ÁVgÀÄvÀÛzÉ. ¸ÀzÀj ¸À«ÄwAiÀÄÄ ¢£ÁAPÀ 29-05-2018 ªÀÄvÀÄÛ 19-06-2018 gÀAzÀÄ
¸À¨sÉUÀ¼À£ÀÄß £Àqɹ 2018-19£Éà ¸Á°£À ºÉƸÀ zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ¥ÀæPÀn¸ÀĪÀÅzÀgÀ §UÉÎ ºÁUÀÆ ªÀÈvÀÛªÁgÀÄ zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ¥ÀæPÀn¸ÀĪÀ §UÉÎ
wêÀiÁð¤¹gÀÄvÀÛzÉ.

G¯ÉèÃR (4) gÀ°è ¸ÀPÁðgÀzÀ PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ, «PÁ¸À ¸ËzsÀ ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ CzsÀåPÀëvÉAiÀÄ°è J¯Áè
C¢üPÁjUÀ¼ÀÄ ºÁUÀÆ UÀÄwÛUÉzÁgÀgÀ ¸ÀAWÀzÀ ¥ÀzÁ¢üPÁjUÀ¼ÉÆA¢UÉ ¸À¨sÉAiÀÄ£ÀÄß £Àqɹ 2018-19£Éà ¸Á°£À zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ¥ÀæPÀn¸ÀĪÀ §UÉÎ
ZÀað¸À¯ÁVgÀÄvÀÛzÉ.

G¯ÉèÃR (5) gÀ ¸ÀPÁðgÀzÀ ¥ÀvÀæzÀ°è zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ¥ÀæPÀn¸ÀĪÀ ¸ÀAzÀ¨sÀðzÀ°è C¼ÀªÀr¸À¨ÉÃPÁzÀ J¯Áè ¸ÁªÀÄVæUÀ¼À zÀgÀUÀ¼À£ÀÄß fJ¸ïn
M¼ÀUÉÆAqÀAvÉ ¥ÀqÉzÀÄ ªÁtÂdå vÉjUÉ E¯ÁSÉUÉ ¸À°è¹, fJ¸ïn ºÉÆgÀvÀÄ¥Àr¹zÀ ¨ÉÃgï zÀgÀUÀ¼À£ÀÄß zÀgÀ«±ÉèõÀuÉAiÀÄ°è C¼ÀªÀr¹PÉÆAqÀÄ
£ÀAvÀgÀ CAzÁdÄ ¥ÀnÖ vÀAiÀiÁj¸ÀĪÁUÀ zÀgÀ¥ÀnÖAiÀÄ zÀgÀUÀ¼ÉÆA¢UÉ ¹«¯ï PÁªÀÄUÁjUÀ¼À£ÀÄß ¸ÉêÉUÀ¼ÉAzÀÄ ¥ÀjUÀt¹ ±ÉÃ.12 gÀµÀÄÖ fJ¸ïn
¸ÉÃj¸À®Ä ºÁUÀÆ ªÀÈvÀÛªÁgÀÄ zÀgÀ¥ÀnÖAiÀÄ£ÀÄß vÀAiÀiÁj¸À®Ä ¤zÉÃð±À£À ¤ÃqÀ¯ÁVgÀÄvÀÛzÉ.

a
G¯ÉèÃR (6) gÀ°è ªÀÄÄRå C©üAiÀÄAvÀggÀ ÄÀ , ¸ÀA¥ÀPð
À ªÀÄvÀÄÛ PÀlÖqUÀ ¼
À ÄÀ (zÀ) ¨ÉAUÀ¼Æ
À gÀÄ gÀªg
À À CzsåÀ PÀëvA
É iÀÄ°è C¥ÀgÀ DAiÀÄÄPÀÛgÄÀ , ªÁtÂdå
vÉjUÉ E¯ÁSÉ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉAiÀÄ J¯Áè ªÀÈvÀÛzÀ C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ ºÁUÀÆ UÀÄwÛUÉzÁgÀgÀ ¸ÀAWÀzÀ ¥Àæw¤¢üUÀ¼ÉÆA¢UÉ
G¯ÉèÃR (1) ªÀÄvÀÄÛ (2) gÀ°è ²¥sÁgÀ¸ÀÄì ªÀiÁrgÀĪÀAvÉ zÀgÀ¥ÀnÖAiÀÄ°è ªÀiÁ¥ÁðqÀÄUÀ¼À£ÀÄß ªÀiÁqÀ®Ä PÀÆ®APÀĵÀªÁV ZÀað¸À¯ÁVgÀÄvÀÛzÉ
ºÁUÀÆ G¯ÉèÃR (5) gÀ ¸ÀPÁðgÀzÀ ¥ÀvÀæzÀ §UÉÎ ZÀað¹ ¸À®ºÉ ¸ÀÆZÀ£ÉUÀ¼À£ÀÄß ¥ÀqÉzÀÄ 2018-19£Éà ¸Á°£À ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉAiÀÄ
zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ªÉÄð£À J¯Áè G¯ÉèÃRUÀ¼À£ÀéAiÀÄ ²¥sÁgÀ¸ÀÄì ªÀÄvÀÄÛ wêÀiÁð£ÀzÀAvÉ vÀAiÀiÁj¹ ªÀÈvÀÛªÁgÀÄ ¥ÀæPÀn¸À®Ä ¤zsÀðj¸À¯ÁVgÀÄvÀÛzÉ.

:: DzÉñÀ ::
¸ÀA: J¸ïE©¹/¸ÀEA-3/2018-19zÀgÀ¥ÀnÖ ¢: ............................

¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ ªÉÄÃgÉUÉ 2018-19 £Éà ¸Á°£À ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛzÀ ¹«¯ï zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ¢£ÁAPÀ ........................ jAzÀ
eÁjUÉ §gÀĪÀAvÉ C£ÀĪÉÆâ¸À¯ÁVzÉ ºÁUÀÆ F zÀgÀ¥ÀnÖAiÀÄÄ ªÀÄÄA¢£À DzÉñÀzÀªÀgÉUÉ eÁjAiÀÄ°ègÀÄvÀÛzÉ.


¸À»/-
(zÀÄgÀÄUÀ¥Àà PÉ.)
C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ,
¯ÉÆÃE, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ,
¨ÉAUÀ¼ÀÆgÀÄ

b
¥ÀæwAiÀÄ£ÀÄß DzÀgÀ ¥ÀǪÀðPÀªÁV ¸À°è¹zÉ.
1) ¥ÀæzsÁ£À PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¯ÉÆÃPÉÄÁÃ¥ÀAiÉÆÃV §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ, «PÁ¸À¸ËzsÀ, ¨ÉAUÀ¼ÀÆgÀÄ
2) PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ, «PÁ¸À¸ËzsÀ, ¨ÉAUÀ¼ÀÆgÀÄ
3) PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¤ÃgÁªÀj E¯ÁSÉ, «PÁ¸À¸ËzsÀ ¨ÉAUÀ¼ÀÆgÀÄ
4) PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¸ÀtÚ ¤ÃgÁªÀj E¯ÁSÉ, «PÁ¸À¸ËzsÀ ¨ÉAUÀ¼ÀÆgÀÄ
5) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ (zÀ), zsÁgÀªÁqÀ (G) ªÀÄvÀÄÛ PÀ®§ÄgÀV (F)
6) ªÀåªÀ¸ÁÞ¥ÀPÀ ¤zÉðñÀPÀgÀÄ, PÉDgïr¹J¯ï ¨ÉAUÀ¼ÀÆgÀÄ
7) ªÀÄÄRå AiÉÆÃd£Á¢üPÁj, Pɲ¥ï, ¨ÉAUÀ¼ÀÆgÀÄ
8) ªÀÄÄRå AiÉÆÃd£Á¢üPÁj, J¸ïºÉZïr¦, ¨ÉAUÀ¼ÀÆgÀÄ
9) ¥ÀæzsÁ£À C©üAiÀÄAvÀgÀgÀÄ, §ÈºÀvï ¨ÉAUÀ¼ÀÆgÀÄ ªÀĺÁ£ÀUÀgÀ ¥Á°PÉ, ¨ÉAUÀ¼ÀÆgÀÄ
10) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀtÚ ¤ÃgÁªÀj, ¨ÉAUÀ¼ÀÆgÀÄ
11) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ
12) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¤ÃgÁªÀj (zÀQët), ªÉÄʸÀÆgÀÄ ¤ÃgÁªÀj (GvÀÛgÀ) ¨É¼ÀUÁA,
13) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, gÁ¶ÖçÃAiÀÄ ºÉzÁÝj, ¨ÉAUÀ¼ÀÆgÀÄ
14) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ºÉêÀiÁªÀw ¥ÁæeÉPïÖ, UÉÆgÀÄgÀÄ
15) C©üAiÀÄAvÀgÀ ¸ÀzÀ¸ÀågÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ C©üªÀÈ¢Þ ¥Áæ¢üPÁgÀ, ¨ÉAUÀ¼ÀÆgÀÄ
16) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, PÀ£ÁðlPÀ UÀȺÀ ªÀÄAqÀ½, ¨ÉAUÀ¼ÀÆgÀÄ
17) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, §ÈºÀvï ¨ÉAUÀ¼ÀÆgÀÄ ªÀĺÁ£ÀUÀgÀ E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ
18) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, d®¸ÀA¥À£ÀÆä® C©üªÀÈ¢Þ ¸ÀA¸ÉÞ, D£ÀAzÀgÁªï ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ
19) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ ¤ÃgÀÄ ¸ÀgÀ§gÁdÄ ªÀÄvÀÄÛ M¼ÀZÀgÀAr ªÀÄAqÀ½, ¨ÉAUÀ¼ÀÆgÀÄ
20) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, PɺÉZïJ¸ïr¦, ¨ÉAUÀ¼ÀÆgÀÄ
21) ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, J¸ïºÉZïr¦, ¨ÉAUÀ¼ÀÆgÀÄ
22) ªÀÄÄRå PÁAiÀÄðZÀgÀt C¢üPÁj, PÉDgïDgïrJ, UÁæ«ÄÃuÁ©üªÀÈ¢Þ ¨sÀªÀ£À, ¨ÉAUÀ¼ÀÆgÀÄ
23) ¤zÉðñÀPÀgÀÄ, ¥ËgÀqÀ½vÀ ¤zÉðñÀ£Á®AiÀÄ, 9£Éà ªÀĺÀr, «±ÉéñÀégÀAiÀÄå UÉÆÃ¥ÀÅgÀ, ¨ÉAUÀ¼ÀÆgÀÄ
24) ¤zÉðñÀPÀgÀÄ, PÉEDgïJ¸ï, PÉDgï ¸ÁUÀgÀ, ªÉÄʸÀÆgÀÄ
25) ªÀĺÁ¯ÉÃR¥Á®PÀgÀÄ, PÀ£ÁðlPÀ ¨ÉAUÀ¼ÀÆgÀÄ 1 ªÀÄvÀÄÛ 2
26) AiÉÆÃd£Á ¤zÉÃð±ÀPÀgÀÄ, E-¥ÉÆæPÀÆågïªÉÄAmï ¸É¯ï, ¨ÉAUÀ¼ÀÆgÀÄ

¥ÀæwAiÀÄ£ÀÄß ªÀÆ»wUÁV PÀ¼ÀÄ»¹PÉÆqÀ¯ÁVzÉ.


1) C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ºÁUÀÆ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ, ªÉÄʸÀÆgÀÄ ªÀÈvÀÛ : UÀÄ®âUÁð ªÀÈvÀÛ
: zsÁgÀªÁqÀ ªÀÈvÀÛ : ªÀÄAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ : ºÁ¸À£À ªÀÈvÀÛ : §¼Áîj ªÀêvÀÛ : ¨É¼ÀUÁA ªÀÈvÀÛ ªÀÄvÀÄÛ ²ªÀªÉÆUÀÎ ªÀÈvÀÛ
2) vÁAwæPÀ ¤zÉðñÀPÀgÀÄ, PÀ£ÁðlPÀ PÉƼÀUÉÃj C©üªÀÈ¢Þ ªÀÄAqÀ½, ¨ÉAUÀ¼ÀÆgÀÄ
3) C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, ¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ, ¸ÀtÚ ¤ÃgÁªÀj ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ, ªÉÄʸÀÆgÀÄ
4) C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, gÁ¶ÖçÃAiÀÄ ºÉzÁÝj ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÄvÀÄÛ zsÁgÀªÁqÀ
5) PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ºÁUÀÆ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ «¨sÁUÀUÀ¼ÀÄ: ¨ÉAUÀ¼ÀÆgÀÄ /
aPÀ̧¼Áî¥ÀÄgÀ / gÁªÀÄ£ÀUÀgÀ / vÀĪÀÄPÀÆgÀÄ / ªÀÄzsÀÄVj / PÉÆïÁgÀ
6) ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛzÀ J¯Áè ¸ÀºÁAiÀÄPÀ PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ºÁUÀÆ M¼À£ÁqÀÄ d®¸ÁjUÉ
E¯ÁSÉ G¥À «¨sÁUÀ.
¸À»/-
(zÀÄgÀÄUÀ¥Àà PÉ.)
C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ,
¯ÉÆÃE, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ,
¨ÉAUÀ¼ÀÆgÀÄ
c
GENERAL NOTES TO THE SR OF CIVIL WORKS
BENGALURU CIRCLE FOR THE YEAR 2018-19
1. The specifications drawn in this SR for roads, bridges, culverts and buildings are based on recent publication of
IRC, NBC & IS codes.
2. Only short & abridged specifications have been published in this SR For detailed specifications the following books
shall be referred,
a. Karnataka Building Specification - KBS
b. Karnataka Standard Rate Analysis for Buildings - KSRB
c. Karnataka Roads and Bridges Specifications - KRBS
d. Karnataka Standard Rate Analysis for Roads
and Bridges - KSRRB
3. The schedule of rates book along with detailed specifications furnished in the form of soft copy, constitute complete SR.
4. The material component rates indicated in the SR are the bare rates. (excluding GST but inclusive of loading,
unloading, lead & lift charges etc.,)
The prevailing market rates of cement, steel and bitumen will be accessed and the bare rates will be
approved by the Superintending Engineer and published quarterly i.e., 1st April, 1st July, 1st October and
1st January whenever the variation in price is more/less than 10% over the previously approved rates.
In case of abnormal variations, issue rates will be revised in the middle of the quarter based on proposals from
the Executive Engineer. These approved rates shall be adopted both for preparation of estimates and evaluation
of tenders.
5. GST of 12% shall be added as per Govt. Letter No. PWD 65 RDF 2017, dated 04-09-2018.
The procedure given in the Annexure 'X' shall be followed for the estimate preparation.
6. The rates for items of works indicated in the Schedule of rates are inclusive of lead, lift, loading and unloading
charges. Extra lead, loading and unloading charges shall not be added except otherwise mentioned in specific
cases.
7. For ensuring the quality aspect of the materials used by the contractors such as cement, steel and bitumen etc.,
it is necessary that the contractor shall furnish the approved quality control test certificates for these materials
including the finished items. Department will have the right to get these materials tested at the cost of contractor.
8. Measurement of doors, windows, ventilators, cupboards etc., shall be taken outside to outside of frames and
coefficients for painting varnishing etc. shall be adopted as per the coefficients prescribed in the IS SP 27-1987.
9. Reinforcement shall be measured in length including hooks. The laps and wastages shall not be measured and
paid. Couplings, welded joints, spacer bars, annealed steel wire used for binding shall not be measured as the
cost of these items are deemed to have been included in the rates.
10. The teak wood items are to be operated only with the prior approval of Superintending Engineer.
11. The volume of reinforcement in RCC works need not be deducted from the measurement of concrete quantity.
12. The mosaic tiles, vitrified tiles and granite slabs, prepolished cement concrete tiles, prepolished granite tiles shall
be procured by the agency only after obtaining approval from the Executive Engineer.
13. The natural/ river sand to be used shall be clean, sieved and of good quality. As far as possible natural/ river sand
shall be used. Whenever there is scarcity of natural/ river sand, manufactured sand / crushed sand can be used to
a maximum extent of 50% of total sand quantity for plastering items and 100% for concrete items. The certification
by the concerned Executive Engineer, Quality Control is mandatory for usage of artificial/ manufactured sand.
14. The use of filtered sand is totally banned in all items of civil works.
15. If the rates for certain items of works are not found in this SR then such items shall be obtained from SR
of Minor Irrigation/National Highway/ PRED/ KUWS & DB/BWS & SB.
16. For items not found in any of the SR data rates shall be prepared and got approved from competent authority.

d
17. For all RCC works the rate is exclusive of Steel and fabrication. For chapter 5 i.e. Stone works, Chapter 6 i.e. Brick
works and Chapters 25-33 i.e. For Bridge Works, the rates are inclusive of form works, scaffolding and centering.
18. For Road works, rates indicated for ‘EARTHWORK FORMATION, GSB, WBM, WMM and ASPHALT ITEMS’ are
for compacted thickness.
19. The rates of materials indicated in the SR are the bare rates and are only for deriving finished rates of items and
for working out data rates and shall not be adopted for making direct payments.
20. RMC : While using RMC, taking out the samples at worksite is mandatory for conducting necessary tests. It is the
responsibility of the contractor to assure and ensure quality of RMC at the work spot as per design mix for which
Executive Engineer shall obtain necessary test certificates as per IS Standards.
21. TMT Steel :The Steel used in all construction works should confirm to IS 1786 / IS 2830 for both physical and
chemical tests.
In Bridge works only Round TMT bars shall be used for dowel bars.
For lapping steel reinforcement, preferably 25mm and above, only welding splices shall be done.
In the case of CC pavement, load transfer-dowel bars used at the expansion joints, construction joints (and also
at contraction joints, if used) should be rounded steel bars as one side of the dowel bars are to be de-bonded
to allow foe expansion / contraction of the CC slabs. In the case of continuously reinforced concrete pavements
(CRCP) also, rounded steel bars are to be used in order to enable expansion / contraction by de-bonding at the
locations of joints.
In the case of bars at longitudinal joints, use of twisted steel bars is more advantageous.
22. The Task Force Committee has issued, directions to adopt minimum cement constants of various cement mix
as per IS 456 along with super plastisizer. The specifications of concrete items are modified indicating the Mix
design along with constant adopted for cement, jelly and sand. Table for Design mixes of concrete is indicated in
Chapter - 4.
23. Procedure for design mix as enumerated in the chapter on concrete shall be adopted.
24. The design mix shall be got certified from the Quality Control Authority / Quality Assurance Authority by the user
Department.
25. Royalty charges to be deducted for embankment using available soil.
26. The innovative items should be operated only after the approval of Superintending Engineer.
27. Comments/ suggestions may be sent by post or e-mail. to PWD Superintending Engineer office sebgl@kpwd.gov.in
and PWD Chief Engineer office - cecbs@kpwd.gov.in

e
ANNEXURE 'X'

Typical calculation sheet for estimation of roads & buildings.


(Rs.) 

Rate indicated in 2018-19 SR


1. A
(excluding contractor's profit, overhead charges & GST)

2. Add 10% contractor's profit on (A) B

3. Add 10% Overhead charges on (A) C

4. Sub total D=A+B+C

5. Add area weightage (if applicable) on (D) E

6. Add 12% GST on (A) F

Total Amount (D+E+F) X

For Bridge Work


(Rs.) 

Rate indicated in 2018-19 SR


1. A
(excluding contractor's profit, overhead charges & GST)

2. Add 10% contractor's profit on (A) B

3. Add 20% Overhead charges on (A) C

4. Sub total D=A+B+C

5. Add area weightage (if applicable) on (D) E

6. Add 12% GST on (A) F

Total Amount (D+E+F) X

f
Weightages to be added for finished items of works to be executed
in the following places:

I.  Common area weightages

Hill stations
MOTORABLE AREA
0 – 25 mtr. Nill
More than 25 m. – upto 150 m. 5%
1.
More than 150 m. – upto 300 m. 10%
More than 300 m – upto 450 m. 15%
More than 450 m – upto 600 m. 20%
600 m and above 25%

2. Other State works 25%

3. MINING Upto 5 kms. radius of mining area 4%

4. Sugar Factory Area / Cement Factory Area (Upto 5 kms radius) 4%

5. Forest Area 5%

II  Bangalore Circle

Bruhat Bangalore Mahanagara Palike limits (BBMP limits)


1. a) For Buildings 6%
b) For Roads & Bridges 8%

BMRDA Limits – All taluks under Bangalore (Urban) and Bangalore


2. 3%
(Rural) district and Ramanagara District.

3. Works carried out at Bangalore Central Prison, Parappana Agrahara 10%

4. Pavagada in Tumkur District. 2%

5. Chikkanayakanahally in Tumkur District. 3%

6. Gubbi in Tumkur District. 2%

Note : 1. Only one weightage is applicable for each work. If two weightages are applicable whichever is
higher is to be considered.
2. Necessary certificate should be obtained from concerned Department for Forest area, Sugar
Factory area, Mining Area & Wildlife sanctuary.

g
h
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
1. ADHESIVES
01 0009 Adhesive(for linoiling flooring) 177.97
02 0509 Adhesive for tiles Kg 25.42
03 0514 Adhesive for joints Kg 63.56
04 0022 Bees Wax Kg 152.54
05 0513 High bond tile adhesive for vitrified tiles Kg 21.19
06 2008 Fevicol Kgs 190.68
07 2047 Ball Adhesives Kgs 199.15
08 0387 Shellac Kgs 230.00
2. AGGREGATE
2a. BRICK AGGREGATE / BRICKS / CC BLOCKS
09 0054 Brick bats 25 to 100 mm Cum 593.22
10 0055 Brick aggregate 20 mm(Nominal) Cum 593.22
11 0056 Brick aggregate 25 mm(Nominal) Cum 593.22
Burnt brick class designation 35 ( Non Modular) Ground
12 0064 100 Nos. 593.22
Moulded
13 0503 Burnt brick class designation 35 (modular) 100 Nos. 593.22
14 0488 Table moulded bricks class designation 50 (non modular) 100 Nos. 677.97
15 0504 Table moulded class designation 50 (modular) 100 Nos. 677.97
16 0505 Wire cut bricks of class designation 75 (non modular) 100 Nos. 1271.19
17 0506 Wire cut bricks of class designation 75 ( modular) 100 Nos. 1186.44
18 0311 Pre-cast hollow blocks (40x20x20cms) - 5.00 N/sqmm. 100 Nos. 3644.07
19 0391 Solid blocks (concrete 40x20x20cms) - 4.00 N/sqmm. 100 Nos. 3559.32
20 0497 Hollow concrete blocks (40x20x20cms) - 3.50 N/sqmm. 100 Nos. 3644.07
21 0498 Hollow concrete blocks (40x20x15cms) - 3.50 N/sqmm. 100 Nos. 3474.58
22 0499 Hollow concrete blocks (40x20x10cms) - 3.50 N/sqmm. 100 Nos. 3389.83

2b. STONE AGGREGATE

23 0175 100 mm and down nominal size Cum 987.62

24 0734 53 mm nominal size Cum 1054.29

I
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
25 0750 40 mm nominal size Cum 1091.43

26 0060 30 mm nominal size Cum 1091.43

27 0800 25 mm nominal size Cum 1091.43

28 0749 20 mm nominal size Cum 1091.43

29 0058 12.5 mm nominal size Cum 1091.43

30 0057 10 mm nominal size Cum 1091.43

31 0707 6 mm nominal size Cum 1091.43

32 0803 Fine aggregate 2.36 mm nominal size Cum 1054.29

33 0762 Key aggregates 22.4 to 2.8 mm Cum 1054.29

34 0746 Filter media stone aggregate 60 mm & down size Cum 1054.29

35 0904 Coarse aggregates 53 mm Cum 1054.29

36 0906 Crushed aggregates 37.5mm Cum 1054.29


Crushed coarse aggregate (Supply of hand broken aggregates)
37 0912 Cum 1054.29
100 mm & down size
38 0919 Key aggregates passing 26.5mm to 2.8mm Cum 1091.43

39 0921 Crushed stone aggregate 13.2mm to 10mm Cum 1091.43

40 0922 Crushed stone chipping, 19mm Cum 1091.43

41 0926 Crushed aggregate 9.5mm to 4.75mm Cum 1091.43

42 567 Filler Aggregates Tonne 1091.43

2c. STONE CHIPPINGS

43 0732 Crushed stone chippings 11.2 mm Cum 1091.43

44 0733 Crushed stone chippings 13.2 mm Cum 1091.43

45 0400 Stone dust / Grit 4.75 mm to 0.075 mm Cum 1000.00

46 0815 Crushed stone chipping 5.6 mm size cum 952.38

47 0819 Lime Stone Dust 0.075 mm & down size Tonne 7619.05

2d. SAND / GRAVEL


48 0287 Pea size gravel/6mm and down stone grit cum 428.57
49 0334 Sand/ Artificial Sand/ Manufactured Sand cum 1591.43
50 0551 Ordinary earth cum 150.00

II
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
57 0731 Sand / Crushed Sand cum 1680.95
58 0751 Granular material 2.36 mm cum 171.43
59 0752 Gravel 2.36 mm cum 190.48
60 0772 Natural sand 5.6 to 75 micron cum 1680.95
61 0781 Quartz sand Kgs 4.76
3. STONES
62 0037 Bond stones 20cms x 20cms x 45cms Each 26.67
63 0039 Boulders Cum 666.67
64 0066 Burnt stone slabs 10cms thick Sqm 428.57
65 0174 Granite stone slabs fine dressed 40 mm thic Sqm 1440.68
66 0330 Rubble stones Cum 476.19
67 0390 Size stone 20x20x25 cm Each 13.33
68 0401 Stone slab 10 to 12 cm thick Sqm 571.43
69 0720 Bond stone 20x20x45 cm Each 26.67
70 0780 Quarry spalls Cum 238.10
71 0789 Size stone 20x20x25 cms Each 11.86
72 0790 Spall (jelly used for packing) Cum 476.19
73 0793 Rough stones 15 cm to 45 cm Cum 380.95
74 0794 Stone boulders 30 cm thick Cum 666.67
75 0795 Stone spalls Cum 333.33
76 0939 Stone with minimum size of 200mm Cum 666.67
4. ALUMINIUM
77 0010 Aluminium beading Kgs 127.12
78 0011 Aluminium handles - 15mm Each 59.32
79 0012 Aluminium hinges 75 mm length Each 33.90
80 0013 Aluminium stays Each 38.14
81 0014 Aluminium tower bolt - 20 cm Each 76.27
82 0017 Aluminium sheet for strips Sqm 254.24
83 0018 Aluminium window frame section 1.2 mm thick Kgs 169.49

III
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
84 0522 Aluminium Composite panel of approved colour straight portion Sqm 1898.31
85 0533 Aluminium frame section Kgs 194.92
86 0544 Aluminium composite panel of curved portion Sqm 3135.59
87 0860 Aluminium studs 100 x 100mm fitted with lense reflectors nos 211.86
Aluminium sheeting fixed with encapsulated lens type reflective
88 0942 Sqm 3220.34
sheeting of size 0.9sqm
Aluminium alloy/galvanised steel/ Galvanised MS plate including
89 0943 Tonne 44915.25
5% wastage
Aluminium alloy plate, 2mm thick, fixed with high intensity grade
90 0944 Sqm 3220.34
sheeting vide Clause 801.3
91 2069 Alluminium anodised profile top cap beading m 338.98
5. ASBESTOS CEMENT PRODUCTS EXCEPT PIPES
92 0007 AC sheet 6 mm thick semi corrugated Sqm 144.07
93 0008 AC sheet 6 mm thick semi trafford Sqm 165.25
94 0327 Ridges (AC sheet) Pair 211.86
6. BITUMEN
95 0717 Bitumen 80/100 Grade bulk Tonne 33891.53
96 835 Bitumen 80/100 Packed Tonne 37091.53
97 0814 Bitumen 60/70 Grade Bulk Tonne 34691.53
98 836 Bitumen 60/70 Packed Tonne 37891.53
99 0030 Bitumen 85/25 Grade Tonne 33891.53
100 0820 Bitumen 30/40 Grade Tonne 29422.03
101 0730 CRMB Tonne 36206.78
102 0806 NRMB 70 Tonne 51797.46
103 0735 Cut back MC 70 Tonne 50406.78
104 0718 Bitumen emulsion Tonne 31722.03
105 0031 Bitumen felt (hessian based) Sqm 72.03
106 0032 Bitumen washer Each 0.85
107 0109 Coal tar Sqm 14.29
108 0108 Coal tar paint L 25.42
109 0035 Blown or residual bitumen Tonne 25506.78
IV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
110 0807 Polymer MB 70 Tonne 53766.95
7. BLASTING MATERIAL
111 0736 Detonator Each 8.47
112 0738 Drill bits Nos 317.80
113 0786 Safety fuse wire Coil 190.68
114 0791 Gelatin Kg 105.93
8. BOARDS
115 0002 12 mm thick pre laminated board (Novapan) exterior grade Sqm 550.85
Prelaminated board 19 mm thick of approved lamination on both
116 0312 Sqm 593.22
side
Prelaminated board of approved lamination on one side and
117 0313 Sqm 567.80
balancing white colour
118 0301 a. Plywood 12 mm thick (Commercial) Sqm 762.71
b. Plywood 19 mm thick (Commercial) Sqm 889.83
c. Plywood 25 mm thick (Commercial) Sqm 1483.05
d. Sheet 6 mm thick (Commercial) Sqm 550.85
119 0293 Plain particle board Sqm 389.83
120 0180 Hard board 45 x 45 mm size Sqm 105.93
121 0181 Hard board 600 x 450 mm size Sqm 120.34
122 0955 Pre-moulded asphalt filler board Sqm 529.66
123 2006 12mm plywood Sqm 635.59
124 2007 4mm thick veneer Sqm 932.20
125 2009 19mm Plyboards Sqm 932.20
126 2010 1.5mm Laminate Sqm 677.97
127 2090 5mm PVC sheet Sqm 635.59
128 2099 5mm BS prelam PVC sheet Sqm 868.64
129 2100 5mm SS prelam PVC shee Sqm 741.53
130 2101 2mm PVC sheet Sqm 296.61
9. CEMENT
131 0084 Cement Qtl 490.63

V
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
132 0439 White cement Qtl 1562.50
Portland Slag Cement (PSC)/ Portland Pozzolona Cement
133 1557 Qtl 490.63
(PPC)
134 1558 Ground Granulated blast furnace slag(GGBS) Qtl 333.33
10. FLOORING MATERIALS
135 0088 Chequered mosaic tiles grey 20 mm thick dark shade Sqm 231.36
136 0089 Chequered mosaic tiles light shade 20 mm thick Sqm 275.42
137 0090 Chequered mosaic tiles medium shade Sqm 254.24
138 0091 Chequered mosaic tiles white colour Sqm 320.34
139 0110 Cobble stone 60 mm thick Sqm 424.76
140 0111 Cobble stone 75 mm thick Sqm 469.52
141 0116 Cuddapah slab 2.5 cm to 4 cm thick Sqm 290.48
142 0176 Gray colour mosaic tiles Sqm 200.00
143 0213 Light shade mosaic tiles Sqm 205.08
144 0228 Machine cut granite stone slab 40 mm Sqm 822.88
145 0229 machine polished granite stone slab 20 mm Sqm 551.69
146 0231 marble chips Kgs 21.90
147 0234 Marble dust Cum 874.29
148 0235 marble powder Cum 740.00
149 0237 marble slab 20 mm thick Sqm 1099.15
150 0248 metallic floor hardner Kgs 50.85
151 0386 shahabad slabs 2.5 cm to 4 cm thick Sqm 354.29
152 0448 white mosaic tiles Sqm 160.17
153 0507 vitrified tiles 10 mm thick 600X600 mm granolite finish Sqm 406.78
154 0508 vitrified tiles 600X600 mm 10 mm thick Sqm 381.36
155 0560 vitrified tiles 900mm x 900mm 12mm thick Sqm 440.68
156 0545 20 mm thick Hassan green / River Pink granite Sqm 1355.93
157 0546 ceramic tiles 30X30 cms Sqm 296.61
158 0510 Grout for vitrified tiles Kgs 67.80
159 0511 Spacers for Vitrified tiles No 1.69

VI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
160 0512 Sealer for vetrified tiles Sqm 1.69
161 0515 Prepolished Grey granite 20 mm thick Sqm 1267.80
162 0517 20 mm thick Ruby red granite Sqm 1623.73
163 0518 20 mm thick grey granite Sqm 889.83
164 0519 20 mm thick Shiva gold granite Sqm 1889.83
165 0520 20 mm thick Black granite Sqm 1088.98
166 0521 Prepolished black granite 20 mm thick Sqm 1266.95
167 0523 Prepolished Water cut grey granite Sqm 938.14
168 0725 Chequerred cement concrete tiles Sqm 190.68
169 0416 Tandur blue slabes 2.5cms to 4 cm thick Sqm 266.95
170 0545 20mm thick Hassan green granite Sqm 1355.93
171 2076 Lakared granite Sqm 2266.95
172 2085 Sadarahalli flammed granite 40mm Sqm 1000.00
173 2086 Sadarahalli pre polished granite 20mm Sqm 854.24
174 2108 Black granite 40mm thick Sqm 1889.83
11. TILES
175 0112 Colour glazed tiles 15 x 15 cms 10mm thick Each 6.78
176 0113 White glazed tiles 15 x 15 cms 6mm thick Each 5.08
177 0186 Hersian cloth for using in tiles as reinforcement sqm 37.50
178 0217 Linolium sheet for tile 30 cmsx30cms sqm 243.75
179 0464 Yelahanka tiles of size 250x250 mm Each 4.76
180 0481 Mangalore tiles first class and special tile for ridges and hips nos 13.33
181 0485 Medium shade mosaic tiles sqm 106.78
182 0486 Ceramic tiles 15 cms x 15 cms sqm 233.05
183 0444 White glazed tiles 15 cms x 15 cm , 10 mm thick plain Each 5.93
184 0445 Color glazed tiles 15 cm x 15 cm, 10 mm thick anti skid Each 5.93
185 578 Pre polished grey granite tile 10mm sqm 457.63
186 579 Pre polished black granite tile 10mm sqm 889.83
187 2073 Concrete designer tiles sqm 436.44

VII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
188 2074 Ceramic tiles of 300x 600mm sqm 409.32
189 2075 Ceramic tiles of 300x 450mm sqm 320.34
190 2042 Border tiles 30x10cms Each 124.58
191 2043 Glazed tiles 300 x 450 sqm 249.15
192 2026 Ceramic tiles 400 x 400mm sqm 368.64
12. READY MIX CONCRETE
193 0495 Ready Mix Concrete M 20 (1:1.5:3) cum 4110.17
194 0496 Ready Mix Concrete M 25 (1:1:2) cum 4194.92
195 2200 Ready Mix Concrete M 30 cum 4237.29
196 2201 Ready Mix Concrete M 35 cum 4406.78
197 2202 Ready Mix Concrete M 40 cum 4576.27
13. STEEL
198 0003 18 gauge 75 mm MS laths of 2.8 m length Nos 186.44
199 0004 Z section Kgs 37.29
200 0019 Angle iron 40x40x6mm Kgs 37.29
201 0087 Channels 25x25x6 mm Kgs 37.29
202 0187 High tension coil oxidised MS Each 677.97
203 0203 Hooks oxidised MS 150 mm Each 16.95
204 0221 M.S. flat 30 cmx25mmx3mm Kgs 37.29
205 0223 M.S. Round Bright bars 20mm Q 3728.81
206 0224 M.S. Square Bright bars 20mm Q 3728.81
207 0249 Mild steel 6 mm dia Kgs 33.90
208 0250 Mild steel bars Q 3389.83
209 0252 MS channels Kgs 37.29
210 0255 MS flats 20 mm x 6 mm Kgs 37.29
211 0257 MS plates Kgs 37.29
212 0258 MS rods Kgs 33.90
213 0259 MS sheet 1 mm thick Kgs 35.59
214 0260 MS sheet 20 gauge Kgs 35.59

VIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
215 0262 MS tees Kgs 33.90
216 0264 Mullion section (MS) Kgs 33.90
217 0288 Pig lead Kgs 50.85
218 0414 T section MS Kgs 37.29
219 0484 M.S.Shoes Kgs 37.29
220 0547 Expanded metal 12.5 mm to 25 mm -14 G sqm 254.24
221 0714 Bearing plates Tonne 52542.37
222 0716 Binding wire Kgs 55.08
223 0723 Cast Steel Kgs 42.37
224 0724 Cast Steel rocker assembly Kgs 72.03
225 0739 Edge beams of steel of special shape and section Kgs 49.15
226 0748 Forges Steel (2 rollers) Kgs 203.39
227 0756 High Tensile steel wires/strands Tonne 50847.46
228 0757 High Tensile strands q 5084.75
230 0759 ISMC 1002.806x1.05 Tonne 37288.14
231 0763 Mild steel q 3389.83
232 0764 Mild steel anchors Kgs 32.20
233 0765 Mild steel matrix including wastage Kgs 32.20
234 0766 Mild steel plate(Galvanised) Tonne 33898.31
235 0767 MS bars Tonne 33898.31
236 0770 MS flats Tonne 33898.31
237 0771 Ms gratings 260 mmx 260 mm Each 84.75
238 0777 Pile shoes-Ci Kgs 84.75
239 0778 Pile shoes-MS Kgs 37.29
240 0792 Stainless steel 304 grade Kgs 254.24
241 0862 Mild Steel pipe 100mm dia 2.5mm thick m 254.24
242 0863 Mild Steel pipe 25mm dia 2.5mm thick m 84.75
243 0864 CGI sheets Kgs 33.90
244 0865 Angle iron 45x45x5mm Kgs. 37.29

IX
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
245 0866 M.S sheet 300mm wide,2.5mm long and 2.6mm thick Kgs. 37.29
246 0867 Angle iron 50x50x2mm long Kgs. 37.29
247 0868 M.S sheet of 12 SWG, 3 Nos of 200mm width and 4m length Kgs. 37.29
248 0870 Steel drum 300mm dia 1.2m high/empty Nos. 101.69
249 0940 Mild steel angle iron 75 x 75 x 6mm Kgs. 37.29
250 0941 Mild steel angle iron 75 x 75x 6mm, 2.85 metres long Kgs. 37.29
Corrugated sheet, 3mm thicken "W" beam section railing, 4.5m
251 0957 Kgs. 46.61
in length.
252 0958 Channel post 150 x 75 x 5mm Kgs. 37.29
253 0959 Channel 150 x 75 x 5 mm Kgs. 37.29
Structural steel in plates, angles, Galvanised structural steel
254 0963 Tonne 37288.14
plate etc.,including 5% wastage
255 0972 RS joist 100 x 75mm Kgs. 37.29
256 0973 Struts - 2 Nos. for terminal posts, 2m long each 2 x 2 x 11.50 Kgs. 37.29
Tie 2 Nos. of 8mm steel plate, 1.5sqm each for terminal posts at
257 0974 Kgs. 37.29
62.80kg/sqm(2x1.5)
258 0975 Steel wire rope 40mm Kgs. 37.29
259 0976 Mild steel pipe 25mm dia, 2.5mm thick m 84.75
MS sheet for 600 x 300 x3mm rectangular vane, one number at
260 0977 Kgs. 37.29
24 kg/sqm
MS sheet for 250mm dia circular vane 3mm thick, 4 number at
261 0978 Kgs. 37.29
24 kg/sqm
262 0979 MS sheet 3mm thick at 24kg/sqm Kgs. 37.29
Galvanised angle sections 100mm x 10mm of 12mm thickness
263 0981 weldable structural steel as per IS:2062.2 Nos. of 12m length Kgs. 37.29
each at 17.7 kg/m
264 0988 Helical pipes 600mm diametre m 152.54
265 0989 Tie rodes 20mm diametre Kgs. 37.29
Steel circular hollow pole of standard specification for street
266 1100 Each 6779.66
lighting to mount light at 9m height above road level.
Tube anchorage set complete with bearing plate, permanent
267 1510 No. 11864.41
wedges etc.
268 1512 Bearing cc 0.51

X
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
269 1513 Bearing rocker & Roller No. 4237.29
270 1516 Sheating duct ID 66mm Tonne 50847.46
271 1519 32mm mild steel dowel bars of grade s240 Tonne 37288.14
272 1520 16mm deformed steel tie bars fo grade S 415 Tonne 37288.14
273 1534 20 x 5 mm diagonals Kgs. 37.29
Cast steel rocker bearing assembly of 250 tonne design load
274 1553 capacity duly painter complete with all leads components as per Nos. 67796.61
drawing and specifications
PTFE sliding plate bearing assembly of 80 t. design load
275 1554 capacity duly painted complete with all its components as per Nos. 67796.61
drawing & technical specification.
276 558 MS angles 65 X 65 X 6 mm 34.7 Kgs Kgs. 37.29
277 562 38 mm dia of 14 guage MS black pipe m 42.37
278 561 20 mm dia hold fast Rod Nos. 50.85
279 571 Stainless steel strips m 186.44
280 573 M S Clamps for Shoe Kgs. 37.29
281 576 Steel column 400x250 mm (ISHB Series) Tonne 42372.88
282 577 Forged steel rollar bearing of 250 tonne No. 3135.59
Steel circular Hollow pole of standard specification for street
283 1103 each 4237.29
lighting to mount light at 5m height above road level.
284 2022 MS flat (12x75mm) Kgs 37.29
285 2021 M S Tubes (14 gauge) Kgs 50.85
286 2027 50mm dia M.S. Hollow pipe B Class 14 Gauge Kgs 50.85
287 2028 20mm x 20mm vertical M.S. Square Rod Kgs 37.29
288 2015 Gusset plates 6mm thick Kgs 50.85
289 2016 Base plate/ base plate Kgs 50.85
290 2018 Anchor Bolts 750mm No. 110.17
291 2029 12x12 M.S. Square Rod Kgs 37.29
292 2030 16x16mm M.S. Square Rod Kgs 37.29
293 2031 40x6mm M.S. Flat Kgs 37.29
294 2032 12mmx6mm M.S. Flat Kgs 37.29

XI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
295 2033 Cast iron spike Nos. 84.75
296 2034 50x50 M.S. Hollow pipe Kgs 50.85
297 2036 36mm x 6mm M.S. Flat Kgs 37.29
298 2038 Stainless steel hollow pipes 14 gauge 50mm dia. Kgs 254.24
299 2039 Stainless steel hollow pipe 14 gauge 25mm dia. Kgs 254.24
300 2040 5" dia 5mm thick M.S. plate Nos. 37.29
301 2067 MS pipes of 80mm to 100mm dia Kgs 37.29
302 2068 RMS Gusset plate Kgs 50.85
303 2078 Stainless steel tubes 40mm, 14 gauge Kgs 254.24
304 2091 M.S. Tube m 220.34
305 489 M.S. 20mm Square bar q 3728.81
MS angle iron 40mm x 40mm x 6mm, 23 metre in length at 3.5
306 0949 Kgs 37.29
kg pe metre
MS angle iron 50mm x 50mm x 6mm, 33.8 metre in length at
307 0950 Kgs 37.29
4.5 kg per metre.
308 0951 Runner flat 50 x 5mm Kgs 37.29
Welded steel with fabric 75 x 50mm mesh at 4kg/ sqm, 4 x 30 x
309 0952 Kgs 37.29
1.2+5% wastage
310 0953 Steel pipe 50mm external dia as per IS:1239 2.5mm thick m 169.49
Medium wt. steel channel (ISMC Series) 100mm x 50mm,10.8
311 0954 Kgs 37.29
metre length at 9.2 kg per m
14. WOOD WORK
312 0115 Corner beads 45x45 mm m 12.71
313 0190 honne wood Cum 62796.61
314 0191 honne wood beading 10 mm wide m 12.71
315 0193 honne wood beading 20x20 mm m 21.19
316 0194 Honne wood scantling Cum 62796.61
317 0195 Honne wood scantling for styles and rails 30mm thick Cum 62796.61
318 0196 Honne wood scantling for styles and rails 35mm thick Cum 62796.61
319 0198 Honne wood planks for shutters(frame) 35mm thick cum 62796.61
320 0200 Honne wood planks for panels 20mm thick cum 62796.61

XII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
321 0201 Honne wood battens cum 62796.61
322 0202 Honne wood beads cum 62796.61
323 0205 Jungle wood battens 25mm x 40mm cum 28813.56
324 0206 Jungle wood battens 50mm x 40mm cum 28813.56
325 0207 Jungle wood runners and planks cum 28813.56
326 0208 Jungle wood runners and planks cum 28813.56
327 0209 Jungle wood scantling cum 28813.56
328 0238 mathi or Nandi wood cum 51694.92
329 0239 mathi or Nandi wood planks for panels 20mm thick cum 51694.92
330 0240 mathi or Nandi wood scantlings for styles and rail 25mm thick cum 51694.92
331 0241 mathi/Nandi wood cum 51694.92
332 0242 mathi/Nandi wood battens cum 51694.92
333 0243 mathi/Nandi wood beadings 10mm wide m 8.47
334 0244 mathi/Nandi wood planks for panels 25mm thick Cum 51694.92
335 0245 mathi/Nandi wood scantling cum 51694.92
336 0246 mathi or Nandi wood scantlings for styles and rails 30mm thick cum 51694.92
337 0266 Nandi wood reepers 50x25 mm m 59.32
338 0269 NUWUD (MDF) panel filling 19 mm thick Sqm 423.73
339 0286 Panel filled with NUWUD (MDF) board 12 mm thick Sqm 381.36
340 0294 planks for filling Sqm 10169.49
341 0332 Sal wood cum 41949.15
342 0333 Sal wood battens cum 42372.88
343 0389 silver oak or equivalent planks 38 mm thick cum 21186.44
344 0417 Teak wood cum 118644.07
345 0418 Teak wood beading 10mm wide m 21.19
346 0419 Teak wood beading 20x20 mm m 55.08
347 0421 Teak wood gutties Big Each 4.24
348 0422 Teak wood planks for panels 25 mm thick cum 125423.73
349 0423 Teak wood reepers 50x25 mm m 118.64

XIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
350 0424 Teak wood scantling for styles and rails 30mm thick cum 125423.73
351 0425 Teak wood scantling for styles and rails 35mm thick cum 125423.73
352 0426 Teak wood beads cum 125423.73
353 0429 TW beading for fixing glass m 16.95
354 0463 Wooden strips of I class teak wood (25 mm/6mm) 4mtr. Long Each 42.37
355 0490 Jungle wood reepers 50x25 mm m 29.66
356 0706 25mm thick silver oak planks Sqm 12711.86
357 0798 Wooden blocks Nos 169.49
358 0462 Wooden cleats Each 2.54
359 0080 Casuarina bellies 75 to 100 mm dia m 37.29
360 0081 Casuarina poles 100 to 150 mm m 47.46
361 0082 Casuarina poles 75 to 100 mm dia m 37.29
362 0869 Jungle wood cum 29661.02
363 0872 Wooden staff for fastening of flag 25mmdia, one m long Each 8.47
364 0961 Wooden ballies 8"dia & 9m long No. 211.86
365 0962 Wooden ballies 2"dia for bracing m 21.19
366 2002 50x35mm salwood crunnel cum 38983.05
367 2003 Teakwood gutties Small Nos. 1.69
368 2011 Teak wood beading 10mm wide m 21.19
15. GLASS
369 0006 5.5mm thick plain glass Sqm 550.85
370 0170 Glass shelf 600x120mm with guard rail Each 779.66
371 0171 Glass strips 40 mm width, 4 mm thick Sqm 438.14
372 0172 Glazing clips Kgs 169.49
373 0467 4mm thick plain glass Sqm 423.73
374 0324 Reeded glass 2 mm thick Sqm 233.05
375 0325 Reeded glass 3 mm thick Sqm 275.42
376 0538 Imported glass 6 mm thick Sqm 762.71
377 2012 12mm thick plain tuffened glass Sqm 1949.15

XIV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
378 2014 12mm thick frosted toughened glass Sqm 2288.14
379 2071 Glass etching Sqm 1144.07
16. FIXTURES
380 0005 25 mm dia pulley (for alluminum sliding door) Each 57.63
381 0011 Aluminium handles - 15mm Each 59.32
382 0012 Aluminium hinges 75 mm length Each 33.90
383 0038 Bottom lock nail Each 39.83
384 0046 Brass screws 25 mm Each 1.69
385 0085 Center pulley Each 84.75
386 0086 Central ball bearing Each 107.63
387 0107 Cleat angles Each 44.92
388 0133 Door closure heavy duty floor mounting Each 1118.64
389 0134 Door lock Each 347.46
390 0177 Gusset plates 3.15 mm thick Kgs 51.69
391 0178 Handles power coated 150 mm Each 50.85
392 0179 Handles to full width 2m long Each 855.93
393 0188 Hinges 5" heavy duty Each 31.36
394 0189 Hold fasts MS Each 32.20
395 0220 Locking arrangments Each 550.85
396 0222 M.S. holder bat clamp 32mm Each 38.14
M.S stays and clamps for 200 mm length including bolts and
397 0225 Each 39.83
nuts
398 0226 M.S stays and clamps for 50 mm length including bolts and nuts Each 22.03
399 0227 M.S stays and clamps for 75 mm length including bolts and nuts Each 27.97
400 0253 MS clamps Each 32.20
401 0254 MS cleats with bolts and nuts to rest on pile Each 11.02
402 0256 MS handles oxidised 150 mm Each 55.08
403 0261 MS side shed clamps Each 52.54
404 0265 Nail and screws Kgs 45.76
405 0314 Pulleys 38 mm dia Each 43.22

XV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
406 0326 Reeper nails 50 mm long Kgs 44.07
407 0384 Screws 40 mm Each 2.54
408 0388 Side guides Each 114.41
409 0399 Stays (MS) Each 16.95
410 0427 Tower bolt 300 mm long Each 101.69
411 0474 Pivots Nos 466.10
412 0540 Screws Nos 3.39
413 0537 Box cleats Nos 32.20
414 0541 Anchor Bolts Nos 14.41
415 0542 Galvanized L brackets Nos 33.90
416 0708 Steel inserts with stainless steel bolts and nuts Kgs 62.71
417 0719 Bolts and nuts Kgs 71.19
418 0768 MS bolts, nuts and washers Tonne 75423.73
419 0710 Anchorages Each 101.69
420 0711 Anchor loops (IS 2062) Each 275.42
421 0712 Anchor plates (IS 2062) Each 199.15
422 0713 Anchorage sets Each 84.75
423 0094 Chrominum plated screw -25mm Each 3.39
424 0167 Gl 'j' or 'L' hook with nuts and bolts 8mm dia Each 14.41
425 0291 Pintels including welded pins Each 11.02
426 0492 C.P brass brackets Pair 27.97
427 2084 Hydraulic door clouser - aluminium body No. 760.17
17. PAINTINGS
428 0015 Aluminium paint L 173.13
429 0016 Aluminium paint primer (red oxide) L 84.75
430 0020 Anticorrosive bitumastic paint L 118.64
431 0033 Black Japan paint L 97.46
432 0131 Dark shade pigment Kgs 171.19
433 0132 Distemper primer L 67.80

XVI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
434 0136 Dry Distumper Kgs 55.93
435 0137 Enamel metal paint L 207.63
436 0138 Enamel primer L 156.78
437 0214 Light shade pigment Kgs 152.54
438 0247 Medium shade pigment Kgs 182.20
439 0285 Paint remover L 110.17
440 0289 Pigment Kgs 33.90
441 0290 Pink primer paint L 127.12
442 0300 Plastic emulsion paint L 194.92
443 0320 Ready mix primer paint L 84.75
444 0321 Ready mix red lead paint L 84.75
445 0323 Red oxide Kgs 84.75
446 0430 undercoat flatting varnish L 139.83
447 0431 Unslaked lime qtl 423.73
448 0432 Varnish L 142.86
449 0433 Wall paint L 169.49
450 0435 Water proof cement paint Kgs 72.03
451 0438 Wax polish Kgs 237.29
452 0271 Oil bound distemper Kgs 111.86
453 0428 Turpentine Oil L 63.56
454 0543 Anodized M R F painting Sqm 289.83
455 0447 White lead paint for priming L 93.22
456 0461 Whitening Kgs 18.64
457 0528 Wax Kgs 177.97
458 0529 Sealer coat L 186.44
459 0530 Melamine Putty Kgs 177.97
460 0531 Melamine Polish L 186.44
461 0532 Thinner L 105.93
462 0775 Paint I quality(synthetic enamel paint) L 228.81

XVII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
463 0776 Pigment Kgs 50.85
464 0784 Road marking paint L 203.39
465 0779 Primer L 65.25
466 0173 Gopi powder Kgs 59.32
467 0218 Linseed oil L 148.31
468 0219 Liquid wood filler L 186.44
469 0524 Sand paper Dozen 68.57
470 0525 50 size sand paper Dozen 114.29
471 0526 36 size sand paper Dozen 114.29
472 569 Primer Kgs. 88.98
473 0528 Wax Kgs 177.97
474 0529 Sealer Coat L 186.44
475 0530 Melamione Patty Kgs 177.97
476 0531 Melamione polish L 186.44
477 0532 Thinner L 105.93
478 0543 Anodized M R F painting Sqm 289.83
479 1504 Epoxy resin hardener mix for primne coat Kgs 576.27
480 2044 Light House Polish L 186.44
481 2045 Texture material Kgs 25.42
482 2046 Antifungal paint L 286.44
483 2050 Textured based white cement Kgs 32.81
484 2060 Soap powder Kgs 105.93
485 2081 Wiping cloths Each 22.86
486 2083 Soap oil / Phenol L 38.14
487 2092 Solvent cement adhesive L 169.49
488 0995 Water based paint for cement concrete surface L 58.59
18. PIPES
489 0021 Asbestos cement pipes 75 mm dia of length 2 mtrs Each 122.88
490 0095 CI Bends 100 mm dia Each 296.61

XVIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
491 0096 CI Bends 75 mm dia Each 241.53
492 0097 CI Bends 90 mm dia Each 127.12
493 0098 CI heads 100 mm dia Each 152.54
494 0099 CI pipes 100 mm dia of 1.8m length Each 1165.25
495 0100 CI pipes 75 mm dia of 1.8m length Each 957.63
496 0101 CI shoes 100 mm dia Each 254.24
497 0102 CI shoes 110 mm dia Each 283.90
498 0103 CI shoes 75 mm dia Each 296.61
499 0146 G.I. Overflow pipe 20mm dia m 131.36
500 0147 G.I. Pipe 100 mm dia B class m 720.34
501 0148 G.I. Pipe 150 mm dia B class m 1076.27
502 0149 G.I. Pipe 15 mm dia B class m 101.69
503 0150 G.I. Pipe 20 mm dia B class m 127.12
504 0151 G.I. Pipe 25 mm dia B class m 177.97
505 0152 G.I. Pipe 32 mm dia B class m 203.39
506 0153 G.I. Pipe 40 mm dia B class m 254.24
507 0154 G.I. Pipe 50 mm dia B class m 279.66
508 0155 G.I. Pipe 65 mm dia B class m 423.73
509 0156 G.I. Pipe 80 mm dia B class m 542.37
510 0157 G.I. Tee 32mm Each 93.22
511 0158 G.I. Tee 65mm Each 313.56
512 0169 GI washers Each 12.71
513 0182 HDPE 110mm dia, 4Kg/sqcm m 161.02
514 0183 HDPE 110mm outer dia, 2.5Kg/sqcm m 161.02
515 0184 HDPE 90mm outer dia, 4Kg/sqcm m 127.12
516 0185 HDPE 90mm outer dia, 2.5Kg/sqcm (rain down water pipes) m 106.78
517 0212 P.V.C. Lead connection pipe 32 mm dia (for wash basin) Each 118.64
518 0303 Polythylene pipes high density 32mm external dia m 135.59
519 0304 Polythylene pipes high density 40mm external dia m 152.54

XIX
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
520 0305 Polythylene pipes high density 50mm external dia m 203.39
521 0306 Polythylene pipes high density 20mm external dia m 38.14
522 0307 Polythylene pipes high density 25mm external dia m 55.08
523 0308 Polythylene pipes high density 32mm external dia m 101.69
524 0309 Polythylene pipes high density 40mm external dia m 127.12
525 0310 Polythylene pipes high density 50mm external dia m 152.54
Sand cast iron bend 100 mm dia with access door, washers,
526 0335 Each 330.51
bolts and nuts
Sand cast iron bend 50 mm dia with access door, washers,
527 0336 Each 254.24
bolts and nuts
Sand cast iron bend 75 mm dia with access door, washers,
528 0337 Each 271.19
bolts and nuts
529 0338 Sand Cast iron pipe 100 mm dia 1.8m length Each 711.86
530 0339 Sand Cast iron pipe 50 mm dia 1.8m length Each 330.51
531 0340 Sand Cast iron pipe 75 mm dia 1.8m length Each 686.44
532 0342 Sand Cast iron plain bend 50 mm dia Each 203.39
533 0344 Sand Cast iron soil waste 114mm offsets 3" dia Each 288.14
534 0345 Sand Cast iron soil waste 152mm offsets 3" dia Each 491.53
535 0346 Sand Cast iron soil waste 230mm offsets 3" Each 533.90
Sand Cast iron soil waste double equal invert plain branches of
536 0347 Each 741.53
required degree '100x100x100x100mm
Sand Cast iron soil waste double equal invert plain branches of
537 0348 Each 300.85
required degree '50x50x50x50mm
Sand Cast iron soil waste double equal invert plain branches of
538 0349 Each 466.10
required degree '75x75x75x75mm
Sand Cast iron soil waste double equal junction of required
539 0350 Each 635.59
degree '100x100x100x100mm
Sand Cast iron soil waste double equal junction of required
540 0351 Each 296.61
degree '50x50x50x50mm
Sand Cast iron soil waste double equal junction of required
541 0352 degree with access 'door, rubber washers bolts and nuts, Each 813.56
100x100x100x100mm
Sand Cast iron soil waste double equal junction of required
542 0353 degree with access 'door, rubber washers bolts and nuts, Each 711.86
100x100x50x50mm
XX
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
Sand Cast iron soil waste double equal junction of required
543 0354 degree with access 'door, rubber washers bolts and nuts, Each 813.56
100x100x75x75mm
Sand Cast iron soil waste double equal junction of required
544 0355 degree with access 'door, rubber washers bolts and nuts, Each 584.75
75x75x75x75mm
Sand Cast iron soil waste double equal junction of required
545 0356 degree with access 'door, rubber washers bolts and nuts, Each 432.20
75x75x50x50mm
Sand Cast iron soil waste double unequal invert plain branches
546 0357 Each 533.90
of required degree '100x100x75mm
Sand Cast iron soil waste double unequal invert plain branches
547 0359 Each 788.14
of required degree '100x100x75x75mm
Sand Cast iron soil waste double unequal invert plain branches
548 0360 Each 491.53
of required degree '75x75x50mm
Sand Cast iron soil waste double unequal invert plain branches
549 0361 Each 406.78
of required degree '75x75x50x50mm
Sand Cast iron soil waste double unequal junction of required
550 0362 Each 813.56
degree '100x100x50x50mm
Sand Cast iron soil waste double unequal junction of required
551 0363 Each 813.56
degree '100x100x75x75mm
Sand Cast iron soil waste double unequal junction of required
552 0364 Each 305.08
degree '75x75x50x50mm
Sand Cast iron soil waste single equal invert plain branches of
553 0365 Each 677.97
required degree '100x100x100x100mm
Sand Cast iron soil waste single equal invert plain branches of
554 0366 Each 440.68
required degree '50x50x50x50mm
Sand Cast iron soil waste single equal invert plain branches of
555 0367 Each 508.47
required degree '75x75x75x75mm
Sand Cast iron soil waste single equal junction of required
556 0368 degree with access 'door, rubber washers bolts and nuts, Each 508.47
75x75x75mm
Sand Cast iron soil waste single equal junction of required
557 0369 Each 694.92
degree with access door ' 100x100x100mm
Sand Cast iron soil waste single equal junction of required
558 0370 Each 389.83
degree with access door ' 50x50x50mm
Sand Cast iron soil waste single equal junction of required
559 0371 Each 508.47
degree with access door ' 75x75x75mm

XXI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
Sand Cast iron soil waste single equal junction of required
560 0372 degree with access 'door, rubber washers bolts and nuts, ' Each 711.86
100x100x100mm
Sand Cast iron soil waste single equal junction of required
561 0373 degree with access 'door, rubber washers bolts and nuts, ' Each 440.68
50x50x50mm
Sand Cast iron soil waste single unequal junction of required
562 0374 Each 360.17
degree 100x100x50mm
Sand Cast iron soil waste single unequal junction of required
563 0375 Each 347.46
degree 100x100x75mm
Sand Cast iron soil waste single unequal junction of required
564 0376 Each 288.14
degree 75x75x50mm
Sand Cast iron soil waste single unequal junction of required
565 0377 degree with access 'door, rubber washers bolts and nuts, Each 576.27
100x100x50mm
Sand Cast iron soil waste single unequal junction of required
566 0378 degree with access 'door, rubber washers bolts and nuts, Each 610.17
100x100x75mm
Sand Cast iron soil waste single unequal junction of required
567 0379 degree with access 'door, rubber washers bolts and nuts, Each 398.31
750x75x50mm
Sand Cast iron soil waste double equal junction of required
568 0380 degree with access 'door, rubber washers bolts and nuts, Each 508.47
50x50x50x50mm
569 0381 Sand cast iron trap 100mm dia Each 500.00
570 0382 Sand cast iron trap 50mm dia Each 394.07
571 0383 Sand cast iron trap 75mm dia Each 440.68
572 0393 Special for overflow pipe Each 37.29
573 0402 Stoneware pipes 100mm dia 60 cms long Each 53.39
574 0403 Stoneware pipes 150mm dia 60 cms long Each 88.98
575 0404 Stoneware pipes 200mm dia 60 cms long Each 124.58
576 0405 Stoneware pipes 230mm dia 60 cms long Each 133.90
577 0406 Stoneware pipes 250mm dia 60 cms long Each 142.37
578 0407 Stoneware pipes 300mm dia 60 cms long Each 152.54
579 0408 Stoneware pipes 350mm dia 60 cms long Each 156.78
580 0409 Stoneware pipes 400mm dia 60 cms long Each 165.25

XXII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
581 0410 Stoneware pipes 450mm dia 60 cms long Each 194.92
582 0476 100 mm dia asbestos dia cement pipe of length 2 mtrs Each 105.93
110 mm outer dia 2 kg/sqcm pressure pipe of approved make
583 0477 m 152.54
(PVC)
110 mm outer dia 2.5 kg/sqcm pressure pipe of approved make
584 0478 m 152.54
(PVC)
90 mm outer dia 2kg/sqcm pressure pipe of approved make
585 0479 m 110.17
(PVC)
Sand cast iron soil waste double equal junction of required
586 0493 m 466.10
degree, 75x75x75x75 mm
587 0534 M S Square pippe 16 G Black pipe Kg 37.29
588 0702 100 mm asbestos cement pipes m 42.37
589 0703 100 mm dia 1 m long GI pipe m 728.81
590 0755 HDPE pipes-90 mm dia m 106.78
591 0782 RCC pipes NP3 1200 mm dia including collars m 6449.15
592 0783 RCC pipes NP3 900 mm dia including collars m 4135.59
593 0821 RCC pipes NP3 300 mm dia including collars m 978.81
594 0822 RCC pipes NP3 450 mm dia including collars m 1822.03
595 0823 RCC pipes NP3 600 mm dia including collars m 2313.56
596 0824 RCC pipes NP3 750 mm dia including collars m 2533.90
597 0825 RCC pipes NP2 300 mm dia including collars m 711.86
598 0826 RCC pipes NP2 450 mm dia including collars m 978.81
599 0827 RCC pipes NP2 600 mm dia including collars m 1512.71
600 0828 RCC pipes NP2 750 mm dia including collars m 1868.64
601 0829 RCC pipes NP2 900 mm dia including collars m 2444.92
602 0830 RCC pipes NP2 1200 mm dia including collars m 4224.58
603 0831 RCC pipes NP4 900 mm dia including collars m 5025.42
604 0832 RCC pipes NP4 1200 mm dia including collars m 8097.46
605 565 RCC pipes NP2 150 mm dia including collars m 266.95
606 566 RCC pipes NP2 250 mm dia including collars m 355.93
607 0911 RCC pipes 200mm dia, 2.5m long for drainage m 220.34

XXIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
608 0929 Plastic tubes 50cm dia, 1.2m high Nos. 23.73
609 568 RCC NP 4 100 mm dia including collars m 523.73
19. WATER SUPPLY
610 0001 100mm 'S' or 'P' trap Each 50.85
611 0023 Bevel lead mirror of superior glass of size 600x450mm Each 720.34
612 0024 Bib cock 15mm nominal bore-NP Each 148.31
613 0025 Bib cock 20mm nominal bore-NP Each 135.59
614 0026 Bib cock 25mm nominal bore-NP Each 186.44
615 0027 Bib cock 32mm nominal bore-NP Each 254.24
616 0028 Bib cock 40mm nominal bore-NP Each 254.24
617 0029 Bib cock 50mm nominal bore-NP Each 296.61
618 0034 black plastic seat and lid as specified Each 245.76
619 0040 Brass ball vlave with plastic float 15mm nominal bore Each 254.24
620 0041 Brass ball vlave with plastic float 20mm nominal bore Each 271.19
621 0042 Brass ball vlave with plastic float 25mm nominal bore Each 389.83
622 0043 Brass ferrule and C.1 Mouth cover 15mm nominal bore Each 101.69
623 0044 Brass ferrule and C.1 Mouth cover 20mm nominal bore Each 142.37
624 0045 Brass ferrule and C.1 Mouth cover 25mm nominal bore Each 169.49
625 0047 Brass shower rose C.P 100mm dia Each 498.31
626 0048 Brass shower rose C.P 150mm dia Each 550.85
627 0049 Brass stop cock-15mm Each 186.44
Brass union 15mm nominal bore with PVC connection pipe
628 0050 Each 142.37
300mm length Each
Brass union 15mm nominal bore with PVC connection pipe
629 0051 Each 160.17
450mm length
Brass union 20mm nominal bore with PVC connection pipe
630 0052 Each 160.17
300mm length
Brass union 20mm nominal bore with PVC connection pipe
631 0053 Each 169.49
450mm length
632 0067 C.I manhole cover with frame 610x455mm size (38 Kgs) Each 2118.64
633 0068 C.I/M.S. brackets for flushing cistern Pair 110.17

XXIV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
634 0069 C.I Cover 500mm dia -50mmthick(16Kgs) Each 932.20
635 0070 C.P brass chain plug Each 110.17
636 0071 C.P brass chain with stainless steel plug Each 194.92
637 0072 C.P.brass pillar tap elbow operated Each 415.25
638 0073 C.P. brass screws 25mm with washers Each 4.24
639 0074 C.P.brass towel rail 600mm length 20mm dia Each 409.32
640 0075 C.P.brass towel rail 740mm length 20mm dia Each 462.71
641 0076 C.P.brass waste union 32mm of standard pattern Each 161.02
642 0077 C.P.brass waste union 40mm with fittings Each 161.02
643 0079 Cast iron foot rest Each 118.64
Circular shape mirror of size 450mm dia with plastic moulded
644 0105 Each 466.10
frame
645 0114 Copper plated brass piller tap Each 211.86
Gun metal non-return valve 100mm nominal bore horizontal
646 0117 Each 1949.15
type
647 0118 Gun metal non-return valve 100mm nominal bore verticall type Each 1779.66
648 0119 Gun metal non-return valve 25mm nominal bore horizontal type Each 466.10
649 0120 Gun metal non-return valve 25mm nominal bore vertical type Each 373.73
650 0121 Gun metal non-return valve 32mm nominal bore horizontal type Each 593.22
651 0122 Gun metal non-return valve 32mm nominal bore vertical type Each 593.22
652 0123 Gun metal non-return valve 40mm nominal bore horizontal type Each 762.71
653 0124 Gun metal non-return valve 40mm nominal bore vertical type Each 720.34
654 0125 Gun metal non-return valve 50mm nominal bore horizontal type Each 1076.27
655 0126 Gun metal non-return valve 50mm nominal bore vertical type Each 1016.95
656 0127 Gun metal non-return valve 65mm nominal bore horizontal type Each 1398.31
657 0128 Gun metal non-return valve 65mm nominal bore vertical type Each 1271.19
658 0129 Gun metal non-return valve 80mm nominal bore horizontal type Each 1737.29
659 0130 Gun metal non-return valve 80mm nominal bore vertical type Each 1559.32
660 0139 Europian type water closet of specified make Each 978.81
661 0143 G.I 32mm dia telescopic flush pipes with fittings/specials Set 320.34

XXV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
G.I.Flush pipe of standard size and C.P brass spreaders,brass
662 0144 Set 466.10
unions and clamps 'including fittings
663 0145 G.I jam nut Each 21.19
664 0159 Gate valve 15mm nominal bore-gun metal Each 211.86
665 0160 Gate value 20mm nominal bore-gun metal Each 262.71
666 0161 Gate value 25mm nominal bore-gun metal Each 355.93
667 0162 Gate value 32mm nominal bore-gun metal Each 661.02
668 0163 Gate value 40mm nominal bore-gun metal Each 830.51
669 0164 Gate value 50mm nominal bore-gun metal Each 1398.31
670 0165 Gate value 65mm nominal bore-gun metal Each 1694.92
671 0166 Gate value 80mm nominal bore-gun metal Each 1796.61
indian type water closet of size 580 mm of specified make with
672 0204 Each 601.69
footrests
673 0273 Orissa pattern of size 575x425 mm with integal type foot rests Each 1186.44
Oval shape mirror of size 450x350 mm with plastic moulded
674 0274 Each 508.47
frame
675 0275 P.V.C automatic flushing cistern 7.5 litres with fittings Each 593.22
676 0276 P.V.C automatic flushing cistern with fittings 10 litres Each 593.22
677 0277 P.V.C automatic flushing cistern with fittings 15 litres Each 677.97
P.V.C flushing cistern 10 litres low level with accessories 40mm
678 0278 Each 576.27
flush pipe
679 0279 P.V.C pipes unplasticised 16mm m 38.14
680 0280 P.V.C pipes unplasticised 20mm m 38.14
681 0281 P.V.C pipes unplasticised 25mm m 46.61
682 0282 P.V.C pipes unplasticised 32mm m 55.08
683 0283 P.V.C automatic flushing cistern 5 litres with fittings Each 444.92
684 0284 P.V.C flushing cistern 10 litres low level with fittings Each 533.90
685 0411 stop cock Each 110.17
686 0434 water meter Each 661.02
687 0302 Polyethylene water storage tank of specified capacity and make L 5.08

XXVI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
Rectangulur shape mirror of size 1500x450mm with drain board
688 0322 Each 932.20
of specific make
Stainless steel kitchen sink of size 400x470mm with drain board
689 0396 Each 4004.24
of specific make
Stainless steel kitchen sink of size 500x1000mm with drain
690 0397 Each 5932.20
board of specific make
Stainless steel kitchen sink of size 510x1575mm with drain
691 0398 Each 10254.24
board of specific make
692 0440 White glazed fire clay kitchen sink of size 600x450x250mm Each 1144.07
693 0441 White glazed fire clay kitchen sink of size 750x450x250mm Each 1457.63
694 0442 White glazed fire clay laboratory sink of size 450x300x150mm Each 779.66
695 0443 White glazed fire clay laboratory sink of size 600x450x200mm Each 1016.95
White glazed/vitreous china clay 10 lts low level flushing cistern,
696 0446 Set 1601.69
with fittings and \brakets and 40mm white C.P flush pipe
White vitreous china clay angle back wash basin size
697 0449 Each 682.20
500x400mm
White vitreous china clay angle back wash basin size
698 0450 Each 889.83
600x480mm
White vitreous china clay flat back lipped front urinal basin of
699 0451 Each 610.17
430x260x350mm size
White vitreous china clay flat back large urinal basin size
700 0453 Each 1694.92
580x380x350mm
701 0454 White vitreous china clay flat back wash basin size 450x330mm Each 508.47
702 0455 White vitreous china clay flat back wash basin size 550x400mm Each 677.97
703 0456 White vitreous china clay flat back wash basin size 630x450mm Each 779.66
704 0457 White vitreous china clay squatting plate Each 847.46
White vitreous china clay surgeon type wash basin size
705 0458 Each 847.46
600x450x250mm
White vitreous china clay wall corner type, lipped front urinal
706 0460 Each 525.42
basin of size '340x410x265mm
707 0487 C.P. brass tap with union Each 254.24
Rectangulur shape mirror of size 453x357mm with plastic
708 0491 Each 720.34
moulded frame
709 0546 Ceramic tiles of size 30x30cms Sqm 398.31
710 2035 Colour Glazed tiles 30x60cms 6mm thick Each 72.03

XXVII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
711 2096 L. Bracket Nos. 25.42
712 0542 Galvanized L brackets Nos 38.14
713 2079 Granite sink 23cm thick Each 9152.54
714 2098 Rubber Gaskete m 12.71
20. MISCELLANEOUS
715 0083 Caustic soda Kgs 38.14
716 0092 Chiken mesh Sqm 12.71
717 0168 GI plaster mesh 0.35 mm thick 10 cms wide m 29.66
718 0251 Mosquito proof coupling 25 mm Each 25.42
719 0295 Plaster mesh 100mm wide m 21.19
720 0296 Plaster mesh 150mm wide m 25.42
721 0297 plaster mesh 200mm wide m 29.66
722 0318 Rabbit wire mesh Sqm 55.08
723 548 Weld Mesh 75mmx25mm of 6G to 10G Sqm 249.15
724 549 Weld Mesh 75x50mm of 6G to 10G Sqm 186.44
725 0729 Copper plate 12 m long x 250 mm wide Kgs 409.32
Wire create size(1.8x1.8mx0.9m)=2.916(4mm dia 2GI wire in 15
726 0796 Kgs 152.54
cms x 15 cms mesh)
727 0797 Wire mesh 50 mm x 50 mm Sqm 279.66
728 0816 Form work for kerb stone/KM stone Sqm 15.25
729 0104 Cinder ballast cum 254.24
730 0093 Chlorophriphos emulstiable concentrate L 169.49
731 0065 Burnt lime/shell lime q 447.62
732 0141 Fly ash cum 15.25
733 0142 Fuel (firewood) q 476.19
734 0210 Kerosene oil L 47.62
735 0215 Lime cum 3800.00
736 0216 Lime surkhi mortar 1:2 cum 423.73
737 0263 Mud mortar cum 190.48
738 0267 Nitric Acid L 72.03

XXVIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
739 0299 Plaster of Paris Kgs 25.00
740 0394 Spirit L 42.37
741 0412 Surkhi cum 333.33
742 0436 Water proofing compound Kgs 42.37
743 0483 Diesel L 42.37
744 0709 Admixture/Super Plasticizer L 169.49
745 0715 Bentonite Tonne 4067.80
746 0741 Epoxy for mortar Kgs 148.31
747 0742 Epoxy for tack coat Kgs 333.33
748 0743 Epoxy material for fixing Kgs 42.37
749 0760 Joint filler (0.01 cm wide and 0.12mm wide) Sqm 169.49
750 0761 Joint sealing com 25 mm deep Kgs 135.59
751 0811 Chloroperene C.C. 0.85
752 0812 Natural Rubber C.C. 0.85
753 0813 Neoprene Kgs 194.92
754 0818 Water KL 40.00
755 0268 Nortlight adjustable ridges of 1.22m Pair 135.59
756 0270 Nylon rollers Each 9.00
757 0315 Putty for filling holes Kgs 67.80
758 0319 Rawl Plug 40 to 50mm Each 1.69
759 0317 PVC Beading m 10.17
Roofing felt type-2 grade-1 fibre based self finish and bitumen
760 0328 Sqm 93.22
based
761 0329 Rubber heading for shutturs beading m 25.42
762 0392 Spun yarn Kgs 33.90
763 0413 Suspension shaft m 762.71
764 0516 Plastic sheet Sqm 5.36
765 0527 Steel wool Pack 21.19
766 0535 Glazing seal m 271.19
767 0536 Weather Seal Nos 186.44

XXIX
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
768 0539 Specer tape Sqm 29.66
769 0704 20mm thick compressible fiber band 12 m long x 25 cm deep Sqm 338.98
770 0705 20 mm thick filler 12m long x 25 cm deep Sqm 364.41
771 0737 Deviator Plates Tonne 38983.05
Elastomeric slab with MS plates inserted inside polysulphine
772 0740 C.C. 0.42
compound filling Space around Bolts and nuts
773 0774 Nipples Each 8.47
774 0788 Sheething duct ID m 12.71
775 0809 PTFE Nodules Sq.cm 6.78
776 0810 PTFE Nodules cm 0.85
777 0331 S.F.R.C. Cover and frame 560 mm (ID) heavy duty Each 762.71
778 0850 Fine Grass Kgs. 5.93
779 0851 Hedge plant Each 3.00
780 0852 Flowring plants Each 2.00
781 0853 Shrubs Each 2.00
782 0854 Sapiling 2m high 25mm dia Each 10.00
783 0855 Neem cake q 900.00
784 0856 Empty bitumen drum Each 125.00
785 0857 Rivets Each 2.86
786 0858 Steel wire 3mm dia Kgs 38.14
787 0859 Sapling 1 to 1.5m high 2cm dia stem Nos. 6.78
788 0861 Traffic cones with 150mm reflective sleeve Nos. 338.98
789 0871 Flag of red color cloth 600x600mm Each 20.00
790 0900 Supply of quarried stone 150-200 size cum 338.98
791 0901 Stone boulder of size 150mm and below cum 446.43
Precast cement concrete tiles Tiles size 300x300mm and 25mm
792 0910 Nos. 23.81
thick
793 1104 Jute Rope m 4.76
794 0925 cold miling machine at 20cum per hour cum 16.95
795 0927 Scrap types of size 900x20 Nos. 200.00

XXX
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
796 0928 20mm steel wire rope Kgs. 33.90
797 0933 Geotextile filter frabic Sqm. 66.96
798 0934 perforated geosynthetic pipe 150mm dia m 211.86
799 0935 Paving fabric Sqm. 17.86
800 0936 Geogrids Sqm. 254.24
801 0937 Connectors/staples Each 5.08
802 0938 Polymer braids m 25.42
803 0945 Hot applied thermoplatic compound L 67.80
804 0946 Reflectorising glass beads Kgs. 46.61
Cost of approved type of delineators from ISI certified firm as
805 0947 Each 220.34
per the standard drawing given in IRC:79
806 0948 Barbed wire 335 metre length at 9.38 kg per 100 metre Kgs. 29.66
807 0960 Sand bags(cost of sand in empty cement bag) No. 47.62
808 0964 Admixture Kgs. 63.56
809 0966 M 35 grade RCC corbel provided for supporting of euipment cum 3559.32
810 0971 NUTS AND Bolts Kgs. 42.37
Elastomeric slab seal expansion joint assembly manufactured by
using chloroprene, elastomer for elastomeric slab unit conforming
811 0980 m 10169.49
to clause 9150.1 of IRC:83 (part II) conforming to clause 2600.6
of Morth specifications.
Preformed continuous chloroprene elastoemer or closed cell
foam sealing sealing element with high mtear strength vulcanised
812 0982 m 11186.44
in a single operation for the full length of a joint ot ensure water
tightness.
Supply of complete assembly of strip seal expansion joint
comprising of edge beams, anchorage, strip seal element
813 0983 m 10169.49
and complete accessories as per approved specifications and
drawings
Supply of a modular strip/box seal joint assembly comprising
of edge beams, central beam, 2 modules chloroprene seal,
814 0984 anchorage elements, support and control system, all steel sections m 4745.76
protected against corrision and installed by the manufacturer or
his authorised representative.

XXXI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
Supply of a modular/box/box seal joint assembly containing
3 modules/cells and comprising of edge beams, two central
815 0985 beams, chloroprene seal, anchorage elements, support and m 5805.08
control system, all steel sections protected against corrosion and
installed by the manufacturer or his authorised representative.
816 0986 LDO L 40.00
817 0987 Trailor 30 Tonne capacity hr 805.08
818 0990 Farmyard manure cum 170.00
819 0991 Seeds Kgs. 140.00
820 0992 Jute netting Sqm 13.33
821 0994 Doob grass Kgs. 30.00
822 0997 Accelerator compound for guniting Kgs. 16.95
823 0998 Wire mess 50mm x 50mm size of 3mm wire Kgs. 33.90
824 1101 Sodium vapour lamp - 250 watt Each 1144.07
Pre - packed ploymer concrete based on epoxy system
825 1502 Kgs. 10.17
complete with curing compound, intiator and promoter
826 1505 Quick setting compound Kgs. 127.12
827 1507 Acrylic polymer bonding coat L 338.98
Pre-packed cement based ploymer mortar of strength 45 Mpa at
828 1508 Kgs. 169.49
28 days
Epoxy resin with pot life not less than 60-90 minutes and
829 1509 Kgs. 483.05
satisfying testing as per clause 2800.3.9
830 1514 Bearing Neoprene No. 1762.71
Separation membrane of impermeable plastic sheeting 125
831 1521 Sq.cm 3.39
micron thick
832 1522 Pre-moulded joint filler, 25mm thick for expansion joint Sq.cm 5.93
833 1523 Joint sealant Kgs. 152.54
834 1524 Sealant Primar Kgs. 127.12
835 1525 Curing compound L 194.92
Super plasticizer admixture IS marked as per 9-103-1999 at
836 1526 Kgs. 59.32
0.5% by wt. of cement
837 1552 Collar for AC pipe (average) Nos, 55.08

XXXII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
Elastomeric bearing assembly consting of 7 layers of elastomer
bonded to 6 nos. reinforcing steel laminates by the process of
838 1555 Nos. 8533.90
vulcanisation, complete with all components as per drawings and
technical specifications.
Pot type bearing consisting of a metal piston supported by a
disc,PTFE pads providing sliding surfaces against stainless steel
839 1556 mating together with cast steel assemblies/ fabricated structural Nos. 68220.34
steel assemblies duly painted with all components as per clause
2006 and complete as per drawing and technical specifications.
840 547 Expanded metal 12.5 mm to 25 mm -14 G Sqm 237.29
841 549 Weldmesh 75 x 50mm of 6g x 10g Sqm 177.97
842 552 Pesticide L 250.00
843 553 Granite slabs 7.5 cm to 8 cm thick sqm. 254.24
845 559 15 mm bolt Nos. 7.63
846 560 60 x 60 x10 Guage sq.plate washer Kgs. 33.05
847 570 Sealant Kgs. 97.46
848 563 PVC Storage Tank L 4.24
849 564 12x12 guage GI wire 100 mtr at Ts. 8.00/m m 10.17
850 574 Steel Helmet and Cushion block Kgs. 50.85
852 0930 Geonets Sqm 55.08
853 0931 Geomembrane Sqm 55.08
854 0932 Geotextile Sqm 55.08
855 2001 Carbon electrodes cc 0.42
856 2004 Screws 3.5" Nos. 3.39
857 2005 Screws 1.75" Nos. 1.69
Latch, Pivot, Locking arrangements, SS door rails etc for glass
858 2013 Set 7203.39
doors
859 2023 Cast iron ornamental design Nos 67.80
860 2024 Cast iron arrows No 67.80
861 2025 Expansion bolt No 21.19
862 2052 Coconut Broom stick No. 38.10
863 2053 Bombay broom stick No. 52.38

XXXIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
864 2054 Squeezer / wiper / rubber brushes No. 76.27
865 2055 Coir brushes No. 28.57
866 2056 Bamboo baskets No. 95.24
867 2057 Plastic buckets 20 L capacity No. 101.69
868 2058 Trollies No. 1355.93
869 2064 Cobble stone 65mm thick Sqm 323.81
870 2065 Cobble stone 80mm thick Sqm 447.62
871 2072 Welding rods Nos 4.76
872 2037 Ball beaing hinges heavy duty Nos. 237.29
873 2041 G.I. Coated expansion bolts Nos. 29.66
874 2048 Ball Joints Kgs 152.54
875 2049 Design-Trowel Nos. 46.61
876 2059 Hose pipe 30m length No. 703.39
877 2061 Plastic Mug Each 25.42
878 2063 Bleaching Powder Kgs 67.80
879 2066 Bronze multiwall polycarbonate G.E. make Kgs 1016.95
880 2070 Sealent taps Joint 5.08
881 2080 Mop stick - alluminium No. 101.69
882 2082 Disposable garbage bags size 0.9m x 1.5m Each 9.32
883 2087 RBI Grade 81 Tonne 27118.64
884 2088 Safe N Easy/Equivalent Bio-degradable L 415.25
885 2093 Polymeric expansion joints filler - 12mm thick Sqm 457.63
886 2094 Polymeric expansion joints filler - 18mm thick Sqm 661.86
887 2095 Polymeric expansion joints filler - 22mm thick Sqm 916.10
888 2102 Crystallisation liquid Kgs 127.12
889 2103 Isoproof Kgs 254.24
890 2104 Acrylic Kgs 169.49
891 2105 FCM Kgs 59.32
892 2106 Non woven geo textile Kgs 80.95

XXXIV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
893 2107 Polysulphide /acrylic sealant Kgs 262.71
894 2112 Empty Sand / cement bag No. 2.54
895 9001 Gulty Trap No. 25.42
896 2097 5mm Semi finished PVC Sheet Sqm 432.20
897 3001 PVC Pipes 10KG/Sqm 90mm outerdia M 296.61
898 3002 PVC Pipes 10KG/Sqcm 110mm outerdia M 432.20
899 3003 PVC Pipes 10KG/Sqcm 140mm outerdia M 728.81
900 3004 PVC Pipes 10KG/Sqcm 160mm outerdia M 932.20
901 3005 PVC Pipes 10KG/Sqcm 180mm outerdia M 1186.44
902 3006 PVC Pipes 10KG/Sqcm 200mm outerdia M 1440.68
903 3007 PVC Pipes 10KG/Sqcm 225mm outerdia M 1779.66
904 3008 PVC Pipes 10KG/Sqcm 250mm outerdia M 2203.39
905 3009 PVC Pipes 10KG/Sqcm 280mm outerdia M 2796.61
906 3010 PVC Pipes 10KG/Sqcm 315mm outerdia M 3559.32
907 3022 Water less urinal of size 328x319x598mm Each 18644.07
908 2203 Galvanised Steel 105 x 50 mm M 177.97
909 2204 Galvanised Steel 20 x 47 mm M 88.98
910 2205 Galvanised Steel 58 x 36 mm M 135.59
911 2206 Galvanised Steel 22 x 20 (FW 66 mm) M 38.14
912 2207 Galvanised "C" Section 12 x 3 M 16.95
913 2208 Float Glass 5 mm Thick Sqm 398.31
914 2212 M.S. Grill Powder Coated 100 mm Pitch Sqm 593.22
915 221 Galvanised "C" Section 18 x 7 (FW 33 mm) M 18.64
916 2209 Galvanised Steel20 x 24 (FW 33 mm) M 39.83
917 2213 Galvanised Steel 90 x 50 mm M 169.49
918 2214 TMT Bars Fe 500 M 45190.68
919 2215 TMT Bars Fe 550 M 45614.41
920 2216 Maranthi Wood cum 30677.97
921 2217 Galvanised Steel 70 x 55 mm M 163.56

XXXV
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
922 2218 Galvanised Flymesh Section 20 x 40 mm M 110.17
923 2219 Galvanised Steel Section 48 x 25 mm M 148.31
924 2220 Galvanised Steel (Glass Beading ) 12 x 12 mm M 0.85
925 2221 Mesh (SS 304 Grade) Sqm 317.80
926 2222 Galvanised Steel 72 x 55 mm M 165.25
927 2223 Galvanised Steel Section 48 x 50 mm M 152.54
928 2224 Galvanised Steel Section 46 x 52 mm M 148.31
929 2225 Galvanised Steel Section 46 x 46 mm M 139.83
930 2226 Galvanised Beading Section 18 x 25 mm M 52.54
931 2227 Fly ash bricks of size 60 x 20 x 15 cm 100 No. 508.47
932 2228 White cement based putty Kgs 22.03
Vitrifed tiles - 10 mm thick double charged, nano technology
933 Sqm 847.46
size 800mmx800mm
Vitrifed tiles - 10 mm thick double charged, nano technology
934 Sqm 1694.92
size 1200mmx600mm
Light weight Concrete (Autoclaved aereated cellular)Blocks of
935 3023 Each 84.75
size 60 x 20 x 15 cm
936 Solid blocks concrete 40 x 15 x 20 cms 100 No. 2966.10
Light weight Concrete (Autoclaved aereated cellular)Blocks of
937 3024 Each 50.85
size 60 x 20 x 10 cm
Light weight Concrete (Autoclaved aereated cellular)Blocks of
938 3025 Each 101.69
size 60 x 20 x 20 cm
939 3027 Polymer modified stucco mortar Kg 19.49
940 Sal wood (Red) cum 33050.85
941 2229 Precast Hallow blocks (40x20x20 cm) grade 50 100 No. 4237.29
942 2280 Solid blocks concrete (40 x 15 x 20 cms) grade 35 100 No. 0.00
943 580 Raw-silk granite 20mm thick Sqm 1101.69
944 Table top 25mm thick PLPB with edge banding Sqm 1610.17
945 75mm thick MS CRCA partition with PLPB tiles Sqm 2542.37
946 25 mm thick PLPB separator with edge handing Sqm 1610.17
947 L clamps No. 4.24

XXXVI
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
948 Nut and bolt No. 3.39
949 Separator and D-Brackets No. 25.42
950 Cantilever Brackets No. 80.51
951 End table hode on Bracket No. 29.66
952 Corner Hook on Bracket No. 29.66
953 25mm thich front modesty Sqm 1525.42
954 25mm thich legs sqm 1822.03
955 Minifix housing No. 4.00
956 Wooden dowels M8x40 No. 1.50
957 M6 screw leg No. 5.08
958 M6 Insert No. 4.24
959 64 mm dia grommet cap No. 8.47
960 50mm thick glass wool Sqm 139.83
961 Wood screws No. 4.00
962 Ahro tape/press putty Bundle 252.54
963 Lipping 1”x ¼ “ Rmt 20.59
964 Etching of glass Sqm 1144.07
965 Patch fittings No. 1186.44
966 Pivot No. 296.61
967 Floor machine No. 5508.47
968 Locking system No. 847.46
969 SS Door rails Set 635.59
970 25mm treated commercial black board Sqm 1610.17
971 Teak wood balls No. 169.49
972 19mm block board vinyl bonded w/p 7’x3’ Sqm 974.58
973 Stainless steel 304 grade Each 37.29
974 Stainless steel 304 grade tower bolt plate Each 25.42
975 Stainless steel 304 grade door lock plate Each 35.59
976 Stainless steel 304 grade aldrop pipe Each 32.20

XXXVII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
977 MS Vertical bolt of size 1/2 x2 Each 25.42
978 TMT steel bar kgs 35.59
979 MS Special square nut 4mm Each 8.47
980 4/15 CSK 304 grade stainless steel screws Each 4.24
981 4mm stainless steel hexagonal grade nut Each 2.54
PP connector for fixing horizontal and vertical members 35mm
982 Each 21.19
dia length
21. ENERGY CONSERVATION BUILDING CODE MATERIALS
Polyurethane foam (PUF) slab 40mm thick average with PU
983 m² 338.98
slab density 36+/-2 kg/m³
Polyurethane foam (PUF) slab 50mm thick average with PU
984 m² 559.32
slab density 36+/-2 kg/m³
Polyurethane foam (PUF) slab 60mm thick average with PU
985 m² 796.61
slab density 36+/-2 kg/m³
Polyurethane foam (PUF) slab 70mm thick average with PU
986 m² 1028.81
slab density 36+/-2 kg/m³
987 Polymerized plaster reinforced with glass fibre mesh m² 254.24
988 Epoxy based bonding adhesive Kgs 735.59
Polyurethane foam (PUF) spray 40mm thick average with PU
989 m² 580.51
slab density 35+/-5 kg/m³
Polyurethane foam (PUF) spray 50mm thick average with PU
990 m² 725.42
slab density 35+/-5 kg/m³
25mm thick extruded polystyrene (XPS) thermal insulating
991 m² 241.53
boards
50mm thick extruded polystyrene (XPS) thermal insulating
992 m² 466.10
boards
75mm thick extruded polystyrene (XPS) thermal insulating
993 m² 720.34
boards
100mm thick extruded polystyrene (XPS) thermal insulating
994 m² 974.58
boards
12mm thick glass wool with resin bonded slab density 48kgs/
995 m² 108.47
cum
25mm thick glass wool with resin bonded slab density 48kgs/
996 m² 211.86
cum

XXXVIII
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
50mm thick glass wool with resin bonded slab density 48kgs/
997 m² 300.85
cum
25mm thick average resin bonded rock wool slab having density
998 m² 54.24
36+/-5 kg/cum
40mm thick average resin bonded rock wool slab having density
999 m² 76.27
36+/-5 kg/cum
50mm thick average resin bonded rock wool slab having density
1000 m² 89.83
36+/-5 kg/cum
65mm thick average resin bonded rock wool slab having density
1001 m² 113.56
36+/-5 kg/cum
75mm thick average resin bonded rock wool slab having density
1002 m² 128.81
36+/-5 kg/cum
100mm thick average resin bonded rock wool slab having
1003 m² 168.64
density 36+/-5 kg/cum
60mm thick extruded polystyrene (XPS) thermal insulating
1004 m² 610.17
boards
70mm thick extruded polystyrene (XPS) thermal insulating
1005 m² 703.39
boards
Polyurethane foam (PUF) spray 60mm thick average with PU
1006 m² 1261.86
foam
Polyurethane foam (PUF) spray 70mm thick average with PU
1007 m² 1577.12
foam
50mm thick thermal insulation of roofing with expanded
1008 m² 122.88
polystyrene
70mm thick thermal insulation of roofing with expanded
1009 m² 182.20
polystyrene
90mm thick thermal insulation of roofing with expanded
1010 m² 242.37
polystyrene
110mm thick thermal insulation of roofing with expanded
1011 m² 302.54
polystyrene
120mm thick thermal insulation of roofing with expanded
1012 m² 332.20
polystyrene
Thermal insulation of roofing with expanded polystyrene (50mm
1013 m² 150.85
thick) with aluminium strips
Thermal insulation of roofing with expanded polystyrene (70mm
1014 m² 227.12
thick) with aluminium strips

XXXIX
MATERIAL RATES FOR PREPARATION OF 2018-19 SR
Sl. Code Bare Rate
Name Unit
No. No. for 2018-19
Thermal insulation of roofing with expanded polystyrene (90mm
1015 m² 281.36
thick) with aluminium strips
Thermal insulation of roofing with expanded polystyrene
1016 m² 358.47
(110mm thick) with aluminium strips
Thermal insulation of roofing with expanded polystyrene
1017 m² 398.31
(120mm thick) with aluminium strips
1018 25mm thick rock wool with resin bonded slab density 48kgs/cum m² 54.24
1019 40mm thick rock wool with resin bonded slab density 48kgs/cum m² 76.27
1020 50mm thick rock wool with resin bonded slab density 48kgs/cum m² 89.83
1021 65mm thick rock wool with resin bonded slab density 48kgs/cum m² 113.56
1022 75mm thick rock wool with resin bonded slab density 48kgs/cum m² 128.81
100mm thick rock wool with resin bonded slab density 48kgs/
1023 m² 168.64
cum

XL
Rate list of materials (Submersible Three Phase 6 inch/150mm)
for SR 2018-19
Sl. No Item Stage Unit Bare Rate
1 5HP/3.7kW 5 1 26628
2 5HP/3.7kW 6 1 27113
3 5HP/3.7kW 7 1 27928
4 5HP/3.7kW 8 1 28837
5 5HP/3.7kW 10 1 29776
6 5HP/3.7kW 12 1 31427
7 6HP/4.5kW 6 1 28031
8 6HP/4.5kW 8 1 29217
9 6HP/4.5kW 10 1 30972
10 6HP/4.5kW 12 1 31746
11 6HP/4.5kW 15 1 34130
12 6HP/4.5kW 18 1 36257
13 7.5HP/5.5kW DOL 8 1 32665
14 7.5HP/5.5kW DOL 10 1 33635
15 7.5HP/5.5kW DOL 12 1 35410
16 7.5HP/5.5kW DOL 15 1 36783
17 7.5HP/5.5kW DOL 19 1 39879
18 7.5HP/5.5kW DOL 20 1 40622
19 7.5HP/5.5kW SD 8 1 33491
20 7.5HP/5.5kW SD 10 1 34461
21 7.5HP/5.5kW SD 12 1 36236
22 7.5HP/5.5kW SD 15 1 37609
23 7.5HP/5.5kW SD 18 1 39962
24 7.5HP/5.5kW SD 20 1 41448
25 7.5HP/5.5kW SD 23 1 43574
26 10HP/7.5kW 10 1 43001
27 10HP/7.5kW 13 1 44818
28 10HP/7.5kW 16 1 47855
29 10HP/7.5kW 20 1 49955
30 10HP/7.5kW 25 1 54300
31 10HP/7.5kW 30 1 58466
32 12.5HP/9.3kW 12 1 47262
33 12.5HP/9.3kW 16 1 49767
34 12.5HP/9.3kW 20 1 53789
35 12.5HP/9.3kW 25 1 56414
36 12.5HP/9.3kW 30 1 60697
37 12.5HP/9.3kW 40 1 69136
38 15HP/11kW 15 1 53208
39 15HP/11kW 20 1 56281

XLI
Rate list of materials (Submersible Three Phase 6 inch/150mm)
for SR 2018-19
Sl. No Item Stage Unit Bare Rate
40 15HP/11kW 24 1 60365
41 15HP/11kW 25 1 60365
42 15HP/11kW 26 1 62288
43 15HP/11kW 30 1 63498
44 15HP/11kW 35 1 67724
45 17.5HP/13kW 17 1 61385
46 17.5HP/13kW 23 1 65147
47 17.5HP/13kW 26 1 68316
48 17.5HP/13kW 28 1 70215
49 17.5HP/13kW 30 1 72126
50 17.5HP/13kW 35 1 73871
51 17.5HP/13kW 40 1 78036
52 20HP/15kW 20 1 66750
53 20HP/15kW 26 1 70144
54 20HP/15kW 30 1 74287
55 20HP/15kW 32 1 76197
56 20HP/15kW 40 1 80375
57 20HP/15kW 50 1 88754
58 20HP/15kW 25 1 78833
59 20HP/15kW 36 1 86771
60 20HP/15kW 40 1 90595
61 20HP/15kW 50 1 95756
62 25HP/18.5kW 50 1 125677
63 25HP/18.5kW 60 1 129062

Rate list of materials (Submersible Single Phase 4 inch/100mm)


for SR 2018-19
Sl.No Item Stage Unit Bare Rate
1 0.5/.37 5 1 9970
2 0.5/.37 7 1 10341
3 0.75/.55 5 1 12250
4 0.75/.55 6 1 12581
5 0.75/.55 7 1 12952
6 0.75/.55 10 1 11910
7 0.75/.55 13 1 12777
8 1/.75 7 1 13231
9 1/.75 10 1 14283

XLII
Rate list of materials (Submersible Single Phase 4 inch/100mm)
for SR 2018-19
Sl.No Item Stage Unit Bare Rate
10 1/.75 12 1 14924
11 1/.75 13 1 14924
12 1/.75 18 1 15130
13 1.5/1.1 7 1 13819
14 1.5/1.1 10 1 13355
15 1.5/1.1 12 1 15356
16 1.5/1.1 14 1 15956
17 1.5/1.1 15 1 16410
18 1.5/1.1 18 1 17410
19 1.5/1.1 20 1 16059
20 1.5/1.1 26 1 17308
21 2/1.5 6 1 17329
22 2/1.5 10 1 16482
23 2/1.5 12 1 17101
24 2/1.5 14 1 16605
25 2/1.5 15 1 17834
26 2/1.5 16 1 18165
27 2/1.5 18 1 19588
28 2/1.5 20 1 19579
29 2/1.5 25 1 19021
30 2/1.5 30 1 20590
31 2/1.5 35 1 21673
32 3/2.2 9 1 21074
33 3/2.2 15 1 20982
34 3/2.2 20 1 22582
35 3/2.2 21 1 20362
36 3/2.2 23 1 23676
37 3/2.2 30 1 26391
38 3/2.2 35 1 23881
39 3/2.2 40 1 24997
40 3/2.2 50 1 27154
41 5/3.7 25 1 26049
42 5/3.7 30 1 27638
43 5/3.7 35 1 26173
44 5/3.7 50 1 30197

XLIII
Rate list of materials (Submersible Three Phase 4 inch/100mm)
for SR 2018-19
Sl.No Item Stage Unit Bare Rate
1 1/.75 7 1 13221
2 1/.75 8 1 11601
3 1/.75 10 1 12200
4 1/.75 13 1 12932
5 1/.75 18 1 14727
6 1.5/1.1 10 1 12756
7 1.5/1.1 12 1 13675
8 1.5/1.1 15 1 13675
9 1.5/1.1 20 1 15461
10 1.5/1.1 26 1 16710
11 2/1.5 6 1 16255
12 2/1.5 10 1 15408
13 2/1.5 12 1 16028
14 2/1.5 14 1 15532
15 2/1.5 16 1 17115
16 2/1.5 20 1 17194
17 2/1.5 25 1 17949
18 2/1.5 30 1 19331
19 2/1.5 35 1 20600
20 3/2.2 9 1 20528
21 3/2.2 15 1 20435
22 3/2.2 20 1 22034
23 3/2.2 21 1 19816
24 3/2.2 23 1 23128
25 3/2.2 30 1 25842
26 3/2.2 35 1 23335
27 3/2.2 40 1 24449
28 3/2.2 50 1 26607
29 4/3.0 12 1 27009
30 4/3.0 16 1 28836
31 4/3.0 20 1 24047
32 4/3.0 25 1 24367
33 4/3.0 28 1 23014
34 4/3.0 30 1 25864
35 4/3.0 32 1 28124
36 4/3.0 40 1 26122
37 4/3.0 50 1 28403
38 5/3.7 15 1 29805

XLIV
Rate list of materials (Submersible Three Phase 4 inch/100mm)
for SR 2018-19
Sl.No Item Stage Unit Bare Rate
39 5/3.7 20 1 32076
40 5/3.7 25 1 27804
41 5/3.7 30 1 27381
42 5/3.7 32 1 27825
43 5/3.7 35 1 25916
44 5/3.7 37 1 31984
45 5/3.7 45 1 35039
46 5/3.7 50 1 36391
47 5/3.7 60 1 40126
48 6/4.5 30 1 31126
49 6/4.5 32 1 29043
50 6/4.5 40 1 36442
51 6/4.5 45 1 36442
52 6/4.5 54 1 39919
53 6/4.5 60 1 41582
54 7.5/5.5 37 1 35616
55 7.5/5.5 40 1 33130
56 7.5/5.5 50 1 35978
57 7.5/5.5 54 1 41612
58 7.5/5.5 75 1 48909
59 10/7.5 100 1 74130

Rate list of materials (Monoblock Single Phase) for SR 2018-19


Sl.No Item Stage Unit Bare Rate
1 0.5/.37 1 6925
2 1/.75 1 8941
3 1.5/1.1 1 8793
4 2/1.5 1 10899

XLV
Rate list of materials (Monoblock Three Phase High Speed) for SR 2018-19
Sl.No Item Stage Unit Bare Rate
1 1.5/1.1 1 11276
2 2/1.5 1 12826
3 3/2.2 1 16592
4 5/3.7 1 19661
5 7.5/5.5 1 24371
6 10/7.5 1 29825
7 12.5/9.3 1 34502
8 15/11 1 38726
9 20/15 1 50161
10 25/18.7 1 55525
11 30/22 1 61298

Rate list of materials (Monoblock Three Phase Slow Speed) for SR 2018-19
Sl.No Item Stage Unit Bare Rate
1 2/1.5 1 15140
2 3/2.2 1 21012
3 5/3.7 1 25792
4 7.5/5.5 1 34345
5 10/7.5 1 42431
6 15/11 1 56369

Rate list of materials (Single Phase Open well) for SR 2018-19


Sl.No Item Stage Unit Bare Rate
1 0.5/.37 1 7080
2 1/.75 1 9882
3 1.5/1.1 1 10867
4 2/1.5 1 14407
5 3/2.2 1 13067
6 5/3.7 1 16266

XLVI
Rate list of materials (Three Phase Open well) for SR 2018-19
Sl.No Item Stage Unit Bare Rate
1 1/.75 1 9138
2 2/1.5 1 12154
3 3/2.2 1 19609
4 5/3.7 1 22230
5 6.5/4.8 1 24563
6 7.5/5.5 1 27175
7 10/7.5 1 33222
8 12.5/9.3 1 38991
9 15/11 1 42253
10 20/15 1 56413

Accessories for Pumpset Installation and Erection


Sl.No Item Stage Unit Bare Rate
1 G.I. Pipe 50mm 'B' Class Meter 415
2 Collar 50mm 1 180
3 UPVC Column Pipe 50mm Meter 306
4 G.I. Adaptor 1 1800
5 Submersible Cable 1x3x1.5 sq.mm Meter 45
6 Submersible Cable 1x3x2.5 sq.mm Meter 58
7 Submersible Cable 1x3x4.0 sq.mm Meter 108
8 Submersible Cable 1x3x6.0 sq.mm Meter 144
9 Submersible Cable 1x3x10.0 sq.mm Meter 220
10 Outdoor Panel upto 6 HP 1 9500
11 Outdoor Panel upto 10 HP 1 10500
12 Outdoor Panel upto 15 HP 1 15500
13 Outdoor Panel upto 20 HP 1 21000
14 Outdoor Panel upto 30 HP 1 30000
15 Gate Valve 50mm 1 1800
16 Non Return Valve 50mm 1 1800
17 Borewell Cap & Clamp Set Set 1800
18 Power Capacitor kVAR 360
19 MCB 1 900
20 G.I. Pipe 40mm 'A' Class Meter 400
21 Pot head 1 360

XLVII
hire charges OF MACHINERIES
Note : These rates are exclusive of contractor's profit & overheads.

Sl. Code Unit Bare Rate


No. No.      Rs. Ps.

1 1001 Mixer (concrete) - 1 cum Capacity Day 1,356.00

2 1002 Vibrator (with needle) Day 297.00

3 1004 Bitumen Boiler Oil Fired - 1500 ltr. Capacity hr 133.00

4 1005 Mini Mix Plant 6/10 TPH Day 1,356.00

5 1006 Wheel Burrows Day 13.00

6 1007 Hand Mixer Day 136.00

7 1008 Farm Tractor Day 1,915.00

8 1010 Mechanical Paver finisher 100 TPH capacity Day 5,966.00

9 1011 Tipper Day 1,708.00

10 1012 Front End Loader 1 cum bucket capacity hr 593.00

11 1013 Hot Mix Plant 40/60 TPH Day 65,220.00

12 1014 Vibrator Roller Day 9,797.00

13 1015 Hire charges for Tractor mounted or mini dozer Day 2,034.00

14 1016 Pneumatic Tyre Roller (8 Tonnes) - 25 cum / hr Day 7,010.00

15 1018 Motor Grader BEML Day 12,881.00

16 1019 Motorised scrapper Day 1,288.00

17 1020 Wheeled Dozer D 50 BEML Day 11,864.00

18 1022 Hydraulic Control Paver finisher (with Electronic Sensor) 100 TPH Day 15,729.00

19 1023 Tractor 40 HP Day 1,288.00

20 1024 Tractor 50 HP Day 2,129.00

21 1028 Wet Mix Plant 60 TPH/ Pug Mill hr 960.00

22 1030 Air Compressor Day 1,953.00

23 1031 J.C.B. Excavator Day 5,695.00

24 1032 Water Tanker / Day Day 412.00

XLVIII
hire charges OF MACHINERIES
Sl. Code Unit Bare Rate
No. No.      Rs. Ps.
25 1035 Road Roller 8-10 T ( 425Cum/day soil compacted) hr 367.00

26 1036 Front end loader (1Cum) Turnover 120 Cum /day when hr 593.00
used with hot mix plant

27 1037 Vibratory Roller 8 Tonne hr 1,102.00

28 1038 Pneumatic Road Roller hr 876.00

29 1039 Tandem Road Roller - 30 cum / hr hr 876.00

30 1040 Motor Grader 3.35 meter blade hr 1,763.00

31 1041 Motorised scraper (950 Cum / day) hr 161.00

32 1042 Wheeled Dozer (D50 BEML) hr 1,356.00

33 1043 Hot mix Plant ( 6-10TPH) 8T /hr capacity hr 318.00

34 1045 Hot mix plant 40-60 TPH Capacity hr 8,153.00

35 1046 Paver finisher Mechanical 100 TPH capacity hr 746.00

36 1047 Paver Finisher Hydrostatic with sensor control 100 TPH hr 1,966.00

37 1048 Tractor 40 HP hr 161.00

38 1049 Tractor 50 HP hr 266.00

39 1055 Air compressor (170 Cfm) hr 246.00

40 1056 Hydraulic Excavator 1 cum bucket hr 958.00

41 1057 Water Tanker hr 52.00

42 1058 Tractor mounted dozer hr 318.00

43 1059 Mixer (concrete small used in culvert) hr 42.00

44 1060 Vibrator hr 42.00

45 1063 Concrete pump 45 & 30 cum capacity hr 164.00

46 1064 Transit mixer 4.5 cum/hour hr 627.00

47 1065 Batching Plant (30 cum/hour) hr 1,568.00

48 1066 Batching Plant (15- 20 cum/hour) hr 1,312.00

XLIX
hire charges OF MACHINERIES
Sl. Code Unit Bare Rate
No. No.      Rs. Ps.

49 1069 HOM for pumping water 3.5 KL / hr capacity pump hr 42.00

50 1070 HOM of Vibrator Day 169.00

51 1071 HOM of welding and grinding machine Day 339.00

52 1073 HOM of cutting and grinding machine Day 339.00

53 1074 HOM of cutting and grinding machine hr 42.00

54 1075 HOM of Machineries for planing cum 34.00

55 1076 HOM of polishing machine Day 169.00

56 1077 HOM of Blow lamp Day 42.00

57 1078 HOM of pilling rig with Bentonite pump, etc. Day 32,169.00

58 1079 HOM of pump 23 KW Day 678.00

59 1080 HOM of pump 9.5 KW Day 424.00

60 1081 HOM of pneumatic hammer and pavement braker hr 42.00

61 1082 HOM of screed vibrator hr 42.00

62 1083 Mastic cooker Day 380.00

63 1084 HOM of gunniting equipment Day 339.00

64 1085 HOM of drilling equipment Day 42.00

65 1086 Plate vibrator having 3 Ton compaction force Day 254.00

66 1087 Crane charges Day 3,390.00

67 1088 Grout pump, agitator Day 254.00

68 1089 HOM of 7.5 cft capacity concrete mixing machine Day 1,220.00

69 1092 Crane Charges hr 424.00

70 1093 HOM of Machinery jack for prestressing hr 77.00

71 1094 HOM of spraying machine Day 64.00

72 1095 Crawlar Tractor hr 169.00

L
hire charges OF MACHINERIES
Sl. Code Unit Bare Rate
No. No.      Rs. Ps.

73 1096 Tipper-5 cum hr 203.00

74 1097 Smooth Wheeled Roller hr 327.00

75 1098 Rotavator - 25 cum / hr hr 12.00

76 1099 Ripper - 60 cum / hr hr 21.00

77 1301 Mechanical Broom Hydraulic hr 262.00

78 1302 Bitumen Pressure Distributor hr 754.00

79 1303 Emulsion Pressure Distrbutor hr 564.00

80 1304 Asphalt Batch Mix Plant - 120 TPH capacity hr 15,763.00

81 1305 Asphalt Batch Mix Plant - 100 TPH capacity hr 11,653.00

82 1306 Vacuum dewatering Sq mtr. 34.00

83 1307 Hydraulic Chip Spreader hr 1,695.00

84 1308 Pot-hole Repair Machine hr 722.00

85 1309 GSB Plant 50 cum hr 764.00

86 1311 Cranes 80 tonnes hr 823.00

87 1312 Cranes 35 tonnes hr 548.00

88 1313 Cranes 3 tonnes hr 229.00

89 1314 Concrete Bucket - 1 cum capacity hr 10.00

90 1315 Kerb Casting Machine hr 237.00

91 1317 Piling Rig with Bantonite Pump hr 4,021.00

92 1321 Generator 100 KVA hr 534.00

93 1322 Generator 33 KVA hr 251.00

94 1324 Road Marking Machine hr 57.00

95 1325 Mobile Slurry Seal Equipment hr 680.00

96 0135 Drilling Equipment (Tractor mounted) Day 1,627.00

LI
hire charges OF MACHINERIES
Sl. Code Unit Bare Rate
No. No.      Rs. Ps.

97 1326 Integrated stone crusher of 200 TPH including belt conveyor hr 11,144.00
vibrating screens

98 1327 Hot Mix Plant 20 to 40 TPH Capacity hr 3,881.00

99 1501 Grout pump with agitator & accessories hr 678.00

100 1503 Epoxy Injection gun hr 233.00

101 1506 Shotcreteing equipment hr 85.00

102 1511 Stressing jack with pump hr 127.00

103 1515 Hire charges for jack of 40 tonne lifting capacity No. 2,797.00

104 1517 Cement concrete batch mix at 75 cum/ hr hr 1,525.00

105 1527 Road sweeper at 1250 sqm/hr hr 234.00

106 1528 Cement concrete batch mix at 175 cum/hr (effective output) hr. 6,698.00

107 1529 Electric generator set 250 KVA hr 636.00

108 1530 Slip form paver with electronic sensor hr 1,525.00

109 1532 Concrete joint cutting machine hr 1,326.00

110 1535 Batch type cold mixing plant 100 - 120 TPH capacity hr 6,780.00
producing an average output of 75 tonne per hour

111 1550 Motorised barge of 20 tonne capacity hr 424.00

112 1551 Boat to carry at least 20 persons hr 93.00

113 0902 base mix plant (pug mill) hr 960.00

114 0965 Transit mixer 4 cum capacity for lead beyond 1 km t.km 2.00

115 0970 Usage of plant & equipment for pneumatic method of hr 339.00
well sinking

116 0996 Air Compressor 250 cfm with pneumatic breaker/ jack hammer hr 218.00
along with accessories

117 0999 Compressor with guniting equipment along with accessories hr 218.00

118 137 Concrete paver finisher with 40 HP Motor hr 1,839.00

LII
PÀ£ÁðlPÀ ¸ÀPÁðgÀ
(¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV, §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ)

ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ), ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ PÀbÉÃj £ÀqÁªÀ½UÀ¼ÀÄ
«µÀAiÀÄ B 2018-19£Éà ¸Á°£À ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀQët) ªÀ®AiÀÄzÀ
¢£ÀUÀÆ° £ËPÀgÀgÀ zÀgÀUÀ¼À£ÀÄß ¢£ÁAPÀ : 01-04-2018 jAzÀ eÁjUÉ §gÀĪÀAvÉ Zone-1, Zone-2 &
Zone-3 ªÀ®AiÀÄUÀ½UÉ C£ÀéAiÀĪÁUÀĪÀAvÉ ¥ÀjµÀÌj¸ÀĪÀ §UÉÎ.

G¯ÉèÃR B 1) ¸ÀPÁðgÀzÀ ¥ÀvÀæ ¸ÀA: ¦qÀ§Æèöår:46:DgïrJ¥sï 2008 ¢£ÁAPÀ : 24-05-2008


2) PÁ«ÄðPÀ E¯ÁSÉ ¸ÀÄvÉÆÛÃ¯É ¥ÀvÀæ ¸ÀA: PÁE:2:J¯ïJAqÀ§Æèöå:2015 ¨ÉAUÀ¼ÀÆgÀÄ
¢£ÁAPÀ : 06-01-2017
3) PÁ«ÄðPÀ E¯ÁSÉ ¥ÀvÀæ ¸ÀA: C¸Á¸ÀA¤:J¸ïL¦:¨ÉAPÀA¸ÀÆ:01:2018
¢£ÁAPÀ : 16-02-2018
4) F PÀbÉÃj DzÉñÀ ¸ÀASÉå : ªÀÄÄEA:¸ÀAPÀzÀ:¸ÁPÉÆÃ:JE-4:¢£ÀUÀÆ°zÀgÀ¥ÀnÖ:2018-19
¢£ÁAPÀ : 25-05-2018
5) C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ ¥ÀvÀæ ¸ÀASÉå : 1123
¢£ÁAPÀ : 27-6-2018
* * * *
¥Àæ¸ÁÛªÀ£É:
G¯ÉèÃR (4)gÀ F PÀbÉÃj DzÉñÀzÀ°è PÁ«ÄðPÀ E¯ÁSÉAiÀÄ ¸ÀÄvÉÆÛÃ¯É ¥ÀæPÁgÀ 2018-19£Éà ¸Á°£À ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV
E¯ÁSÉ, (zÀQët) ªÀ®AiÀÄzÀ ¢£ÀUÀÆ° £ËPÀgÀgÀ PÀ¤µÀ× zÀgÀUÀ¼À£ÀÄß ¢£ÁAPÀ : 01-04-2018 jAzÀ eÁjUÉ §gÀĪÀAvÉ Zone-1,
Zone-2 & Zone-3 ªÀ®AiÀÄUÀ½UÉ C£ÀéAiÀĪÁUÀĪÀAvÉ PÀ¤µÀ× zÀgÀUÀ¼À£ÀÄß ¥ÀæPÀn¸À¯ÁVgÀÄvÀÛzÉ.

2018-19£Éà ¸Á°£À zÀgÀ¥ÀnÖAiÀÄ£ÀÄß ºÉÆgÀr¸ÀĪÀ ¸ÀA§AzsÀ ¢£ÁAPÀ : 19-06-2018 gÀAzÀÄ ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ,
¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ), ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ PÀbÉÃjAiÀÄ°è £ÀqÉzÀ zÀgÀ¥ÀnÖ ¸À¨sÉAiÀÄ°è Zone-3 gÀ zÀgÀUÀ¼À£ÀÄß zÀgÀ¥ÀnÖAiÀÄ°è
¥ÀjUÀt¸À®Ä ¸ÀÆa¸À¯ÁVgÀÄvÀÛzÉ. CzÀgÀ£ÀéAiÀÄ Zone-3 gÀ ¢£ÀUÀÆ° zÀgÀUÀ¼À£ÉÆß¼ÀUÉÆAqÀ ¢£ÀUÀÆ° £ËPÀgÀgÀ PÀ¤µÀ× zÀgÀªÀ£ÀÄß
PÁ«ÄðPÀ E¯ÁSÉAiÀÄ C¢ü¸ÀÆZÀ£É G¯ÉèÃR (2) ªÀÄvÀÄÛ (3) gÀ ¥ÀæPÁgÀ vÀAiÀiÁj¸À¯ÁVgÀÄvÀÛzÉ.
DzÉñÀ ¸ÀASÉå: ªÀÄÄEA:¸ÀAPÀzÀ:¸ÁPÉÆÃ:JE-4:¢£ÀUÀÆ° zÀgÀ¥ÀnÖ:2018-19 ¢£ÁAPÀ: 24-08-2018
¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è CqÀPÀªÁVgÀĪÀ CA±ÀUÀ¼À£ÀÄß ¥ÀjUÀt¹ 2018-19£Éà ¸Á°£À ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ (zÀQët) ªÀ®AiÀÄ
¢£ÀUÀÆ° zÀgÀUÀ¼À£ÀÄß (ªÀÄÆ® ªÉÃvÀ£À ªÀÄvÀÄÛ fêÀ£À ¤ªÀðºÀuÉ ¨sÀvÉå) zÀgÀ¥ÀnÖAiÀÄ°è zÀgÀ«±ÉèõÀuÉUÀ½UÉ C¼ÀªÀr¸ÀĪÀ PÀÆ°
CA±ÀUÀ½UÉ (Labour Component of the SR) ºÁUÀÆ E¯ÁSÉAiÀÄ°è ¢£ÀUÀÆ° DzsÁgÀzÀ°è ¤ªÀð»¸ÀÄwÛgÀĪÀ £ËPÀgÀjUÉ
¥ÁªÀw¸ÀĪÀ ¸À®ÄªÁV C£ÀéAiÀĪÁUÀĪÀAvÉ ¢: 01-04-2018 jAzÀ eÁjUÉ §gÀĪÀAvÉ ¥ÀjµÀÌj¹ Zone-1, Zone-2 & Zone-3
ªÀ®AiÀÄUÀ½UÉ C£ÀéAiÀĪÁUÀĪÀAvÉ C£ÀĪÉÆÃzÀ£É ¤ÃqÀ¯ÁVzÉ.

LIII
ªÀ®AiÀÄ-1 §ÈºÀvï ¨ÉAUÀ¼ÀÆgÀÄ ªÀĺÁ£ÀUÀgÀ ¥Á°PÉ ºÁUÀÆ gÁdåzÀ
(Zone-1) J¯Áè ªÀĺÁ£ÀUÀgÀ ¥Á°PÉUÀ¼ÀÄ ªÀÄvÀÄÛ EªÀÅUÀ½UÉ UÉÆvÀÄÛ¥Àr¹zÀ
DUÉÆèêÀÄgÉõÀ£ï ¥ÀæzÉñÀUÀ¼ÀÄ
ªÀ®AiÀÄ-1 ªÀ®AiÀÄ-1gÀ°è £ÀªÀÄÆ¢¹gÀĪÀ ¥ÀæzÉñÀUÀ¼À£ÀÄß ºÉÆgÀvÀÄ¥Àr¹
(Zone-2) gÁdåzÀ J¯Áè f¯Áè PÉÃAzÀæUÀ¼ÀÄ
ªÀ®AiÀÄ-1 ªÀ®AiÀÄ-1 ªÀÄvÀÄÛ 2 gÀ°è £ÀªÀÄÆ¢¹gÀĪÀ ¥ÀæzÉñÀUÀ¼À£ÀÄß
(Zone-3) ºÉÆgÀvÀÄ¥Àr¹ gÁdåzÀ J¯Áè f¯Áè PÉÃAzÀæUÀ¼ÀÄ

F zÀgÀUÀ¼ÀÄ ¢£ÁAPÀ : 01-04-2018 jAzÀ ªÀÄÄA¢£À DzÉñÀzÀªÀgÉUÉ eÁjAiÀÄ°ègÀÄvÀÛzÉ.


CqÀPÀ : Zone-1, Zone-2 & Zone-3 UÀ¼À 148 ¢£ÀUÀÆ° £ËPÀgÀgÀ zÀgÀUÀ¼À ¥ÀnÖ

¸À»/-
ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ,
¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ)
¨ÉAUÀ¼ÀÆgÀÄ

¥ÀæwAiÀÄ£ÀÄß CzÀgÀ ¥ÀǪÀðPÀªÁV ¸À°è¹zÉ.


1. ¥ÀæzsÁ£À PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ, «PÁ¸À ¸ËzsÀ,
¨ÉAUÀ¼ÀÆgÀÄ.
2. PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ, «PÁ¸À ¸ËzsÀ, ¨ÉAUÀ¼ÀÆgÀÄ.
3. PÁAiÀÄðzÀ²ðUÀ¼ÀÄ, ¤ÃgÁªÀj E¯ÁSÉ, «PÁ¸À¸ËzsÀ, ¨ÉAUÀ¼ÀÆgÀÄ.
4. ªÀĺÁ¯ÉÃR¥Á®gÀÄ, PÀ£ÁðlPÀ ¨ÉAUÀ¼ÀÆgÀÄ 1 ªÀÄvÀÄÛ 2

¥ÀæwAiÀÄ£ÀÄß ªÀiÁ»wUÁV PÀ¼ÀÄ»¹PÉÆqÀ¯ÁVzÉ.


1. ¥ÀæzsÁ£À C©üAiÀÄAvÀgÀgÀÄ, §ÈºÀvï ¨ÉAUÀ¼ÀÆgÀÄ ªÀĺÁ£ÀUÀgÀ ¥Á°PÉ, ¨ÉAUÀ¼ÀÆgÀÄ. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀA¥ÀPÀð ªÀÄvÀÄÛ
PÀlÖqÀUÀ¼ÀÄ, GvÀÛgÀ F±Á£Àå, zsÁgÀªÁqÀ, UÀÄ®âUÁð.
2. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¸ÀtÚ ¤ÃgÁªÀj, ¨ÉAUÀ¼ÀÆgÀÄ.
3. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¥ÀAZÁAiÀÄvïgÁeï EAf¤AiÀÄjAUï E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ.
4. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¤ÃgÁªÀj (zÀQët) ªÉÄʸÀÆgÀÄ ¤ÃgÁªÀj (GvÀÛgÀ) ¨É¼ÀUÁA.
5. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, gÁ¶ÖçÃAiÀÄ ºÉzÁÝj, ¨ÉAUÀ¼ÀÆgÀÄ.
6. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ºÉêÀiÁªÀw ¥ÁæeÉPïì, UÉÆgÀÄgÀÄ.
7. C©üAiÀÄAvÀgÀ ¸ÀzÀ¸ÀågÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ C©üªÀÈ¢Þ ¥Áæ¢üPÁgÀ, ¨ÉAUÀ¼ÀÆgÀÄ.
8. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, §ÈºÀvï ¨ÉAUÀ¼ÀÆgÀÄ ªÀĺÁ£ÀUÀgÀ E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ.
9. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, PÀ£ÁðlPÀ UÀȺÀ ªÀÄAqÀ½, ¨ÉAUÀ¼ÀÆgÀÄ.
10. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, d®¸ÀA¥À£ÀÆä® C©üªÀÈ¢Þ ¸ÀA¸ÉÜ, D£ÀAzÀgÁªï ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ.
11. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ ¤ÃgÀÄ ¸ÀgÀ§gÁdÄ ªÀÄvÀÄÛ M¼ÀZÀgÀAr ªÀÄAqÀ½, ¨ÉAUÀ¼ÀÆgÀÄ.
12. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, PɺÀZïJ¸ïr¦, ¨ÉAUÀ¼ÀÆgÀÄ.

LIV
13. ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ, J¸ïºÉZïr¦, ¨ÉAUÀ¼ÀÆgÀÄ.
14. ªÀÄÄRå PÁAiÀÄðZÀgÀt C¢üPÁj, PÉDgïrJ, ¤ªÀiÁðt ¨sÀªÀ£À, ¨ÉAUÀ¼ÀÆgÀÄ.
15. ¤zÉðñÀPÀgÀÄ, ¥ËgÀqÀ½vÀ ¤zÉðñÀ£Á®AiÀÄ, 9£Éà ªÀĺÀrü «±ÉéñÀégÀAiÀÄå UÉÆÃ¥ÀÅgÀ, ¨ÉAUÀ¼ÀÆgÀÄ.
16. ¤zÉðñÀPÀgÀÄ, PÉEDgïJ¸ï, PÉ.Dgï. ¸ÁUÀgÀ, ªÉÄʸÀÆgÀÄ.
17. ªÀåªÀ¸ÁÜ¥ÀPÀ ¤zÉðñÀPÀgÀÄ, PÉDgïr¹J¯ï, ¨ÉAUÀ¼ÀÆgÀÄ.
18. ªÀÄÄRå AiÉÆÃd£Á¢üPÁj, Pɲ¥ï, ¨ÉAUÀ¼ÀÆgÀÄ.
19. ªÀÄÄRå AiÉÆÃd£Á¢üPÁj, J¸ïºÉZïr¦, ¨ÉAUÀ¼ÀÆgÀÄ.
20. Project Director, e-govrenance Department, e-procurement Cell, No.141, M.S.Building,
Bangalore.
21. C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ºÁUÀÆ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ PÀlÖqÀUÀ¼À ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ
: ªÉÄʸÀÆgÀÄ ªÀÈvÀÛ: UÀÄ®éUÁð ªÀÈvÀÛ: zsÁgÀªÁqÀ ªÀÈvÀÛ : ªÀÄAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ: ºÁ¸À£À ªÀÈvÀÛ : §¼Áîj ªÀÈvÀÛ: ¨É¼ÀUÁA ªÀÈvÀÛ
ªÀÄvÀÄÛ ²ªÀªÉÆUÀÎ ªÀÈvÀÛ.
22. vÁAwæPÀ ¤zÉÃð±ÀPÀgÀÄ, PÀ£ÁðlPÀ PÉƼÀUÉÃj C©üªÀÈ¢Þ ªÀÄAqÀ½, ¨ÉAUÀ¼ÀÆgÀÄ.
23. C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, ¥ÀAZÁAiÀÄvïgÁeï EAf¤AiÀÄjAUï ªÀÈvÀÛ, ¨ÉAUÀ¼ÀÆgÀÄ, ¸ÀtÚ ¤ÃgÁªÀj ªÀÈvÀÛ ¨ÉAUÀ¼ÀÆgÀÄ,
ªÉÄʸÀÆgÀÄ.
24. PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ E¯ÁSÉ «¨sÁUÀUÀ¼ÀÄ, zÀQët
ªÀ®AiÀÄ.
25. PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ, ¸ÀtÚ ¤ÃgÁªÀj «¨sÁUÀ.
26. zÀQët ªÀ®AiÀÄzÀ ¸ÀºÁAiÀÄPÀ PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV §AzÀgÀÄ ªÀÄvÀÄÛ M¼À£ÁqÀÄ d®¸ÁjUÉ
E¯ÁSÉ G¥À «¨sÁUÀUÀ¼ÀÄ

¸À»/-
ªÀÄÄRå C©üAiÀÄAvÀgÀgÀÄ,
¸ÀA¥ÀPÀð ªÀÄvÀÄÛ PÀlÖqÀUÀ¼ÀÄ (zÀ)
¨ÉAUÀ¼ÀÆgÀÄ

LV
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
Diploma Holder in
1 675.00 61.20 736.20 675.00 61.20 736.20 675.00 61.20 736.20 Equivalent Cadre
Engineering
2 Graduate in Engineering 873.00 61.20 934.20 873.00 61.20 934.20 873.00 61.20 934.20 Equivalent Cadre
3 I.T.I. Certificates Holder 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Job Oriented Diploma
4 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Holder
5 Mazdoor Heavy 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
6 Mazdoor Light/Bisti 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre

LVI
7 Stone Wadder (Heavy) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
8 Stone Wadder (Light) 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
Stone revetment builder/
9 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Hort Supr/Gauge
10 Scavenger 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
11 Sweeper 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
12 Mason Class I (with tools) 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
13 Mason Class II (with tools) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Carpenter Class I
14 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
(with tools)
15 Carpenter Class II ( - do -) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
16 Carpenter Assistant 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
17 Stone Dresser (with tools) 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
18 Painter Class I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
19 Painter Class II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
20 White/Colour Washer 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Wagon Driller/Pnematic
21 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
tamper
22 Stone Chistler Calss I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
23 Stone Chistler Class II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
24 Floor Polisher/Tile Layer 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
25 a) Bar Bender/Welder I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
26 b) Bar bender/Welder II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre

LVII
27 Driver for light vehicle 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
28 Driver for heavy vehicle 449.00 61.20 510.20 437.00 61.20 498.20 407.00 61.20 468.20 Equivalent Cadre
29 Driver for road rollers 449.00 61.20 510.20 437.00 61.20 498.20 407.00 61.20 468.20 Equivalent Cadre
30 Manual Driller 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Science Graduate
31 675.00 61.20 736.20 675.00 61.20 736.20 675.00 61.20 736.20 Equivalent Cadre
employed in Laboratory
Arts/Commerce Graduate
32 675.00 61.20 736.20 675.00 61.20 736.20 675.00 61.20 736.20 Equivalent Cadre
employed in Office
33 Licenced Blaster 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
34 Blaster Helper 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Hammer man/Stone
35 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Breaker
Licenced Plumber with
36 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
tools
Licenced electri Wiremen
37 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
fitter with tools
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
38 Lineman 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
Auto Electrician/ Mechanic
39 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Grade I
Auto Electrician/Mechanic
40 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Grade II
41 Gas or Electric Welder 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Telephone Operator/
42 465.00 61.20 526.20 455.00 61.20 516.20 425.00 61.20 486.20 Equivalent Cadre
Lineman

LVIII
43 Telephone Mechanic 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
44 Telephone Attender 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
45 Wireless Operator 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
46 Fitter Class I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
47 Fitter Class II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Mechanic Class I/
48 Mechanic HmP Grade I/ 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
EME Grade I
Mechanic Class II/
49 Mechanic HmP Grade I/ 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
EME Grade III
Operator/Heavy/CC Mixer/
50 Generator/(Compressor) 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Stone Crusher/Motor Mill
Operator/Heavy/CC Mixer/
51 Generator/(Compressor) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Stone Crusher/Motor Mill
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
Operator Light/Pump
52 Vibrator/Grinder/Air 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
conditioner
53 Turner 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
54 Tinker (With tools) 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
55 Cleaner 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
56 Crest Gate operator 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
57 Gate Operator for Dam 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre

LIX
Sluice gate operator for
58 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Dam
59 Sluiceman for canals 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
60 Foreman Grade I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
61 Foreman Grade II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
EME Operator Grade I /
62 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Shoval/Scrapper/Crane
63 EME operator Grade II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Divers with Helmet working
64 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
under Pneumatic pressure
65 Divers (ordinary) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
66 Well Sinker 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
67 Stenographer (Senior) 465.00 61.20 526.20 455.00 61.20 516.20 425.00 61.20 486.20 Equivalent Cadre
68 Stenographer (Junior)
69 Typist (Senior) 465.00 61.20 526.20 455.00 61.20 516.20 425.00 61.20 486.20 Equivalent Cadre
70 Typist (Junior) 460.00 61.20 521.20 445.00 61.20 506.20 415.00 61.20 476.20 Equivalent Cadre
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
71 Lift operator 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
72 Laboratory Attender 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
73 Watchman/Peon 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
74 Gurkha Watchman 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
Cartman with cart and
75 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
single bullock
Cartman with cart and
76 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
double bullock

LX
Hot asphalt spraying
77 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
mazdoor
Hot asphalt premix
78 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
spraying mazdoor
79 Spun pipe moulder Class I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
80 Spun pipe moulder Class II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
81 Patkary/Sowdy/Neerganti 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Horticultural Assistant
82 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
(Trained)
Boatman (Licenced) with
83 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
boat
84 Boatman 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
85 Guage Reader 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
86 Sweeper 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
87 Chawalies 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
88 Navaganies 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
Brick layer Class I /
89 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Moulder
90 Brick Layer Class II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
91 Fireman 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
92 Gangman/Survey/mazdoor 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
93 Wood Sawer (with tools) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
94 Compounder/Pharmasist 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
95 Compunder (SSLC) 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre

LXI
96 School Bus Conductor 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
97 I.B. Maity 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
98 I.B. Waterman 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
99 Photographer 465.00 61.20 526.20 455.00 61.20 516.20 425.00 61.20 486.20 Equivalent Cadre
100 Dhobi 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
101 Artisan Chistler 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
102 Artisan Mason 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
103 Artisan Helper 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
104 Artisan fitter 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
105 Assistant Mechanic 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
106 Blacksmith Grade I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
107 Blacksmith Grade II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
108 Cook 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Drilling/Grouting Operator
109 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Gr.I
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
Drilling/Grouting operator
110 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Gr.II
Foreman - heavy
111 machinery work shop 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
(General)
112 Fabricator 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Field Asst. spraying
attender, Plant
113 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
propagators, Prunders with

LXII
Horticulture Dept. certificate
114 Mali (Gardner) trained 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Mali (Gardner) untrained
115 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
heavy
Mali (Gardner) Untrained
116 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
light
Literate Assistant
117 675.00 61.20 736.20 675.00 61.20 736.20 675.00 61.20 736.20 Equivalent Cadre
(Graduate)
Literate Assistant
118 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
(SSLC passed)
Literate Assistant
119 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
(Non SSLC)
120 Hammer Mazdoor 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
121 Helper (Electrical) 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
122 Medicine sprayer - Malnad 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
123 Medicine sprayer - Maidan 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
124 Jack Hammer Driller 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Laboratory Asst.
125 675.00 61.20 736.20 675.00 61.20 736.20 675.00 61.20 736.20 Equivalent Cadre
(Graduate)
Laboratory Asst.
126 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
(SSLC Passed)
127 Mechinist Class - I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
128 Mechinist Class - II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Operator for pump

LXIII
129 compressor Mixer 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
without ITI
130 Drilling mechanic Grade I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
131 Drilling mechanic Grade II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
132 Revenue Surveyor 460.00 61.20 521.20 445.00 61.20 506.20 415.00 61.20 476.20 Equivalent Cadre
133 Stone cutter Class - I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
134 Stone cutter Class - II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Sismological Asst. having
135 675.00 61.20 736.20 675.00 61.20 736.20 675.00 61.20 736.20 Equivalent Cadre
graduation in Geology
136 Tracer/Blue Printer 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
Turner with ITI Certifiate
137 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Gr.I
Turner with ITI Certificate
138 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Gr.II
139 Valveman 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
140 Welder Grade I 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
141 Welder Grade II 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre
Statement showing the labour rates, KPW & IWTD, SOUTH ZONE FOR THE YEAR 2018-19
(For payment of wages of daily wage employees & For adoption in data rates and preparation of SR)
New labour rate to be adopted from 01-04-2018
ZONE CATEGORIZATION
ZONE 1 :: Bruhat Bengaluru Mahanagara Palike, Other Corporation areas of the state & their Agglomeration Areas.
ZONE 2 :: All District Centres of the state other than mentioned in Zone 1
ZONE 3 :: Other than Places mentiioned in Zone 1 & 2
ZONE-1 ZONE-II ZONE-III REMARKS
Sl.
Particulars Basic DA Total Basic DA Total Basic DA Total Equivalent Cadre
No.
Work Inspector/Maistry/
142 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Supervisor
Electrical Inspector with
143 Supervisor with 5 years 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
experience
144 Driver for Rig 449.00 61.20 510.20 437.00 61.20 498.20 407.00 61.20 468.20 Equivalent Cadre
Ex-Serviceman/Night
145 385.00 61.20 446.20 375.00 61.20 436.20 350.00 61.20 411.20 Equivalent Cadre
Watchman
146 Ballower 395.00 61.20 456.20 385.00 61.20 446.20 360.00 61.20 421.20 Equivalent Cadre

LX IV
147 Chinnadika Cooli 425.00 61.20 486.20 415.00 61.20 476.20 390.00 61.20 451.20 Equivalent Cadre
148 Saranga/Khasasi 405.00 61.20 466.20 395.00 61.20 456.20 375.00 61.20 436.20 Equivalent Cadre
Chapter - 1
MORTAR

1
Sl. No. Description Unit Rate
Rs. Ps.

1.0 MORTAR
1.1 KSRB 0.5-1 : Providing cement mortar (cement : sand) including cost
of all materials, labour charges, HOM complete as per specifications.
Specification No. KBS 0.5-1.2
1.1 KSRB 0.5-1.1 : – do – cement mortar of mix 1:1 cum 6,611.00
1.2 KSRB 0.5-1.2 : – do – cement mortar of mix 1:2 cum 5,308.00
1.3 KSRB 0.5-1.3 : – do – cement mortar of mix 1:3 cum 4,659.00
1.4 KSRB 0.5-1.4 : – do – cement mortar of mix 1:4 cum 4,014.00
1.5 KSRB 0.5-1.5 : – do – cement mortar of mix 1:5 cum 3,668.00
1.6 KSRB 0.5-1.6 : – do – cement mortar of mix 1:6 cum 3,370.00
1.7 KSRB 0.5-1.7 : – do – cement mortar of mix 1:8 cum 3,073.00
1.8 KSRB 0.5-1.8 : – do – cement mortar of mix 1:10 cum 2,875.00
1.9 KSRB 0.5-2 : Providing lime mortar ( lime putty : sand) including cost
of all materials, labour charges, HOM complete as per specifications.
Specification No. KBS 0.5-2.1
1.9 KSRB 0.5-2.1 : – do – lime mortar of mix 1:1 (1 lime putty : 1 sand) cum 4,795.00
1.10 KSRB 0.5-2.2 : – do – lime mortar of mix 1:2 (1 lime putty : 2 sand) cum 4,239.00
1.11 KSRB 0.5-2.3 : – do – lime mortar of mix 1:3 (1 lime putty : 3 sand) cum 3,966.00
1.12 KSRB 0.5-3 : Providing lime surkhi mortar (lime putty : surkhi)
including cost of all materials, labour charges, HOM complete as per
specifications.
Specification No. KBS 0.5
1.12 KSRB 0.5-3.1 : – do – lime surkhi mortar of mix 1:1 (1 lime putty : cum 3,845.00
1 surkhi)
1.13 KSRB 0.5-3.2 : – do – lime surkhi mortar of mix 1:2 (1 lime putty : cum 2,972.00
2 surkhi)
1.14 KSRB 0.5-3.3 : – do – lime surkhi mortar of mix 1:3 (1 lime putty : cum 2,539.00
3 surkhi)
1.15 KSRB 0.5-4 : Providing lime surkhi sand mortar (lime putty : surkhi
: sand) including cost of all materials, labour charges, HOM complete
as per specifications.
Specification No. KBS 0.5
1.15 KSRB 0.5-4.1 : – do – lime surkhi sand mortar of mix 1:1:1 (1 lime putty cum 3,560.00
: 1 surkhi : 1 sand)
1.16 KSRB 0.5-4.2 : – do – lime surkhi sand mortar of mix 1:1:2 (1 lime putty cum 2,856.00
: 1 surkhi : 2 sand)

2
Sl. No. Description Unit Rate
Rs. Ps.

1.17 KSRB 0.5-5.1 : Providing cement mortar with stone dust/grit of mix 1:2 cum 4,741.00
(1 cement : 2 stone dust/grit) including cost of all materials, labour
charges, HOM complete as per specifications.
Specification No. KBS 0.5 - 2.1
1.18 KSRB 0.5-6 : Providing cement lime mortar (cement : lime putty:
sand) including cost of all materials, labour charges, HOM complete as
per specifications.
Specification No. KBS 0.5-2.3
1.18 KSRB 0.5-6.1 : – do – cement lime mortar of mix 1:1:3 cum 5,677.00
(1 cement : 1 lime putty:3 sand)
1.19 KSRB 0.5-6.2 : – do – cement lime mortar of mix 1:1:4 cum 5,332.00
(1 cement : 1 lime putty:4 sand)
1.20 KSRB 0.5-6.3 : – do – cement lime mortar of mix 1:1:5 cum 5,097.00
(1 cement : 1 lime putty:5 sand)
1.21 KSRB 0.5-6.4 : – do – cement lime mortar of mix 1:1:6 cum 4,640.00
(1 cement : 1 lime putty:6 sand)
1.22 KSRB 0.5-6.5 : – do – cement lime mortar of mix 1:1:7 cum 4,383.00
(1 cement : 1 lime putty: 7 sand)
1.23 KSRB 0.5-6.6 : – do – cement lime mortar of mix 1:1:8 cum 4,151.00
(1 cement : 1 lime putty: 8 sand)
1.24 KSRB 0.5-6.7 : – do – cement lime mortar of mix 1:2:9 cum 4,466.00
(1 cement : 2 lime putty: 9 sand)
1.25 KSRB 0.5-6.8 : – do – cement lime mortar of mix 1:3:12 cum 4,386.00
(1 cement : 3 lime putty: 12 sand)
1.26 KSRB 0.5-7 : Providing white cement mortar with marble dust (white
cement : marble dust) including cost of all materials, labour charges,
HOM complete as per specifications. Specification No. KBS 0.5 - 2.3
1.26 KSRB 0.5-7.1 : – do – white cement mortar with marble dust of mix 1:2 cum 11,983.00
(1 white cement : 2 marble dust)
1.27 KSRB 0.5-7.2 : – do – white cement mortar with marble dust of mix 1:3 cum 9,406.00
(1 white cement : 3 marble dust)
1.28 KSRB 0.5-7.3 : – do – white cement mortar with marble dust of mix 1:4 cum 7,354.00
(1 white cement : 4 marble dust)
1.29 KSRB 0.5-7.4 : – do – white cement mortar with marble dust of mix 1:5 cum 6,249.00
(1 white cement : 5 marble dust)
1.30 KSRB 0.5-8 : Providing fly ash sand mortar (fly ash : sand) including cost
of all materials, labour charges, HOM complete as per specifications.
KBS 0.5 - 2.4
1.30 KSRB 0.5-8.1 : – do – fly ash sand mortar of mix 1:1.5:3 (1 cement cum 3,251.00
: 1.5 fly ash : 3 sand)

3
Sl. No. Description Unit Rate
Rs. Ps.

1.31 KSRB 0.5-8.2 : – do – fly ash sand mortar of mix 1:2:4 cum 2,805.00
(1 cement : 2 fly ash : 4 sand)
1.32 KSRB 0.5-8.3 : – do – fly ash sand mortar of mix 1:2.5:5 cum 2,557.00
(1 cement : 2.5 fly ash : 5 sand)
1.33 KSRB 0.5-8.4 : – do – fly ash sand mortar of mix 1:3:6.5 cum 2,359.00
(1 cement : 3 fly ash : 6.5 sand)
1.34 Mud Mortar cum 231.00

4
Chapter - 2
earthwork for buildings

5
Sl. No. Description Unit Rate
Rs. Ps.

2.0 EARTH WORK FOR BUILDINGS


2.1 KSRB 2-1 : Earthwork in surface excavation for levelling and lowering
the ground manually (Other than foundation of buildings, culverts, road
drains and trenches of pipe lines and cables) and removing the excavated
stuff to a distance not exceeding 50m and lift up to 1.5m, excavated
surface levelled and neatly dressed, disposed earth to be levelled
including breaking of clods and neatly dressed as per specifications.
specification. No. KBS 2.1(a) / 2.3.1
2.1 KSRB 2-1.1: – do – Ordinary soil cum 207.00
2.2 KSRB 2-1.2: – do – Hard soil cum 290.00
Note : Adopt item 2.24 for excavation in all types of soils for lowering
& levelling the ground for building works by mechanical means
2.3 KSRB 2-2 : Earthwork excavation by manual means for foundation
of buildings, water supply and sanitary lines and electrical conduits
etc, either in pits or in trenches 1.5m and above in width, in soil not
exceeding 1.5 m. in depth including dressing the bottom and sides
of pits and trenches, stacking the excavated soil clear from edges of
excavation with lead upto 50 m. including breaking of clods complete
as per specifications.
2.3 KSRB 2-2.1: – do – in ordinary soil. No. KBS 2.1(a) / 2.3.5 cum 249.00
2.4 KSRB 2-2.2 : --do-- in hard soil. No. KBS 2.1(b) / 2.3.5 cum 373.00
2.5 KSRB 2-2.3 : Excavation by manual means for foundation of buildings, cum 571.00
water supply & sanitary lines and electrical conduits etc., either in pits
or in trenches 1.50m and above in width, in soft rock / ordinary rock
not exceeding 1.50mtrs in depth including stacking the excavated stuff
clear from edges of excavation with lead upto 50mt including cost of
explosives, labour, HOM complete as per specifications.
specification. No. KBS 2.1C/2.9.4/2.18/2.19
2.6 KSRB 2-2.4 : – do – in soft rock / ordinary rock without blasting cum 1,184.00
2.7 KSRB 2-2.5 : Excavation by manual means for foundation of buildings, cum 616.00
water supply & sanitary lines and electrical conduits etc., either in pits
or in trenches 1.50m & above in width in hard rock not exceeding
1.50m in depth including stacking the excavated stuff clear from edges
of excavation with lead upto 50m including cost of explosives, labour
HOM complete as per specifications
specification. No. KBS 2.1.d/2.3.4/2.18/2.19
2.8 KSRB 2.2.6 : Excavation for foundation of buildings, water supply & cum 1,701.00
sanitary lines & electrical conduits etc., either in pits or in trenches 1.50m
& above in width in hard rock by chiselling and / or wedging where
blasting is prohibited, not excluding 1.50m in depth including stacking
the excavated stuff clear from edges of excavation with lead upto 50m
including cost of labour, HOM complete as per specifications
2.9 KSRB 2.2.7: Benching hard rock 5 to 7.5 cm depth. for seating of Sqm 1,826.00
foundation, including cost of all labours, tools etc., complete as per
specifications. specification. No. KBS 2.1(a) / 2.3.1

6
Sl. No. Description Unit Rate
Rs. Ps.

2.10 KSRB 2.3 : Filling available excavated earth ( excluding rock ) in sides cum 167.00
of foundations upto plinth in layers not exceeding 20 cms. in depth,
compacting each deposited layer by ramming after watering with lead
upto 50 m. and lift upto 1.5 m. including cost of all labour complete as
per specifications. Specification. No. KBS 2.9
2.11 KSRB 2-4 : Refilling available earth around pipe lines, cables in layers cum 100.00
not exceeding 20cms in depth, compacting each deposited layer by
ramming after watering with lead upto 50m. and lift upto 1.5 m. including
cost of all labour complete as per specifications.
2.12 KSRB 2.5 : Earthwork excavation in all soil deposits and filling cum 335.00
sides of foundation upto plinth in layers not exceeding 20cms. in depth,
compacting each deposited layer by ramming after watering with all
lead and lift including cost of all labour complete as per specifications.
specification. No. KBS 2.9.9 / 2.9.10.1 / 2.1.1
2.13 KSRB 2.6 : Providing and filling sand in foundation to required depth cum 1,717.00
for sub soil treatment including watering ramming with all lead and lift
complete as per specifications.
specification. No. KBS 2.10.2
2.14 KSRB 2.7 : Providing and removing shoring and strutting for Sqm 374.00
protecting the sides of foundation trenches, wherever required,
including cost of all materials and labour complete as per specifications.
specification. No. KBS 2.5 / 2.13
2.15 KSRB 2.8 : Providing and Filling in foundation with granite / trap cum 2,024.00
broken metal 100mm. and down size & with approved sand including
hand packing, ramming, watering, including cost of all materials and
labour with all lead and lift. complete as per specifications.
specification. No. KBS 2.10.2
2.16 KSRB 2.9 : Spreading and forming the excavated earth to required Sqm 7.00
level, slope for an average thickness of 75mm. in all classes of soils
including breaking clods and tamping manually alround the building and
low laying areas complete as per specifications.
2.17 KSRB 2.10 : Providing sand cement bed with all leads for all materials
and lift of 1.5 m. machine mixed, laid in layers of 15cms. thick and well
compacted for foundation, including curing cost of materials labour and
HOM complete as per specifications.
specification. No. KBS 2.10.2
2.17 KSRB 2.10 : – do – sand cement bed with 5% cement cum 2,499.00
2.18 KSRB 2.11 : – do – sand cement bed with 10% cement cum 2,854.00
2.19 KSRB 2.12 : Providing sand piles with all leads and lift of 1.5 m. for Sqm 269.00
stabilising foundation after duly making 5 cms. dia holes to a depth of 1.2
to 1.5 m. at 0.5 m c/c and filling with sand and tamping wherever required
including cost of materials, labour complete as per specifications.

7
Sl. No. Description Unit Rate
Rs. Ps.

2.20 KSRB 2.13 : Providing sand and cement piles with all leads and lift Sqm 300.00
of 1.5 m. for stabilising foundation after duly making 5 cms. dia holes
to a depth of 1.2 to 1.5 m. at 0.5 m c/c and filling with sand and 10%
cement and tamping wherever required including cost of materials,
labour complete as per specifications.
2.21 KSRB 2.14-1: Extra for additional lift of 1.5m. or part thereof for
excavation In soil / rock including cost of materials, labour complete as
per specifications.
specification. No. KBS
2.21 KSRB 2.14-1: – do – in loose / soft or hard rock cum 16.00
2.22 KSRB 2.14-2: – do – in soft or hard rock cum 29.00
2.23 Earth work excavation for foundation of structures upto 3 mtrs.
by mechanical means as per drawing and technical specification,
including setting out, providing shoring, strutting and bracing, removal
of stumps and other deleterious matter, dressing of sides and bottom,
filling back the excavated earth to the extent required and utilising /
transporting the remaining earth upto 1.00km lead. including cost of
labour, materials and HOM etc., complete.
2.23.1 - do - In all types of soils cum 43.00
2.23.2 - do - Soft rock / Ordinary Rock (Without blasting) cum 56.00
2.23.3 - do - Ordinary / Hard Rock (With blasting using explosives) cum 617.00
2.23.4 - do - Marshy soil cum 260.00
2.24 Earth work for lowering and levelling the ground other than foundation cum 50.00
works by mechanical means upto 3.00 depth, including providing
shoring strutting and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom, filling back the excavated earth to
the extent required & utilising/transporting the remaining earth upto
1.00 km lead. Including the cost of labour & HOM as per drawing and
technical specification.

Note
KSRB 2.2
1. Excavation for foundation of buildings, water supply sanitary lines,
electrical conduits either in pits or in trenches where excavation width is
above 600 mm below 1.5 mtrs. depth add 25% extra and for width upto
600 mm add 50% extra for respective rates due to restricted conditions.
KSRB 2.2
2. Extra for excavation under water conditions and/or foul conditions
including bailing/pumping out, removing slush add 20% of the rate of
the respective rate on account of slow progress of work under these
conditions.
KSRB 2.3, 2.4 & 2.9
3. Royalty charges need not be deducted for these items.

8
Chapter - 3
anti termite treatment

9
Sl. No. Description Unit Rate
Rs. Ps.

3.0 ANTI TERMITE TREATMENT


3.1 KSRB-3.1 Supplying chloropyriphos emulsifiable concentrate of L 171.00
20%, in sealed containers including delivery as specified sales tax,
transport, Insurance and other levies complete as per specifications.
Specification No. KBS
3.2 KSRB-3.2: Providing and injecting chemical emulsion for Sqm 88.00
Pre-constructional Anti-Termite Treatment, creating continuous
chemical barrier under and around the column pits, walls, trenches,
basement excavation, top surface of the plinth filling, junction of
wall and floor, along the external perimeter of building, expansion joints,
over the top surface of consolidated earth on which apron is to be laid,
surrounding of pipes and conduits, with chloropyriphos emulsifiable
concentrates of 20% concentration at 3.19 Litre/sqm., including cost
of chemical, diluting in water to one percent concentration, labour, HOM
complete as per specifications. (Plinth area of the building at ground floor
only shall be measured ) Specification No. KBS : 3.2.6 / 3.2.7
3.3 KSRB-3.3 : Providing, injecting chemical emulsion for Anti-Termite m 71.00
Treatment along external walls where the apron is not provided using
chemical emulsion at 3.19 Litre/sqm of the vertical surface of the substructure
to a depth of 300mm. Including excavation of channel along the wall and
redoing with chlorophyriphos emulsion concentrate 20% diluting in
water to 1% concentration, including cost of chemicals, diluting in water to
one percent concentration, labour, HOM complete as per specifications.
Specification No. KBS : 3.3.3

3.4 KSRB-3.4: Providing, injecting chemical emulsion for Anti-Termite m 38.00


Treatment along external walls below concrete or masonry apron using
chemical emulsion at 2.25 litre/m. including drilling and plugging of holes, 12
mm dia at 30 mm c/c with chlorophyriphos emulsion concentrate 20% diluting
in water to 1% concentration, including cost of chemicals, diluting in water
to one percent concentration, labour, HOM complete as per specifications.
Specification No. KBS : 3.3.4
3.5 KSRB 3.5: Providing, injecting chemical emulsion for Anti-Termite Sqm 209.00
Treatment of soil under existing floors using chemical emulsion at one
litre / hole 300mm apart including drilling 12mm. dia holes and plugging
with cement mortar 1:2 proportion to match with the existing floors with
chlorophyriphos emulsion concentrate 20%, including cost of chemical
diluting in water to one percent concentration, labour, HOM complete as
per specifications.
3.6 KSRB.3-6: Providing, Injecting chemical emulsion for Anti-Termite m 65.00
Treatment of existing masonry using chemical emulsion at one liter /
hole at 300mm intervals including drilling of holes at 45 degree and plugging
them with cement mortar 1:2 to the full depth of the hole with Chloropyriphos
emulsifiable concentration 20% including cost of chemical diluting in water
to one percent concentration, labour, HOM complete as per specifications.
Specification No. KBS : 3.3.5

10
Sl. No. Description Unit Rate
Rs. Ps.

3.7 KSRB 3.7: Providing, injecting chemical emulsion for Anti-Termite m 209.00
Treatment at points of contacts of wood work by chemical emulsion
Chloropyriphos ( in oil or kerosene based solution ) at 0.5 liters per hole by
drilling 6mm. dia holes at downword angle of 45 degree at 150mm. c/c and
sealing the same including cost of chemicals, diluting in water to one percent
concentration, labour, HOM complete as per specifications.
Specification No. KBS : 3.3.7
3.8 Providing general disinfection services, spraying of insecticide and Sqm 24.00
pesticide inside and outside the building (flies, bedbugs,lizards, cockroaches,
spiders caterpillars etc.,) including cost of materials labour lead lift, hire
charges of equipments etc., complete.

11
Chapter - 4
cement concrete

12
Sl. No. Description Unit Rate
Rs. Ps.

4.0 CEMENT CONCRETE


4.1 KSRB 4-1.1: Providing and laying in position plain cement concrete cum 4,403.00
of Mix 1:2:4 with OPC @ 240kgs, with 40mm and down size graded
granite metal coarse aggregates @0.878cum and fine aggregates @
0.459cum machine mixed, concrete laid in layers not exceeding 15 cms.
thick, well compacted, in foundation, including cost of all materials,
labour, HOM curing complete as per specifications
Specification No. KBS 4.1, 4.2
4.2 KSRB 4-1.2 : Providing and laying in position plain cement concrete cum 4,328.00
of Mix 1:3:6 with OPC @ 220kgs, with 40mm and down size graded
granite metal coarse aggregates @0.892cum and fine aggregates @
0.465cum machine mixed, machine mixed, concrete laid in layers not
exceeding 15 cms. thick, well compacted, in foundation including cost
of all materials, labour, HOM curing complete as per specifications.
Specification No. KBS 4.1, 4.2
4.3 KSRB 4-1.3 : Providing and laying in position plain cement concrete cum 4,252.00
of Mix 1:4:8 with OPC @ 180kgs, with 40mm and down size graded
granite metal coarse aggregates @0.85cum and fine aggregates @
0.57cum machine mixed, machine mixed, concrete laid in layers not
exceeding 15 cms. thick, well compacted, in foundation, including cost
of all materials, labour, HOM curing complete as per specifications.
Specification No. KBS 4.1, 4.2
4.4 KSRB 4-1.4 : Providing and laying in position plain cement concrete cum 4,179.00
of Mix 1:5:10 with OPC @ 160kgs, with 40mm and down size graded
granite metal coarse aggregates @0.86cum and fine aggregtes @
0.58cum machine mixed, machine mixed, concrete laid in layers not
exceeding 15 cms. thick, well compacted, in foundation, including cost
of all materials, labour, HOM curing complete as per specifications.
Specification No. KBS 4.1, 4.2
4.5 KSRB 4-1.5 : Providing and laying in position plain cement concrete of cum 4,440.00
Mix M20 with OPC @ 300kgs, with 20mm and down size graded granite
metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum,
machine mixed, concrete laid in layers not exceeding 15 cms. thick,
well compacted, in foundation, plinth and cills, including cost of all
materials, labour, HOM curing complete as per specifications.
Specification No. KBS 4.1, 4.2
4.6 KSRB 4-1.6 ; Providing and laying in position plain cement concrete cum 4,518.00
of Mix 1:2:4 with OPC @ 240kgs, with 20mm and down size graded
granite metal coarse aggregates @ 0.878 cum and fine aggregtes @
0.53cum, machine mixed, concrete laid in layers not exceeding 15 cms.
thick, well compacted, in foundation, plinth and cills, including cost of
all materials, labour, HOM curing complete as per specifications.
Specification No. KBS 4.1, 4.2
4.7 KSRB 4-1.7 : Providing and laying in position plain cement concrete cum 4,424.00
of Mix 1:3:6 with OPC @ 220kgs, with 20mm and down size graded
granite metal coarse aggregates @0.69 cum and fine aggregtes
@ 0.56cum, machine mixed, concrete laid in layers not exceeding
15 cms. thick, well compacted, in foundation, plinth and cills, including
cost of all materials, labour, HOM curing complete as per specifications.
Specification No. KBS 4.1, 4.2

13
Sl. No. Description Unit Rate
Rs. Ps.

4.8 KSRB 4-1.8 : Extra for laying cement concrete under water including cum 127.00
cost of pumping or dewatering and clearing slush as per specifications.
Specification No. KBS 4.2, 4.8
4.9 KSRB 4-1.9 : Extra for laying cement concrete under foul conditions. cum 183.00
Specification No. KBS
4.10 KSRB 4.2.1 : Providing and laying in position reinforced cement cum 4,843.00
concrete of Design Mix M25 with OPC @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.70 cum and fine
aggregtes @ 0.47cum, with super plasticisers @ 3 liters confirming to
IS 9103-1999 reafirmed-2008 at machine mixed, concrete laid in layers
not exceeding 15 cms thick, vibrated for all works in foundation for
footings, pedastals, retaining walls, return walls, walls (any thickness)
including attached pilasters, columns pillars, posts, struts, buttresses,
bed blocks, anchor blocks & plinths etc., including cost of all materials,
labour, HOM curing, complete but excluding cost of reinforcement as
per specifications.
Specification No. KBS 4.1, 4.6
4.11 KSRB 4.2.2 : Providing and laying in position reinforced cement cum 4,716.00
concrete of Design Mix M20 with OPC @ 320kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and fine
aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming
to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in
layers not exceeding 15 cms thick, vibrated for all works in foundation
for footings, pedastals, retaining walls, return walls, walls (any
thickness) including attached pilasters, columnspillars, posts,
struts, buttresses, bed blocks, anchor blocks & plinths etc., including
cost of all materials, labour, HOM curing, complete but excluding cost
of reinforcement as per specifications.
Specification No. KBS 4.1, 4.6
4.12 KSRB 4.2.7 : Providing and laying in position reinforced cement cum 5,037.00
concrete of design Mix M25 with OPC @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.70cum and
fine aggregtes @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in
layers not exceeding 15 cms thick, vibrated for all works in ground
floor level for roof slabs, staircase, lintels and beams retaining walls,
return walls, walls (any thickness) including attached pilasters,
columns, lintles, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain window
cills, fillets etc., including cost of all materials, labour, HOM curing,
complete but excluding cost of reinforcement as per specifications.
Specification No. KBS 4.1, 4.6
4.13 KSRB 4.2.8: Providing and laying in position reinforced cement cum 4,910.00
concrete of design Mix M20 with OPC @ 320kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers
not exceeding 15 cms thick, vibrated for all works in ground floor level
for roof slabs, staircase, lintels, and beams retaining walls, return
walls, walls (any thickness) including attached pilasters, columns,

14
Sl. No. Description Unit Rate
Rs. Ps.

pillars, posts, struts, buttresses, string or lacing courses, parapets,


coping, bed blocks, anchor blocks, plain window cills, fillets
etc., including cost of all materials, labour, HOM curing, complete but
excluding cost of reinforcement as per specifications.
Specification No. KBS 4.1, 4.6
4.19 KSRB 4.2.10 : Providing and laying in position reinforced cement sqm 367.00
concrete of design Mix M20 with OPC @ 24kgs, with 12mm and
down size graded granite metal coarse aggregates @0.05175cum and
fine aggregtes @ 0.0345cum, with superplastisiser @0.225lts, machine
mixed, well compacted for plain chajja of 7.5 cms. average thickness,
upto ground floor level, including cost of all materials, labour, HOM
finishing, curing, complete but excluding cost of reinforcement as per
specifications.
Specification No. KBS 4.1, 4.6
4.20 KSRB 4.2.11 : Providing and laying in position reinforced cement sqm 414.00
concrete of design Mix M20 with OPC @ 27.20kgs, with 12mm and
down size graded granite metal coarse aggregates @0.05865cum and
fine aggregtes @ 0.0391cum, with superplastisiser @0.225lts, machine
mixed, well compacted for plain chajja of 8.5 cms. average thickness,
upto ground floor level, including cost of all materials, labour, HOM
finishing, curing, complete but excluding cost of reinforcement as per
specifications.
Specification No. KBS 4.1, 4.6
4.21 KSRB 4-2.12 : Extra for providing throating or drip moulding to R.C.C. m 27.00
chajja with plastering ( labour charges only ) as per specifications.
Specification No. KBS
4.22 KSRB 4-3.1 : Extra if vibrator is used for Item No.4-1 to 4-8 as per specifications. cum 12.00
Specification No. KBS 4.2.6
4.23 KSRB 4-3.2 : Deduct where machine mixing is not done cum 12.00
Specification No. KBS 4.2.2.5 / 4.3.2.2
4.24 KSRB 4-4.1 : Extra for use of water proofing compound in Cement cum 174.00
concrete of mix 1:1:2,at one kg of compound per bag of cement.
Specification No. KBS
4.25 KSRB 4-4.2 : Extra for use of water proofing compound in Cement cum 129.00
concrete of mix 1:1.5:3,at one kg of compound per bag of cement.
Specification No. KBS
4.26 KSRB 4-4.3 : Extra for use of water proofing compound in Cement cum 103.00
concrete of mix 1:2:4,at one kg of compound per bag of cement.
Specification No. KBS
4.27 KSRB 4-5 : Providing lath plaster with cement mortar 1:3, 5cms Sqm 936.00
thick with 6mm dia mild steel bars at 20 cms c/c both horizontally and
vertically fixed with chicken mesh for drop chajja, facia, backing to cup
boards including cost of all materials, labour, providing and removing
form work HOM curing, complete as per specifications.
Specification No. KBS

15
Sl. No. Description Unit Rate
Rs. Ps.

4.28 KSRB 4-6.1 : Providing and removing centering, shuttering, strutting, Sqm 215.00
propping etc., and removal of form work for foundations, footings,
bases of columns for mass concrete including cost of all materials,
labour complete as per specifications.
Specification No. KBS 4.6.2
4.29 KSRB 4-6.2 : Providing and removing centering, shuttering, strutting,
propping etc., and removal of form work for suspended floors, landings,
balconies and likes, thickness upto 200 mm including cost of all
materials, labour complete as per specifications for heights more than
3.50m from ground level.
Specifications No. KBS 4.6.2
4.29.2 - do - 0 to 5 mts Sqm 333.00
4.29.3 - do - 0 to 6 mts Sqm 483.00
4.29.4 - do - 0 to 7mts Sqm 625.00
4.29.5 - do - 0 to 8 mts Sqm 766.00
4.29.6 - do - 0 to 9 mts Sqm 975.00
4.29.7 - do - 0 to 10 mts Sqm 1,192.00
4.29.8 - do - 0 to 11 mts Sqm 1,408.00
4.29.9 - do - 0 to 12 mts Sqm 1,616.00
4.29.10 - do - 0 to 13 mts Sqm 1,825.00
4.29.11 - do - 0 to 14mts Sqm 2,050.00
4.29.12 - do - 0 to 15 mts Sqm 2,316.00
4.29.13 - do - 0 to 16 mts Sqm 2,566.00
4.30 KSRB 4-6.3 : Providing and removing centering, shuttering, strutting, Sqm 366.00
propping etc., and removal of form work for flat surface such as
suspended floors, roofs, landings, balconies and likes, thickness above
200 mm including cost of all materials, labour complete as per Specification.
Specification No. KBS 4.6.2
4.31 KSRB 4-6.4 : Providing and removing centering, shuttering, strutting, Sqm. 298.00
propping etc., and removal of form work for vertical surface such
as walls at any thickness, including attached pilasters, buttresses,
plinth cills and string courses cost of all materials, labour complete as
per specifications.
Specification No. KBS 4.6.2
4.32 KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, Sqm. 379.00
propping etc., and removal of form work for columns, pillars, post
and struts, square / rectangular/ polygon in plan including cost of all
materials, labour complete as per specifications.
Specification No. KBS 4.6.2
4.33 KSRB 4-6.6 : Providing and removing centering, shuttering, strutting, Sqm 760.00
propping etc., and removal of form work for columns, pillars,post and
struts, circular or curved in plan including cost of all materials, labour
complete as per specifications. Specification No. KBS 4.6.2

16
Sl. No. Description Unit Rate
Rs. Ps.

4.34 KSRB 4-6.7 :Providing and removing centering, shuttering, strutting, Sqm 243.00
propping etc., and removal of form work for sides and soffits of beams,
beam haunchings, cantilever girders, bressumers and lintels not
exceeding 1m in depth including cost of all materials, labour complete
as per specifications.
Specification No. KBS 4.6.2
4.35 KSRB 4-6.8 : Providing and removing centering, shuttering, strutting, Sqm 335.00
propping etc., and removal of form work for sides and soffits of beams,
beams haunchings, cantilever, girders, bressumers and lintels
exceeding 1m in depth including cost of all materials, labour complete
as per specifications.
Specification No. KBS 4.6.2
4.36 KSRB 4-6.9 :Providing and removing centering, shuttering, strutting, Sqm 629.00
propping & removal of form work etc., for edges of slabs and breaks in
floor including cost of all materials, labour complete as per specifications.
Specification No. KBS 4.6.2
4.37 KSRB 4-6.10 :Providing and removing centering, shuttering, strutting, Sqm 269.00
propping etc., and removal of form work for chajja, corbels etc.,
including edges including cost of all materials, labour complete as per
specifications.
Specification No. KBS 4.6.2
4.38 KSRB 4-6.11 :Providing and removing centering, shuttering, strutting, Sqm 432.00
propping etc., and removal of form work for Stairs (excluding landing)
except spiral staircase including cost of all materials, labour complete
as per specificaiton.
Specification No. KBS 4.6.2
4.39 KSRB 4-6.12 :Providing and removing centering, shuttering, strutting, Sqm 425.00
propping etc., and removal of form work for cornices and mouldings
including cost of all materials, labour complete as per specifications.
Specification No. KBS 4.6.2
4.40 KSRB 4-6.13 :Providing and removing, centering, shuttering, strutting, Sqm 497.00
propping etc., and removal of form work for vertical fins and vertical
sun breakers including cost of all materials, labour complete as per
specifications. Specification No. KBS 4.6.2
4.41 KSRB 4-6.14 :Providing and removing centering, shuttering, strutting, Sqm 426.00
propping etc., and removal of form work for sloping or battering surface
including folded plates where inclination to horizontal plane does not
exceed 30 degree requiring shuttering only on the under side including
cost of all materials, labour complete as per specifications.
Specification No. KBS 4.6.2
4.42 KSRB 4-6.15 : Providing and removing centering, shuttering, strutting, Sqm 676.00
propping etc., and removal of form work for where inclination to
horizontal plane exceeds 30 degree (where shuttering may be
provided both on under side and upper side if required) including cost
of all materials, labour complete as per specifications.
Specification No. KBS 4.6.2

17
Sl. No. Description Unit Rate
Rs. Ps.

4.43 KSRB 4-7 : Providing 2 legged scaffolding for stone masonry work
using 10-15 cms. dia best quality casurina poles of 4m over all length
(3m +0.5m projection + 0.5m In to the ground), the distance between
two rows being 1.25m and spacing of posts being 2m in both rows with
2 horizontal posts with 0.5 mm overlap on either side and braces at 2
m c to c including longitudinal and transveres middle braces to step up
and providing platform with casurina poles, forms tied up using coir rope
complete as per specifications.
Specification No. KBS
4.43.1 - do - KSRB 4-7 : Scaffolding for stone masonry work converted to m. m 279.00
4.43.2 - do - KSRB 4-7 : Scaffolding for stone masonry work converted to cum. cum 209.00
4.43.3 - do - KSRB 4-7 : Scaffolding for stone masonry work converted to sqm. sqm 100.00
4.44 KSRB 4-8 : Providing two legged scaffolding for brick masonry work
using 10-15 cms. dia best quality Casurina poles of 4m over all length
(3m +0.5m projection + 0.5m In to the ground) the distance between
two rows being 1.25m and spacing of post being 2m in both rows with
2 horizontal posts with 0.5 mm overlap on either side and braces at
2 m c to c including longitudinal and transveres middle braces to step
up and providing platform with casurina poles, forms tied up using coir
rope complete as per specifications. Specification No. KBS
4.44.1 - do - for non modular brick work cum 208.00
(Non modular standard bricks : 4x0.23x3=2.76 cum)
4.44.2 - do - for modular brick work cum 241.00
(Modular bricks 4x0.2x3=2.4 cum)
4.44.3 - do - for non modular brick work Sqm 48.00
4.44.4 - do - for modular brick work Sqm 48.00
4.46 KSRB 4.9.2 : Providing T.M.T steel reinforcement for R.C.C work
including straightening, cutting, bending, hooking, placing in position,
lapping and / or welding wherever required, tying with binding wire and
anchoring to the adjoining members wherever necessary complete as per
design (laps, hooks and wastage shall not be measured and paid) cost
of materials, labour, HOM complete as per specifications. Specification
No. KBS 4.6.3
4.46.2 - do - TMT bars Fe 500 Tonne 58,096.00
4.46.3 - do - TMT bars Fe 550 Tonne 58,556.00
4.47 Lift charges for steel of all diameters for additional floors over ground Tonne 622.00
floor per floor height of 3.5 m. or part there of cost of labour, complete
as per specifications. Specification No. KBS
4.48 Providing and laying cement concrete using 20 mm and down size granite cum 4,537.00
coarse aggregates and fine aggregates of ready mixed concrete (RMC)
M20 for R.C.C works laid in 15 cms thick layers and well compacted by
vibrating, curing, for foundations & sub-structure works with all lead
and lifts etc., complete (exclusive of cost of steel and fabrication charges.)

18
Sl. No. Description Unit Rate
Rs. Ps.

4.49 Providing and laying cement concrete using 20mm and down size granite
coarse aggregates and fine aggregates of ready mixed concrete for
RCC works laid in 15 cm thick layers and well compacted including
vibrating curing etc., for all super structure works with all lead and lift
etc., complete. (exculsive of cost of steel and fabrication charges)

4.49.1 Ready mixed Cement concrete M-20 cum 4,537.00

4.49.2 Ready mixed Cement concrete M-25 cum 4,580.00

4.49.3 Ready mixed Cement concrete M-30 cum 4,665.00

4.49.4 Ready mixed Cement concrete M-35 cum 4,836.00

4.49.5 Ready mixed Cement concrete M-40 cum 5,007.00

4.49.6 Ready mixed Cement concrete with OPC 50% + GGBS 50% M-20 cum 4,236.00

4.49.7 Ready mixed Cement concrete with OPC 50% + GGBS 50% M-25 cum 4,322.00

4.49.8 Ready mixed Cement concrete with OPC 50% + GGBS 50% M-30 cum 4,493.00

4.49.9 Ready mixed Cement concrete with OPC 80% + GGBS 20% M-35 cum 4,758.00

4.49.10 Ready mixed Cement concrete with OPC 85% + GGBS 15% M-40 cum 4,910.00

Note : The RMC should be obtained only from the plants


certified by Quality Council of India as per CE, C&B letter,
AE2, 2015-16, Dt. 12-09-2015
4.51 Providing and mixing fibermesh MD(Multi Dimensional) Graded cum 545.00
(fibermesh inforce e3) fibrilated (interconnected bundles of fibers that
open up during the mix process) 100% virgin Polypropylene fibers
contains no reprocessed olefin materials and are specially manufactured
with 25 individual unique fiber design to an optimum gradation for use
as complete secondary reinforcement. Application per cubic meter
shall equal a minimum of 0.1% by volume (0.9kg per cubic meter) in the
concrete. Fibermesh MD Graded Polypropylene fibrilated fiber should
confirm to ASTM C 1116 type III 4.1.3 ASTM C 1116 performance level
1% ASTM C 1339 (Minimum average residual strength of 0.35 Mpa).

4.52 Providing and mixing fibermesh stealth e3 Fibermesh150 multi cum 300.00
dimensional graded multifilamenrt 100%virgin polypropylene fibres
contains no reprocesserd olfrin materials and are specifically
manufactured for use as concrete secondary reinforcement. Application
per cubic meter shall be @ 0.9kg to 1.8kg per cum of concrete. Fibermesh
stealth e3 shall confirm to ASTM C 1116 type 111.4.106.

4.53 Providing and casting reinforced cement concrete racks with design sqm 820.00
mix M20, granite or trap jelly 12mm and down size 5 cms thick and below
with reinforcements of 6mm dia MS bars at 15 cms. Centre to centre
for main reinforcement and at 30cms centre to centre for distribution
including supports wherever necessary with burnt brick in CM 1:4
including centring, form work, curing etc., complete (inclusive of cost of
steel and fabrication charges).

19
Sl. No. Description Unit Rate
Rs. Ps.

4.54 Providing RCC loft (atta) 7.5cms thick with cement concrete design sqm 357.00
mix M20 using clean granite or trap jelly of 20mm and down size with
necessary reinforcements at 20cms centre to centre as per design
including form work, centring, curing, etc., complete (exclusive of cost
of steel and fabrication charges).
4.55 Providing and fixing RCC slabs 5 cms thick for wall shelves with 12mm sqm 515.00
and down size jelly cement concrete design mix M20 including CM 1:3
plaster finishing, curing etc., complete (excluding the cost of steel and
fabrication charges).
4.56 Providing RCC M20 as per IS 456 using granite metal 20mm and down
size for 7.5 cms thick solid parapet or perforated as per design,
specification and directions.(exclusive of cost of steel and fabrication
charges) including necessary centring, form work and finishing smooth with
CM (1:3) etc., complete.
4.56.1 - do - 7.5 cms thick sqm 350.00
4.56.2 - do - 10 cms thick sqm 532.00
4.57 Providing and mixing Alkali resistant glass fibers HD12 to arrest cum 250.00
plastic shrinkage cracks and to provide as a secondary reinforcement
in concrete at 600 gms / cum of concrete and containing minimum
127 millions of fibers of length 12mm, diameter 14 microns, specific
gravity 2.68, modulus of elasticity 72 Gpa and having the aspect ratio
(length/dia) of 857, including cost of labour,materials and HOM etc
complete. (NOTE: Rate is for cum of concrete)
4.58 Providing and laying pervious concrete of mix M20 with OPC 320 kgs cum 4,057.00
with 20mm size metal coarse aggregate at 0.69 cum and 12mm size
aggregates at 0.43 cum with chemical admixture at 1.44 kg/cum machine
mixed, laid in layer not exceeding 15 cm thick well compacted for foot
path, drain bed, all round building premises, parking area etc., including
cost of all materials, labour, HOM curing complete as per specifications.

20
Sl. No. Description Unit Rate
Rs. Ps.

Note:

CONCRETE MIX PROPORTIONING


1. IS 456:2000 re-affirmed : 2011 has recommended that minimum grade of concrete shall
not be less than M20 in reinforced concrete work. Design mix concrete is preferred to
nominal mix . If design mix concrete cannot be used for any reason on the work for grades
M20 or lower, nominal mixes may be used with permission of Engineer-in-charge, which
however is likely to involve higher cement content. Accordingly all concrete above M20
grade for RCC work must be design mixes.
PROPORTIONS FOR NOMINAL MIX CONCRETE (Kg per cubic metre of concrete)

Quantities calculated are based on concrete density of 2400 Kg/cum. and proportion
of fine aggregate to coarse aggregate (by mass) generally 1:2 but subjected to an
upper limit of 1:1.5 and a lower limit of 1:2.5.

Mix of Cement Range of Fine Range of Coarse Water - Kgs.


Concrete Content - Kgs Aggregate - Kgs Aggregate - Kgs
1 : 5 : 10 160 615-860 1286-1531 96
1:4:8 180 600-845 1270-1510 108
1:3:6 220 585-820 1230-1462 132
1:2:4 240 575-810 1210-1440 144

DATA FOR MIX PROPORTIONING :

The following basic data are required for mix proportioning of a particular grade of concrete:
a) Exposure condition of the structure under consideration (for guidance see table
3 of IS 456-2000), Re-affirmed : 2011
b) Grade Designation : Minimum grade of concrete to be designed for the type of exposure
condition of the structure under consideration. (for guidance see Tables 3 and 5 of IS
456-2000), Re-affirmed : 2011. This has been reproduced in Appendix.
c) Type of cement, viz., Ordinary Portland Cement (OPC), Portland Pozzolana Cement
(PPC), Portland Slag Cement (PSC) etc.
d) Maximum nominal size of aggregate to be used, viz. 40mm, 20mm and 12.5mm.
e) Minimum cement content (for guidance see Tables 3,4,5 and 6 of IS 456-2000)
Re-affirmed : 2011
f) Maximum water-cement ratio (for guidance see Tables 3 and 5 of IS 456-2000)
Re-affirmed : 2011
g) Degree of workability desired (for guidance see Clause 7 of IS 456-2000)
Re-affirmed : 2011
h) Maximum temperature of concrete at the time of placing.
i) Early age strength requirements, if required.
j) Type of aggregate viz., Granite, Basalt, Natural River Sand, Manufactured Sand etc.,
k) Maximum cement content.
l) Use of admixture, its type and condition of its use. Dosage of admixture shall be decided
based on manufacturers recommendations.

21
Sl. No. Description Unit Rate
Rs. Ps.

CEMENT CONSTANTS FOR CONCRETE GRADE M20 AND ABOVE (FOR OPC 43/53 GRADE CEMENTS)

Cement Cement Water Water


Sl. Grade of Admixtures
Content Content Content Cement
No. Concrete in Kgs.
in Kgs. in bags in Kgs. ratio
M-20
1 300 6.00 165 0.55 3
(PCC)
M-20
2 320 6.40 160 0.50 3
(RCC)
3 M-25 340 6.80 163 0.48 3
4 M-30 360 7.20 162 0.45 3
5 M-35 390 7.80 168 0.43 3
6 M-40 420 8.40 164 0.39 3
7 M-45 440 `8.80 163 0.37 4
8 M-50 450 9.00 149 0.33 4

CEMENT CONSTANTS FOR CONCRETE GRADE M20 AND ABOVE (FOR PPC/PSC)

Cement Cement Water Water


Sl. Grade of Admixtures
Content Content Content Cement
No. Concrete in Kgs.
in Kgs. in bags in Kgs. ratio
M-20
1 320 6.40 176 0.55 3
(PCC)
M-20
2 330 6.60 165 0.50 3
(RCC)
3 M-25 340 6.80 163 0.48 3
4 M-30 360 7.20 162 0.45 3
5 M-35 400 8.00 172 0.43 3
6 M-40 430 8.60 168 0.39 3

Note : Determination of Cement content in Concrete Mixes is based on guidelines given


in :
1) IS 456-2000 Re-affirmed : 2011 - Indian Standard - Plain & Reinforced
Concrete-Code of Practice (4th Revision)
2) IS 10262-2009- Recommended Guidelines for Concrete mix design; and
3) IS SP 23 : 1982 - Hand Book on Concrete mixes.
2. All concrete items are including finishing the exposed surfaces but excluding
plastering.
3. KSRB 4-6.15 : Only the area beneath shall be measured for payment.
7. Lift charges: An additional rate of Rs. 60.00/cum per floor may be added for every
additional floor for items under Sl.No. 4.1 to 4.13 and Rs. 5.00/sqm per floor may
be added for every additional floor for items under Sl. No. 4.19, 4.20, 4.27, 4.28,
4.55, 4.56, 4.57. For 4.43.1 to 4.44.4 an additional rate of Rs. 6/floor may be added.
8. Centering height of 3.5 meters is considered for item No. 4.28, 4.30 to 4.44.4.
An additional rate Rs. 25 shall be added for every additional meter or part thereof
for the above limits.

22
Sl. No. Description Unit Rate
Rs. Ps.

9. Usage of Ground Granulated Blast Furnace Slag as per IS-12089


10. The difference in cost of cement for RMC items shall be effected for every price
revision of cement.
11. RMC : While using RMC, taking out the samples at worksite is mandatory for
conducting necessary tests. It is the responsibility of the contractor to assure
and ensure quality of RMC at the work spot as per design mix for which Executive
Engineer shall obtain necessary test certificates as per IS Standards.
12. TMT Steel : For all RCC works the contractor shall purchase the TMT STEEL
manufactured by the authorized dealers and necessary physical tests for the TMT
Steel so procured shall be conducted. As per IS 1786 if necessary chemical tests
may also be insisted.
For lapping steel reinforcement, preferably 25mm and above, only welding splices
shall be done.

23
Chapter - 5
STONE WORK

24
Sl. No. Description Unit Rate
Rs. Ps.

5.0 STONE WORK


5.1 KSRB 5-1.1 : Providing and constructing granite / trap / basalt rubble cum 1,965.00
stone masonry in foundation with mud mortar (uncoursed), bond
stones at 2m. apart in each course including cost of materials, labour,
curing complete as per specifications. KBS 5.1.12
5.2 KSRB 5.1 : Providing and constructing granite / trap / basalt rubble
stone masonry in foundation with cement mortar (uncoursed), bond
stones at 2m. apart in each course including cost of materials, labour,
curing complete as per specifications. KBS 5.1.12
5.2 KSRB 5.1-2 : - do - with cement mortar 1:8 cum 2,935.00
5.3 KSRB 5.1-3 : - do - with cement mortar 1:6 cum 3,039.00
5.4 KSRB 5.2-1 : Providing and constructing granite / trap / basalt size cum 2,918.00
stone masonry in foundation with mud mortar, stone hammered
dressed in courses not less than 20 cms high, bond stones at 2m. apart
in each course including cost of materials, labour, curing complete as
per specifications. KBS 5.1.12
5.5 KSRB 5.2 : Providing and constructing granite / trap / basalt size
stone masonry in foundation with cement mortar, stone hammered
dressed in courses not less than 20 cms high, bond stones at 2m. apart
in each course including cost of materials, labour, curing complete as
per specifications. KBS 5.1.13
5.5 KSRB 5.2-2 : - do - cement mortar 1:8 cum 3,745.00
5.6 KSRB 5.2-3 : - do - cement mortar 1:6 KBS 5.1.13 cum 3,830.00
5.9 KSRB 5.3-3 : Providing and constructing granite / trap / basalt size cum 4,569.00
stone masonry in basement with cement mortar 1:6, edges of stones
chistle dressed in courses not less than 15 cms high, bond stones
at 2m. apart in each course including cost of materials, labour, curing
complete as per specifications. KBS 5.1.13
5.12 KSRB 5.4 : Providing and constructing granite / trap / basalt size stone
masonry in superstructure with cement mortar, edges of stones chistle
dressed in courses not less than 15 cms high, bond stones at 2m. apart
in each course including cost of materials, labour, scaffolding, curing
complete as per specifications. KBS 5.1.13
5.12 KSRB 5.4-3 : - do - with cement mortar 1:6 cum 4,820.00
5.13 KSRB 5.4-4 : - do - with cement mortar 1:4 cum 5,004.00
5.14 KSRB 5-5 : Extra lift charges for size stone masonry above ground floor cum 260.00
for every additional floor. KBS 5.1.13
5.15 KSRB 5-6 : Extra for constructing stone masonry in square or cum 407.00
rectangular pillars complete as per specifications. KBS 5.1.13

25
Sl. No. Description Unit Rate
Rs. Ps.

5.16 KSRB 5-7 : Extra for constructing masonry in circular pillars including cum 923.00
cost of extra materials and labour complete as per specifications.
KBS 5.1.13
5.17 KSRB 5-8.1 : Providing one line dressing to granite stone slab / Sqm 747.00
granite stone masonry as per specifications. KBS 5.1.13
5.18 KSRB 5-8.2 : Providing two line dressing to granite stone slab / Sqm 1,246.00
granite stone masonry as per specifications. KBS 5.1.13
5.19 KSRB 5-8.3 : Providing three line dressing to granite stone slab / Sqm 1,743.00
granite stone masonry as per specifications. KBS 5.1.13
5.20 KSRB 5-8.4 : Providing pulmane finish only on three line dressed Sqm 492.00
surface as per specifications. KBS 5.1.13
5.21 KSRB 5-8.5 : Providing quoin dressing to stone masonry and m 124.00
stone slabs, two line 5 cms wide on each face as per specifications.
(measurement including mortar joints) KBS 5.1.13
5.22 KSRB 5-9 : Providing chamfering edges to stone slab 2.5 cms. wide m 48.00
as per specifications. (only chamfered length shall be recorded)
KBS 5.1.13
5.23 KSRB 5-10 : Providing hammer dressing to size stones as per No 9.00
specifications. KBS 5.1.13.3
5.24 KSRB 5-11: Providing and constructing load bearing wall with cement
concrete cavity blocks (Hollow blocks) Grade B having a minimum
face shell thickness of 30mm and web thickness of 25mm with block
density between 1100kg/m3 and 1500kg/m3 having a minimum
average compressive strength of 5.00 N/mm2 confirming to IS 2185
(Part 1) : 2005 and constructed with CM 1:4, as per IS 2572:2005
including cost of all materials, labour charges, scaffolding, curing, hire
charges of machineries etc., complete as per specifications.KBS No.5.4
5.24.1 - do - with cement concrete cavity blocks (Hollow blocks) of size Sqm 763.00
400x200x200 mm
5.24.2 - do - with cement concrete cavity blocks (Hollow blocks) of size Sqm 753.00
400x150x200 mm
5.25 KSRB 5-12: Providing and constructing load bearing wall with cement
concrete cavity blocks (Hollow blocks) Grade B having a minimum
face shell thickness of 30mm and web thickness of 25mm with block
density between 1100kg/m3 and 1500kg/m3 having a minimum average
compressive strength not less than 3.5 N/mm2 confirming to IS 2185
(Part 1):2005 and constructed with CM 1:4, as per IS 2572:2005 including
cost of all materials, labour charges, scaffolding, curing, hire charges of
machineries etc., complete as per specifications. KBS No.5.4
5.25.1 - do - with cement concrete cavity blocks (Hollow blocks) of size Sqm 763.00
400x200x200mm

26
Sl. No. Description Unit Rate
Rs. Ps.

5.25.2 - do - with cement concrete cavity blocks (Hollow blocks) of size Sqm 742.00
400x150x200mm
5.26 KSRB 5-14: Providing and constructing load bearing wall with solid
concrete blocks having block density not less than 1800kg/m3 having
a minimum average compressive strength of 4.00 N/mm2 confirming to
IS 2185 (Part 1):2005 and constructed with CM 1:4, as per IS 2572:2005
including cost of all materials labour charges, scaffolding, curing, hire
charges of machineries etc., complete as per specifications. KBS No.5.4
5.26.1 - do - with solid concrete blocks of size 400x200x200mm Sqm 801.00
5.26.2 - do - with solid concrete blocks of size 400x150x200mm Sqm 770.00
5.27 KSRB 5-14.1 : Providing and constructing load bearing wall with solid
concrete blocks having block density not less than 1800kg/m3 having a
minimum average compressive strength of 5.00 N/mm2 confirming to
IS 2185 (Part 1):2005 and constructed with CM 1:4, as per IS 2572:2005
including cost of all materials labour charges, scaffolding, curing, hire
charges of machineries etc., complete as per specifications. KBS No.5.4
5.27.1 - do - with solid concrete blocks of size 400x200x200mm Sqm 759.00
5.27.2 - do - with solid concrete blocks of size 400x150x200mm Sqm 794.00
5.28 KSRB 5-15: Providing and constructing non load bearing wall with solid Sqm 675.00
concrete blocks of size 400x100x200mm having a block density not
less than 1800kg/m3 having a minimum average compressive strength
of 4.00 N/mm2 confirming to IS 2185 (Part 1):2005 and constructed
with CM 1:4, as per IS 2572:2005 including cost of all materials, labour
charges, scaffolding, curing, hire charges of machineries etc., complete
as per specifications. KBS No.5.4
5.29 Providing and fixing Pre cast solid concrete kerb stones made out of CC
1:2:4 and finished with CM 1:3 plastering and finishing cutting etc., complete.
5.29.1 - do - of size 450 x 200 x 400 mm No. 375.00
5.29.2 - do - of size 450 x 150 x 500 mm No. 367.00
5.30 Providing and fixing pre cast solid cement concrete kerb stones No. 340.00
made out of C.C. 1:2:4 with top and bottom width 114 and 165 mm
respectively, 400mm high and 450mm in length finished with CM 1:3
plastering and finishing cutting, including form work, curing, including cost
of all materials, labour, hire charges of machinery, loading, unloading,
lead and lift, transportation etc., complete.
5.31 Providing granite slabs of selected quality roughly dressed and fixed
in cement mortar (1:6) including fixing curing etc., complete.
5.31.1 - do - 7.5 cms thick Sqm 584.00
5.31.2 - do - 10 cms thick Sqm 760.00
5.32 Removing B.S. slab of Drain and stacking. Sqm 82.00
5.33 Removing & Refixing stone slabs of drains and pointing in C.M (1:3) Sqm 87.00
Note :
1. Additional rate of Rs. 35.00/Sqm. for item no. 5.24, 5.25, 5.26, 5.27,
5.28 for every additional floor.
27
Chapter - 6
BRICK WORK

28
Sl. No. Description Unit Rate
Rs. Ps.

6.0 BRICK WORK


6.1 KSRB 6-1.1 :Providing and constructing burnt brick masonry with cum 4,313.00
approved quality of non-modular bricks of standard size of class
designation 3.5 Newton per sqmm with mud mortar for basement and
superstructure including cost of materials, labour charges, scaffolding,
curing complete as per specifications.
Specification No. KBS 6.2
6.2 KSRB 6-1 : Providing and constructing burnt brick masonry for basement
and superstructure with approved quality of non-modular bricks of
standard size of class designation 3.5Newton per sqm with cement
mortar including cost of materials, labour charges, scaffolding, curing
complete as per specifications.
Specification No. KBS 6.2
6.2 KSRB 6-1.2 : - do - with cement mortar 1:8 cum 5,101.00
6.3 KSRB 6-1.3 : - do - with cement mortar 1:6 cum 5,176.00
6.5 KSRB 6-2 : Providing and constructing burnt brick masonry with approved cum
quality of non-modular bricks of standard size of class designation
5.0Newton per sqmm (table moulded) with cement mortar 1:8 for
basement and superstructu/re including cost of materials, labour charges,
scaffolding, curing complete as per specifications.
Specification No. KBS 6.2
6.5 KSRB 6-2.2 : - do - with cement mortar 1:8 cum 5,500.00
6.6 KSRB 6-2.3 : - do - with cement mortar 1:6 cum 5,590.00
6.7 KSRB 6-2.4 : Providing and constructing burnt brick masonry with cum 5,749.00
approved quality of non-modular bricks of standard size of class
designation 5.0 Newton per sqmm with cement mortar 1:4 for
basement and superstructure including cost of materials, labour charges,
scaffolding, curing complete as per specifications.
Specification No. KBS 6.2
6.8 KSRB 6-3 : Providing and constructing burnt brick masonry with approved
quality of non-modular bricks of standard size of class designation
7.5Newton per sqmm with cement mortar 1:8 for basement and
superstructure (Machine moulded Wirecut bricks) with cost of materials,
labour charges, scaffolding, curing complete as per specifications.
Specification No. KBS 6.2
6.8 KSRB 6-3.1 : - do - with cement mortar 1:8 cum 8,081.00
6.9 KSRB 6-3.2 : - do - with cement mortar 1:6 cum 8,154.00
6.10 KSRB 6-3.3 : - do - with cement mortar 1:4 cum 8,312.00
6.11 KSRB 6-3.4 : - do - with cement mortar 1:3 cum 8,471.00

29
Sl. No. Description Unit Rate
Rs. Ps.

6.13 KSRB 6-4 : Providing and constructing burnt brick masonry with
approved quality of modular bricks ground moulded of standard
size of class designation 3.5Newton per sqmm with cement mortar
for basement and superstructure with cost of materials, labour charges,
scaffolding, curing complete as per specifications.
Specification No. KBS 6.2
6.13 KSRB 6-4.2 : - do - with cement mortar 1:8 cum 5,220.00
6.14 KSRB 6-4.3 : - do - with cement mortar 1:6 cum 5,285.00
6.16 KSRB 6-5.2 : Providing and constructing burnt brick masonry with
approved quality of modular bricks of standard size of class
designation 5.0Newton per sqmm (table moulded) with cement mortar
1:8 for basement and superstructure including cost of materials, labour
charges, scaffolding, curing complete as per specifications.
Specification No. KBS 6.2
6.16 KSRB 6-5 : - do - with cement mortar 1:8 cum 5,670.00
6.17 KSRB 6-5.3 : - do - with cement mortar 1:6 cum 5,734.00
6.18 KSRB 6-5.4 : - do - with cement mortar 1:4 cum 5,872.00
6.19 KSRB 6-6.1 : Providing and constructing burnt brick masonry with
approved quality of modular bricks of standard size of class
designation 7.5Newton per sqmm (Machine moulded Wirecut bricks)
with cement mortar 1:8 for basement and superstructure including cost of
materials, labour charges, scaffolding, curing complete as per specifications.
Specification No. KBS 6.2
6.19 KSRB 6-6.1 : - do - with cement mortar 1:8 cum 8,367.00
6.20 KSRB 6-6.2 : - do - with cement mortar 1:6 cum 8,431.00
6.21 KSRB 6-6.3 : - do - with cement mortar 1:4 cum 8,570.00
6.22 KSRB 6-6.4 : - do - with cement mortar 1:3 cum 8,708.00
6.23 KSRB 6-7 : Construction of partition wall 11.2 cms thick with non
modular ground moulded burnt bricks of class designation
with cement mortar 1:4 including providing and fixing plaster
mesh manufactured out of hot dipped galvanised iron of nominal
thickness 0.35 mm. 100 mm. wide as per I.S. 2212/1991 at
7.5 m. c/c including cost of materials, labour charges, scaffolding, curing
complete as per specifications.
Specification No. KBS 6.2
6.23 KSRB 6-7.1 : - do - with bricks of class designation 3.5 Newton per sqmm Sqm 698.00
6.24 KSRB 6-7.2 : - do - with bricks of class designation 5.0 Newton per sqmm Sqm 766.00
6.25 KSRB 6-7 : Construction of partition wall 11.2 cms thick with
non-modular ground moulded burnt bricks of class designation
with cement mortar 1:4 including cost of materials, labour charges,
scaffolding, curing complete as per specifications.
Specification No. KBS 6.2

30
Sl. No. Description Unit Rate
Rs. Ps.

6.25 KSRB 6-7.3 : - do - with bricks of class designation 3.5 Newton per sqmm Sqm 679.00
6.26 KSRB 6-7.4 : - do - with bricks of class designation 5.0 Newton per sqmm Sqm 736.00
6.27 KSRB 6-8.1 :Construction of partition wall 10 cms thick with ground Sqm 636.00
moulded modular burnt bricks of class designation 3.5 Newton per
sqmm with cement mortar 1:4 including providing and fixing plaster mesh
manufactured out of hot dipped gelvanised iron of nominal thickness
0.35 mm. 100 mm. wide as per I.S. 2212/1991 at 7.5 m. c/c including
cost of materials, labour charges, scaffolding, curing complete as per
specifications. Specification No. KBS 6.2
6.28 KSRB 6-8.2 : Construction of partition wall 10 cms thick with table Sqm 685.00
moulded modular burnt bricks of class designation 5.0Newton per
sqmm with cement mortar 1:4 including providing and fixing plaster mesh
manufactured out of hot dipped gelvanised iron of nominal thickness
0.35 mm. 100 mm. wide as per I.S. 2212/1991 at 7.5 m. c/c including
cost of materials, labour charges, scaffolding, curing complete as per
specifications. Specification No. KBS 6.2
6.29 KSRB 6-8.3 :Construction of partition wall 10 cms thick with ground Sqm 606.00
moulded modular burnt bricks of class designation 3.5Newton per
sqmm with cement mortar 1:4 including cost of materials, labour charges,
scaffolding, curing complete as per specifications. Specification No. KBS 6.2
6.30 KSRB 6-8.4 : Construction of partition wall 10 cms thick with table moulded Sqm 655.00
modular burnt bricks of class designation 5.0 Newton per sqmm with cement
mortar 1:4 including cost of materials, labour charges, scaffolding, curing
complete as per specifications. Specification No. KBS 6.2
6.31 Providing and constructing approved quality of standard size precast cum 4,347.00
FLY ASH brick masonry with compresive strength not less than
3.5 Newton per sqmm with cement mortar 1:6 for basement and
superstructure with cost of materials, labour charges, scaffolding, curing
complete as per specifications.
6.32 Provinding and constructing non load bearing wall with Light Weight
Concrete (Autoclaved aerated concrete) Blocks confirming to IS:2185
(part-3) 1984 and IS 6441-1972 of compressive strength of 3.0N/sq mm
with a thin layer of polymer based jointing solvent for super structure
with neccesary scaffolding, curing including cost of all materials, labour,
lead& lift etc, complete as per specifications.
6.32.1 - do - with 600x200x100mm size Blocks Sqm 937.00
6.32.2 - do - with 600x200x150mm size Blocks Sqm 1,253.00
6.32.3 - do - with 600x200x200mm size Blocks Sqm 1,411.00
6.32.4 - do - 600x200x230mm size Blocks Sqm 1,722.00
Note:
1. Lift charges: The above rates are applicable for Ground floor only.
An additional rate of Rs. 60.00/cum and Rs. 6/sqm per floor may be
added for every additional floor above or below the ground floor.
2. Add 10% extra for gable portion.

31
Chapter - 7
STEEL AND ALUMINIUM WORK

32
Sl. No. Description Unit Rate
Rs. Ps.

7.0 STEEL AND ALLUMINIUM WORK


7.1 KSRB 7.1 : Providing and fixing in position collapsible steel shutters Sqm 4,341.00
with single or double leaf with vertical channel 20mmx10mmx2mm
braced with flat iron diagonals 20mmx5mm size, with top and bottom rails
of T iron sections of 40x40x6 mm with 38mm dia steel pulleys complete
with bolt and nuts, locking arrangements, stoppers, handles on both sides
with 7.5cms openings at 10 cms. c to c applying a priming coat of red
lead paint. cost of materials, labour, HOM complete as per specifications.
size of gate 2.4mx1.4m
Specification No. KBS 7.7 / 7.12
7.2 KSRB 7.2 : Providing and fixing 1mm thick M.S. sheet sliding shutters Sqm 2,650.00
with frame and diagonal braces of 40x40x6 mm angle Iron 3.15mm thick
M.S. Gusset plates at junctions and corners, 25mm dia pulley, 40x40x6
mm angles and T iron guide rail top and bottom respectively with handles,
stoppers and locking arrangements etc., including applying a priming
coat of red lead paint cost of materials, labour, HOM complete as per
specifications.
1 double leaf door of size 2.4x2.4m
Specification No. KBS 7.8 / 7.12
7.3 KSRB 7.3 : Providing and fixing 1mm thick M.S. sheet garage door with Sqm 2,274.00
frame and diagonal braces of size 40x40x6 mm angle Iron, 3.15mm thick
M.S. Gusset plates at the junctions and corners, with handles, stoppers
and locking arrangements etc., including applying a priming coat of red
lead paint cost of materials, labour, HOM complete as per specifications.
Double leaf door of size 2.4x2.4m
Specification No. KBS 7.9 / 7.12
7.4 KSRB 7.4 : Providing and fixing 1mm thick M.S. sheet garage door with Sqm 1,777.00
frame and diagonal braces of size 40x40x6 mm angle Iron, using M.S.
flats 30x6 mm for diagonal braces and central cross pieces 3.15mm thick
M.S. Gusset plates at the junctions and corners, with handles, stoppers
and locking arrangements etc., including applying a priming coat of red
lead paint cost of materials, labour, HOM complete as per specifications.
1 double leaf door of size 2.4x2.4m
Specification No. KBS 7.9 / 7.12
7.5 KSRB 7.5 : Providing and fixing pull and push type rolling shutters Sqm 2,172.00
of approved make out of 18 guage, 75mm wide cold rolled steel laths
of convex corrugation, with side guides and bottom rail, with interlocking
arrangements for steel laths by means of alternate clips, suspension shaft
with High tension coil type springs two numbers, mounted on specially
designed pipe shaft, with bracket plates, guide channels, ball bearing
arrangements, for inside & outside locking with push & pull operations
complete including pulling hooks, 4Nos. handles with all fittings and
accessories, painted with a coat of red lead paint (without top cover) cost
of materials, labour, HOM complete as per specifications.
Shutter size 3mx2.8 m
Specification No. KBS 7.10 / 7.12

33
Sl. No. Description Unit Rate
Rs. Ps.

7.6 KSRB 7.6 : Providing and fixing top covers made out of 20 guage m 401.00
M.S. sheet over pull and push rolling shutters bent to shape including
cost of red lead primer coat of painting , materials, labour, HOM complete
as per specifications.
Specification No. KBS 7.10.6 / 7.12
7.7 KSRB 7.7 : Providing and fixing in position in cement concrete Sqm 3,248.00
1:3:6 steel glazed windows and ventilators side hung/top hung fully
openable as per approved drawings using Z angles of 25x33x3mm,
weighing 1.419 Kg/m both for outer and inner frames and central mullion
section of size 25x46x3mm. weighing 2.28Kg/m duly providing T section
19x19x3mm weighing 0.839 kg/m for glazing of windows not more than
34 cms. c/c including providing and fixing 4mm. thick reeded glass with
teakwood beading of required size, all steel sections should confirm to
I.S 7452:1990, 4nos. of holdfasts of approved size, section should be
cut to length welded and electrically grinded subdividing frames of unit
shall be tenonned and revetted into the frames electrically. All the steel
surface shall be throughly cleaned free of rust and painted with one coat
of anti-corosive paint and finishing with two coats of ready mix paint of
approved colour and make including cost of materials, fixtures, labour
and HOM complete as per specifications.
Specification No. KBS 7.12.1 / 7.12.2 / 7.12.3 / 7.12
7.8 KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 Sqm 2,773.00
steel glazed windows and ventilators side hung/top hung 2/3 openable
1/3 fixed as per approved drawings using Z angles of 25x33x3mm,
weighing 1.419 kg/m both for outer and inner frames and central mullion
section of size 25x46x3mm, weighing 2.28kg/m all duly providing T
section 19x19x3mm weighing 0.839 kg/m for glazing of windows, not
more than 34 cms. c to c including providing and fixing 4mm. thick reeded
glass with teakwood beading of required size, all steel sections should
confirm to I.S 7452:1990, 4nos. of holdfasts of approved size, section
should be cut to length welded and grinded electrically subdividing frames
of unit shall be tenonned and revetted into the frames electrically. All
the steel surface shall be throughly cleaned free of rust and painted
with one coat of anti-corrosive paint and finishing two coats of ready mix
paint of approved colour and make including cost of materials, fixtures,
labour charges and HOM complete as per specifications.
7.9 KSRB 7.9 : Providing and fixing M.S.grill work for windows and Kgs 79.00
ventilators using M.S. flats, or M.S. square rods, or combination of M.S.
flats and square rods as per approved design, drawing including cutting
steel sections and welding the same to required pattern with a coat of
red lead primer, cost of materials, fixtures, labour and HOM complete
as per specifications.
Specification No. KBS 7.12
7.10 KSRB 7.10 : Providing and fixing in position aluminium windows
and ventilators as per approved drawings with sliding shutters using
double track window frame section of size 61.85x31.75mm. with

34
Sl. No. Description Unit Rate
Rs. Ps.

1.2mm thick, bottom section weight 0.695 kg/m, sides and top sections
1.3 mm. thick weight 0.659 kg/m; and shutter comprising top and bottom
section of size 40mmx18mm, 1.25mm thick 0.417 kg./m; shutter outer
side 40mmx18mm, 1.25mm.thick weight 0.417 kg/m, shutter interlock
section 40mmx26.7mm, 1.1mm thick, weight 0.469 kg/m. the shutters
mounted on nylon rollers with approved quality of fixtures such as
aluminium handles tower bolts etc.; and providing and fixing 5.5mm. thick
plain glass for shutters fitted with rubber beading aluminium sections
including cutting to required length, joints mitred subdividing the frame
tenonned and rivetted in the assembled frame stiffened with end clips
at corners angles etc., and fixed to the walls, lintels, floor beams/cills
as the case may be with necessary steel screws, raul plugs, or teak
wood gatties including cutting masonry or concrete and making good
the original surface using cement mortar, aluminium sections pretreated
for removal of any Specification No. KBS
7.10.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 3,555.00
7.10.2 -do- using aluminium section powdered coated to a minimum of 60-70 Sqm 3,646.00
microns with exterior durable pure polyester grade powder of approved
quality.
7.11 KSRB 7.11 : Providing and fixing in position aluminium windows and
ventilators as per approved drawings with sliding shutters using three
track window frame of size 92x31.75mm bottom section 1.3mm thick,
weight 1.07kg/m; sides and top sections 1.3 mm, thick, weight 0.933
kg/m.shutter frame section comprising top and bottom section of size
40mmx18mm, wall thickness 1.25mm. weight 0.417 kg./m. shutter side
outer 40mmx18mm. wall thickness 1.25mm. weight 0.417 kg/m, shutter
interlock section 40mmx26.7mm wall thickness 1.1 mm. thick, weight
0.469 kg/m, the shutters mounted on nylon rollers with approved quality
of fixtures such as aluminium handles tower bolts etc.; providing and
fixing 5.5mm. thick plain glass for shutters fitted with rubber beading
all aluminium sections including cutting to required length, joints mitred
subdividing the frame tenonned and rivetted, in the assembled frame,
stiffened with end clips for corners, angles etc., and fixed to the walls,
lintels, floor beams/cills as the case may be, with necessary steel screws,
raul plugs or teak wood gatties including cutting masonry or concrete
and making good the original surface using cement mortar.
7.11.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 3,625.00
7.11.2 -do- using aluminium section powdered coated to a minimum of 60-70 Sqm 3,727.00
microns with exterior durable pure polyester grade powder of approved
quality.
7.12 KSRB 7.12 : Providing and fixing in position aluminium windows and
ventilators as per approved drawings with sliding shutters using four
track window frame of size 122.2x31.75mm. for bottom section 1.1mm
thick, weight 1.205 kg/m; sides and top sections 1.2 mm. thick weight
1.093 kg/m; shutter section comprising top and bottom section of size
40mmx18mm wall thickness 1.25mm. weight 0.417 kg./m, shutter side

35
Sl. No. Description Unit Rate
Rs. Ps.

outer 40mmx18mm. wall thickness 1.25mm. weight 0.417 kg/m, shutter


interlock section 40mmx26.7mm wall thickness 1.1 mm. weight 0.469
kg/m; shutters mounted on nylon rollers with approved quality of fixtures
such as aluminium handles, tower bolts etc.; providing and fixing 5.5mm.
thick plain glass for shutters fitted with rubber beading including cutting
to required length, joints mitred subdividing the frame, tenoned and
riveted in the assembled frame to be stiffened with end clips at corners,
angles etc.; fixed to the walls, lintels, floor beams;cills, as the case may
be with necessary steel screws, raul plugs, or teak wood gatties including
cutting masonry or concrete and making good the original surface using
cement mortar; aluminium sections pretreated for removal of any rust
and coated with greasy materials for non adhesion of mortar and other
sticky materials; ( this coating should be cleaned after installation )
including cost of materials, fixtures, labour and HOM complete as per
specifications.
7.12.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 3,102.00
7.12.2 -do- using aluminium section powdered coated to a minimum of 60-70 Sqm 3,252.00
microns with exterior durable pure polyester grade powder of approved
quality.
7.13 KSRB 7.13 : Providing and fixing aluminium casement windows,
combination of fixed glazing at top fully open able windows using
Z sections of 33mm, web thickness 4mm, weight 0.663 kg/m; central
mullion section 59x33mm with web thickness 3mm section weight
1.123kg/m; the shutters on aluminium hinges with approved quality of
fixtures such as aluminium tower bolts, handles, stays etc., providing
and fixing 5.5mm plain glass for shutters fitted with glazed clips
19mmx17.3mmx11mm. 0.9mm thick and rubber beading, aluminium
sections cutting to required length, joints metered, subdividing the
frame tenoned and riveted, assembled frame to be stiffened with end
clips at corner, angles and fixed to wall, lintel beam, floor; cill, as the
case may be with necessary screws, rawl plugs, cutting masonry or
concrete and making good the original surface; aluminium surface
pretreated for removal of any rust and coated with greasy materials
for non-adherence of mortar or any other sticky materials; (coating
removed after installation) and thoroughly cleaned free from dirt, rust
etc., including cost of materials, fixtures, labour and HOM complete as
per specifications.
7.13.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 3,980.00
7.13.2 -do- using aluminium section powdered coated to a minimum of 60-70 Sqm 4,050.00
microns with exterior durable pure polyester grade powder of approved
quality.
7.14 KSRB 7.14 : Providing, fabricating, assembling and fixing in position
aluminium partitions using sections in combination of plain,
single grove and double grove as per requirements for the frames
of overall size 101.6mm x 44.45mm, 3.18mm.thick having section

36
Sl. No. Description Unit Rate
Rs. Ps.

weight, plain sections 2.40kg/m single grove section 2.541kg/m. and


double grove section 2.683 kg/m and bottom bottom member 114.3
mm x 44.45 mm 3.18 mm thick and 2.6 46 kg/m; aluminium louvres of
size 77.6mmx27.6mm 1.7mm. thick section weight 0.483kg/m; bottom
portions provided with 12mm. thick pre laminated sheet both side of
approved colour lamination exterior grade; aluminium sections of mat
finish or glossy finish using section, spacing of vertical member shall
not exceed 0.6 m. c to c; sections are cut to the required lengths, joints
mitered and corners grinded subdividing frames tennoned and riveted
to the frames, the assembled frame should be stiffened with corner
angles stripped and fixed with screws, rawl plugs and teak wood gutties
to R.C.C.columns or masonry on sides, R.C.C. lintels or beams at top
and floor at bottom, including cutting chistling and making good with
cement mortar to match the surface, providing and fixing bottom panel
filled with the materials to a height of 0.9m. from floor level; and 5.5mm.
thick plain glass for middle portion viz., 0.9m. to 2.13 m. and top panel
with lower sections, the glass and panels fitted with glazing clips of
19mmx17.3mm. with thickness of 0.9mm. weight 0.124kg/m; aluminium
sections pre-treated for removal of any rust and prevention of further
rust formation, and coated with greasy materials for non-adherence of
mortars or any other sticky materials; vertical members embedded in
the flooring by making suitable size holes and fixing with cement mortar,
with necessary opening for fixing of doors of standard size (excluding
cost of door opening) All the frame should be throughly cleaned free
from rust, scale or dirt including cost of materials, fixtures, labour and
HOM complete as per specifications.
7.14.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 3,945.00
7.14.2 -do- using aluminium section powdered coated to a minimum of 60-70 Sqm 3,995.00
microns with exterior durable pure polyester grade powder of approved
quality.
7.15 KSRB 7.15 : Providing, fabricating, assembling and fixing in position
aluminium partitions using aluminium sections of mat finish or glassy
finish in combination of plain grove, single grove and double grove as
per requirements for the frames of overall size 63.5mm x 38.1mm. with
thickness of 2mm. having section weight, plain sections 1.054kg/m,
single grove thickness 1.95mm. section weight 1.094kg/m, double
grove thickness 1.9mm section weight 1.094kg/m and bottom member
114.3 mm. x 44.45mm. thickness 3.18mm. weight 2.646 kg/m;
aluminium louvres section of size 36.5mmx34.93mm 1.45mm. thick
section weight 0.429kg/m; bottom portions provided with 12mm. thick
prelaminated sheet both sides of approved colour lamination exterior
grade upto 0.9m height, spacing of vertical member not exceeding
0.6 m. c to c; sections are cut to the required lengths, joints mitered
and corners grinded subdividing frames tennoned and rivetted to the
frames; the assembled frame stiffened with corner angles, stripped and
fixed with screws, rawl plugs and teak wood gutties to R.C.C.columns
on sides, R.C.C. lintels or beams at top and floor at bottom, including

37
Sl. No. Description Unit Rate
Rs. Ps.

cutting chistelling and making good with cement mortar to match the
surface; providing and fixing 5.5mm. thick plain glass for middle portion
viz., 0.9m. to 2.13 m. and top panel with louvres sections; the glass and
panels fitted with glazing clips of 19mmx17.3mm. of thickness 0.9mm.
weight 0.124kg/m, aluminium sections treated for removal of any rust
and prevention of further rust formation, coated with greasy materials
for non-adherence of mortars or any other sticky materials; vertical
members embedded in the flooring by making suitable sized holes and
fixing with cement mortar, with necessary opening for fixing of door of
standard size (excluding cost of door ) all the frame thoroughly cleaned,
free from rust, scale or dirt including cost of materials, fixtures, labour
and HOM complete as per specifications.
7.15.1 -do- using aluminium section anodized to 12 15 microns. Sqm 2,803.00
7.15.2 -do- using aluminium section powdered coated to a minimum of Sqm 2,860.00
60-70 microns with exterior durable pure polyester grade powder of
approved quality.
7.16 KSRB 7.16 : Providing, fabricating, assembling and fixing in position
aluminium shutters to the existing door frame in the partition using
47.62x44.45mm section thickness 3.18mm, weight 1.505kg/m for
vertical frame; 47.62x44.45 thickness of 3mm, weight 1.42kg/m for top
section, 49.91mmx44.45mm with wall thickness 3mm, weight 1.495kg/m
for central rail; and 114.3mmx44.45mm thickness 3.18mm, weight
2.646kg/m for bottom rail; aluminium sections and cut to length joint
metred and corners grinded, the bottom rail and top rail hinged or pivoted,
opening arrangements including providing and fixing standard approved
accessories, such as aluminium handles, tower bolts, lock, pivots: hinges
P.V.C. or rubber gasket, 12mm prelaminated sheets (Novopan) exterior
grade of approved colour both sides same colour for bottom panel
of maximum height 0.90m and 5.5mm thick plain glass for top panel
(Novopan) and glass fixed with glazed clips 19mmx17.3mmx11mm,
0.9mm thick, weight 0.124kg/m; aluminium sections treated for removal of
any rust and prevention of further rust formation, and coated with greasy
materials for non-adherance of mortars or any other sticky materials,
including cost of materials, fixtures, labour and HOM complete as per
specifications.
7.16.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 3,314.00
7.16.2 -do- using aluminium section powdered coated to a minimum of Sqm 3,348.00
60-70 microns with exterior durable pure polyester grade powder of
approved quality.
7.17 KSRB 7.17 : Providing, fabricating, assembling and fixing in position
aluminium doors using following aluminium mat finish or glossy
finish, outer frame plain section 101.6x44.45mm thickness 3.18mm,
section weight 2.404 kg/m, door shutters vertical section 44.62x44.45mm
thickness 3.18mm, section weight 1.505kg/m, top section 47.62x44.45mm
thickness 3.00mm, section weight 1.426kg/m bottom section 114.3x44.45

38
Sl. No. Description Unit Rate
Rs. Ps.

thickness 3.18mm, section weight 2.646kg/m, door central section


49.91x44.45mm thickness 3.00mm, section weight 1.495 kg/m glazing
clips 19x17.3x11mm thickness 0.9mm section weight 0.124kg/m;
aluminium sections cut to length joint metred corners grinded, the
shutters pivoted opening arrangement with heavy duty aluminium alloy
automatic door closures floor mounted, providing and fixing standard
approved accessories, such as aluminium handle for full width or length,
tower bolts, lock, pivots: P.V.C. or rubber gasket with 5.5m. thick plain
glass for top and bottom panel; aluminium sections treated for removal of
any rust and prevention of further rust formation, and coated with greasy
materials for non-adherance of mortars or any other sticky materials;
the assembled frame fitted with the corner angles, strips and fitted with
screws, rawl plugs or teakwood gutties to R.C.C. columns or masonry
on sides. beams and flooring in bottom. including cutting, chistling and
making good with cement mortar to match the surface; all the frames
throughly cleaned free from rust, scale, or dirt including cost of materials,
fixtures, labour and HOM complete as per specifications.
7.17.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 5,109.00
7.17.2 -do- using aluminium section powdered coated to a minimum of Sqm 5,183.00
60-70 microns with exterior durable pure polyester grade powder of
approved quality.
7.18 Providing and fixing of Aluminium composite panel of approved make Sqm 3,283.00
and colour for wall cladding for straight Brick/Rcc/stone walls & coloumns/
beams with necessary aluminium frame works at required level made
out of 50x25x4mm C section or equivalent. The panel should consist of
3mm thick non-halogonated FR grade mineral based polymer core (2 hrs
fire resistance as per ASTM E119-12 & clause B, S1, do as per BS476
EN 13501) sandwiched between 0.50mm skin thick aluminium sheet
making a total panel thickness of 4mm. The surfaces will be finished
with PVDF based coating on topsides and service coating on reverse
sides would be in polyester paint. The system shall be fixed using GI
brackets, aluminium L cleats and stainless steel bolts and nuts complete
with spring washer and cap nuts and all other necessary accessories,
sealing shall be done using weather sealant of Dow Corning 789 with
necessary rods etc., complete.
7.19 Providing and fixing of Aluminium composite panel of approved Sqm 3,666.00
make and colour for wall cladding for curved Brick/Rcc/stone walls &
coloumns/beams with necessary aluminium frame works at required
level made out of 50x25x4mm C section or equivalent. The panel
should consist of 3mm thick non-halogonated FR grade mineral
based polymer core (2 hrs fire resistance as per ASTM E119-12 &
clause B, S1, do as per, BS476 EN 13501) sandwiched between
0.50mm skin thick aluminium sheet making a total panel thickness
of 4mm. The surfaces will be finished with PVDF based coating on
topsides and service coating on reverse sides would be in polyester paint.
The system shall be fixed using GI brackets, aluminium L cleats and

39
Sl. No. Description Unit Rate
Rs. Ps.

stainless steel bolts and nuts complete with spring washer and cap nuts
and all other necessary accessories, sealing shall be done using weather
sealant necessary rods etc., complete.
7.20 Providing, fabricating and fixing of stick type structural glazing using Sqm 5,544.00
Alluminium Extrusions of 63.5 mm x 58.00 mmx 2.25 mm of 1.73 kgs/
mtr for vertical and Horizontal members and 63.5 mm x 38.1 x 1.33
mm of 0.759 kg/Mtr, as outer frame with Electro Anodized Paint coated
block finishing, using 6mm thick imported glass reflective hard coated
ocean blue raw glass with all necessary accesories like ultra glass
Silicon sealant of Space tape, Masking tape, Galvanized Anchaor
bolt, machine screws, 6mm thick M.S. angle 50mm x 150mm x 6mm
M.S. Galvanized L Brackets, structural sealent setting clocks, fasteners,
wall connection etc., complete.
7.21 “Providing fusion bonded epoxy coating not less than 175 microns
thickness and upto 300 microns to reinforcement of all diameters as per
IS: 13620-1993 including testing of coating at plant. The rate is inclusive
of cost on account of careful handling, PVC coated binding wire instead
of GI Binding wire, touch up material supplied by coating agency, repair
work, loading, unloading and straightening of bent rods etc., complete
as per specification and as directed by the Engineer in charge. (Inclusive
of all taxes but excluding transportation charges)
7.21.1 _do_For 10mm to 16mm dia bars Tonne 8,780.00
7.21.2 _do_For 20mm to 32mm dia bars Tonne 6,983.00
7.22 Providing , fabricating, assembling and fixing in position aluminium
partition using 101.60mm x 44.45mm x 3.18mm aluminium, mat
finish or glossy finish , anodized sections combination of plain, single
groove and double groove members should not exceed 0.60mc/c and
bottom member of required lengths, joints mitred and corner grinded
sub dividing assembled frame should be stiffened with corner angles.
Stripped and fixed with screws rawl plug and teakwood guttas to RCC
column or masonry on sides. RCC lintels or beams at top and mosaic
floor at bottom; including cutting chistelling and making good with
cement mortar to match the surface .Providing and fixing 12mm. thick
prelaminated sheet (Ecoboard – exterior grade) of approved colour
for bottom panel of maximum height 0.9m, and 5.50 mm thick plain or
pin headed glass for middle panel and top panel with glazing clips pf
19.05mm.x17.30mm.1.00mm. All the aluminium sections used should be
treated for removal of any rust and prevention of further rust formation
and coated with greasy materials for non adherence of mortar or any
other sticky materials: The vertical members should be embedded in the
flooring by making suitable size holes and fixing with cement mortar.
All the frame should be thoroughly cleaned free from rust, scale or dirt.
work should be carried out as per direction of engineer-in-charge of the
work with all lead and lift as per chief Architect’s drawing etc., complete
to a degree of perfection.

40
Sl. No. Description Unit Rate
Rs. Ps.

7.22.1 -do- using aluminium section anodized to 12 - 15 microns. Sqm 2,083.00


7.22.2 -do- using aluminium section powdered coated to a minimum of 60-70 Sqm 2,166.00
microns with exterior durable pure polyester grade powder of approved
quality.
7.23 Providing and fixing door frame with or without ventilator made out Sqm 1,666.00
of cold rolled steel section of thickness 1.25mm formed into section
of 60mm x 105mm welded to form a rectangular door conforming to
IS 513-1973 and phosphated and painted and with one coat of red oxide
primer, two coat of approved enamel paints the frame work with 4nos.
of hold fast of size 200 x 25 x 4mm fixed in cement concrete 1:3:6 of
20mm down size jelly and 4nos. of ISI marked hinges 125mm long welded
to the frame and fixed with shutter made out of Honne wood styles and
rails of 30mm thick with panels of 12mm thick ‘Ecoboard’ Plain Particle
Board of exterior grade conforming to IS- 3087 excluding the cost of
fixtures but including labour charges for fixing of fixtures.. The hollow
portion of the frame to be filled with c.c1:2:4 of 20mm down size jelly.
7.24 “Providing and fixing cold rolled prepainted steel windows of
IS standards, made out of 0.6mm thick deep drawing quality galvanised
on both sides 120gms/sq.mtr. Primer coat upto 5 microns with
thermosetting epoxy resin and finish painted with a polyester based
paint 20 microns thick. The size of profiles is approximately 46x52mm
for external frames, 46x46mm section for shutters, 46x70mm section for
centre mullion/transom and 18x31mm section is for fixing glasses. The
section should be cut to length joint mitred and assembling by means of
corner brackets made out of cold rolled cold annealed strips of 1.2mm
thick duly galvanised and fixed with nickle plated self taping screws. The
shutters are provided with approved quality of fixtures like handles made
out of zamac alloy die cast and powder coated, receiver made out of
glass filled nylone and hinges made out of CRCA powder coated. 4mm
thick glass should be fixed with EPDM gaskets. Guard bars fabricated
out of 10mm square bright bars shall be fixed horizontally at 125mm
C/C by rivetting to the external frame. The above frames are fixed to the
concrete / masonry walls by means of self expanding screws.”
7.24.1 a) - do- with 4mm float glass without gaurd bars Sqm 3,666.00
b) - do- with 4mm tinted glass without gaurd bars Sqm 3,750.00
c) - do- with 4mm float glass with gaurd bars Sqm 4,375.00
d) - do- with 4mm tinted glass with gaurd bars Sqm 4,458.00
7.25 Providing and fixing cold rolled prepainted steel partitions of IS Sqm 2,083.00
standards, made out of 0.6mm of deep drawing quality galvanised on both
sides 120gms/Sq.mtr. Primer coated upto 5 microns with thermosetting
epoxy resin and finish painted with a polyester based paint 20 microns
thick. The size of profiles is 46X52mm for external frame, section for
mullion or transom is of size 46x70mm and section for fixing glass/board

41
Sl. No. Description Unit Rate
Rs. Ps.

is of 18x31mm. The section should be cut to length joint mitred and


assembling by means of corner brackets made out of cold rolled cold
annealed strips of 1.2mm thick duly galvanised and fixed with nickel
plated self taping screws. 5mm thick glass should be fixed with EPDM
gaskets. 10mm thick prelaminated particle board shall be fixed with the
help of the clipping bead. The above frames are fixed to the concrete /
masonry walls and floors by means of self expanding screws.
7.26 Supplying and fixing pressed steel door frames size 125x65 mm Sqm 2,675.00
manufactured from 1.25mm thick carbon steel or imported steel strips
with mitred joints of 900 for door openings and shutters made out of
seasoned Honne wood, styles of 30 mm, thick with lock rail of 160
mm, width, top and side rails of 100 mm. width and bottom rails of 250
mm width and panel filling with 12mm thick particle board of exterior
grade bonded with phenol formal dehide resin and the shutter shall
be rot proof, vermin proof, heat resistant guaranteed against shrinkage,
warpage and such other defects for a period of 3 years. This shall be as per
approved drawings, specification and direction including cost of conveyance,
manufacturing, painting with enamel paint 2 coats over primer coat, cost of
labour for all items of work, machinery, equipment and all other incidental
charges with all lead, lift, loading and unloading etc., complete. The Hollow
portion of the frame to be filled with cement concrete 1:2:4.
7.27 “Supplying and fixing pressed steel window frame of size 100 x 50mm Sqm 2,958.00
manufactured from 1.25 mm thick carbon steel or imported steel strips
with neat mitred joints at 900degree for window openings and shall be
suitable to fix M.S. grills as per design and drawings using 12mm dia rods
at 100mm Centre to Centre horizontally and two members of M.S flats of
6mmx40mm size at 150mm apart, welded into a frame of 6mmx40mm
size M.S. flats with 16mm size lugs, and 8 Nos. of 100mm size hinges,
4 Nos of Butt Stay pins and 4 Nos. Tower bolts and shutters half panelled
and hallf glazed with shutters made out of seasoned honne wood, styles
of 30mm thick and 100mm width and rails of 30mm thick and 100mm
width and using 4mm thick pin headed glass and panel, filling with 12mm
thick particle board of exterior grade bonded with phenol formal dehide
resin and the shutter shall be rot proof vermin proof, heat resistant
guaranteed against shrinkage, warp age and such other defects for a
period of 3 years.This shall be as per approved drawing, specification
and direction including cost of conveyance, manufacturing painting with
2 coats enamel paint over one coat of primer, cost of labour for all items
of work, machinery, equipment and all other incidental charges with all
lead, lift loading and unloading etc., complete. The Hollow portion of the
frame to be filled with cement concrete 1:2:4.”
7.28 Providing electric welding using carbon electrodes including cost of cm 2.50
welding machine, power charges, welding rods, and labour charges for
welding etc., complete as per specification.

42
Sl. No. Description Unit Rate
Rs. Ps.

7.29 Fabrication supplying and erecting M.S. tubular trusses of all spans as Kgs 92.00
per approved drawing & design with prefabricated steel applications using
quality material and are durable, reliable and corrosion and abrasion
resistant. Welding shall confirm to latest structural welding code. Quality
shall be on various parameters like shape, size, design gauge and
polish. The entire trusses is anchored in RCC column by using 4 nos
of M.S. anchor bolts at each support with 10mm thick base plate and
shoe plate. The work includes cutting, straightening, placing in position
of M.S. pipes and welding wherever necessary and applying one coat of
redoxide primer coat to all the members including cost of all materials,
labour charges, and hire charges of machineries for cutting, welding,
grinding and erection equipments, with all lead and lift, transportation,
letc., complete as per specification
7.30 Fabricating, supplying & erecting M.S. Angular Truss for all spans as per Kgs 107.00
approved designs and drawing. The entire truss is anchored suitably by
using 4 Nos. of M.S. anchor bolts at each support, with base plate and
shoe plate. The work includes cutting, straightening, placing in position of
M.S angle and welding wherever necessary, and applying one coat of red
oxide primer coat to all the members including cost of all materials, labour
charges, & hire charges of machineries for cutting, welding, grinding &
erection equipments, etc., complete as per specification
7.31 Fabricating, providing and erecting in poiston of M.S. Ornamental Kgs 110.00
security Grill Gate without hot dip using 75 x 12mm M S Flat for alround
frame work with verticals at the centre and horizontal centere support M
S Square of 20 x20 mm of different heights as shown in the drawing are
to be fixed at 16 cms C/C for square bars of full height and at 8cms C /
C for bottom rods providing ornamental C I Designers at the bottom and
C I arrows in the midle and top. The entire frame work is to be fixed by
means of expansion bolts to the brick pillars with necesary drilling holes.
the work includes providing two coats of enamel painting over one coatr
of red lead ready mix primer coat etc complete cost of all labour, painting,
erection charges using hoist pulleycranes with all lead and lift, loading,
transporting and unloading using hoist pulley cranes, scaffolding charges
and all other incidental charges required for successful completion fo
the work as per specification and drawings.
7.32 Fabricating, providing and erecting in poiston of Hot dip galvanised Kgs 125.00
M.S.Ornamental security Grill Gate using 75 x 12mm M S Flat for
alround frame work with verticals at the centre and horizontal center
support M S Square of 20 x20 mm of different heights as shown in the
drawing are to be fixed at 16 cms C/C for square bars of full height and
at 8cms C / C for bottom rods provide ornamental C I Designers at the
bottom and C I arrows in the middle and top. The entire frame work is to
be fixed by means of expansion bolts to the brick pillars with necessary
drilling holes. the work includes providing two coats of enamel painting
over one coat of red lead ready mix primer coat etc complete cost of all
labour, painting, erection charges using hoist pulleycranes etc as per
specification and drawings.

43
Sl. No. Description Unit Rate
Rs. Ps.

7.33 Fabricating, providing and erecting in poiston of M S Ornamental Kgs 125.00


security Grill without hot dip using 75 x 12mm M S Flat for alround
frame work with verticals at the centre and horizontal centere support
M S Square of 20 x20 mm of different heights as shown in the drawing
are to be fixed at 16 cms C/C for suqare bars of full height and at 8cms
C / C for bottom rods providg ornamental C I Designers at the botom
and C I arrows inthe midle and top. The entire frame work is to be fixed
by means of expansion bolts to the brick pillars with necesary drillling
holes. the work includes providing two coats of enamel painting over
one coatr of red lead ready mix primer coat etc complete cost of all
labour, painting, erection charges using hoist pulleycranes etc as per
specification and drawings.
7.34 Fabricating, providing and erecting in poiston of Hot dip galvanised Kgs 149.00
M S Ornamental security Grill using 75 x 12mm M S Flat for alround
frame work with verticals at the centre and horizontal centere support M
S Square of 20 x20 mm of different heights as shown in the drawing are
to be fixed at 16 cms C/C for suqare bars of full height and at 8cms C /
C for bottom rods providg ornamental C I Designers at the botom and C I
arrows inthe midle and top. The entire frame work is to be fixed by means
of expansion bolts to the brick pillars with necesary drillling holes. the
work includes providng two coats of enamel painting over one coatr of
red lead ready mix primer coat etc complete cost of all labour, painting,
erection charges using hoist pulleycranes with all lead and lift, loading,
transporting and unloading using hoist pulley cranes, scaffolding charges
and all other incidental charges required for successful completion fo
the work as per specification and drawings,
7.35 Providing and fixing M.S. Hand railing for Balcony/Staircase etc., Sqm 2,366.00
with 50mm dia. M.S. hollow pipe of 14 gauge, welded to 20mmx20mm
M.S. square rod placed vertically, spaced at 100mm at regular intervals
of 600mm. These vertical rods laterally tied to 3 horizontal rods spaced
at equal interval. These assembly is fixed to concrete by using expansion
bolts and welding the same to reinforcement bars and making good the
surface. All the joints and sections hould be cut to length, welded and
grinded wherever necessary etc., complete . The work includes cost of all
materials, labour charges for all items of work, hire charges for welding,
cutting and grinding equipment, and electricity charges, etc., complete
as per specification and drawing.
7.36 Providing and fixing M.S. Grill over existing compound wall as Sqm 4,473.00
per using 16mm x 16mm M.S. Square rod at 150mm c/c spacing
and 6mm x 40mm M.S. flats at horizontal and 6mm x12mm M.S.
flat for ornamental design and providing shop edge design at the
vertex of every vertical rods, including welding, grinding wherever
necessary. All the steel surface should be thoroughly cleaned
free of rust and painted with anti corrosive paint (shop paint) etc.,
complete. The work includes cost of all materials, labour charges
for all items of work, hire charges for welding, cutting and grinding
equipment, and electricity charges, etc., complete as per specification.

44
Sl. No. Description Unit Rate
Rs. Ps.

7.37 Providing and fixing M.S. Gate as per Chief Architect Drawing, Sqm 2,509.00
using 50mm x 50mm 14 guage M.S. hollow pipe frame work bent to
ornamental shape as shown in the drawing and 35mm x 6mm and 16 x
16mm Square rods for verticals alternatively spaced at 4cms c/c in two
halves and 40mmx6mm M.S. flats for horizontal member and at the top
cast iron spikes are provided at alternate vertical members as shown in
the drawing etc., complete. All the steel surface should be thoroughly
cleaned free of rust and painted with anti corrosive paint (shop paint) etc.,
complete. The work includes cost of all materials, labour charges for all
items of work, hire charges for welding, cutting and grinding equipment,
and electricity charges, with lead and lift, loading and unloading charges,
etc., complete as per specification.
7.38 Providing and fixing stainless steel 304 grade for staircase railings, Sqm 5,017.00
balconies, ramps, with hand rail, 50mm dia 16 guage hollow pipe
welded to vertical hollow 50mm dia pipe of 16 guage, stainless steel
vertical pipe spaced at 1.20m regular intervals and 5 Nos of 25mm
dia. Stainless steel hollow horizontal pipe are welded to vertical 50mm
dia hollow pipe. The entire assembly is fixed to staircase concrete by
using expansion bolts by drilling concrete etc., complete including cost
of materials, labour, HOM of and electrical charges, etc., complete as
per specifications.
7.39 Providing and fixing 304 - grade stainless steel hand rails of 14-gauge Sqm 4,481.00
pipes for Ramps staircase made out of stainless steel hallow pipes,
using 50mm dia for verticals @1.60 mtr c/c fixed tot he ramps or steps
by drilling with bolts and 100mm dia MS base plates 10mm gauge for
fixing of Vertical pipes 4 - Nos anchor bolts & 40mm dia pipes fixed
horizontally for 2-rows top, one pipes fixed with vertical pipes another
one fixed with elbows and 25mm dia pipes are fixed horizontally for
2-rows below top measure @ equal intervals including cutting, welding,
bending wherever necessary with suitable caps @ tops, bottoms &
corners finishing with mat / shining etc., complete including cost and
conveyance of all materials, labour for all items of work, HOM with all
lead and lift, loading and unloading, transportation charges and all other
incidental charges etc., complete as per specification and directions of
the Engineer-in-charge of the work.
Ramps or Staircase for physically challenged.
7.40 Providing and fixing of customized Aluminium formwork for monolithic Sqm 125.00
construction RCC members with a repetitive usage of 100 times using
grade 5052 aluminium for panel sheets of miniumum 4 mm thick and
grade 6061 (Type-6) aluminium for extruded sections. The form work
includes of beam components i.e. beam side panel, prop head for soffit
beam, beams soffit panel, beam soffit bulk head and deck components
i.e. deck panel, deck prop, prop length, deck mid, soffit length, deck

45
Sl. No. Description Unit Rate
Rs. Ps.

beam bar and wall components i.e. wall panel, rocker, kiker and internal
soffit corner, external soffit corner, external corner, internal corner etc.
The panels are held in position by a simple pin and wedge system that
passes through holes in the out side rib of each panel. The tolerance
of finished panels to be (-1 mm) and shall conform to IS 14687-1999.
Pins and wedges to be made of high grade mid steel, all complete as
per direction of Engineer-incharge. (Cost of RCC work shall be paid
separately)

Note :

1. KSRB 7-14 and KSRB 7-15: Door opening shall only be deleted from the
overall measurements and balance area shall only be considered for
payment.
2. Lift charges: The above rates are applicable for Ground and basement
floors only. Add an additional rate of Rs. 6.00/sqm per floor above or below.

46
50mm

50mm

47
1200mm c/c
1200mm c/c
Chapter - 8
ROOFING

48
Sl. No. Description Unit Rate
Rs. Ps.

8.0 ROOFING
8.1 KSRB 8.1 : Providing and fixing in position stone slab roofing Sqm 965.00
10 to 12 cms thick laid to line and level over wooden rafters or R.C.C.
battens, pointing exposed joints with cement mortar 1:4 including cost
of materials, labour, curing complete as per specifications. ( wooden
rafters and R.C.C. battens to be paid seperately)
Specification No. KBS
8.2 KSRB 8.2 : Providing and fixing in position black cuddapah slab / Sqm 530.00
Shahabad slab / Thandur blue slab 4 cms thick for roofing laid to
line and level over wooden rafters or R.C.C. battens pointing exposed
joints with cement mortar 1:4 including cost of materials, labour, curing
complete as per specifications. (wooden rafters and R.C.C. battens to
be paid seperately )
8.3 KSRB 8.3-1 : Providing and laying to required line and slope roofing with Sqm 288.00
corrugated asbestos cement sheet 6mm. thick fixed with galvanised
iron J or L hooks, bolts and nuts 8mm. dia C.I plain and bitumen washers
over the existing purlins, rafters and trusses including cost of materials,
labour, complete as per specifications.
Specification No. KBS 8.5
8.4 KSRB 8.5 : Providing and laying cinder concrete in cement 1:15 cum 1,663.00
(1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or
sunken slabs, laid to slope compacting, including cost of materials,
labour, curing complete as per specifications.
8.5 KSRB 8.6-1 : Providing and fixing on wall surface cast iron rain down m 824.00
water pipes 75mm dia including filling the joints with spun yarn soaked
in neat cement slurry 1:2 with necessary specials like shoes, bends
and offsets fixed with iron clamps, wall plugs, screws, including cost of
materials, labour, complete as per specifications.
8.6 KSRB 8.3-2 : Providing and laying to required line and slope roofing Sqm 311.00
with semi-corrugated ( Trafford ) asbestos cement sheet 6mm. thick
fixed with galvanised iron J or L hooks, bolts and nuts 8mm. dia C.I
plain and bitumen washers, over the existing purlins, rafters and trusses
including cost of materials, labour, complete as per specifications.
8.7 KSRB 8.3-3 Extra for A.C. sheet corrugated / semi-corrugated sheet Sqm 12.00
roofing with vertical sheeting to a pitch exceeding 60 degrees
8.8 KSRB 8.3-4 : Providing and fixing ridges, hips with asbestos cement m 250.00
sheet roofing with G.I. J or L hooks, bolts and nuts 8mm. dia G.I.plain
and bitumen washers, serrated or plain wings, adjustable ridges,
including cost of materials, labour, complete as per specifications.
8.9 KSRB 8.3-5 : Providing and fixing northlight adjustable ridges, hips m 176.00
with asbestos cement sheet roofing with G.I. J or L hooks, bolts and
nuts 8mm. dia G.I.plain and bitumen washers, serrated or plain wings,
adjustable ridges, including cost of materials, labour, complete as per
specifications.

49
Sl. No. Description Unit Rate
Rs. Ps.

8.10 KSRB 8.4 : Providing and fixing Mangalore tile roofing using first class
tiles with necessary special tiles for ridges and hips, wood reepers and
pointed with cement mortar 1:4 over the existing rafters including cost of
materials, labour, curing complete as per specifications. Specification
No. KBS 8.17
8.10 KSRB 8.4-1 : – do – Teak wood reepers of size 50x25mm Sqm 889.00
8.11 KSRB 8.4-2 : – do – Nandi wood reepers of size 50x25mm Sqm 663.00
8.12 KSRB 8.4-3 : – do – Jungle wood reepers of size 50x25mm Sqm 550.00
8.14 KSRB 8.6 : Providing and fixing on wall surface asbestos cement rain
down water pipes including filling the joints with spun yarn soaked
in neat cement slurry 1:2 with necessary specials like shoes, bends
and offsets fixed with iron clamps, wall plugs, screws, including cost of
materials, labour, curing complete as per specifications.
Specification No. KBS 8.27, 8.28
8.14 KSRB 8.6-3 : – do – 75 mm dia m 320.00
8.15 KSRB 8.6-4 : – do – 100 mm dia m 349.00
8.16 KSRB 8.6 : Providing and fixing on wall surface 2.5 kg / sq.cm H.D.P.E.
rain down water pipes of approved make and brand with necessary
specials like shoes, bends and offsets fixed with iron clamps, wall
plugs, screws, including cost of materials, labour, curing complete as
per specifications.
8.16 KSRB 8.6-5 : – do – 2.5kg / sq.cm H.D.P.E. rain down water pipes m 304.00
90mm outer dia
8.17 KSRB 8.6-6 : – do – 2.5kg / sq.cm H.D.P.E. rain down water pipes m 360.00
110mm outer dia
8.18 KSRB 8.6 : Providing and fixing on wall surface 4.0 kg / sq.cm H.D.P.E.
rain down water pipes 90 mm outer dia. approved make and brand
with necessary specials like shoes, bends and offsets fixed with iron
clamps, wall plugs, screws, including cost of materials, labour, complete
as per specifications.
8.18 KSRB 8.6-7 : – do – 4.0 kg / sq.cm H.D.P.E. rain down water pipes m 326.00
90mm outer dia
8.19 KSRB 8.6-8 : – do – 4.0 kg / sq.cm H.D.P.E. rain down water pipes m 426.00
110mm outer dia
8.20 KSRB 8.7 :Providing and fixing in position 10mm thick plaster
of paris (Gypsum anhydrous) for ceiling upto a height of
5 m above floor level over aluminium strips 25mm / 6mm with 10mm
gap in between and reinforced with rabbit wire mesh fixed to metal frames
including cost of materials, labour, curing complete as per specifications.
8.20 KSRB 8.7-1 : – do – ceiling flat surface Sqm 1,105.00
8.21 KSRB 8.7-2 : – do – ceiling curved surface Sqm 1,232.00

50
Sl. No. Description Unit Rate
Rs. Ps.

8.22 KSRB 8.7-3 : Extra over item No. 8.7-1 and 8.7-2 for any sunk or raised Sqm 496.00
moulded design plaster of paris (Gypsum anhydrous) ceiling
8.23 KSRB 8.7-4 : Extra over item No. 8.7-1 and 8.7-2 for providing plaster Sqm/m 133.00
of paris (Gypsum anhydrous) ceiling above 5 m height from floor level
8.24 KSRB 8.7-5 : Providing and fixing in position 12mm thick plaster of Sqm 972.00
paris (Gypsum anhydrous) for ceiling reinforced with hessian cloth
flat surface with ceiling tiles up to a height of 5 m above floor level over
aluminium strips 25mm x 6mm and rendered smooth with plaster of paris
including cost of materials, labour, curing complete as per specifications.
8.25 KSRB 8.7-6 : Extra over item No. KSRB 8.7-5 for providing plaster of Sqm/m 59.00
paris (Gypsum anhydrous) ceiling tiles above 5 m height from floor level
8.26 Providing top layer with 12mm thick silica latex plaster with smooth Sqm 287.00
finishing on top surface.
8.27 Providing and fixing 6mm clear / opal white / solar / bronze / blue / Sqm 2,604.00
green tinted multi wall poly carbonate sheet for tubular structure. The
work including cost of all materials, labour charges and hire charges
of machineries for cutting, welding, grinding and erection equipments,
with all lead and lifts, transportation, loading and unloading and all other
incidental charges etc. complete as per specification and directions of
the engineer in charge of the work.
8.28 Providing and Fixing 15 mm thick densified tegular edged eco friendly Sqm 1,253.00
light weight calcium silicate false ceiling tiles of approved texture of
size 595 x 595 mm in true horizontal level, suspended on inter locking
metal grid of hot dipped galvanized steel sections (galvanizing @ 120
grams per sqm including both side) consisting of main 'T' runner suitably
spaced at joints to get required length and of size 24 x 38 mm made
from 0.33 mm thick (minimum) sheet, spaced 1200 mm centre to centre,
and cross 'T' of size 24 x 28 mm made out of 0.33 mm (minimum) sheet,
1200 mm long spaced between main 'T' at 600 mm centre to centre to
form a grid of 1200 x 600 mm and secondary cross 'T' of length 600 mm
and size 24 x 28 mm made of 0.33 mm thick (minimum) sheet to be inter
locked at middle of the 1200 x 600 mm panel to from grid of size 600 x
600 mm, resting on periphery walls / partitions on a Perimeter wall angle
pre-coated steel of size (24 x 24 x 3000 mm made of 0.40 mm thick
(minimum) sheet with the help of rawl plugs at 450 mm centre to centre
with 25 mm long dry wall screwes at 230 mm intervals and laying 15 mm
thick densifed edges calcium silicate ceiling tiles of approved texture in
the grid, including cutting / making opening for services like diffusers,
grills, light fittings, fixtures, smoke detectors etc., wherever required. Main
'T' runners to be suspended from ceiling using G.I. slotted cleats of size
25 x 35 x 1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash
fasteners, 4 mm G.I. adjustable rods with galvanised steel level clips of
size 85 x 30 x 0.80mm spaced at 1200 mm centre to centre along main
'T', bottom exposed with 24 mm of all T sections shall be pre-painted
with polyster baked paint for all heights, as per specifications, drawings
and as directed by Engineer-in-charge.

51
Sl. No. Description Unit Rate
Rs. Ps.

8.29 Providing and fixing of pre pigmented extruded orange cement roof Sqm 601.00
tiles of size 420mm x 330mm with necessary specials such as Ridges,
Barges and Nails etc. including cast of providing PVC (6.00kgs/sq cm)
gutters of min 6” radius and down water pipes of 4” dia as per the roof
design on EXISTING MS/WOODEN ROOF or TRUSS. Including cost
of materials, scaffoldings, labour etc., compelte as per specifications.
8.30 Providing and fixing of pre pigmented extruded orange cement roof Sqm 571.00
tiles of size 420mm x 330mm with necessary specials such as Ridges,
Barges and Nails etc., including cost of providing PVC (6.00kgs/ sqcm)
gutters of min 6” radius and down water pipes of 4” dia as per roof design
on EXISTING CONCRETE SLOPING ROOF SLAB. Including cost of
mortar band, all materials labour as per specifications.
8.31 Providing and laying non-asbestos high impact polypropylene
reinforced corrugated cement roofing sheet reinforced with a blend of
strong factory made fibers as per IS:14871 and ISO:9933:1995 (E)
roofing upto any pitch and fixing with polymer coated J or L hooks,bolts
and nuts 8mm dia,G.I plain and bitumen washers or with self drilling
fastener and EPDM washers etc. complete but excluding the cost
of purlins, rafters and trusses. Including cutting to size and shape of
corrugated sheets wherever required.and cost of materials, labour,
complete as per specifications.
8.31.1 -do- with Natural Grey colour Sqm 452.00
8.31.2 -do- with Other colours Sqm 491.00

52
Chapter - 9
WOOD WORK

53
Sl. No. Description Unit Rate
Rs. Ps.

9.0 WOOD WORK


9.1 KSRB 9-1 : Labour for providing Teak wood wrought and putup for cum 4,155.00
purlins, common rafters and similar work including cost of labour, HOM
complete as per specifications.
Specification No. KBS 9.4
9.2 KSRB 9-2.1 : Providing wood wrought and putup for purlins, common
rafters and similar work including cost of materials, labour, HOM of
machineries complete as per specifications.
Specification No. KBS 9.27
9.2 KSRB 9-2.1 : – do – Honne wood wrought and putup for purlins cum 71,949.00
9.3 KSRB 9-2.2 : – do – Mathi / Nandi wood wrought and putup cum 59,943.00
9.4 KSRB 9-2.3 : – do – Sal wood wrought and putup for purlins cum 49,403.00
9.5 KSRB 9-2.4 : – do – Jungle wood such as Nerale, Neem wrought cum 35,197.00
and putup
9.10 KSRB 9.4-1 : Providing wood frames of doors, windows, clerestory
windows, ventilators and other frames, wrought, framed or assembled
including making plaster groves (excluding cost of cement concrete and
side clamps), but including cost of materials, labour, HOM complete as
per specifications.
Specification No. KBS 9.33
9.10 KSRB 9.4 : – do – Teak wood frames cum 1,51,732.00
9.11 KSRB 9.4-2 : – do – Honne wood frames cum 73,003.00
9.12 KSRB 9.4-3 : – do – Mathi / Nandi wood frames cum 60,996.00
9.13 KSRB 9.4-4 : – do – White Sal wood frames cum 50,456.00
9.13.1 KSRB 9.4-5 : – do – Red Sal wood frames cum 50,511.00
9.14 KSRB 9.5 : Providing and fixing in position fully panelled wood shutters
for doors, with styles and rails of 40mm. thick with bottom and lock rails
180mm wide top rail and styles 100mm wide as per drawing and panels
of 25mm thick including cost of materials, labour, HOM complete as per
specifications. (excluding cost of fixtures)
Specification No. KBS 9.34
9.14 KSRB 9.5-1 : – do – Teak wood Sqm 6,756.00
9.15 KSRB 9.5-2 : – do – Honne wood Sqm 3,935.00
9.16 KSRB 9.5-3 : – do – Mathi/Nandi wood Sqm 3,479.00
9.17 KSRB 9-6.1 : – do – Teak wood Styles and rails of 35mm thick Sqm 6,364.00
9.18 KSRB 9-6.2 : – do – Honne wood - do - Sqm 3,753.00
9.19 KSRB 9-6.3 : – do – Mathi/ Nandi wood - do - Sqm 3,330.00

54
Sl. No. Description Unit Rate
Rs. Ps.

9.20 KSRB 9-7.1 : Providing and fixing in position fully panelled wood shutters
for doors, styles and rails of 30mm. thick with bottom and lock rails
180mm wide top rail and styles 100mm wide as per drawing and panels
of 25mm thick including cost of materials, labour, HOM complete as per
specifications. (excluding cost of fixtures)
Specification No. KBS 9.34
9.20 KSRB 9-7.1 : – do – Teak wood Sqm 5,973.00
9.21 KSRB 9-7.2 : – do – Honne wood Sqm 3,572.00
9.22 KSRB 9-7.3 : – do – Mathi/ Nandi Sqm 3,180.00
9.23 KSRB 9-8.1 : – do – Teak wood wood panels of 35mm thick Sqm 5,610.00
9.24 KSRB 9-8.2 : – do – Honne wood Sqm 3,390.00
9.25 KSRB 9-8.3 : – do – Mathi/ Nandi wood Sqm 2,131.00
9.26 KSRB 9-9 : Providing and fixing in position half panelled and half glazed
shutters for doors, styles and rails of 40mm. thick with bottom and lock
rails 180mm wide top rail and styles 100mm wide as per drawing and
panels of 25mm thick, 4mm thick plain glass, fixed with beading 15mm
wide and thickness to finish with the shutters surface including cost of
materials, labour, HOM complete as per specifications. (excluding cost
of fixtures)
Specification No. KBS 9.34, 9.42
9.26 KSRB 9-9.1: – do – Teak wood Sqm 5,913.00
9.27 KSRB 9-9.2: – do – Honne wood Sqm 3,573.00
9.28 KSRB 9-10.1 : Providing and fixing in position Teak wood half panelled Sqm 5,521.00
and half glazed shutters for doors, styles and rails of 35mm. thick with
bottom and lock rails 180mm wide top rail and styles 100mm wide as
per drawing and panels of 25mm thick, 4mm thick plain glass, fixed with
beading 15mm wide and thickness to finish with the shutters surface
including cost of materials, labour, HOM complete as per specifications.
( excluding cost of fixtures )
9.29 KSRB 9-10.2 : Providing and fixing in position Honne wood half panelled Sqm 3,391.00
and half glazed shutters for doors, styles and rails of 35mm. thick with
bottom and lock rails 180mm wide top rail and styles 100mm wide as
per drawing and panels of 25mm thick, 4mm thick plain glass, fixed with
beading 15mm wide and thickness to finish with the shutters surface
including cost of materials, labour, HOM complete as per specifications.
(excluding cost of fixtures)
Specification No. KBS 9.34, 9.42
9.30 KSRB 9-11 : Providing and fixing in position half panelled and half glazed
shutters for doors, styles and rails of 30mm. thick with bottom and lock
rails 180mm wide top rail and styles 100mm wide as per drawing and
panels of 25mm thick, 4mm thick plain glass, fixed with beading 15mm

55
Sl. No. Description Unit Rate
Rs. Ps.

wide and thickness to finish with the shutters surface including cost of
materials, labour, HOM complete as per specifications. ( excluding cost
of fixtures )
Specification No. KBS 9.34, 9.42
9.30 KSRB 9-11.1 : – do – Teak wood Sqm 5,051.00
9.31 KSRB 9-11.2 : – do – Honne wood Sqm 3,174.00
9.32 KSRB 9-12 : Providing and fixing in position wood half panelled and
half glazed shutters for doors, styles and rails of 30mm. thick with
bottom and lock rails 180mm wide top rail and styles 100mm wide as
per drawing and panels of 20mm thick, 4mm. thick plain glass, fixed with
beading 15mm wide and thickness to finish with the shutters surface
including cost of materials, labour, HOM complete as per specifications.
( excluding cost of fixtures )
Specification No. KBS 9.34, 9.42
9.32 KSRB 9-12.1 : – do – Teak wood Sqm 4,834.00
9.33 KSRB 9-12.2 : – do – Honne wood Sqm 3,065.00
9.34 KSRB 9-13 : Providing and fixing in position shutters for doors made out
of Honne wood styles and rails of 40mm. thick with bottom and lock rails
180mm wide top rail and styles 100mm wide as per drawing and panels
of 18mm thick of exterior grade Melamine impregnated prelamination
particle board of approved colour including cost of materials, labour,
HOM complete as per specifications. ( excluding cost of fixtures )
Specification No. KBS 9.34, 9.26.4
9.34 KSRB 9-13-1 : – do – Approved colour on both side Sqm 3,070.00
9.35 KSRB 9-13-2 : – do – Approved colour on one side Sqm 3,053.00
9.36 KSRB 9-13-3 : Providing and fixing in position shutters for doors made Sqm 2,940.00
out of Honne wood styles and rails of 40mm. thick with bottom and lock
rails 180mm wide top rail and styles 100mm wide as per drawing and
panels of 18mm thick of exterior grade plain particle board including cost
of materials, labour, HOM complete as per specifications. ( excluding
cost of fixtures )
Specification No. KBS 9.34, 9.26.3
9.37 KSRB 9-14 : Providing and fixing in position shutters for doors made out
of Honne wood styles and rails of 35mm. thick with bottom and lock rails
180mm wide top rail and styles 100mm wide as per drawing and panels
of 18mm thick of exterior grade Melamine impregnated prelamination
particle board of approved colour on including cost of materials, labour,
HOM complete as per specifications. ( excluding cost of fixtures )
Specification No. KBS 9.34, 9.26.4
9.37 KSRB 9-14-1 : – do – Approved colour on both side Sqm 2,860.00
9.38 KSRB 9-14-2 : – do – Approved colour on one side Sqm 2,872.00

56
Sl. No. Description Unit Rate
Rs. Ps.

9.39 KSRB 9-14-3 : Providing and fixing in position shutters for doors made Sqm 2,868.00
out of Honne wood styles and rails of 35mm. thick with bottom and lock
rails 180mm wide top rail and styles 100mm wide as per drawing and
panels of 18mm thick of exterior grade plain particle board including cost
of materials, labour, HOM complete as per specifications. ( excluding
cost of fixtures )
Specification No. KBS 9.34, 9.26.3
9.40 KSRB 9-15 : Providing and fixing in position shutters for doors made out
of Honne wood styles and rails of 30mm. thick with bottom and lock rails
180mm wide top rail and styles 100mm wide as per drawing and panels
of 18mm thick of exterior grade Melamine impregnated prelamination
particle board of approved colour on including cost of materials, labour,
HOM complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34, 9.26.3
9.40 KSRB 9-15-1 : – do – Approved colour on both side Sqm 2,707.00
9.41 KSRB 9-15-2 : – do – Approved colour on one side Sqm 2,690.00
9.42 KSRB 9-15-3 : Providing and fixing in position shutters for doors made Sqm 2,578.00
out of Honne wood styles and rails of 30mm. thick with bottom and lock
rails 180mm wide top rail and styles 100mm wide as per drawing and
panels of 18mm thick of exterior grade Plain particle board including cost
of materials, labour, HOM complete as per specifications. ( excluding
cost of fixtures)
Specification No. KBS 9.34, 9.26.3
9.43 KSRB 9-16 : Providing and fixing in position wood fully panelled shutters
for windows with styles and rails of 35mm. thick, 75mm wide in two halves
with panels of 25mm thick including cost of materials, labour charges,
HOM complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34
9.43 KSRB 9-16.1 : – do – Teak wood Sqm 6,851.00
9.44 KSRB 9-16.2 : – do – Honne wood Sqm 4,107.00
9.45 KSRB 9-16.3 : – do – Mathi/ Nandi wood Sqm 3,621.00
9.46 KSRB 9-16.4 : Providing and fixing in position fully panelled shutters Sqm 3,278.00
for windows with Honne wood styles and rails of 35mm. thick, 75mm
wide in two halves with panels provided with NUWUD ( MDF ) of 25mm
thick including cost of materials, labour charges, HOM complete as per
specifications. (excluding cost of fixtures )
Specification No. KBS 9.34, 9.26.3
9.47 KSRB 9-17.1 : Providing and fixing in position wood fully panelled
shutters for windows with styles and rails of 30mm. thick, 75mm wide in
two halves with panels of 20mm thick including cost of materials, labour
charges, HOM complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34
9.47 KSRB 9-17.1 : – do – Teak wood Sqm 5,935.00

57
Sl. No. Description Unit Rate
Rs. Ps.

9.48 KSRB 9-17.2 : – do – Honne wood Sqm 3,648.00


9.49 KSRB 9-17.3 : – do – Mathi/ Nandi wood Sqm 3,243.00
9.50 KSRB 9-17.4 : Providing and fixing in position fully panelled shutters Sqm 3,048.00
for windows with Honne wood styles and rails of 30mm. thick, 75mm
wide in two halves with panels provided with NUWUD ( MDF ) of 18mm
thick including cost of materials, labour charges, HOM complete as per
specifications. (excluding cost of fixtures)
Specification No. KBS 9.34, 9.26.3
9.51 KSRB 9-18 : Providing and fixing in position wood fully panelled shutters
for windows with styles and rails of 25mm. thick, 75mm wide in two halves
with panels of 20mm thick including cost of materials, labour charges,
HOM complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34
9.51 KSRB 9-18.1 : – do – Teak wood Sqm 5,477.00
9.52 KSRB 9-18.2 : – do – Honne wood Sqm 3,419.00
9.53 KSRB 9-18.3 : – do – Mathi/ Nandi wood Sqm 3,054.00
9.54 KSRB 9-18 : Providing and fixing in position fully panelled shutters for
windows with Honne wood styles and rails of 25mm. thick, 75mm wide
in two halves with panels provided with NUWUD (MDF) including cost
of materials, labour charges, HOM complete as per specifications.
(excluding cost of fixtures)
Specification No. KBS 9.34, 9.26.3
9.54 KSRB 9-18.4 : – do – NUWUD (MDF) of 18mm thick Sqm 2,621.00
9.55 KSRB 9-18.5 : – do – NUWUD (MDF) of 12mm thick Sqm 2,592.00
9.56 KSRB 9-19 : Providing and fixing in position half panelled shutters at
bottom and half glazed at top for window shutters with styles and rails of
35mm. thick, 75mm wide in two halves with panels of 25mm thick, 3mm
thick reeded glass for top panels fixed with wooden beading including
cost of materials, labour charges, HOM of machineries complete as per
specifications. (excluding cost of fixtures) Specification No. Providing
and fixing in position Teak wood half panelled shutters at bottom and
half glazed at top for window shutters with styles and rails of 35mm.
thick, 75mm wide in two halves with panels of 25mm thick, 3mm thick
reeded glass for top panels fixed with wooden beading including cost of
materials, labour charges, HOM complete as per specifications. (excluding
cost of fixtures) Specification No. KBS 9.34, 9.42
9.56 KSRB 9-19.1 :– do – Teak wood Sqm 5,969.00
9.57 KSRB 9-19.2 :– do – Honne wood Sqm 3,797.00
9.58 KSRB 9-19.3 :– do – Mathi/ Nandi wood Sqm 3,412.00

58
Sl. No. Description Unit Rate
Rs. Ps.

9.59 KSRB 9-19.4 :Providing and fixing in position windows half paneled Sqm 3,192.00
shutters at bottom and half glazed at top for window shutters with
Honne wood styles and rails of 35mm. thick, 75mm wide in two halves
with panels filled with NUWUD ( MDF ) of 18mm thick, 3mm thick
reeded glass for top panels fixed with wooden beading including cost
of materials, labour charges, HOM complete as per specifications.
(excluding cost of fixtures )
Specification No. KBS 9.34, 9.42, 9.26.3
9.60 KSRB 9-20 : Providing and fixing in position half panelled shutters at
bottom and half glazed at top for window shutters with styles and rails of
30mm. thick, 75mm wide in two halves with panels of 20mm thick, 3mm
thick reeded glass for top panels fixed with wooden beading including
cost of materials, labour charges, HOM complete as per specifications.
(excluding cost of fixtures) Specification No. KBS 9.34, 9.42
9.60 KSRB 9-20.1 : – do – Teak wood Sqm 5,396.00
9.61 KSRB 9-20.2 : – do – Honne wood Sqm 3,510.00
9.62 KSRB 9-20.3 : – do – Mathi/ Nandi wood Sqm 3,176.00
9.63 KSRB 9-20.4 : Providing and fixing in position windows half paneled Sqm 2,827.00
shutters at bottom and half glazed at top for window shutters with Honne
wood styles and rails of 30mm. thick, 75mm wide in two halves with
panels filled with NUWUD (MDF ) of 18mm thick, 3mm thick reeded glass
for top panels fixed with woodenbeading including cost of materials,
labour charges, HOM complete as per specifications. (excluding cost
of fixtures)
Specification No. KBS 9.34,9.42, 9.26.3
9.64 KSRB 9-21 : Providing and fixing in position half panelled shutters at
bottomand half glazed at top for window shutters with wood styles
and rails of25mm. thick, 75mm wide in two halves with panels of 20mm
thick, 3mm thick reeded glass for top panels fixed with wooden beading
including cost of materials, labour charges, HOM of machineries
complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34, 9.42
9.64 KSRB 9-21.1 : – do – Teak wood Sqm 4,946.00
9.65 KSRB 9-21.2 : – do – Honne wood Sqm 3,288.00
9.66 KSRB 9-21.3 : – do – Mathi/ Nandi wood Sqm 2,990.00
9.67 KSRB 9-21.4 : Providing and fixing in position windows half paneled Sqm 2,598.00
shutters at bottom and half glazed at top for window shutters with Honne
wood styles and rails of 25mm. thick, 75mm wide in two halves with
panels filled with NUWUD (MDF) of 18mm thick, 3mm thick reeded glass
for top panels fixed with wooden beading including cost of materials,
labour charges, HOM complete as per specifications. (excluding cost
of fixtures) Specification No. KBS 9.34, 9.42, 9.26.3

59
Sl. No. Description Unit Rate
Rs. Ps.

9.68 KSRB 9-22 : Providing and fixing in position fully glazed for windows
shutters with wood styles and rails of 35mm. thick 75mm wide in single
shutters with 4mm thick plain glass fixed with wooden beading including
cost of materials, labour charges, HOM complete as per specifications.
(excluding cost of fixtures)
Specification No. KBS 9.34, 9.42
9.68 KSRB 9-22.1 : – do – Teak wood Sqm 4,397.00
9.69 KSRB 9-22.2 : – do – Honne wood Sqm 2,964.00
9.70 KSRB 9-23 : Providing and fixing in position fully glazed for windows
shutters with wood styles and rails of 30mm. thick, 75mm wide in single
shutters with 4mm thick plain glass fixed with wooden beading including
cost of materials, labour charges, HOM complete as per specifications.
(excluding cost of fixtures)
Specification No. KBS 9.34, 9.42
9.70 KSRB 9-23.1 :– do – Teak wood Sqm 4,053.00
9.71 KSRB 9-23.2 :– do – Honne wood Sqm 2,792.00
9.72 KSRB 9-24 : Providing and fixing in position fully glazed for windows
shutters with wood styles and rails of 25mm. thick, 75mm wide in single
shutters with 4mm thick plain glass fixed with wooden beading including
cost of materials,labour charges, HOM complete as per specifications.
(excluding cost of fixtures)
Specification No. KBS 9.34, 9.42
9.72 KSRB 9-24.1 : – do – Teak wood Sqm 3,710.00
9.73 KSRB 9-24.2 : – do – Honne wood Sqm 2,620.00
9.74 KSRB 9-25 : Providing and fixing in position fully glazed shutters for
ventilators side hung or central pivoted with wood styles and rails of
30mm. thick, 50mm wide and central divider of 30mm. wide, 3mm thick
reeded glass fixed with wooden beading of size 10mm wide flushed to the
thickness of the frame including cost of materials, labour charges, HOM
complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34, 9.42
9.74 KSRB 9-25.1 : - do – Teak wood Sqm 5,178.00
9.75 KSRB 9-25.2 : - do – Honne wood Sqm 3,406.00
9.76 KSRB 9-25.3 : - do – Mathi/ Nandi wood Sqm 3,062.00
9.77 KSRB 9-26 : Providing and fixing in position fully glazed shutters for
ventilators side hung or central pivoted with wood styles and rails of
25mm. thick, 50mm wide and central divider of 25mm. wide, 3mm thick
reeded glass fixed with wooden beading of size 10mm wide flushed to the
thickness of the frame including cost of materials, labour charges, HOM
complete as per specifications. (excluding cost of fixtures)
Specification No. KBS 9.34, 9.42

60
Sl. No. Description Unit Rate
Rs. Ps.

9.77 KSRB 9-26.1 : – do – Teak wood Sqm 3,115.00


9.78 KSRB 9-26.2 : – do – Honne wood Sqm 2,146.00
9.79 KSRB 9-26.3 : – do – Mathi/ Nandi wood Sqm 1,948.00
9.80 KSRB 9-27 : Fixing of frames in an existing opening including
embeeding frame in floor and walls after cutting masonry for holdfasts
for embedding holdfast in cement concrete 1:3:6 of 20mm and down
size granite metal painting two coats of coal tar to sides of frame, making
good the damages to walls and floor as required and disposal of the
debries with lead upto 50 m. including cost of materials, labour charges,
complete as per specifications.
9.80 KSRB 9-27.1 : – do – Fixing of door frame Nos 1,138.00
9.81 KSRB 9-27.2 : – do – Fixing of window frame Nos 773.00
9.82 KSRB 9-27.3 : – do – Fixing of ventilator frame Nos 659.00
9.83 SOLID PANEL PVC DOOR SHUTTER
Providing & fixing 30mm thick factory made rigid foam Panelled Door Sqm 2,314.00
Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for
styles and 15x15mm for top & bottom rails, covered with heat moulded
PVC channel of 5mm thick sheet & 30 x 50mm wide to form styles &
5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on
either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail
& bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame,
Sealed to the styles & rails with 5x30mm PVC sheet beading on either
side & joined together with solvent cement adhesive etc., Complete as
per manufacturers specification & direction of Engineer-in-charge fixed
to frames with 3 nos of 75 m.m Aluminium hinges.
9.84 SOLID PVC DOOR FRAME
Providing & fixing factory made PVC Door frame of size 50x47mm Sqm 390.00
with a wall thickness of 5mm, made out of extruded 5mm rigid PVC
foam sheet metered cut at corners & jointed 2 No.s of 150mm long
brackets of 15x15mm M.S Square tube, the entire door frame to be
reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame
to be fixed to the wall using M.S. Screws of 65/80mm size complete
as per manufacturers specification & direction of Engineer-in-charge.
9.85 SOLID PANEL PRELAM PVC DOOR SHUTTER
Providing & fixing 30mm thick factory made rigid foam Prelam Panelled
Door Shutters made from M.S. tube of 19x19mm, 19 gauge for styles
and 15x15mm for top & bottom rails, covered with heat moulded
Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to
form styles & 5mm thick & 75mm wide Prelaminated PVC Sheets for
top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide
cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm
thick PVC sheet Prelaminated on either side fitted in the M.S. frame,

61
Sl. No. Description Unit Rate
Rs. Ps.

Sealed to the styles & rails with PVC Designer beading on either side
& joined together with solvent cement adhesive etc., Complete as per
manufacturers specification & direction of Engineer-in-charge fixed to
frames with 3 nos of 75mm. Aluminium hinges.
9.85.1 -do- with both side prelam Sqm 3,121.00
9.85.2 -do- with one side prelam Sqm 2,331.00
9.86 PVC DOOR SHUTTER : Supply and fixing of door shuttersmade of rigid Sqm 1,487.00
PVC extruded hollow section of 20mm x 200mm with the wall thickness
of 1.0mm + /0.1mm equally divided into 4nos with tongue and groove
locking arrangements. The shutter frame is made of 58x24 mm with
the wall thickness of 1.5mm+/-0.15mm section metricut and joined at
4 corners with 125mmx225mm plastic brackets. The shutter shall be
horizontally reinforced with 2nos of 8mm PVC rods. Teak wood battons
shall be reinforced inside the door shutter during the fabrication of the
door shutter at those points wherever the hardware is fixed on to the
door shutter.
9.87 Supply and fixing of door shutters made of rigid PVC extruded hollow Sqm 1,666.00
section (Nandi or equivalent) of 20mmx200mm with the wall thickness
of 1.0mm+/-0.1mm equally divided into 4nos with tongue an groove
locking arrangements. The shutter frame is made of 30mm x 79mm with
the wall thickness of 1.5mm+/-0.15mm section metric cut and joined at
4 corners with 125mmx225mm plastic brackets. The shutter shall be
horizontally reinforced with 2nos of 8mm PVC rods. Teak wood battons
shall be reinforced inside the door shutter during the fabrication of the
door shutter at those points wherever the hardware is fixed on to the
door shutter.
9.88 Supply and fixing of door frame made of hollow extruded PVC Section m 208.00
having dimension of 40x57mm with the wall thickness of 2mm+/-0.2mm
duly reinforced with seasoned wood plank at the hinges side. The door
frame top 2corners shall be metric cut/welded.
9.89 Supply and fixing of door frame made of hollow extruded PVC Section m 208.00
having dimension of 40x46mm with the wall thickness of 2mm+/-0.2mm
duly reinforced with seasoned wood plank at the hinges side. The door
frame top 2 corners shall be metric cut/weilded .
9.90 Providing and fixing factory made splendoor of solid core single
leaf rigid composite polymer laminated sal wood, door shutter of
required thickness, manufactured out of solid core door conforming to
IS 2202 (Part-1) 1991, laminated with 0.8 mm thick polymer, termite,
water resistant and fire retardant with superior gluing based on vacuum
lamination technology and with various pre moulded design on both faces
conforming to IS 6307-1985, using adhesive conforming to IS 4835-1979
and door shuters tested in conformation to IS 4020-1994. The finish
of shutters will be TEAK/CEDAR/ROSE WOOD/WALNUT, plain colurs
WHITE/IVORY/BEIGE/LIGHT GREY. Excluding cost of fixtures and
inclusive of supply of shutters to respective work spot.

62
Sl. No. Description Unit Rate
Rs. Ps.

9.90.1 _do_ with door shutter 30mm thick Sqm 2,708.00


9.90.2 _do_ with door shutter 35mm thick Sqm 3,166.00
9.91 Providing and fixind of factory made 30mm P.V.C rigid foam PANEL Sqm 2,000.00
DOORS made from MS tube of 19 guage, size of 19mm x 19mm and
covered with heat moulded PVC C Channel of 5 mm thick and width
of 50mm to form styles and rails. The inner panel should be inserted in
between the frame with 5mm thick PVC rigid foam sheet, welded/sealed
to the styles and rails along with 5mm PVC, beeding on all and either
sides. The vertical tubes may be filled with suitable wood material to
further enhance the screw holding capacity
9.92 Providing and fixing PVC Hollow Door Frame of the size 50x47mm with m 300.00
a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam
sheet, mitre cut at two corners and joined with 2 Nos. of 150mm long
brackets of 15x15mm M.S. Square tube. The two vertical door profiles
are to be reinforced with 19x19 mm M.S. Square tube of 19 gauge, EPDM
rubber gasket weather seal to be provided through out the frame. The
door screws through the frame by using PVC fasteners. A minimum of
4 Nos of screws to be provided for each vertical member & minimum 2
Nos. for horizontal member.
9.93 Providing and fixing factory made single leaft rigid GRP Sandwich Sqm 2,500.00
composite door shutter of 32mm thick, laminated with two GRP
skins with wood grain finish, fabricated using U.V-stabilized Isopthalic
Gelcoat and on layer of 45 gsm E-Glass Chopped strand Mat (CSM),
impregnated with orthopthalic polyster resin. The thickness of the skins
shall not be less than 1.5mm. Expanded Polystyrene (EPS) structural
foam panel of 29mm thickness and a density of 20 Kg/m3 shall be
used as core material. Wooden reinforcements made of Seasoned
Salwood block of cross section not less than 28mmx32mm and also
necessary salwood reinforcements for fixing the metal fittings such
as tower bolts, aldrops, handles, etc, shall be provided. A structural
adhesive compatible with EPS foam shall be used for bonding the core
material, the Salwood reinforcement and the skins. The material and
process for manufacturing the door shutters shall confirm to RV/TIFAC
Composites Design centre Standards and specifications and the door
shutters tested in confiramation to IS 4020-1994. The finish of shutter
will be plain colour White/Ivory/Beige/Light Grey or any other colour
using high quality pigments. Exclusing cost of fixtures and inclusive of
supply of shutters to respective work spot.
9.94 Providing and fixing factory made single leaf rigid GRP Sandwich Sqm 3,166.00
composite door shutter of 40 mm thick, laminated with two GRP
skins with wood grain finish, fabricated using U.V-stabilized Isopthalic
Gelcoat and one layer of 450 gns E-Glass Chopped Strand Mat (CSM),
impregnated with orthopthalic polyester resin. The thickness of the skins
shall not be less than 1.5mm. Expanded Polystyrene (EPS) structural
foam panel of 37mm thickness and a density of 20 Kg/m3 shall be used
as core material. Wooden reinforcements made of Seasoned Salwood

63
Sl. No. Description Unit Rate
Rs. Ps.

block of cross section not lessthan 36mmx32mmand also necessary


salwood reinforcements for fixing the metal fittings such as tower
bolts, aldrops, handles, etc. shall be provided. A structural adhesive
compatible with EPS foam shall be used for bonding the core material,
the salwood reinforement and the skins. The material and process for
manufacturing the door shutters shall confirm to RV-TIFAC Composites
Design Centre Standards and specifications and the door shutters tested
in confiramation to IS 4020-1994. The finish of shutter will be plain coulur
White/IVORY/Beige/Light Grey or any other colour using high quality
pigments. Excluding cost of fixtures and inclusive of supply of shutters
to respective work spot.
9.95 Providing and fixing 65mmx90mm GRP Doorframe fabricated using m 375.00
E-Glass Chopped Strand Mat (CSM). U.V-stabilized Isopthalic Gelcoat
and Isopthalic resin. The thickness of the GRP skin shall not be less than
2.0 mm. The doorframe consists of four segmens, which are provided
with plug-in-socket arrangement in-situ in the mould. The segments are
plugged in and are joined together by means of screws. The GRP frame
shall be provided with wooden reinforcement of 6 locations fro high screw
holding capacity for fixing metallic hold fast and shall be consolidated
by filling with medium density foam/Plaster with fibre reinforcement. Six
Numbers of 260mmx25mmx5mm size S shaped M.S. flat hold fast shall
be provided with the frame.
9.96 Providing and fixing 65mmx125mm GRP Doorframe fabricated using m 458.00
E-Glass Chopped Strand Mat (CSM) U.V- stabilized Isopthalic Gelcoat
and Isopthalic resin. The thickness of the GRP skin shall not be less than
2.0mm. The doorframe consists of four segments, which are provided
with plug-in-socket arrangement in-situ in the mould. The segments
are plugged in and are joined together by means of screws. The GRP
frame shall be provided with wooden reinforcement on 6 locations for
high screw holding capacity for fixing metalling hold fast and shall be
consolidated by filling with medium density foam/Plaster of Paris with
fibre reinforcement. Six Numbers of 260mmx25mmx5mm size S shaped
M.S. flat hold fast shall be provided with the frame.
9.97 Providing G.R.P. unbreakable railings available in a wide range of Each 333.00
attractive colours made out of cross section >70mmx64mm of standard
length 7 feet (approximate 3.6Kg/m). The material and process for
manufacturing railings shall confirm to RV-TIFAC composites design
centre standards and specifications.
9.98 Providing and fixing pre fabricated non-monolithic R.C.C. Door Frames m 763.00
factory manufactured in separate parts and assembled at bolt nuts
system with mechanical table vibrating as per IS 6523-1983 with using
M25 concrete as per IS 456 with a cross section of 60 mm x 100 mm
reinforced with 1.70 kg of TMT steel reinforced with 3 Nos. of 6 mm
dia Main TMT bars and 6 mm Dia TMT stirrups welded at 40 cm c/c in
triangle shape per meter length of door frames, including cost of steel
and fabrication charges having 3/4 No. Stainless Steel hinges plate
attachment made of 165 mm x 25 mm x 2.5 mm Stainless Steel Flat
welded with required iron rods and flats with drilling for fixing flat CSK
Head Machine screws and nut made out of 304 grade stainless steel

64
Sl. No. Description Unit Rate
Rs. Ps.

screws, nut and MS square nut of size 8 x 8 square and length 10 mm


and making necessary provision in concrete for fixing aldrops, tower
bolts and hold fasts etc., complete including two coats of oil based
enamel primer providing without cill for shutter thickness upto 30 mm,
21 days tank immersed curing including cost of labour, materials, HOM
etc., complete excluding the cost of door fixtures as per the direction
of Engineer.
9.99 Providing and fixing mosquito mesh to mesh to windows with 7.5 mm Sqm 595.00
to 1.25 mm thick Honne wood petties including labour charges etc.,
complete.
9.100 Providing and fixing require line and slope roofing with semi-corrugated Sqm 683.00
PVC roofing sheets of industrial profile 250/40 in 2.00 mm thick white
colour, fire and heat resistant having width of 1.054 mtrs. fixed with
self tapping screws with washers, over the existing purlins, rafters and
trusses including cost of materials, labour, complete as per specification.
9.101 Providing and fixng Teak Wood Hand railing to stair case using bulusters rmt 9,349.00
of sections 40mm x 25mm as per design drawing No: 11863 / railings
issued by the Principal Chief Architect and fixing it to the steps using anchor
bolts and necessary adhesive materiasl and fixing T.W. handrail of section
75 x 75 mm to bulusters and finishing the same by using colourless polish
etc., complete. The work includes cost of all materials, labour charges for
all items of work, hire charges for welding, cutting and grinding equipment,
and electricity charges, with lead and lift, loading and unloading charges,
etc., complete as per drawing and specification
9.102 Providing Maranthi wood frames of doors, windows, clear story windows, cum 38,010.00
ventilation and other frames, wrought, framed or assembled including
making plaster grooves (excluding cost of concrete cement and side
clamps) but including cost of materials, labours, HOM complete as per
specifications.
9.103 Providing & Fixing Mosquito mesh shutters made out of Stainless Steel Sqm 2,666.00
mosquito proof mesh with 95% & above visibility which is fixed to the
powder coated aluminium frame 32mm thick of approved shade. The
work including fixing the shutters with necessary accessories, to complete
as per specification including the labour charges for fixing the shutter
to the existing frames.
9.104 Providing & Fixing Mosquito mesh shutters made out of Stainless Steel Sqm 2,416.00
mosquito proof mesh with 95% & above visibility which is fixed to the
powder coated aluminium frame 20mm thick of approved shade. The
work including fixing the shutters with necessary accessories, to complete
as per specification including the labour charges for fixing the shutter
to the existing frames.
9.106 Providing and fixing flush door shutter made out of solid core black
board type, well seasoned chemically treated hard wood battens and
internal frame with minimum 45 mm wide wooden frame all-round door
shutters covered with cross bonded wooden sheets (core veneer)
hot pressed and fastened on both sides of the door using liquid
phenol formaldehyde resin as per IS specification 2202 (Part-I) 1991.
From manufacturer (Factory) complete as per specification.
65
Sl. No. Description Unit Rate
Rs. Ps.

9.106.1 - do - 30mm thick both side teak Sqm 3,085.00


9.106.2 - do - 30mm thick one side teak and one side commercial Sqm 2,630.00
9.106.3 - do - 30mm thick both side commercial Sqm 1,923.00
9.106.4 - do - 35mm thick both side Teak Sqm 3,286.00
9.106.5 - do - 35mm thick one side teak and one side commercial Sqm 2,791.00
9.106.6 - do - 35mm thick both side commercial Sqm 1,875.00
9.106.7 - do - 40mm thick both side teak Sqm 3,387.00
9.106.8 - do - 40mm thick one side teak and one side commercial Sqm 2,983.00
9.106.9 - do - 40mm thick both side commercial Sqm 2,327.00
9.107 Providing and fixing to the existing door frames, factory made single Sqm 1,958.00
leaf HDF – Teak Veneer skin sandwich composite door shutter of
40 mm thickness made out of honeycomb of 34 mm thick and surrounded
by good quality properly seasoned wooden reinforcements of size
33 mm X 65 mm for fixing fixtures such as tower bolts, aldrops, handles
etc., and laminated on either sides with 3 mm thick wood grain finish good
quality HDF-Teak Veneer skins, using structural bonding material compatible
with honeycomb core, wood and HDF- Teak Veneer skin and the whole
assembly is bonded together at high temperature and pressure using 650
tonnage heated compression moulding press.All the four sides of the door
shutter are applied with two coats of UV stabilized polyester resin putty to
completely cover and seal the wood from water ingression. The material and
process for manufacturing the door shall confirm to RV-TIFAC composites
design centre standards and specification and the door shutters tested in
confirmation to IS4020-1994, including cost of all materials, labour charges,
HOM etc. complete but excluding the cost of fixtures.
9.108 Providing and fixing to the existing door frames, factory made Sqm 1,375.00
single leaf HDF skin sandwich composite door shutter of 40 mm
thickness made out of honeycomb of 34 mm thick and surrounded
by good quality properly seasoned wooden reinforcements of size
33 mm X 65 mm for fixing fixtures such as tower bolts, aldrops, handles
etc., and laminated on either sides with 3 mm thick wood grain finish good
quality HDF skins, using structural bonding material compatible with
honeycomb core, wood and HDF skin and the whole assembly is bonded
together at high temperature and pressure using 650 tonnage heated
compression moulding press. The HDF Composite door surface is coated
with 2 coats of high quality primer.The front and back surfaces of the door
shutter and all the four sides are painted with two coats of high quality
paint of any desired colour. The material and process for manufacturing
the door shall confirm to RV-TIFAC composites design centre standards
and specification and the door shutters tested in confirmation to
IS4020-1994, including cost of all materials, labour charges, HOM
and machineries etc. complete but excluding the cost of fixtures.
9.109 Providing and fixing to the existing door frames, factory made single leaf Sqm 1,816.00
HDF – Teak Veneer skin sandwich composite door shutter of 32 mm
thickness made out of honeycomb of 29 mm thick and surrounded by
good quality properly seasoned wooden reinforcements of size 28 mm
X 40 mm for fixing fixtures such as tower bolts, aldrops, handles etc., and

66
Sl. No. Description Unit Rate
Rs. Ps.

laminated on either sides with 3 mm thick wood grain finish good quality
HDF- Teak Veneer skins, using structural bonding material compatible
with honeycomb core, wood and HDF- Teak Veneer skin and the whole
assembly is bonded together at high temperature and pressure using 650
tonnage heated compression moulding press. All the four sides of the door
shutter are applied with two coats of UV stabilized polyester resin putty to
completely cover and seal the wood from water ingression. The material and
process for manufacturing the door shall confirm to RV-TIFAC composites
design centre standards and specification and the door shutters tested in
confirmation to IS4020-1994, including cost of all materials, labour charges,
HOM etc. complete but excluding the cost of fixtures.
9.110 Providing and fixing to the existing door frames, factory made single leaf Sqm 1,375.00
HDF skin sandwich composite door shutter of 32 mm thickness made
out of honeycomb of 26 mm thick and surrounded by good quality properly
seasoned wooden reinforcements of size 25 mm X 65 mm for fixing fixtures
such as tower bolts, aldrops, handles etc., and laminated on either sides
with 3 mm thick wood grain finish good quality HDF skins, using structural
bonding material compatible with honeycomb core, wood and HDF skin and
the whole assembly is bonded together at high temperature and pressure
using 650 tonnage heated compression moulding press. The HDF Composite
door surface is coated with 2 coats of high quality primer.The front and back
surfaces of the door shutter and all the four sides are painted with two coats
of high quality paint of any desired colour. The material and process for
manufacturing the door shall confirm to TIFAC composites standards and
specification and the door shutters tested in confirmation to IS4020-1994,
including cost of all materials, labour charges, HOM etc. complete but
excluding the cost of fixtures.
9.111 Providing and fixing to the existing door frames, factory made single Sqm 1,541.00
leaf HDF skin sandwich composite door shutter of 32 mm thickness
made out of honeycomb of 26 mm thick and surrounded by good quality
properly seasoned wooden reinforcements of size 25 mm x 65 mm for
fixing fixtures such as tower bolts, aldrops, handles etc., and laminated
on either sides with 3 mm thick wood grain finish good quality HDF
skins, using structural bonding material compatible with honeycomb
core, wood and HDF skin and the whole assembly is bonded together at
high temperature and pressure using 650 tonnage heated compression
moulding press. The HDF Composite door surface is coated with 2 coats
of high quality primer.The front and back surfaces of the door shutter
and all the four sides are painted with two coats of high quality paint
of any desired colour. The material and process for manufacturing the
door shall confirm to TIFAC composites standards and specification and
the door shutters tested in confirmation to IS4020-1994, including cost
of all materials, labour charges, HOM etc. complete but excluding the
cost of fixtures.

Note:
1. Lift charges : The above rates are applicable for Ground floor only.
An additional rate of Rs. 4.00/sqm per floor may be added for every
additional floor above or below for items vide Sl. No. 9.14 to 9.99,
9.101, 9.102 to 9.111.
67
Chapter - 10
WATER PROOFING

68
Sl. No. Description Unit Rate
Rs. Ps.

10.0 WATER PROOFING

10.1 KSRB 10-2 : Providing and laying in position Yelahanka tiles of size 250 Sqm 815.00
x 250mm of approved quality and make, over a bed of cement mortar 1:3
an average thickness 25mm over weather proof course and pointed with
cement mortar 1:3 mix with red oxide including curing cost of materials,
labour complete as per specifications.
Specification No. KBS

10.2 KSRB 10-3 : Providing and laying integral cement based waterproofing Sqm 838.00
treatment including preparation of surface as required for treatment
of roofs, balconies, terraces etc., consisting of following application.
(a) Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm
of cement admixed with proprietary water proofing compound conforming
to IS:2645 over the RCC slab after cleaning the surface before treatment.
(b) Laying cement concrete using broken brick bats 25mm to 100mm size
with 50% of cement mortar 1:5 admixed with proprietary water proofing
compound conforming IS:2645 over 20mm thick layer of cement mortar
1:5 admixed with proprietary water proofing compound to required slope
and treating similarly the adjoining walls upto 300mm height including
rounding off junctions of walls and slabs. (c) After two days of proper
curing, applying a second coat of cement lurry admixed with proprietary
water proofing compound (d) Finishing the surface with 20mm thick joint
less cement mortar of mix 1:4 admixed with proprietary water proofing
compound and finally finishing the surface with trowel and neat cement
slurry and making of 300x300mm square. (e) The whole terrace so
finished shall be flooded with water for a minimum period of two weeks
for curing and for final test including cost of materials, labour complete
as per specifications.

10.3 KSRB 10-4 : Providing and laying four courses water proofing Sqm 200.00
treatment with bitumen felt over roof consisting of first and third courses
of blown and / or residual bitumen applied hot at 1.45 kg / sqm of area
for each course second course of roofing felt Type - 3 grade-I (hessian
based self finish bitumen felt) and forth and final course of stone grit 6mm
and down size or pea sized gravel spread at 0.06 cum. / sqm including
preparation of surface but excluding grading complete with bitumen
felt (hessian based) Type - 3 grade-I blown or / and residual bitumen
applied hot 1.4 kg / sqm including cost of materials, labour complete as
per specifications. KBS 10.4.3

10.4 KSRB 10-5 : Providing and laying six courses water proofing treatment Sqm 342.00
with bitumen felt over roof consisting of first, third and fifth courses of
blown and / or residual bitumen applied hot at 1.45 kg, 1.2kg and 1.7kg /
sqm of area respectively, second and fourth courses of roofing felt Type
-2 grade-I (fibre based self finish bitumen felt) and sixth and final course
of stone grit 6mm and down size or pea sized gravel spread at 0.06 cum.
/ sqm including preparation of surface, excluding grading but including
cost of materials, labour complete as per specifications. KBS 10.4.3

69
Sl. No. Description Unit Rate
Rs. Ps.

10.5 Waterproofing of RCC Terrace / podium slab / toilet / utilities / water


retaining structure by preparing the surface by chipping and cleaning
and Grouting of Honey comb, voids,cracks / construction joints with
cement slurry (1kg cement added in 10 ltr of water) added with 100gm
of inorganic accelerator, followed by spraying of liquid biological modified
alkaline earth silicates @ 0.40 ltr per sqm on whole surface to reduce the
micro porosity and allowing it to dry, curing the surface for the silicates
to penetrate deeper into the concrete and spraying waterproofing
impregnate liquid containing silane and silanol linear copolymer @ 0.50
ltr per sqm and finally applying polymer slurry made out of cross linked
acrylic / styrene / butadiene & cement in the ratio of 1:0.1, @ 0.50kg/sqm
on the whole surface, including all labour charges tools and equipments,
all complete as per the specification
10.5.1 -do- Sqm 479.00
10.5.2 Bore Packing : filling the bore wherever necessary with polymer Sqm 200.00
modified concrete and brushing one coat of acrylic copolymer cross
linked formulation on the bore. including all labour charges tools and
equipments, all complete as per the manufacturer
10.5.3 Extra for water proofing the inside surface of tanks (OHT & UGT) - Sqm 229.00
applying of modified polymers soft acrylic esters coat @0.40 kg/sqm in
2 coats including all labour charges tools and equipments, all complete
as per the specification.
10.6 Providing and fixing food grade epoxy painting to over head tank and Sqm 83.00
sump tank after cleaning and drying including pumping and bailing out
of water, including cost of all materials labour lead and lifts etc., complete
10.7 Cleaning RCC sump tanks and RCC overhead tanks with mechanical L 0.40
dewatering including removal of sludge, mud, dirt, algea etc and cleaning
the wall surface of tanks using high pressure jet, vacuum cleaning and
spraying anti bacterial treatment to the wall and ceiling surfaces and
UV treatment, including removing of sludge etc., using suitable coconut
broomstick, squeesers / wipers / rubber brushes, coir brushes, plastic
buckets, mugs, dewatering using motor with portal arrangement, hose
pipe etc., complete including all safety measures.
10.8 Providing and applying composite water proofing compound as Sqm 480.00
impregnate only on wet surfaces to arrest leaks in surfaces such as
roof cealing, internal and external walls, flooring and other surfaces
apart from water tanks, sumps, reservoirs, by mixing the composite
waterproofing compound with water in ratio of 1:10 to make a workable
slurry and pouring it on all cleaned and prepared corners and disturbed
area and further mixing in the ratio 1:20 AND pouring it on the prepared
surface by cleaning the surface with etchant chemical from dirt foreign
materials etc., and allowing it to be there upto 3 hours and then cleaning
the same using water complete as per specification so that the surface
is got back and ready to use after 4 hours.

70
Sl. No. Description Unit Rate
Rs. Ps.

10.9 Providing and applying Polymer based water proofing slurry having Sqm 2,458.00
chemical resistance properties, capable of withstanding a Temperature
of 200 DegC for Protective Negative coating for Water Dampness &
seepages, comprising of Portland cement, Lime stone, Silica sand,
Alumina cement, sodium aluminate in the form of powder composition
at 3.30 kgs mixed with 1.0 liter of Acrylic emulsion, applied on
0.64 Sqm area/liter of slurry on a cleaned surface free of loose materials
etc, complete on all masonry structures, overhead tank, sump tank,
water closet areas, sunken slab and other such areas, filling tile joints,
capable of Self curing within 3 to 4 hours of its application in normal
atmospheric condition, including cost of all materials, labour charges,
HOM etc., complete.
10.10 Providing and applying Polymer based instant running water leak arrester Kg 1,666.00
in civil works using mixture capable of withstanding a temperature
of 200 Deg C comprising of Portland cement, Lime stone, Silica
sand, Alumina cement, Sodium aluminate, Calcium oxide in the form
of powder composition of 1.00kg mixed with 250ml water, applied on
a cleaned surface free of loose materials, dust etc., for cavities and
also for damaged areas in all masonry and concrete structures, for
rapid hardening and leak arresting including cost of all materials, labour
charges, HOM etc., complete.
10.11 Providing and applying water proofing in two coats of 300 microns Sqm 729.00
thickness on all surfaces like concrete, Metal, Plastic, Asbestos, Wood,
Cloth canopy using Heat refractive compound made out of Vinyl Acetate
copolymer latex, Water, Titanium Dioxide, Barium metaborate, Ceramic
Microsphere powder, Mica, Propylene Glycol in suitable proportions and
the surface to be treated should be cleared of loose particles/dust/fungus
etc and kept dry before the application of heat refractive compound,
including cost of all materials, labour charges, HOM etc., complete.

Note:
1. It can be followed by other operations like screeding, tiling etc.,
after 1 hour. DO NOT FORCIBLY REMOVE composite waterproofing
compound ON TILES IF ANY.

71
Chapter - 11
DRAINAGE WORK

72
Sl. No. Description Unit Rate
Rs. Ps.

11.0 DRAINAGE WORK


11.1 KSRB 12-1 : Providing and laying in position to required level or slope
of internal diameter salt glazed stoneware pipes grade A and jointing
with stiff mixture of cement mortar in proportion of 1:1, testing of pipes
and joints,including cost of materials, labour charges complete as per
specifications.
Specification No. KBS 12.2.5 / 12.7
11.1 KSRB 12-1.1 : – do – 100mm m 204.00
11.2 KSRB 12-1.2 : – do – 150mm m 306.00
11.3 KSRB 12-1.3 : – do – 200mm m 405.00
11.4 KSRB 12-1.4 : – do – 230mm m 446.00
11.5 KSRB 12-1.5 : – do – 250mm m 482.00
11.6 KSRB 12-1.6 : – do – 300mm m 525.00
11.7 KSRB 12-1.7 : – do – 350mm m 568.00
11.8 KSRB 12-1.8 : – do – 400mm m 620.00
11.9 KSRB 12-1.9 : – do – 450mm m 728.00
11.10 KSRB12-2 : Providing and laying in position plain cement concrete
M7.5 using 40mm and down size graded granite metal, machine mixed
concrete laid in layers not exceeding 15 cms thick, well compacted, for
internal diameter stoneware pipes including cost of materials, labour
charges, HOM curing complete as per specifications
Specification No. KBS 4.1 / 4.2
11.10 KSRB 12-2.1 : – do – 100mm m 201.00
11.11 KSRB 12-2.2 : – do – 150mm m 340.00
11.12 KSRB 12-2.3 : – do – 200mm m 378.00
11.13 KSRB 12-2.4 : – do – 230mm m 407.00
11.14 KSRB 12-2.5 : – do – 250mm m 425.00
11.15 KSRB 12-2.6 : – do – 300mm m 484.00
11.16 KSRB 12-2.7 : – do – 350mm m 544.00
11.17 KSRB 12-2.8 : – do – 400mm m 603.00
11.18 KSRB 12-2.9 : – do – 450mm m 658.00
11.19 KSRB 12-3 : Providing and laying in position plain cement concrete of
mix M 7.5 using 40mm and down size graded granite / trap metal for
haunching of internal diameter stoneware pipes, concrete machine
mixed laid in layers not exceeding 15 cms thick, well compacted, including
cost of materials, labour charges, form work, HOM curing complete as
per specifications.
Specification No. KBS 4.1 / 4.2
11.19 KSRB 12-3.1 : – do – 100mm m 310.00
73
Sl. No. Description Unit Rate
Rs. Ps.

11.20 KSRB 12-3.2 : – do – 150mm m 482.00


11.21 KSRB 12-3.3 : – do – 200mm m 568.00
11.22 KSRB 12-3.4 : – do – 230mm m 653.00
11.23 KSRB 12-3.5 : – do – 250mm m 662.00
11.24 KSRB 12-3.6 : – do – 300mm m 765.00
11.25 KSRB 12-3.7 : – do – 350mm m 875.00
11.26 KSRB 12-3.8 : – do – 400mm m 984.00
11.27 KSRB 12-3.9 : – do – 450mm m 1,092.00
11.28 KSRB 12-4 : Providing and laying in position plain cement concrete of
M - 7.5 using 40mm and down size graded granite / trap metal for
surrounded encasing internal diameter stoneware pipes, concrete
machine mixed well compacted including cost of materials, labour
charges, form work, HOM curing complete as per specifications.
Specification No. KBS 4.1 / 4.2
11.28 KSRB 12-4.1 : – do – 100mm m 634.00
11.29 KSRB 12-4.2 : – do – 150mm m 770.00
11.30 KSRB 12-4.3 : – do – 200mm m 899.00
11.31 KSRB 12-4.4 : – do – 230mm m 981.00
11.32 KSRB 12-4.5 : – do – 250mm m 1,040.00
11.33 KSRB 12-4.6 : – do – 300mm m 1,185.00
11.34 KSRB 12-4.7 : – do – 350mm m 1,351.00
11.35 KSRB 12-4.8 : – do – 400mm m 1,512.00
11.36 KSRB 12-4.9 : – do – 450mm m 1,666.00
11.37 KSRB 12-5 : Constructing brick masonry circular type manhole 0.91
m internal dia at bottom and 0.56m dia at top with table moulded non-
modular bricks of 50 class designation 50 in cement mortar 1:4, inside
cement plastered 12mm thick with cement mortar 1:3, finished with a
floating coat of neat cement, foundation concrete M 10 using 40mm
and downsize granite metal and making necessary channel in cement
concrete M 50 with 20mm and downsize granite metal finished with a
floating coat of neat cement, with S.F.R.C. cover and frame ( heavy duty,
HD-20 grade designation) 560mm internal diametre confirming IS :12592,
total weight cover and frame to be not less than 182 kg, fixed in cement
concrete 1:2:4, 20mm and downsize broken granite metal, providing
and removing centering, shuttering including cost of materials, labour
charges, HOM complete as per specifications. (Excavation, footrests
and 12mm thick cement plaster on the external surface shall be paid
separately)
Specification No. KBS 12.4
11.37 KSRB 12-5.1 : – do – deep 0.91m Nos 12,254.00

74
Sl. No. Description Unit Rate
Rs. Ps.

11.38 KSRB 12-5.2 : – do – deep 1.67m Nos 20,236.00


11.39 KSRB 12-5 : Constructing brick masonry circular type manhole
1.22 m internal dia at bottom and 0.56m dia at top, with table moulded
and non modular bricks of class designation 50 in cement mortar 1:4,
inside cement plaster 12mm thick with cement mortar 1:3, finished with
a floating coat of neat cement, foundation concrete M 10 using 40mm
and down size granite metal and making necessary channel in cement
concrete M 15 with 20mm and down size granite metal, finished with
a floating coat of neat cement, with S.F.R.C. cover and frame ( heavy
duty, HD-20 grade designation) 560mm internal diameter confirming to
IS :12592, total weight length of cover and frame to be not less than
182 kg, fixed in cement concrete M 15 20mm and down size broken
granite metal, providing and removing centering, shuttering including
cost of materials, labour charges, HOM complete as per specifications.
(Excavation, footrests and 12mm thick cement plaster on the external
surface shall be paid separately)
Specification No. KBS 12.4
11.39 KSRB 12-5.3 : – do – 1.68m deep Nos 24,431.00
11.40 KSRB 12-5.4 : – do – 2.29m deep Nos 29,044.00
11.41 KSRB 12-5 : Constructing brick masonry circular type manhole
1.52 m internal dia at bottom and 0.56m dia at top, with table
moulded and non-modular bricks of class designation 50 in cement
mortar 1:4, inside cement plaster 12mm thick with cement mortar
1:3, finished with a floating coat of neat cement, foundation concrete
M 10 mixed using 40mm and down size granite metal and making
necessary channel in cement concrete 1:2:4 mix with 20mm anddown
size granite metal, finished with a floating coat of neat cement, with
S.F.R.C. cover and frame (heavy duty, HD-20 grade designation)
560mm internal diameter confirming to IS :12592, total weight length of
cover and frame to be not less than 182 kg, fixed in cement concrete
M 15 20mm and down size broken granite metal, providing and removing
centering, shuttering including cost of materials, labour charges,
HOM complete as per specifications. (Excavation, footrests and 12mm
thick cement plaster on the external surface shall be paid separately)
Specification No. KBS 12.4
11.41 KSRB 12-5.5 : – do – deep 2.30m Nos 38,231.00
11.42 KSRB 12-5.6 : – do – deep 4.18m Nos 71,207.00
11.43 KSRB 12-5.7 : Constructing circular type manhole 1500mm internal Nos 39,202.00
dia at bottom 2.50m deep, 525mm dia at top, in brick masonry with
1:5 cement mortar, cement plaster 1:3, finish with a floating coat of neat
cement, RCC 1:2:4 top slab using 20mm and down size granite metal,
foundation concrete M 7.5 using 40mm and down size granite metal and
making channels in cement concrete M 15 using 20mm and down size
granite metal, neatly finished curing, fixing CI cover complete including
cost of materials, labour charges, HOM complete as per specifications.
(Excavation, footrests and 12mm thick cement plaster on the external
surface shall be paid separately)
Specification No. KBS 12.4
75
Sl. No. Description Unit Rate
Rs. Ps.

11.44 KSRB 12-6.1 : Providing 20mm square M.S footrest and fixing in Nos 230.00
manhole with M 10 cement concrete block of 20x20x10cms, using 20mm
and down size metal of size including cost of materials, labour charges,
curing complete as per specifications.
Specification No. KBS 12.4.6
11.45 KSRB 12-6.2 : Providing 20mm round M.S footrest and fixing in manhole Nos 211.00
with M 10 cement concrete block of 20x20x10cms, using 20mm and
down size metal of size including cost of materials, labour charges,
curing complete as per specifications.
Specification No. KBS 12.4.6
11.46 KSRB 12-6.3 : Providing cast iron footrest and fixing in manhole with Nos 196.00
M 10 cement concrete block of 20x20x10cms, using 20mm and down
size metal of size including cost of materials, labour charges, curing
complete as per specifications.
Specification No. KBS 12.4.6
11.47 KSRB 12-7 : Making connection of drain or sewer line, external dia with
existing manhole including breaking into and making good the walls,
floors with cement concrete M 15 with 20mm and downsize granite metal,
cement plastered on both sides of mix 1:3, finished with a floating coat
of neat cement, and making necessary channels for the drain, including
cost of materials, labour charges, curing complete as per specifications.
Specification No. KBS
11.47 KSRB 12-7.1 : – do – 100 to 230mm Nos 2,242.00
11.48 KSRB 12-7.2 : – do – 250 to 300mm Nos 2,906.00
11.49 KSRB 12-7.3 : – do – 350 to 450mm Nos 3,709.00
11.50 KSRB 12-8.1 : Constructing brick masonry inspection chamber
for single pipeline, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover withframe (light duty)
internal dimensions, total weight of cover with frame to be not less
than 38 kg ( weight of cover 23kg and weight of frame 15 kg) R.C.C.
top slab with cement concrete M 15 with 20mm and downsize granite
metal, foundation concrete M 5 with 40mm and downsize granite metal
inside plastering 12mm thick with cement mortar 1:3, finish smooth
with a floating coat of cement on walls and bed concrete complete as
per standard design including cost of materials, labour charges, curing
complete as per specifications.
Specification No. KBS
11.50.1 – do – 455x610mm and 450mm depth (clear inside dimension) for Nos 5,886.00
single pipeline, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover withframe (light duty)
455x610mm
11.50.2 – do – 600x600mm and 450mm depth (clear inside dimension) for Nos. 7,075.00
single pipeline, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover withframe (light duty)
600x600mm

76
Sl. No. Description Unit Rate
Rs. Ps.

11.50.3 – do – 450x450mm and 450mm depth (clear inside dimension) for Nos. 4,416.00
single pipeline, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover withframe (light duty)
450x450mm
11.50.4 – do – 450x300mm and 450mm depth ( clear inside dimension ) Nos. 3,166.00
for single pipeline, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover withframe (light duty)
450x300mm
11.50.5 – do – 230x150mm and 450mm depth ( clear inside dimension ) Nos. 1,333.00
for single pipeline, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover withframe (light duty)
230x150mm
11.51 KSRB 12-8.1.1 : Extra for item no. KSRB 12-8.1 depth beyond 450mm Each 607.00
and brick masonry chamber with table moulded non modular bricks of
class designation 50 in cement mortar 1:5 for every 150mm depth or
part thereof including cost of materials, labour charges, curing complete
as per specifications.
Specification No. KBS
11.52 KSRB 12-8.2 : Constructing brick masonry inspection chamber Each 6,564.00
500x700mm, and 450mm depth, ( clear inside dimension ) for pipeline
with one or two inlets, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover with frame (light duty)
455x610mm internal dimensions, total weight of cover with frame to be
not less than 38 kg ( weight of cover 23kg and weight of frame 15 kg )
R.C.C. top slab with cement concrete M 15 with 20mm and downsize
granite metal , foundation concrete M 5 with 40mm and downsize granite
metal inside plastering 12mm thick with cement mortar 1:3, finished
smooth with a floating coat of cement on walls and bed concrete complete
as per standard design including cost of materials, labour charges,
curing complete as per specifications.
Specification No. KBS
11.53 KSRB 12-8.2.1 : Extra for item no. KSRB 12-8.2 depth beyond 450mm Each 675.00
and brick masonry chamber with table moulded non-modular bricks of
class designation 50 in cement mortar 1:5 for every 150mm depth or
part thereof including cost of materials, labour charges, curing complete
as per specifications.
Specification No. KBS
11.54 KSRB 12-8.3 : Constructing brick masonry inspection chamber Each 7,525.00
600x850mm, and 450mm depth, ( clear inside dimension ) for pipeline
with three or more inlets, using table moulded non-modular bricks of class
designation 50 in cement mortar 1:5, C.I cover with frame (light duty)
455x610mm internal dimensions, total weight of cover with frame to be
not less than 38 kg ( weight of cover 23kg and weight of frame 15 kg )
R.C.C. top slab with cement concrete M 15 with 20mm and downsize
granite metal , foundation concrete M 5 with 40mm and downsize granite

77
Sl. No. Description Unit Rate
Rs. Ps.

metal inside plastering 12mm thick with cement mortar 1:3, finished
smooth with a floating coat of cement on walls and bed concrete complete
as per standard design including cost of materials, labour charges,
curing complete as per specifications.
Specification No. KBS
11.55 KSRB 12-8.3.1 : Extra for item no. KSRB12-8.3 depth beyond 450mm Each 785.00
and brick masonry chamber with table moulded non-modular bricks of
class designation 50 in cement mortar 1:5 for every 150mm depth or
part thereof including cost of materials, labour charges, curing complete
as per specifications.
Specification No. KBS
11.56 Providing and fixing unplasticised PVC pipes with working pressure
10 kg/sq.cm with pipe fittings, clips, making good the floor, including
cost of all materials, labour charges, HOM and testing complete as
per specifications.
11.56.1 -do- with 90mm outer dia m 359.00
11.56.2 -do- with 110mm outer dia m 505.00
11.56.3 -do- with 140mm outer dia m 824.00
11.56.4 -do- with 160mm outer dia m 1,041.00
11.56.5 -do- with 200mm outer dia m 1,316.00
11.56.6 -do- with 225mm outer dia m 1,590.00
11.56.7 -do- with 250mm outer dia m 2,411.00
11.56.8 -do- with 280mm outer dia m 3,050.00
11.56.9 -do- with 315mm outer dia m 3,871.00

Note :
1. The items vide Sl.No. 11.10 to 11.18 are for cement concrete bedding
for stoneware pipes.
2. The items vide Sl.No. 11.19 to 11.27 are for haunching of stoneware
pipes with cement concrete.
3. The items vide Sl.No. 11.28 to 11.36 are for Haunching of stoneware
pipes with cement concrete surrounded encasing.
4. The walls of manholes and inspection chambers shall be built of
one brick thickness for depths upto 4.25m. Below the depth of
4.25m in ordinary subsoil the wall thickness shall be increased to
one and half brick and at 9.75m below ground two brick thick walls
shall be built.

78
Chapter - 12
sanitary work

79
Sl. No. Description Unit Rate
Rs. Ps.

12.0 SANITARY WORK


12.1 KSRB 11-1 : Providing and fixing white vitreous china clay, water pan 2,921.00
closet Indian type (Squatting pan) of size 580mm with footrests,
100mm S or P trap, 10 litre low level, P.V.C flushing cistern ( all are
approved make ) with fittings, C.I / M.S brackets, 32mm diameter flush
pipe fittings and clamps, overflow arrangements with specials and 25mm
mosquito proof coupling of approved design, painting of fittings and
brackets, cutting and making good the wall and floor wherever required,
including cost of materials, labour complete as per specifications.
Specification No. KBS 11
12.2 KSRB 11-2 : Providing and fixing white vitreous china clay, water pan 3,520.00
closet Orissa pattern of size 580 x 440mm with integral type footrests,
100mm S or P trap, 10 litre low level, P.V.C flushing cistern (all are
approved make ) with fittings, C.I / M.S brackets, 32mm diameter flush
pipe fittings and clamps, overflow arrangements with special and 25mm
mosquito proof coupling of approved design, painting of fittings and
brackets, cutting and making good the wall and floor wherever required,
including cost of materials, labour complete as per specifications.
Specification No. KBS 11
12.3 KSRB 11-3 : Providing and fixing white vitreous china clay, water pan 1,109.00
closet Indian type (Squatting pan) of size 580mm with footrests,
100mm S or P trap, (approved make) cutting and making good the
wall and floor wherever required, including cost of materials, labour
complete as per specifications.
12.4 KSRB 11-4 : Providing and fixing white vitreous china clay, water pan 1,722.00
closet Orissa pattern of size 580 x 440mm with integral type footrests,
100mm S or P trap, (approved make ) cutting and making good the
wall and floor wherever required, including cost of materials, labour
complete as per specifications.
Specification No. KBS 11
12.5 KSRB 11-5 : Providing and fixing white vitreous china clay, water Each 4,130.00
closet European type ( Pedestal type, P-trap ) with black solid
plastic seat and lid, C.P brass hinges, rubber buffers. 10 litre low level,
P.V.C flushing cistern ( all are approved make ) with fittings, C.I / M.S
brackets, 40mm diameter flush bend with fittings and clamps, overflow
arrangements with special and 25mm mosquito proof coupling of
approved design, painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
Specification No. KBS 11
12.6 KSRB 11-6 : Providing and fixing white vitreous china clay, water Each 4,005.00
closet European type ( Pedestal type, S-trap ) with black solid plastic
seat and lid, C.P brass hinges, rubber buffers. 10 litre white glazed /
vitreous china clay low level, flushing cistern ( all are approved make )
with fittings, C.I / M.S brackets, 40mm diameter flush bend with fittings

80
Sl. No. Description Unit Rate
Rs. Ps.

and clamps, overflow arrangements with specials and 25mm mosquito


proof coupling of approved design, painting of fittings and brackets,
cutting and making good the wall and floor wherever required, including
cost of materials, labour complete as per specifications.
Specification No. KBS 11
12.7 KSRB 11-7.1 : Providing and fixing white vitreous china clay, flat Unit 2,560.00
back, lipped front urinal basin of 430x260x350mm with 5 litres PVC
automatic flushing cistern, C.I / M.S brackets, standard flush pipe
and C.P. brass spreaders with brass unions and G.I. clamps complete
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.8 KSRB 11-7.2 : Providing and fixing white vitreous china clay, flat Unit 3,470.00
back, lipped front urinal basin of 430x260x350mm in the range of
two 7.5 litre P.V.C with automatic flushing cistern, C.I / M.S brackets,
standard flush pipe and C.P. brass spreaders with brass unions and
G.I. clamps painting of fittings and brackets, cutting and making good
the wall and floor wherever required, including cost of materials, labour
complete as per specifications.
Specification No. KBS 11
12.9 KSRB 11-7.3 : Providing and fixing white vitreous china clay, flat back, Unit 4,845.00
lipped front urinal basin of 430x260x350mm in the range of three 7.5
litres PVC automatic flushing cistern, C.I / M.S brackets, standard
flush pipe and C.P. brass spreaders with brass unions and G.I. clamps
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.10 KSRB 11-7.4 : Providing and fixing white vitreous china clay, flat back, Unit 5,909.00
lipped front urinal basin of 430x260x350mm in the range of four with
10 litres PVC automatic flushing cistern, C.I / M.S brackets, standard
flush pipe and C.P. brass spreaders with brass unions and G.I. clamps
complete painting of fittings and brackets, cutting and making good the
wall and floor wherever required, including cost of materials, labour
complete as per specifications.
Specification No. KBS 11
12.11 KSRB 11-8.1 : Providing and fixing white vitreous china clay, wall Unit 2,486.00
corner type, lipped front urinal basin of size 340x410x265mm with 5
litres P.V.C automatic flushing cistern, C.I / M.S brackets, standard
flush pipe and C.P. brass spreaders with brass unions and G.I. clamps
complete painting of fittings and brackets, cutting and making good the
wall and floor wherever required, including cost of materials, labour
complete as per specifications.
Specification No. KBS 11

81
Sl. No. Description Unit Rate
Rs. Ps.

12.12 KSRB 11-8.2 : Providing and fixing white vitreous china clay, wall Unit 3,193.00
corner type, lipped front urinal basin of size 340x410x265mm in the
range of two with 7.5 litre P.V.C automatic flushing cistern, C.I / M.S
brackets, standard flush pipe and C.P. brass spreaders with brass unions
and G.I. clamps painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
Specification No. KBS 11
12.13 KSRB 11-8.3 : Providing and fixing white vitreous china clay, wall Unit 3,745.00
corner type, lipped front urinal basin of size 340x410x265mm in the
range of three with 7.5 litre P.V.C automatic flushing cistern, C.I / M.S
brackets, standard flush pipe and C.P. brass spreaders with brass unions
and G.I. clamps painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
Specification No. KBS 11
12.14 KSRB 11-8.4 : Providing and fixing white vitreous china clay, wall Unit 4,297.00
corner type, lipped front urinal basin of size 340x410x265mm in the
range of four with 10 litre P.V.C automatic flushing cistern, C.I / M.S
brackets, standard flush pipe and C.P. brass spreaders with brass unions
and G.I. clamps painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
Specification No. KBS 11
12.15 KSRB 11-9.1 : Providing and fixing white vitreous china clay, flat back Unit 4,145.00
or half stall urinal basin of size 580x380x350mm with 5 litres P.V.C
automatic flushing cistern, C.I / M.S brackets, standard flush pipe and
C.P. brass spreaders with brass unions and G.I. clamps C.I dtrap with
outlet grating and other couplings in C.P brass, painting of fittings and
brackets, cutting and making good the wall and floor wherever required,
including cost of materials, labour complete as per specifications.
12.16 KSRB 11-9.2 : Providing and fixing white vitreous china clay, flat Unit 6,727.00
back or half stall urinal basin of size 580x380x350mm in the range of
two with 7.5 litres P.V.C automatic flushing cistern, C.I / M.S brackets,
standard flush pipe and C.P. brass spreaders with brass unions and G.I.
clamps, C.I. trap with outlet grating and other couplings in C.P brass
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.17 KSRB 11-9.3 : Providing and fixing white vitreous china clay, flat Unit 9,154.00
back or half stall urinal basin of size 580x380x350mm in the range of
three with 10 litres P.V.C automatic flushing cistern, C.I / M.S brackets,
standard flush pipe and C.P. brass spreaders with brass unions and G.I.
clamps, C.I. trap with outlet grating and other couplings in C.P brass
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
82
Sl. No. Description Unit Rate
Rs. Ps.

12.18 KSRB 11-9.4 : Providing and fixing white vitreous china clay, flat Unit 11,580.00
back or half stall urinal basin of size 580x380x350mm in the range of
four with 10 litres P.V.C automatic flushing cistern, C.I / M.S brackets,
standard flush pipe and C.P. brass spreaders with brass unions and G.I.
clamps, C.I. trap with outlet grating and other couplings in C.P brass
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.19 KSRB 11-10.1 : Providing and fixing white vitreous china clay, Unit 2,824.00
squatting plate with 5 litre P.V.C automatic flushing cistern including
brass coupling C.I / M.S brackets, G.I flush pipe of standard size and
C.P. brass spreaders painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
Specification No. KBS 11
12.20 KSRB 11-10.2 : Providing and fixing white vitreous china clay, Unit 4,300.00
squatting plate in the range of two single squatting plate with 7.5
litre P.V.C automatic flushing cistern including brass coupling C.I /
M.S brackets, G.I flush pipe of standard size and C.P. brass spreaders
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.21 KSRB 11-10.3 : Providing and fixing white vitreous china clay, Unit 5,622.00
squatting plate in the range of three single squatting plates with
10 litre P.V.C automatic flushing cistern including brass coupling C.I /
M.S brackets, G.I flush pipe of standard size and C.P. brass spreaders
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.22 KSRB 11-10.4 : Providing and fixing white vitreous china clay, Unit 7,032.00
squatting plate in the range of four single squatting plates with
one number 15 litre P.V.C automatic flushing cistern including brass
coupling C.I / M.S brackets, G.I flush pipe of standard size and C.P.
brass spreaders painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
Specification No. KBS 11
12.23 KSRB 11-11.1 : Providing and fixing white vitreous china clay, flat Unit 3,339.00
back wash basin size 630x450mm with a pair of 15mm C.P brass
pillar taps with C.I / M.S brackets, 32 mm C.P. brass waste of standard
pattern, painting of fittings and brackets, cutting and making good the
wall and floor wherever required, including cost of materials, labour
complete as per specifications.
Specification No. KBS 11
83
Sl. No. Description Unit Rate
Rs. Ps.

12.24 KSRB 11-11.2 : Providing and fixing white vitreous china clay, flat Unit 2,624.00
back wash basin size 630x450mm with a single 15mm C.P brass
pillar tap with C.I / M.S brackets, 32 mm C.P. brass waste of standard
pattern, painting of fittings and brackets, cutting and making good the
wall and floor wherever required, including cost of materials, labour
complete as per specifications.
Specification No. KBS 11
12.25 KSRB 11-11.3 : Providing and fixing white vitreous china clay, flat back Unit 3,232.00
wash basin size 550x400mm with a pair of 15mm C.P brass pillar taps
with C.I / M.S brackets, 32 mm C.P. brass waste of standard pattern,
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete as
per specifications.
Specification No. KBS 11
12.26 KSRB 11-11 : Providing and fixing white vitreous china clay, flat
back wash basin with a single 15mm C.P brass pillar tap with C.I /
M.S brackets, 32 mm C.P. brass waste of standard pattern, painting
of fittings and brackets, cutting and making good the wall and floor
wherever required, including cost of materials, labour complete as per
specifications.
Specification No. KBS 11
12.26 KSRB 11-11.4 : - do - of size 550 x 400mm Unit 2,517.00
Specification No. KBS 11
12.27 KSRB 11-11.5 : - do - of size 450 x 300mm Unit 2,339.00
Specification No. KBS 11
12.28 KSRB 11-11 : Providing and fixing white vitreous china clay, angle back
wash basin size with a single 15mm C.P brass pillar tap with C.I /
M.S brackets, 32 mm C.P. brass waste of standard pattern, painting
of fittings and brackets, cutting and making good the wall and floor
wherever required, including cost of materials, labour complete as per
specifications.
12.28 KSRB 11-11.6 : - do - of size 600 x 480 mm Unit 2,740.00
Specification No. KBS 11
12.29 KSRB 11-11.7 : - do - of size 400 x 400 mm Unit 2,521.00
Specification No. KBS 11
12.30 KSRB 11-11.8 : Providing and fixing white vitreous china clay, surgeon Unit 3,837.00
type wash basin size 660x460mm with a pair of 15mm C.P brass pillar
taps with pair of elbow operated levers, C.I / M.S brackets, 32 mm C.P.
brass waste of standard pattern, painting of fittings and brackets, cutting
and making good the wall and floor wherever required, including cost of
materials, labour complete as per specifications.
KBS 11
12.31 KSRB 11-11.9 : Providing and fixing white vitreous china clay, surgeon Unit 3,401.00
type wash basin size 660x460mm with single 15mm C.P brass pillar
tap with single elbow operated lever, C.I / M.S brackets, 32 mm C.P.

84
Sl. No. Description Unit Rate
Rs. Ps.

brass waste of standard pattern, painting of fittings and brackets, cutting


and making good the wall and floor wherever required, including cost of
materials, labour complete as per specifications. KBS 11
12.32 KSRB 11-12 : Providing and fixing white glazed fire clay kitchen
sink with M.S / C.I brackets, C.P brass chain with rubber plug, 32 mm
C.P. brass waste, tap with union, brass stop cock complete, painting
of fittings and brackets, cutting and making good the wall and floor
wherever required, including cost of materials, labour complete as per
specifications. KBS 11
12.32 KSRB 11-12..1 : - do - of size 600 x 450 x 250 mm Unit 2,910.00
12.33 KSRB 11-12.2 : - do - of size 750 x 450 x 250 mm Unit 3,428.00
12.34 KSRB 11-13 : Providing and fixing white glazed fire clay laboratory
sink with M.S / C.I brackets, C.P brass chain with rubber plug, 32 mm
C.P. brass waste, tap with union, brass stop cock complete, painting
of fittings and brackets, cutting and making good the wall and floor
wherever required, including cost of materials, labour complete as per
specifications.
12.34 KSRB 11-13.1 : - do - of size 600 x 450 x 200 mm Unit 2,965.00
12.35 KSRB 11-13.2 : - do - of size 450 x 300 x 150 mm Unit 2,716.00
12.36 KSRB 11-14 : Providing and fixing stainless steel kitchen sink of
bowl depth 178mm, with drain board, M.S / C.I brackets, stainless
steel plug 40 mm, painting of fittings and brackets, cutting and making
good the wall and floor wherever required, including cost of materials,
labour complete as per specifications.
12.36 KSRB 11-14.1 : - do - of size 510 x 1040 mm Unit 11,878.00
12.37 KSRB 11-14.2 : - do - of size 500 x 1000 mm Unit 7,383.00
12.38 KSRB 11-14.3 : Providing and fixing stainless steel kitchen sink Unit 5,378.00
of size 400x915mm bowl depth 160mm, with drain board, M.S / C.I
brackets, stainless steel plug 40 mm, painting of fittings and brackets,
cutting and making good the wall and floor wherever required, including
cost of materials, labour complete as per specifications.
12.39 KSRB 11-15.1 : Providing and fixing 600x450mm bevelLead edge Unit 964.00
mirror of superior glass with 6mm hard board backing and fixed to
wooden cleats with C.P screws, washers, including cost of materials,
labour complete as per specifications.
12.40 KSRB 11-15.2 : Providing and fixing 450mm dia circular shape mirror Unit 690.00
with plastic moulded frame of approved make and shade with 6mm thick
hard board backing including cost of materials, labour complete as per
specifications.
12.41 KSRB 11-15.3 : Providing and fixing 453x357mm dia rectangular Unit 946.00
shape mirror with plastic moulded frame of approved make and shade
with 6mm thick hard board backing including cost of materials, labour
complete as per specifications.

85
Sl. No. Description Unit Rate
Rs. Ps.

12.42 KSRB 11-15.4 : Providing and fixing 450x350mm dia oval shape Unit 728.00
mirror with plastic moulded frame of approved make and shade with
6mm thick hard board backing including cost of materials, labour
complete as per specifications.
12.43 KSRB 11-15.5 : Providing and fixing 1500x450mm dia rectangular Unit 1,234.00
shape mirror with plastic moulded frame of approved make and shade
with 6mm thick hard board backing including cost of materials, labour
complete as per specifications.
12.44 KSRB 11-16 : Providing and fixing 600x120mm glass shelf supported Unit 901.00
on alluminium angle frame with C.P brass brackets, guard rail fixed to
wooden cleats with C.P. brass screws and washers including cost of
materials, labour complete as per specifications.
12.45 KSRB 11-17-1 : Providing and fixing C.P. brass towel rail 740mm Unit 615.00
length, 20mm dia with C.P brackets, fixed to wooden cleats with
C.P. brass screws including cost of materials, labour complete as per
specifications.
12.46 KSRB 11-17.2 : Providing and fixing C.P. brass towel rail 600 mm Unit 561.00
length, 20mm dia with C.P brackets, fixed to wooden cleats with C.P. brass
screws including cost of materials, labour complete as per specifications.
12.47 KSRB 11-18-1 : Providing and fixing sand cast iron soil waste and vent
pipes with spun yarn soaked in cement slurry and cement mortar 1:2
including cost of materials, labour, testing complete as per specifications.
KBS 11-1.10
12.47 KSRB 11-18-1.1 : - do - with 100mm dia pipe m 555.00
12.48 KSRB 11-18-1.2 : - do - with 75mm dia pipe m 528.00
12.49 KSRB 11-18-1.3 : - do - with 50 mm dia pipe m 270.00
12.50 KSRB 11-18-2.0 : Providing and fixing sand cast iron soil waste with
access door, insertion of rubber washers 3mm thick bolts and nut, with
spun yarn soaked in cement slurry and cement mortar 1:2 including cost
of materials, labour, testing complete as per specifications.
12.50 KSRB 11-18-2.1 : - do - with 100 mm dia bends. Each 422.00
12.51 KSRB 11-18-2.2 : - do - with 75 mm dia bends. Each 362.00
12.52 KSRB 11-18-2.3 : - do - with 50 mm dia bends. Each 345.00
12.53 KSRB 11-18-3 : Providing and fixing sand cast iron soil waste with
spun yarn soaked in cement slurry and cement mortar 1:2 including cost
of materials, labour, testing complete as per specifications.
KBS 11-1.10
12.53 KSRB 11-18-3.1 : - do - with 100 mm dia plain bends Each 811.00
12.54 KSRB 11-18-3.2 : - do - with 75 mm dia plain bends Each 262.00
12.55 KSRB 11-18-3.3 : - do - with 50 mm dia plain bends Each 293.00

86
Sl. No. Description Unit Rate
Rs. Ps.

12.56 KSRB 11-18-4 : Providing and fixing sand cast iron soil waste double
equal junction of required degree with access door insertion of rubber
washers 3mm thick bolts and nuts, including cost of materials, labour,
testing complete as per specifications. KBS 11-1.10

12.56 KSRB 11-18-4.1 : - do - with access door 100 x 100 x 100 x 100 mm Each 898.00

12.57 KSRB 11-18-4.2 : - do - with access door 75 x 75 x 75 x 75 mm Each 665.00

12.58 KSRB 11-18-4.3 : - do - with access door 50 x 50 x 50 x 50 mm Each 587.00

12.59 KSRB 11-18-5 : Providing and fixing sand cast iron soil waste single
equal junction of required degree with access door 100x100x100mm,
insertion of rubber washers 3mm thick bolts and nuts, including cost of
materials, labour, testing complete as per specifications.
KBS 11-1.10

12.59 KSRB 11-18-5.1 : - do - with access door 100 x 100 x 100 mm Each 777.00

12.60 KSRB 11-18-5.2 : - do - with access door 75 x 75 x 75 mm Each 587.00

12.61 KSRB 11-18-5.3 : - do - with access door 50 x 50 x 50 mm Each 466.00

12.62 KSRB 11-18-6 : Providing and fixing sand cast iron soil waste double
unequal junction of required degree with access door insertion of rubber
washers 3mm thick bolts and nuts, including cost of materials, labour,
testing complete as per specifications.
KBS 11-1.10

12.62 KSRB 11-18-6.1 : - do - with access door 100 x 100 x 75 x 75 mm Each 898.00

12.63 KSRB 11-18-6.2 : - do - with access door 100 x 100 x 50 x 50 mm Each 898.00

12.64 KSRB 11-18-6.3 : - do - with access door 75 x 75 x 50 x 50 mm Each 380.00

12.65 KSRB 11-18-7 : Providing and fixing sand cast iron soil waste single
unequal junction of required degree with access door, insertion of
rubber washers 3mm thick bolts and nuts, including cost of materials,
labour, testing complete as per specifications.
KBS 11-1.10

12.65 KSRB 11-18-7.1 : - do - with access door 100 x 100 x 75 mm Each 690.00

12.66 KSRB 11-18-7.2 : - do - with access door 100 x 100 x 50 mm Each 656.00

12.67 KSRB 11-18-7.3 : - do - with access door 75 x 75 x 50 mm Each 475.00

12.68 KSRB 11-18-8 : Providing and fixing sand cast iron soil waste double
equal junction of required degree including cost of materials, labour,
testing complete as per specifications.
Specification No. KBS 11.1.10

12.68 KSRB 11-18-8.1 : - do - with 100 x 100 x 100 x 100 mm Each 716.00

87
Sl. No. Description Unit Rate
Rs. Ps.

12.69 KSRB 11-18-8.2 : - do - with 75 x 75 x 75 x 75 mm Each 544.00


12.70 KSRB 11-18-8.3 : - do - with 50 x 50 x 50 x 50 mm Each 370.00
12.71 KSRB 11-18-9.1 : Providing and fixing sand cast iron soil waste single Each 777.00
equal junction of required degree with access door 100x100x100mm,
including cost of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.72 KSRB 11-18-10.1 : Providing and fixing sand cast iron soil waste Each 898.00
double unequal junction of required degree100x100x75x75mm,
including cost of materials, labour, testing complete as per specifications.
KBS 11-1.10
12.73 KSRB 11-18-11.1 : Providing and fixing sand cast iron soil waste single
unequal junction of required degree including cost of materials, labour,
testing complete as per specifications.
KBS 11-1.10
12.73 KSRB 11-18-11.1 : - do - with 100 x 100 x 75 mm Each 422.00
12.74 KSRB 11-18-11.2 : - do - with 100 x 100 x 50 mm Each 435.00
12.75 KSRB 11-18-11.3 : - do - with 75 x 75 x 50 mm Each 362.00
12.76 KSRB 11-18-12 : Providing and fixing sand cast iron soil waste
double equal invert plain branches of required degree including cost
of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.76 KSRB 11-18-12.1 : - do - with 100 x 100 x 100 X 100 mm Each 825.00
12.77 KSRB 11-18-12.2 : - do - with 75 x 75 x 75 X 75 mm Each 544.00
12.78 KSRB 11-18-12.3 : - do - with 50 x 50 x 50 X 50 mm Each 375.00
12.79 KSRB 11-18-13 : Providing and fixing sand cast iron soil waste
single equal invert plain branches of required degree including cost
of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.79 KSRB 11-18-13.1 : - do - with 100 x 100 x 100 X 100 mm Each 760.00
12.80 KSRB 11-18-13.2 : - do - with 75 x 75 x 75 X 75 mm Each 587.00
12.81 KSRB 11-18-13.3 : - do - with 50 x 50 x 50 X 50 mm Each 518.00
12.82 KSRB 11-18-14.1 : Providing and fixing sand cast iron soil waste double Each 872.00
unequal invert plain branches of required degree 100x100x75x75mm,
including cost of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.83 KSRB 11-18-14.3 : Providing and fixing sand cast iron soil waste double Each 483.00
equal invert plain branches of required degree 75x75x50x50mm,
including cost of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10

88
Sl. No. Description Unit Rate
Rs. Ps.

12.84 KSRB 11-18-15.1 : Providing and fixing sand cast iron soil waste single Each 423.00
unequal invert plain branches of required degree 100x100x75mm,
including cost of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.85 KSRB 11-18-15.2 : Providing and fixing sand cast iron soil waste Each 362.00
single unequal invert plain branches of required degree 75x75x50mm
including cost of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.86 KSRB 11-18-16.1 : Providing and fixing sand cast iron soil waste Each 561.00
152mm offsets for 100mm pipes, including cost of materials, labour,
testing complete as per specifications.
Specification No. KBS 11.1.10
12.87 KSRB 11-18-16.2 : Providing and fixing sand cast iron soil waste Each 354.00
114mm offsets for 75mm pipes, including cost of materials, labour,
testing complete as per specifications.
Specification No. KBS 11.1.10
12.88 KSRB 11-18-16.3 : Providing and fixing sand cast iron soil waste 230 Each 605.00
mm offsets for 75mm pipes, including cost of materials, labour, testing
complete as per specifications.
Specification No. KBS 11.1.10
12.89 KSRB 11-18-17 : Providing and fixing sand cast iron trap of 100mm
dia, of self cleaning design with screwed down or hinged grating with
or without vent arm including cutting and making good the walls and
floors, cost of materials, labour, testing, complete as per specifications
Specification No. KBS 11.1.10
12.89 KSRB 11-18-17.1 : - do - with 100 mm dia Each 691.00
12.90 KSRB 11-18-17.2 : - do - with 75 mm dia Each 630.00
12.91 KSRB 11-18-17.3 : - do - with 50 mm dia Each 581.00
12.92 KSRB 11-18-18.1 : Providing lead caulked joints to sand cast iron /
cast iron ( spun ) pipes and fittings of, including cost of materials, labour,
testing, complete as per specifications.
Specification No. KBS 13.2.7
12.92 KSRB 11-18-18.1 : - do - with 100 mm dia Joint 107.00
12.93 KSRB 11-18-18.2 : - do - with 75 mm dia Joint 92.00
12.94 KSRB 11-18-18.3 : - do - with 50 mm dia Joint 77.00
12.95 KSRB 11-18-9 : Providing and fixing sand cast iron soil waste single
equal junction of required degree with access door, including cost of
materials, labour, testing complete as per specifications
Specification No. KBS 11.1.10
12.95 KSRB 11-18-9.2 : - do - with 75 x 75 x 75 mm Each 587.00

89
Sl. No. Description Unit Rate
Rs. Ps.

12.96 KSRB 11-18-9.3 : - do - with 50 x 50 x 50 mm Each 466.00


12.97 KSRB 11-18-10 : Providing and fixing sand cast iron soil waste double
unequal junction of required degree, including cost of materials, labour,
testing complete as per specifications.
Specification No. KBS 11.1.10
12.97 KSRB 11-18-10.2 : - do - with 100 x 100 x 50 x 50 mm Each 898.00
12.98 KSRB 11-18-10.3 : - do - with 75 x 75 x 50 x 50 mm Each 483.00
12.99 KSRB 11-18-19 : Providing and fixing M.S stays and clamps for sand
cast iron pipes of 100mm dia including cost of materials, labour, complete
as per specifications.
12.99 KSRB 11-18-19.1 : - do - with 100 mm dia No 273.00
12.100 KSRB 11-18-19.2 : - do - with 75 mm dia No 256.00
12.101 KSRB 11-18-19.3 : - do - with 50 mm dia No 48.00
12.102 KSRB 11-18-14.2 : Providing and fixing sand cast iron soil waste double Each 857.00
unequal invert plain branches of required degree 100x100x75x75mm
including cost of materials, labour, testing complete as per specifications.
Specification No. KBS 11.1.10
12.103 Providing (China Clay) glazed foot rests of approved 1st quality and Pair 145.00
make conforming to ISI specifications and fixing in CM (1:3) as directed
(Rate includes cost of materials and conveyance to work spot).
12.104 Providing plastic seat with approved 1st quality and make conforming
to ISI specifications double flapped and fixing to English water closet
with all fittings (Rate includes cost of materials, fixtures and conveyance
to work spot).
12.104.1 -do- White Pair 220.00
12.104.2 -do- Black Pair 187.00
12.105 Providing 3 cms dia GI telescopic flush tank lever of approved 1st quality Each 175.00
and make conforming to ISI specifications and fixing in position as
directed by the Engineer. Rate includes cost of materials and conveyance
to work spot.
12.106 Providing vulcanizing or rubber float of approved 1st quality and make Each 137.00
conforming to ISI Specifications and fixing for low down cistern as directed.
Rate includes cost of materials and conveyance to work spot.
12.107 Providing wash basin brackets of approved 1st quality and make Pair 200.00
conforming to ISI Specifications and fixing for low down cistern as
directed .Rate includes cost of materials and conveyance to work spot.
12.108 Providing pedestal for wash basin of approved 1st quality and make Each 750.00
conforming to ISI Specifications and fixing for low down cistern as
directed .Rate includes cost of materials and conveyance to work spot.

90
Sl. No. Description Unit Rate
Rs. Ps.

12.109 Providing and fixing white vitreous china clay urinals with flat back Each 708.00
of approved make fixed to wooden plugs including bends, painting white
to exposed pipes etc., complete as per directions.(rate includes cost of
all materials and lead).A grade.
12.110 Providing white vitreous china clay Indian pattern squatting urinals Each 791.00
with white glazed foot rests of approved quality and make conforming
to ISI specifications and fixing in Position with M-15 as directed of size
50.8 cms X 38 cms X 10.16 cms - A Grade (Rate includes cost of all
materials and conveyance to work spot).
12.111 Providing and fixing 7.5 cms to 15.00 cms dia NP grating 100 mm dia. Each 125.00
12.112 Providing stoneware gully trap of approved quality and make fixing in
M-15 and plastering with CM 1:3 wherever necessary.( Rate includes
cost of all materials, fixtures and lead).
12.112.1 -do- 10cms x 10cms Each 158.00
12.112.2 -do- 15cms x 10cms Each 233.00
12.113 Providing and fixing CI Nahani trap of approved make conforming to
ISI specifications and construction of Cistern in M-15 as per directions
(Rate is inclusive of cost of materials and fixtures and conveyance of
materials to work spot).
12.113.1 -do- 10cms x 7.5cms Each 208.00
12.113.2 -do- 12.5cms x 7.5cms Each 237.00
12.114 Cleaning the blockages of closets and soil pipes into working order
12.114.1 -Do- with scaffolding m 50.00
12.114.2 -Do- without scaffolding m 41.00
12.114.3 -do- underground stone ware pipes m 16.00
12.115 Providing and fixing white viterous china clay, wall corner type, lipped Unit 19,885.00
front waterless urinal basin of size 328x319x598mm C.I. / M.S. brackets,
standard flush pipe complete painting of fittings and brackets, cutting
and making good the wall and floor wherever required, including cost
of materials, labour complete as per specifications.
12.116 Providing and fixing to wall, ceiling and floor unplasticised PVC 6.00
kgs/sqcm working pressure with pipe fittings, wall clips etc., and
making good the wall, ceiling and floor for sanitary pipelines including
cost of all materials, labour charges, HOM and testing complete as per
specifications.
12.116.1 - do - 110 mm dia m 361.00
12.116.2 - do - 140 mm dia m 573.00
12.116.3 - do - 160 mm dia m 710.00
12.116.4 - do - 200 mm dia m 1,128.00
12.116.5 - do - 250 mm dia m 1,729.00

91
Chapter - 13
WATER SUPPLY WORK

92
Sl. No. Description Unit Rate
Rs. Ps.

13.0 WATER SUPPLY WORK


13.1 KSRB13-1.1 : Providing and fixing to wall, ceiling and floor galvanised /
mild steel tube nominal bore with fittings (medium grade weight 1.27
kg/mtr) B class including cost of all materials, labour charges, HOM and
testing complete as per specifications.
Specification No.KBS 13.2.14 / 13.8
13.1 - do - 15 mm dia m 168.00
13.2 - do - 20 mm dia m 200.00
13.3 - do - 25 mm dia m 259.00
13.4 - do - 32 mm dia m 300.00
13.5 - do - 40 mm dia m 372.00
13.6 - do - 50 mm dia m 426.00
13.7 KSRB13-2.1 : Extra for concealed pipe including painting with
anticorrosive bitumastic paint cutting chases, making good the concrete
surface, and plaster for nominal bore including cost of all materials,
labour charges, HOM complete as per specifications.
Specification No.KBS
13.7 - do - 15 mm dia nominal bore m 130.00
13.8 - do - 20 mm dia nominal bore m 130.00
13.9 - do - 25 mm dia nominal bore m 130.00
13.10 KSRB13-3.1: Providing and fixing in trenches galvanised / mild steel
tubes (medium grade) nominal bore with all fittings (earth work in trenches
to be measured and paid for separately) including cost of all materials,
labour charges, HOM and testing complete as per specifications.
Specification No.KBS 13.2.14 / 13.6
13.10 KSRB13.3.1 - do - 15 mm dia m 120.00
13.11 KSRB13.3.2 - do - 20 mm dia m 147.00
13.12 KSRB13.3.3 - do - 25 mm dia m 208.00
13.13 KSRB13.3.4 - do - 32 mm dia m 235.00
13.14 KSRB13.3.5 - do - 40 mm dia m 295.00
13.15 KSRB13.3.6 - do - 50 mm dia m 323.00
13.16 KSRB13.3.7 - do - 65 mm dia m 496.00
13.17 KSRB13.3.8 - do - 80 mm dia m 624.00
13.18 KSRB13.3.9 - do - 100 mm dia m 833.00
13.19 KSRB13.3.10 - do - 150 mm dia m 1,244.00

93
Sl. No. Description Unit Rate
Rs. Ps.

13.20 KSRB13-4.1 : Making connection of G.I distribution branch with G.I Nos 402.00
main of 25 to 40mm nominal bore, including cutting and threading the
pipes, providing and fixing Tee, nuts, labour for all item of works, testing
and HOM complete as per specifications.
Specification No.KBS 13.10
13.21 KSRB13-4.2 : Making connection of G.I distribution branch with G.I Nos 732.00
main of 50 to 85mm and 100 to 150 nominal bore, including cutting
and threading the pipes, providing and fixing Tee, nuts, labour for all
item of works, testing and HOM complete as per specifications.
Specification No.KBS 13.10
13.22 KSRB13-5 : Providing and fixing water meter with stop cock, jam Set 1,100.00
nut, socket in G.I pipe line including cutting and threading the pipe and
making long screws including cost of all materials, labour, HOM and
testing complete as per specifications.
Specification No.KBS 13.2.19 / 13.16
13.23 KSRB13-6.1 : Providing and fixing in position brass bib cock of
approved quality nominal bore including cost of all materials, labour
and HOM with all leads complete as per specifications.
Specification No.KBS 13.2.2 / 13.3
13.23 KSRB13-6.1-1 - do - 15 mm dia nominal bore Each 158.00
13.24 KSRB13-6.1-2 - do - 20 mm dia nominal bore Each 144.00
13.25 KSRB13-6.1-3 - do - 25 mm dia nominal bore Each 196.00
13.26 KSRB13-6.2 : Providing and fixing in position brass stop cock of
approved quality nominal bore including cost of all materials, labour
and HOM with all leads complete as per specifications.
Specification No.KBS 13.2.2 / 13.3
13.26 KSRB13-6.2-1 - do - 15 mm dia nominal bore Each 117.00
13.27 KSRB13-6.2-2 - do - 20 mm dia nominal bore Each 117.00
13.28 KSRB13-6.2-3 - do - 25 mm dia nominal bore Each 116.00
13.29 KSRB13-6.2-4 - do - 32 mm dia nominal bore Each 116.00
13.30 KSRB13-6.2-5 - do - 40 mm dia nominal bore Each 116.00
13.31 KSRB13-6.2-6 - do - 50 mm dia nominal bore Each 114.00
13.32 KSRB13-6.3 : Providing and fixing in position brass gate valve with
C.I wheel of approved quality ( screwed end ) nominal bore including
cost of all materials, labour and HOM with all leads complete as per
specifications.
Specification No.KBS 13.2.6 / 13.3
13.32 KSRB13-6.3-1 - do - 15 mm dia nominal bore Each 226.00
13.33 KSRB13-6.3-2 - do - 20 mm dia nominal bore Each 280.00

94
Sl. No. Description Unit Rate
Rs. Ps.

13.34 KSRB13-6.3-3 - do - 25 mm dia nominal bore Each 374.00


13.35 KSRB13-6.3-4 - do - 32 mm dia nominal Each 691.00
13.36 KSRB13-6.3-5 - do - 40 mm dia nominal Each 867.00
13.37 KSRB13-6.3-6 - do - 50 mm dia nominal Each 1,449.00
13.38 KSRB13-6.3-7 - do - 65 mm dia nominal Each 1,752.00
13.39 KSRB13-6.3-8 - do - 80 mm dia nominal Each 1,850.00
13.40 KSRB13-6.4 : Providing and fixing in position brass ball valve high or
low pressure with plastic float of approved quality nominal bore including
cost of all materials, labour and HOM with all leads complete as per
specifications.
Specification No.KBS
13.40 KSRB13-6.4-1 - do - 15 mm dia nominal Each 285.00
13.41 KSRB13-6.4-2 - do - 20 mm dia nominal Each 298.00
13.42 KSRB13-6.4-3 - do - 25 mm dia nominal Each 427.00
13.43 KSRB13-6.5 : Providing and fixing in position nominal bore brass ferrule
with C.I mouth cover including boring and tapping the main, cost of all
materials, labour and HOM with all leads complete as per specifications.
Specification No.KBS 13.2.3 / 13.14
13.43 KSRB13-6.5-1 - do - 15 mm dia nominal Each 134.00
13.44 KSRB13-6.5-2 - do - 20 mm dia nominal Each 174.00
13.45 KSRB13-6.5-3 - do - 25 mm dia nominal Each 200.00
13.46 KSRB13-6.6 : Providing and fixing unplasticised PVC connection pipe
with brass union 15mm nominal bore of PVC connection including
cost of all materials, labour and HOM with all leads complete as per
specifications.
Specification No.KBS
13.46 KSRB13-6.6-1 - do - 300 mm Length Set 195.00
13.47 KSRB13-6.6-2 - do - 450 mm Length Set 220.00
13.48 KSRB13-6.6 : Providing and fixing unplasticised PVC connection pipe
with brass union 20mm nominal bore of PVC connection including
cost of all materials, labour and HOM with all leads complete as per
specifications.
Specification No.KBS
13.48 KSRB13-6.6-3 : - do - 300 mm Length Set 201.00
13.49 KSRB13-6.6-4 : - do - 450 mm Length Set 205.00
13.50 KSRB13-6.7 : Providing and fixing in position chromium plated brass
shower rose with 15 or 20mm inlet including cost of all materials,
labour and HOM with all leads complete as per specifications.
Specification No.KBS 13.2.16 / 13.3

95
Sl. No. Description Unit Rate
Rs. Ps.

13.50 KSRB13-6.7-1 - do - 100 mm dia Each 589.00


13.51 KSRB13-6.7-2 - do - 150 mm dia Each 625.00
13.52 KSRB13-7.1 : Providing and fixing in position nominal bore gun metal
non-return valve horizontal type of approved make including cost of all
materials, labour and HOM with all leads complete as per specifications.
Specification No.KBS 13.2.10 / 13.13
13.52 KSRB13-7.1-1 - do - 25 mm dia nominal bore Nos 489.00

13.53 KSRB13-7.1-2 - do - 32 mm dia nominal bore Nos 616.00

13.54 KSRB13-7.1-3 - do - 40 mm dia nominal bore Each 789.00

13.55 KSRB13-7.1-4 - do - 50 mm dia nominal bore Nos 1,108.00

13.56 KSRB13-7.1-5 - do - 65 mm dia nominal bore Nos 1,440.00

13.57 KSRB13-7.1-6 - do - 80 mm dia nominal bore Nos 1,785.00

13.58 KSRB13-7.1-7 - do - 100 mm dia nominal bore Nos 2,002.00

13.59 KSRB13-7.2 : Providing and fixing in position nominal bore non-return


valve vertical type of approved make including cost of all materials,
labour and HOM with all leads complete as per specifications.
Specification No.KBS 13.2.10 / 13.13
13.59 KSRB13-7.2-1 - do - 25 mm dia nominal bore Nos 396.00

13.60 KSRB13-7.2-2 - do - 32 mm dia nominal bore Nos 622.00

13.61 KSRB13-7.2-3 - do - 40 mm dia nominal bore Nos 752.00

13.62 KSRB13-7.2-4 :- do - 50 mm dia nominal bore Nos 1,057.00

13.63 KSRB13-7.2-5 - do - 65 mm dia nominal bore Nos 1,315.00

13.64 KSRB13-7.2-6 - do - 80 mm dia nominal bore Nos 1,607.00

13.65 KSRB13-7.2-7 - do - 100 mm dia nominal bore Nos 1,831.00

13.66 KSRB13-8 : Providing and fixing to wall, ceiling and floor, medium
density polyethylene pipes 6.00 kgs/sq.cm working pressure of
outside diameter with special flange, compression type fittings, wall clips,
making good the wall, ceiling and floor including cost of all materials, labour
charges, HOM and testing complete as per specifications.
Specification No.KBS 13.2.15.1 / 13.9 for internal water supply connection
13.66 KSRB13-8.1 - do - 20 mm dia m 89.00

13.67 KSRB13-8.2 - do - 25 mm dia m 107.00

13.68 KSRB13-8.3 - do - 32 mm dia m 158.00

13.69 KSRB13-8.4 - do - 40 mm dia m 190.00

96
Sl. No. Description Unit Rate
Rs. Ps.

13.70.1 KSRB13-8.5 - do - 50 mm dia m 217.00

13.70.2 KSRB13-8.6 : -do- 63mm m 247.00

13.70.3 KSRB 13-8.7 : -do- 75mm m 271.00

13.70.4 KSRB 13-8.8 : -do- 90mm m 316.00

13.70.5 KSRB 13-8.9 : -do- 110mm m 375.00

13.70.6 KSRB 13-8.9 : -do- 140mm m 463.00

13.70.7 KSRB 13-8.9 : -do- 160mm m 522.00

13.71 KSRB13-9 : Providing and fixing to wall, ceiling and floor high density
polyethylene pipes 6.00 kgf/sq.cm working pressure of outside
diameter raising mains & exposed distribution pipes with special flange,
compression type fittings, wall clips, making good the wall, ceiling and
floor, including cost of all materials, labour charges, HOM and testing
complete as per specifications.
Specification No. KBS 13.2.15.2 / 13.9
13.71 KSRB13-9.1 - do - 32 mm dia m 195.00
13.72 KSRB13-9.2 - do - 40 mm dia m 218.00
13.73.1 KSRB13-9.3 - do - 50 mm dia m 273.00
13.73.2 KSRB 13-9.4 : -do- 63mm m 310.00
13.73.3 KSRB 13-8.9 : -do- 75mm m 354.00
13.73.4 KSRB 13-8.9 : -do- 90mm m 415.00
13.73.5 KSRB 13-8.9 : -do- 110mm m 495.00
13.73.6 KSRB 13-8.9 : -do- 140mm m 617.00
13.74 KSRB13-10 : Providing and fixing to wall, ceiling and floor unplasticised
PVC pipes 10.00 kgs/sq.cm working pressure of outside diameter
chemp plast / Wavin or equivalent make with pipe fittings, wall clips,
making good the wall, ceiling and floor, including cost of all materials,
labour charges, HOM and testing complete as per specifications.
Specification No.KBS 13.2.15.4 / 13.9
13.74 KSRB13-10.1 - do - 16 mm dia m 89.00
13.75 KSRB13-10.2 - do - 20 mm dia m 89.00
13.76 KSRB13-10.3 - do - 25 mm dia m 98.00
13.77 KSRB13-10.4 - do - 32 mm dia m 107.00
13.78 KSRB 13-11 : Providing and placing on terrace, polyethylene water storage Nos 5,690.00
tanks as per IS 12701 : 1996 with manhole lid and suitable locking arrangements,
making holes of suitable diameter for inlet, outlet and over flow pipes, including
cost of all materials, labour, transport charges, HOM and testing complete as
per specifications. (For 1000 litre capacity)
Specification No.KBS 13.22

97
Sl. No. Description Unit Rate
Rs. Ps.

13.79 Providing and fixing gun metal wheel valve conforming to IS


specification of approved make as per directions including all lead and
lift etc., complete.
13.79.1 -do- for 15mm dia: Each 329.00
13.79.2 -do- for 20mm dia: Each 345.00
13.79.3 -do- for 25mm dia: Each 372.00
13.79.4 -do- for 32mm dia: Each 405.00
13.79.5 -do- for 40mm dia: Each 468.00
13.79.6 -do- for 50mm dia: Each 611.00
13.80 Providing gun metal pillar cocks 15mm dia of I class conforming to Each 201.00
ISI specifications and fixing them in position as per directions including
of cost of materials and fixtures and conveyance to spot.
13.81 Providing NP/CP waste unions conforming to ISI specifications and
fixing them in position as per directions including cost of materials,
fixtures and conveyance to work spot etc., complete.
13.81.1 -do- for 32mm dia: Each 100.00
13.81.2 -do- for 40mm dia: Each 133.00
13.81.3 -do- for 50mm dia: Each 175.00
13.82 Providing & fixing Polyethelene-Aluminium-Polyethelene (PE-AL-PE)
Composite Pressure Pipes conforming to IS 15450 duly “ISI” marked,
U.V. stabalized with Carbon black for hot & cold water supply, capable to
withstand temperature upto 80°C including all special composite fittings
(engineering plastic blend and brass inserts wherever required.) e.g.
elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00
meter spacing, cutting & making good the walls etc., including testing
complete as required. (Internal work)
Pipes exposed on wall
13.82.1 1216(16 mm OD) Pipe m 149.00
13.82.2 1620(20mm OD) pipe m 178.00
13.82.3 2025(25mm OD) pipe m 211.00
13.82.4 2532(32mm OD) pipe m 297.00
13.82.5 3240 (40mm OD) pipe m 425.00
13.82.6 4050 (50mm OD) pipe m 490.00
13.83 Providing & fixing Polyethelene-Aluminium-Polyethelene (PE-AL-PE)
Composite Pressure Pipes conforming to IS 15450 duly “ISI” marked,
U.V. stabilized with Carbon black for hot & cold water supply, capable to
withstand temperature upto 80°C including all special composite fittings
(engineering plastic blend and brass inserts wherever required.) e.g.

98
Sl. No. Description Unit Rate
Rs. Ps.

elbows, tees, reducers, couplers & connectors etc. with cement tacking
at 1.00 meter spacing, and every fitting, cutting & making good the walls
etc., including testing complete as required. (Internal work)
Concealed piping with cutting chases & making good walls etc.,
13.83.1 1216(16 mm OD) Pipe m 220.00
13.83.2 1620(20mm OD) pipe m 254.00
13.83.3 2025(25mm OD) pipe m 291.00
13.83.4 2532(32mm OD) pipe m 388.00
13.83.5 3240 (40mm OD) pipe m 540.00
13.83.6 4050 (50mm OD) pipe m 625.00
13.84 Providing & fixing Polyethelene-Aluminium-Polyethelene (PE-AL-PE)
Composite Pressure Pipes conforming to IS 15450 duly “ISI” marked,
U.V. stabalized with Carbon black for hot & cold water supply, capable
to withstand temperature upto 80°C including all special composite
fittings (engineering plastic blend and brass inserts wherever required.)
e.g. elbows, tees, reducers, couplers & connectors etc. with tranching
& refilling upto 1.00 meter depth including testing complete as required.
(External work)
Pipe in trenches including excavation & refilling etc.,
13.84.1 1216 (16mm OD) pipe m 142.00
13.84.2 1620 (20mm OD) pipe m 165.00
13.84.3 2025 (25mm OD) pipe m 190.00
13.84.4 2532 (32mm OD) pipe m 263.00
13.84.5 3240 (40mm OD) pipe m 373.00
13.84.6 4050 (50mm OD) pipe m 439.00
13.85 Providing and fixing chorinated poly vinyl Chloride (CPVC) pipes
conforming to IS 15778, having thermal stability for hot and cold water
supply including all CPVC plain and brass threaded fittings including
fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of
pipes and fittings with one step CPVC solvent cement and testing of
joints complete. (internal work exposed on wall)
13.85.1 15mm nominal OD pipes m 108.00
13.85.2 20mm nominal OD pipes m 130.00
13.85.3 25mm nominal OD pipes m 163.00
13.85.4 32mm nominal OD pipes m 211.00
13.85.5 40mm nominal OD pipes m 280.00
13.85.6 50mm nominal OD pipes m 387.00

99
Sl. No. Description Unit Rate
Rs. Ps.

13.86 Providing and fixing chorinated poly vinyl Chloride (CPVC) pipes
conforming to IS 15778, having thermal stability for hot and cold water
supply including all CPVC plain and brass threaded fittings including
fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of
pipes and fittings with one step CPVC solvent cement & the cost of cutting
chases & making good the same including testing of joints complete.
(Concealed work including cutting chases and making good walls)
13.86.1 15mm nominal OD pipes m 171.00
13.86.2 20mm nominal OD pipes m 195.00
13.86.3 25mm nominal OD pipes m 244.00
13.86.4 32mm nominal OD pipes m 311.00
13.87 Providing and fixing chorinated poly vinyl Chloride (CPVC) pipes
conforming to IS 15778 having thermal stability for hot and cold water
supply including all CPVC plain and brass threaded fittings, this includes
jointing of pipes and fittings with one step solvent cement, trenching,
refilling & testing of joints complete. (external work).
13.87.1 15mm nominal OD pipes m 105.00
13.87.2 20mm nominal OD pipes m 121.00
13.87.3 25mm nominal OD pipes m 149.00
13.87.4 32mm nominal OD pipes m 188.00
13.87.5 40mm nominal OD pipes m 243.00
13.87.6 50mm nominal OD pipes m 360.00
13.87.7 62.50mm nominal OD pipes m 1,175.00
13.87.8 75mm nominal OD pipes m 1,500.00
13.87.9 100mm nominal OD pipes m 2,041.00
13.87.10 150mm nominal OD pipes m 3,541.00
13.88 Providing and fixing polished granite sink of size 60cms x 90cms Each 5,469.00
of 23cm thick, the sink portion shall be 15cm in depth of shapes oval /
round / square over brick masonry in cement mortar 1:6 including cost
and conveyance of all materials, labour for all items of work, HOM with all
lead and lift, loading and unloading, transportation charges and all other
incidental charges etc., complete as per specification and directions of
the Engineer-in-charge of the work.
13.89 Providing and fixing polished granite sink of size 60cms x 75cms Each 4,645.00
of 23cm thick, the sink portion shall be 15cm in depth of shapes oval /
round / square over brick masonry in cement mortar 1:6 including cost
and conveyance of all materials, labour for all items of work, HOM with all
lead and lift, loading and unloading, transportation charges and all other
incidental charges etc., complete as per specification and directions of
the Engineer-in-charge of the work.

100
Sl. No. Description Unit Rate
Rs. Ps.

13.90 Providing and fixing polished granite sink of size 60cms x 60cms Each 3,821.00
of 23cm thick, the sink portion shall be 15cm in depth of shapes oval /
round / square over brick masonry in cement mortar 1:6 including cost
and conveyance of all materials, labour for all items of work, HOM with all
lead and lift, loading and unloading, transportation charges and all other
incidental charges etc., complete as per specification and directions of
the Engineer-in-charge of the work.
13.91 Providing and Fixing Stainless Steel sink of sizes upto 40cms x Each 4,530.00
47cms in 20mm thick granite slab of by cutting required thickness and
width of grooves and fixing using adhesives etc., complete including cost
and conveyance of all materials, labour for all items of work, HOM with all
lead and lift, loading and unloading, transportation charges and all other
incidental charges etc., complete as per specification and directions of
the Engineer-in-charge of the work.
13.92 Cutting granite slab upto 40mm thick and required width of grooves
for fixing Stainless Steel sink and fixing using adhesives.
13.92.1 _do_ for fixing Stainless steel sink upto 60cm x 45 cms No 872.00
13.92.2 _do_ for fixing Stainless steel sink above 60cm x 45 cms No 1,308.00
13.93 Providing and fixing concealed UVstabilised and antimicrobial fusion
3 layer PP-R pipes confirming to DIN 8077 complete with PP-R plain
fittings incluiding brass threaded polypropelene random fittings including
chasing the walls.
Internal Plumbing - for concealed fitting
13.93.1 20mm pipe outer dia (3 layer) m 175.00
13.93.2 25mm pipe outer dia (3 layer) m 216.00
13.93.3 32mm pipe outer dia (3 layer) m 275.00
13.94 Providing and fixing concealed UV stabilised and antimicrobial fusion
3 layer PP-R pipes confirming to DIN 8077 compete with PP-R plain
fittings including brass threaded polypropelene random fittings including
chasing the walls.
Internal Plumbing - for exposed on wall
13.94.1 20mm pipe outer dia (3 layer) m 116.00
13.94.2 25mm pipe outer dia (3 layer) m 150.00
13.94.3 32mm pipe outer dia (3 layer) m 208.00
13.94.4 40mm pipe outer dia (3 layer) m 291.00
13.94.5 50mm pipe outer dia (3 layer) m 416.00
13.95 Providing and fixing concealed UV stabilised and antimicrobial
fusion 3 layer PP-R pipes confirming to DIN 8077 complete with PP-R
plain fittings including brass threaded polypropelene random fittings
including chasing the walls.

101
Sl. No. Description Unit Rate
Rs. Ps.

External plumbing
13.95.1 20mm pipe outer dia (3 layer) m 108.00
13.95.2 25mm pipe outer dia (3 layer) m 150.00
13.95.3 32mm pipe outer dia (3 layer) m 183.00
13.95.4 40mm pipe outer dia (3 layer) m 250.00
13.95.5 50mm pipe outer dia (3 layer) m 458.00
13.95.6 63mm pipe outer dia (3 layer) m 558.00
13.95.7 75mm pipe outer dia (3 layer) m 666.00
13.95.8 90mm pipe outer dia (3 layer) m 1,000.00
13.95.9 110mm pipe outer dia (3 layer) m 1,200.00
13.95.10 160mm pipe outer dia (3 layer) m 1,883.00

Note : KSRB13-11 : Polyethylene tanks


1. These tanks shall be ready made / manufactured with following
materials.
i) HDPE ; High density poly-ethylene :
ii) LDPE : Low density poly-ethylene
iii) LLDPE : Linear low density poly-ethylene
2. Tanks shall be placed on firm base covering entire bottom area.
3. Fittings checknuts etc., shall be paid separately.
4. Tanks shall be anchored properly depending upon location
5. Tanks are available in sizes 200 to 20000 litres
6. Add 15% extra for internal water supply items.

102
Chapter - 14
FLOORING

103
Sl. No. Description Unit Rate
Rs. Ps.

14.0 FLOORING
14.1 KSRB 14.1 : Providing and laying flooring with burnt stone slabs 10 Sqm 956.00
cms thick, rough chistle dressed on sand bed of 7.5 cms to 8 cms
thick and pointed with cement mortar 1:3, including cost of materials,
sand, labour, curing complete as per specifications.
Specification No. KBS 14.26
14.2 KSRB 14.2 : Providing and laying flooring with burnt stone slabs Sqm 926.00
10 cms thick rough chistle dressed on cement mortar bed 1:6, 25 mm
thick, and pointed with cement mortar 1:3, including cost of materials,
mortar, labour, curing complete as per specifications.
Specification No. KBS 14.26
14.3 KSRB 14.3 : Providing and laying flooring and steps machine cut Sqm 2,022.00
granite slabs 40mm thick on cement mortar bed 1:6, 25 mm thick,
and pointed with cement mortar 1:3 over existing cement concrete
bed, including cost of materials, mortar, labour, curing complete as per
specifications.
Specification No. KBS 14.26
14.4 KSRB 14.4 : Providing and laying flooring and steps fine dressed granite Sqm 2,700.00
stone slabs 40 mm thick on cement mortar bed 1:6, 25 mm thick,
and pointed with cement mortar 1:3 over existing cement concrete
bed, including cost of materials, mortar, labour, curing complete as per
specifications. Specification No. KBS 14.26
14.5 KSRB 14.5 : Providing and laying flooring and steps fine machine Sqm 986.00
polished granite stone slabs 20 mm thick on cement mortar bed 1:6,
20 mm thick, and joints finished with cement mortar 1:3 over existing
cement concrete bed , including cost of materials, mortar, labour, curing
complete as per specifications.
Specification No. KBS 14.26
14.6 KSRB 14.6 : Providing and laying heavy duty cobble stones interlock
pavers, using cement and course sand for manufacture of blocks of
approved size, shape and colour with a minimum compressive strength
of 281 kg per sqm over 50mm thick sand bed (average thickness) and
compacting with plate vibrator having 3 tons compaction force thereby
forcing part of sand underneath to come up in between joints, final
compaction of paver surface joints into its final level, including cost of
materials, labour and HOM complete as per specifications.
Specification No. KBS
14.6 KSRB 14.6-1 : - do - heavy duty cobble stones 60mm thick Sqm 877.00
14.7 KSRB 14.6-2 : - do - heavy duty cobble stones 75mm thick Sqm 925.00
14.8 KSRB 14.7-1: Providing and laying flooring with M15 cement concrete Sqm 290.00
40 mm thick using broken granite 20mm and down size laid to line and
level in one layer and finish with a floating coat of neat cement , including
cost of materials, labour, curing, complete as per specifications.
Specification No. KBS 14.3

104
Sl. No. Description Unit Rate
Rs. Ps.

14.9 KSRB 14.7-2 : Providing and laying red oxide flooring 40 mm thick, Sqm 554.00
with an under layer of 30mm thick M-15 cement concrete, using broken
granite metal of 12.5mm nominal size and top layer of 10mm thick plaster
with 1:3 cement mortar mixed with red oxide ( using 3.5 kg of red oxide
per 50 kg of cement ) finished with floating coat of neat cement mixed
with red oxide (mix of same proportion), including cost of materials,
labour, curing, complete as per specifications.
Specification No. KBS 14.3

14.10 KSRB 14.7-3 : Providing and laying flooring 40 mm thick, with an under Sqm 506.00
layer of 30mm thick M-15 cement concrete, using broken granite metal
of 12.5mm nominal size and top layer of 10mm thick plaster with cement
mortar 1:3, finished with floating coat of neat cement , including cost of
materials, labour, curing, complete as per specifications.
Specification No. KBS 14.3

14.11 KSRB 14.7-4 : Extra for making chequers of approved pattern on Sqm 30.00
cement concrete floor, steps, landings, pavements, including cost of
labour complete as per specifications.
Specification No. KBS

14.12 KSRB 14.8-1: Providing and laying linolium covering to floors plain or Sqm 340.00
coloured 3.2mm thick sheet / tiles laid with an approved adhesive on sub
floor stretching, cutting and fixing complete, including cost of materials,
labour, complete as per specifications.
Specification No. KBS 14.37.7

14.13 KSRB 14.9-1: Providing and laying M-15 cement concrete flooring, Sqm 525.00
50 mm thick with metallic concrete hardner topping, under layer of
35mm thick m-15 cement concrete using broken granite metal of 20mm
and down size, and top layer 50mm thick of metallic cement hardner
consisting of mix 1:2 (1 cement hardner mix : 2 granite metal 10mm
nominal size) by volume, with which metallic hardening compound of
approved quality mix in the ratio of 4:1 ( 4 part of cement and 1 part of
metallic floor hardening compound of approved quality by wt), including
finishing cost of materials, labour, curing, complete as per specifications
Specification No. KBS 14.4

14.14 KSRB 14.9-2 : Providing and laying M-15 cement concrete flooring Sqm 584.00
60 mm thick with metallic concrete hardner topping, under layer of
45mm thick M-15 cement concrete using broken granite metal of 20mm
and down size and top layer of 15mm thick metallic cement hardner
consisting of mix 1:2 (1 cement hardner mix : 2 granite metal 10mm
nominal size) by volume, with metalic hardening compound of approved
quality mix in the ratio of 4:1 (4 part of cement = 1 part of metallic floor
hardening compound of approved quality by wt), including finishing, cost
of materials, labour, curing, complete as per specifications.
Specification No. KBS 14.4

105
Sl. No. Description Unit Rate
Rs. Ps.

14.15 KSRB 14.10-1: Flooring with 25mm thick polished tandur blue stone Sqm 1,045.00
slabs using cement mortar 1:6, 25mm thick over existing cement
concrete bed or top of roof laid to line and level and jointed with cement
slurry mixed with pigment to match the shade of the slab, including cost
of materials, labour, curing, polishing complete as per specifications.
Specification No. KBS
14.16 KSRB 14.10-2: Flooring with 20 mm thick polished shahabad slabs Sqm 1,150.00
using cement mortar 1:6, 25mm thick over existing cement concrete bed
or top of roof laid to line and level and jointed with cement slurry mixed
with pigment to match the shade of the slab, including cost of materials,
labour, curing, polishing complete as per specifications.
Specification No. KBS
14.17 KSRB 14.10-3: Providing flooring with 20 mm thick polished Cadapa Sqm 1,073.00
slabs using cement mortar 1:6, 25 mm thick over existing cement
concrete bed or top of roof laid to line and level and jointed with cement
slurry mixed with pigment to match the shade of the slab, including cost
of materials, labour, curing, polishing complete as per specifications.
Specification No. KBS
14.18 KSRB 14.11-1: Providing mosaic flooring with cast-in-situ 40mm Sqm 1,216.00
thick using marble chips flooring rubbed and polished to granolithic
finish with under layer of 28mm thick cement concrete M-15 with stone
aggregate 12mm and down size, and top layer 12mm thick with dark
shade pigment with ordinary cement in top layer only using white,
black, chacolate, yellow or baroda green marble chips of size from
7 to 10 nominal size laid in cement marble powder mix 3:1 ( 3 cement:
1 marble powder by weight ) in proportion of 4:7 ( 4 cement marble
powder mix : 7 marble chips by volume ) curing polishing oxalic acid
wash, wax polish , including cost of materials, labour, complete as per
specifications.
Specification No. KBS 14.8
14.19 KSRB 14.11-2 : Providing mosaic flooring with cast-in-situ 40mm Sqm 1,310.00
thick using marble chips flooring, rubbed and polished to granolithic
finish with under layer of 28mm thick cement cocrete M-15 with stone
aggregate 12mm and down size , and top layer 12mm thick with light
shade pigment with white cement in top layer only using white, black,
chacolate, yellow or baroda green marble chips of size from 7 to 10
nominal size laid in cement marble stone mixed 3:1 ( 3 cement : 1 marble
powder by weight ) in proportion of 4:7 ( 4 cement marble powder mix :
7 marble chips by volume ) curing polishing oxalic acid wash, wax polish,
including cost of materials, labour, complete as per specifications.
Specification No. KBS 14.8
14.20 KSRB 14.11-3 : Providing mosaic flooring with cast-in-situ 40mm thick Sqm 1,244.00
using marble chips flooring rubbed and polished to granolithic finish with
under layer of 28mm thick cement cocrete M-15 with stone aggregate
12mm and down size, and top layer 12mm thick with medium shade
pigment with approximately 50% white cement and 50% ordinary cement

106
Sl. No. Description Unit Rate
Rs. Ps.

in top layer only using white, black, chacolate, yellow or baroda green
marble chips of size from 7 to 10 nominal size laid in cement marble
stone mixed 3:1 (3 cement : 1 marble powder by weight) in proportion
of 4:7 (4 cement marble powder mix : 7 marble chips by volume) curing
polishing oxalic acid wash, wax polishing, including cost of materials,
labour, complete as per specifications.
Specification No. KBS 14.8
14.21 KSRB 14.11-4 : Providing mosaic flooring with cast-in-situ 40mm Sqm 1,287.00
thick using marble chips and polished to granolithic finish with under
layer of 28mm thick cement concrete M-15 with stone aggregate 12mm
and down size, and top layer 12mm thick with white cement without
any pigment in top layer only using white, black, chacolate, yellow
or baroda green marble chips of size from 7 to 10 nominal size laid in
cement marble powder mix 3:1 ( 3 cement : 1 marble powder by weight)
in proportion of 4:7 ( 4 cement marble powder mix : 7 marble chips by
volume ) curing, polishing oxalic acid wash, wax polish, including cost
of materials, labour, complete as per specifications.
Specification No. KBS 14.8
14.22 KSRB 14.11-5 :Extra for providing and fixing aluminium strips 40 mm m 33.00
wide and 1.5mm thick painted with a protective coat of bitumen for joints
of mosaic floors, including cost of materials, labour, curing, complete as
per specifications.
Specification No. KBS
14.23 KSRB 14.11-6 :Extra for providing and fixing glass strips 40 mm wide m 40.00
and 4mm thick for joints of mosaic floors , including cost of materials,
labour, curing, complete as per specifications.
Specification No. KBS
14.24 KSRB 14.12-1: Providing mosaic tiles flooring with precast grey Sqm 582.00
colour mosaic tiles 20mm thick using marble chips of approved colour
7 to 10 nominal size laid in floors and landings on a bed of 25mm thick
cement mortar 1:6, mix, jointed with neat cement slurry mix with pigment
to match the shade of tiles curing, rubbing, polishing, oxalic acid wash,
wax polish , including cost of materials, labour, HOM complete as per
specifications.
Specification No. KBS 14.11
14.25 KSRB 14.12-2: Providing mosaic tiles flooring with precast light Sqm 670.00
shade pigment with white cement mosaic tiles 20mm thick using
marble chips of approved colour 7 to 10 nominal size laid in floors
and landings on a bed of 25mm thick cement mortar 1:6, mix, jointed
with neat cement slurry mix with pigment to match the shade of tiles,
curing. rubbing, polishing, oxalic acid wash, wax polish, including cost
of materials, labour, HOM complete as per specifications.
Specification No. KBS 14.11
14.26 KSRB 14.12-3 : Providing mosaic tiles flooring with precast medium Sqm 540.00
shade pigment using 50% white cement and 50% ordinary cement

107
Sl. No. Description Unit Rate
Rs. Ps.

mosaic tiles 20mm thick using marble chips of approved colour 7 to 10


nominal size laid in floors and landings on a bed of 25mm thick average
thickness of cement mortar 1:6, mix, jointed with neat cement slurry
mix with pigment to match the shade of tiles, curing, rubbing, polishing,
oxalic acid wash, wax polish , including cost of materials, labour, HOM
complete as per specifications.
14.27 KSRB 14.12-4 : Providing mosaic tiles flooring with white precast Sqm 644.00
cement mosaic tiles 20mm thick using marble chips of 7 to 10 nominal
size laid in floors and landings on a bed of 25mm thick average thickness
of cement mortar 1:6, mix, jointed with neat cement slurry mix with
pigment to match the shade of tiles, curing, rubbing, polishing, oxalic
acid wash, wax polish , including cost of materials, labour, HOM complete
as per specifications.
14.28 KSRB 14.13-1: Providing precast chequered mosaic tiles dark shade Sqm 891.00
using ordinary grey cement for steps and flooring, with precast
20mm thick, using marble chips of 7 to 10 nominal size laid in floors,
steps and landings on a bed of 12mm thick cement mortar 1:3 mix, and
jointed with neat cement slurry mixed with pigment to match the shade
of tiles, curing, rubbing, polishing, oxalic acid wash, wax polish,including
cost of materials, labour, complete as per specifications.
14.29 KSRB 14.13-2: Providing precast chequered mosaic tiles light shade Sqm 977.00
using white cement for steps and flooring, 20mm thick, using marble
chips of 7 to 10 nominal size laid in floors, steps and landings on a bed
of 12mm thick cement mortar 1:3 mix, and jointed with neat cement
slurry mixed with pigment to match the shade of tiles curing, rubbing,
polishing, oxalic acid wash, wax polish , including cost of materials,
labour, complete as per specifications.
Specification No. KBS 14.13, 14.14
14.30 KSRB 14.13-3: Providing precast chequered mosaic tiles medium Sqm 945.00
shade pigment using 50% white cement and 50% ordinary cement
for steps and flooring 20mm thick using marble chips of 7 to 10 nominal
size laid on a bed of 12mm thick cement mortar 1:3 mix, and jointed
with neat cement slurry mixed with pigment to match the shade of tiles
curing, rubbing, polishing, oxalic acid wash, wax polish , including cost
of materials, labour, complete as per specifications.
Specification No. KBS 14.13, 14.14
14.31 KSRB 14.13-4: Providing precast chequered mosaic tiles white colour Sqm 1,031.00
for steps and flooring, 20mm thick, using marble chips of 7 to 10
nominal size laid on a bed of 12mm thick cement mortar 1:3 mix, and
jointed with neat cement slurry mixed with pigment to match the shade
of tiles rubbing, polishing, oxalic acid wash, wax polish, including cost
of materials, labour, curing, complete as per specifications.
Specification No. KBS 14.13, 14.14
14.36 KSRB 14.14-5: Providing Ceramic tiles of approved make,shade and
size for flooring, treads of steps and landings laid on a bed of 12mm
thick, cement mortar 1:3 mix, flush pointing with white cement using

108
Sl. No. Description Unit Rate
Rs. Ps.

colour pigment , including cost of materials, labour, curing, complete as


per specifications.
Specification No. KBS

14.36.1 _do_ for Ceramic Tiles of size 15x15cms 6mm thick Sqm 936.00

14.36.2 _do_ for Ceramic Tiles of size 30x30cms 6mm thick Sqm 1,008.00

14.36.3 _do_ for Ceramic Tiles 400 x 400mm on a bed of 20mm thick Sqm 1,123.00

14.36.4 _do_ for Ceramic Tiles 30cm x 60cm 6mm thick, on a bed of 20mm thick Sqm 1,123.00

14.37 KSRB 14.15-1: Providing marble slab flooring 20mm thick with edges Sqm 2,985.00
of slab machine cut, for flooring, treads of steps and landings laid on a
bed of 25mm thick cement mortar 1:6, mix, to line and level, jointed with
cement slurry curing, rubbing, polishing complete finishIing with flush
pointing using white cement, including cost of materials, HOM labour,
curing, complete as per specifications.

14.38 KSRB 14-16.1 : Providing skirting upto 30 cms. height with cement Sqm 269.00
mortar 1:3 finished with a floating coat of neat cement including rounding
off junctions floor, overall 15 mm thick including cost of materials, labour,
complete as per specifications.
Specification No.KBS 14.5

14.39 KSRB 14-16.2 : Providing red oxide skirting upto 30 cms. height with Sqm 284.00
cement mortar 1:3 including rounding off junctions with floor, finished
overall 15 mm thick, top portion 5mm thick mixed with red oxide and a
floating coat of neat cement using 3.5kg of red oxide of iron per 50 kg of
cement including cost of materials, labour, complete as per specifications.
Specification No.KBS 14.5

14.40 KSRB 14-17.1 : Providing skirting, dadoing, rises of steps with white Sqm 973.00
glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed
with white cement slurry over existing rough plaster surface using glazed
tiles of approved make and size including cost of materials, labour,
complete as per specifications.
Specification No.KBS 14.16, 14.17

14.41 KSRB 14-17.2 : Providing skirting, dadoing, rises of steps with colour
glazed tiles on 10mm thick cement plaster 1:3 and jointed with white
cement slurry over existing rough plaster surface using glazed tiles of
approved make and size including cost of materials, labour, complete
as per specifications.
Specification No.KBS 14.16, 14.17

14.41.1 Colour glazed tiles 15x15 cms 6mm thick Sqm 1,059.00

14.41.2 Colour glazed tiles 30x60 cms 6mm thick with border of size 30 x 10 cms Sqm 1,360.00

14.41.3 Colour glazed tiles 30x45 cms 6mm thick with border of size 30 x 10 Sqm 1,062.00
cms.

109
Sl. No. Description Unit Rate
Rs. Ps.

14.42 KSRB 14-18.1 : Providing skirting, dadoing, rises of steps using Sqm 3,223.00
marble slabs with machine cut edges upto 25mm thick and not
exceeding 30 cms. height on 10 mm. thick cement mortar 1:3 and
jointed with white cement slurry over existing rough plaster surface
including cost of materials, mortar, labour complete as per specifications.
Specification No.KBS 14.19
14.43 Providing and fixing Special make glazed Vitrified tiles (Granomite Sqm 915.00
finish) of approved make, quality and colour of size 600x600x10mm
thick fixed on existing flooring with a special adhesive for flooring, skirting
and jointed with neat cement slurry mixed with pigment to match shade of
tiles, including providing spacers at required interval and removing stains
etc., cost of materials, mortar, labour etc., complete as per specification.
14.44 Providing and fixing Vitrified glazed tiles of approved make, quality & Sqm 862.00
colour of size 600 x 600 x 10mm thick fixed on existing flooring with
special adhesive for flooring, skirting and jointed with neat cement slurry
mixed with pigment to mach shade of tiles, including providing spacers
at required interval and removing stains, cost of materials, mortar, labour
etc., complete as per specification.
14.45 Providing and fixing Vitrified glazed tiles of approved make, quality Sqm 813.00
& colour of size 600 x 600 x 10mm thick fixed on bed of 12mm thick
cement mortar for flooring, skirting and jointed with neat cement slurry
mixed with pigment to mach shade of tiles, including providing spacers
at required interval and removing stains, including cost of all mateirals,
mortar, labour, etc., Complete as per specification.
14.45.1 Providing and fixing Vitrified glazed tiles of approved make, quality Sqm 947.00
& colour of size 900 x 900 x 12mm thick fixed on bed of 12mm thick
cement mortar for flooring, skirting and jointed with neat cement slurry
mixed with pigment to mach shade of tiles, including providing spacers
at required interval and removing stains, including cost of all mateirals,
mortar, labour, etc., Complete as per specification.
14.46 Providing and laying pattern flooring for staircase treads and risers Sqm 5,995.00
using the combination of 20mm thick ruby red granite @ 66%,20 mm
thick grey granite @ 20%, 20mm thick, 20mm thick black granite 14%.
The granite materials are laid with a bed of CM 1:3, 20mm thick pointed
with colour pigment, including full rounding for nosing, flaming the ruby
red granite for 50 mm wide including cost of all materials, mortar, labour,
curing etc., complete as per specification.
14.47 Providing and laying flooring using prepolished, gang saw/water cut
19mm thick granite laid with a bed of 20mm thick 1:4 cm & jointed
with neat cement slurry mixed with pigment to mach shade of granite
slabs including laying POP on finished surface and cleaning the surface,
including the cost of all materials, mortar and labours etc., complete as
per specifications.
14.47.1 -do- using silver grey granite / Multy Red / Ruby Red / Black / Hassan Sqm 2,282.00
Green / River Pink Granite of width not less than 1200mm

110
Sl. No. Description Unit Rate
Rs. Ps.

14.47.2 -do- using black granite/ Multy Red / Ruby Red / Black / Hassan Sqm 2,006.00
Green / River Pink Granite of width not less than 900mm
14.47.3 -do- using 10mm thick silver grey granite / Multy Red / Ruby Red / Sqm 1,166.00
Black / Hassan Green / River Pink Granite tiles
14.47.4 -do- using 19mm thick Raw Silk / Black Pearl granite of width not less Sqm 2,281.00
than 1200 mm
14.47.5 -do- using 19mm thick Raw Silk / Black Pearl granite of width not less Sqm 1,982.00
than 900 mm
14.48 Providing and laying flooring for corridors/lobbies using combination
of pre polished 19 mm thick water cut/gang saw Grey Granite,
Black Granite, and strips of 50mm wide pre flamed grey granite using
pre polished grey granite 19mm thick 76%, Pre polished black granite
19mm thick @ 2% and preflamed 19mm thick grey granite @22% over
existing cement concrete bed in CM 1:4 average 20mm thick pointed
with white cement/colour pigment etc., including cost of all materials,
mortar, labour, curing etc., complete as per specification.
14.48.1 _do_ using 19mm thick granite width not less than 1200mm Sqm 2,184.00
14.48.2 _do_ using 10mm thick granite slab Sqm 1,460.00
14.49 Providing and fixing of wall cladding using 20mm thick gang saw Sqm 2,951.00
water cut Shiva gold granite, grey granite in CM 1:3 proportion
cut to required shape, pattern with paper joints, finished with cement
mortal using white cement and colour pigments to match the colour of
slab making through jointing with sealant, making holes 25mmx12mm
grooves in joints including cost of all materials, mortar, labour, curing
etc., complete as per specification.
14.50 “Providing and fixing skirting of 300mm height using prepolished water m 632.00
cut/gang saw of 19mm thick grey granite 0.5mm wide chamfered width
and depth and fixing in CM 1:4 of 20mm thick after chipping the walls
etc., including cost of all materials, mortar, labour, curing etc., complete
as per specification.
14.51 Providing and laying Hassan Green / River Pink granite flooring for Sqm 3,713.00
staircase, treads and rises using pre polished 20 mm thick water
cut green Granite slab laid over existing cement concrete bed in CM
1:3, average 20mm thick including full rounding for nosing, cutting 3
line grooves not more than 2 mm wide for antiskidding, including cost of
all materials, mortar, labour, curing etc., complete as per specification.
14.52 Providing and laying platform using prepolished, water cut / gang Sqm 2,937.00
saw 40mm thick telephonic Black Granite. laid on existing vertical
-supports and fixing in CM 1:3 proportion. Including cutting to required
shape, pattern with paper joints, including full rounding for nosing,
finished with cement mortar, pointed with colour pigments to match
the colour of slab making through jointing with sealant, making holes
25mm x 12mm grooves in joints including cost of all materials, mortar,
labour, curing etc., complete as per specification.

111
Sl. No. Description Unit Rate
Rs. Ps.

14.53 Providing full nosing for 40mm thick granite slab using required m 450.00
machinery including cost and conveyance of all materials, labour for all
items of work, HOM etc., complete as per specification

14.54 Providing half nosing for 40mm thick granite slab using required m 300.00
machinery including cost and conveyance of all materials, labour for all
items of work, HOM etc., complete as per specification

14.55 Providing full nosing for 20mm thick granite slab using required m 225.00
machinery including cost and conveyance of all materials, labour for all
items of work, HOM etc., complete as per specification

14.56 Providing half nosing for 20mm thick granite slab using required m 150.00
machinery including cost and conveyance of all materials, labour for all
items of work, HOM etc., complete as per specification

14.57 Providing and fixing for flooring 40mm thick sadarhalli grey flammed Sqm 1,528.00
granite slab for bath areas in Bathrooms over a bed of 25mm thick CM
1:6 and fixing granite slab with CM 1:3.

14.58 Providing and fixing granite flooring in combination of 19mm thick Sqm 2,895.00
(Avg) gang saw water cut LAKARED granite with 86% and with 14% of
19mm thicl (avg) Black granite in CM 1:4 proportion with a coat of rough
plastering using CM 1:4, cut to required shape, pattern with paper joints,
finished with cement mortar using white cement and colour pigments to
match the colour of slab making through jointing with sealant, grooves
in joints including cost of curing etc., complete including cost and
conveyance of all materials, mortar, labour for all items of work, HOM
etc., complete as per specification

14.59 Providing and fixing for flooring 20mm thick gang saw water cut Sqm 1,993.00
telephonic black granite in CM 1:4 proportion with a coat of rough
plastering using CM 1:4, cut to required shape, pattern with paper joints,
finished with cement mortar using white cement and colour pigments to
match the colour of slab making through jointing with sealant, grooves in
joints including cost of curing etc., complete including cost and conveyance
of all materials, mortar, labour for all items of work, HOM etc., complete as
per specification

14.60 Providing and fixing 20mm thick gang saw water cut LAKARED Sqm 2,892.00
granite for cladding in CM 1:4 proportion with a coat of rough plastering
using CM 1:4, cut to required shape, pattern with paper joints, finished
with cement mortar using white cement and colour pigments to match the
colour of slab making through jointing with sealant, grooves in joints including
cost of curing etc., complete including cost and conveyance of all materials,
mortar, labour for all items of work, HOM etc., complete as per specification.

112
Sl. No. Description Unit Rate
Rs. Ps.

14.61 Providing and fixing for flooring 20mm thick sadarhalli grey granite
in CM 1:4 proportion, cut to required shape, pattern with paper joints,
finished with cement mortar using white cement and colour pigments to
match the colour of slab making through jointing with sealant, groves
in joints including cost of including cost of all materials, mortar, labour,
curing etc., complete as per specification.

14.61.1 - do - minimum width of 1200mm (gang saw water cut) Sqm 1,709.00

14.61.2 - do - minimum width of 900mm (gang saw water cut) Sqm 1,649.00

14.62 Providing and laying/fixing cement base, precast, pre polished Sqm 1,026.00
cement concrete, designer tiles 25mm thick for flooring conforming to
IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on
a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing
using white cement, including cost of materials, mortar, including cutting,
griding the edge to half/full round wherever required, labour, curing
complete as per specification.

14.63 Providing and fixing Ceramic tiles of size 400x400mm for flooring, Sqm 943.00
threads, steps and landing, laid on a bed of 20mm thick cement mortar
1:3 mix flush pointing with white cement mixed with matching colour
pigment including curing, cleaning etc., complete. The work includes
cost of all materials, mortar, labour charges for all items of work, hire
charges for equipment, etc., complete as per specification.

14.64 Providing and fixing colour glazed tiles of size 300mmx600mm for Sqm 1,010.00
walls with borders of size 300x100mm, set in Cement Mortar 1:3 and
pointed with white cement with matching colour pigment with necessary
curing, cleaning including providing and removing scaffolding wherever
necessary etc., complete. The work includes cost of all materials, mortar,
labour charges for all items of work, hire charges for equipment etc.,
complete as per specification.

14.65 Providing and fixing colour glazed tiles of size 300mmx450mm for Sqm 861.00
walls with borders of size 300x100mm, set in Cement Mortar 1:3 and
pointed with white cement with matching colour pigment with necessary
curing, cleaning including providing and removing scaffolding wherever
necessary etc., complete. The work includes cost of all materials, mortar,
labour charges for all items of work, hire charges for equipment etc.,
complete as per specification.

14.67 Providing and fixing of wall cladding using 20 mm thick gang saw water
cut granite in CM 1:3 proportion cut to required shape patron with paper
joint finished with cement mortar using white cement and colour pigments to
match the colour of slab making through jointing with sealant, making holes
25mm × 12mm grooves in joints including cost of all materials, mortar,
labour, curing etc., complete as per specification.

113
Sl. No. Description Unit Rate
Rs. Ps.

14.67.1 - do- with grey granite 20mm thick gang saw with minimum width 1200 Sqm 2,039.00

14.67.2 - do- with sadharalli 20mm thick gangsaw with minimum width 1200 Sqm 1,940.00

14.68 Providing and fixing of clay tiles for cladding tiles of size 230x75x10mm Sqm 1,250.00
thick on 12mm thick cement mortar 1:3 & jointed with Adhesive / cement
slurry over rough plaster surface excluding cost of rough plasterd surface
and the surface is painted with red apex paint and black apex paint into
the groves. Including cost of all materials, mortar, labour, curing etc.,
complete as per specification.

14.69 Supplying, fabricating and fixing of Stainless steel cladding for walls using Sqm 10,291.00
304 grade Stainless steel 16 guage sheet wall cladding of thickness over
the frame made out of 50x50mmx3mm thickness anodized aluminium
frame work at an equal distance of 2 ft vertifically fixed to the wall using
100mm screws, guttas, anchor bolts and fastners with all necessary
bending and cutting as per the desing and site condition. The frame work
finally to be finished with 12mm BWP plywood to receive the SS sheet
on it uniformly. Including cost of all materials, mortar, labour, curing etc.,
complete as per specification.

14.70 Providing and laying of teak wooden polished flooring of 12mm thick, high Sqm 4,000.00
density timber of approved colour and design with end trims, transition,
profiles, beading, 15mm thick felt, and 20 micron polyester film with 4mm
thick foam underlay etc., including cost of all mateirals, mortar, labour,
curing etc., complete as per specification.

14.71 Providing and laying of Modular wooden polished flooring of 12mm Sqm 2,266.00
thick, high density timber of approved colour and design with end trims,
transition, profiles, beading, 15mm thick felt, and 20 micron polyester
film with 4mm thick foam underlay etc., including cost of all materials,
mortar, labour, curing etc., complete as per specification.

14.72 Providing Venyl flooring of approved quality and make, fixed on the top Sqm 466.00
of existing flooring fixed with suitable adhesive, including cutting to
the requied size and fixing etc., complete Iicluding cost of all materials,
mortar, labour, curing etc., complete as per specification.

Note: Lift charges: The above rates are applicable for Ground and basement
floors only. An additional rate of Rs. 2.00/sqm per floor may be added
for every additional floor for items vide Sl.No.14.1 to 14.72.

114
Chapter - 15
FINISHING WORK

115
Sl. No. Description Unit Rate
Rs. Ps.

15.0 FINISHING WORK


15.1 KSRB 15.1 Providing flush pointing 20 mm deep to square rubble,
course or uncoursed stone masonry with cement mortar after raking
joints to depth of 20mm nicely lining, including cost of materials, labour,
curing complete as per specifications.
15.1 KSRB 15.1.1 – do – cement mortar 1:3 Sqm 117.00
15.2 KSRB 15.1.2 – do – cement mortar 1:4 Sqm 116.00
15.3 KSRB 15.1.3 – do – Providing ruled pointing 20 mm deep to coursed
stone masonry with cement mortar after raking joints to depth of 20mm
nicely lining, including cost of materials, labour, curing complete as per
specifications.
15.3 KSRB 15.1.3 – do – cement mortar 1:3 Sqm 118.00
15.4 KSRB 15.1.4 – do – cement mortar 1:4 Sqm 116.00
15.5 KSRB 15.1.5 Providing raised and cut pointing 20 mm deep to coursed
stone masonry with cement mortar after raking joints to depth of 20mm
nicely lining, including cost of materials, labour, curing complete as per
specifications.
15.5 KSRB 15.1.5 – do – cement mortar 1:3 Sqm 172.00
15.6 KSRB 15.1.6 – do – cement mortar 1:4 Sqm 170.00
15.7 KSRB 15.2.1 Providing flush pointing 12 mm deep to stone slab Sqm 36.00
pavements, with cement mortar 1:3, after raking joints, nicely lining,
including cost of materials, labour, curing complete as per specifications.
15.8 KSRB 15.2.2 : Providing ruled pointing 20 mm deep to stone slab Sqm 38.00
pavements with cement mortar 1:3, 20mm deep, after raking joints
nicely lining, including cost of materials, labour, curing complete as per
specifications.
15.9 KSRB 15.3 : Providing 12mm thick cement plaster in single coat with
cement mortar to brick masonry including rounding off corners wherever
required smooth rendering, : Providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications.
15.9 KSRB15-3.1 : – do – cement mortar 1:3 Sqm 175.00
15.10 KSRB15-3.2 : – do – cement mortar 1:4 Sqm 170.00
15.11 KSRB15-3.3 : – do – cement mortar 1:6 Sqm 160.00
15.12 KSRB15-3 : Providing 15mm thick cement plaster in single coat with
cement mortar to brick masonry including rounding off corners wherever
required smooth rendering, : Providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications.
15.12 KSRB15-3.4 : – do – cement mortar 1:3 Sqm 195.00
15.13 KSRB15-3.5 : – do – cement mortar 1:4 Sqm 184.00
15.14 KSRB15-3.6 : – do – cement mortar 1:6 Sqm 173.00

116
Sl. No. Description Unit Rate
Rs. Ps.

15.15 KSRB15-3 : Providing 18mm thick cement plaster in single coat with
cement mortar to brick masonry including rounding off corners wherever
required smooth rendering, : Providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications.
15.15 KSRB15-3.7 : – do – cement mortar 1:3 Sqm 230.00
15.16 KSRB15-3.8 : – do – cement mortar 1:4 Sqm 217.00
15.17 KSRB15-3.9 : – do – cement mortar 1:6 Sqm 204.00
15.18 KSRB15-3 : Providing 20mm thick cement plaster in single coat
with cement mortar, to stone masonry & concrete surface including
rounding off corners wherever required smooth rendering, including
providing and removing scaffolding, cost of materials, labour, curing etc.,
complete as per specification.
15.18 KSRB15-3.10 : – do – cement mortar 1:3 Sqm 240.00
15.19 KSRB15-3.11 : – do – cement mortar 1:4 Sqm 225.00
15.20 KSRB15-3.12 : – do – cement mortar 1:6 Sqm 211.00
15.21 KSRB15-3 : Providing 12mm thick cement plaster in single coat
with cement mortar, to ceiling including rounding off corners wherever
required smooth rendering, including providing and removing scaffolding,
cost of materials, labour, curing etc., complete as per specification.
15.21 KSRB15-3.13 : – do – cement mortar 1:3 Sqm 195.00
15.22 KSRB15-3.14 : – do – cement mortar 1:4 Sqm 187.00
15.23 KSRB15-4 : Extra for providing and mixing waterproofing compound
in cement plaster work in Brick masonry at one kg per bag or in the
proportion recommended by the manufacturers.
15.23 KSRB15-4.1 – do – cement mortar 1:3, 12mm thick Sqm 5.00
15.24 KSRB15-4.2 – do – cement mortar 1:4, 12mm thick Sqm 4.00
15.25 KSRB15-4.3 – do – cement mortar 1:4, 15mm thick Sqm 5.00
15.26 KSRB15-4.4 – do – cement mortar 1:4, 18mm thick Sqm 6.00
15.27 KSRB15-4.5 Extra for providing and mixing waterproofing compound Sqm 7.00
in cement plaster for stone masonry work at one kg per bag or in the
proportion recommended by the manufacturers, for cement mortar 1:4,
20mm thick cost of materials complete as per specifications.
15.28 KSRB15-4.6 Extra for providing and mixing waterproofing compound Sqm 10.00
in cement plaster for brick masonry work at one kg per bag or in the
proportion recommended by the manufacturers, for cement mortar 1:3,
20mm thick cost of materials complete as per specifications.
15.29 KSRB15-4.7 Extra for providing and mixing waterproofing compound Sqm 7.00
in cement plaster for brick masonry work at one kg per bag or in the
proportion recommended by the manufacturers, for cement mortar 1:4,
20mm thick cost of materials complete as per specifications.

117
Sl. No. Description Unit Rate
Rs. Ps.

15.30 KSRB15-5 : Providing rough cement plastering 15mm thick in single


coat with cement mortar to brick masonry for base of dadooing works
with sand of approved quality, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications.
15.30 KSRB15-5.1 : – do – cement mortar 1:4 Sqm 170.00
15.31 KSRB15-5.2 : – do – cement mortar 1:6 Sqm 160.00
15.32 KSRB15-6 : Providing floating coat of cement to plastering and Sqm 15.00
finishing smooth, including cost of materials, labour, curing complete
as per specifications.
15.33 KSRB15-7 : Providing lime rendering for plastering to wall and Sqm 26.00
ceiling, including cost of materials, labour, curing complete as per
specifications.
15.34 KSRB 15.8 : Providing and fixing suitable plaster mesh manufactured
out of hot dipped galvanised iron of nominal thickness 0.35mm with a
zinc coating of 120gms per sqm width, along route of walls chipped
for services, junction between RCC and brick walls including cost of
materials, labour for fixing complete as per specifications. (length of
mesh only be measured for payment )
15.34 KSRB 15.8.1 – do – suitable plaster mesh 100mm wide m 21.00
15.35 KSRB 15.8.2 – do – suitable plaster mesh 150mm wide m 25.00
15.36 KSRB 15.8.3 – do – suitable plaster mesh 200mm wide m 30.00
15.37 KSRB 15.9 Providing and fixing corner beads 45x45mm size m 23.00
manufactured out of hot dipped galvanised iron of nominal thickness
0.35mm with a zinc coating of 120gms per sqm width, along exposed
corners of walls, columns, lintels including cost of materials, labour for
fixing complete . (length of mesh be measured for payment)
15.38 KSRB 15.10.1 Providing white washing to new wall surface in two Sqm 10.00
coats with lime of approved quality, to give an even shade including cost
of materials, labour, complete as per specifications.
15.39 KSRB 15.10.2 Providing white washing for every one additional coat Sqm 5.00
with lime of approved quality, to give an even shade including cost of
materials, labour, complete as per specifications.
15.40 KSRB 15.10.3 Providing white washing to ceiling and / or sloping Sqm 10.00
roof surface in two coats with lime of approved quality, to give an even
shade including cost of materials, labour, complete as per specifications.
15.41 KSRB 15.10.4 Providing white washing to ceiling and / or sloping Sqm 5.00
roof surface with additional one coat with lime of approved quality, to
give an even shade including cost of materials, labour, complete as per
specifications.

118
Sl. No. Description Unit Rate
Rs. Ps.

15.42 KSRB 15.11.1Providing cement washing to rough wall surface in one Sqm 9.00
coat with portland cement slurry using 1.07 kg of cement/10 sqm area
to give an even shade after throughly brooming the surface to remove
all dirt, dust, mortar drops and other foreign matter including cost of
materials, labour, complete as per specifications.
15.43 KSRB 15.11.2 Providing cement washing on iron surface in one coat Sqm 85.00
with portland cement slurry using 1.07 kg of cement/10 sqm area mixed
with boiled linseed oil to give an even surface after thoroughly cleaning
the surface to remove all dirt, dust, mortar drops and other foreign matter
including cost of materials, labour, complete as per specifications.
15.44 KSRB 15.12.1Providing Gopi colour washing to new wall surface in Sqm 12.00
two coats with lime and gopi colour of approved quality, to give an even
shade after thoroughly brooming the surface to remove all dirt, dust,
mortar drops and other foreign matter including cost of materials, labour,
complete as per specifications.
15.45 KSRB 15.12.2 Providing Gopi colour washing to new wall surface in Sqm 6.00
one coat with lime and gopi colour of approved quality, to give an even
shade after thoroughly brooming the surface to remove all dirt, dust,
mortar drops and other foreign matter including cost of materials, labour,
complete as per specifications.
15.46 KSRB15-13 : Applying of distemper
KSRB 15-13.1 : Providing and applying one coat distemper primer
of approved brand on wall surface after throughly brooming the surface
to remove all dirt, dust, mortar drops and other foreign matter including
preparing the surface, even and sand paper smooth, cost of materials,
labour, complete as per specifications.
15.46.1 -wall surface- Sqm 29.00
15.46.2 KSRB 15-13.2 : Extra over Item KSRB 15-13.1 for applying one coat of Sqm 2.00
distemper primer over ceiling and / or sloping roof as per specifications.
15.47 KSRB 15-13.3 : Providing and applying two coats dry distemper of
approved brand, and shade on wall surface including priming coat and
whitening after throughly brooming the surface to remove all dirt, dust,
mortar drops and other foreign matter including preparing the surface
even and sand paper smooth, cost of materials, labour, complete as
per specifications.
15.47.1 -do- Sqm 60.00
15.47.2 KSRB 15-13.4 : Extra over Item KSRB 15-13.3 for applying distemper Sqm 5.00
primer over ceiling and / or sloping roof as per specifications.
15.48 KSRB 15-13.5 : Providing and applying one coat on old surface dry
distemper of approved brand, and shade on wall surface after thoroughly
brooming the surface clean of all gease, dirt, loose pieces of scales
including preparing the surface even and sand paper smooth, cost of
material, labour, complete as per specifications.
15.48.1 -wall surface- Sqm 16.00

119
Sl. No. Description Unit Rate
Rs. Ps.

15.48.2 KSRB 15-13.6 : Extra over Item KSRB 15-13.5 for applying distemper Sqm 1.00
over ceiling and /or sloping roof as per specifications.
15.48.3 KSRB 15-13.7 : Extra for providing and applying every subsequent cost Sqm 11.00
of dry distemper of approved brand , for item no. 15-13.3 and 15-13.5
of approved shade on wall surface cost of materials, labour, complete
as per specifications.
15.49 KSRB 15-14.1 : Providing and applying two coats with oil bound
washable distemper of approved brand and shade on wall surface
including priming coat with distemper primer after throughly brooming
the surface free from mortar drops and other foreign matter including
preparing the surface even and sand paper smooth, cost of materials,
labour, complete as per specifications.
15.49.1 -do- Sqm 91.00
15.49.2 KSRB 15-14.2 : Extra over Item KSRB 15-14.1 for applying oil bound Sqm 6.00
washable distemper on ceiling and / or sloping roof as per specifications.
15.50 KSRB 15-14.3 : Providing and applying one coat with oil bound
washable distemper of approved brand and shade on wall surface to
give an even shade after throughly brooming the surface free from all
grease, dirt, loose peases of scales, including preparing the surface
even and sand paper smooth, cost of materials, labour, complete as
per specifications.
15.50.1 -do- Sqm 38.00
15.50.2 KSRB 15-14.4 : Extra over Item 15-14.3 for applying one coat with Sqm 2.00
oil bound washable distemper on ceiling and / or sloping roof as per
specifications.
15.51 KSRB 15-15.1 : Providing and applying painting in two coats with
plastic emulsion paint of approved brand on wall surface to give an
even approved shade after thoroughly brushing the surface, free from
mortar drops and other foreign matter including preparing the surface
even and sand paper smooth, cost of materials, labour, complete as
per specifications.
15.51.1 -do- Sqm 72.00
15.51.2 -do- with primer Sqm 75.00
15.51.3 KSRB 15-15.2 : Extra over Item KSRB 15-15.1 for painting two coats Sqm 4.00
with plastic emulsion paint of approved brand and shade on ceiling and
/ or sloping roof as per specifications.
15.52 KSRB 15-15.3 : Providing and applying painting in one coat with plastic
emulsion paint of approved brand and manufacture on wall surface
to give an even approved shade after thoroughly brushing the surface,
free from mortar drops and other foreign matter including preparing the
surface even and sand paper smooth, cost of materials, labour, complete
as per specifications.

120
Sl. No. Description Unit Rate
Rs. Ps.

15.52.1 -do- Sqm 46.00

15.52.2 KSRB 15.15.4 : Extra over Item KSRB 15-15.3 for painting with one Sqm 3.00
coat plastic emulsion paint of approved brand and shade on ceiling and
/ or sloping roof as per specifications.

15.52.3 KSRB 15-15.5 : Extra for providing and applying every subsequent coat Sqm 30.00
of painting with plastic emulsion paint of approved brand and shade for
Item no. KSRB 15-15.1 and KSRB 15-15.3 cost of materials, labour,
complete as per specifications.

15.53 KSRB 15-16.1 : Providing and finishing external walls in two coats
with waterproof cement paint of approved brand and shade to give
an even shade after throughly brooming the surface to remove all dirt
and loose powdered material, free from mortar drops and other foreign
matter cost of materials, labour, complete as per specifications.

15.53.1 -do- Sqm 74.00

15.53.2 -do- with primer Sqm 85.00

15.53.3 KSRB 15-16.3 : Extra for providing and applying every subsequent coat Sqm 28.00
of waterproofing cement paint of approved brand and shade for Item
KSRB 15-16. 1 cost of materials, labour, complete as per specifications.

15.54 KSRB 15-16.2 : Providing and finishing external walls in one coat with
waterproof cement paint of approved brand and shade to give an
even shade after throughly brooming the surface to remove all dirt and
loose powdered material, free from mortar drops and other foreign matter
cost of materials, labour, complete as per specifications.

15.54.1 -do- Sqm 42.00

15.54.2 -do- with primer Sqm 39.00

15.54.3 KSRB 15-16.3 : Extra for providing and applying every subsequent coat Sqm 28.00
of waterproofing cement paint of approved brand and shade for Item
KSRB 15-16.1 and 15-16.2 cost of materials, labour, complete as per
specifications.

15.55 KSRB 15-17.1 : Applying priming coat over new wood surface and / Sqm 35.00
or wood based surface with white lead paint priming including preparing
the surface after thoroughly cleaning oil, grease, dirt and foreign matter,
sand papering and knotting ready mix paint including cost of materials,
labour, complete as per specifications.

15.56 KSRB 15-17.2 : Applying priming coat over new wood surface and Sqm 38.00
/ or wood based surface after brushing with wood primer pink paint
including preparing the surface after thoroughly cleaning oil, grease, dirt
and foreign matter, sand papering and knotting ready mix paint including
cost of materials, labour, complete as per specifications.

121
Sl. No. Description Unit Rate
Rs. Ps.

15.57 KSRB 15-17.3 : Applying priming coat over new wood surface and Sqm 35.00
/ or wood based surface after brushing with aluminium paint primer,
water resistant including preparing the surface after thoroughly cleaning
oil, grease, dirt and foreign matter, sand papering and knotting ready mix
paint including cost of materials, labour, complete as per specifications.
15.58 KSRB 15-17.4 : Applying priming coat over new wood surface Sqm 41.00
and / or wood based surface, after brushing with ready mix enamel
priming paint including preparing the surface after thoroughly cleaning
oil, grease, dirt and foreign matter, sand papering and knotting ready mix
paint including cost of materials, labour, complete as per specifications.
15.59 KSRB 15-17.5 : Applying priming coat over new wood surface and Sqm 41.00
/ or wood based surface after preparing the surface after throughly
cleaning oil, grease, dirt and foreign matter, sand papering and knotting
liquid wood filler, for varnish including cost of materials, labour, complete
as per specifications.
15.60.1 KSRB 15-17.6 : Providing and applying painting two coats (excluding Sqm 80.00
priming coat ) on new wood surface and / or wood based surface with
enamel paint to give an even shade, cleaning the surface of all dirt, dust
and foreign matter, sand papering including cost of materials, labour,
complete as per specifications.
15.60.2 KSRB 15-17.8 : Extra over Item No. KSRB 15-17.6 for applying every Sqm 45.00
subsequent coat of enamel paint to give an even shade after cleaning
the surface of all dirt, dust and foreign matter, sand papering including
cost of materials, labour, complete as per specifications.
15.61.1 KSRB 15-17.7 : Providing and applying painting one coat (excluding Sqm 51.00
priming coat ) on new wood surface and / or wood based surface
with enamel paint to give an even shade after cleaning the surface of all
dirt, dust and foreign matter, sand papering including cost of materials,
labour, complete as per specifications.
15.61.2 KSRB 15-17.8 : Extra over Item No. KSRB 15-17.7 for applying every Sqm 45.00
subsequent coat of enamel paint to give an even shade after cleaning
the surface of all dirt, dust and foreign matter, sand papering including
cost of materials, labour, complete as per specifications.
15.62.1 KSRB 15-17.9 : Applying varnish two coats (excluding priming coat) Sqm 72.00
on new wood surface and / or wood based surface undercoating with
flatting varnish and finishing coat with varnish to give an even shade after
cleaning the surface of all dirt, dust and foreign matter, sand papering
so as to produce smooth dry, mat surface including cost of materials,
labour, complete as per specifications.
15.62.2 KSRB 15-17.11 : Extra over Item No. KSRB 15-17.9 and KSRB 15- Sqm 37.00
17.10 for applying every subsequent coat of varnish to produce a
smooth dry and mat surface after cleaning the surface of all dirt, dust
and foreign matter, including cost of materials, labour, complete as per
specifications.

122
Sl. No. Description Unit Rate
Rs. Ps.

15.63.1 KSRB 15-17.10 : Providing and applying varnishing one coat Sqm 42.00
(excluding priming coat ) on previously varnished wood / or wood
based surface to give an even surface after cleaning the surface of all
dirt, dust and foreign matter, sand papering so as to produce a smooth
dry and mat surface, including cost of materials, labour, complete as
per specifications.

15.63.2 KSRB 15-17.11 : Extra over Item No. KSRB 15-17.9 and KSRB 15-17.10 Sqm 37.00
for applying every subsequent coat of varnish to produce a smooth
dry and mat surface after cleaning the surface of all dirt, dust and foreign
matter, including cost of materials, labour, complete as per specifications.

15.64 KSRB 15-17.12 : Providing and applying polishing with french polish Sqm 168.00
on new wood surface and / or wood based surface to give an even
surface after cleaning the surface of all dirt, dust and foreign matter,
sand papered smooth, including cost of wood filler and materials, labour,
complete as per specifications.

15.65 KSRB 15-17.13 : Providing and applying polishing with french polish Sqm 89.00
over previously polished wood or wood based surface to give an
even surface after cleaning the surface of all dirt, dust and foreign matter,
sand papered smooth, including cost of wood filler and materials, labour,
complete as per specifications.

15.66 KSRB 15-17.14 : Providing and applying wax polish in two coats on Sqm 77.00
new wood surface and / or wood based surface, with bees wax polish
in proportion of 2:1.5:1:0.5 (2 bees wax : 1.5 linseed oil : 1 turpentine oil :
0.5 varnish by weight) to give an even surface after cleaning the surface
of all dirt, dust and foreign matter, sand papered smooth, including cost
of materials, labour, complete as per specifications.

15.67 KSRB 15-17.15 : Providing and applying wax polish in single coat on Sqm 39.00
new wood surface and / or wood based surface, with bees wax polish
in proportion of 2:1.5:1:0.5 (2 bees wax : 1.5 linseed oil : 1 turpentine oil :
0.5 varnish by weight) to give an even surface after cleaning the surface
of all dirt, dust and foreign matter, sand papered smooth, including cost
of materials, labour, complete as per specifications.

15.68 KSRB 15-17.16 : Providing and applying painting two coats (excluding Sqm 50.00
priming coat) on new wood surface and / or wood based surface
with coal tar paint to give an even shade after cleaning the surface of all
dirt, dust and foreign matter, including cost of materials, labour, complete
as per specifications.

15.69 KSRB 15-17.17 : Providing and applying painting one coat ( excluding Sqm 33.00
priming coat ) on new wood surface and / or wood based surface with
coal tar paint to give an even shade after cleaning the surface of dirt,
dust and foreign matter, including cost of materials, labour, complete
as per specifications.

123
Sl. No. Description Unit Rate
Rs. Ps.

15.70 KSRB 15-17.18 : Providing and applying painting one coat (excluding Sqm 27.00
priming coat) on previously painted wood surface and / or wood
based surface with coal tar paint to give an even shade after cleaning
the surface of all dirt, dust and foreign matter, including cost of materials,
labour, complete as per specifications.
15.71 KSRB 15-17.19: Providing and applying painting one coat (excluding Sqm 46.00
priming coat) on previously painted wood surface and / or wood
based surface with enamel paint to give an even shade after cleaning
the surface of all dirt, dust and foreign matter, including cost of materials,
labour, complete as per specifications.
15.72 KSRB 15-17.20: Applying additional one coat (excluding priming Sqm 41.00
coat) on previously painted wood surface and / or wood based
surface with enamel paint to give an even shade after cleaning the
surface of all dirt, dust and foreign matter, including cost of materials,
labour, complete as per specifications.
15.73 KSRB 15-18.1 : Applying red lead ready mix priming coat over new Sqm 34.00
steel or other metal surface including preparing the surface after
throughly cleaning oil, grease, dirt and other foreign matter, and scoured
with wire brushes, fine steel wool, sand papers including cost of materials,
labour, complete as per specifications.
15.74 KSRB 15-18.2 : Providing and applying enamel metal paint two coats Sqm 79.00
(excluding priming coat) over new steel or other metal surface
brushing to give an even shade after cleaning oil, grease, dirt and other
foreign matter, including cost of materials, labour, complete as per
specifications.
15.75 KSRB 15-18.3 : Providing and applying enamel metal paint one coat Sqm 50.00
(excluding priming coat ) on previously painted steel or other metal
surface brushing to give an even shade after cleaning oil, grease, dirt
and other foreign matter, including cost of materials, labour, complete
as per specifications.
15.76 KSRB 15-18.4 : Providing and applying aluminium paint two coats Sqm 61.00
(excluding priming coat ) over new steel or other metal surface
brushing to give an even shade after cleaning oil, grease, dirt and
other foreign matter, including cost of materials, labour, complete as
per specifications.
15.77 KSRB 15-18.5 : Providing and applying aluminium paint one coat Sqm 40.00
(excluding priming coat ) on previously painted steel or other metal
surface brushing to give an even shade after cleaning oil, grease, dirt
and other foreign matter, including cost of materials, labour, complete
as per specifications.
15.78 KSRB 15-18.6 : Providing and applying black japan paint one coat Sqm 38.00
(excluding priming coat ) on previously painted steel or other metal
surface brushing to give an even shade after cleaning oil, grease, dirt
and other foreign matter, including cost of materials, labour, complete
as per specifications.

124
Sl. No. Description Unit Rate
Rs. Ps.

15.79 KSRB 15-18.7 : Extra for applying every subsequent black japan paint Sqm 33.00
on previously painted steel or other metal surface brushing to give an
even shade after cleaning of oil, grease, dirt and other foreign matter,
including cost of materials, labour, complete as per specifications.
15.80 KSRB 15-19.1 : Providing and applying ready mix priming coat Sqm 30.00
over concrete / masonry / asbestos cement sheet / plastered surfaces
including preparing the surface after thoroughly cleaning of oil, grease,
dirt and other foreign matter, and sand papering including cost of
materials, labour, complete as per specifications.
15.81 KSRB 15-19.2 : Providing and applying spray painting (excluding
priming coat ) over concrete / masonry / asbestos cement sheet /
plastered surfaces with flat wall paint of approved brand to give even
shade after cleaning the surface of all dirt, dust and other foreign matter,
and sand papering including cost of materials, labour, complete as per
specifications.
15.81 KSRB 15-19.2 : – do – spray painting in two coat Sqm 70.00
15.82 KSRB 15-19.3 : – do – spray painting in one coat Sqm 45.00
15.83 KSRB 15-20.1 : Providing and applying floor painting with ready mix
paint in (excluding priming coat ) on new concrete / asbestos cement
sheet / plastered surfaces brushing to give an even shade after preparing
the surface after thoroughly cleaning oil, dirt, dust other foreign matter
and sand papering including cost of materials, labour, complete as per
specifications.
15.83 KSRB 15-20.1 : – do – two coat Sqm 59.00
15.84 KSRB 15-20.2 : – do – one coat Sqm 38.00
15.85 KSRB 15-21.1 : Providing and applying wax polish on concrete floor
and vertical plastered surface using approved brand to give an even
shade after preparing the surface after thoroughly cleaning oil, dirt, dust
other foreign matter, including cost of materials, labour, complete as
per specifications.
15.85 KSRB 15-21.1 : – do – on new concrete floor Sqm 36.00
15.86 KSRB 15-21.2 : – do – previously polished concrete floor Sqm 35.00
15.87 KSRB 15-22.1 : Providing marble chips skirting or dadoing (upto Sqm 1,120.00
30cms height) rubbed and polished to granolithic finish, top layer 6mm
thick with white, black, chocolate, grey, yellow or baroda green marble
chips from smallest to 4mm nominal size dark shade pigment with
ordinary cement (in top layer only) laid in cement marble powder 3:1
(3 cement : 1 marble powder by weight ) in proportion of 4:7 (4 cement
marble powder mix : 7 marble chips by volume) overall thickness 24mm
(18mm thick under layer, 6mm thick top layer) in cement mortar of mix
1:3 including cost of materials, labour, complete as per specifications.
15.88 KSRB 15-22.2 : Providing marble chips skirting or dadoing (upto Sqm 1,162.00
30cms height) rubbed and polished to granolithic finish, top layer 6mm
thick, with white, black, chocolate, grey, yellow or baroda green marble

125
Sl. No. Description Unit Rate
Rs. Ps.

chips from smallest to 4mm nominal size, light shade pigment with white
cement ( in top layer only ) laid in cement marble powder 3:1 (3 cement :
1 marble powder by weight) in proportion of 4:7 (4 cement marble powder
mix : 7 marble chips by volume ) overall thickness 24mm (18mm thick
under layer, 6mm thick top layer ) in cement mortar of mix 1:3 including
cost of materials, labour, complete as per specifications.
15.89 KSRB 15-22.3 : Providing marble chips skirting or dadoing (upto Sqm 1,148.00
30cms height) rubbed and polished to granolithic finish top layer 6mm
thick with white, black, chocolate, grey, yellow or baroda green marble
chips from smallest to 4mm nominal size, medium shade pigment
with approximately 50% white cement and 50% ordinary cement
(in top layer only ) laid in cement marble powder 3:1 (3 cement :1 marble
powder by weight) in proportion of 4:7 (4 cement marble powder mix :
7marble chips by volume) overall thickness 24mm (18mm thick under
layer, 6mm thick top layer) in cement mortar of mix 1:3 including cost
of materials, labour, complete as per specifications.
15.90 KSRB 15-22.4 : Providing marble chips skirting or dadoing (upto Sqm 1,116.00
30cms height) rubbed and polished to granolithic finish top layer 6mm
thick with white, black, chocolate, grey, yellow or baroda green marble
chips from smallest to 4mm nominal size, white cement without any
pigment (in top layer only) laid in cement marble powder 3:1 ( 3 cement : 1
marble powder by weight ) in proportion of 4:7 ( 4 cement marble powder
mix : 7 marble chips by volume ) overall thickness 24mm (18mm thick
under layer, 6mm thick top layer) in cement mortar of mix 1:3 including
cost of materials, labour, complete as per specifications.
15.91 KSRB 15-22.5 : Extra labour for work in dado exceeding 30 cms in height Sqm 25.00
including cost of labour, complete as per specifications.
15.92 KSRB 15-23.1 : Providing pre-cast grey colour mosaic tiles 20mm m 276.00
thick with marble chips of white, black, chocolate, grey, yellow or
baroda green from smallest to 6mm nominal size, with ordinary cement
( in top layer only ) for skirting and rises of steps ( not exceeding 30cms
height) on 10cms thick cement mortar 1:3 jointed with neat cement slurry,
rubbed and polished to granolithic finish, including cost of materials,
labour, complete as per specifications.
15.93 KSRB 15-23.2 : Providing pre-cast mosaic tiles using light shade m 323.00
pigment with white cement 20mm thick with marble chips of white,
black, chocolate, grey, yellow or baroda green from smallest to
6mm nominal size, with ordinary cement (in top layer only) for skirting
and rises of steps (not exceeding 30cms height) on 10cms thick cement
mortar 1:3 jointed with neat cement slurry, rubbed and polished to
granolithic finish, including cost of materials, labour, complete as per
specifications.
15.94 KSRB 15-23.3 : Providing pre-cast mosaic tiles using medium shade m 287.00
pigment using approximately 50% white cement and 50% ordinary
cement 20mm thick with marble chips of white, black, chocolate, grey,

126
Sl. No. Description Unit Rate
Rs. Ps.

yellow or baroda green from smallest to 6mm nominal size, with ordinary
cement ( in top layer only ) for skirting and rises of steps ( not exceeding
30cms height) on 10cms thick cement mortar 1:3 jointed with neat
cement slurry, rubbed and polished to granolithic finish, including cost
of materials, labour, complete as per specifications.
15.95 KSRB 15-23.4 : Providing pre-cast mosaic tiles of white shade with m 252.00
white cement without any pigment 20mm thick with marble chips of
white, black, chocolate, grey, yellow or baroda green from smallest to
6mm nominal size, with ordinary cement ( in top layer only ) for skirting
and rises of steps ( not exceeding 30cms height ) on 10cms thick
cement mortar 1:3 jointed with neat cement slurry, rubbed and polished
to granolithic finish, including cost of materials, labour, complete as per
specifications.
15.96 Providing melamine polishing of approved shade including removing Sqm 713.00
and refixing of doors shutters scraping with blade and rubbing with
zero size sand paper and applying sealer coat by way of spraying with
necessary compressor and applying patty after rubbing with steel wool
including two coats of approved shade of melamine polish etc., complete.
15.97 Providing melamine polishing of approved shade including removing Sqm 865.00
and refixing of doors shutters, glass, beading and existing
polishing, scraping with blade and rubbing with zero size sand paper
and applying sealer coat by way of spraying with necessary compressor
and applying patty after rubbing with steel wool including two coats of
approved shade of melamine polish etc., complete.
15.98 Providing and mixing Synthetic fibers 100% Virgin triangular
monofilament polyster fibers 6mm in cut length for use as micro
reinforcement for application at 125 grams per bag of cement I.e 0.25%
by weight of cement.
15.98.1 _do_ for CM 1:4, 20mm thick Sqm 5.00
15.98.2 _do_ for CM 1:4, 12mm thick Sqm 4.00
15.98.3 _do_ for CM 1:6, 20mm thick Sqm 3.00
15.98.4 _do_ for CM 1:6, 12mm thick Sqm 4.00
15.99 Providing and mixing Synthetic fiber 100% virgin triangular Sqm 10.00
monofilament polyester fibers for use as micro secondary reinforcement
in guitie and shotcrete civil works with application dosage of 125-175
grams per bag of cement i.e. 0.25%-0.30% by weight of cement.
15.100 Providing and mixing fiber mesh Harbourite fine fibrillated 100% virgin
polypropylene fibers contains no olefin materials and are specially
engineered manufactured to use as cementitious micro reinforcement.
Application @125 gms for 1:3 cement mortar, 150 gms for 1:4 CM and
200 gms for 1:6 CM mix per bag of cement in both coats of the plaster.
Harbourite 12mm long shall be used in the back coat and Harbourite
6 mm long fibers shall be used in the top coat. Fibermesh Harbourite
fibers should be confirming to ASTM C 1116 ACI 524-93.

127
Sl. No. Description Unit Rate
Rs. Ps.

15.100.1 _do_ for CM 1:3 , 20mm thick Sqm 20.00


15.100.2 _do_ for CM 1:3 , 12mm thick Sqm 13.00
15.100.3 _do_ for CM 1:4 , 20mm thick Sqm 18.00
15.100.4 _do_ for CM 1:4 , 12mm thick Sqm 11.00
15.100.5 _do_ for CM 1:6 , 20mm thick Sqm 15.00
15.100.6 _do_ for CM 1:6, 12mm thick Sqm 11.00
15.101 Providing and mixing fibermesh stealth micro blocker anti microbial
multi filament 100% virgin polypropylene fibers which should be free
from reprocessed olefin materials, containing an active anti microbial
ingredient built in to the polymer structure of the fiber itself during
manufacturing process.It should prevent the growth of micro organisms
like bacteria, mold fungus, mildew etc. on concrete surfaces. Application
top of plaster to be mixed in mechanical mixer at 150 gm of fibers
per bag of cement for CM 1:3, 175 gm for CM 1:4 and 250 gms for
CM 1:6 fibermesh stealth micro blocker shall confirm to ASTM C-1116
type 111 4.1.3.
15.101.1 _do_ for CM 1:3, 20mm thick Sqm 33.00
15.101.2 _do_ for CM 1:3, 12mm thick Sqm 22.00
15.101.3 _do_ for CM 1:4, 20mm thick Sqm 29.00
15.101.4 _do_ for CM 1:4, 12mm thick Sqm 19.00
15.101.5 _do_ for CM 1:6, 20mm thick Sqm 27.00
15.101.6 _do_ for CM 1:6, 12mm thick Sqm 25.00
15.102 Providing and mixing Harbourite 12 mm fine fibrilated 100% virgin Sqm 56.00
polypropylene fibers which should be free from reprocessed olefin
materials and specifically manufactured for use as cementitious micro
reinforcement application rate of 175 gms to 250 gms per bag of cement
or 1.8 kg per cum in the guinite/shotcret and designed to an optimum
gradation for use as concrete secondary reinforcement.
15.103 Providing external walls with texture finish using approved brand Sqm 283.00
paint, applied uniformly in three coats over one coat of primer including
cost of all materials, machineries, labour, transportation, loading and
unloading, all lead and lift and all other incidental charges including
scaffolding and removing stains, complete as per specifications.
15.104 Providing and finishing external walls in two coats over one coat of Sqm 150.00
100% acrylic silicon glazed primer with antifungal paint for top coat
of approved brand and shade to give an even shade after thoroughly
brooming the surface to remove all dirt and loose powdered material,
free from mortar drops and other foreign matter cost of materials, labour,
complete as per specifications.

128
Sl. No. Description Unit Rate
Rs. Ps.

15.105 Providing textured paint of approved quality, colour and shade to Sqm 365.00
wall surface after cleaning and rubbing the wall surface with wire brush
of medium size emery stone to remove all the loosely adhering particles,
the surface is then cleaned with water and ensured that it is in line and
level. The textured material is then mixed with 40-50% of clean water
until a homogeneous thick slurry is formed, the slurry is left for 5-10
min, to react completely with ingredients. The textured finish prepared
as above is then applied to the wall surface with suitable roller/spray
gun/putty/ blade/ trowel to get the desired finish. The finished surface
shall be applied with two coats of exterior paint of approved shade.
The rate includes providing and removing scaffolding, all lead and lift
and all other incidental charges etc., complete as per directions of the
Engineer-in-charge of the work.
15.106 Providing applying two coats of wall putty to inside plastered walls and Sqm 65.00
ceiling using white cement putty. Scrapping and levelling the surface
using steel blade and preparing the surface even and smooth by using
different grade sand papers, including cost of all materials, cost of labour
and scaffolding etc., complete as per the specification.
Area to be considered -
(a) 100% for fresh surface
(b) Upto 10 % for repainting

Note:

1. Lift charges: The above rates are applicable for Ground floor only.
An additional rate of Rs. 6.00/sqm per floor for inside plastering
works only may be added for every additional floor. Below or above
the ground floor.

2. Lift charges: The above rates are applicable for Ground floor.
An additional rate of Rs. 4.00/sqm per floor for painting works of
exterior walls only may be added for every additional floor.

3. Scaffolding charges : An additional rate of Rs. 12.00/sqm per


floor for external plastering works only may be added for every
additional floor.

4. Scaffolding charges : An additional rate of Rs. 4.00/sqm for painting


works of exterior walls only maybe added for every additional floor.

129
Chapter - 16
REPAIRS TO BUILDINGS

130
Sl. No. Description Unit Rate
Rs. Ps.

16.0 REPAIRS TO BUILDINGS


16.1 KSRB 24-1 : Removing white wash or colour wash by steel brushing Sqm 7.00
and / or scraping, sand papering and preparing wall surface smooth
including repairs to scraches, including cost of material, labour, complete
as per specifications.
Specification No.KBS
16.1.2 KSRB 24-2 : Extra for removing white wash or colour wash by steel Sqm 8.00
brushing and / or scraping, sand papering the ceiling and / or sloping roof
surface smooth including repairs to scraches, including cost of material,
labour, complete as per specifications.
16.1.3 KSRB 24-3 : Extra for washing the wall surface spoiled by smoke, soot, Sqm 3.00
with clear water before sand papering the surface smooth including
necessary repairs to scraches, including cost of material, labour,
complete as per specifications.
16.1.4 KSRB 24-4 : Extra for washing the ceiling and / or sloping roof surface Sqm 3.00
spoiled by smoke soot with clear water before sand papering the surface
smooth and including necessary repairs to scraches, including cost of
material, labour, complete as per specifications.
16.2.1 KSRB 24-5 : Cleaning and washing of decorated wall surface with Sqm 3.00
soap, soda and water including cost of materials, labour, complete as
per specifications.
Specification No.KBS
16.2.2 KSRB 24-6 : Extra for KSRB 24-5 cleaning and washing the old ceiling Sqm 3.00
and / or sloping roof with soap, soda and water including cost of
materials, labour, complete as per specifications.
16.3.1 KSRB 24-7 : Cleaning and washing the old plastered wall surface with Sqm 3.00
soap, soda, water including cost of materials, labour, complete as per
specifications.
16.3.2 KSRB 24-8 : Extra for Item No. 24-7 cleaning and washing the old Sqm 3.00
plastered ceiling and / or sloping roof surface with soap, soda, water
including cost of materials, labour, complete as per specifications.
16.4 KSRB 24-9 : Cleaning and washing of stone masonry wall surface Sqm 4.00
with nitric acid including cost of materials, labour, complete as per
specifications.
Specification No.KBS
16.5 KSRB 24-10 : Removing the old paint or polish from wood and / or Sqm 54.00
wood based surface with paint remover of approved brand / manufacturer
and making surface even including cost of materials, labour, complete
as per specifications.
Specification No.KBS

131
Sl. No. Description Unit Rate
Rs. Ps.

16.6 KSRB 24-11 : Removing the old paint or polish from wood and / Sqm 37.00
or wood based surface with caustic soda solution and making surface
even including cost of materials, labour, complete as per specifications.
Specification No.KBS 24
16.7 KSRB 24-12 : Removing the old paint from wood and / or wood Sqm 77.00
based surface with blow lamp and making surface even including cost
of materials, labour, complete as per specifications.
Specification No.KBS 24
16.8 KSRB 24-13 : Removing the old paint from steel and / or other metal Sqm 70.00
surface with hand scraping and making surface even including cost of
labour, complete as per specifications.
Specification No.KBS 24
16.9 KSRB 24-14 : Removing the old paint from steel and / or other metal Sqm 77.00
surface with flame cleaning and making surface even including cost of
material, labour, complete as per specifications.
Specification No.KBS 24
16.10 KSRB 24-15 : Removing the old paint from steel and / or other metal Sqm 53.00
surface with paint remover of approved brand / manufacturer cleaning
and making surface even including cost of material, labour, complete
as per specifications.
Specification No.KBS 24
16.11 KSRB 24-16 : Fixing small pieces ( not exceeding 0.015 cum ) for Piece 21.00
making good wherever hinges etc., have been removed from frames or
joinery etc., with teak wood excluding cost of materials but including
cost of labour, complete as per specifications.
Specification No.KBS 24
16.12 KSRB 24-17 : Providing and fixing small pieces ( not exceeding 0.015
cum ) for making good wherever hinges etc., have been removed from
frames or joinery etc., including cost of materials, labour, complete as
per specifications.
Specification No.KBS 24
16.12 KSRB 24-17 : – do – Honne wood Piece 143.00
16.13 KSRB 24-18 : – do – Matti / nandi wood Piece 121.00
16.14 KSRB 24-19 : – do – Sal wood pieces ( not exceeding 0.015 cum ) Piece 101.00
16.15 KSRB 24-20 : Renewing bars, styles and rails, straight for joinery upto
50mm thick including mitres, haunching, mortices etc., and removing the
old defective pieces and replacing including cost of materials, labour,
complete as per specifications.
Specification No.KBS
16.15 KSRB 24-20 : – do – Teak wood Piece 938.00
16.16 KSRB 24-21 : – do – Honne wood Piece 415.00
16.17 KSRB 24-22 : – do – Matti / Nandi wood Piece 356.00

132
Sl. No. Description Unit Rate
Rs. Ps.

16.18 KSRB 24-23 : Rewedging, cramping joinery of any description with


new wedges in glue or white lead and repinning including rehanging or
refixing of shutters, hinges or pivots, removing or dismantling excluding
cost of wood but including cost of labour, complete as per specifications.
Specification No.KBS 24
16.18 KSRB 24-23 : – do – not exceeding one sqm per leaf Leaf 480.00
16.19 KSRB 24-24 : – do – exceeding one sqm but not exceeding two Leaf 638.00
sqm per leaf
16.20 KSRB 24-25 : – do – exceeding two sqm Leaf 901.00
16.21 KSRB 24-26 : Making repairs to joinery at angles with 300mm x Each 93.00
25mm x 3mm length of MS flat forged to shape and let into wood work,
counter sunk, drilled and screwed including cost of materials, labour,
complete as per specifications. Specification No.KBS
16.22 KSRB 24-27 : Renewing wood battens in roof including making
good the holes in walls, removal of rubbish to the dumping round with
a lead upto 50 m including cost of materials, labour, complete as per
specifications. Specification No.KBS 24
16.22 KSRB 24-27 : – do – Honne wood battens cum 11,205.00
16.23 KSRB 24-28 : – do – Matti / Nandi wood battens cum 9,833.00
16.24 KSRB 24-29 : – do – Sal wood battens cum 8,680.00
16.25 KSRB 24-30 : Removal of old broken glass panes ( any thickness of
size, quality or description ) from frames, glazed with putty or fixed with
beads including cost of labour, complete as per specifications.
Specification No.KBS 24
16.25 KSRB 24-30 : – do – from wooden frames Sqm 103.00
16.26 KSRB 24-31 : – do – from metal frames Sqm 145.00
16.27 KSRB 24-32 : Removing serviceable glass of any description from Sqm 149.00
old wood or metal frames (any thickness or size, quality or description)
hacking out old putty etc., including risk and making good breakages in
taking out and handling, stacking within a lead of 50 m. including cost
of labour, complete as per specifications.
Specification No.KBS 24
16.28 KSRB 24-33 : Supplying and fixing new wood beads wherever necessary
including cost of materials, labour, complete as per specifications.
Specification No.KBS 24
16.28 KSRB 24-33 : – do – Teak wood beads m 33.00
16.29 KSRB 24-34 : – do – Honne wood beads m 27.00
16.30 KSRB 24-35 : Renewal of old putty of glass panes including cost of m 30.00
materials, labour, complete as per specifications.
Specification No.KBS 24.2.6
16.31 KSRB 24-36 : Removing the tiles in patches in area exceeding 10 tiles
and not exceeding 5 sqm including removing old tiles preparing surfaces

133
Sl. No. Description Unit Rate
Rs. Ps.

and laying or setting new or old tiles complete including cost of


materials, (excluding cost of tiles) labour, complete as per specifications.
Specification No.KBS 24
16.31 KSRB 24-36 : – do – glazed tiles Sqm 670.00
16.32 KSRB 24-37 : – do – mosaic tiles Sqm 515.00
16.33 KSRB 24-38 : Cutting out cracks of roof terrace to V section cleaning m 53.00
out, wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand)
including cost of materials, labour, complete as per specifications.
Specification No.KBS 24.2.1
16.34 KSRB 24-39 : Cutting out cracks of roof terrace to V - section Sqm 55.00
cleaning out and filling solidly with a hot mixure of bitumen and clean
dry sand 1:1 by weight including cost of materials, labour, complete as
per specifications. Specification No. KBS 24.2.1
16.35.1 KSRB 24-40 : Dubbing out on old irregular walls average 10mm thick Sqm 141.00
and making good the surface with cement mortar 1:3 including curing
cost of materials, labour, complete as per specifications.
Specification No.KBS 24.2.1
16.35.2 KSRB 24-43 : Add for KSRB No. 24-40 for every 5mm thick increase Sqm 40.00
after 10mm with respective mortars including curing cost of materials,
labour, complete as per specifications.
16.36.1 KSRB 24-41 : Dubbing out on old irregular walls average 10mm thick Sqm 128.00
and making good the surface with cement mortar 1:4 including curing
cost of materials, labour, complete as per specifications.
Specification No.KBS 24.2.1
16.36.2 KSRB 24-43 : Add for KSRB No. 24-41 for every 5mm thick increase Sqm 37.00
after 10mm with respective mortars including curing cost of materials,
labour, complete as per specifications.
16.37.1 KSRB 24-42 : Dubbing out on old irregular walls average 10mm thick Sqm 115.00
and making good the surface with cement mortar 1:6 including curing
cost of materials, labour, complete as per specifications.
Specification No.KBS 24.2.1
16.37.2 KSRB 24-43 : Add for KSRB No. 24-42 for every 5mm thick increase Sqm 34.00
after 10mm with respective mortars including curing cost of materials,
labour, complete as per specifications.
16.38 KSRB 24-44 : Repairs to plaster in patches of 2.5 sqm and less in
walls, ceilings 10 to 20mm thick in cement mortar including cutting the
patches in proper shape and replastering the surface of the wall including
disposal of rubbish with a lead of 50m including curing cost of materials,
labour, complete as per specifications.
Specification No.KBS 24.2.1
16.38 KSRB 24-44 : – do – cement mortar 1:3 Sqm 243.00
16.39 KSRB 24-45 : – do – cement mortar 1:4 Sqm 229.00
16.40 KSRB 24-46 : – do – cement mortar 1:6 Sqm 215.00

134
Sl. No. Description Unit Rate
Rs. Ps.

16.41 Removing of existing old or broken wash basin / urinals and Each 267.00
disposing it with all cost and conveyance labour for all items of work,
HOM with all lead and lift, loading and unloading, transportation charges
and all other incidental charges etc., complete as per specification and
directions of the Engineer-in-charge of the work.
16.42 Removing of existing old or broken Water closet Indian / Eurpoean Each 246.00
and disposing it with all cost and conveyance labour for all items of work,
HOM with all lead and lift, loading and unloading, transportation charges
and all other incidental charges etc., complete as per specification and
directions of the Engineer-in-charge of the work.
16.43 Removing of existing old Sanitary and plumbing pipelines, stacking m 82.00
and disposing it with all cost and conveyance labour for all items of work,
HOM with all lead and lift, loading and unloading, transportation charges
and all other incidental charges etc., complete as per specification and
directions of the Engineer-in-charge of the work.
16.44 External sweeping and terrace cleaning - m 0.80
Cleaning of outer periphery like roads footpaths curb stones terrace
including removing grass dust etc., to the nearest garbage pit using
suitable coconut broomstic,bombay broomstick, squezers /wipers /
rubberbrushes, coir brushes, bamboo baskets, plastic bukets mugs
trolley etc., complete
16.45 Cleaning stone parapets removing of dirt dust etc., using suitrable Sqm 0.80
soap powder, coconut broomstick, squeezers / wipers/ rubber
brushes, coir brushes, plastric brushjes, mugs, booster pumps with
portable arrangement, hose pipe etc., complete including cost of water
charges and electrical charges.
16.46 Cleaning Quadrangle chajjas including removing of dirt dust etc., Sqm 9.00
using suitrable soap powder, coconut broomstick, squeezers /
wipers/ rubber brushes, coir brushes, plastric brushjes, mugs, booster
pumps with portable arrangement, hose pipe etc., complete excluding
water charges including electrical charges and all safety measures.
16.47 Cleaning sub surface drains including removing of dirt dust etc., m 10.00
using suitrable soap powder , coconut broomstick, squeezers /
wipers/ rubber brushes, coir brushes, plastric brushjes, mugs, booster
pumps with portable arrangement, hose pipe etc., complete
16.48 Cleaning surface drains including removing of dirt dust etc., using m 6.00
suitrable soap powder , coconut broomstick, squeezers / wipers/ rubber
brushes, coir brushes, plastric brushjes, mugs, booster pumps with
portable arrangement, hose pipe etc., complete.
16.49 Cleaning of office floors, toilet floors, corridors, lobbies, partitions, Sqm 1.00
storage units, furniture, electrical & electronic equipments, doors,
windows, curtains, blinds etc., including cleaning of dust, etc., using
suitable bombay broom stick, squezers / wipers/rubber brushes, mop
sticks, coir brushes, bamboo baskets, plastic buckets, trolleys, wiping
cloths, carry bags, etc.,removing the debris to the nearest garbage pit
complete.
135
Chapter - 17
ROADS AND BRIDGES -
carriage of materials

136
Sl. No. Description Unit Rate
Rs. Ps.

17.0 ROADS & BRIDGES - CARRIAGE OF MATERIALS


17.1 KSRRB M100-1 Loading and Unloading of Stone Boulder / Stone cum 47.00
aggregates /Sand/ Kanker / Moorum.
KSRRB M100-1 : Placing tipper at loading point, loading with front end
loader,dumping, turning for return trip, excluding time for haulage and
return trip complete as per specifications.
MORTH -100/ Chapter 1
17.2 KSRRB M100-2. Loading and Unloading of Stone Boulders by cum 92.00
Manual Means complete as per specifications.
MORTH -100/ Chapter 1
17.3 KSRRB M100-3 Loading and Unloading of Cement or Steel by Tonne 125.00
Manual Means and as per specifications complete.
MORTH -100/ Chapter 1
17.4 KSRRB M100-4.1. Cost of Haulage Excluding Loading and Unloading t.km 1.50
MORTH -100/ Chapter 1
Case-I : Surface Road
17.5 KSRRB M100-4.2. Haulage of materials by tipper excluding cost of t.km 1.50
loading, unloading and stacking complete as per specifications.
MORTH -100/ Chapter 1 Case-II : Unsurfaced Gravelled Road
17.6 KSRRB M100-4.3. Haulage of materials by tipper excluding cost of t.km 3.00
loading, unloading and stacking complete as per specifications.MORTH
Chapter 1 Case-III : Kaccha Track and Track in River Bed / Naha Bed.
17.7 KSRRB M100-5. Supply of quarried stone, hand breaking into coarse cum 550.00
aggregate 63mm nominal size (passing 80 mm and retained on 50 mm
sieve) and stacking as directed complete as per specifications.
MORTH -100/ Chapter 1
17.8 KSRRB M100-6. Crushing of stone boulders of 150 mm size in an cum 665.00
integrated stone crushing unit of 200 tonnes per hour capacity comprising
of primary and secondary crushing units, belt conveyor and vibrating
screens to obtain stone aggregates of 13.2 mm nominal size including
cost of materials, equipments, labour etc. complete.
MORTH -100/ Chapter 1
17.9 KSRRB M100-7. – do – stone aggregates of 20 mm nominal size cum 669.00
17.10 KSRRB M100-8. – do – stone aggregates of 40 mm nominal size cum 597.00

137
Chapter - 18
SITE CLEARANCE AND
DISMANTLING

138
Sl. No. Description Unit Rate
Rs. Ps.

18.0 ROADS & BRIDGES -- SITE CLEARANCE AND DISMANTLING


KSRRB 200 Cutting of trees
18.1 KSRRB 200-1. Cutting of trees girth from 300mm to 600mm including Each 249.00
cutting of trunks, branches and removal of stumps roots stacking of
serviceable materials earth filling in the depressions / pit, labour charges
complete as per specifications.
MORTH specification clause 201/ Chapter 2
18.2 KSRRB 200-2. – do – 600mm to 900mm Each 768.00
18.3 KSRRB 200-3. – do – 900mm to 1800mm Each 1,869.00
18.4 KSRRB 200-4. – do – 1800mm to 2700mm Each 2,907.00
18.5 KSRRB 200-5. – do – 2700mm to 3600mm Each 5,814.00
18.6 KSRRB M200-6.1 Cutting of trees girth from 300mm to 600mm including Each 452.00
cutting of trunks, branches and removal of stumps, roots stacking of
serviceable materials with all lifts and up to a lead of 1000m and earth filling
in the depressions / pit, complete as per specifications.
MORTH Specification No. 201
18.7 KSRRB M200-6.2 : – do – 600mm to 900mm Each 859.00
18.8 KSRRB M200-6.3 : – do – 900mm to 1800mm Each 1,966.00
18.9 KSRRB M200-6.4 : – do – 1800mm to 2700mm Each 5,957.00
KSRRB M200- Clearing grass
18.10 KSRRB M200-7.1. Clearing grass and removal of rubbish by manual Ha 21,462.00
means and stacking outside the periphery of the area cleaned complete
as per specifications.
MORTH Specification No. 201
KSRRB 200- Clearing and grubbing road land
18.11 KSRRB 200-8. Clearing and grubbing road land including uprooting rank Sqm 8.00
vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm,
by manual means, in area of light jungle, removal of stumps, disposal of
unserviceable materials, stacking of serviceable materials labour charges
complete as per specifications.
MORTH / Chapter 2
18.12 KSRRB 200-9. –do– thorney jungle Sqm 12.50
18.13 KSRRB M200-10.1. Clearing and grubbing road land including uprooting Ha 64,548.00
rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removaL of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned,
including removal and disposal of top organic soil not exceeding 150 mm
in thickness complete as per specifications. I. By Manual Means: A. In
area of light jungle.
MORTH Specification No. 201
18.14 KSRRB M200-10.2. –do– I. By Manual Means: B. In area of thorny jungle. Ha 86,171.00

139
Sl. No. Description Unit Rate
Rs. Ps.

18.15 KSRRB M200-11.1. Clearing and grubbing road land including uprooting Ha 15,438.00
rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removalof stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned,
including removal and disposal of top organic soil not exceeding 150 mm
in thickness complete as per specifications.
II. By Mechanical Means: A. In area of light jungle.
MORTH Specification No. 201
18.16 KSRRB M200-11.2. –do– II. By Mechanical Means:B. In area of thorny Ha 19,089.00
jungle
18.17 KSRRB M200-12.1. Dismantling of existing structures like culverts, cum 378.00
bridges, retaining walls and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal of unserviceable
material and stacking the serviceable material with all lifts complete as per
specifications.
i) Lime /Cement Concrete. I. By Manual Means: A. Lime Concrete,
cement concrete grade M-10 and below.
MORTH Specification No. 202
18.18 KSRRB M200-12.2. –do– i) Lime /Cement Concrete. I. By Manual Means cum 464.00
:B. Cement Concrete Grade M-15 & M-20.
18.19 KSRRB M200-12.3. –do– C. Prestressed / Reinforced cement concrete cum 1,324.00
grade M-20 above.
18.20 KSRRB M200-13.1. –do– II. By Mechanical Means. A. Cement Concrete cum 325.00
Grade M-15 & M-20.
18.21 KSRRB M200-13.2. –do– By Mechanical Means. cum 615.00
18.22 KSRRB M200-14.1. Dismantling of existing structures like culverts, cum 206.00
bridges, retaining walls and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal of unserviceable
material and stacking the serviceable material with all lifts complete as
per specifications. ii) Dismantling Brick / Tile work. A. In lime mortar.
MORTH Specification No. 202
18.23 KSRRB M200-14.2. –do– Dismantling brick/Tile work B. In cement mortar. cum 292.00
18.24 KSRRB M200-14.3. –do– Dismantling brick/Tile work C. In mud mortar. cum 22.00
18.25 KSRRB M200-14.4. –do– Dismantling brick/Tile work D. Dry brick cum 155.00
pitching or brick soling.
18.26 KSRRB M200-15.1. Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever necessary,
sorting the dismantled material, disposal of unserviceable material and
stacking the serviceable material with all lifts complete as per specifications.
iii) Dismantling Stone Masonry.
MORTH Specification No. 202
18.26 KSRRB M200- 15.1. –do– A. Rubble Stone masonry in lime mortar. cum 240.00

140
Sl. No. Description Unit Rate
Rs. Ps.

18.27 KSRRB M200- 15.2. –do– B. Rubble stone masonry in cement mortar. cum 292.00
18.28 KSRRB M200- 15.3. –do– C. Rubble stone masonry in mud mortar. cum 206.00
18.29 KSRRB M200-15.4. –do– D. Dry rubble masonry. cum 189.00
18.30 KSRRB M200-15.5. –do– E. Dismantling stone pitching / dry stone cum 172.00
spalls.
18.31 KSRRB M200-15.6. –do– Dismantling brick/Tile work F. Dismantling cum 206.00
Boulders laid in wire crates including opening of crates and stacking
dismantled materials.
18.32 KSRRB M200-16. –do– iv) Dismantling wood work wrought framed cum 554.00
and fixed in frames of trusses upto a Height of 5m above Plinth Level.
18.33 “KSRRB M200-17.1. –do– v) Steel work in all types of Sections upto Tonne 1,577.50
a Height of 5 m above plinth level excluding Cutting of Rivet. – A.
Including dismembering.”
18.34 KSRRB M200-17.2. –do– v)Steel work in all types of Sections upto Tonne 1,188.00
a Height of 5 m above plinth level excluding Cutting of Rivet– B.
Excluding dismembering.
18.35 –do– B for cutting rivets. Rivet 11.00
18.36 KSRRB M200-18.1. –do– vi) Scraping of Bricks Dismantled from Brick Nos 1.50
work including Stacking - A. In Lime / Cement mortar.
18.37 KSRRB M200-18.2. –do– B. In mud mortar. Nos 0.80
18.38 KSRRB M200-19.1. –do– vii) Scraping of stones from dismantled stone cum 602.00
masonry – A. In cement and lime mortar.
18.39 KSRRB M200-19.2. –do– B. In mud mortar. cum 127.00
18.40 KSRRB M200-20. –do– viii) Scraping plaster in lime or cement mortar Sqm 17.00
from brick / stone masonry.
18.41 KSRRB M200-21.1. –do– ix) Removal of all types of Hume pipes and stacking m 222.00
including earthwork and dismantling of masonry works – A. Upto 600 mm dia.
18.42 KSRRB M200-21.2. –do– Removal of all types of Hume pipes and m 301.00
stacking including earthwork and dismantling of masonry works – B.
Above 600 mm to 900 mm dia.
18.43 KSRRB M200-21.3. - do - Removal of all types of Hume pipes and stacking including m 515.00
earthwork and dismantling of masonry works C. Above 900 mm dia.
18.47 KSRRB M200-24. Dismantling of cement concrete pavement by cum 749.00
mechanical means using pneumatic tools, breaking to pieces not exceeding
0.02 cum in volume and stock piling at designated locations and disposal
of dismantled materials stacking serviceable and unserviceable materials
seperately complete as per specifications.
MORTH Specification No. 202
18.48 KSRRB M200-25. Dismantling of guard rails by manual means and disposal m 72.00
of dismantled materials with all lifts and stacking serviceable materials and
unserviceable materials seperately complete as per specifications.
MORTH Specification No. 202

141
Sl. No. Description Unit Rate
Rs. Ps.

18.49 KSRRB M200-26. Dismantling Kerb stone by manual means and disposal m 10.00
of dismantled materials with all lifts and complete as per specifications.
MORTH Specification No. 202
18.50 KSRRB M200-27. Dismantling of Kerb stone channel by manual means m 15.00
including and disposal of dismantled material with all lifts and complete as
per specifications.
MORTH Specification No. 202
18.51 KSRRB M200-28.1. Dismantling of kilometre stone including cutting Each 390.00
of earth, foundation and disposal of dismantled material with all lifts and
back filling of pit complete as per specifications. A. 5th KM stone ( quantity
of cement concrete = 0.392 cum).
MORTH Specification No. 202
18.52 KSRRB M200-28.2. –do– B. Ordinary KM stone ( quantity of cement Each 230.00
concrete = 0.269 cum ).
18.53 KSRRB M200-28.3. –do– C. 200M stone ( quantity of cement concrete = Each 45.00
0.048 cum ].
18.54 KSRRB M200-29. Dismantling of barbed wire fencing / wire mesh m 55.00
fencing including posts, foundation concrete, back filling of pit by manual
means including disposal of dismantled material with all lifts and stacking
serviceable material and unserviceable material separately complete as
per specifications.
MORTH Specification No. 202
18.55 KSRRB M200-30. Dismantling of CI water pipe line 600 mm dia including m 114.00
disposal with all lifts and stacking of serviceable material and unserviceable
material separately under supervision of concerned department complete
as per specifications.
MORTH Specification No. 202
18.56 KSRRB M200-31. Removal of cement concrete pipe of sewer gutter m 140.00
1500 mm dia under the supervision of concerned department including
disposal with all lifts and stacking of serviceable and unserviceable material
separately but excluding earth excavation and dismantling of masonry works
complete as per specifications.
MORTH Specification No. 202
18.57 KSRRB M200-32. Removal of Telephone / Electric poles including Nos 180.00
excavation and dismantling of foundation concrete and lines under the
supervision of concerned department, disposal with all lifts and stacking
the serviceable and unserviceable material separatelycomplete as per
specifications.
MORTH Specification No. 202

142
Chapter - 19
EARTH WORK,
EROSION CONTROL AND
DRAINAGE

143
Sl. No. Description Unit Rate
Rs. Ps.

19.0 EARTH WORK, EROSION AND DRAINAGE


19.1 KSRRB 300-1. Earthwork excavation by manual means for roads, drains cum 108.00
& similar works in ordinary soil excavated surface levelled and sides neatly
dressed, the disposed earth to be levelled neatly after breaking of clods
complete as per specifications.
MORTH / Chapter 3

19.2 KSRRB 300-2. –do– in hard soil cum 149.00


19.3 KSRRB 300-3. Earthwork excavation and forming in embankment by manual cum 136.00
means in all types of soils (When earth is taken from bank cutting or
from soil deposits) including breaking of clods, spreading to required line
and level, forming, and cost of all labour complete as per specifications.
( excluding watering and compaction of earth ) (with all lead and lift)
MORTH / Chapter 3

19.5 KSRRB 300-5. Excavation in soft rock with blasting for formation of cum 370.00
roads including stacking neatly, to uniform line and level including cost of
explosives, labour, HOM of machineries and equipments complete as per
specifications. (with all lead and lift)
MORTH / Chapter 3

19.6 KSRRB 300-6. Excavation in soft rock / ordinary rock without blasting cum 1,000.00
for formation of roads including stacking neatly, to uniform line and level with
an initial lead upto 15m. including cost of all labour, equipments, complete
as per specifications.

19.7 KSRRB 300-7. Excavation in hard rock by blasting for formation of roads cum 481.00
including stacking to uniform line and level as directed by the engineer
including cost of explosives, labour, HOM complete as per specifications.
(with all lead and lift)
MORTH / Chapter 3

19.8 KSRRB 300-8. Excavation in hard rock by chiselling and / or wedging cum 1,510.00
where blasting is prohibited for formation of roads including stacking
to uniform line and level including cost of all labour complete as per
specifications. (with all lead and lift)
MORTH / Chapter 3

19.13 KSRRB M300-13. Excavation for roadway in hard rock (requiring cum 134.00
blasting) by drilling, blasting and breaking, trimming of bottom and side
slopes in accordance with requirements of lines, grades and cross sections,
loading and stacking at site of cut road with a lead of 1.00 km and complete
as per specifications. (Excavated rock credited to contractor)
MORTH Specification No. 301

19.14 KSRRB M300-14. Excavation for roadwork in all types of soil by cum 34.00
mechanical means including cutting and loading to tippers, trimming
bottom and side slopes, in accordance with requirements of lines, grades
and cross sections, and transportation with a lead of 1.00 km and complete
as per specifications.
MORTH Specification No.301

144
Sl. No. Description Unit Rate
Rs. Ps.

19.15 KSRRB M300-15. Excavation for roadway in ordinary rock by cum 46.00
mechanical means including cutting and loading to tippers, transporting
with a lead of 1.00 km and trimming bottom and side slopes in accordance
with requirements of lines, grades and cross sections complete as per
specifications.
MORTH Specification No. 301
19.16 KSRRB M300-16.1. Excavation for roadway in hard rock by mechanical cum 310.00
means (blasting prohibited) including breaking rock, loading in tippers
and disposing with all lead and lifts trimming bottom and side slopes in
accordance with requirements of lines, grades and cross sections complete
as per specifications.
MORTH Specification No. 301
19.17 KSRRB M300-16.2. Excavation for roadway in hard rock by manual means cum 985.00
(blasting prohibited) including breaking rock, loading in tippers and disposal
with all lead and lifts trimming bottom and side slopes in accordance with
requirements of lines, grades and cross sections complete as per specifications.
MORTH Specification No. 301
19.18 KSRRB M300-17. Excavation for road way in hard rock ( controlled cum 151.00
blasting) with rock breakers including breaking rock, loading to tippers
transporting and stacking at site and trimming bottom and side slopes in
accordance with requirement of lines, grades and cross sections complete
as per specifications.
MORTH Specification No. 301
19.19 KSRRB M300-18. Earth work Excavation for road way in marshy soil cum 39.00
by mechanical means including loading to tippers and disposing with a
lead of 1.00 km including the cost of equipments, machineries, labour etc.
complete as per specifications.
19.20 KSRRB M300-19. Removal of unserviceable soil including excavation, cum 27.00
loading and disposal but excluding replacement by suitable soil which shall
be paid separately as per clause 300.5 complete as per specifications.
MORTH Specification No. 301
KSRRB 300- Extra additional lead
19.30 KSRRB 300-26.1. Extra for every additional lead of 7.50 mtr. beyond 15m but cum 5.00
upto 60m by manual means for all kinds of soils except hard rock including
cost of all labour complete as per specifications.
MORTH Chapter 3
19.31 KSRRB 300-26.2. When lead is more than 60m upto 500m by any means cum 5.00
of conveyance including loading and unloading for all kinds of soils except
hard rock including cost of all labour complete as per specifications.
MORTH Chapter 3
19.33 KSRRB 300-28. Box cutting / trenching the sub grade to proper slope, Sqm 1.50
camber and removing inequalities including removing the stuff and depositing
on the road side slopes ( cutting of earthwork shall be paid seperately in the
respective item on the basis of classification of the excavation) including
cost of all labour complete as per specifications.
MORTH Chapter 3

145
Sl. No. Description Unit Rate
Rs. Ps.

KSRRB M300- Turfing with Sods/Seeding and Mulching

19.36 Providing and laying live sods for turfing on embankment. slopes, verges or Sqm 91.00
other locations over 20mm thick sand backing including cost of all materials,
machinery and labour and including the surface preparation, spreading sand,
tamping, watering for 15 days. Complete with all lead and lifts.

19.42 KSRRB M300-36. Construction sub-surface drain with perforated pipe of m 489.00
100 mm internal diameter of metal / asbestos cement / cement concrete
/ PVC, closely jointed, perforations ranging from 3mm to 6mm depending
upon size of crushed stone material surrounding the pipe, with 150mm
bedding below the pipe and 300mm cusion above the pipe, cross-section
of excavation 450x550mm. Excavated material to be utilised in roadway at
site complete as per specifications.
MORTH Specification No. 309

19.43 KSRRB M300-37. Construction of sub-surface drain 300mm x 450mm with m 204.00
crushed stone aggregates conforming to Table 300-4, excavated material
to be utilised in roadway complete as per specifications.
MORTH Specification No. 309

19.44 Construction of coverd drain 1m x 1m (inside dimension) with RCC M20 m 4,727.00
grade 10cm thick for walls and floor, laid over 10cm thick 1:3:6 PCC bed
and covered with M30 grade RCC slab of 15cm thick excluding earth
work including reinforcement @ 35 kg/rmt and form work complete as per
specifications. MORTH 309

19.45 KSRRB M300-39. Preparation and Surface Treatment of Formation by Sqm 1.50
removing mud and slurry, watering to the extent needed to maintain the
desired moisture content, trimming to the required line, grade, profile and
rolling with 8-10 tonne smooth sheeled roller, complete as per Clause 310.
complete as per specifications.
MORTH Specification No. 310

19.46 KSRRB M300-40. Excavation in all types of soils in hilly areas by cum 64.00
mechanical means including cutting and trimming of side slopes and
disposing of excavated earth and complete as per specifications.
MORTH Specification No. 301

19.47 KSRRB M300-41. Excavation in hilly area in ordinary rock not requiring cum 100.00
blasting by mechanical means including cutting and trimming of slopes
and disposal of cut material and complete as per specifications.
MORTH Specification No. 301

19.48 KSRRB M300-42. Excavation in hilly area in hard rock requiring blasting cum 275.00
by mechanical means including trimming of slopes and disposal of cut
material and complete as per specification.
MORTH Specification No. 301

146
Sl. No. Description Unit Rate
Rs. Ps.

19.51 KSRRB 300-45. Scarifying by manual means stone metal crust 50mm to Sqm 66.00
100mm thick along with premix carpet / surface dressing and stacking of
old serviceable materials including cost of all labour charges complete as
per specifications.
MORTH / Chapter 3

19.52 KSRRB 300-46. Scarifying by mechanical means stone metal crust 50mm Sqm 32.00
to 100mm thick by along with 20mm premix carpet / surface dressing and
stacking of old serviceable materials including cost of all labour charges,
HOM complete as per specifications.
MORTH / Chapter 3

19.53 KSRRB 300-47. Scarifying kankar / gravel / metal crust by manual means Sqm 33.00
upto 150mm thick and disposal of stuff including cost of all labour charges
complete as per specifications.
MORTH / Chapter 3

19.54 KSRRB 300-48. Scarifying kankar / gravel / metal crust by mechanical Sqm 20.00
means upto 150mm thick disposal of stuff including cost of all labour
charges, HOM complete as per specifications.
MORTH / Chapter 3

19.55 KSRRB 300-49. Scarifying bituminous course 50mm to 75mm thick along Sqm 75.00
with premix carpet / surface dressing by manual means without disturbing
the base and stacking of the debris materials including cost of all labour
charges complete as per specifications.
MORTH / Chapter 3

19.56 KSRRB 300-50. Scarifying bituminous course 50mm to 75mm thick Sqm 32.50
along with premix carpet / surface dressing by mechanical means attached
with scarifier without disturbing the base and stacking the debris including
cost of all labour charges, HOM complete as per specifications.
MORTH / Chapter 3

19.57 KSRRB 300-51. Making 50mm x 50mm furrows at 450 to the centre line of Sqm 4.00
the road and at one metre interval in the existing thin bituminous wearing
course including sweeping, taking out old materials, stacking the debris cost
of all labour charges complete as per specifications.
MORTH / Chapter 3

19.58 KSRRB M300-52.1. Scarifying the existing granular road surface to a depth of Sqm 25.00
50mm and disposal of scarified material and complete as per specifications.
MORTH Specification No. 305.4.3

19.60 KSRRB M300-53. Construction of embankment with approved material cum 270.00
Gravel/Murrum with all lifts and leads, transporting to site, spreading, grading
to required slope and compacting to meet requirement Table 300-2 complete
as per specifications, including cost of gravel / murrum, watering charges &
compaction by vibratory roller to 95% of modified proctors density.
MORTH Specification No. 305

147
Sl. No. Description Unit Rate
Rs. Ps.

19.61 KSRRB M300-54.Construction of embankment with approved material cum 79.00


deposited at site from roadway cutting and excavation from drain and
foundation of other structures graded and compacted to meet requirement
of Table 300-2 complete asper specifications. Which includes, watering
charges & compaction by vibratory roller)
MORTH Specification No. 305
19.62 KSRRB M300-55. Construction of sub-grade and earthen shoulders with cum 290.00
approved material Gravel/Murrum with all lifts & leads, transporting to site,
spreading, grading to required slope and compacted to meet requirement
of Table No. 300-2 complete as per specifications, including cost of earth,
watering charges & compaction by vibratory roller to 97% of modified
proctors density)
MORTH Specification No. 305
19.63 KSRRB M300-56. Construction of rockfill embankment with available broken cum 30.00
hard rock fragments of size not exceeding 300mm laid in layers not exceeding
500mm thick including filling of surface voids with stone spalls, binding top
layer with granular material, rolled with vibratory road roller, all complete as
per Clause 313 complete as per specifications.
MORTH Specification No. 313
19.64 KSRRB 300-58. Compaction of original ground by mechanical means Sqm 5.00
including filling in depression occuring during rolling including cost of all
labour, HOM complete as per specifications.
MORTH / Chapter 3
19.66 KSRRB M300-59.2. Loosening, levelling and compacting original ground Sqm 19.00
supporting embankment to facilitate placement of first layer of embankment
/ subgrade, scarified to a depth of 150mm, mixed with water at OMC and
then compacted by rolling so as to achieve minimum dry density as given in
Table 300-2 for embankment / subgrade including HOM construction, labour
etc.. complete as per specifications. MORTH Specification No. 305.3.4
19.67 KSRRB 300-60. Extra for laying earth by manual means as per cum 13.00
specifications for compaction in 250mm thick loose layers when laying of
earth in layers is done simultaneously with excavation of earth work and
dressing but excluding rolling and watering including cost of all labour
complete as per specifications.
MORTH / Chapter 3
19.68 KSRRB 300-61. Extra for laying earth by manual means as per cum 87.00
specifications for compaction in 250mm thick loose layers when laying of
earth in layers is done from stacked materials including breaking of clods
and dressing but excluding rolling and watering including cost of all labour
complete as per specifications.
MORTH / Chapter 3
19.69 KSRRB 300-62. Extra for laying earth by mechanical means as per cum 48.00
specifications for compaction in 250mm thick loose layers when laying of
earth in layers is done from stacked materials including breaking of clods
and dressing but excluding rolling and watering including cost of all labour,
HOM complete as per specifications.
MORTH / Chapter 3

148
Sl. No. Description Unit Rate
Rs. Ps.

19.70 KSRRB M300-63. Construction of Embankment with Flyash / Pond cum 60.00
Ash available from Coal or Lignite Burning Thermal Plants as Waste
Material. Construction of embankment with flyash conforming to Table 1 of
IRC:SP:58-2001 obtained from coal or lignite burning thermal power stations
as waste material, spread and compacted in layer of 200mm thickness each
at OMC, all as specified in IRC:SP:58-2001 and as per approved plans
complete as per specifications.
19.71 KSRRB 300-64.1. Extra for watering the earth to bring the earth upto cum 10.00
required optimum moisture content manually including cost of all labour
complete as per specifications. MORTH / Chapter 3
19.72 KSRRB 300-64.2. Extra for watering the earth to bring the earth upto cum 1.50
required optimum moisture content with machinery including cost of all
labour, HOM of machineries complete as per specifications.
MORTH / Chapter 3
19.73 KSRRB 300-65. Extra for rolling to specification with the use of vibratory roller cum 10.00
when earth is at suitable moisture content to achieve desired field density as
per the requirements of table 300-2 of MORTH V revision. including HOM
of machineries, labour, materials, complete as per specifications.
MORTH / Chapter 3
KSRRB M300-Horticulture
KSRRB M300-Spreading of sludge farm yard manure or/ and good earth
19.77 KSRRB M300-1. Spreading of sludge farm yard manure or/ and good earth cum 85.00
in required thickness (cost of sludge, farm yard manure or/and good earth
to be paid for separately) complete as per specifications.
MORTH Specification No. 307
KSRRB M300- Grassing with Doobs grass
19.78 KSRRB M300- 2.1. Grassing with Doobs grass including watering and Sqm 38.00
maintenance of the lawn for 30 days or more till the grass forms a thick lawn
free from weeds and fit for moving including supplying good earth if needed
complete as per specifications.
MORTH Specification No. 307
i) In rows 15 cm apart in either direction.
19.79 KSRRB M300-2.2. – do– ii) In rows 7.5 cm apart in either direction Sqm 70.00
KSRRB M300-Making lawns including ploughing and dradding with
‘swagha’ breaking of clod
19.80 KSRRB M300-3. Making lawns including ploughing and breaking of clod, Sqm 13.00
removal of rubbish, dressing and supplying doobs grass roots and planting
at 15 cm apart, including supplying and spreading of farm yard manure at
rate of 0.18 cum per 100 sqm complete as per specifiifications.
MORTH Specification No. 307
KSRRB M300- Maintenance of lawns or Turfing
19.81 KSRRB M300-4.Maintenance of lawns or Turfing of slopes (rough grassing) Sqm 85.00
for a period of one year including watering etc complete as per specifications.
MORTH Specification No. 307

149
Sl. No. Description Unit Rate
Rs. Ps.

KSRRB M300-Turfing lawns with fine grassing including ploughing, dressing

19.82 KSRRB M300-5. Turfing lawns with fine grassing including ploughing, Sqm 19.00
dressing including breaking of clods, removal of rubbish, dressing and
supplying doobs grass roots at 10 cm apart, including supplying and
spreading of farm yard manure at rate of 0.6 cum per 100 sqm complete as
per specifications. MORTH Specification No. 307

KSRRB M300- Maintenance of lawns with fine grassing for the first year

19.83 KSRRB M300-6. Maintenance of lawns with fine grassing for the first year Sqm 76.00
including watering etc complete as per specifications.
MORTH Specification No. 307

KSRRB M300- Planting and maintenance permanent hedges

19.84 KSRRB M300-7.1. Planting permanent hedges including digging of trenches, m 246.00
60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart complete as per specifications.
A) Planting permanent hedges including digging of trenches
MORTH Specification No. 307

19.85 “KSRRB M300-7.2. –do– Maintenance of hedge for one year m 173.00

KSRRB M300 - Planting and Maintaining of Flowering Plants and Shrubs

19.86 KSRRB M300- 8.1. Planting and Maintaining of Flowering Plants and Shrubs m 38.00
- A) Planting flowring plants and shrubs in central verge
MORTH Specification No. 307

19.87 KSRRB M300- 8.2. –do– Maintenance of flowering plants and shrubs in Km 1,82,285.00
central verge for one year.

KSRRB M300- Planting of trees and their maintenance for one year

19.88 KSRRB M300-9. Planting of trees by the road side (Avenue trees) in 0.60 Each 875.00
m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
fixing the tree guard and maintaining the plants for one year complete as
per specifications.
MORTH Specification No. 307

KSRRB M300-Renovation lawns including, weeding, forking the ground,


top dressing with forked soil

19.89 KSRRB M300-10. Renovation lawns including, weeding, forking the ground, Sqm 14.00
top dressing with forked soil, watering and maintenance the lawns, for 30
days or more, till the grass forms a thick lawn, free from weeds, and fit for
moving and disposal of rubbish as directed, including supplying good earth,
if needed but excluding the cost of well decayed farmyard namure complete
as per specifications. MORTH Specification No. 308

150
Sl. No. Description Unit Rate
Rs. Ps.

KSRRB M300-Supply at site of work well decayed farm yard manure


19.90 KSRRB M300-11. Supply at site of work well decayed farm yard manure, cum 170.00
from any available source, approved by the engineer in charge including
screening and stackin complete as per specifications.
MORTH Specification No. 308.2
KSRRB 300-Supply at site of work/ store-deoiled neem cake
19.91 KSRRB 300-12. Supply at site of work/ store-deoiled neem cake duly packed quintal 916.00
in used gunny bags complete as per specifications.
MORTH Specification No. 308.2
KSRRB M300-Supplying sludge
19.92 KSRRB M300-13. Supplying sludge duly stacked at site/store complete as cum 172.00
per specifications.
MORTH Specification No. 308.2
KSRRB M300- Half brick circular tree guard
19.93 KSRRB M300-14. Half brick circular tree guard, in 2nd class brick, internal Each 1,679.00
diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre
below ground, bottom two courses laid dry, and top three courses in cement
mortar 1:6 (1 cement 6 sand) and the intermediate courses being in dry honey
comb masonry, as per design complete, complete as per specifications.
KSRRB M300-Edging with 2nd class bricks, laid dry lengthwise
19.94 KSRRB M300-15. Edging with 2nd class bricks, laid dry lengthwise, including m 34.00
excavation, refilling, consolidation, with a hand packing and spreading nearly
surplus earth within a lead of 50 metres complete as per specifications.
KSRRB M300- Making tree guard from empty bitumen drums
19.95 KSRRB M300-16. Making tree guard 53 cm dia and 1.3 m high as per design Each 311.00
from empty bitumen drum, slit suitably to permit sun and air, (supplied by
the department at stock issue rate) including providing and fixing 2 nos MS
sheet rings 50 x 0.5 mm with rivets, complete in all respect complete as
per specifications.
19.96 KSRRB M300-17. Making tree guard 53 cm dia and 2 metres high as per Each 586.00
design from empty bitumen drums, slit suitably to permit sun and air, (supplied
by the department at stock issue rate) including providing and fixing four
legs 40 cm long of 30 x 3 mm MS riveted to tree guard and providing and
fixing 2 nos. MS sheet rings 50 x 0.5 mm with rivets complete in all respects
complete as per specifications.
KSRRB M300- Wrought iron and mild steel welded work
19.97 KSRRB M300-18. Wrought iron and mild steel welded work (using angles, quintal 5,989.00
square bars, tees and channel grills, grating frames, gates and tree guards
of any size and design etc. including cost of screens and welding rods or
bolts and nuts complete fixed in position but without the cost of excavation
and concrete for fixing which will be paid separately complete as per
specifications.

151
Sl. No. Description Unit Rate
Rs. Ps.

KSRRB M300-Tree guard with MS iron


19.98 KSRRB M300-19. Providing and fixing MS iron tree guard 60 cm dia and 2 Each 1,504.00
metre high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25
x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves,
bolted together with 8 mm dia and 30 mm long bolts including painting two
coats with paint of approved brand over a coat of priming, complete in all
respects, complete as per specifications.
KSRRB M300-Tree gaurd with MS Angle and Steel wire
19.100 KSRRB M300-20. Providing and fixing tree gaurd 0.60 metre square, 2.00 Each 1,938.00
metre high fabricated with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3
mm and steel wire 3 mm dia welded and fabricated as per design in two
halves bolted together complete as per specifications
KSRRB M300-Compensatory afforestation
19.101 KSRRB M300-21. Planting trees as compensatory afforestation at the rate Ha 63,655.00
of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the
ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing
farm yard/sludge manure with soil, planting of saple.
19.102 Milling the bituminous pavement surface upto a depth of 55 mm using milling Sqm 58.00
machine, to make a uniform surface without disturbing the base, cleaning
the milled surface, including cost of all labour charges and hire charges of
machineries etc complete., including stacking the milled material on the
sides of road.

Note for Item 19.102


1. For any additional depth over and above 55mm, rate shall be worked
out on pro-rata basis
2. In case there is a situation where the cross-section is of cut and fill
and cut earth is required to be used in embankment in the immediate
vicinity. The lead charges shall be allowed only with prior approval of
Executive Engineer.
3. KSRRB 300-26.2. Note : For lead beyond 500 m earthwork shall be
payable at carriage rates by mechanical transport. These rates also
include earthwork excavation in ordinary soil including loading and
unloading.
4. Area weightages are not applicable for items 19.46, 19.47 & 19.48
5. Item 19.55 to be operated when the area is restricted to 100 sqm.
6. Royalty charges to be deducted for soil in the items 19.61, 19.68 & 19.69.

152
Chapter - 20
SUB BASES-BASES
(NON BITUMINOUS)
AND SHOULDERS

153
Sl. No. Description Unit Rate
Rs. Ps.

20.0 SUB BASES - BASES (NON BITUMINOUS) AND SHOULDERS

20.1 KSRRB 400-1. Providing, laying, spreading and compacting inverted cum 1,930.00
choke of screening Type ‘B’ or sand in sub-base course in uniform
layer on a prepared base by mechanical means with motor grader and
compacting with power roller including cost of all materials, labour, HOM
complete as per specifications.
MORTH Chapter 4

20.2 KSRRB 400-2. Providing, laying, spreading and compacting specified cum 1,040.00
graded, gravel or any other course material 60% and cushed
stone aggregates of granite / trap / basalt 40% in sub-base course,
close grading-I including premixing the material at OMC in mechanical
mixer (Pug mill), carriage of mixed material, spreading in uniform layers
with motor grader on a prepared base and compacting with power roller
to achieve the desired density including all materials, labour, HOM
lighting, guarding, barricading and maintenance of diversion complete
as per specifications.
MORTH Chapter 4

20.5 Construction of granular sub-base Grading-V as Sub-base and drainage cum 1,458.00
layer by providing coarse graded crushed stone aggregates of granite/
trap/basalt material, mixing in a mechanical mix plant at OMC,
Carriage of mixed material to work site, spreading in uniform layers with
motor grader on prepared surface and compacting with vibratory power
roller to achieve the 98 % proctor density, complete as per specifications.
Clause 401 of MORTH V Revision.

20.6 Construction of granular sub-base Grading-V as Sub-base and cum 1,333.00


drainage layer by providing coarse graded crushed stone aggregates
of granite/trap/basalt material, mixing by mix in place method by
rotavator at OMC,spreading in uniform layers with motor grader
on prepared surface and compacting with vibratory power roller to
achieve the 98 % proctor density, complete as per specifications.
Clause 401 of MORTH V Revision.

20.7 KSRRB M400-8.1. Laying and spreading available soil in the subgrade cum 316.00
on a prepared surface, pulverising, mixing the spread soil in place with
rotavator with 3 per cent slaked lime having minimum content of 70 per
cent of CaO, grading with motor grader and compacting with the road
roller at OMC to the desired density to form a layer of improved subgrade
complete as per specifications. A. By Mechanical means
MORTH Specification No. 402

154
Sl. No. Description Unit Rate
Rs. Ps.

20.8 KSRRB M400-8.2. Lime Stabilisation for improving Subgrade Laying cum 371.00
and spreading available soil in the subgrade on a prepared surface,
pulverising, mixing the spread soil in place with rotavator with 3 per cent
slaked lime having minimum content of 70 per cent of CaO, grading
with motor grader and compacting with the road roller at OMC to the
desired density to form a layer of improved subgrade. complete as per
specifications. B. By Manual means
MORTH Specification No. 402
20.9 KSRRB M400-9. Providing, laying and spreading soil on a prepared cum 396.00
subgrade, pulverising, mixing the spread soil in place with rotavator with
3% slaked lime with minimum content of 70 per cent of CaO, grading
with motor grader and compacting with the road roller at OMC to achieve
atleast 98% of the maximum dry density to form a layer of sub-base
complete as per specifications.
MORTH Specification No. 402
20.10 KSRRB M400-10. Providing, laying and spreading soil on a prepared cum 656.00
subgrade, pulverising, adding the designed quantity of cement to the spread
soil, mixing in place with the rotavator, grading with the motor grader and
compacting with the road roller at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base/base complete as
per specifications. (For 4% quantity of cement by weight of soil).
MORTH Specification No. 403
20.11 KSRRB M400-11. Providing, laying and spreading material on a prepared
subgrade, adding the Designed quantity of cement to the spread material,
mixing in place with the rotavator, grading with the motor grader and
compacting with the road roller at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base/base complete
as per specifications. (Quantity of cement assumed as 4% of quantity
of crushed rock by weight)
MORTH Specification No. 403
20.11.1 Cement at site at 4% by wt. of crushed aggregate (600 tonne) Grading cum 1,998.00
of material for sub-base course
20.11.2 Cement at site at 4% by wt. of crushed aggregate (600 tonne) Grading cum 1,965.00
of material for base course
20.14 KSRRB M400-14.1. Providing, laying, spreading and compacting
cushed stone aggregates of granite / trap / basalt of specific sizes to
water bound macadam specifications including spreading in uniform
thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 8-10
tonnes in stages to proper grade and camber, applying and brooming
requisite type of screening/binding materials to fill up the interstices of
coarse aggregates, watering and compacting to the required density
complete as per Specification. A. By manual means.
MORTH Specification No. 404

155
Sl. No. Description Unit Rate
Rs. Ps.

20.14.1 Type A 13.2mm for grading II cum 1,826.00


20.14.2 Crushable type such as Moorum or Gravel for grading II cum 1,707.00
20.14.3 Type B 11.2mm for grading III cum 1,935.00
20.14.4 Crushable type such as Moorum or Gravel for grading III cum 1,728.00
KSRRB M400- Crushed cement sub-base/base
20.16 KSRRB M400- 15. Breaking and crushing of material obtained by cum 228.00
breaking damaged cement concrete slabs to size range not exceeding
75mm as specified in Table 400.7 transporting the aggregate obtained
from breaking of cement concrete slabs , laying and compacting the same
as sub-base / base course, constructed as WBM to Clause 400.4 except
the use of screening or binding material complete as per specifications.
MORTH Specification No. 405
KSRRB M400- Penetration Coat over top layer of crushed cement
concrete base
20.17 KSRRB M400-16. Spraying of bitumen over cleaned dry surface of Sqm 101.00
crushed cement concrete base at the rate of 25 kg per 10 sqm by a
bitumen pressure distributor, spreading of key aggregates at the rate of
0.13 cum per 10 sqm by a mechanical gritter and rolling the surface as
per Clause 500.6.3.8 complete as per specifications
MORTH Specification No. 405.2
20.18 KSRRB M400-17. Providing, laying, spreading and compacting cushed cum 1,573.00
stone aggregates of granite / trap / basalt to wet mix macadam
specifications including pre mixing the material with water at OMC in
mechanical mix plant carriage of mixed materials by tipper to site,
laying in uniform layers with paver in sub-base/base course on well
prepared surface and compacting with vibratory roller to achieve the
desired density complete as per specifications. MORTH Specification
No. 406
20.19 KSRRB M400-18. Construction of Median and island above road cum 145.00
level with approved material deposited at site from roadway cutting and
excavation for drain and foundation of other structures, spread, graded
and compacted as per Clause 400.7 complete as per specifications.
MORTH Specification No. 407
20.20 KSRRB M400-19. Construction of Median and island above cum 174.00
road level with approved material deposited from soil deposits,
spread, sloped and compacted as per Clause 400.7 complete as per
specifications. MORTH Specification No. 407
20.21 KSRRB M400-21. Construction of footpath/separator by providing Sqm 574.00
a 150 mm compacted granular sub-base as per Clause 401 & 25mm
thick cement concrete grade M-15, overlaid with precast concrete tiles
in cement mortar 1:3 including provision of all drainage arrangements
but excluding kerb channel complete as per specifications.
MORTH Specification No. 409

156
Sl. No. Description Unit Rate
Rs. Ps.

20.26 KSRRB M400-23. Construction of sub-base using lime-flyash cum 301.00


admixture with granular soil, free from organic matter/deleterious
material or clayey silts and low plasticity clays having PI between 5 &
20 and liquid limit less than 25 and commercial dry lime slaked at site
or pre-slaked with CaO content not less than 50%, flyash to conform
to gradation as per Clause 43 of IRC: 88-1984, lime + flyash content
ranging between 10 to 30%, the minimum un-confined compressive
strength and CBR value after 28 days curing and 4 days soaking to
be 7.5 kg/sqcm and 25% respectively, all as specified in IRC:88-1984
complete as per specifications.

Note : KSRRB-400-2,4
Note 1. This analysis provides for median and island with earthen top. In
case the surface is required to be turfed or planted with shrubs,
the same is required to be provided separately.
Note 2. KSRRB M400-20. Construction of Shoulders
A. Earthen Shoulders. The rate as applicable for sub-grade
construction may be adopted.
B. Hard Shoulders. Rate as applicable for sub-base and or base
may be adopted as per approved design.
C. Paved Shoulders. The rate may be adopted as applicable for
different layers of pavement depending upon approved design
of paved shoulders.
Note 3. Ground granulated blast furnace slag / slag sand may be used for
item no. 20.1, 20.2, 205 & 20.6 instead of river sand grit and 6 mm
below aggregate or in combinations.
Note 4. Lime + Flyash has been taken as 20% of total mass and ratio of
lime of flyash as 1:4 for estimating purposes. Total quantities will
be as per approved design.

157
Chapter - 21
BASE AND SURFACE COURSES
(BITUMINOUS)

158
Sl. No. Description Unit Rate
Rs. Ps.

21.0 BASE AND SURFACE COURSE (BITUMINOUS)


21.1 KSRRB 500-1. Cleaning the existing WBM road surface including Sqm 17.50
removing of binding materials and other foreign matter with wire brushes
and small picks, sweeping with brooms or soft brushes and finally dusting
with old gunny bags and / or compressed air, to receive bituminous
treatment including cost of all materials, labour, HOM complete as per
specifications.
Clause 501 of MORTH V revision
21.2 KSRRB 500-2. Cleaning the existing black topped surface with Sqm 4.00
brooms, soft brushes and finally dusting with old gunny bags and / or
compressed air to receive bituminous treatment including cost of all
materials, labour, HOM complete as per specifications.
Clause 501 of MORTH V revision
21.3 KSRRB 500-3. Scarifying existing stone metal layer upto 75mm thick Sqm 105.00
along with their bituminous surface, picking up scarified materials and
stacking of old serviceable materials with lead of 100 m. sequential spreading
of the salvaged aggregates with fresh aggregates on prepared base and
consolidating as per water bound macadam specifications including cost of all
labour, HOM complete as per specifications.
Clause 501 of MORTH V revision
21.5 KSRRB 500-4 Providing and applying primer coat for surfaces of Sqm 30.00
medium porosity like cement stabilized soil base @ 0.90kg/sqm over
prepared surface with S.S bitumen emulsion using bitumen tanker fitted
with spray set (excluding cleaning of road surface) including cost of all
material, labour, HOM complete as per specifications.
Clause 501 of MORTH V revision
21.6 KSRRB M500-6. Providing and applying primer coat with S.S. Sqm 23.00
bitumen emulsion on prepared surface of granular base such as WMM
including cleaning of road surface and spraying primer at the rate of
0.60 kg / sqm using mechanical means complete as per specifications.
Clause 502 of MORTH V revision
21.7 KSRRB 500-7. Providing and applying tack coat using 80/100 grade Sqm 10.00
bitumen(VG10) on the prepared black topped surfaces at 2.5 kg per 10
sqm, heating bitumen in boiler fitted with spray set (excluding cleaning
of road surface) including cost of all materials, labour, HOM complete
as per specifications.
Clause 503 of MORTH V revision
21.9 KSRRB 500-9. Providing and applying tack coat using 80/100 grade Sqm 17.50
bitumen(VG10) on granular base such as WBM surfaces hot bitumen
primed at 4 kg per 10 sqm, heating bitumen in boiler fitted with spray
set (excluding cleaning of road surface) including cost of all materials,
labour, HOM complete as per specifications.
Clause 503 of MORTH V revision

159
Sl. No. Description Unit Rate
Rs. Ps.

21.10 KSRRB M500-10. Providing and applying tack coat using 80/100 grade Sqm 9.00
bitumen(VG10) in boiler fitted with spray set distributor at the rate of
0.25 kg per sqm on the existing prepared bituminous surface (primed
surface) cleaned with mechanical broom. complete as per specifications.
Clause 503 of MORTH V revision
21.11 KSRRB 500-11. Providing and laying bituminous macadam on prepared
surface with crushed coarse aggregates as per design mix formula for
base / binding course including loading of aggregates with F.E. loader,
hot mixing of stone aggregates and bitumen in hot mix plant, transporting
the mixed material in tipper to paver and laying mixed materials with
paver finisher to the required level and grade, rolling by smooth wheeled,
vibratory & tandem rollers to achieve the desired density, but excluding
cost of primer / tack coat & including lead, lift and cost of all materials,
labour, HOM complete as per specifications.
Clause 504 of MORTH V revision
21.11.1 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver cum 4,566.00
Gr-1 (80 mm to 100mm) with 3.3% VG-30 Bitumen
21.11.2 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-II cum 4,936.00
(50 mm to 75 mm) with 3.4% VG-30 Bitumen
21.11.3 - do - using 40/60 TPH capacity H.M.P. with sensor paver Gr-I cum 4,459.00
(80 mm to 100 mm) with 3.3% VG-30 Bitumen
21.11.4 - do - using 40/60 TPH capacity H.M.P. with sensor paver Gr-II cum 4,560.00
(50 mm to 75 mm) with 3.4% VG-30 Bitumen
21.11.5 - do - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-I cum 4,423.00
(80 mm to 100 mm) with 3.3% VG-30 Bitumen
21.11.6 - do - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II cum 4,524.00
(50 mm to 75 mm) with 3.4% VG-30 Bitumen
21.12 KSRRB 500-12. Providing, laying and consolidating of crushed Sqm 307.00
stone aggregates on prepared surface as per built up spray grout
specifications 75mm thick, as base course compacted in two layers
composite construction of crushed stone aggregates with application of
bitumen binder after each layer and lay aggregate on the top of second
layer and rolling with power roller 8 to 10 tonne but excluding cost of
primer / tack coat including cost of all materials, labour, HOM complete
as per specifications.
Clause 506 of MORTH V revision
21.17 KSRRB M500-17. Providing and laying dense graded bituminous
macadam using crushed aggregates of specified grading, premixed
with VG30 grade bituminous binder and, transporting the hot mix to
work site, laying to the required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to achieve the desired
compaction in all respects complete as per specifications.
Clause 505 of MORTH V revision

160
Sl. No. Description Unit Rate
Rs. Ps.

21.17.1 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-1 cum 5,319.00
(80 mm to 100mm) with 4 % VG-30 Bitumen
21.17.2 - do -using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-II cum 5,764.00
(50 mm to 75 mm) with 4.5 % VG-30 Bitumen
21.17.3 - do - using 40/60 TPH capacity HMP with sensor paver Gr-I cum 5,206.00
(80 mm to 100 mm) with 4 % VG-30 Bitumen
21.17.4 - do - using 40/60 TPH capacity HMP with sensor paver Gr-II cum 5,651.00
(50 mm to 75 mm) with 4.5 % VG-30 Bitumen
21.17.5 - do - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-I cum 5,167.00
(80 mm to 100 mm) with 4 % VG-30 Bitumen
21.17.6 - do - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II cum 5,613.00
(50 mm to 75 mm) with 4.5 % VG-30 Bitumen
21.22 KSRRB M500-19. Providing and laying bituminous concrete using
crushed aggregates of specified grading, premixed with bituminous
binder and filler, transporting the hot mix to work site, laying with
a paver finisher to the required grade, level and alignment, rolling
with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction in all respects complete as per specifications.
Clause 507 of MORTH V revision
21.22.1 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-I cum 6,436.00
(50 mm) with 5.2% VG-30 Bitumen
21.22.2 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-II cum 6,648.00
(30 mm to 40 mm) with 5.4% VG-30 Bitumen
21.22.3 - do - using 40/60 TPH capacity H.M.P. with sensor paver Gr-I cum 6,321.00
(50 mm) with 5.2% VG-30 Bitumen
21.22.4 - do - using40/60 TPH capacity H.M.P. with sensor paver Gr-II cum 6,534.00
(30 mm to 40 mm) with 5.4% VG-30 Bitumen
21.22.5 - do - using 40-60 TPH capacity H.M.P. with mechanical paver grading I cum 6,283.00
(50-65mm) with 5.2% VG-30 Bitumen
21.22.6 - do - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II cum 6,495.00
(30 mm to 40 mm) with 5.4% VG-30 Bitumen
21.23 KSRRB M500-19. Providing and laying bituminous concrete using
crushed aggregates of specified grading, premixed with bituminous
binder and filler, transporting the hot mix to work site, laying with paver
finisher to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction
in all respects complete as per specifications.
Clause 507 of MORTH V revision & IRC - SP - 53-2010
21.23.1 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-I cum 6,621.00
(50 to 65mm) with 5.2% CRMB 55

161
Sl. No. Description Unit Rate
Rs. Ps.

21.23.2 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-II cum 6,843.00
(30 mm to 40 mm) with 5.4% CRMB 55
21.23.3 - do - using 40/60 TPH capacity H.M.P. with sensor paver Gr-I cum 6,508.00
(50 mm to 65mm) with 5.2% CRMB 55
21.23.4 - do - using40/60 TPH capacity H.M.P. with sensor paver Gr-II cum 6,730.00
(30 mm to 40mm) with 5.4% CRMB 55
21.23.5 - do - using 40-60 TPH capacity H.M.P. with mechanical paver grading I cum 6,470.00
(50 -65mm) with 5.2% CRMB-55 grade
21.23.6 - do - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II cum 6,691.00
(30 mm to 40 mm) with 5.4% CRMB 55
21.23.7 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-I cum 8,430.00
(50 to 65 mm) with 5.2% NRMB 70/ PMB 70
21.23.8 - do - using 120 TPH capacity Asphalt batch mix plant with sensor paver Gr-II cum 8,750.00
(30 mm to 40 mm) with 5.4% NRMB 70/ PMB 70
21.23.9 - do - using 40/60 TPH capacity H.M.P. with sensor paver Gr-I cum 8,413.00
(50 mm to 65mm) with 5.2%NRMB 70/PMB 70
21.23.10 - do - using40/60 TPH capacity H.M.P. with sensor paver Gr-II cum 8,734.00
(30 mm to 40 mm) with 5.4% NRMB 70/ PMB 70
21.23.11 - do - using 40-60 TPH capacity H.M.P. with mechanical paver grading I cum 8,375.00
(50-65mm) with 5.2% NRMB 70/ PMB 70

21.23.12 - do - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II cum 8,695.00
(30 mm to 40 mm) with 5.4% NRMB 70/ PMB 70
21.26 KSRRB 500-22. Providing and laying single coat surface dressing or Sqm 74.00
first coat of the two surface dressing with 0.15 cum/10 sqm crushed
stone chippings passing 19mm & retained on 13.20mm sieve as per
Table 500-21and bitumen 12 kg / 10 sqm of VG-10 (80/100) as wearing
course consisting of a layer of bituminous binder laid on the prepared
surface followed by cover of crushed stone chippings of specified
size (may be pre-coated also) and rolling with power roller 8-10 tonne
capacity including cost of all materials, labour, HOM complete as per
specifications. Clause 509 of MORTH V revision
21.27 KSRRB 500-23. Providing and laying second coat surface dressing with Sqm 60.00
0.10 cum/10 sqm crushed stone chippings passing 13.2mm & retained on
9.50mm sieve as per Table 500-21and bitumen 10 kg / 10 sqm of VG-10
(80/100) as wearing course consisting of a layer of bituminous binder
laid on the prepared surface followed by cover of crushed stone chippings
of specified size (may be pre-coated also) and rolling with power roller 8-10
tonne capacity including cost of all materials, labour, HOM complete as per
specifications.
Clause 509 of MORTH V revision

162
Sl. No. Description Unit Rate
Rs. Ps.

21.32 KSRRB 500-27. Providing and laying open graded premix carpet of Sqm 109.00
20mm thick on prepared surface in a single course as wearing course
composed of 11.2mm and 13.2mm size stone aggregates 0.027 cum/
sqm premixd with bituminous binder at 1.46kg/sqm in mini hot mix plant
6-10 tonne capacity laying manually and rolling with power roller 8-10
tonne, excluding cost of tack coat, including cost of all materials, labour,
HOM complete as per specificationsusing VG 10 (80/100) grade. Clause
510 of MORTH V revision

21.33 KSRRB 500-28. - do - using CRMB 55 grade. Sqm 112.00

21.36 KSRRB 500-30. Providing and laying 20 mm thick mix seal surfacing Sqm 120.00
Type A on prepared surface as wearing course with specified graded
crushed aggregates of 5.6mm and 11.2mm size 0.027 cum/sqm
premixd with bituminous binder at 2.15kg/sqm, in hotmix plant 40/60
tonne, transporting the mixed materials in tipper and laying with
machanical paver finisher to required level and grade, rolling with
power roller 8-10 tonne, excluding cost of tack coat including cost of all
materials, labour, HOM complete as per specifications using VG-30 (To
be used where the annual rainfall is more than 150 cms)
Clause 508 of MORTH V revision IRC-SP-53-2010

21.37 KSRRB 500-31. - do - using CRMB 55 grade bitumen Sqm 121.00

21.38 KSRRB 500-32. Providing and laying 20 mm thick mix seal surfacing Sqm 112.00
Type-B on prepared surface as wearing course with specified graded
crushed aggregates of 5.6mm and 13.2mm size 0.027 cum/sqm premixed
with bituminous binder at 1.90kg/sqm, in hotmix plant 40/60 TPH,
transporting the mixed materials in tipper and laying with mechanical
paver finisher to required level and grade, rolling with power roller 8-10
tonne, excluding cost of tack coat including cost of all materials, labour,
HOM complete as per specifications using VG-30 (To be used where
the annual rainfall is less than 150 cms)
Clause 508 of MORTH V revision IRC-SP-53-2010

21.39 KSRRB 500-33. - do - using CRMB 55 grade bitumen Sqm 114.00

21.40 KSRRB 500-34. Providing and laying 20 mm thick mix seal surfacing Sqm 132.00
Type A on prepared surface in a single course composed of specified
graded crushed aggregates 5.6mm to 11.2mm size 0.027 cum/sqm
premixd with bitumen binder at 2.15 kg/sqm of in a minimix plant 6 /
10 tonne capacity, laying manually and rolling with power roller 8-10
tonne excluding cost of tack coat including cost of all materials, labour,
HOM complete as per specifications using VG-30 (60/70 grade to be
used where the annual rainfall is more than 150 cms)
Clause 508 of MORTH V revision IRC-SP-53-2010

21.41 KSRRB 500-35. - do - using CRMB 55 grade bitumen Sqm 135.00

163
Sl. No. Description Unit Rate
Rs. Ps.

21.42 KSRRB 500-36. Providing and laying 20 mm thick mix seal surfacing Sqm 128.00
Type-B on prepared surface in a single course composed of specified
graded crushed aggregates 5.6mm to 13.2mm size 0.027 cum/sqm
premixd with bitumen binder at 1.90 kg/sqm of VG-30 (60/70) in a
minimix plant 6 / 10 tonne capacity, laying manually and rolling with
power roller 8-10 tonne excluding cost of tack coat including cost of all
materials, labour, HOM complete as per specifications. (To be used
where the annual rainfall is less than 150 cms)
Clause 508 of MORTH V revision
21.43 KSRRB 500-37.Providing and laying 20 mm thick mix seal surfacing Sqm 127.00
Type-B on prepared surface in a single course composed of specified
graded crushed aggregates 5.6mm to 13.2mm size 0.027 cum/sqm
premixd with bitumen binder at 1.90 kg/sqm of CRMB 55 grade in a
minimix plant 6 / 10 tonne capacity, laying manually and rolling with
power roller 8-10 tonne excluding cost of tack coat including cost of all
materials, labour, HOM complete as per specifications.
(To be used where the annual rainfall is less than 150 cms)
Clause 511 of MORTH V revision
21.45 KSRRB M500- 39.1 and 39.2. Providing and laying SEAL COAT for
sealing the voids on Bituminous surface, laid to the specified levels,
grade and cross fall manually and rolling with power roller 8 - 10 tonne
capacity including cost of all materials, labour, HOM complete as per
the specifications.
Clause 511 of MORTH V revision
21.45.1 - do - TYPE A - using graded aggregates 6.7mm and down size at 0.009 Sqm 43.00
cum/sqm with bitumen binder VG-10 (80/100 grade) at 0.98 kg/sqm.
21.45.2 - do -TYPE B - using graded aggregates 2.36mm and down size at Sqm 34.00
0.006 cum/sqm with bitumen binder VG-10 (80/100 grade) at 0.68 kg/sqm.
21.47 KSRRB M500-41. Providing and laying 25 mm thick mastic asphalt Sqm 571.00
wearing course using crushed aggregates of specified grading as
per the requirements given in table 500-41 and paving grade bitumen
VG-40 as per clause 516.3.2, prepared by using mastic cooker with
the aggregates of 0.020 cum per Sqm , filler as unslaked lime of 12.70
kg per Sqm and bitumen of VG-40 grade at 10.10 kg per Sqm for mix,
and tack coat of VG-10 at 0.30 kg per Sqm,laid to required level and
slope after cleaning the surface, including providing chicken mesh with
antiskid surface, including cost of materials, labour, HOM all complete
as per specifications.
Clause 516 of MORTH V revision.
21.53 KSRRB M500-48. Providing and applying slow setting bitumen Sqm 29.00
emulsion@at 0.90 kg/sqm for sealing cracks less than 3 mm wide or
incipient fretting or disintegration in an existing bituminous surfacing
complete as per specifications. Case-I Crack upto 3mm width.
Clause 517 of MORTH specification.

164
Sl. No. Description Unit Rate
Rs. Ps.

21.55 KSRRB M500-49.1. Providing, laying and rolling of bituminous cold mix cum 9,067.00
on prepared base consisting of a mixture of unheated mineral aggregate
and emulsified bitumen, including mixing in a plant of suitable type and
capacity, transporting, laying, compacting and finishing to specified
grades and levels complete as per specifications.

Case - I : using bitumen emulsion at 230 kg/cum & 9.5mm nominal


size aggregate” Clause 518 of MORTH V revision

21.56 KSRRB M500-49.2. Providing, laying and rolling of Bituminous cold mix cum 7,920.00
on prepared base consisting of a mixture of unheated mineral aggregate
and emulsified bitumen, including mixing in a plant of suitable type and
capacity, transporting, laying, compacting and finishing to specified
grades and levels complete as per specifications. Case - II : using
bitumen emulsion at 193.80 kg/cum & 19mm or 13.2mm nominal
size aggregate. Clause 518 of MORTH V revision

21.57 KSRRB M500-49.3. Providing, laying and rolling of Bituminous cold cum 9,759.00
mix on prepared base consisting of a mixture of unheated mineral
aggregate and emulsified bitumen, including mixing in a plant of suitable
type and capacity, transporting, laying, compacting and finishing to
specified grades and levels complete as per specifications. Case - III
: using bitumen emulsion at 157.50 kg/cum & 19mm nominal size
aggregate. Clause 518 of MORTH V revision

21.64 KSRRB M500-56.1. Providing and laying slurry seal @ 5.40 kg/ Sqm 23.00
sqm (Residual binder @ 13% by wt. of dry aggregate) consisting
of a mixture of fine aggregates, portland cement filler, bituminous
emulsion and water on a road surface including cleaning of surface,
mixing of slurry seal in a suitable mobile plant, laying and compacting
to provide even riding surface Complete as per specifications.
Type I : 2-3 mm width hair cracks. Clause 512 of MORTH V revision

21.65 KSRRB M500-56.2. Providing and laying slurry seal @ 9.10 kg/sqm Sqm 26.00
(Residual binder @ 10.50% by wt. of dry aggregate) consisting of a
mixture of fine aggregates, portland cement filler, bituminous emulsion
and water on a road surface including cleaning of surface, mixing of
slurry seal in a suitable mobile plant, laying and compacting to provide even
riding surface Complete as per specifications. Type II : 4-6 mm width hair
cracks. Clause 512 of MORTH V revision

21.66 KSRRB M500-56.3. Providing and laying slurry seal @ 11.05 kg/sqm Sqm 25.00
(Residual binder @ 9.25% by wt. of dry aggregate) consisting of a mixture
of fine aggregates, portland cement filler, bituminous emulsion and water
on a road surface including cleaning of surface, mixing of slurry seal in a
suitable mobile plant, laying and compacting to provide even riding surface
Complete as per specifications. Type III : 6-8 mm width hair cracks.
Clause 512 of MORTH V revision

165
Sl. No. Description Unit Rate
Rs. Ps.

21.67 KSRRB M500-57.1. Providing and laying of a stress absorbing Sqm 50.00
membrane over a cracked road surface, with crack width below
6 mm after cleaning with a mechanical broom, using modified binder
complying with clause No 517 sprayed at the rate of 11 kg/sqm and
spreading 5.6 mm crushed stone aggregates at 0.11 cum per 10 sqm
with hydraulic chip spreader, sweeping the surface for uniform spread
of aggregates and surface finished to conform to clause 902 complete
as per specification. Case - II :Stress absorbing membrane (SAM)
crack 3mm to 6mm width.
Clause 517 of MORTH V revision

21.68 KSRRB M500-57.2. Providing and laying of a stress absorbing membrane Sqm 55.00
over a cracked road surface, with crack width 6 to 9 mm after cleaning
with a mechanical broom, using modified binder complying with clause
517, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm
crushed stone aggregates at 0.12 cum per 10 sqm, sweeping the surface
for uniform spread of aggregates and surface finished to conform to
clause 902 complete as per specification. Case - III :Stress absorbing
membrane (SAM) crack 6mm to 9mm width.
Clause 517 of MORTH V revision

21.69 KSRRB M500-57.3. Providing and laying a single coat of a stress Sqm 69.00
absorbing membrane over a cracked road surface, with crack width above
9 mm and cracked area above 50% after cleaning with a mechanical
broom, using modified binder complying with clause 517, sprayed at
the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone
aggregates at 0.12 cum per 10 sqm, sweeping the surface for uniform
spread of aggregates and surface finished to conform to clause 902
complete as per specification. Case - IV :Stress absorbing membrane
(SAM) crack width above 9 mm and cracked area above 50%.
Clause 517 of MORTH V revision

21.70 KSRRB M500-57.4. Providing and laying a bitumen impregnated Sqm 99.00
geotextile layer after cleaning the road surface, geotextile conforming
to requirements of clause 703.3 laid over a tack coat with 1.05 kg per
sqm of paving grade bitumen 80 - 100 penetration and constructed to
the requirement of clause 703.4.4 complete as per specification. Case
: Bitumen impregnated geotextile. Clause 517 of MORTH V revision

21.71 KSRRB M500-58.1. Providing and laying of premix of crushed stone cum 5,043.00
aggregates of 40mm down size and emulsion binder at 98 kgs/cum
mixed in a batch type cold mixing plant, laid over prepared surface, by
paver finisher, rolled with a pneumatic tyred roller initially and finished
with a smooth steel wheel roller, all as per clause 510 complete as per
specifications. Case - I : 75 mm thickness. Clause 510 of MORTH V revision

166
Sl. No. Description Unit Rate
Rs. Ps.

21.72 KSRRB M500-58.2. Providing and laying of premix of crushed stone cum 6,735.00
aggregates of 13.20mm down size and emulsion binder at 153 kg/cum
mixed in a batch type cold mixing plant, laid over prepared surface,
by paver finisher, rolled with a pneumatic tyred roller initially and finished
with a smooth steel wheel roller, all as per clause 500.19.3 complete as per
specifications. Case - II : 40 mm thickness. Clause 510 of MORTH V
revision
21.73 KSRRB M500-58.3. Providing and laying of premix of crushed stone cum 7,690.00
aggregates of 6.00mm down size and emulsion binder at 186 kg/cum
mixed in a batch type cold mixing plant, laid over prepared surface, by
paver finisher, rolled with a pneumatic tyred roller initially and finished
with a smooth steel wheel roller, all as per clause 500.19.3 complete as per
specifications. Case - III : 25 mm thickness. Clause 510 of MORTH V
revision
21.74 KSRRB M500-47. Recycling pavement by cold milling of existing
bituminous layers, planing the surface after cold milling, reclaiming
excavated material to the extent of 30 per cent of the required quantity,
hauling and stock piling the reclaimed material near the central recycling
plant after carrying out necessary checks and evaluation, adding fresh
material including rejuvenators as required, mixing in a 40/60 TPH hot
mix plant, transporting to site and laying with mechanical paver and
compacting to the required grade, level and thickness including cost of
all materials and labour etc., complete as specified in MORTH. Clause 518
of MORTH V revision
21.74.1 - do - using milling machine for DBM grade II (50mm to 75mm thick) using cum 4,395.00
bitumen binder VG-30 (60/70 grade) to achieve 4.50% bitumen content.
21.74.2 - do - Scarifying using roller attached scarifier - for DBM grade II (50mm cum 4,410.00
to 75mm thick) using bitumen binder VG-30 (60/70 grade) to achieve
4.50% bitumen content.
21.74.3 - do - using milling machine for BM grade II (50mm to 75mm thick) using cum 3,431.00
bitumen binder VG-30 (60/70 grade) to achieve 3.30% bitumen content
21.74.4 - do - Scarifying using roller attached scarifier - for BM grade II (50mm cum 3,448.00
to 75mm thick) using bitumen binder VG-30 (60/70 grade) to achieve
3.30% bitumen content.
21.75 Providing and laying 20 mm thick mix seal surfacing Type A on prepared Sqm 118.00
surface as wearing course with specified graded crushed aggregates of
5.6mm and 11.2mm size 0.027 cum/sqm premixed with modified bituminous
binder at 2.15 kg/sqm consisting of 2.024 kg of VG- 10 bitumen (80/100
grade) and Plastomeric Thermoplastics (Waste Plastic Additive) @ 0.176
kg, in hotmix plant 40/60 TPH, transporting the mixed materials in tipper
and laying with mechanical paver finisher to required level and grade, rolling
with power roller 8-10 tonne, excluding cost of tack coat, including cost of all
materials, labour, HOM complete as per specifications. (To be used where
annual rainfall is more than 150cms)
Clause 508 of MORTH V revision
167
Sl. No. Description Unit Rate
Rs. Ps.

21.76 Providing and laying 20 mm thick mix seal surfacing Type B on Sqm 114.00
prepared surface as wearing course with specified graded crushed
aggregates of 5.6mm and 13.2mm size 0.027 cum/sqm premixd with
modified bituminous binder at 1.90 kg/sqm consisting of 1.748 kg of
VG- 10 bitumen (80/100 grade) and Plastomeric Thermoplastics (Waste
Plastic Additive) @ 0.152 kg, in hotmix plant 40/60 TPH, transporting
the mixed materials in tipper and laying with mechanical paver finisher
to required level and grade, rolling with power roller 8-10 tonne, excluding
cost of tack coat, including cost of all materials, labour, HOM complete as
per specifications. (To be used where annual rainfall is less than 150cms)
Clause 508 of MORTH V revision

21.78 Providing and laying bituminous concrete 40mm thick with hot mix
plant, using crushed aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site, laying
with a paver finisher to the required grade, level and alignment, rolling
with smooth wheeled, vibratory and tandem rollers to achieve the desired
compaction in all respects complete as per specifications.
Clause 507 of MORTH V revision as per IRC SP-53-2015.

21.78.1 – do – using 120 TPH capacity Asphalt batch mix plant with sensor paver cum 6,273.00
grading I (50-65mm) with 5.2% of modified bituminous binder consisting
of 4.78% of VG-10 bitumen (80/100 grade) and 0.42% of plastomeric
thermoplastics (waste plastic)

21.78.2 – do – using 120 TPH capacity Asphalt batch mix plant with sensor paver cum 6,476.00
grading II (30-45mm) with 5.4% of modified bituminous binder consisting
of 4.97% of VG-10 bitumen (80/100 grade) and 0.43% of plastomeric
thermoplastics (waste plastic)

21.78.3 – do – using 40-60 TPH capacity HMP with sensor paver grading I cum 5,902.00
(50-65mm) with 5.2% of modified bituminous binder consisting of
4.78% of VG-10 bitumen (80/100 grade) and 0.42% of plastomeric
thermoplastics (waste plastic)

21.78.4 – do – using 40-60 TPH capacity HMP with sensor paver grading II cum 6,361.00
(30-45mm) with 5.4% of modified bituminous binder consisting of
4.97% of VG-10 bitumen (80/100 grade) and 0.43% of plastomeric
thermoplastics (waste plastic)

21.78.5 – do – using 40-60 TPH capacity HMP with mechanical sensor paver cum 6,028.00
grading I (50-65mm) with 5.2% of modified bituminous binder consisting
of 4.78% of VG-10 bitumen (80/100 grade) and 0.42% of plastomeric
thermoplastics (waste plastic)

21.78.6 – do – using 40-60 TPH capacity HMP with mechanical paver grading cum 6,486.00
II (30-45mm) with 5.4 % of modified bituminous binder consisting of
4.97% of VG-10 bitumen (80/100 grade) and 0.43% of plastomeric
thermoplastics (waste plastic)

168
Sl. No. Description Unit Rate
Rs. Ps.

21.78.7 – do – using 120 TPH capacity Asphalt batch mix plant with sensor paver cum 6,363.00
grading I (50-65mm) with 5.2% of modified bituminus binder consisting
of 4.78% of VG-30 bitumen (60/70 grade) and 0.42% of plastomeric
thermoplastics (waste plastic)
21.78.8 – do – using 120 TPH capacity Asphalt batch mix plant with sensor paver cum 6,570.00
grading II (30-45mm) with 5.4% of modified bituminus binder consisting
of 4.97% of VG-30 bitumen (60/70 grade) and 0.43% of plastomeric
thermoplastics (waste plastic)
21.78.9 – do – using 40-60 TPH capacity HMP with sensor paver grading I cum 5,992.00
(50-65mm) with 5.2% of modified bituminus binder consisting of 4.78% of
VG-30 bitumen (60/70 grade) and 0.42% of plastomeric thermoplastics
(waste plastic)
21.78.10 – do – using 40-60 TPH capacity HMP with sensor paver grading II cum 6,455.00
(30-45mm) with 5.4% of modified bituminus binder consisting of 4.97%
of VG-30 bitumen (60/70 grade) and 0.43% of plastomeric thermoplastics
(waste plastic)
21.78.11 – do – using 40-60 TPH capacity HMP with mechanical sensor paver cum 6,117.00
grading I (50-65mm) with 5.2% of modified bituminus binder consisting
of 4.78% of VG-30 bitumen (60/70 grade) and 0.42% of plastomeric
thermoplastics (waste plastic)
21.78.12 – do – using 40-60 TPH capacity HMP with mechanical paver grading II cum 6,581.00
(30-45mm) with 5.4 % of modified bituminus binder consisting of 4.97%
of VG-30 bitumen (60/70 grade) and 0.43% of plastomeric thermoplastics
(waste plastic)
21.79 Stone Matrix Asphalt (SMA) as per section 515 of MORTH 5th Revision:
Providing and laying Stone Matrix Asphalt (SMA) using crushed
aggregates of specified grading (as per section 515 of MORTH 5th
Revision): premixed with modified bituminous binder containing
Pelletized Cellous fibre at 0.3% (on loose fibre basis) on the weight of
total mix in the batch and filler(Hydrated lime dust @ 2% of weight of
aggregates, transporting the hot mix to work site, Laying with a paver
finisher to the required grade, level and alignment, rolling with smooth
wheeled, Vibratory and tandem rollers to achieve the desired compaction
complete in all respects complete as per specification. Clause 515 of
MORTH V revision
Note: Pneumatic tyre roller must not be used
21.79.1 -do- using 40/60 TPH capacity H.M.P. with mechanical paver cum 7,983.00
SMA - 45mm to 75mm, compacted thickness with 5.8% VG-30 bitumen
as per MORTH 5 revision clause 515.
21.79.2 - do- using 40/60 TPH capacity H.M.P. with mechanical paver cum 7,993.00
SMA - 40mm to 50mm, compacted thickness with 5.8% VG-30 bitumen
as per MORTH 5 revision clause 515.

169
Sl. No. Description Unit Rate
Rs. Ps.

NOTE : KSRRB 500-11, 13, 16, 17, 18, 19,


1. Labour for traffic control, watch and ward and other miscellaneous
duties at site including sundries have been included in administrative
overheads of the contactor.
2. Where tack coat is required to be provided before laying mastic
asphalt, the same is required to be measured and paid separately.
3. Where the contractors selected source of aggregates have poor
affinity for bitumen as a condition for the approval of that source the
bitumen shall be treated with approved anti stripping agent as per the
manufactures recommendations without additional payment.
4. As per ministry circular No. RW/24011/01/2008-Mech. dated
21.10.2011, the use of Batch type Hot Mix Plant is Mandatory with
effect from 01.04.2012, where the cost of Bituminous work is greater
than Rs. 25.00 crores.

170
Chapter - 22
CONCRETE PAVEMENT

171
Sl. No. Description Unit Rate
Rs. Ps.

22.0 CONCRETE PAVEMENT


KSRRB M600- Cement Concrete Pavements
22.1 KSRRB M600-1.Providing and Constructing dry lean cement concrete
mix CC 1:5:10 base with OPC 25mm and down size graded granite
metal coarse aggregate at 0.86cum and fine aggregates @0.58cum
over a prepared sub-base, coarse and fine aggregate conforming to
IS: 383-2016,aggregate cement ratio not to exceed 15:1, Aggregate
gradation after blending to be as per Table 600-1,optimum moisture
content to be determined during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver, compacting with 8-10 tonnes
vibratory roller, finishing and curing complete as per specifications.
Clause 601of MORTH V Revision and IS 456 Table-5
22.1.1 -do- with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine cum 2,987.00
aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity
with Slip form paver with electronic sensor.
22.1.2 -do- with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine cum 3,054.00
aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity
with fixed form paver.
22.1.3 -do- with OPC at 120 kg/cum and Fly ash 30 kg/cum conforming to cum 2,824.00
IS:3812, coarse aggregate 0.86cum, fine aggregate 0.58cum using
Concrete Batch mix Plant at 75 cum/hr capacity with Slip form paver
with electronic sensor.
22.1.4 -do- with OPC at 120 kg/cum and Fly ash 30 kg/cum conforming to cum 2,632.00
IS:3812, coarse aggregate 0.86cum, fine aggregate 0.58cum using
Concrete Batch mix Plant at 75 cum/hr capacity with fixed form paver.
22.2 KSRRB M600-2. Providing and Constructing un-reinforced, dowel
jointed, plain cement Pavement Quality concrete for pavements using
Grade concrete M40 having Flexural strength not less than 4.50 Mpa
over a prepared base with OPC, coarse aggregate at 0.64 cum, fine
aggregates at 0.36 cum,Coarse and fine aggregate conforming to IS:383-
2016 and Table 600-3 of MORTH V Revision, with Superplastizer at 3 lts
conforming to IS 9103-2008. loading materials to batch mix plant by front
end loader,mixed in a cement concrete batch mix plant as per approved
mix design,transported to site in transit truck agitator 5 cum capacity,
laid with Paver,compacted and finished in a continuous operation as
per IRC-15 including cost for providing of contraction,expansion,co
nstruction and longitudinal joints, joint filler,separation membrane of
impermiable plastic sheet of 125 micron, groove cutting,sealant primer
joint sealent, debonding strip,dowel bars at 9 kg/cum, tie rods at 1.15
kg/cum, admixtures as approved, curing compound, finishing to lines
and grades, textured with texturing machine, and curing including cost
of all materials, labour,hire charges of machineries,all lead & lift charges
etc., complete as per specifications.
Clause 601of MORTH V Revision and IS 456 Table-5

172
Sl. No. Description Unit Rate
Rs. Ps.

22.2.1 -do- with OPC at 420 kg/cum and coarse aggregate 0.64cum, fine cum 4,558.00
aggregate 0.36cum using Concrete Batch mix Plant at 75 cum/hr capacity
with Slip form paver with electronic sensor.
22.2.2 -do- with OPC at 420 kg/cum and coarse aggregate 0.64cum, fine cum 4,598.00
aggregate 0.36cum using Concrete Batch mix Plant at 75 cum/hr capacity
with fixed form paver.
22.2.3 -do- with OPC at 370 kg/cum and GGBS 50 kg/cum conforming to cum 4,479.00
IS:12089, coarse aggregate 0.64cum, fine aggregate 0.36cum using
Concrete Batch mix Plant at 75 cum/hr capacity with Slip form paver
with electronic sensor.
22.2.4 -do- with OPC at 370 kg/cum and GGBS 50 kg/cum conforming to cum 4,517.00
IS:12089, coarse aggregate 0.64cum, fine aggregate 0.36cum using
Concrete Batch mix Plant at 75 cum/hr capacity with fixed form paver.
22.2.5 -do- with OPC at 370 kg/cum and Fly ash 50 kg/cum conforming to cum 4,311.00
IS:3812, coarse aggregate 0.64cum, fine aggregate 0.36cum using
Concrete Batch mix Plant at 75 cum/hr capacity with Slip form paver
with electronic sensor.
22.2.6 -do- with OPC at 370 kg/cum and Fly ash 50 kg/cum conforming to cum 4,349.00
IS:3812, coarse aggregate 0.64cum, fine aggregate 0.36cum using
Concrete Batch mix Plant at 75 cum/hr capacity with fixed form paver.
22.3 KSRRB M600-3. Construction of Rolled Cement Concrete mix 1:4:8 cum 2,835.00
OPC @180kgs, with 25mm and down size graded granite metal coarse
aggregate at 0.85cum and fine aggregates @0.57cum base course with
coarse and fine aggregate conforming to IS:383, aggregate cement ratio
12:1 and minimum cement content of 180kg/cum, aggregate gradation to
be as per Table 600-4 after blending, mixing in batching plant at optimum
moisture content, transporting to site, laying with a paver with electronic
sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to
achieve, the designed flexural strength, finishing and curing complete
as per specifications
22.6 Constructing un-reinforced, plain cement concrete for pavements
using Grade concrete M30 over a prepared base with OPC coarse
aggregate at 0.69 cum, fine aggregates at 0.46 cum,Coarse and fine
aggregate conforming to IS:383-2016, with Superplastizer at 3 lts
conforming to IS 9103-2008. mixed in a concrete mixer of not less
than 0.6 cum capacity and appropriate weigh batcher as per approved
mix design, laid in approved fixed side form work (steel channel,
laying and fixing of 125 micron thick polythene film, wedges, steel
plates including levelling the form work as per drawing). & Spreading
the concrete with shovels, rackers compacted using needle, screed
and plate vibrator and finished with floaters in a continuous operation
including provision of contraction, expansion, construction and
longitudinal joints,including groove cutting charges, joint filler, separation
membrane of impermiable plastic sheet of 125 micron, sealant primer,
joint sealant, admixtures as approved, curing compound, finishing to

173
Sl. No. Description Unit Rate
Rs. Ps.

lines and grades, textured with texturing machine, and curing including
cost of all materials, labour,hire charges of machineries,all lead & lift
charges etc., complete as per specifications.
22.6.1 -do- with OPC at 360 kg/cum and coarse aggregate 0.69cum, fine cum 4,096.00
aggregate 0.46cum.
22.6.2 -do- with - with OPC at 320 kg/cum and GGBS 40 kg/cum conforming to cum 4,031.00
IS:12089,coarse aggregate 0.69cum, fine aggregate 0.46cum.
22.6.3 -do- with OPC at 320 kg/cum and Fly ash 40 kg/cum conforming to cum 3,899.00
IS:3812, coarse aggregate 0.69cum, fine aggregate 0.46cum.
22.7 Vaccum de-watering with vaccum pump and suction mat and Sqm 68.00
compaction with skin floater clubbed with floating disc including cost of
generator, HOM of machinery, Screed Vibratory, Power Floater, blade
and disc etc., with all lead and lift.
22.8 Providing groove cutting for width of 5mm to 10mm and depth 80mm-
100mm including cost of cutting machine, generator & HOM, including
cost of blade,coolant etc., including cleaning of groove & providing sand
and hot bitumen fillars, and filler metal etc., including cost of conveyance
of all materials, labour, lead and lift charges and all other incidental
charges as per drawing and as per specifications.
22.8.1 - do- for concrete pavement Rmt. 112.00
22.8.2 - do- for asphalt pavement Rmt. 83.00
22.9 Providing and laying M40 grade high early strength concrete produced by cum 5,708.00
ISO-9001 accredited plants, conforming to is 10262 - 2009, with strength
of 40 MPa attained at 72 hrs with OPC @ 430 kgs/cum conforming
to IS 269-2015, aggregates 20 mm @ 680 kgs/cum, 12.5 mm @ 430
kgs/cum & Fine aggregates (M - Sand / River Sand) conforming to IS
383-2016 @ 710 kgs/cum and using Mineral admixture such as Silica
Fumes, Rice Husk, Ultrafine GGBS etc @ 50 kgs/cum conforming to
IS 456-2000. Fine particles below 75 micron should conform to IS 383-
2016 for fine aggregates. Water content max. 160 kgs/cum & slump to
be between 150 mm to 180 mm with retention of 1 hour at site including
cost of all materials, labour charges, scaffolding, curing & hire charges
of machineries etc complete as per the directions of engineer incharge
of the work.

Note 1. The specification 22.9 shall be adopted only after the approval of
Superintending Engineer. Necessary quality control tests certificate
shall be obtained from the departmental QA/QC labs.
Note 2. The ultrafine GGBS shall have particle size d95 < 11 microns and
mean particle size d50 not more than 6 microns when tested in PSD
analyser as per ISO 13322.

174
Chapter - 23
GEOSYNTHETIC AND
REINFORCED EARTH

175
Sl. No. Description Unit Rate
Rs. Ps.

23.0 GEOSYNTHETIC AND REINFORCED EARTH


23.1 KSRRB M700-1. Construction of sub surface drain 200 mm dia m 550.00
using geotextilestreated with carbon black with physical properties as
given in clause 700.2.2.3 formed in to a stable network and a planar
geocomposites structure, joints wrapped with geotextiles to prevent
ingress of soil, all as per clause 700.2 and approved drawings including
excavation and backfilling complete as per specifications.MORTH
Specification No. 702
23.2 KSRRB M700-2. Construction of a narrow filter sub- surface drain m 628.00
Narrow Filter Sub-Surface Drain consisting of porous or perforated
pipe laid in narrow trench surrounded by a geotextiles filter fabric, with
a minimum of 450 mm overlap of fabric and installed as per clause
700.2.3 and 300.9.3.5 including excavation and backfilling complete as
per specifications.
MORTH Specification No. 702.4
23.3 KSRRB M700-3. Laying Paving Fabric Beneath a Pavement Overlay:- Sqm 56.00
Providing and laying paving fabric with physical requirements as per
Table 704-2 over a tack coat of paving grade Bitumen 80-100 penetration,
laid at the rate of 1 kg per sqm over thoroughly cleaned and repaired
surface to provide a water resistant membrane and crack retarding layer.
Paving fabric to be free of wrinkling and folding and to be laid before
cooling of tack coat, brooming and rolling of surface with pneumatic roller
to maximise paving fabric contact with pavement surface complete as
per specifications. MORTH Specification No. 703
23.4 KSRRB M700-4. Laying Boulder Apron in Crates of Synthetic cum 3,133.00
Geogrids:- Providing, preparing and laying of geogrids crated apron
1 m x 5 m, 600 mm thick including excavation and backfilling with baffles
at 1 metre interval, made with geogrids having characteristics as per
clause 700.4.2, joining sides with connectors/ring staples, top corners
to be tie tensioned, placing of suitable cross interval ties in layers of 300
mm connecting opposite side with lateral braces and tied with polymer
braids to avoid bulging, constructed as per clause 700.4.3. filled with
stone with minimum size of 200 mm and specific gravity not less than
2.65, packed with stone spalls, keyed to the foundation recess in case of
sloping ground and laid over a layer of geotextiles to prevent migration
of fines, all as per clause 700.4 and laid as per clause 200.5.3.3 and
approved design complete as per specifications. MORTH Specification
No. 704

176
Chapter - 24
TRAFFIC SIGNS, MARKINGS &
OTHER ROAD APPURTENANCES

177
Sl. No. Description Unit Rate
Rs. Ps.

24.0 TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES


24.1 KSRRB 800-1. Painting two coats after filling the surface with synthetic Sqm 66.00
enamel paint in approved shades on new plastered concrete surfaces,
with materials, labour complete as per specifications.
MORTH Chapter 8
24.2 Retro-Reflectorised Traffic Signs
Providing and fixing of retro - reflectorised cautionary, mandatory and
informatory sign as per IRC:67 made of high intensity grade sheeting vide
Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported
on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to
the ground by means of properly designed foundation with M 15 grade
cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as
per approved drawing. (Standard data Book data)
24.2.1 900 MM Equilateral triangle - TYPE XI No 2,878.00
24.2.2 600 MM Equilateral triangle - TYPE XI No 2,049.00
24.2.3 600 MM Circle - TYPE XI No 2,550.00
24.2.4 600 X 800 mm - TYPE XI No 3,326.00
24.2.5 600 X 450 mm - TYPE XI No 2,499.00
24.2.6 900 MM Octagon Stop Board - TYPE XI No 4,083.00
24.3 Direction and Place Identification Signs upto 0.9 sqm Size Board: Sqm 5,719.00
Providing and erecting direction and place identification retro-reflectorised
sign as per IRC:67 made of high intensity grade sheeting vide Clause
801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm
firmly fixed to the ground by means of properly designed foundation with
M 15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level
as per approved drawing.
24.4 Direction and Place Identification Signs with size morethan 0.9 Sqm 5,941.00
sqm Size Board:
Providing and erecting direction and place identification retro-reflectorised
sign as per IRC:67 made of high intensity grade sheeting vide Clause
801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6
mm , 2 Nos. firmly fixed to the ground by means of properly designed
foundation with M 15 grade cement concrete 45 x 45 x 60 cm, 60 cm
below ground level as per approved drawing.
24.5 KSRRB M800-5.1. Over head Signs (Truss and Vertical Support): Tonne 58,872.00
Manufacturing, Supply and installation of retro- reflective Over-Head
Gantry signboards made out of cube corner micro prismatic grade
sheeting confirming to Type XI standards of IRC:67:2012 fixed over 4mm
thick Aluminium Composite Panel sheet, excluding the cost of Type

178
Sl. No. Description Unit Rate
Rs. Ps.

XI retro-reflective sheeting and 4mm Thick ACP sheet with suitable


back support frame over a designed support system of aluminum
alloy or galvanised steel trestles and trusses of section type as per
structural design requirements and approved plans complete as per
specifications. Vertical and Lateral Clearance of the Gantry shall be as
per IRC 67 2012 and as per Clause 800.2.2 and 800.2.3 and installed
as per clause 800.2.7.
24.6 KSSRB M800-5.2 Over Head Sign Board : Supply and installation of Sqm 7,937.00
retro- reflective Over-Head Gantry sign boards made out of cube corner
micro prismatic grade sheeting confirming to Type XI standards of
IRC:67:2012 specification & fixed over 4mm thick Aluminium Composite
Panel sheet having minimum 0.30 mm thick aluminum skin on both
sides excluding the cost of back support frame, vertical support
and horizontal support and foundation. as directed by the engineer
incharge of the work.
KSRRB M800 - Painting Letters
24.7 KSRRB M800-6. Painting two coats on New Concrete Surface : Sqm 68.00
Painting two coats after filling the surface with synthetic enamel paint
in all shades on new plastered concrete surfaces complete as per
specifications. MORTH Specification No. 803
24.8 KSRRB M800-7. Painting:-Providing and applying two coats of ready
mix paint of approved brand after through cleaning of surface to give
an even shade complete as per specifications.
MORTH Specification No. 803
24.8.1 -do- Painting on Steel Surface Sqm 60.00
24.8.2 -do- Painting on Wood Surface Sqm 65.00
24.9 KSRRBM800-9. Painting New Letter and Figures of any Shade with cm 0.80
synthetic enamel paint black or any other approved colour to give an
even shade complete as per specifications. (“i) Hindi ( Matras commas
and the like not to be measured and paid for half letter shall be counted
as half)” MORTH Specification No. 803
24.10 KSRRB M800-10. Painting new letter and figures of any shade with cm 0.60
synthetic enamel paint black or any other approved colour to give an
even shade complete as per specifications. (“ii) English and Roman -
Hyphen and the like not to be measured and paid for”
MORTH Specification No.801
24.11 KSRRB M800-11.1.Painting lines, dashes, arrows etc.,on Roads in Sqm 121.00
two coats on New Work:-Painting lines, dashes, arrows etc on roads in
two coats on new work with ready mixed road marking paint conforming
to IS:164 on bituminous surface, including cleaning the surface of all
dirt, dust and other foreign matter, demarcation at site and traffic control
complete as per specifications. i) Over 10 cm in width.
MORTH Specification No. 803

179
Sl. No. Description Unit Rate
Rs. Ps.

24.12 KSRRB M800-11.2. Painting lines, dashes, arrows etc.,on Roads in Sqm 104.00
two coats on New Work:-Painting lines, dashes, arrows etc on roads in
two coats on new work with ready mixed road marking paint conforming
to IS:164 on bituminous surface, including cleaning the surface of all
dirt, dust and other foreign matter, demarcation at site and traffic control
complete as per specifications.ii) Upto 10 cm in width
MORTH Specification No. 803
24.13 KSRRB M800-12.1.Painting lines, dashes, arrows etc.,on Roads in Sqm 108.00
two coats on Old Work:-Painting lines, dashes, arrows etc on roads in
two coats on old work with ready mixed road marking paint conforming
to IS: 164 on bituminous surface, including cleaning the surface of all
dirt, dust and other foreign matter, demarcation at site and traffic control
complete as per specifications. i) Over 10 cm in width
MORTH Specification No. 803
24.14 KSRRB M800-12.2 -do- ii) Upto 10 cm in width Sqm 92.00
MORTH Specification No. 803
24.15 KSRRB M800-13.Road Marking with Hot Applied Thermoplastic Sqm 357.00
Compound with Reflectrising Glass Beads on Bituminous Surface/
Concrete Surface: Providing and laying of hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass beads at 250
gms per sqm area, thickness of 2.5 mm is exclusive of surface applied
glass beads as per IRC:35 standards specified. The finished surface
to be level, uniform and free from streaks and holes complete as per
specifications. MORTH Specification No. 803
KSRRB 800- Kilometre stone
24.16 KSRRB M800-14.1. Reinforced cement concrete M-15 Grade 5th Nos 2,844.00
kilometre stone of standard design as per IRC:8-1980, fixing in position
including painting and printing etc complete as per specifications.
Including additional M-15 concrete pedestal of 0.2mt. height above G.L.
MORTH Specification No. 804
24.17 KSRRB M800-14.2. Reinforced cement concrete M-15 Grade kilometre Nos 1,771.00
stone of standard design as per IRC:8-1980, fixing in position including
painting and printing etc complete as per specifications. Including
additional M-15 concrete pedestal of 0.2mt. height above G.L.
MORTH Specification No. 804
24.18 KSRRB M800-14.3. Reinforced cement concrete M-15 Grade 200m Nos 450.00
stone of standard design as per IRC:26-1980, fixing in position including
painting and printing etc complete as per specifications. Including
additional M-15 concrete pedestal of 0.2mt. height above G.L.
MORTH Specification No. 804
24.19 KSRRB M800-15. Road Delineators: Supply & Installation of Vertical Nos 1,543.00
Delineator having wide angle cube corner micro prismatic non metallic
reflective sheeting confirming to Type XI of IRC:67:2012 with White and
Red Color combination and having minimum of retro reflective exposed
area of 125 Sq CM on top slots & 35 Sq CM on bottom slots and no

180
Sl. No. Description Unit Rate
Rs. Ps.

edges shall be exposed for tampering. This tubular delineator shall


have a core and shell construction, shell shall be made of tough, high
impact resistant, injection-molded, thermoplastic outer body & the inner
core shall consist of powder coated or painted Mild steel of minimum
thickness 1.0mm.& core-shell structure shall be of height not less than
800 mm above the ground and width not less than 80 mm. The metallic
core of the delineator shall extend 300mm beyond the shell length from
bottom for installing in the ground. The extended portion of the metallic
core having suitable slots to be fixed in M20 grade Cement Concrete of
size 300X300X400 MM with suitable anchoring rods for enhancing the
grip,as per IRC:79 Specifications.
24.20 KSRRB M800-16. Guard Stones Boundar Pillars :- Reinforced cement Nos 394.00
concrete M-15 grade guard stone boundry pillars standard design as
per IRC:25-1967, fixed in position including finishing and lettering but
excluding painting complete as per specifications. MORTH Specification
No. 806
KSRRB M800- Fencing/ Railing
24.21 KSRRB M800-17. G.I. Barbed Wire Fencing 1.2 Metre High-Providing m 170.00
and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron
posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center
founded in M15 grade cement concrete, 0.6 metre below ground level,
every 15th post, last but one end post and corner post shall be strutted
on both sides and end post on one side only and provided with 9
horizontal lines and 2 diagonals interwoven with horizontal wires, fixed
with GI staples, turn buckles etc complete as per clause 800.7 as per
specifications. MORTH Specification No. 807
24.22 KSRRB M800-18. G.I. Barbed Wire Fencing 1.8 Metre High:- Providing m 282.00
and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron
posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center
founded in M-15 grade cement concrete, 0.6 metre below ground
level, every 15th post, last but one end post and corner post shall be
strutted on both sides and end post on one side only and provided with
12 horizontal lines and 2 diagonals interwoven with horizontal wires,
fixed with GI staples, turn buckles etc complete as per clause 800.7 as
per specifications. (Excluding the cost of excavation for foundation and
foundation concrete) MORTH Specification No. 807
24.23 KSRRB M800-19. Fencing with Welded Steel Wire Fabric 75mm x m 424.00
50mm:-Providing 1.20 metre high fencing with angle iron posts 50 mm
x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded
in M15 grade cement concrete, corner, end and every 10th post to be
strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh
or 75 mm x 25 mm mesh and fixed to iron posts by flat iron 50 x 5 mm
and bolts etc. complete in all respects as per specifications.
MORTH Specification No.Suggestive

181
Sl. No. Description Unit Rate
Rs. Ps.

24.24 KSRRB M800-20.Tubular Steel Railing on Medium Weight Steel m 1,188.00


Channel (ISMC Series) 100 mm x 50mm:-Providing, fixing and erecting
50 mm dia steel pipe railing in 3 rows duly painted on medium weight
steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above
ground, 2 m centre to centre, complete as per approved drawings as
per specifications. MORTH Specification No. 808
24.25 KSRRB M800-21.Tubular Steel Railing on Precast RCC Posts, 1.2m m 1,007.00
High Above Ground Level:-Providing, fencing and erecting 50 mm dia
painted steel pipe railing in 3 rows on precast M-20 Grade RCC vertical
posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed
2 metres centre to, complete as per approved drawing as per specifications.
MORTH Specification No. 808
KSRRB M800- Crash Barrier
24.26 KSRRB M800-22.Reinforced Cement Concrete Crash Barrier: m 2,739.00
Provision of an Reinforced cement concrete crash barrier at the edges
of the road, approaches to bridge structures and medians, constructed
with M-20 grade concrete with HYSD reinforcement conforming to IRC:21
and dowel bars 25 mm dia, 450 mm long at expansion joints filled with
pre-moulded asphalt filler board, keyed to the structure on which it is built
and installed as per design given in the enclosure to MOST circular No.
RW / NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in
the approved drawing and at locations directed by the Engineer, all as
specified complete as per specifications. MORTH Specification No. 809
24.27 KSRRB M800-23.1. Metal Beam Crash Barrier:-Providing and erecting m 1,632.00
a “W” metal beam crash barrier comprising of 3 mm thick corrugated
sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to
centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and
fitments to be galvanised by hot dip process, all fittings to conform to
IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with
a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete
as per clause 800.10 complete as per specifications. Excluding cost of
earth work excavation and PCC for fixing. A. Type - A, “W”
MORTH Specification No. 810
24.28 KSRRB M800-23.2. Metal Beam Crash Barrier:-Providing and erecting m 2,536.00
a “Thrie” metal beam crash barrier comprising of 3 mm thick corrugated
sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre,
2m high with 1.15m below ground level, all steel parts and fitments to
be galvanised by hot dip process, all fittings to conform to IS:1367 and
IS:1364, metal beam rail to be fixed on the vertical post with a space of
channel section 150 x 75 x 5 mm, 546 mm long complete as per clause
800.10 complete as per specifications. Excluding cost of earth work
excavation & PCC for fixing. B. Type - B, “THRIE”
MORTH Specification No. 810

182
Sl. No. Description Unit Rate
Rs. Ps.

24.29 KSRRB M800-24. Flexible Crash Barrier, Wire Rope Safety Barrier: m 1,454.00
Providing and erecting a wire rope safety barrier with vertical posts of
medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m),
1.50 m long 0.85 m above ground and 0.65 m below ground level, split
at the bottom for better grip, embedded in M-15 Grade cement concrete
450 x 450 x 450 mm, 1.50 m center to center and with 4 horizontal steel
wire rope 40 mm dia and anchored at terminal posts 15 m apart. Terminal
post to be embedded in M 15 grade cement concrete foundation 2400
x 450 x 900 mm (depth), strengthened by a strut of RS joist 100 x 75
mm, 2 m long at 45º inclination and a tie 100 x 8 mm, 1.50 m long at the
bottom, all embedded in foundation concrete as per approved design
and drawing, rate excluding excavation and cement concrete complete
as per specifications. Excluding cost of earth work excavation & PCC
for fixing. MORTH Specification No. Suggestive
KSRRB M800- Anti-Glare devices in Median
24.30 KSRRB M800-26.2. Providing and erecting an anti - glare screen with Each 1,968.00
25 mm dia vertical pipes fabricated and framed in the form of panels
of one metre length and 1.75 metre height fixed with circular vane 250
mm dia at top and rectangular vane 600 x 300 mm at the middle, made
out of steel sheet of 3 mm thickness, end vertical pipes of the panel
made larger for embedding in foundation concrete, applying 2 coats of
paint on all exposed surfaces, all as per approved design and drawings
complete as per specifications. B. Anti-glare screen with 25 mm steel
pipe framework fixed with circular and rectangular vanes. Excluding cost
of earth work excavation & PCC for fixing.
MORTH Specification No. Suggestive
24.31 KSRRB M800-26.3. Providing and erecting anti - glare screen with m 595.00
rectangular vanes of size 750 x 500 mm made from MS sheet, 3 mm
thick and fixed on MS angle 50 x 50 x 6 mm at an angle of 45º to the
direction of flow of traffic, 1.5 m center to center, top edge of the screen
1.75 m above ground level, vertical post firmly embedded in M-15 cement
concrete foundation 0.60 m below ground level, applying 2 coats of paint
on exposed faces, all complete as per approved design and drawings
complete as per specifications.C. Anti-glare screen with rectangular
vane MS sheet. Excluding cost of earth work excavation & PCC for
fixing. MORTH Specification No. Suggestive
KSRRB M800 - Street lighting
24.32 KSRRB M800-27. Providing and erecting street light mounted on a Each 9,012.00
steel circular hollow pole of standard specifications for street lighting,
9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in
the median and on one side if fixed on the footpath, fitted with sodium
vapour lamp and fixed firmly in concrete foundation complete as per
specifications. Excluding cost of earth work excavation & PCC for fixing.
MORTH Specification No. Suggestive

183
Sl. No. Description Unit Rate
Rs. Ps.

24.33 KSRRB M800-28. Lighting on Bridges : Providing and fixing lighting on Each 5,825.00
bridges, mounted on steel hollow circular poles of standard specifications,
5 m high fixed on parapets with cement concrete, 20 m apart and fitted
with sodium vapour lamp complete as per specifications
KSRRB M800- Cable Duct Across the road
24.34 KSRRB M800-29.1. Providing and laying of a reinforced cement concrete m 1,439.00
pipe duct, 300 mm dia, across the road (new construction), extending
from drain to drain in cuts and toe of slope to toe of slope in fills,
constructing head walls at both ends, providing a minimum fill of granular
material over top and sides of RCC pipe as per IRC:98-1997, bedded on
a 0.3 m thick layer of granular material free of rock pieces, outer to outer
distance of pipe at least half dia of pipe subject to minimum450 mm in
case of double and triple row ducts, joints to be made leak proof, invert
level of duct to be above higher than ground level to prevent entry of water
and dirt, all as per IRC: 98 - 1997 and approved drawings complete as
per specifications. Case - I : Single row for one utility service
24.35 KSRRB M800-29.2. -do- Case - II : Double row for two utility services m 2,659.00
24.36 KSRRB M800-29.3. -do- Case-III :Triple row for three utility services. m 3,900.00
KSRRB M800-Gantry mounted variable message sign board
24.37 KSRRB M800-33.1. Providing and erecting gantry mounted variable Tonne 56,222.00
message sign board electronically operated capable of flashing the
desired message over a designed support system of aluminium alloy or
galvanised steel, erected as per approved design and drawings and with
lateral clearance as per clause 800.2.3 complete as per specifications.
i) Gantry Support System
KSRRB M800-34Traffic input attenuators at abutments and piers
24.38 KSRRB M800-34.1. Providing and installation of traffic attenuators at Sqm 1,119.00
abutment/pier of flyovers bridges using scrap tyres of size 100 x 20
retrieved from trucks laid in 2 rows and 4 tiers, one above the other
and tied with 20 mm wire rope as per approved design and drawings
complete as per specifications
24.39 KSRRB M800-34.2. Providing and installation of traffic impact attenuator Sqm 1,060.00
at abutment/pier of flyovers bridges using plastic/steel barrels 0.60 m dia
and 1.0 m in height, filled with sand in three rows and tied with20 mm
steel wire rope as per approved design and drawings complete as per
specifications. B. Using Plastic / steel Barrel, Filled with Sand
24.40 KSRRB M800-34.3. Providing and installing a patentend HI - DRO Sqm 635.00
cell system as a traffic impact attenuators, using plastic tubes 50 cm
dia, 1.2 m in height, 25 mm opening at the top, placed in three rows,
filled with water and tied with a 20 mm steel wire rope complete as
per specifications. (In this patented HI - DRO cell system, water gets
discharged from plastic tubes on impact over a pre-determined time,
thus absorbing the energy) C. With HI - DRO Cell Sandwich (Patented)

184
Sl. No. Description Unit Rate
Rs. Ps.

KSRRB M800 Road markers / Road stud


24.41 KSRRB M800-35. Supply and Installtion of Moulded Shank Raised Nos 280.00
Pavement Markers made of polycarbonate and ABS(Acrylonitrile
Butadiene Styrene) moulded body and reflective panels with micro
prismatic lens capable of providing total internal reflection of the light
entering the lens face and shall support a load of 16000 kg tested in
accordance to Specifications of Category A of MORTH Circular No RW/
NH/33023/10-97 – DO III Dt 11.06. 1997. The height, width and length
shall not exceed 50 mm, 100 mm and 102 mm and with minimum
reflective area of 13 Sqcm on each side and the slope to the base shall
be 35 degree. The strength of detachment of the integrated cylindrical
shanks, (of diameter not less than 19 mm and height not less than 30 mm)
from the body is to be a minimum value of 500 Kg. Fixing will be by drilling
holes on the road for the shanks to go inside, without nails and using
epoxy resin based adhesive as per manufacturer’s recommendation and
complete as directed by the engineer.
KSRRB M800- Traffic cone
24.42 KSRRB M800-36. Provision of red fluorescent with white reflective Nos 342.00
sleeve traffic cone made of low density polyethylene (LDPE) material
with a square base of 390 x 390 x 35 mm and a height of 770 mm,
4 kg in weight, placed at 1.5 m interval, all as per BS: 873 complete as
per specifications
KSRRB M800- policeman umbrella
24.43 KSRRB M800-39. Provision of a 2 m high (floor to roof) umbrella for Nos 3,825.00
traffic policeman at road crossings, where necessary, installed on a
raised platform, built on a central support of a steel pipe 100 mm dia, roof
made of 25 mm dia steel pipe to provide covered area of 3 sqm, roofed
with CGI sheets, all steel parts to be given 2 coats of paint complete as
per specifications
KSRRB M800-Portable barricade in construction zone
24.44 KSRRB M800-43. Installation of a steel portable barricade with horizontal Each 2,075.00
rail 300 mm wide, 2.5m in length fitted on a ‘A’ frame made with
45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted
(2 coats) with yellow and white stripes, 150 mm in width at an angle
of 45º, ‘A’ frame painted with 2 coats of yellow paint, complete as per
IRC:SP:55-2001 complete as per specifications.
KSRRB M800-Permanent type barricade in construction zone
24.45 KSRRB M800-44.1. Construction of a permanent type barricade made Each 3,190.00
of steel components, 1.5 m high from road level, fitted with 3 horizontal
rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical
support, painted with yellow and white strips, 150 mm in width at an angle
of 45º, complete as per IRC:SP:55-2001 complete as per specifications.
A. With steel components

185
Sl. No. Description Unit Rate
Rs. Ps.

24.46 KSRRB M800-44.2. Construction of a permanent type barricade made of Each 6,008.00
wooden components, 1.5 m high from road level, fitted with 3 horizontal
planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical
post, painted with yellow and white strips, 150 mm in width at an angle
of 45º, complete as per IRC:SP:55-2001 complete as per specifications.
B. With Wooden components
24.47 KSRRB M800-44.3. Construction of a permanent type barricade made Each 13,865.00
with brick work in mud mortar, 1.5 m high, 4 m long, 600 mm thick,
plastered with cement mortar 1:6, painted with yellow and white strips
complete as per specifications. C. With bricks
KSRRB M800-Drum delineator in construction zone
24.48 KSRRB M800-45. Provision of metal drum/empty bitumen drum Each 436.00
delineator, 300 mm in diameter, 800 mm high, filled with earth for stability,
painted in circumferential strips of alternate black and white 100 mm
wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001
complete as per specifications.
KSRRB M800-Flagman
24.49 KSRRB M800-46. Positioning of a smart flagman with a yellow vest and Each 457.00
a yellow cap and a red flag 600 x 600 mm securely fastened to a staff 1
m in length for guiding the traffic complete as per specifications
24.51 Removing and verifying guard stones/KM stones/ boundary stones, Each 42.00
in a complete manner embedded in earth excluding painting.
24.52 Providing and fixing RCC precast guard stones of size 0.23mx0.23mx1.5m Each 2,058.00
casted in cc 1:1.5:3 with 20mm down size aggregates using 10mm dia
vertical 4TMT steel rods and 8 mm dia stirrups at 20 cm c/c fixed 0.90
m above Ground level using steel moulding, Curing, transportation to
work spot including excavation in hard soil fixing in plain cement concrete
1:2:4 using 20mm downsize aggregate including aligning to plumb and
line providing enamel painting to exposed faces in alternate black and
white strips and painting with reflective paint on top of guard stone with
a width of 10 cm including cost of all materials, labour, hire charge of
machineries complete. ( As per drawing)
24.53 Supply & installation of Aluminum-backed flexible prismatic sheeting Sqft 656.00
made of Yellow coloured flexible prismatic sheeting with non-metallic
prismatic lens, formed in a transparent, synthetic resin, as retroreflective
elements mounted on a Aluminum (Al) foil with a pre-coated pressure
sensitive adhesive and easily removable liner,containing screen printed
arrow/slant line pattern in black color in a continuous roll format and the
sheeting shall be extremely flexible and easy to bend or wrap around
objects,capable of exhibiting very high conformability and non-returning
dead-fold characteristics required for application on rough and uneven
surfaces.
24.54 Supply & Installation of Flexible Median Markers made of combination No. 294.00
of tough, high impact resistant molded thermoplastic body with U
shape structure & rebound property & exposed body structure should
be cornered rounded for better aesthetics. The flexible median marker
shall have U shaped florescent yellow color retro-reflective sheeting
186
Sl. No. Description Unit Rate
Rs. Ps.

with minimum exposed reflective area 75 cm2. The reflective sheeting


should confirm to Type XI Florescent Yellow sheeting as per IRC 67
2012 .The third party test report for reflective sheeting shall be submitted
along with product information. The product design has to with stand all
natural impacts and should not get damaged if any pedestrian stamp
on top of it intentionally or unintentionally. The product should bend up
to 90 degree on both sides (becoming completely horizontal), it should
be able to take minimum 500 stamping without any significant damage.
The Flexible Median Marker shall be fixed by a combination of epoxy
adhesive and grouting/Drilling as recommended by manufacturer.
24.55 Supply & Installation of Solar Raised Pavement Markers made of No. 2,467.00
polycarbonate molded body with circular shape, solar powered, LED self
illumination in active mode, 360 degree illumination and reflective panels
with micro prismatic lens in passive mode. The marker shall support a
load of 20000 kg tested in accordance to IRC 37 and shall be resistant to
dust and water ingress according to IP 65 (Ingress Protection 65 is a test
which is conducted to check if solar road stud is protected from total dust
Ingress and low pressure water jets from any direction) standards and
should withstand temperatures in the range of 0 C to 70 C. Color of lighting
could be provided in red or yellow (amber) as per requirement and typical
frequency of blinking is 1 Hz. There should be current losses of less than
20 micro-amperes at 2.4 V in sleep-charging mode to enhance the life of
the marker and a full charge should provide for a minimum autonomy of
50 hours. The height, width and length of the marker shall not be less than
10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker
shall not be less than 100 mm respectively. The weight of the marker
shall not exceed 0.5 Kilograms. Fixing will be by drilling holes on the
road for the shanks to go inside, without nails and using epoxy resin
based adhesive as per manufacturer’s recommendation and complete
as directed by the engineer.
24.56 Supply & Installation of Rigid Median Marker made of tough, high No. 370.00
impact resistant, injection-molded, thermoplastic body with an isosceles
trapezoidal structure of length, width and height not less than 15cm,
10cm and 10cm respectively and thickness not less than 1.8mm, the
body structure shall be rounded suitably. The plastic used for molding
the Median Marker shall conform to ASTM D256. The logo of the
manufacturer shall be embossed on either side of the body in the injection
molding process. The Median Marker shall have rectangular-shaped,
fluorescent yellow color retro-reflective sheeting of size not less than
8.5cm*8.5cm and with fully reflective micro prismatic cube corners as
its retro-reflective elements as per IRC 67 2012. The retro-reflective
sheeting shall be a one or both sides of the Median Marker and shall be
edge protected with no exposed edges which will prevent edge lifting,
vandalism, sheeting damage, etc. The Median Marker shall be fixed by
a combination of epoxy adhesive and grouting.
24.58 Manufacturing,Supply and installation of Retro- reflective Hazard Sqm 3,890.00
Marker signbaords made out of cube corner micro prismatic grade
sheeting confirming to Type XI standards of IRC:67:2012 & ASTM D
4956-09 specification & fixed over 4 mm thick Aluminium Composite

187
Sl. No. Description Unit Rate
Rs. Ps.

Panel sheet having minimum 0.30 mm thick aluminum skin on both


sides & fixed over back support frame of 25x25x 3mm MS angle frame.
Supported on round pipe post of 1.5 Meters height and gouted 60 cm
below ground level. The sign post should be painted with one coat of red
oxide paint and two coats of synthetic enamel paint of black and firmly
fixed to the ground by means of foundation with M 20 grade cement,
concrete foundation size of 45 cm x 45 cm x 60 cm including cost &
conveyance of all materials, equipment,machinery & Labour with all
leads and lifts,Loading charges necessary for satisfactory completion
of the work as directed by engineer incharge.
24.59 Supply and fixing of Retro Reflective Single Arrow Road Name Sqm 11,080.00
Signboard of size 1600mm x 900mm made out of retro reflective
sheeting conforming to Type XI standards of ASTM D 4956 - 09 & as per
IRC 67-2012 for full back ground of blue colour & white letters and fixed
over 4 mm thick Aluminium Composite Material sheet having minimum
0.5 mm thick Aluminium skin on both sides with back side painted grey
colour and fixed over back support frame SS angle of 15mm x 20mm
x 1.2mm, supported by 38mm OD stainless steel pipe all round in 304
grade and 2 nos of vertical posts of 50 mm OD stainless steel pipe of 202
grade firmly fixed to the ground by means of properly designed foundation
of size 450mm x 450mm x 600mm in 1:1.5:3 ratio cement concrete.
The background shall be blue in color with letters and border in white,
the item includes earthwork excavation, cost of all materials, loading,
unloading, lead, lift, transportation etc., complete. as per direction of
engineer incharge of work clause 6.9 of IRC 67-2012 for Type XI retro
reflective sheeting from the sheeting manufacturer & a certified copy of
test reports from an independent test laboratory conforming to clause
6.7 of IRC 67-2012 including outdoor weather exposure report for the
retro reflective sheeting offered shall be submitted by the contractor for
technical qualification in the tender.
24.60 Supply and fixing of Retro Reflective Single arrow road name sign Sqm 13,154.00
board of size 2000mm x 900mm made out of retro reflective sheeting
conforming to Type XI standards of ASTM D 4956 - 09 & as per IRC
67-2012 for full back ground of blue colour & white letters and fixed
over 4 mm thick Aluminium Composite Material sheet having minimum
0.5 mm thick Aluminium skin on both sides with back side painted grey
colour and fixed over back support frame SS angle of 15mm x 20mm
x 1.2mm, supported by 38mm OD stainless steel pipe all round in 304
grade and 2 nos of vertical posts of 50 mm OD stainless steel pipe of
202 grade firmly fixed to the ground by means of properly designed
foundation of size 450mm x 450mm x 600mm in 1:1.5:3 ratio cement
concrete. The background shall be blue in color with letters and border
in white, the item includes earthwork excavation, cost of all materials,
loading, unloading, lead, lift, transportation etc., complete. as per clause
6.9 of IRC 67-2012 for Type XI retro reflective sheeting from the sheeting
manufacturer & a certified copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-2012 including outdoor
weather exposure report for the retro reflective sheeting offered shall
be submitted by the contractor for technical qualification in the tender.
188
Sl. No. Description Unit Rate
Rs. Ps.

NOTE : XI sheeting conforming to IRC 67 2012 and ASTM D 4956-09


specification parameters, the warranty should be in original and
1. Lettering and arrow marks on sign board to be provided separately as per jointly signed by the contractor.
actual requirement. Rates for these items have been analysed separately.
d. A Certified copy of laboratory test report for Type XI Retro
2. Rate for excavation, cement concrete M-15 and painting may be
Reflective Sheeting from a reputed and independent laboratory
taken from respective chapters
shall be obtained from Retro Reflective Sheeting Manufacturer
3. Excavation and backfilling are incidental to work and not to be and must be submitted by the contractor for technical
measured separately. qualification. The Type XI Retro reflective Sheeting should
4. In the case of median crash barrier, ‘W’ metal beam or their beam have been tested for the below performance parameters as per
section should be provided on both sides of the vertical posts fixed ASTM D 4956-09 & ASTM E-810. The Report should be clearly
in the median. Extra provision for metal beam railing and spacer is required mentioned the sheeting to have passed all the below tests :
to be made when fixed in the median depending on approved design. (i) Coefficient of Retro Reflection (ii) Day time color &
5. Plantation of shrubs and plants of approved species in the median luminance
apart from cutting off glare from vehicle coming from opposite direction, (iii) Accelerated outdoor weathering (iv) Colourfastness
these plants provide a pleasant environment and are eco-friendly.
(v) Shrinkage (vi) Flexibility (vii) Liner Removal (viii)
6. The Guard stones of RCC M15 Grade shall be used as per IRC 25:1967. Adhesion
7. Necessary test certificates, warranty certificates should be f urnished (ix) Impact resistance (x) Specular gloss (xi) Nighttime color
for the specifications 24.2, 24.3, 24.5, 24.6, 24.41, 24.53 to 25.60.
e. A copy of 3-year outdoor exposure report for the product
8. A sealing primer may be applied in advance on cement concrete offered shall be submitted. The report shall be attested by the
pavement to ensure proper bonding. Any laitance and / or curing retroreflective sheeting manufacturer, the performance reading
compound to be removed where paint is required to be applied on after 3 years, must be atleast 80% of the minimum values
concrete surface. And the cost of painter is already included in Road mentioned in ASTM D 4956 type XI sheeting performance
marking machine in specification No. 24.15. table. The outdoor weathering shall be conducted at
9. Message display board at Sl. No. 24.37 is 6 sqm electronically operated 2 locations with different climatic conditions, as mentioned in
with complete electronic fitments for flashing the pre-determined ASTM D 4956, i.e.-
messages. This is a specialized commercial product and the lumpsum
1) Tropical Summer Rain 2) Desert
rate including erecting at site is required to be ascertained from the
market and including in rate analysis. The size of the board will vary f. Indian lab (local) test report containing test report on Retro-
depending upon specific location. The rate for the gantry mounted reflectivity and Colorometry shall be submitted along with the
variable sign would be the addition of cost of gantry support system qualification documents.
as per approved design determined and the cost of message display g. Supplied and Installed Signboards shall be tested by the
board is to be ascertained from the market & shall be got approved by Retro-Reflective sheeting Manufacturer using a Reflectometer
the Superintending Engineer. on a random basis at the end of 1st year, 3rd year, 5th year
and 7th Year for Retained Reflectivity - Ra values of Type
Suggested Qualifying Conditions to be included in road safety tender:
XI Retro Reflective sheeting as per table 6.9 of IRC 67 2012
Retro-Reflective XI- Diamond Grade Sheeting Specifications as per the table given below.
a. Contractor shall submit a current dated Authorization certificate
Table 1: Acceptable min. coefficient of retro reflection for wide angle
issued by the Retro reflective sheeting manufacturer stating that
prismatic sheeting
the contractor is authorized to participate in the said tender. The
certificate should be in original and issued by the retroreflective
yellow Green
Observation

sheeting manufacturer or its subsidy in India. Certificate issued by


Florescent

Florescent

Florescent
Entrance

distributor dealer/ power of attorney holder shall be disqualified.


Orange

Orange
Yellow

Brown
Green

yellow
Angle

Angle

white

Blue
Red

b. The Tenderer should be experienced sign maker and having necessary


infrastructure for making quality signs, they should be possessing 0.1°B -4° 830 620 290 83 125 37 25 660 500 250
equipment’s like HSRA, Plotter cutter, Screen printing facilities etc., 0.1°B +30° 325 245 115 33 50 15 10 260 200 100
All Cautionary / Mandatory signboards shall be screen printed using
0.2° -4° 580 435 200 58 87 26 17 460 350 175
Red / black
0.2° +30° 220 165 77 22 33 10 7 180 130 66
c. Contractor shall submit a 10 year pre-qualification warranty, in 0.5° -4° 420 315 150 42 63 19 13 340 250 125
original, issued by the retro reflective sheeting manufacturer or its
0.5° +30° 150 110 53 15 23 7 5 120 90 45
subsidiary in India for Technical qualification in the tender and Actual
Warranty post installation. The warranty shall be for micro Prismatic 1.0° -4° 120 90 42 12 18 5 4 96 72 36
type retro reflective sheeting confirming to ASTM D4956-09 type 1.0° +30° 45 34 16 5 7 2 1 36 27 14

189
Sl. No. Description Unit Rate
Rs. Ps.

RAISED PAVEMENT MARKER / ROAD STUDS:


1. The bidder shall be an Authorized Convertor / Applicator of RPM DELINEATORS:
or Road Studs manufacturer & Shall upload the Authorization 1. The Tenderer shall be an Authorized Convertor / Applicator of
certificate during the bid submission manufacturer & Shall upload the Authorization certificate during
2. A certified copy of test reports of having tested the lens and the bid submission.
structural strength as per ASTM D 4280 for the specified tests 2. The contractor shall obtain Pre-Qualification Warranty certificate
including the C.I.L. values as per the table 800-13 & 800-14 for two years in original and submit the same along with the bid.
of clause 804 of MoRTH specification including compressive 3. A test report from the manufacturer of retro-reflective sheeting
Strength and its having passed these tests shall be obtained stating that the white and red retro-reflective sheeting used in the
and the same shall be submitted along with the technical bid Delineator shall conform to ASTM D4956 type XI specifications
3. The contractor shall obtain Pre-Qualification Warranty certificate and shall retain at least 80% of its initial values of coefficient of
for two years in original and submit the same along with the bid. retro-reflection after getting subjected to accelerated outdoor
4. A sample of the stud with two molded shanks confirming to weathering for 3 years.
the specifications mentioned above shall be submitted by the 4. IRC Accreditation copy for the Delineators.
contractor.

MEDIAN MARKER:
1. Bidder should submit & upload a Letter of authorization confirming that the supplier of the Median Marker is an authorized applicator /
converter of the Median Marker Manufacturer.
2. Sample Median Marker shall have manufacturer LOGO embossed on either side of the body during the injection molding process
3. A test report from the manufacturer of retro-reflective sheeting stating that the Fluorescent Yellow retro-reflective sheeting used in the
Median Marker shall conform to ASTM D4956 type XI specifications and shall retain at least 80% of its initial values of coefficient of retro-
reflection after getting subjected to accelerated outdoor weathering for 3 years.
4. Conformance certificate from the Manufacturer of the Median Marker stating that the Polycorbonate Used for Manufacturing of Median
Markers conforms to ASTM D 256 for Impact Strength & ASTM G155 (or) ISO 180/A for Performance under accelerated weathering for
1000hrs as in Table should be submitted by the bidder during the Bid.

Minimum value (Joule/meter)


Minimum Initial value after 1000hrs of Minimum
Mechanical property Test Method
(Joule/meter) Accelerated Weathering % retention
as per ASTM G155 or ISO 180/A
Impact Strength
ASTM D256 600 J/m 420 J/m 70%
(Izod)

5. A Pre-Qualification Warranty on field performance of the Median Marker shall be satisfactory for a period of at least 2 years, provided it is
handled, installed and maintained as per the Median Marker manufacturer’s recommendations.
6. IRC Accreditation copy for the Median

Aluminum backed Flexible Prismatic Sheeting (AFP): Solar RPM:


1. Bidder shall submit an authorized applicator / convertor certificate of 1. Bidder shall submit a certificate that they are authorized
the Aluminum backed Flexible Prismatic Sheeting Manufacturer applicator / convertor of the Solar RPM Manufacturer.
2. A third party test report confirming the flexibility and reflectivity as 2. Prequalification warranty for Solar RPM shall be submitted along
per ASTM- D4956-09 Type-VI performance of the flexible prismatic the bid.
sheeting used in AFP shall be submitted by the contractor during 3. Third Party Test Report of Solar RPM shall be submitted during
prequalification and supply of material. the Bid Submission.
3. Adhesion for application: This Aluminum-backed flexible prismatic
sheeting, with the liner removed, shall be applied with a Neoprene
high performance contact adhesive with Polychloroprene base,
viscosity of 200-450 cps and solid content of 20-30% for better
adhesion.
4. Edge sealing for protection: After application, the edges of Aluminum-
backed flexible prismatic sheeting shall be sealed all around with a
two part epoxy based structural adhesive, with epoxy having viscosity
of 8000-14000 mPa.s when measured as per ISO 12058, so that it
becomes extremely difficult to peel off.

190
Cautionary Signboard Mandatory Signboard
SOR Reference No : 24.2.1 & 24.2.2 SOR Reference No : 24.2.3

Facility Information Board Chevron Signboard


SOR Reference No : 24.2.4 SOR Reference No : 24.2.5

191
Over Head Gantry board Informatory Signboard
SOR Reference no :- 24.3 & 24.4

Vertical Delineator
SOR Reference No :-24.19

192
900 MM Octagonal Board
SOR Reference No : 24.2.6
Hazard Marker Board
SOR Reference No : 24.58

Aluminum Backed Flexible prismatic Sheeting


SOR Reference No : 24.53

Solar Road Studs RPM’s/Cat Eyes/Road studs


SOR Reference No - 24.55 SOR Reference No : 24.41

Flexible Median Marker Rigid Median Marker


SOR Reference No : 24.54 SOR Reference No : 24.56

193
Single Arrow Street Name Signboard
SOR Reference No : 24.59

Double Arrow Street Name Signboard


SOR Reference No : 24.60

194
Chapter - 25
BRIDGES - PILE FOUNDATION

195
Sl. No. Description Unit Rate
Rs. Ps.

25.00 BRIDGES - PILE FOUNDATION


25.1 KSRRB 1100-1. Bored / Cast-in-situ R.C.C. 1000mm dia. piles with
OPC design mix with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregtes @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
excluding reinforcement as per drawings including cost of all materials,
labour, HOM complete as per specifications.
MORTH specification No. 1100
25.1.1 -do- M20, 1000mm dia piles 320 Kg Cement, C.A. 0.69 M3, F.A 0.46 M3 m 18,850.00
25.1.2 -do- M30, 1000mm dia piles 360 Kg Cement, C.A. 0.69 M3, F.A 0.46 M3 m
25.1.3 -do- M35, 1000mm dia piles 390 Kg Cement, C.A. 0.69 M3, F.A 0.45 M3 m
Note : The above items ie. 25.1, 25.1.1, 25.1.2, are to adopted only
after obtaining approval from S.E.
25.2 KSRRB 1100-2. Driving cast-in-place vertical R.C.C. 500mm dia.
piles with OPC design mix with 20mm and down size graded granite
metal coarse aggregates @0.69cum and fine aggregtes @ 0.46cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
excluding reinforcement as per drawings including cost of all materials,
labour, HOM complete as per specifications.
MORTH specification No. 1100
25.2.1 -do- M20, 500mm dia piles 320 Kg Cement, C.A. 0.69 M3, F.A 0.46 M3 m 6,410.00
25.2.2 -do- M30, 500mm dia piles 360 Kg Cement, C.A. 0.69 M , F.A 0.46 M
3 3
m
25.2.2 -do- M35, 500mm dia piles 390 Kg Cement, C.A. 0.69 M3, F.A 0.45 M3 m
25.3 KSRRB M1100-3.1. Bored cast-in-situ R.C.C. Pile with OPC design
mix M35 @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregtes @ 0.45cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
excluding Reinforcement complete as per Drawing and Technical
Specifications and removal of excavated earth with all lifts and lead
upto 1000 m including costs of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No.1100 & 1700
25.3 KSRRB M1100-3.1. -do- A. Pile diametre = 750 mm m 3,860.00
25.4 KSRRB M1100-3.2. -do- B. Pile diametre = 1000 mm m 6,177.00
25.5 KSRRB M1100.3.3. -do- C. Pile diametre = 1200 mm m 6,916.00
25.6 KSRRB M1100-4.1. Driven cast-in-place vertical R.C.C. Pile with OPC
design mix M35 @ 390kgs, with 20mm and down size graded granite
metal coarse aggregates @0.68cum and fine aggregtes @0.45cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
excluding Reinforcement complete as per Drawing and & Technical
Specification including costs of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No.1100 & 1700
25.6 KSRRB M1100-4.1. -do- Pile diametre = 750 mm m 3,094.00

196
Sl. No. Description Unit Rate
Rs. Ps.

25.7 KSRRB M1100-4.2. -do- Pile diametre = 1000 mm m 4,989.00


25.8 KSRRB M1100-4.3.-do- Pile diametre = 1200 mm m 7,287.00
25.9 KSRRB M1100-4.4. Driven precast vertical circular R.C.C. Piles
with OPC design mix M35 @ 390kgs, with 20mm and down size
graded granite metal coarse aggregates @0.68cum and fine aggregtes
@ 0.45cum, with superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008, excluding Reinforcement complete as per Drawing
and & Technical Specification including costs of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
MORTH Specification No. 1100 & 1700
25.9 KSRRB M1100-4.4. -do- Pile diametre = 500 mm m 1,423.00
25.10 KSRRB M1100-4.5. -do- Pile diametre = 750 mm m 2,445.00
25.11 KSRRB M1100-4.6. -do- Pile diametre = 1000 mm m 4,095.00
25.12 KSRRB M1100-4.7. Driven precast vertical R.C.C. Piles with OPC
design mix M35 @ 390kgs, with 20mm and down size graded granite
metal coarse aggregates @0.68cum and fine aggregtes @ 0.45cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
excluding Reinforcement complete as per Drawing and & Technical
Specification including costs of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No.1100 & 1700
25.12 KSRRB M1100-4.7. -do- Size of pile = 300 mm x 300 mm m 957.00
25.13 KSRRB M1100-4.8. -do- Size of pile = 500 mm x 500 mm m 1,600.00
25.14 KSRRB M1100-4.9. -do- Size of pile = 750 mm x 750 mm m 3,093.00
25.15 KSRRB M1100-5. Driven Vertical Steel Piles as per Drawing and & m 4,240.00
Technical Specification complete as per specifications. Section of the pile
=H Section steel column 400 x 250 mm (ISHB Series)
MORTH Specification No.1100 & 1900
25.16 KSRRB M1100-6. Driven Vertical Steel Piles as per Drawing and & m 4,788.00
Technical Specification complete as per specifications. Section of the pile
=H Section steel column 450 x 250 mm (ISHB Series)
MORTH Specification No.1100 & 1900
25.18 KSRRB M1100-8.1. Cement Concrete for Reinforced Concrete in cum 4,497.00
Pile Cap as per Drawing and Technical Specification complete as per
specifications. RCC with OPC design mix M20 @ 320kgs, with 20mm
and down size graded granite metal coarse aggregates @0.69cum and
fine aggregtes @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008, including costs of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
Case-I: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700

197
Sl. No. Description Unit Rate
Rs. Ps.

25.19 KSRRB M1100-8.2. -do- RCC with OPC design mix M20 @ 320kgs, with cum 3,888.00
20mm and down size graded granite metal coarse aggregates @0.69cum
and fine aggregtes @ 0.46cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008, including costs of all materials, labour,
HOM form works, scaffolding & centering.
MORTH Specification No.1100, 1500 & 1700

25.20 KSRRB M1100-9.1. Cement Concrete for Reinforced Concrete in cum 4,626.00
Pile Cap as per Drawing and Technical Specification complete as per
specifications. RCC with OPC design mix M25 @ 340kgs, with 20mm
and down size graded granite metal coarse aggregates @0.7cum and
fine aggregtes @ 0.47cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2009. including costs of all materials, labour,
HOM form works, scaffolding & centering
Case-I: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700

25.21 KSRRB M1100-9.2. -do- RCC with OPC design mix M25 @ 340kgs, with cum 4,137.00
20mm and down size graded granite metal coarse aggregates @0.7cum
and fine aggregtes @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2009. including costs of all materials, labour,
HOM form works, scaffolding & centering.
Case-II: Using Batching Plant, Transit Mixer and Concrete Pump
MORTH Specification No.1100, 1500 & 1700

25.22 KSRRB M1100-10.1. Cement Concrete for Reinforced Concrete in Pile cum 4,725.00
Cap per Drawing and Technical Specification complete as per specifications.
RCC with OPC design mix M30 @ 360kgs, with 20mm and down size
graded granite metal coarse aggregates @0.69cum and fine aggregtes
@ 0.46cum, with superplastisiser @3lts confirming to IS 9103-1999
Reaffirmed-2008. including costs of all materials, labour, HOM form
works, scaffolding & centering.
Case-I: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700

25.23 KSRRB M1100-10.2. -do- RCC with OPC design mix M30 @ 360kgs, cum 4,154.00
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregtes @ 0.46cum, with superplastisiser @3lts
confirming to IS 9103-1999 Reaffirmed-2008. including costs of all
materials, labour, HOM form works, scaffolding & centering.
Case-II: Using Batching Plant, Transit Mixer and Concrete Pump
MORTH Specification No.1100, 1500 & 1700

198
Sl. No. Description Unit Rate
Rs. Ps.

25.24 KSRRB M1100-11.1. Cement Concrete for Reinforced Concrete in cum 4,863.00
Pile Cap complete as per Drawing and Technical Specification complete
as per specifications. RCC with OPC design mix M35 @ 390kgs, with
20mm and down size graded granite metal coarse aggregates @0.68cum
and fine aggregtes @ 0.45cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008. including costs of all materials, labour,
HOM, form works, scaffolding & centering.
Case-I: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700
25.25 KSRRB M1100-11.2. -do- RCC with OPC design mix M35 @ 390kgs, cum 4,359.00
with 20mm and down size graded granite metal coarse aggregates
@0.68cum and fine aggregtes @ 0.45cum, with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed-2008. Case-II: Using Batching
Plant, Transit Mixer and Concrete Pump. including costs of all materials,
labour, HOM, form works, scaffolding & centering.
MORTH Specification No.1100, 1500 & 1700
25.26 KSRRB M1100-12. Providing and laying of PCC M 15 levelling course 100 cum 3,620.00
mm thick below the pile cap including costs of all materials, labour, HOM
,form works, scaffolding & centering complete as per specifications.
MORTH Specification No.1100 & 1700
25.27 KSRRB M1100-13. Providing and Placing un-coated TMT steel
reinforcement for RCC work including straightening, cutting, bending,
hooking, placing in position of lapping and / or welding wherever required,
tying with binding wire and anchoring to the adjoining members wherever
necessary complete as per design (Flats, hooks & wastage shall not be
measured and paid) including cast of materials, labours, HOM complete as
per specifications.
MORTH Specification No.1600 & 2200.
25.27.2 -do- TMT bars Fe 500 Tonne 55,575.00
25.27.3 -do- TMT bars Fe 550 Tonne 55,975.00
25.28 KSRRB M1100-14. Supplying, fitting and placing un-coated Mild steel Tonne 43,085.00
reinforcement in foundation as per drawing and technical specification
including costs of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
MORTH Specification No.1600
25.29 Trail Bores : Drilling 80mm dia hole through all kinds of soil using cas- m 1,157.00
ing shoe bit vertical or inclined up to 10 degree to vertical, as directed
including cost of materials, machineries, labour, water charges, remain-
ing, collection of wash samples at suitable intervals, logging and leaving,
supplying honne wood core box, fixing casing pipes (excluding cost of
casing pipes etc., including costs of all materials, labour, HOM, form
works, scaffolding & centering.

199
Sl. No. Description Unit Rate
Rs. Ps.

25.30 Trail Bores : Drilling 76mm dia (NX) core hole in soft rock using dia- m 2,013.00
mond core bit vertical or inclined up to 10 degree to vertical, as directed
including cost of materials, machineries, labour, water charges, collection
of core samples, logging and leaving, supplying honne wood core box
including cement grounding (excluding cost of cement for grouting) and
re-drilling in case of collapse of sides etc., including costs of all materials,
labour, HOM form works, scaffolding & centering.
25.31 Trail Bores : Drilling 76 mm dia (NX) core hole in Hard rock using m 3,680.00
diamond core bit vertical or inclined up to 10 degree to vertical as di-
rected including cost of materials, machineries, labour, including cement
grouting (excluding cost of cement for grouting) and re-drilling incase
of collapse of sides etc., including costs of all materials, labour, HOM,
form works, scaffolding & centering.

Note : KSRRB 1100.1, KSRRB 1100.2


Note 1 : Rate for 450mm dia, 550mm dia, 750mm dia. piles and
1200mm. dia. piles can be extrapolated as per proportion of pile
cross-sectional area.
Note 2 : Item No. 25.1 is to be adopted :
a) Only where manual labour is used for removal of excavated
earth, disposal of excavated earth etc. and when only pilling rig
and Bentonite pump machinery is used.
Note 3 : Items No. 25.2.1 to 25.14 are to be adopted where entire
work is taken up using machinery.
Note 4 : In case steel lining is included in the design for cast-in-situ
driven pile and is planned to be retained, the same may be included
in the rate analysis. In case temporary steel casing is used during
casting and is planned to be removed an additional cost of 0.5% of
cost of concrete may be provided to cover it's usage.

200
Chapter - 26
BRIDGES - WELL FOUNDATION

201
Sl. No. Description Unit Rate
Rs. Ps.

26.0 BRIDGES - WELL FOUNDATION


26.1 KSRRB M1200-1.1. Providing and Constructing Temporary Island 16 No 95,805.00
m diameter for Construction of Well Foundation for 8m dia Well including
cost of all materials, labour, HOM form works, scaffolding & centering
complete as per specifications.
MORTH Specification No. 1200
26.2 KSRRB M1200-1.2. Providing and Constructing Temporary Island 16 No 5,84,984.00
m diameter for Construction of Well Foundation for 8m dia Well complete
as per specifications. B. Assuming depth of water 4.0 m and height of
island 4.5m including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. 1200
26.3 KSRRB M1200-1.3. Providing and Constructing Temporary Island m 3,829.00
16 m diameter for Construction of Well Foundation for 8m dia Well
complete as per specifications. C. Providing and constructing one span
service road to reach island location from one pier location to another
pier location- Assuming span length 30 m, width of service road 10 m
& depth of water 1m including cost of all materials, labour, HOM, form
works, scaffolding & centering complete as per specifications.
MORTH Specification No. 1200
26.4 KSRRB M1200-2. Providing and Laying Cutting Edge of Mild Steel Tonne 64,145.00
weighing 40 kg per metre for Well Foundation complete as per Drawing
and Technical Specification including cost of all materials, labour, HOM,
form works, scaffolding & centering complete as per specifications.
MORTH Specification No.1200 & 1900
26.5 KSRRB M1200-3.1. Plain / Reinforced Cement Concrete, in Well
Foundation complete as per Drawing and Technical Specification.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
MORTH Specification No. 1200,1500 & 1700
26.5.1 KSRRB M1200-3.1 i) RCC with OPC design mix M20 @ 320kgs, with cum 5,185.00
20mm and down size graded granite metal coarse aggregates @0.69cum
and fine aggregates @ 0.46cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
26.5.2 KSRRB M1200-3.2 ii) RCC with OPC design mix M25 @ 340kgs, with cum 5,346.00
20mm and down size graded granite metal coarse aggregates @0.7cum
and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
26.5.3 KSRRB M1200-3.3. iii) RCC with OPC design mix M35 @ 390kgs, cum 5,597.00
with 20mm and down size graded granite metal coarse aggregates
@0.68cum and fine aggregates @ 0.45cum, with superplastisiser @3lts

202
Sl. No. Description Unit Rate
Rs. Ps.

confirming to IS9103-1999 Reaffirmed-2008 including cost of all


materials, labour, HOM form works, scaffolding & centering complete
as per specifications.
26.5.4 KSRRB M1200-4.1. i) PCC design mix M15 with OPC @ 240kgs, with cum 4,090.00
40mm and down size graded granite metal coarse aggregates @0.63cum
and fine aggregates @ 0.42cum including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
26.5.5 KSRRB M1200-4.2. ii) PCC with OPC design mix M20 @ 300kgs, with cum 4,529.00
40mm and down size graded granite metal coarse aggregates @0.64cum
and fine aggregates @ 0.43cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
26.5.6 KSRRB M1200-4.3. iii) RCC with OPC design mix M20 @ 320kgs, cum 4,770.00
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM form works, scaffolding & centering complete
as per specifications.
26.5.7 KSRRB M1200-4.4. iv) PCC with OPC design mix M25 @ 340kgs, with cum 4,915.00
40mm and down size graded granite metal coarse aggregates @0.7cum
and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
26.5.8 KSRRB M1200-4.5. v) RCC with OPC design mix M25 @ 340kgs, with cum 4,916.00
20mm and down size graded granite metal coarse aggregates @0.7cum
and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
26.5.9 KSRRB M1200-4.6. vi) PCC with OPC design mix M30 @ 360kgs, with cum 5,002.00
40mm and down size graded granite metal coarse aggregates @0.69cum
and fine aggregates @ 0.46cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
26.5.10 KSRRB M1200-4.7. vii) RCC with OPC design mix M30 @ 360kgs, with cum 5,002.00
20mm and down size graded granite metal coarse aggregates @0.69cum
and fine aggregates @ 0.46cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
26.5.11 KSRRB M1200-4.8 viii) RCC with OPC design mix M35 @ 390kgs, with cum 5,146.00
20mm and down size graded granite metal coarse aggregates @0.68cum
and fine aggregates @ 0.45cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.

203
Sl. No. Description Unit Rate
Rs. Ps.

26.5.12 KSRRB M1200-4.9. ix) RCC with OPC cement design mix M40 cum 4,711.00
@ 420kgs, with 20mm and down size graded granite metal coarse
aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
- Using Batching Plant, Transit Mixer and Concrete Pump MORTH
Specification No.1200,1500 & 1700 including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
26.6 KSRRB M1200-5.1. Plain / Reinforced Concrete, in Well Foundation cum 4,433.00
complete as per Drawing and Technical Specification Concrete to be
placed using tremie pipe. Bottom Plug: i) PCC with 43 grade cement
design mix M20 @ 320kgs, with 40mm and down size graded granite
metal coarse aggregates @0.69cum and fine aggregates @ 0.46cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.7 KSRRB M1200-5.2. Plain / Reinforced Concrete, in Well Foundation cum 3,877.00
complete as per Drawing and Technical Specification Concrete to be
placed using tremie pipe ii) PCC with OPC design mix M20 @ 320kgs,
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - II : Using Batching
Plant, Transit Mixer and Crane / Concrete Pump.
MORTH Specification No.1200,1500 & 1700
26.8 KSRRB M1200-6.1. Plain / Reinforced Cement Concrete, in Well cum 4,802.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe iii) PCC with OPC design
mix M25 @ 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.9 KSRRB M1200-6.2. Plain / Reinforced Cement Concrete, in Well cum 4,135.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe iv) PCC with OPC design
mix M25 @ 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - II : Using Batching
Plant, Transit Mixer and Crane / Concrete Pump. MORTH
Specification No.1200,1500 & 1700

204
Sl. No. Description Unit Rate
Rs. Ps.

26.10 KSRRB M1200-7.1. Plain / Reinforced Cement Concrete, in Well cum 5,360.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe. PCC with OPC design mix
M30 @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.11 KSRRB M1200-7.2. Plain / Reinforced Cement Concrete, in Well cum 4,216.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe. PCC with OPC design mix
M30 @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - II : Using Batching
Plant, Transit Mixer and Crane / Concrete Pump. MORTH
Specification No.1200,1500 & 1700
26.12 KSRRB M1200-8.1. Plain / Reinforced Cement Concrete, in Well cum 5,536.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe. PCC with OPC design mix
M35 @ 390kgs, with 40mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.13 KSRRB M1200-8.2. Plain / Reinforced Cement Concrete, in Well cum 4,354.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe PCC with OPC design mix
M35 @ 390kgs, with 40mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump. MORTH Specification No.1200,1500 & 1700
26.14 KSRRB M1200-9.1. (i) PCC with OPC design mix M20 @ 320kgs, cum 4,341.00
with 40mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. Same as in bottom plug concrete, excluding cost
of forming sump, protective bunds, chiselling etc.MORTH Specification
No.1200,1500 & 1700
26.15 Intermediate Plug - Plain / Reinforced Cement Concrete, in Well
Foundation MORTH Specification No.1200,1500 & 1700

205
Sl. No. Description Unit Rate
Rs. Ps.

26.15.1 KSRRB M1200-9.2. (ii) PCC with OPC design mix M25 @ 340kgs, cum 4,587.00
with 40mm and down size graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM form works, scaffolding & centering complete
as per specifications. Same as in bottom plug concrete, excluding cost
of forming sump, protective bunds, chiselling etc. MORTH Specification
No.1200,1500 & 1700
26.15.2 KSRRB M1200-9.3. (iii) PCC with OPC design mix M30 @ 360kgs, cum 5,360.00
with 40mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications.
26.16 E.Top Plug - KSRRB M1200-10.1. (i) PCC design mix M15 with cum 3,718.00
OPC @ 240kgs, with 40mm and down size graded granite metal coarse
aggregates @0.63cum and fine aggregates @ 0.42cum including cost of
all materials, labour, HOM form works, scaffolding & centering complete
as per specifications.
MORTH Specification No.1200,1500 & 1700
26.17 KSRRB M1200-10.2. (ii) PCC with OPC design mix M20 @ 320kgs, cum 4,240.00
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications.
MORTH Specification No.1200,1500 & 1700
26.18 KSRRB M1200-10.3. (iii) PCC with OPC design mix M25 @ 340kgs, cum 4,486.00
with 40mm and down size graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. Same as item 2100-11.5. excluding formwork
MORTH Specification No.1200,1500 & 1700
26.19 KSRRB M1200-10.4. (iv) PCC with OPC design mix M30 @ 360kgs, cum 4,565.00
with 40mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. Same as item 2100-11.9. excluding formwork
MORTH Specification No.1200,1500 & 1700

206
Sl. No. Description Unit Rate
Rs. Ps.

26.20 “KSRRB M1200-11.1. Plain / Reinforced Cement Concrete, in Well cum 5,055.00
Foundation complete as per Drawing and Technical Specification F.
Well cap. i) RCC with OPC design mix M20 @ 320kgs, with 20mm
and down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - I:Using Concrete Mixer”
MORTH Specification No.1200,1500 & 1700
26.21 “KSRRB M1200-11.2. Plain / Reinforced Cement Concrete, in Well cum 3,959.00
Foundation complete as per Drawing and Technical Specification.
i) RCC with OPC design mix M20 @ 320kgs, with 20mm and down
size graded granite metal coarse aggregates @0.69cum and fine
aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
(Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump” MORTH Specification No.1200,1500 & 1700)
26.22 KSRRB M1200-11.3. Plain / Reinforced Cement Concrete, in Well cum 4,510.00
Foundation complete as per Drawing and Technical Specification.
i) RCC with OPC design mix M20 @ 320kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - I : Using Concrete Mixer MORTH Specification No.1200,1500
& 1700
26.23 “KSRRB M1200-11.4. Plain / Reinforced Cement Concrete, in Well cum 4,100.00
Foundation complete as per Drawing and Technical Specification.
(ii) RCC with OPC design mix M25 @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.7cum and
fine aggregates @ 0.47cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
(Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump” MORTH Specification No.1200,1500 & 1700)
26.24 “KSRRB M1200-11.5. Plain / Reinforced Cement Concrete, in Well cum 4,730.00
Foundation complete as per Drawing and Technical Specification.
(iii) RCC with OPC design mix M30 @ 360kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
Case - I : Using Concrete Mixer” MORTH Specification No.1200,1500
& 1700

207
Sl. No. Description Unit Rate
Rs. Ps.

26.25 “KSRRB M1200-11.6. Plain / Reinforced Cement Concrete, in Well cum 4,160.00
Foundation complete as per Drawing and Technical Specification.
:RCC with OPC design mix M30 @ 360kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump” MORTH Specification No.1200,1500 & 1700
26.26 “KSRRB M1200-11.7. Plain / Reinforced Cement Concrete, in Well cum 4,831.00
Foundation complete as per Drawing and Technical Specification.
(iv) RCC with OPC design mix M35 @ 390kgs, with 20mm and
down size graded granite metal coarse aggregates @0.68cum and
fine aggregates @ 0.45cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - I : Using Concrete Mixer” MORTH Specification No.1200,1500
& 1700
26.27 “KSRRB M1200-11.8. Plain / Reinforced Cement Concrete, in Well cum 4,295.00
Foundation complete as per Drawing and Technical Specification:RCC
with OPC design mix M35 @ 420kgs, with 20mm and down size
graded granite metal coarse aggregates @0.68cum and fine aggregates
@ 0.45cum, with superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008. including cost of all materials, labour, HOM, form
works, scaffolding & centering complete as per specifications. Case - II
: Using Batching Plant, Transit Mixer and Crane / Concrete Pump”
MORTH Specification No.1200,1500 & 1700
26.28 “KSRRB M1200-12. Plain / Reinforced Cement Concrete, in Well cum 4,410.00
Foundation complete as per Drawing and Technical Specification
(v) RCC with OPC design mix M40 @ 420kgs, with 20mm and
down size graded granite metal coarse aggregates @0.67cum and
fine aggregates @ 0.44cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Using Batching Plant, Transit Mixer and Concrete Pump” MORTH
Specification
KSRRB M1200- Sinking of well in sandy soil
26.29 KSRRB M1200-13.1. Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.29 KSRRB M1200-13.1. -do- i) Depth below bed level upto 3.00 m. Rate m 2,030.00
of sinking = 0.50 m per hour

208
Sl. No. Description Unit Rate
Rs. Ps.

26.30 KSRRB M1200-13.2. -do- ii) Beyond 3 m upto 10 m depth, Rate of m 2,662.00
sinking = 0.33 m per hour
26.34 KSRRB M1200-14.1. Sinking of 7 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is
reckoned from bed level including cost of all materials, labour, HOM
form works, scaffolding & centering complete as per specifications.
A. Sandy Soil, Diameter of well = 7 m
MORTH Specification No. Section 1200
26.34 KSRRB M1200-14.2. -do- i) Depth below bed level upto 3.0 m, Rate m 2,724.00
of sinking = 0.30 m per hour.
26.35 KSRRB M1200-14.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 3,417.00
sinking = 0.22 m per hour
26.39 KSRRB M1200-15.1. Sinking of 8 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.39 KSRRB M1200-15.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 3,294.00
of sinking at 0.25 m per hour
26.40 KSRRB M1200-15.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 3,946.00
sinking at 0.20 m per hour
26.44 KSRRB M1200-16.1. Sinking of 9 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.44 KSRRB M1200-16.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 3,421.00
of sinking at 0.25 m per hour
26.45 KSRRB M1200-16.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 4,326.00
sinking = 0.18 m per hour
26.49 KSRRB M1200-17.1. Sinking of 10 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200

209
Sl. No. Description Unit Rate
Rs. Ps.

26.49.1 i) Depth below bed level upto 3.0 m. Rate of sinking = 0.20 m / hour m 3,797.00
26.49.2 (ii) Beyond 3 m upto 10 m depth. Rate of sinking = 0.17 m/ hour m 4,655.00
26.53 KSRRB M1200-18.1. Sinking of 11 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.53 KSRRB M1200-18.2. -do- i) Depth below bed level upto 3.0 m, Rate m 7,906.00
of sinking = 0.15 m per hour
26.54 KSRRB M1200-18.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 8,698.00
sinking at 0.13 m per hour
26.58 KSRRB M1200-19.1. Sinking of 12 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.58 KSRRB M1200-19.2. -do- i) Depth below bed level upto 3.0 m, Rate m 17,696.00
of sinking at 0.05 m/ hour
26.59 KSRRB M1200-19.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 21,455.00
sinking at 0.038 m/hour.
26.63 KSRRB M1200-20.1. Sinking of Twin D Type well ( other than
pneumatic method of sinking ) through all types of strata namely, sandy
soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is reckoned
from bed level complete including cost of all materials, labour, HOM
of machineries, form works, scaffolding & centering complete as per
specifications. Overall length = 12 m, Overall width = 6 m.
MORTH Specification No. 1200
26.63 KSRRB M1200-20.1. -do- (i) Depth from bed level upto 3.0 m, Rate m 3,921.00
of sinking at 0.18 m/ hour
26.64 KSRRB M1200-20.2. -do- (ii) Beyond 3 m upto 10 m depth: Rate of m 4,315.00
sinking at 0.17 m/hour
26.68 KSRRB M1200-21.1. Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No.Section 1200

210
Sl. No. Description Unit Rate
Rs. Ps.

26.68 KSRRB M1200-21.2. -do- (i) Depth below bed level upto 3.00m, rate m 2,661.00
of sinking at 0.33m per hour
26.69 KSRRB M1200-21.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 5,853.00
sinking = 0.17 m per hour
26.73 KSRRB M1200-22.1. Sinking of 7 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.73 KSRRB M1200-22.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 3,417.00
of sinking = 0.22 m per hour
26.74 KSRRB M1200-22.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 5,414.00
sinking = 0.17 m per hour
26.78 KSRRB M1200-23.1. Sinking of 8 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.78 KSRRB M1200-23.2. -do- (i) Depth from bed level upto 3.0 m. Rate m 4,177.00
of sinking = 0.18 m/ hour
26.79 KSRRB M1200-23.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 6,000.00
sinking = 0.17 m/ hour
26.83 KSRRB M1200-24.1. Sinking of 9 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.83 KSRRB M1200-24.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 4,495.00
of sinking = 0.17 m per hour
26.84 KSRRB M1200-24.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 6,443.00
sinking = 0.15 m per hour

211
Sl. No. Description Unit Rate
Rs. Ps.

26.88 KSRRB M1200-25.1. Sinking of 10 m external diameter well (other


than pneumatic method of sinking) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is
reckoned from bed level including cost of all materials, labour, HOM,
form works, scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.88 KSRRB M1200-25.1. -do- (i) Depth below bed level upto 3.0 m, Rate m 5,542.00
of sinking = 0.18 m per hour
26.89 KSRRB M1200-25.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 6,925.00
sinking = 0.15 m per hour
26.93 KSRRB M1200-26.1. Sinking of 11 m external diameter well (other
than pneumatic method of sinking) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.93 KSRRB M1200-26.1. -do- m 9,130.00
i) Depth from bed level upto 3.0 m. Rate of sinking = 0.10 m / hour
26.94 KSRRB M1200-26.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 14,746.00
sinking = 0.08 m/ hour
26.98 KSRRB M1200-27.1. Sinking of 12 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is reckoned from
bed level complete as per specifications.
MORTH Specification No. Section 1200
26.98 KSRRB M1200-27.1. -do- i) Depth below bed level upto 3.0 m, Rate m 21,547.00
of sinking = 0.04 m / hour
26.99 KSRRB M1200-27.2. -do- (ii) Beyond 3 m upto 10 m depth, Rate of m 33,147.00
sinking = 0.03 m/ hour
26.103 KSRRB M1200-28.1. Sinking of Twin D Type Well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.103 KSRRB M1200-28.2.-do- i) Depth below bed level upto 3.0 m , Rate m 4,875.00
of sinking = 0.16 m / hour

212
Sl. No. Description Unit Rate
Rs. Ps.

26.104 KSRRB M1200-28.2.-do- (ii) Beyond 3 m upto 10 m depth, Rate of m 7,613.00


sinking = 0.15 m/ hour
26.107 KSRRB M1200.29. Sinking of 6 m external diameter well (other than m 14,464.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
Depth in soft rock strata upto 3 m. Rate of sinking = 0.25 m per hour
MORTH Specification No. Section 1200
26.108 KSRRB M1200.30. Sinking of 7 m external diameter well (other than m 9,980.00
pneumatic methodof sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
Depth in soft rock strata upto 3 m. Rate of sinking = 0.22 m per hour
MORTH Specification No. Section 1200
26.109 KSRRB M1200.31. Sinking of 8 m external diameter well (other than m 11,316.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
Depth in soft rock strata upto 3 m. Rate of sinking = 0.22 m per hour
MORTH Specification No. Section 1200
26.110 KSRRB M1200.32. Sinking of 9m external diameter well (other than m 12,948.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
Depth in soft rock strata upto 3 m. Rate of sinking = 0.15 m per hour
MORTH Specification No. Section 1200
26.111 KSRRB M1200.33. Sinking of 10m external diameter well (other than m 14,321.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in
soft rock strata upto 3 m. Rate of sinking = 0.14 m/ hour MORTH
Specification No. Section 1200

213
Sl. No. Description Unit Rate
Rs. Ps.

26.112 KSRRB M1200.34. Sinking of 11m external diameter well (other than m 31,780.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in soft
rock strata upto 3 m. Rate of sinking = 0.06 m / hour MORTH
Specification No. Section 1200
26.113 KSRRB M1200.35. Sinking of 12m external diameter well (other than m 68,928.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in soft
rock strata upto 3 m. Rate of sinking = 0.025 m / hour MORTH
Specification No. Section 1200
26.114 KSRRB M1200.36. Sinking of Twin D Type Well (other than pneumatic m 14,913.00
method of sinking) through all types of strata namely sandy soil, clayey
soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
Depth in soft rock strata upto 3 m. Rate of sinking = 0.12 m / hour
MORTH Specification No. Section 1200
KSRRB M1200- Hard Rock
26.115 KSRRB M1200.37. Sinking of 6 m external diameter well (other than m 13,005.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
Depth in hard rock strata upto 3 m. Rate of sinking = 0.17 m per hour
MORTH Specification No. Section 1200
26.116 KSRRB M1200.38. Sinking of 7 m external diameter well (other than m 16,818.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is reckoned from
bed including cost of all materials, labour, HOM, form works, scaffolding
& centering complete as per specifications. Depth in hard rock strata
upto 3 m. Rate of sinking = 0.17 m per hour MORTH Specification
No. Section 1200

214
Sl. No. Description Unit Rate
Rs. Ps.

26.117 KSRRB M1200.39. Sinking of 8 m external diameter well (other than m 17,427.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard
rock strata upto 3 m. Rate of sinking = 0.17 m per hour MORTH
Specification No. Section 1200
26.118 KSRRB M1200.40. Sinking of 9 m external diameter well (other than m 19,718.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard
rock strata upto 3 m. Rate of sinking = 0.15 m per hour MORTH
Specification No. Section 1200
26.119 KSRRB M1200.41. Sinking of 10 m external diameter well (other than m 20,532.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard
rock strata upto 3 m. Rate of sinking = 0.12 m per hour MORTH
Specification No. Section 1200
26.120 KSRRB M1200.42. Sinking of 11 m external diameter well (other than m 44,562.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard rock
strata upto 3 m. Rate of sinking = 0.05 m/hour MORTH Specification
No. Section 1200
26.121 KSRRB M1200.43. Sinking of 12 m external diameter well (other than m 91,940.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard rock
strata upto 3 m. Rate of sinking = 0.020 m/hour MORTH Specification
No. Section 1200
26.122 KSRRB M1200.44. Sinking of Twin D Type Well (other than pneumatic m 21,868.00
method of sinking) through all types of strata namely sandy soil, clayey
soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Depth in hard rock strata upto
3 m. Rate of sinking = 0.10 m/hour
MORTH Specification No. Section 1200
215
Sl. No. Description Unit Rate
Rs. Ps.

26.123 KSRRB M1200-45. Pneumatic sinking of wells with equipment of cum 48,039.00
approved design, drawing and specifications worked by competent and
trained personnel and comprising of compression and decompression
chambers, reducers, two air locks separately for men and plant &
materials, arrangement for supply of fresh air to working chambers,
check valves, exhaust valves, shafts made from steel plates of riveted
construction not less than 6 mm thick to withstand an air pressure of 0.50
MPa, controlled blasting of hard rock where required, staircases and 1
m wide landing platforms with railing, arrangement for compression and
decompression, electric lighting of 50 V maximum, proper rooms for rest
and medical examinations and compliance with safety precautions as
per IS:4138, including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. all as per clause
1200.7.6 of MORTH Specifications.
MORTH Specification No. Section 1200
26.124 KSRRB M1200-46. Sand filling in wells complete as per drawing and cum 2,206.00
technical specifications including cost of all materials, labour, HOM, form
works, scaffolding & centering complete as per specifications.
MORTH Specification No.1207
26.125 KSRRB M1200-47. Providing steel liner 10 mm thick for curbs and Tonne 57,157.00
6 mm thick for seining of wells including fabricating and setting out as
per detailed drawing complete as per specifications including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. MORTH Specification No.1200 & 1900
KSRRB M1200-Reinforced cement concrete for well Kerb
26.126 KSRRB M1200-48.1. Construction of cement concrete kerb with m 288.00
top and bottom width 115 and 165 mm respectively, 250 mm high in
M-20 grade PCC on M-10 grade foundation 150 mm thick, foundation
having 50 mm projection beyond kerb stone, kerb stone laid with kerb
lying machine, founation concrete laid manually, including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. all complete as per Clause 400.8 complete as per
spcifications. A. Using Concrete Mixer
MORTH Specification No.408
26.127 KSRRB M1200-48.2. Construction of cement concrete kerb with m 230.00
top and bottom width 115 and 165 mm respectively, 250 mm high in
M-20 grade PCC on M-10 grade foundation 150 mm thick, foundation
having 50 mm projection beyond kerb stone, kerb stone laid with kerb
lying machine, foundation concrete laid manually, including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. all complete as per Clause 400.8 complete as per
spcifications. B. Using Concrete Batching and Mixing Plant
MORTH Specification No.408
26.128 KSRRB M1200-49.1. Cast-in-Situ Cement Concrete M 20 Kerb with m 526.00
Channel. Construction of cement concrete kerb with channel with top
and bottom width 115 and 165 mm respectively, 250 mm high in M-20
grade PCC on M-10 grade foundation 150 mm thick, kerb channel laid

216
Sl. No. Description Unit Rate
Rs. Ps.

with kerb laying machine, foundation concrete laid manually, including


cost of all materials, labour, HOM, form works, scaffolding & centering
complete as per specifications. all complete as per Clause 400.8
complete as per specifications. A. Using Concrete Mixer
MORTH Specification No.408
26.129 KSRRB M1200-49.2. Cast-in-Situ Cement Concrete M 20 Kerb with m 441.00
Channel. Construction of cement concrete kerb with channel with top and
bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade
PCC on M10 grade foundation 150 mm thick, kerb channel laid with kerb
laying machine, foundation concrete laid manually, including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. all complete as per Clause 400.8 complete as per
specifications. B. Using Concrete Batching and Mixing Plant MORTH
Specification No.408
26.130 Providing and fixing 3m long 25mm dia TMT dowel bars 1.5m inserted
in 50mm dia holes drilled in hard rock and grouting in CM 1:1 including
necessary bending, hooking, cutting and handling charges including
cost of all materials, labour, HOM, form works, scaffolding & centering
complete as per specifications. the cost of steel. (MORTH clause 1200).
26.130.1 -do- below LWL in open foundation upto 3m. Each 1,397.00
26.130.2 -do- below LWL in open foundation beyond 3m. Each 1,625.00
26.130.3 -do- for well foundation below LWL upto 3m. Each 2,522.00
26.130.4 -do- for well foundation below LWL beyond 3m. Each 3,222.00

Note: 1. KSRRB M 1200-13.3,14.3, 15.3, 16.3, 17.3, 18.3, 19.3, 20.3, 21.3,
22.3, 23.3, 24.3, 25.3, 26.3, 27.3 and 28.3 beyond 10m upto 20m
a) Add 5% for every additional meter depth of sinking over the rate
for sinking of previous meter

2. KSRRB M 1200-13.4,14.4, 15.4, 16.4, 17.4, 18.4, 19.4, 20.3, 21.4,


22.4, 23.4, 24.4, 25.4, 26.4, 27.4 and 28.4 beyond 20m upto 30m
a) Add 7.5% for every additional meters of depth of sinking over
the rate of sinking for the pervious meter
b) Add 20%of cost for Kentledge including supports, loading ar-
rangement and labour where cost is 80% of finished rate of
previous meter

3. KSRRB M 1200-13.5,14.5, 15.5, 16.5, 17.5, 18.5, 19.5, 20.5, 21.5,


22.5, 23.5, 24.5, 25.5, 26.5, 27.5 and 28.5 beyond 30m upto 40m.
a) Add 10% for every additional meters of depth of sinking over
the rate of sinking for the pervious meter
b) Add 20% of cost for Kentledge including supports, loading ar-
rangements and labour where cost is 80% of finished rate of
previous meter.

217
Chapter - 27
BRIDGES - OPEN FOUNDATIONS

218
Sl. No. Description Unit Rate
Rs. Ps.

27.0 BRIDGES - OPEN FOUNDATIONS


27.1 KSRRB M2100-1.1. Earth work excavation in all kinds of soils for
foundation of structures as per drawing and technical specifications,
including setting out, providing shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and bottom and filling
back with approved material including cost of all materials, labour, HOM
complete as per specifications.
MORTH Specification No. 304
27.1 KSRRB M2100-1.1. -do-.i) 0 m to 3 m depth by manual means cum 162.00
27.2 KSRRB M2100-1.2. -do-.ii) 3 m to 6 m depth by manual means cum 209.00
27.3 KSRRB M2100-1.3.-do- (iii) Above 6 m depth by manual means cum 279.00
27.4 “KSRRB M2100-2.1. -do- (i) 0 m to 3 m depth by mechanical means cum 41.00
27.5 “KSRRB M2100-2.2. -do- (ii) 3 m to 6 m depth by mechanical means cum 47.00
27.6 “KSRRB M2100-2.3. -do- (iii) Above 6 m depth by mechanical means cum 60.00
27.7 “KSRRB M2100-3.1. Earth work excavation in all kinds of ordinary rock
/ soft rock not requiring blasting for foundation of bridges and allied
works as per drawing and technical specifications, including setting out,
providing shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and filling back with approved
material including cost of all materials, labour, HOM complete as per
specifications.
MORTH Specification No. 304
27.7.1 “KSRRB M2100-3.1. -do- (i) 0 m to 3 m depth by manual means cum 232.00
27.7.2 “KSRRB M2100-3.1. -do- (ii) 3 m to 6 m depth by manual means cum 276.00
27.7.3 “KSRRB M2100-3.1. -do- (iii) Above 6 m depth by manual means cum 344.00
27.7.4 “KSRRB M2100-3.2. -do- (iv) 0 m to 3 m depth by Mechanical means cum 50.00
27.7.5 “KSRRB M2100-3.2. -do- (v) 3 m to 6 m depth by Mechanical means cum 57.00
27.7.6 “KSRRB M2100-3.2. -do- (vi) Above 6 m depth by Mechanical means cum 68.00
27.9 “KSRRB M2100-4.1. Earth work excavation in hard rock with blasting
for foundation of bridges and allied works as per drawing and technical
specifications, including setting out, providing shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides and
bottom and filling back with approved material including cost of all
materials, labour, HOM complete as per specifications.
MORTH Specification No. 304
27.9.1 “KSRRB M2100-4.1. -do- (i) 0 m to 3 m depth by manual means cum 488.00
27.9.2 “KSRRB M2100-4.1 -do- (ii) 3 m to 6 m depth by manual means cum 532.00
27.9.3 “KSRRB M2100-4.1 -do- (iii) Above 6 m depth by manual means cum 599.00

219
Sl. No. Description Unit Rate
Rs. Ps.

27.10 “KSRRB M2100-4.2. Earth work excavation in hard rock without blasting
for foundation of bridges and allied works as per drawing and technical
specifications, including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides and
bottom and filling back with approved material including cost of all
materials, labour, HOM complete as per specifications.
MORTH Specification No. 304
27.10.1 KSRRB M2100-4.2. -do- i) 0 m to 3 m depth by mechanical means cum 392.00
27.10.2 KSRRB M2100-4.2. -do- ii) 3 m to 6 m depth by mechanical means cum 459.00
27.10.3 KSRRB M2100-4.2. -do- iii) Above 6 m depth by mechanical means cum 525.00
27.11 KSRRB 2100-5. Excavation in marshy soil upto 3m depth for cum 751.00
foundations of structures as per drawing and technical specifications
including removing the excavated stuff to a lead of 15m., including
dewatering , shoring strutting wherever necessary watering and ramming
including cost of all materials, labour, HOM complete as per specifications
MORTH Chapter 12
27.12 “KSRRB M2100-5.1. Earth work excavation in marshy soil for foundation
of structures as per drawing and technical specifications, including setting
out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and filling back with
approved material including cost of all materials, labour, HOM complete
as per specifications.
MORTH Specification No. 304
27.12 “KSRRB M2100-5.1. -do- Manual Means upto 3 m depth cum 511.00
27.13 “KSRRB M2100-5.2. -do- Mechanical Means upto 3 m depth cum 120.00
27.14 KSRRB 2100-6. Filling the foundations trenches using approved cum 2,532.00
sand as per drawing and technical specifications in 250mm layers,
wherever necessary watering and ramming including cost of all materials,
labour, HOM complete as per specifications.
MORTH Chapter 12
27.15 “KSRRB M2100-7. Back filling the Marshy Foundations Pits of abutment cum 290.00
wing walls and returns using approved material with ramming and
watering with all lead and lifts, cost of labour, HOM etc., complete as
per specification and direction of the Engineer incharge of the work”
MORTH Specification No. 304
27.16 KSRRB M2100-8. Filling Annular Space Around Footing in Rock cum 4,090.00
Lean cement concrete M 10 mix. including cost of all materials, labour,
HOM of machineries, curing, form works, scaffolding and centering
complete as per specifications

220
Sl. No. Description Unit Rate
Rs. Ps.

27.18 KSRRB M2100-10. Providing and laying Plain cement concrete of cum 4,262.00
mix 1:3:6 with OPC @ 220kgs, with crushed 40mm and down size
graded granite metal coarse aggregates @0.89cum and fine aggregates
@ 0.46cum, in foundation mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days including cost of all
materials, labour, HOM curing, form works, scaffolding and centering
complete as per specifications.
MORTH Specification No. 2100
27.22 “KSRRB M2100-12.1. Providing and constructing Stone Masonry cum 3,628.00
Work in Cement Mortar 1:3 in Foundation complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications A. Square Rubble Coursed Rubbie Masonry (first sort)”
MORTH Specification No. 1405.4
27.23 KSRRB M2100-12.2. Providing and constructing Stone Masonry cum 3,530.00
Work in Cement Mortar 1:4 in Foundation complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications. B. Random Rubble Masonry( coursed / uncoursed)
MORTH Specification No. 1405.4
27.24 KSRRB M2100-13. Providing and laying Plain / Reinforced Cement cum 4,252.00
Concrete of mix 1:2:4 with OPC @ 240kgs, with 40mm and down size
graded granite metal coarse aggregates @0.84cum and fine aggregates
@ 0.56cum in Open Foundation including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications complete as per Drawing and Technical Specifications.
MORTH Specification No. 1500,1700 & 2100
27.25 “KSRRB M2100-14. Providing and laying Plain /Reinforcement cum 4,404.00
Cement Concrete M20 with OPC @ 320 kgs, with 40mm and down size
graded granite metal coarse aggregates @0.64cum and fine aggregates
@ 0.43cum, with superplasticizer @3lts confirming to IS9103-1999
Reaffirmed-2008 in Open Foundation including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications complete as per Drawing and Technical Specifications.
“MORTH Specification No. 1500,1700 & 2100
27.27 “KSRRB M2100-15.2. Providing and laying Plain /Reinforcement cum 4,047.00
Cement Concrete M20 with OPC @ 320 kgs, with 20mm and down
size graded granite metal coarse aggregates @0.69cum and fine
aggregates @ 0.46cum, with superplasticizer @3lts confirming to
IS9103-1999 Reaffirmed-2008 in Open Foundation complete as per
Drawing and Technical Specifications including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications.
MORTH Specification No. 1500,1700 & 2100

221
Sl. No. Description Unit Rate
Rs. Ps.

27.29 KSRRB M2100-16.2. Providing and laying Plain / Reinforced Cement cum 4,162.00
Concrete design mix M25 with OPC @ 340kgs, with 40mm and
down size graded granite metal coarse aggregates @0.70cum and
fine aggregates @ 0.47cum, with superplasticizer @3lts confirming
to IS9103-1999 Reaffirmed-2008,Open Foundation complete as per
Drawing and Technical Specifications including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications.
MORTH Specification No.1500,1700 & 2100
27.31 KSRRB M2100-17.2. Providing and laying Plain / Reinforced Cement cum 4,162.00
Concrete design mix M25 with OPC @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.70cum and
fine aggregates @ 0.47cum, with superplasticizer @3lts confirming
to IS9103-1999 Reaffirmed-2008,Open Foundation complete as per
Drawing and Technical Specification including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications.
MORTH Specification No. 1500,1700 & 2100
27.33 KSRRB M2100-18.2. Providing and laying Plain / Reinforced Cement cum 4,236.00
Concrete in Open Foundation with OPC design mix M30 @ 360kgs,
with 40mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplasticizer @3lts
confirming to IS9103-1999 Reaffirmed-2008 complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications.
MORTH Specification No. 1500,1700 & 2100
27.35 KSRRB M2100-19.2. Providing and laying Plain / Reinforced Cement cum 4,236.00
Concrete in Open Foundation with OPC design mix M30 @ 360kgs,
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplasticizer @3lts
confirming to IS9103-1999 Reaffirmed-2008 complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications.
MORTH Specification No. 1500,1700 & 2100
27.37 KSRRB M2100-20.2. Providing and laying Plain / Reinforced Cement cum 4,351.00
Concrete in Open Foundation with OPC design mix M35 @ 390kgs,
with 20mm and down size graded granite metal coarse aggregates
@0.68cum and fine aggregates @ 0.45cum, with superplasticizer
@3lts confirming to IS9103-1999 Reaffirmed-2008. including cost of all
materials, labour, HOM curing, form works, scaffolding and centering
complete as per specifications.
MORTH Specification No. 1500,1700 & 2100

222
Sl. No. Description Unit Rate
Rs. Ps.

Note: 1. KSRRB M2100-1.1, KSRRB M2100-1.2, KSRRB M2100-1.3, KSRRB


M2100-2.1, KSRRB M2100-2.2, KSRRB M2100-2.3, KSRRB M2100-
3.1, 3.2, 4.1, 4.2 Add 10% extra for dewatering charges.

2. KSRRB M2100-5.1 : Add 30% extra for dewatering charges.

3. KSRRB M2100-5.2: Add 20% extra for dewatering charges.

4. Add 15% extra for shoring and strutting for items KSRRB M2100-
5.1 specification is to be modified accordingly.

5. Add 10% extra for shoring and strutting for items KSRRB M2100-
5.2.

6. For excavation by manual means, add Rs. 5/m for every 'm' depth
for 3m to 6m & Rs. 10/m for above 6m.

7. It is assumed that Marshy soil will be available upto 3m depth


only.

223
Chapter - 28
BRIDGES - SUB-STRUCTURE

224
Sl. No. Description Unit Rate
Rs. Ps.

28.0 BRIDGES - SUB-STRUCTURE


28.7.1 KSRRB M2200-5.1 Providing and laying cement concrete of mix cum 4,517.00
1:2:4 with OPC @ 240kgs, with 40mm and down size graded granite
metal coarse aggregates @0.63cum and fine aggregates @ 0.42cum
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per MORTH Section : 2200 & IS 456
a) upto 5mtr height
28.7.1.1 Providing and laying cement concrete 1:2:4 with OPC @ 240kgs, cum 4,969.00
with 40mm and down size graded granite metal coarse aggregates
@0.63cum and fine aggregates @ 0.42cum above 5mtr height
28.7.2 KSRRB M2200-5.2. Providing and laying Design mix M20 with cum 4,679.00
OPC @ 320kgs, with 40mm and down size graded granite metal
coarse aggregates @0.64cum and fine aggregates @ 0.43cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
b) upto 5 m height
28.7.2.1 Providing and laying PCC grade design mix M20 with OPC @ 320kgs, cum 5,146.00
with 40mm and down size graded granite metal coarse aggregates
@0.64cum and fine aggregates @ 0.43cum, with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed-2008, including cost of materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications. above 5mtr height
28.7.3 KSRRB M2200-5.3. Providing and laying Design mix M25 With cum 4,434.00
OPC @ 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
c) - i) Upto 5 m height
28.7.4 KSRRB M2200-5.4. Providing and laying Design mix M25 @ cum 5,010.00
with OPC 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii) For height above 5 m and upto 10 m.
28.7.5 KSRRB M2200-5.5. Providing and laying Design mix M25 with cum 5,298.00
OPC @ 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10 m.

225
Sl. No. Description Unit Rate
Rs. Ps.

28.7.6 KSRRB M2200-5.6. Providing and laying Design mix M30 with cum 4,512.00
OPC @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) upto 5 m height
28.7.7 KSRRB M2200-5.7. Providing and laying Design mix M30 with cum 5,098.00
OPC @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
ii) For height above 5 m and upto 10 m.
28.7.8 KSRRB M2200-5.8. Providing and laying Design mix M30 with cum 5,391.00
OPC @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10 m.
28.7.9 KSRRB M2200-5.9. Providing and laying Design mix M20 with cum 4,310.00
OPC @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) Upto 5 m height.
28.7.10 KSRRB M2200-5.10. Providing and laying Design mix M20 with cum 4,870.00
OPC @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii) For height, 5m to 10m
28.7.11 KSRRB M2200-5.11. Providing and laying Design mix M20 with cum 5,150.00
OPC @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10 m.
28.7.12 KSRRB M2200-5.12. Providing and laying Design mix M25 with cum 4,434.00
OPC @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
- i) Upto 5m height
226
Sl. No. Description Unit Rate
Rs. Ps.

28.7.13 KSRRB M2200-5.13. Providing and laying Design mix M25 with cum 5,010.00
OPC @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii)For height, 5m to 10m
28.7.14 KSRRB M2200-5.14. Providing and laying Design mix M25 with cum 5,298.00
OPC @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height, above 10m,
28.7.15 KSRRB M2200-5.15. Providing and laying Design mix M30 with cum 4,512.00
OPC @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) Upto 5m height,
28.7.16 KSRRB M2200-5.16. Design mix M30 with OPC @ 360kgs, with 20mm cum 5,098.00
and down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008
ii) For height, 5m to 10m
28.7.17 KSRRB M2200-5.17. Providing and laying Design mix M30 with cum 5,391.00
OPC @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
iii) For height, above 10m
28.7.18 KSRRB M2200-5.18. Providing and laying Design mix M35 with cum 4,635.00
OPC @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) U pto 5m height
28.7.19 KSRRB M2200-5.19. Providing and laying Design mix M35 with cum 5,237.00
OPC @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii) For height 5m to 10m
227
Sl. No. Description Unit Rate
Rs. Ps.

28.7.20 KSRRB M2200-5.20. Providing and laying Design mix M35 with cum 5,538.00
OPC @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10m,
28.8 KSRRB M2200-6. Providing T.M.T. steel reinforcement for R.C.C. work
including straightening, cutting, bending, hooking, placing in position,
lapping and/or welding wherever required, tying with binding wire and
anchoring to the adjoining members wherever necessary complete as
per disign (laps, hooks and wastage shall not be measured and paid)
cost of materials, labour, HOM complete as per specification.
MORTH Specification No.1600 & 2200
28.8.2 -do- TMT Bars Fe 500 Tonne 55,769.00
28.8.3 -do- TMT Bars Fe 550 Tonne 56,250.00
KSRRB M2200- Providing Weep Holes
28.10 KSRRB M2200-8. Providing weep holes in Brick masonry / Plain / Nos /mtr 122.00
Reinforced concrete abutment, wing wall / return wall with 100 mm dia
AC pipe, extending through the full width of the structure with slope of
1V :20H towards drawing force. Complete as per drawing and Technical
Specifications including cost of materials, labour, HOM complete as
per specifications. MORTH Specification No.2706 & 2200
28.11 KSRRB M2200-8.1. Back filling behind abutment, wing wall and return cum 581.00
wall complete as per drawing and Technical Specification including cost
of materials, labour, HOM of machineries, complete as per specifications.
A. Granular material MORTH Specification No. 2204 & 304
KSRRB M2200- Filter Media
28.13 KSRRB M2200-9. Providing and laying of Filter media with granular cum 1,742.00
materials /stone crushed aggregates satisfying the requirements laid
down in clause 2504.2.2. of MORTH specifications to a thickness of
not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and provided over the entire surface behind abutment,
wing wall and return wall to the full height compacted to a firm condition
complete as per drawing and Technical Specification including cost of
materials, labour, HOM complete as per specifications.
MORTH Specification No. 2504.2.2
KSRRB M2200- Bearings
28.14 KSRRB M2200-10. Supplying, fitting and fixing in position true to line and Each 299.00
level cast steel rocker bearing conforming to IRC: 83 (Pt.-1) section Tonne
IX and clause 2000.3 of MORTH specifications complete including all bearing
accessories as per drawing and Technical Specifications including cost capacity
of materials, labour, HOM complete as per specifications.
MORTH Specification No.1000, 2000 & 2200

228
Sl. No. Description Unit Rate
Rs. Ps.

28.15 KSRRB M2200-11. Supplying, fitting and fixing in position true to line and Each 16.00
level forged steel roller bearing conforming to IRC: 83(Pt.-1) section Tonne
IX and clause 2000.3 of MORTH specifications complete including all bearing
accessories as per drawing and Technical Specifications including cost capacity
of materials, labour, HOM complete as per specifications.
MORTH Specification No.1000, 2000 & 2200
28.16 KSRRB M2200-12. Supplying, fitting and fixing in position true to line Tonne 935.00
and level sliding plate bearing with PTFE surface sliding on stainless
steel complete including all accessories as per drawing and Technical
Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause
2000.4 of MORTH Specifications including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No.2000 & 2200
28.17 KSRRB M2200-13. Supplying, fitting and fixing in position true to line C.C. 0.50
and level elastomeric bearing conforming to IRC: 83 (Part-II) section
IX and clause 2000.5 of MORTH specifications complete including all
accessories as per drawing and Technical Specifications including cost
of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2000 & 2200
28.18 KSRRB M2200-14. Supplying, fitting and fixing in position true to line and Tonne 934.00
level sliding plate bearing with stainless steel plate sliding on stainless
steel plate with mild steel matrix complete including all accessories as
per drawing and Technical Specifications including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No.2000 & 2200
28.19 KSRRB M2200-15. Supplying, fitting and fixing in position true to line Tonne 302.00
and level POT-PTFE bearing consisting of a metal piston supported by
a disc or unreinforced elastomer confined within a metal cylinder, sealing
rings, dust seals, PTFE surface sliding against stainless steel mating
surface, complete assembly to be of cast steel/fabricated structural
steel, metal and elastomer elements to be as per IRC: 83 part-I & II
respectively and other parts conforming to BS: 5400, section 9.1 & 9.2
and clause 2000.6 of MORTH Specifications complete as per drawing
and approved Technical Specifications including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No.2000 & 2200

Note : 1. In case of stone masonry, the size of the weep hole shall be
150mm x 80mm or circular with 150mm diameter.
2. For structure in stone masonry, the weep holes shall be deemed
to be included in the item of stone masonry work and shall not
be paid separately.

229
Chapter - 29
BRIDGES - CONCRETE
SUPERSTRUCTURE

230
Sl. No. Description Unit Rate
Rs. Ps.

29.0 BRIDGES - CONCRETE SUPERSTRUCTURE


29.1 KSRRB M2300-1.1. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. A. RCC - with OPC design
mix M20 @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008.
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700, 1800, 2300 & IS 456
29.1.1 Height upto 5 m cum 5,185.00
29.1.2 Height 5 m to 10 m cum 5,394.00
29.1.3 Height 10 m to 15 m cum 5,601.00
29.1.4 Height 15 m to 20 m cum 5,564.00
29.1.5 Height above 20 m cum 5,736.00
For T-Beams & Slabs
29.2 KSRRB M2300-1.2. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification - complete as per specifications. A. RCC with OPC design
mix M20 @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008.
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.2.1 Height upto 5 m cum 5,394.00
29.2.2 Height 5 m to 10 m cum 5,601.00
29.2.3 Height 10 m to 15 m cum 5,810.00
29.2.4 Height 15 m to 20 m cum 6,095.00
29.2.5 Height above 20 m cum 6,312.00
Solid Slab Super Structure
29.5 KSRRB M2300-3.1. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. B. RCC with OPC design
mix M25 @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600, 1700 & 2300 IS 456

231
Sl. No. Description Unit Rate
Rs. Ps.

29.5.1 Height upto 5 m cum 5,348.00


29.5.2 Height 5 m to 10 m cum 5,563.00
29.5.3 Height 10 m to 15 m cum 5,778.00
29.5.4 Height 15 m to 20 m cum 5,746.00
29.5.5 Height above 20 m cum 5,926.00
T - Beams & slabs
29.6 KSRRB M2300-3.2. Furnishing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. B. RCC with OPC design
mix M25 @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
Case - I : Using Concrete Mixer
MORTH Specification No. 1500,1600 & 1700
29.6.1 Height upto 5 m cum 5,563.00
29.6.2 Height 5 m to 10 m cum 5,778.00
29.6.3 Height 10 m to 15 m cum 5,992.00
29.6.4 Height 15 m to 20 m cum 6,285.00
29.6.5 Height above 20 m cum 6,509.00
Solid Slab Super Structure
29.9 KSRRB M2300-5.1. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. C. RCC with OPC cement
design mix M30 @ 340kgs, with 20mm and down size graded granite
metal coarse aggregates @0.69cum and fine aggregates @ 0.46cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.9.1 Height upto 5 m cum 5,478.00
29.9.2 Height 5 m to 10 m cum 5,698.00
29.9.3 Height 10 m to 15 m cum 5,919.00
29.9.4 Height 15 m to 20 m cum 6,206.00
29.9.5 Height above 20 m cum 6,287.00
For T-Beams & Slabs

232
Sl. No. Description Unit Rate
Rs. Ps.

29.10 KSRRB M2300-5.2. Providing and Placing Reinforced / Prestressed


cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. C. RCC with OPC design
mix M30 @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.10.1 Height upto 5 m cum 5,698.00
29.10.2 Height 5 m to 10 m cum 5,919.00
29.10.3 Height 10 m to 15 m cum 6,139.00
29.10.4 Height 15 m to 20 m cum 6,435.00
29.10.5 Height above 20 m cum 6,665.00
Solid Slab Super Structure
29.13 KSRRB M2300-7.1. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. RCC / PSC with OPC
design mix M35 @ 390kgs, with 20mm and down size graded granite
metal coarse aggregates @0.68cum and fine aggregates @ 0.45cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.13.1 Height upto 5 m cum 5,544.00
29.13.2 Height 5 m to 10 m cum 5,770.00
29.13.3 Height 10 m to 15 m cum 5,997.00
29.13.4 Height 15 m to 20 m cum 6,287.00
29.13.5 Height above 20 m cum 6,524.00
For T-Beams & Slabs
29.14 KSRRB M2300-7.2. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. RCC / PSC with OPC
design mix M35 @ 390kgs, with 20mm and down size graded granite
metal coarse aggregates @0.68cum and fine aggregates @ 0.45cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.14.1 Height upto 5 m cum 5,770.00
29.14.2 Height 5 m to 10 m cum 5,997.00

233
Sl. No. Description Unit Rate
Rs. Ps.

29.14.3 Height 10 m to 15 m cum 6,224.00


29.14.4 Height 15 m to 20 m cum 6,524.00
29.14.5 Height above 20 m cum 6,760.00
29.15 KSRRB M2300-7.3. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. RCC / PSC with OPC
design mix M35 @ 390kgs, with 20mm and down size graded granite
metal coarse aggregates @0.68cum and fine aggregates @ 0.45cum,
with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.15.1 Height upto 5 m cum 6,450.00
29.15.2 Height 5 m to 10 m cum 6,904.00
29.15.3 Height 10 m to 15 m cum 7,358.00
29.15.4 Height 15 m to 20 m cum 7,942.00
29.15.5 Height above 20 m cum 8,415.00
29.19 Solid slab super structure
KSRRB M2300-9.1. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. PSC with OPC design
mix M40 @ 420kgs, with 20mm and down size graded granite metal
coarse aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.19.1 Height upto 5 m cum 6,195.00
29.19.2 Height 5 m to 10 m cum 6,255.00
29.19.3 Height 10 m to 15 m cum 6,466.00
29.19.4 Height 15 m to 20 m cum 6,678.00
29.19.5 Height above 20 m cum 6,890.00

234
Sl. No. Description Unit Rate
Rs. Ps.

29.20 KSRRB M2300-9.2. Providing and Placing Reinforced / Prestressed


cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. PSC with OPC design
mix M40 @ 420kgs, with 20mm and down size graded granite metal
coarse aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.20.1 Height upto 5 m cum 5,893.00
29.20.2 Height 5 m to 10 m cum 6,090.00
29.20.3 Height 10 m to 15 m cum 6,288.00
29.20.4 Height 15 m to 20 m cum 6,867.00
29.20.5 Height above 20 m cum 7,113.00
T - Beams & Slabs including launching of precast girder by
launching truss upto 40 m span
29.22 KSRRB M2300-10.2. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. RCC with OPC design
mix M40 @ 420kgs, with 20mm and down size graded granite metal
coarse aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600, 1700, 1800, 2300 & IS 456
29.22.1 Height upto 5 m cum 5,224.00
29.22.2 Height 5 m to 10 m cum 5,425.00
29.22.3 Height 10 m to 15 m cum 5,626.00
29.22.4 Height 15 m to 20 m cum 5,932.00
29.22.5 Height above 20 m cum 6,147.00
Cast insitu Box - Girder, Segmental construction and Balanced
cantilever.
29.23 KSRRB M2300-10.3. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. RCC with OPC design
mix M40 @ 420kgs, with 20mm and down size graded granite metal
coarse aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700

235
Sl. No. Description Unit Rate
Rs. Ps.

29.23.1 Height upto 5 m cum 5,827.00


29.23.2 Height 5 m to 10 m cum 6,230.00
29.23.3 Height 10 m to 15 m cum 6,632.00
29.23.4 Height 15 m to 20 m cum 7,222.00
29.23.5 Height above 20 m cum 7,651.00
29.24 KSRRB M2300-11.1. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. F. PSC with OPC design
mix M40 @ 420kgs, with 20mm and down size graded granite metal
coarse aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.24.1 Height upto 5 m cum 4,942.00
29.24.2 Height 5 m to 10 m cum 5,143.00
29.24.3 Height 10 m to 15 m cum 5,345.00
29.24.4 Height 15 m to 20 m cum 5,545.00
29.24.5 Height above 20 m cum 5,746.00
29.25 KSRRB M2300-11.2. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. PSC with OPC design
mix M45 @ 440kgs, with 20mm and down size graded granite metal
coarse aggregates @0.66cum and fine aggregates @ 0.44 cum, with
superplastisiser @4lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.25.1 Height upto 5 m cum 5,322.00
29.25.2 Height 5 m to 10 m cum 5,528.00
29.25.3 Height 10 m to 15 m cum 5,733.00
29.25.4 Height 15 m to 20 m cum 6,062.00
29.25.5 Height above 20 m cum 6,285.00
29.26 KSRRB M2300-11.3. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. PSC with OPC design
mix M45 @ 440kgs, with 20mm and down size graded granite metal
coarse aggregates @0.66cum and fine aggregates @ 0.44 cum, with

236
Sl. No. Description Unit Rate
Rs. Ps.

superplastisiser @4lts confirming to IS9103-1999 Reaffirmed-2008


including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.26.1 Height upto 5 m cum 5,940.00
29.26.2 Height 5 m to 10 m cum 6,351.00
29.26.3 Height 10 m to 15 m cum 6,763.00
29.26.4 Height 15 m to 20 m cum 7,400.00
29.26.5 Height above 20 m cum 7,845.00
29.27 KSRRB M2300-12. Providing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. PSC with OPC design
mix M50 @ 450kgs, with 20mm and down size graded granite metal
coarse aggregates @0.66cum and fine aggregates @ 0.44 cum, with
superplastisiser @4lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700
29.27.1 Height upto 5 m cum 5,970.00

29.27.2 Height 5 m to 10 m cum 6,387.00

29.27.3 Height 10 m to 15 m cum 6,804.00

29.27.4 Height 15 m to 20 m cum 7,217.00

29.27.5 Height above 20 m cum 7,442.00

29.28 KSRRB M2300-13. Providing and Placing Reinforced/ Prestressed


cement concrete in super-structure as per drawing and Technical
Specification complete as per specifications. PSC with OPC design
mix M55 @ 450kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @4lts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM, curing, form works, scaffolding
and centering complete as per specifications.
MORTH Specification No. 1500,1600 & 1700

29.28.1 Height upto 5 m cum 6,025.00

29.28.2 Height 5 m to 10 m cum 6,446.00

29.28.3 Height 10 m to 15 m cum 6,868.00

29.28.4 Height 15 m to 20 m cum 7,282.00

237
Sl. No. Description Unit Rate
Rs. Ps.

29.28.5 Height above 20 m cum 7,510.00

29.29 KSRRB M2300-14. Providing T.M.T. steel reinforcement for R.C.C. work
including straightening, cutting, bending, hooking, placing in position,
lapping and/or welding wherever required tying with binding wire and
anchoring to the adjoining members wherever necessary complete as
per design (laps, hooks and wastage shall not be measured and paid)
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 1600 & 2200

29.29.2 -do- TMT Bars Fe 500 Tonne 57,077.00

29.29.3 -do- TMT Bars Fe 550 Tonne 57,450.00

29.30 KSRRB M2300 - High tensile wires

KSRRB M2300-15. High tensile steel wires / strands including all Tonne 1,41,883.00
accessories for stressing, stressing operations and grouting complete as
per drawing and Technical Specifications complete as per specifications
MORTH Specification No. 1800

238
Chapter - 30
BRIDGES-RIVER TRAINING WORKS
AND PROTECTION WORKS

239
Sl. No. Description Unit Rate
Rs. Ps.

30.0 BRIDGES - RIVER TRAINING WORKS AND PROTECTION WORKS


30.1 KSRRB M2500-1.1. Providing and laying boulders apron on river bed cum 1,205.00
for protection against scour with stone boulders weighing not less
than 40 kg each complete as per drawing and Technical specification
including cost of materials, labour, HOM complete as per specifications.
A. Boulder Laid Dry Without Wire Crates
MORTH Specification No. 2503
30.2 “KSRRB M2500-1.2. Providing and laying of boulder apron laid in wire cum 1,795.00
crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in
100mm x 100mm mesh (weaved diagonally) including 10% extra for laps
and joints laid with stone boulders weighing not less than 40 kg each
including cost of materials, labour, HOM complete as per specifications.
B. Boulder Apron Laid in Wire Crates”
MORTH Specification No. 2503
30.3 KSRRB M2500-2. Providing and laying of apron with cement concrete cum 4,516.00
blocks of size 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15
grade cement concrete with a minimum cement content of 240 kg / cum
including cost of materials, labour, HOM complete as per specifications as
per IRC: 21-2000 complete as per specifications
MORTH Specification No. 2503
30.4 KSRRB M2500-3. Providing and laying Filter material underneath pitching cum 1,951.00
in slopes complete as per drawing and Technical specification including
cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2504
30.5 KSRRB M2500-4.1. Providing and laying Pitching stones of size cum 1,344.00
0.3x0.3x0.3 on slopes laid over prepared filter media including boulder
apron laid dry in front of toe of embankment complete as per drawing and
Technical specifications including cost of materials, labour, HOM complete
as per specifications. A. Stone / Boulder
MORTH Specification No. 2504
30.6 KSRRB M2500-4.2. -do- B. Cement Concrete Blocks of size 0.3x0.3 x0.3 cum 4,516.00
m cast in cement concrete of mix 1:2:4
MORTH Specification No. 2504
30.7 KSRRB M2500-5.1. Providing and laying Flooring with Rubble stone in cum 3,771.00
cm 1:3 over a bed of 100mm thick CC bed of 1:2:4 mix proportion including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No. 2505
30.8 “KSRRB M2500-5.2. Providing and laying Flooring with cement concrete cum 5,022.00
blocks made out of proportion 1:2:4 over a bed of 100mm thick CC bed of
1:2:4 mix proportion including cost of materials, labour, HOM complete as
per specifications.
MORTH Specification No. 2505

240
Sl. No. Description Unit Rate
Rs. Ps.

30.10 “KSRRB M2500-7. Supplying and laying of mechanically bonded poly cum 98.00
propylene non woven geotextile as filter media below mattress as per
MORTH 700 Type-I geotextile. The width of geotextile roll shall not be less
than 4.5m, at easily accessible location including top and bottom, with all
leads and lifts, labour, materials and machinery etc. complete and as directed
by Engineer-in-charge of the works, complete as per specifications.
MORTH Specification No. 700 & 2504

KSRRB M2500- Gabian Structure


30.15 KSRRB M2500.12. Providing and construction of a gabian structure for cum 2,550.00
retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m
each divided into 1.5 m compartments by cross netting, made from 4 mm
galvanised steel wire at 32 kg per 10 sqm having minimum tensile strength
of 300 Mpa conforming to IS:280 and galvanizing coating conforming to
IS:4826, woven into mesh with double twist, mesh size not exceeding 100
x 100 mm, filled with boulders with least dimension of 200 mm, all loose
ends to be tied with 4 mm galvanised steel wire including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No. 2503.3

30.16 KSRRB M2500-13 Gabian Structure for Erosion Control, River Training cum 4,378.00
Works and Protection works Providing and constructing gabian structures for
erosion control, river training works and protection works with wire crates of
size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting,
made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum
tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating
conforming to IS:4826, woven into mesh with double twist, mesh size not
exceeding 100 mm x 100 mm, filled with boulders with least dimension of
200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2503.3

241
Chapter - 31
EXPANSION JOINTS

242
Sl. No. Description Unit Rate
Rs. Ps.

31.0 EXPANSION JOINTS


31.1 KSRRB M2600-1. Providing and laying a burried expansion joint, expansion m 995.00
gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanised
weldable structural steel plate as per IS: 2062, placed symmetrical to centre
line of the joint, resting freely over the top surface of the deck concrete,
welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c
along the centre line of the plate, including cost of materials, labour, HOM
complete as per specifications, all as specified in clause 2600.4
MORTH Specification No. 2604
31.2 KSRRB M2600-2. (i) Providing & fixing 250 mm wide, 2 mm thick corrugated m 2,070.00
copper plate in expansion joint complete as per drawing & Technical
Specification including cost of materials, labour, HOM complete as per
specifications. MORTH Specification No. 2605
31.3 KSRRB M2600-3. (ii) Providing & fixing 250 mm wide, 20 mm thick m 99.00
compressible fibre board in expansion joint complete as per drawing &
Technical Specification including cost of materials, labour, HOM complete
as per specifications.
MORTH Specification No. 2605
31.4 KSRRB M2600-4. (iii)Providing and fixing in position 300 mm wide, 20 m 129.00
mm thick premoulded joint filler in expansion joint for fixed ends of simply
supported spans not exceeding 10 m to cater for a horizontal movement
upto 20 mm, covered with sealant complete as per drawing & Technical
Specification
MORTH Specification No. 2605
31.5 KSRRB M2600-5.(iv) Providing and filling joint sealing compound upto a m 27.00
depth of 100mm as per drawings and technical specifications with coarse
sand and 6 per cent bitumen by weight complete as per specifications
MORTH Specification No. 2605
31.6 KSRRB M2600-6. Providing and laying of asphaltic plug joint to provide m 899.00
for horizontal movement of 25 mm and vertical movement of 2 mm, depth
of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750
mm (in traffic direction), covered with a closure plate of 200mm x 6mm of
weldable structural steel conforming to IS: 2062, asphaltic plug to consist of
polymer modified bitumen binder, carefully selected single size aggregate
of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all
as per approved drawings and specifications, including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No. 2600
31.7 KSRRB M2600-7. Providing and laying of an elastomeric slab steel m 11,625.00
expansion joint, catering to right or skew (less than 20 deg., moderately
curved with maximum horizontal movement upto 50 mm, complete as
per approved drawings and standard specifications to be installed by the
manufacturer/supplier or their authorised representative ensuring compliance
to the manufacturer’s instructions for installation and clause 2600.6 of
MORTH specifications for road & bridge works including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No. 2606

243
Sl. No. Description Unit Rate
Rs. Ps.

31.8 KSRRB M2600-8. Providing and laying of compression seal joint consisting m 13,850.00
of steel armoured nosing at two edges of the joint gap suitably anchored
to the deck concrete and a preformed chloroprene elastomer or closed
cell foam joint sealer compressed and fixed into the joint gap with special
adhesive binder to cater for a horizontal movement upto 40 mm and vertical
movement of 3 mm including cost of materials, labour, HOM complete as
per specifications.
MORTH Specification No. 2600
31.9 KSRRB M2600-9. Providing and laying of a strip seal expansion joint catering m 11,615.00
to maximum horizontal movement upto 70 mm, complete as per approved
drawings and standard specifications to be installed by the manufacturer/
supplier or their authorised representative ensuring compliance to the
manufacturer’s instructions for installation including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No. 2607
31.10 KSRRB M2600-10. Providing and laying of a modular strip Box seal m 5,195.00
expansion joint including anchorage catering to a horizontal movement
beyond 70 mm and upto 140mm, complete as per approved drawings
and standard specifications to be installed by the manufacturer/supplier or
their authorised representative ensuring compliance to the manufacturer’s
instructions for installation including cost of materials, labour, HOM complete
as per specifications.
MORTH Specification No. 2600
31.11 KSRRB M2600-11 Providing and laying of a modular strip box seal expansion m 6,355.00
joint catering to a horizontal movement beyond 140mm and upto 210mm,
complete as per approved drawings and standard specifications to be
installed by the manufacturer/supplier or their authorised representative
ensuring compliance to the manufacturer’s instructions for installation.
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2600

Note :
1. Guidelines laid down vide the MORTH may be referred for expansion
joints.
2. The nominal size of aggregates shall be 12.5 mm for depth of joint upto
75mm and 20mm for joints of depth more than 75mm.
3. The installation shall be done by the manufacturer or his authorised
represesntative to the satisfaction of the Engineer.
4. The concreting for joining the expansion joint asssembly with the deck
has not been included in this analysis as the same is catered in the
quantities of RCC deck.
5. The anchoring bars of the expansion joint assembly shall be welded
to the main reinforcement of the deck.

244
Chapter - 32
BRIDGES - WEARING COAT &
APPURTENANCEs

245
Sl. No. Description Unit Rate
Rs. Ps.

32.0 BRIDGES - WEARING COAT & APPURTENANCES


32.1 KSRRB M2700-1. Providing and laying 12 mm thick mastic asphalt Sqm 250.00
wearing course on top of deck slab excluding prime coat with paving grade
bitumen meeting the requirements given in table 500-29, prepared by using
mastic cooker and laid to required level and slope after cleaning the surface,
including providing antiskid surface with bitumen precoated fine grained hard
stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm
and at an approximate spacing of 10 cm center to center in both directions,
pressed into surface when the temperature of surfaces not less than 100
deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per
clause 5100.5 complete as per specifications.
MORTH Specification No. 515 & 2702
32.2 KSRRB M2700-2. Construction of precast RCC railing of M-30 Grade, m 1,470.00
aggregate size not exceeding 12 mm, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, centre to centre spacing between
vertical post not to exceed 2000 mm, leaving adequate space between
vertical post for expansion, complete as per approved drawings and technical
specifications including cost of materials, labour, HOM complete as per
specifications.
MORTH Specification No. 2703,1500,1600 & 1700
32.3 KSRRB M2700-3. Construction of RCC railing of M30 Grade in-situ with 20 m 1,443.00
mm nominal size aggregate, true to line and grade, tolerance of vertical RCC
post not to exceed 1 in 500, centre to centre spacing between vertical post
not to exceed 2000 mm, leaving adequate space between vertical post for
expansion, complete as per approved drawings and technical specifications
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2703,1500,1600 & 1700
32.4 KSRRB M2700-4. Providing, fitting and fixing mild steel railing using ISMC m 2,198.00
@ 29.46 kg/m, MS flats @ 10.12 kg/m and MS bars @ 1.80 kg/m as per
drawing and Technical Specification including bolts and nuts etc., including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No. 2703.2, 1900
32.5 KSRRB M2700-5. Drainage Spouts using 100mm class ‘B’ GI pipe as per No 1,293.00
drawing and Technical specification including clamps and nuts etc., including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No. 2705
32.6 KSRRB M2700-6. PCC M15 Grade leveling course below approach cum 4,518.00
slab complete as per drawing and Technical specification complete as per
specifications MORTH Specification No. 2700
32.7 KSRRB M2700-7. Reinforced cement concrete M30 approach slab cum 8,224.00
including reinforcement @ 70 kg/cum and formwork complete as per drawing
and Technical specification including cost of materials, labour, HOM complete
as per specifications.
MORTH Specification No.1500, 1600, 1700 & 2704
32.8 KSRRB M2300-16. Providing and laying Cement concrete wearing coat cum 8,501.00
with OPC cement design mix M30 @ 360 kgs, with 20mm and down size

246
Sl. No. Description Unit Rate
Rs. Ps.

graded granite metal coarse aggregates @0.69cum and fine aggregtes@


0.46cum, and reinforcement at 75 kg/cum with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed-2008 including cost of reinforcement
complete as per drawing and Technical Specifications including cost of
materials, labour, HOM complete as per specifications. MORTH Specification
No. 2702
32.9 KSRRB M2700-9. Providing, precasting, cement concrete with 470kg of cum 19,090.00
cement, 0.90cum of coarse aggregates and 0.45 cum of fine aggregates
including steel high tension strands and admixtures, transportation and
placing in position precast pretensioned concrete girders as per drawing
and technical specifications including the cost high tensiled strands including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No.1800 & 2300
32.10 KSRRB M2700-10. Providing and fixing Helical pipes in voided concrete m 333.00
slabs including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 1700 & 1800
32.11 KSRRB M2700-12. Providing and applying 2 coats of water based cement Sqm 55.00
paint to unplastered concrete surface after cleaning the surface of dirt, dust,
oil, grease, efflorescence and applying paint at of 1 litre for 2 sqm including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No. 800
32.13 Providing and laying 3mm thick asphalt seal pad made of actatic Sqm 338.00
polypropylene polymer (app) modified bituminous pad reinforced with
non woven polyester mat of high bear strength as a carrier (confirming to
ASTM - D6222 (S) Specification) on concrete bridge deck slab including
cost of materials, labour, HOM complete as per specifications.

Note : For KSRRB 2700-1


1. The rates for 6mm or any other thickness may be worked out on pro-rata basis
2. The quantity of bitumen works out 17% of the mastic asphalt blocks
without aggregates and falls within the standards laid down by MORTH
specifications.
Note : For KSRRB 2700-2 & KSRRB 2700-3
3. Quantities of material have been adopted from standard plans of
MORTH vide drawing No. SD/202.
Note : For KSRRB 2700-5
4. In case of viaducts in urban areas, the drainage spouts should be
connected with suitably located pipelines to discharge the surface
run-off to drains provided at ground level.
5. In case of bridges, sufficient length of G.I. Pipe shall be provided to
ensure that there is no splashing of water from the drainage spout on
the structure.

247
Chapter - 33
BRIDGES - REPAIR AND
REHABILITATION

248
Sl. No. Description Unit Rate
Rs. Ps.

33.0 BRIDGES - REPAIR AND REHABILITATION

33.1 KSRRB M2800-1. Removal of existing cement concrete wearing coat Sqm 82.00
including its disposal complete as per Technical Specification without causing
any detrimental effect to any part of the bridge structure and removal of
dismantled material with all lifts and lead including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No.2809
33.2 KSRRB M2800-2. Removal of existing asphaltic wearing coat comprising Sqm 59.00
of 50 mm thick asphaltic concert laid over 12 mm thick mastic asphalt
including disposal with all lift and lead including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No. 2809
33.3 KSRRB M2800-3. Guniting concrete surface with cement mortar applied Sqm 463.00
with compressor after cleaning surface and spraying with epoxy including
cost of materials, labour, HOM complete as per specifications, complete as
per Technical Specification.
MORTH Specification No.2807
33.4 KSRRB M2800-4. Providing and inserting nipples with approved fixing No 113.00
compound after drilling holes for grouting as per Technical Specifications
including subsequent cutting/removal and sealing of the hole as necessary
of nipples after completion of grouting with Cement / Epoxy including cost
of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2800
33.5 “KSRRB M2800-5.1. Sealing of cracks / porous concrete by injection Kgs 208.00
process through nipples/Grouting complete as per Technical Specification
including cost of materials, labour, HOM complete as per specifications.
A. Cement Grout”
MORTH Specification No. 2806
33.6 “KSRRB M2800-5.2. Sealing of cracks / porous concrete by injection Kgs 205.00
process through nipples/Grouting complete as per Technical Specification,
including cost of materials, labour, HOM complete as per specifications.
B. Cement Mortar (1:1) Grouting”
MORTH Specification No. 2806
33.7 KSRRB M2800-6. Patching of damaged concrete surface with polymer Sqm 563.00
concrete and curing compounds, initiator and promoter, available in present
formulations, to be applied as per instructions of manufacturer and as
approved by the Engineer including cost of materials, labour, HOM complete
as per specifications.
MORTH Specification No. 2800
33.8 KSRRB M2800-7. Sealing of crack / porous concrete with Epoxy Grout Kgs 330.00
by injection through nipples complete as per clause 2800.3.1 including cost
of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2803

249
Sl. No. Description Unit Rate
Rs. Ps.

33.9 KSRRB M2800-8. Applying epoxy mortar over leached, honey combed Sqm 371.00
and spalled concrete surface and exposed steel reinforcement complete
as per Technical Specification, including cost of materials, labour, HOM
complete as per specifications.
MORTH Specification No. 2804

33.10 KSRRB M2800-9. Removal of defective concrete, cleaning the surface Sqm 221.00
thoroughly, applying the shotcrete mixture mechanically with compressed air
under pressure, comprising of cement, sand, coarse aggregates, water and
quick setting compound in the proportion as per clause 2800.7.1. sand and
coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively,
water cement ratio ranging from 0.35 to 0.50, density of gunite not less than
2000 kg/cum, strength not less than 25 Mpa and workmanship conforming
to clause 2800.7.6 including cost of materials, labour, HOM complete as
per specifications.
MORTH Specification No. 2807

33.11 KSRRB M2800-10. Applying pre-packed cement based polymer mortar Sqm 325.00
of strength 45 Mpa at 28 days for replacement of spalled concrete including
cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2800

33.12 KSRRBM 2800-11. Epoxy bonding of new concrete to old concrete Sqm 477.00
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2805

33.13 KSRRB M2800-12.1. Providing external prestressing with high tensile Tonne 3,28,663.00
steel wires / strands for taking output of 1 MT, including drilling for passage
of prestessing steel, all accessories for stressing and stressing operation
and grouting complete as per drawing and Technical Specification including
cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 1800 & 2300

33.14 KSRRB M2800-12.2. Providing external prestressing with high tensile Tonne 2,39,477.00
steel wires /strands for taking output of 3.10 MT, including drilling for passage
of prestessing steel, all accessories for stressing and stressing operation
and grouting complete as per drawing and Technical Specification including
cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 1800 & 2300

33.15 KSRRB M2800-12.3. Providing external prestressing with high tensile Tonne 2,14,458.00
steel wires / strands for taking output of 9.28 MT, including drilling for passage
of prestessing steel, all accessories for stressing and stressing operation
and grouting complete as per drawing and Technical Specification including
cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 1800 & 2300

250
Sl. No. Description Unit Rate
Rs. Ps.

33.16 KSRRB M2800-13. Replacement of Bearings complete as per Technical


Specification including cost of materials, labour, HOM complete as per
specifications.
MORTH Specification No. 2810

33.16.1 Bearing Rocker & Roller including cost of materials, labour, HOM complete Nos 11,660.00
as per specifications.

33.16.2 Bearing Neoprene including cost of materials, labour, HOM complete as No 8,980.00
per specifications.

33.18 KSRRB M2800-15. Replacement of Corrugated Copper Plate in m 1,762.00


Expansion Joints and finished with wearing coat complete as per drawings
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2605, 2300

33.19 KSRRB M2800-16. Replacement of Damaged Concrete Railing including m 249.00


cost of materials, labour, HOM complete as per specifications.

33.20 KSRRB M2800-17. Replacement of Crash Barrier including cost of m 481.00


materials, labour, HOM complete as per specifications.

33.21 KSRRB M2800-18. Replacement of Damaged Mild Steel Railing including m 203.00
cost of materials, labour, HOM complete as per specifications.

33.22 KSRRB M2800-19. Repair of Crash Barrier. Repair of concrete crash m 184.00
barrier with cement concrete of M-30 grade by cutting and trimming the
damaged portion to a regular shape, cleaning the area to be repaired
thoroughly, applying cement concert after erection of proper form work
including cost of materials, labour, HOM complete as per specifications.

33.23 KSRRB M2800-20. Repair of RCC Railing Carrying out repair of RCC M-30 m 129.00
railing to bring it to the original shape including cost of materials, labour,
HOM complete as per specifications.

33.24 KSRRB M2800-21. Repair of Steel Railing to bring it to the original shape m 191.00
including cost of materials, labour, HOM complete as per specifications.

251
Chapter - 34
PIPE CULVERTS

252
Sl. No. Description Unit Rate
Rs. Ps.

34.0 PIPE CULVERTS


KSRRB M2900- PCC M10 in Foundation
34.1 KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone cum 3,521.00
aggregate 40mm nominal size mechanically mixed, placed in foundation
and compacted by vibration including curing including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No. 408
34.2 KSRRB M2900-2.1. Laying Reinforced cement concrete pipe NP4 /
prestressed concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar 1:2
but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets, curing including cost of
materials, labour, HOM complete as per specifications.
MORTH Specification No. 2900 & IS 458 - 2003
34.2 KSRRB M2900-2.1. -do- A. 1000 mm dia m 7,540.00
34.3 KSRRB M2900-2.2. -do- B. 1200 mm dia m 8,454.00
34.4 KSRRB M2900-3.1. Laying Reinforced cement concrete pipe NP4 /
prestressed concrete pipe for culverts on first class bedding of granular
material in double row including fixing collar with cement mortar 1:2
but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets curing, including cost of
materials, labour, HOM complete as per specifications.
MORTH Specification No. 2900 & IS 458 - 2003
34.4 KSRRB M2900-3.1. -do- A. 1000 mm dia m 15,134.00
34.5 KSRRB M2900-3.2. -do- B. 1200 mm dia m 16,966.00
34.6 Providing and laying reinforced cement concrete pipe NP3 for
culverts including pointing ends, and fixing collars with cement mortar
1:2 including cost of all materials, labour, curing, including cost of
materials, labour, HOM complete as per specifications.
Specifications. No. KSRB 1000, 2300
MOST Specification No.1000 / 2300
34.6.1 300mm. dia m 1,278.00
34.6.2 450mm. dia m 2,152.00
34.6.3 600mm. dia m 2,659.00
34.6.4 750mm. dia m 2,890.00
34.6.5 900mm. dia m 4,585.00
34.6.6 1200mm. dia m 7,023.00

253
Sl. No. Description Unit Rate
Rs. Ps.

34.7 Providing and laying reinforced cement concrete pipe NP2 for
culverts including pointing ends, and fixing collars with cement mortar 1:2
including cost of materials, labour, HOM complete as per specifications,
curing complete as per specifications.
Specifications. No. KSRB 1000, 2300
MOST Specification No.1000 / 2300
34.7.1 150mm dia m 325.00
34.7.2 250mm dia m 440.00
34.7.3 300mm dia m 880.00
34.7.4 450mm dia m 1,199.00
34.7.5 600mm dia m 1,799.00
34.7.6 750mm dia m 2,225.00
34.7.7 900mm dia m 2,819.00
34.7.8 1200mm dia m 4,698.00
34.8 Providing and constructing granite / trap / basalt size stone masonry in
foundation with cement mortar & stone hammerd dressed in courses not
less than 20 cms high, bond stones at 2m. apart in each course including
cost of materials, labour, HOM, curing complete as per specifications.
KBS 5.1.13
34.8.1 - do - cement mortar 1:8 cum 3,745.00
34.8.2 - do - cement mortar 1:6 cum 3,830.00
34.9 Providing and constructing granite / trap / basalt size stone masonry in cum 4,569.00
basement with cement mortar 1:6, edges of stones chistle dressed in
courses not less than 15 cms high, bond stones at two m. apart in each
course including cost of materials, labour, HOM, scaffolding, curing
complete as per specifications. KBS 5.1.13
34.10 Providing and constructing granite / trap / basalt size stone masonry in
superstructure with cement mortar & edges of stones chistle dressed
in courses not less than 15 cms high, bond stones at two m. apart in
each course including cost of materials, labour, HOM, scaffolding, curing
complete as per specifications. KBS 5.1.13
34.10.1 - do - with cement mortar 1:6 cum 4,820.00
34.10.2 - do - with cement mortar 1:4 cum 4,836.00
34.11 Providing and laying in position plain cement concrete of mix 1:2:4 with cum 4,402.00
cement @ 240kgs, with 20mm and down size graded granite metal
coarse aggregates @ 0.69 cum and fine aggregtes @ 0.459cum,
machine mixed, concrete laid in layers not exceeding 15 cms. thick,
well compacted, for coping. Including cost of all materials, labour, HOM,
curing complete as per specifications.
Specification No. KBS 4.1, 4.2
254
Sl. No. Description Unit Rate
Rs. Ps.

34.12 Providing flush pointing to square rubble, course or uncoursed stone


masonry with cement mortar, 20mm deep, after raking joints to depth
of 20mm nicely lining, including cost of materials, labour, HOM curing
complete as per specifications.

34.12.1 – do – cement mortar 1:4 Sqm 117.00

34.12.2 – do – cement mortar 1:3 Sqm 116.00

34.13 Providing ruled pointing to coursed stone masonry with cement mortar,
20mm deep, after raking joints to depth of 20mm nicely lining, including
cost of materials, labour, HOM curing complete as per specifications.

34.13.1 – do – cement mortar 1:4 Sqm 116.00

34.13.2 – do – cement mortar 1:3 Sqm 118.00

34.14 Providing and constucting pithcing / Revetment of 30 cm thick on slopes Sqm 372.00
using granite/basalt/trap/stones of surface area not less than 0.04 sqm
and wedged with spalls including cost of all materials, labour, HOM etc.,
complete as per specification.

34.15 Earth work in excavation for foundation of structures like culverts,


retaining walls etc., as per drawing and technical specification, including
setting out, construction of shoring and bracing, dressing of sides and
bottom, back filling with approved material, disposal of balance earth as
per specifications, including cost of labour, HOM etc., complete.

34.15.1 -do- in all kinds of soil by manual means. cum 150.00

34.15.2 -do- in all kinds of soil by mechanical means. cum 37.00

34.15.3 -do- in ordinary rock/ soft rock by manual means. cum 214.00

34.15.4 -do- in ordinary rock/ soft rock by mechanical means. cum 45.00

34.15.5 -do- in hard rock with blasting. cum 450.00

34.15.6 -do- in hard rock without blasting. cum 361.00

34.16 Providing and laying in position plain cement concrete of mix 1:2:4 for cum 3,874.00
sub-structure works like Culverts, retaining walls etc., with cement @
240 kgs, 40 mm & down size graded granite metal coarse aggregate
@ 0.84 cum and fine aggregates @ 0.46 cum machine mixed, with
necessary scaffolding,form work etc., including cost of labour, HOM
curing etc., complete.

255
34.17 Providing and laying in position plain/Reinforced cement cement concrete cum 4,148.00
M20 for sub-structure/Superstructure works, with cement @ 320 kgs, 20
mm & down size graded granite metal coarse aggregate @ 0.69 cum and
fine aggregates @ 0.46 cum machine mixed with super plasticisers @ 3
lts confirming to IS 9103-2008,concrete laid in layers, well compacted and
providing weep holes wherever necessary. with necessary scaffolding,
form work etc., including cost of labour, HOM curing etc., complete.

Note :

1. In case of cement cradle bedding, quantity of PCC M-15 is to be


calculated as per design and priced separately and added.

2. The rate analysis does not include excavation / cement/ masonry


works in head walls, backfilling, protection works and parapet walls.
The same are to be calculated as per approved design and drawings
and priced separately on rates available under respective chapters.

256
Chapter - 35
MAINTENANCE OF ROADS

257
Sl. No. Description Unit Rate
Rs. Ps.

35.0 MAINTENANCE OF ROADS


35.1 KSRRB M3000-1. Restoration of rain cuts with soil, moorum, gravel or m 102.00
a mixture of these, clearing the loose soil, benching for 300 mm width,
laying fresh material in layers not exceeding 250 mm and compacting
with plate compactor or power rammers to restore the original alignment,
levels and slopes including cost of materials, labour, HOM complete as
per specifications. MORTH Specification No. 3002
35.2 KSRRB M3000-2. Making up loss of material / irregularities on shoulder Sqm 23.00
to a minimum depth of 150mm to the design level by adding fresh
approved soil and compacting it with appropriate equipment including
cost of materials, labour, HOM complete as per specifications.
MORTH Specification No.3003
35.3 KSRRB M3000-3. Stripping excess soil from the shoulder surface to a Sqm 12.00
minimum depth of 150mm to achieve the approved level and compacting
with plate compactor including cost of materials, labour, HOM complete
as per specifications. MORTH Specification No. 3003
35.4 KSRRB 3000 Filling Pot-holes and Patch Repairs with Open-Graded
Premix Surfacing, 20 mm
KSRRB M3000-4. Removal of all failed material, trimming of completed Sqm 150.00
excavation to provide firm vertical faces, cleaning of surface, applying
tack coat on the sides and base of excavation at 0.40 kgs/sqm as per
clause 500.3, and filling the pot holes with open graded pre-mix material
as per clause 500.11, & sealing the surface with Type-B seal coat as per
clause 513 compacting the surface to form a smooth continuous surface,
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 3004.2
35.5 KSRRB 3000 Filling Pot-holes and Patch Repairs with Bituminous
Concrete, 40 mm
KSRRB M3000-5. Removal of all failed material, trimming of completed Sqm 265.00
excavation to provide firm vertical faces, cleaning of surface, applying
tack coat on the sides and base of excavation at 2.5kg/10sqm as per
clause 500.3, filling back the pot holes with hot bituminous material as
per clause 500.4, compacting, trimming and finishing the surface to
form a smooth continuous surface, all as per clause 3004.2 including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No. 3004.2
35.6 KSRRB M3000-6. Filling of crack using slow - curing bitumen emulsion m 3.00
and applying crusher dust in case crack are wider than 3mm including
cost of materials, labour, HOM complete as per specifications. MORTH
Specification No. 3004.3.3

258
Sl. No. Description Unit Rate
Rs. Ps.

35.7 KSRRB M3000-7. Applying crusher dust to areas of road where bleeding m 2.00
of excess bitumen has occurred including cost of materials, labour, HOM
complete as per specifications.
MORTH Specification No. 3004.4

35.8 KSRRB 3000 Repair of Joint Grooves with Epoxy Mortar

KSRRB M3000-8. Repair of spalled joint grooves of contraction joints, m 276.00


longitudinal joints and expansion joints in concrete pavements using
epoxy mortar or epoxy concrete including cost of materials, labour, HOM
complete as per specifications.
MORTH Specification No. 3005.1

35.9 KSRRB M3000-9. Removal of existing sealant and re sealing of m 35.00


contraction, longitudinal or expansion joints in concrete pavement with
fresh sealant material including cost of materials, labour, HOM complete
as per specifications.
MORTH Specification No. 3005.2

35.10 KSRRB M3000-10. Removal of earth from the choked hill side drain m 45.00
and disposing it on the valley side manually including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No. 3000

35.11 KSRRBM 3000-11. Clearance of land slides in soil and ordinary rock cum 10.00
by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the
valley side including cost of materials, labour, HOM complete as per
specifications. MORTH Specification No. 3000

35.12 KSRRB M3000-12. Clearing of land slide in hard rock requiring blasting cum 45.00
for 50% of the boulders and disposal of the same on the valley side
including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No. 3000

35.13 Patching of deep potholes by restoring the granular base course using
material confirming to WBM garde -III standards /WMM wherver necessary
by manual means including trimming the pothole to the required shape and
size, cleaning the pothole applying tack coat at 4 kg/10sqm over the WBM/
WMM surface including cleaning etc, and covering the surface with premixed
mix seal TYPE-A 20mm thick including lead, loading unloading, rolling and
finishing etc., including cost of materials, labour, HOM complete as per
specifications. Complete as per standard specification.

35.13.1 - do - upto 75 mm thick Sqm 265.00

35.13.2 - do - upto 150 mm thick Sqm 343.00

259
Sl. No. Description Unit Rate
Rs. Ps.

35.14 Patching of shallow potholes on asphalt surfaces by using corresponding


standard premixes including removing the failed materials on the road
surface, preparation of potholes to the required standards before patching
them, application of tack coat at 2.5 kg/10 sqm over the asphalt surface
including lead, loading unloading, rolling and finishing etc., including cost
of materials, labour, HOM complete as per specifications. complete as
per standard specification.
35.14.1 - do - using MSS Type - A upto 20 mm thick Sqm 142.00
35.14.4 - do - using BM for base coarse 50mm thick and BC 40mm thick for finishing Sqm 430.00
35.15 Supplying, placing & compacting ready made cold bituminous pothole 50 Kg 280.00
patching mix in accordance with IRC 116-2014 in 50 kg plastic sturdy Bag
bags. The mix shall contain at least 5.6% MC 800 cutback Bitumen &
suitable anti-stripping agent. The mix shall be workable for at least 6
months.

NOTE :
1. The earth stripped from earthen shoulders to be dumped on the
side slopes locally for disposal.
2. The constituents of epoxy mortary/ epoxy concrete will be as per
the instruction and manual of the manufacturer.
3. 35.13.2 & 35.15 Should be operated after obtaining approval from S.E.
4. The ready made cold bituminous pothole patching mix contains
volatile kenosene & sealed bags shall not be stored in closed building
or warehouse and no open flame or smoking permitted near to the
stored mix. The detailed procedure shall be followed as per guidelines
laidout in IRC-116-2014.

260
Chapter - 36
REINFORCED EARTH STRUCTURE

261
Sl. No. Description Unit Rate
Rs. Ps.

36.0 REINFORCED EARTH STRUCTURE


36.1 Assembling, joining and laying of soil reinforcing elements connecting with
precast facia panels, connecting arrangements, necessary anti corrosive
coating, all materials, labour, lead and lift, plants a plants, machinery,
complete as per the direction of the Engineer-in-charge and complying
with Technical specifications clause 3100 of MORTH specifications (with
steel strips)
36.1.1 -do- using steel strips m 196.00
36.1.2 -do- using aluminium strips m 186.00
36.1.3 -do- using polymeric strips m 183.00
36.2 Assembling, Joining and laying of soil reinforcing elements connecting with Sqm 269.00
precast modular blocks, including connecting arrangements, all materials,
labour, lead and lift, plants and machinery complete as per the directions
of engineer incharge of the work. Clause 3100 of MORTH specification.
36.3 Providing and laying in position M35 grade pre cast concrete facia panel with Sqm 1,471.00
architectural finish with a thickness as per approved drawing, but not less
than minimum 140mm thick excluding architectural finishes and including
TMT reinforcement bars as per approved drawing for reinforced earth
wall using OPC which includes providing initial leveling pad as necessary
(minimum 150mm thick and having suitable width) using M15 grade plain
cement concrete, an aesthetic architectural finish, necessary connection
arrangements for soil reinforcement (as shown in the drawing), necessary
coping beam, neoprene sponge joint material between reinforced soil wall
facia and crash barriers, the backfill material and the drainage material shall
be separated using permeable non-woven geotextile, necessary anchor
rods at the toe of wall for laying first pre cast panel including all materials,
labour, lead and lift, plants, machinery, complete as per the direction of the
Engineer-in-charge and copying with Technical specifications clause 3100
of MORTH specifications

NOTE :
1. The specification and construction details to be adopted shall be as
per section 3100 of MORTH specification.
2. Drainage arrangement shall be made as per approved design and
drawings.
3. The quantity of filter media shall be calculated as per approved design
and specifications and shall be priced separately. The rate for same to
be adopted from chapter 15.
4. For compaction of Earthwork, attention is invited to clause 3105.5 of
MORTH specification.

262
Sl. No. Description Unit Rate
Rs. Ps.

5. Length of reinforcing strips will vary with the height of wall and will be
as per approved design and drawings.
6. The earth fill material shall be clean, free draining, granular with high
friction and low cohesion, non-corrosive, coarse grained with not 10
percent of particles passing 75 micron sieve, free of any deleterious
matter, chlorides, salts, acids, alkalie.
7. The cost of reinforced earth retaining wall shall include following :
i) Excavation for foundation including backfilling.
ii) Foundation concrete as per approved design.
iii) Cost of facial pannels and their erection.
iv) Cost of reinforcing elements including theilr fixing and joining with
the facial pannels.
v) Drainage arrangement including filter media as per approved design
and drawings.
8. The compacted earth filling to be retained shall form part of
embankment.

263
Chapter - 37
OTHER ITEMS

264
Sl. No. Description Unit Rate
Rs. Ps.

37.0 OTHER ITEMS


37.1 Providing erecting and removing casurinapole Barricading using poles of
7.50 to 10 cms. Dia and 1.5 height above ground fixed vertically at intervals
of 2.0 to 2.5 mtrs. C/C and Horizontally at 0.50 mtrs, above ground level,
including fixing poles in the ground level for minimum depth of 0.30 mtr and
tied with coir rope firmly including cost and conveyance of all materials,
labour, HOM lead and lift charges and complete as per specifications.
37.1.1 For two tier Barricading m 47.00
37.1.2 For three tier Barricading m 60.00
37.2 Supplying and fixing M.S. Rectangular poles made out of 2 equal angles m 715.00
of 65x65x6 mm welded together and fixed in CC (1:2:4) WITH 2 NOS 16mm
dia M.S. hold fast rods each of length 25 cms. Including cost of all materials
cutting, bending scaffolding wherever necessary, nicely finishing the welded
joints with all lead lifts and as per the directions of the Engineer-in - charge of
the work and including providing 2 coats of approved quality paint over one
coat of shop painting ( excluding cost of earthwork and concrete) including
cost of materials, labour, HOM complete as per specifications.
37.3 Providing chain link fencing 50mm size of 8 guage properly stretched Sqm 595.00
between existing rectangular poles and fixed with suitable bolts & nuts, the
free ends shall be welded to the pole and block pipe at top and bottom as
required including cost of all materials, labour, lead and lifts and as per the
directions of the Engineer-in-charge of work including two coats of approved
quality paint over one coat of shop paint, including cost of materials, labour,
HOM complete as per specifications.
37.4 Providing and fixing M.S. Block pipe of 38mm dia, of heavy guage of 14 m 340.00
including removing the bends, cutting the pipe, and fixing pipe in between the
existing two verticle poles (M.S. rectangular poles) and spot welding the chain
link with M.S. block pipe including cost of all materials wastage in cutting,
and scaffolding wherever necessary with all lead and lift as directed by the
Engineer-in-charge of work etc., complete including two coats of approved
quality paint over one coat of shop paint, including cost of materials, labour,
HOM complete as per specifications.
37.5 Providing barbed GI wire fencing of 12x12 gauge drawn into stone pillars m 26.00
or iron pillars including drawing in holes wherever necessary excluding the
cost of pillars but including the cost of barbed wire and binding wire etc.,
including cost of materials, labour, HOM complete as per specifications.
37.6 Providing corrugated cement asbestos Ridge sheets set in C.M. 1:3 m 346.00
and pointed with C.M. 1:3. including cost of materials, labour, HOM complete
as per specifications.
37.7 Providing Mangalore Ridge tiles set in C.M. 1:2 and pointed with m 172.00
C.M. 1:2. including cost of materials, labour, HOM complete as per
specifications.

265
Sl. No. Description Unit Rate
Rs. Ps.

37.8 Fixing doors, window and ventilators in walls. including cost of materials, No 197.00
labour, HOM complete as per specifications.

37.9 Supplying and fixing new Mangalore tiles on existing reepers including cost Sqm 339.00
of materials, labour, HOM complete as per specifications.

37.10 Removing and fixing old Mangalore ridge tiles including pointing with m 85.00
C.M. 1:3. including cost of materials, labour, HOM complete as per
specifications.

37.11 Repairs to roof with available corrugated zinc sheets/ A.C.sheets with new Sqm 85.00
J bolts, screws and washers etc., on existing reeper and rafters. including
cost of materials, labour, HOM complete as per specifications.

37.12 Repairing door and window frames with available wood to the required size. Sqm 571.00
including cost of materials, labour, HOM complete as per specifications.

37.13 Repairing and fixing shutters (panelled or glazed) to doors, windows, Sqm 571.00
ventilators and cupboards. including cost of materials, labour, HOM complete
as per specifications.

37.14 Fixing old eve board with necessary screws and approved painting two coats. m 21.00
including cost of materials, labour, HOM complete as per specifications.

37.15 Providing and fixing plain rolled glass 3mm thick with T.W beading of 10mm Sqm 509.00
thick. including cost of materials, labour, HOM complete as per specifications.

37.16 Providing and fixing 4mm thick glass panes to steel windows including T.W. Sqm 660.00
beading of 10 mm thick and 2 coats of approved paints. including cost of
materials, labour, HOM complete as per specifications.

37.17 Easing of shutters of door. including cost of materials, labour, HOM complete No 72.00
as per specifications.

37.18 Easing of window shutters. including cost of materials, labour, HOM complete No 70.00
as per specifications.

37.19 Providing and fixing M.S bars to windows and ventilators including cutting Kgs 109.00
making holes in frame work with two coats of approved paints. including
cost of materials, labour, HOM complete as per specifications.

37.20 Labour charges for fixing iron bars to windows including cutting fixing and Kgs 71.00
making holes in the frame work and painting two coats with approved paint
etc., including cost of materials, labour, HOM complete as per specifications.
complete (excluding the cost of iron bars)

37.21 Repairs to cornice or coping or mortar band, 15 cm deep and 8cm projection Sqm 85.00
for damaged portion. including cost of materials, labour, HOM complete as
per specifications.

266
Sl. No. Description Unit Rate
Rs. Ps.

37.22 Removing cuddappa slab flooring and stacking the material with a lead Sqm 40.00
of 50 meters. including cost of materials, labour, HOM complete as per
specifications.

37.23 Removing and resetting Mangalore tiles and replacing broken ones Sqm 20.00
wherever necessary including cost of materials, labour, HOM complete as
per specifications. (excluding cost of new tiles).

37.24 Cleaning glass with chemicals. including cost of materials, labour, HOM Sqm 12.00
complete as per specifications.

37.25 Removing and refixing existing mortar and pestle stone. including cost of Each 214.00
materials, labour, HOM complete as per specifications.

37.26 Removing by chiselling cement joints 50mm to 80mm deep in pipes upto Sqm 40.00
150mm dia. including cost of materials, labour, HOM complete as per
specifications.

37.27 Labour charges for fixing plain, frosted or pin headed glass panels Sqm 299.00
(clear glass area) with teak wood beading. including cost of materials, labour,
HOM complete as per specifications.

37.28 Drilling holes of 2.50 cms dia (roof/chajja/stone). including cost of materials,
labour, HOM complete as per specifications.

37.28.1 -do- in slabs upto 7.50 cms thick No 109.00


37.28.2 -do- in slabs upto 10 cms thick No 130.00
37.29 Providing and fixing mortar and pestle stone with suitable size of pestle stone
including three line dressing for top and two line dressing for the exposed
faces including cost of materials, labour, HOM complete as per specifications.

37.29.1 -do- 50 cms x 50 cms x 60 cms Set 435.00


37.29.2 -do- 40 cms x 40 cms x 40 cms Sqm 349.00
37.30 Providing wall black boards in CM 1:3 with two coats of black paint including Each 650.00
finishing etc., including cost of materials, labour, HOM complete as per
specifications.

37.31 Providing and fixing mortise locks heavy duty to doors. including cost of No 473.00
materials, labour, HOM complete as per specifications.

37.32 Providing and fixing hydraulic door closures-with mounting heavy duty. No 1,180.00
including cost of materials, labour, HOM complete as per specifications.

37.33 Providing and fixing hydraulic door closures-Aluminium body. including cost No 822.00
of materials, labour, HOM complete as per specifications.

37.34 Cleaning of glazed tiles. including cost of materials, labour, HOM complete Sqm 56.00
as per specifications.

267
Sl. No. Description Unit Rate
Rs. Ps.

37.35 Wall bores in Brick masonry upto 45 cm thick. including cost of materials, Each 105.00
labour, HOM complete as per specifications.
37.36 Wall bores in size stone masonry. including cost of materials, labour, HOM
complete as per specifications.
37.36.1 -do- upto 45 cm thick. Each 252.00
37.36.2 -do- upto 60 to 90cm thick. Each 274.00
37.36.3 -do- upto 90 to 120 cm thick. Each 315.00
37.37 Cutting of road surface for pipeline trenches and disposing of the excavated cum 249.00
stuff as directed including barricading, danger lighting etc., in the Macadam
road including cost of materials, labour, HOM complete as per specifications.
37.38 Cutting of road surface for pipeline trenches and disposing of the excavated cum 374.00
stuff as directed including barricading, danger lighting etc., in the Asphalt
surface road including cost of materials, labour, HOM complete as per
specifications.
37.40 Cutting of road surface for pipeline trenches and disposing of the excavated cum 571.00
stuff as directed including barricading, danger lighting etc., in the Cement
concrete road including cost of materials, labour, HOM complete as per
specifications.
37.41 Diversion of water course by providing Coffer dams or bunds or islands
as may be necessary for piers and abutments foundations, bailing out or
pumping water during excavation and until completion etc., including cost
of materials, labour, HOM complete as per specifications.
37.41.1 -do- 1.50 mtrs depth below LWL. cum 246.00
37.41.2 -do- beyond 1.50 mtrs depth upto & including 3m depth. cum 328.00
37.41.3 -do- beyond 3.00 mtrs depth upto & including 4.5m depth. cum 540.00
37.41.4 -do- beyond 4.50 mtrs depth upto & including 6.00m depth. cum 668.00
37.42 Dismantling Mangalore tiles roof and stacking the material within a radius
of 50 meters. including cost of materials, labour, HOM complete as per
specifications.
37.42.1 -do- with reepers Sqm 61.00
37.42.2 -do- without reepers Sqm 40.00
37.42.3 -do- A.C. sheet roofing. Sqm 82.00
37.43 Dismantling CI or AC rain water Pipes with fittings and clamps and stacking Rmt 20.00
the materials with a lead of 50 meters. including cost of materials, labour,
HOM complete as per specifications.
37.44 Dismantling weather proof course and removing and conveying the debris cum 616.00
to a distance upto 200m. including cost of materials, labour, HOM complete
as per specifications.

268
Sl. No. Description Unit Rate
Rs. Ps.

37.45 Dismantling Madras terrace jack arch roof including rafters and stacking Sqm 205.00
the materials with a lead upto 50m and removing the debris to a distance
upto 200m. including cost of materials, labour, HOM complete as per
specifications.
37.46 Dismantling stone slab roofing over wooden reepers or RCC battens Sqm 205.00
(dismantling reepers and battens to be paid for separately) including stacking
of serviceable materials and disposal of unserviceable within 200m lead
(with in average thickness of 10 cms including cost of materials, labour,
HOM complete as per specifications.
37.47 Dismantling burnt brick masonry in clay mortar/lime mortar/cement mortar cum 205.00
and stacking the bricks within a radius of 50m and removing the debris to
a distance upto 200m. including cost of materials, labour, HOM complete
as per specifications.
37.48 Dismantling size stone masonry in clay mortar and stacking the size stone cum 225.00
within a radius of 50m and removing the debris to a distance upto 200m.
including cost of materials, labour, HOM complete as per specifications.
37.49 Dismantling the tile work in floor and roof laid in cement or surki mortar Sqm 40.00
including stacking the materials with in 50 m lead of tiles thickness 10mm
to 25mm. including cost of materials, labour, HOM complete as per
specifications.
37.50 Dismantling plastering and removing the debris with a lead upto 200m. Sqm 30.00
including cost of materials, labour, HOM complete as per specifications.
37.51 Dismantling cement concrete flooring or plain cement concrete work including Sqm 71.00
removing and conveying the debris to distance upto 200m (within average
thickness of 15 cms). including cost of materials, labour, HOM complete as
per specifications.
37.52 Dismantling barbed wire or flexible wirer rope in fencing including making m 5.00
rolls and stacking within 50m lead. including cost of materials, labour, HOM
complete as per specifications.
37.53 Dismantling expanded metal or IRC fabric with weld mesh necessary battens Sqm 20.00
and beading etc., including stacking the serviceable materials within 50 m lead.
including cost of materials, labour, HOM complete as per specifications.
37.54 Providing and fixing 12.5mm to 25 mm expanded metal work of 14 gauge Sqm 1,240.00
with Mathi or Nandi wood patties of 50 mm x 12 mm size, including two coats
approved paint etc., complete. (Including cost of screws). including cost of
materials, labour, HOM complete as per specifications.
37.55 _do_ with weld mesh 75 mm X 25 mm 6G X 10G. Sqm 1,235.00
37.56 Removing and resetting of footpath slab Sqm 164.00
37.57 Removing and resetting of kerb stones m 82.00

269
Sl. No. Description Unit Rate
Rs. Ps.

37.59 Providing and laying plain/reinforced cement concrete for side drains using
M20 nominal mix concrete with OPC at 300 kgs. with 20mm and down size
granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum
machine mixed, well compacted for walls and bottom including centering,
shuttering, cost of materials, HOM of machinery, curing etc., complete
excluding cost of steel as per MORTH specification No. 1500, 1700, 2200.
including cost of materials, labour, HOM complete as per specifications.
37.59.1 -do- Wall & bottom thickness 10cm cum 5,718.00
37.59.2 -do- Wall & bottom thickness 15cm cum 5,558.00
37.60 Providing and fixing RCC name board of size 1.35xk0.60x0.04 mtrs fixed Each 4,583.00
in reinforced cement concrete poles of size 0.10x0.10x2.60mtrs in cement
concrete M 20 proportion using 20mm and down size graded metal machine
mixed with 10mm dia main steel bars and 8mm dia stirups. The board shall
be provided with 12mm thick cement plaster in cement mortar 1:3 on both
the sides. The poles shall be embedded in the ground for a depth of 0.5 mtrs
with cement concrete M 10 proportion. The board shall be fixed as per the
drawing and at the place indicated by the Engineer incharge of the work. The
cost includes excavation, bare cost of all materials, cost of steel, centering,
transportation charges, fixing charges, labour, HOM etc., The work shall be
carried out as per the detailed specifications, drawings and directions of the
Engineer in charge of the work.
37.61 Providing and fixing sign board of size 60x60cm equilateral triangle using Each 2,916.00
M.S sheet 5mm thick with RCC pole of size 0.15x0.15x2.3 mtr made out of
cement concrete M 20 proportion using 20mm and down size graded metal
machine mixed with 10mm dia main steel bars and 8mm dia stirups. The
poles shall be embedded in the ground for a depth of 0.6mtrs with cement
concrete M 10 proportion. The board shall be fixed as per the drawing and at
the place indicated by the Engineer incharge of the work. The cost includes
excavation, bare cost of all materials, cost of steel, centering, transportation
charges, fixing charges labour, HOM etc., The work shall be carried out as
per the detailed specifications, drawings and directions of the Engineer in
charge of the work.
37.62 Providing and constructing informatory name board of size 1.75m x 1.75m Each 5,750.00
with Burnt brick masonry in CM 1:6 with non-modular bricks of standard size
of class designation 50 (table moulded). The foundation shall be provided
with cement concrete M 7.5 for a depth of 10cms and with size stone masonry
with Cement Mortar 1:6 and copping concrete with cement concrete M 10
as indicated in the drawing. The name board shall be provided with 12mm
thick plaster in CM 1:6 on both the sides including rounding of corners. The
name board shall be provided with painting with 2 coats of enamel paint.
The board shall be fixed as per the drawing and at the place indicated by
the Engineering charge of the work. The cost includes excavation, cost
of all materials, centering, transportation charges, fixing charges labour,
HOM etc., The work shall be carried out as per the detailed specifications,
drawings and directions of the Engineer in charge of the work.

270
Sl. No. Description Unit Rate
Rs. Ps.

37.63 Providing two bulb underreemed pile foundation upto maximum 5m depth
including hire charges of machineries digging the pile holes, labour charges
and laying 20mm and down size jelly RCC M 20 keeping the reinforcement
edge cutting etc., including cost of materials, labour, HOM complete as per
specifications.

37.63.1 23cm dia m 757.00

37.63.2 30cm dia m 1,235.00

37.64 Providing and fixing RCC precast fencing pole of size 0.15m x 0.15m x Each 1,458.00
2.0m casted in CC 1:1.5:3 with 20mm downsize aggregate making holes
for drawing barbed wire at 30cm c/c using 10 mm dia vertical 4 TMT steel rods
and 8mm dia stirrups at 15cm c/c fixed 1.5m above ground level using steel
moulding, curing, transportation to work spot including excavation in hard soil
fixing in plain cement concrete 1:2:4 using 20mm downsize aggregate including
aligning to plumb and line providing including cost of all materials, labour, hire
charge of machineries lead, lift loading & unloading etc.,Complete.

37.65 Providing and laying 100mm thick pre-cast U-shaped RCC drains using m
M20 grade Concrete reinforced with steel @ 5 kg per Sqm Precast units
and jointed in CM 1:3 proportion and neatly finished including cost of labour,
materials, HOM of machineries, curing, lead and lift charges etc, Complete
as per MORTH specifications No. 1500, 1700

37.65.1 -do- With size of 450 mm x 450 mm inner dimensions m 1,356.00

37.65.2 -do- With size of 450 mm x 600 mm inner dimensions m 1,614.00

37.66 Providing and laying 100mm thick pre-cast cover slabs over drains of width m 894.00
not exceeding 800 mm using M20 concrete reinforced with steel @ 6.00
kg/Sqm, slabs jointed in CM 1:3 proportion and nicely finished including
providing holes in the Cover slabs wherever necessary for easy drainage of
surface water including of labour, materials, HOM of machineries, curing, lead
and lift charges etc, Complete as per MORTH specifications No. 1500, 1700.

271
Chapter - 38
INNOVATIVE ITEMS

272
General Notes
1. QUALITY:
For ensuring the quality aspect of the innovative materials used by the contractors, it is necessary that the
contractor shall furnish the quality control test certificates from approved laboratories for these materials.
Department will have the right to get these materials tested at the cost of contractor.

2. PROCEDURE FOR ADOPTION:


The rates of innovative items included in this volume are expensive over the conventional items, but highly
effective performance wise. Hence these items shall be used effectively and judiciously duly adopting the
following procedures:
a) Site Engineer / Sub-Divisional Officer shall identify the specific work for adoption of these items with
proper justification and report.
b) Assistant Executive Engineer, Quality Assurance shall furnish his opinion on this report.
c) Executive Engineer shall examine the necessity of the proposal and submit to Superintending Engineer
with due recommendations for inclusion in the estimate.
d) Superintending Engineer shall decide the necessity and accord approval for inclusion in the estimate.

3. Inspection:
The work shall be inspected by SE / EE QA during execution and after the completion and should obtain the
report.

4. Availability of innovative products:


Details of manufacturers /Authorized dealers of Innovative products are appended.

5. Comments / Suggestions:
Comments, suggestions with reference to the specification, rates and additions if any, may please be
communicated to the following address:

Office of the Superintending Engineer, Tele: 080-22875794


KPWP & IWTD, Bangalore Circle, Fax : 080-22374092
Bangalore – 560009 E-mail : sebgl@kpwd.gov.in

273
Sl. No. Description Unit Rate
Rs. Ps.

38.0 INNOVATIVE ITEMS


38.1 WATER PROOFING TO CONCRETE SURFACES
Using Membrane Technology
For raft & retaining wall
Providing & applying water proofing to concrete surfaces using high Sqm 358.00
quality polymer-modified bituminous compounds (confirming to ASTM
D 5147) reinforced with non woven polyester fabric, weighing 180gm/
sqm granular finish 4mm thick by torch on application method confirming
to the properties indicated below. It shall be provided after priming the
surface using bitumen primer at 0.2 ltr /sqm.
Detailed specification & Methodology
1. Membrane thickness 4mm (+ or – 5%)
2. Tensile strength – Longitudinal 790 N/5cm Transverse 730 N/5cm
3. Elongation of Membrane - Longitudinal 65% Transverse 69%
4. Tear Resistance - Longitudinal 180 N Transverse 190 N
5. Lap joint strength - Longitudinal 750 N/5cm Transverse 550 N/5cm
6. Puncture Resistance – Static 1.4 Dynamic 1.3
7. Water absorption - < 0.15%
8. Water permeability - Nil
9. Chemical resistance – Chloride, sulphate and Nitrate
The area to be water proofed shall be free from loose aggregate, dust
free and in dry condition. Primer must be applied to the surface and
allowed to dry prior to application of membrane. The membrane shall
be applied within 6 hours after application of primer. The membrane
comes in a roll form shall be unrolled and placed in the correct position
where it has to be torched. Each layer must over lap the next layer by
min 10cm at the adjacent and 15cm at the ends. The heat application
through propane gas torch shall be applied on membrane thus causing
melting and subsequent adhesion in the surface. The membrane should
be properly placed and torched on in staggered position.
38.2 For roof Slab & Terraces
Providing & applying water proofing to roof slab, terraces, landscape Sqm 520.00
area, podium etc., using modified polyurethane cures (conforming to
ASTM C836-84) to give a tough elastomeric waterproof membrane
on the surface. The surface shall be cleaned free from dust and other
particle before usage.
Standards & Methodology :
This compound has a medium viscosity grade with 620% of elongation
and shall be done either by roller application/brush application/ spray.
This will be applied for a thickness of 1.3mm first layer 0.5mm & 2nd
layer 0.8mm. After applying the 2nd layer sand sprinkle shall be done
to provide mechanical key.
38.3 ISO PROOF SEALER
Providing waterproof treatment to roof slab using 2 coats of acrylic co Sqm 800.00
polymer elastomeric ISOPROOF sealer & protector. The surface

274
Sl. No. Description Unit Rate
Rs. Ps.

shall be prepared free of tar, dust, fungus, loose particles etc.,


The surface shall be applied with basecoat of crystallization liquid and
then ISOPROOF, wetting agent and liquid (1:1:6) over the prepared
surface. In addition the surface shall be provided with polysulphide/acrylic
sealant to V groves, making haunch at junction of parapet and roof slab
and at damaged portion using patching mortar to drain off rain water.
Over this one coat of flexible cementatious membrane (FCM), Spreading
2 layers of 40 gsm non woven geotextile membrane as reinforcing
material (over FCM) with one primer coat of ISOPROOF & applying
second coat of ISOPROOF liquid over the primer coat - conforming to
ASTM D 412 - 1992. The work shall be carried out as per the directions
of the Engineer in charge.
Standards & Methodology :
1. Surface Preparation
The surface shall be made free from all dirt, fungus, loose particles
by using wire brush. The surface shall be cleaned with solvent like
xylene, Toluene, Benzene, dilute hydro chloric acid.
i) Cutting of ‘V’-Grooves : The V shaped grooves shall be cut along
the location of all the visible cracks. The ‘V’-Grooves shall be of size
5mm as directed by the Engineer in charge.
2. Primary reduction of water permeability
The concentrated crystallization liquid of specific gravity 1.09 is
lightly diluted and applied on the prepared surface. The sodium
acetate formed during the chemical reaction penetrates inside the
pores of the concrete and reacts with water to form crystals to block
the pores of the concrete, there by reducing water permeability.
3. Porosity and voids reduction (Base Coat Application)
Applying wetting agent consisting of acrylic monomer, co-polymer
liquid and crystallization liquid as base on the prepared surface and
V groove and cracks etc.
4. Application of Sealant / Patching Mortar
Cracks will be sealed using suitable sealant or patching mortar.
These make them ideally suited for joint treatment. Its adhesion is
very strong & binds with the building materials such as concrete,
and take care of expansion and contraction in the structures.
5. Levelling course using Flexible Cementatious Material
A concrete mix in the ratio 1:1.5:3 (1:cement : 1.5 quartz powder :
3 graded stone) is laid to make haunch at junction of parapet and
roof slab and at damaged portions to drain off water.
The factory made dry CEMENTATIOUS silica sand power consisting
of dry cement mortar (1 cement : 4 silica sand) shall be mixed with
additives like ISOPROOF chemical and acrylic polymer and water
to arrive at workable consistency. The same shall be applied over
the prepared surface to give even surface and act as base for geo-
textile fabric.

275
Sl. No. Description Unit Rate
Rs. Ps.

6. Non woven Geo Textile Fabric Application


Two layers of Non-Woven Geo Fabric 40gsm (40=40=80gsm) shall
be applied on FCM coating. Geo fabric shall be saturated with
acrylic co polymer applied in wet condition. Over this layer, flexible
monolithic membrane shall be laid by mixing single component ISO
PROOF with water in the ratio of 1:1.
7. Primer Coat
A mixture of acrylic monomer (1:1) ISOPROOF & water mixed in
proper proportion will be applied on the geotextile membrane.
8. Final Coat
Application of a coat of ISOPROOF shall be applied at right angles
to the primer coat and drying time is about 3 hours. The rate of
completion of ISOPROOF for primer and final coat shall not be less
than 1.25Kg per Sq meter.
38.4 Atotic Polypropylene
Providing and laying Water proofing with single layer of 3mm thick granule Sqm 375.00
finish @ 4.5kg/sqm using Atotic Polypropylene membranes (APP) with
overlap of 100mm at every joints including applying bitumen emulsion
priming coat over the dry surface, including scarifying the surface and
removing dust and foreign materials removing debris and cleaning
surface with wire brush to give even surface. The work shall be carried
out as per the instructions of Engineer in charge of the work.
38.5 Admixture for concrete mix
Concrete structures including water retaining structures Providing Kgs 300.00
admixture to concrete mix using INTEGRAL CRYSTALINE admixture.
Integral Crystalline Admixture shall be added @0.8% by weight of cement
to the ready mix concrete / concrete at the time of batching conforming
to ASTM C 1202 & DIN V 18998.
Methodology :
Mixing: Admixture must be added to the concrete at the time of batching
at 0.8% by weight of cement. The sequence of procedures for addition
will vary according to the type of batch plant operation and equipment:
Addition of Admixture to RMC Transit Mixer / Concrete Mixer: Mix
Admixture with water to form a very thin slurry 1 powder : 1.26 liters
of water (e.g. 18 kg of powder mixed with 22.7 liters of water). Pour
this material into the drum of the ready-mix truck/ concrete mixer. The
aggregate, cement and water should be batched and mixed in the plant
in accordance with standard practices (taking into account the quantity
of water that has already been placed in the ready-mix truck). Mix for at
least 5 minutes to ensure even distribution of the Admixture throughout
the concrete.

276
Sl. No. Description Unit Rate
Rs. Ps.

Addition of Admixture to the Batching Plant: Add Admix to the


coarse aggregates and sand, then mix thoroughly for 2 – 3 minutes
before adding the cement and water. The total concrete mass should be
blended using standard practices. In case of a fully automated Batching
plant, the Admix shall be poured in the dry form (in the required pre-
measured quantity) to the coarse aggregates and sand while the same
is being fed to the batching plant through the conveyor belt.
Note: It is important to obtain a homogeneous mixture of Admixture with
the concrete. Therefore, do not add dry Admixture powder directly to
wet concrete as this may cause clumping and thorough dispersion will
not occur. STORAGE: Admixture must be stored dry at a temperature
of 25 degrees. A secured covered storage space shall be provided in
the close vicinity of the batching plant.
38.6 For Construction joints
Providing pressure grouting for construction joints with cement grout Point 79.00
mixed with plasticised expanding grout admixture at 225 grams/bag of
cement conforming to BS:8110 part 1 - 1985, Section 8,9,4.6.
Methodology:
The admixture, cement and water shall be added in the ratio of 225
gram/bag of cement /21 ltrs of water. This shall be applied to concrete
joints at a pressure of 2 to 4 kg/cm2 by using pumping equipments.
The admixture shall confirm to ASTM C827 and shall have unrestrained
expansion upto 4%
38.7 Water retaining Structures
Providing & applying water proofing to concrete surfaces using crystalline Sqm 395.00
capillary water proofing system at 1 kg per sqm for concrete surfaces
(confirming to ASTM D 4060, D4541) followed by application of 2 coats
of 1mm thick acrylic polymer based cementatious coating. This crystalline
water proofing compound in powder form shall be mixed with water at
3:1 ratio (3 powder : 1 water) at the time of application.
Methodology:
The surface shall be pre damped with water. The water shall be mixed
powder in the ratio of 3 powder :1water mixing thoroughly with a slow
speed drill fitted at a speed RPM of 282640. The final crystalline slurry
shall be applied with a soft brush bloom at average of 1 kg /sqm area.
Curing shall be minimum of 48 hour by treating the surface by fog spray
3 to 4 time a day. Acrylic / Liquid polymer compound shall be mixed with
water by means of using a slow speed drill mixer 500 RPM and gradually
adding the powder component to the liquid avoiding lump formation and
mixed for 2 to 4 minutes. The slurry shall be applied using stiff brush
in 2 coats that forms 1mm thick. (0.5 mm thick each coat) Curing shall
be minimum of 48 hour by treating the surface by fog spray 3 to 4 time
a day. Protection layer such as plastering or concrete screen shall be
applied on the water proof membrane surface.

277
Sl. No. Description Unit Rate
Rs. Ps.

38.8 COVING
Providing and laying 12mm thick coving at the junction of slab and vertical Rmtr. 125.00
offsets with CM 1:3 admixed with modified styrene butadiene rubber
emulsion (confirming to BS 6319) specially designed for use as a bonding
aid and gauging liquid for cementations system (5 ltrs for 50kg cement).
Methodology:
Modified styrene butadiene rubber emulsion shall be added to dry
mix of cement mortar of 1:3 (5 ltrs for 1 bag of cement and 3 bags of
cement) mixed thoroughly by adding water 0.35 water cement ratio and
peddling for 2 minutes.
38.9 Swellable rapid expansion water proofing for construction joints
in all types of concrete works / composite works
Providing and water proofing treatment to construction joints of all types m 408.00
of concrete works using swellable rapid expansion in water. Water stop
capable of expanding 215% in 120 hours, when immersed potable water
Conforming to ASTM D 297 & ASTM D 6 Standard
Methodology:
The water stopper shall be laid as per following steps:
i. Clean the surface sufficiently to receive the water stopper
ii. Apply a coat of primer to the area where water stopper is to be laid
placed at an application rate of 240 running meters per 3.78 Liters
of primer (primer is supplied along with water stopper)
iii. Using moderate hand pressure with the heel of the hand, press a
continuous bead of Water Stopper firmly into the position. Make
sure that the product has bonded to the primed area.
iv. Peel the protective backing form the exposed side of the water stop
and tightly butt the coil ends to form a continuous water stop. Do
not overlap the water stop.
v. Follow standard concrete pouring procedures here after.
The proposed water stopper shall be used for the following situations:
1. At all the cold construction joints
2. At the junction of Horizontal Raft and vertical retaining walls
3. At the Junction of horizontal Roof slab and vertical Parapet walls
4. At all cold construction joints in Water retaining structures such as
water tanks, swimming pools, water bodies on Podium, roof garden
or Flower beds etc.
5. Around the Pipe penetrations, metal penetrations, any other
penetrations, where there is a joint between two different surfaces
– one of the surfaces being Concrete.
6. Construction joints in the lift Pits

278
Sl. No. Description Unit Rate
Rs. Ps.

38.10 FOR CRACKS IN ROOFTOP SURFACES


Providing Water proofer Capable of bridging cracks upto 2mm in the
Exposed Roof surface using Spray Applied Liquid Water proofer at the
rate of 0.20 ltr/sqm. Primer & chemical mortar shall be applied before
applying this spray liquid water proofer. The area shall be cleaned by
high pressure water jet/wire bush or by mechanical means to make it
free from loose particle, dust dirt etc.
38.10.1 _do_ for crack filling Rmt 79.00
38.10.2 _do_ for applying spray Sqm 291.00
Methodology :
1. The first part consisting of grouting the porous slab area with non-
shrink cementatious grout (if required).
2. The second part consisting of treating the cracks and construction
joints by routing-out to a minimum 20mm x 20mm groove and filling
it with a crystalisation Mortar after priming with crystalisation slurry.
3. The third part consisting of making vata at the interface joint of the
slab and parapet with crystalisation Mortar.
4. The fourth part consisting of sealing all joints of outlet drains pipe,
etc. with crystalisation Mortar.
5. The fifth part consisting of providing and applying liquid water
proofer which can be spray applied at a coverage of 0.2 lt/ sqmt
“to permanently fix non-soluble crystalline growth throughout the
capillary tracts and pores of concrete. It is spray applied over the
entire terrace concrete slab and parapet walls up to 300 mm height
PRECAUTIONS TO BE TAKEN WHILE CARRYING OUT THE
TREATMENT ON THE ROOF SURFACE
1] Before application of liquid water proofer the entire TERRACE slab
shall be cleaned with high pressure water jet
2] During the cleaning process all the cracks and construction joints
shall become visible. They should be treated as explained above.
3] Liquid water proofer shall be spray applied at a coverage rate of
0.2 lts/ sq mts. After application of when the surface is dry to touch
[usually after 4-6 hrs] flood the surface with abundant water
4] 24 hrs later flood the surface with abundant water again. After 24
hrs again flood the surface with water. After the 3rd flooding treated
area shall be ponded to verify the waterproofing performance.
38.11 FOR TOILETS SUNK PORTIONS
Providing INTEGRAL CRYSTALINE Waterproofing treatment to the Sqm 416.00
sunken portion of Toilets. Using Crystalline Slurry of approved make
@ 1.4kg per SQM in two coats (0.7 kg per sqm per coat) conforming to
ASTM C 1202 & DINV 18998 standards.

279
Sl. No. Description Unit Rate
Rs. Ps.

Methodology:
1. The first part consisting of grouting the porous slab area with non-
shrink cementatious grout (if required).
2. The second part consisting of treating the cracks and construction
joints by routing-out to a minimum 20mm x 20mm groove and treating
it with crystalisation Mortar. First it is primed with crystalisation slurry
and later filled with crystalisation mortar and later again a coat of
crystalisation slurry.
3. The third part consisting of making required slopes at the interface
joint of the toilet slab and masonry wall with crystalisation Mortar..
4. The fourth part consisting of sealing / packing all joints of outlet
pipes, etc. with CRYSTALISATION MORTAR
5. The fifth part consisting of providing and applying In-depth Crystalline
Waterproofing System @ 1.4 kgs/sqm in 2 coats to permanently fix
non-soluble crystalline growth throughout the capillary tracts and
pores of concrete. The In-depth Crystalline waterproofing Material
shall be applied by brushing as per manufacturer’s specification.
on the entire toilet sunken slab and walls.
38.12 SELF CURING COMPOUND FOR CONCRETE SURFACE
(WATER/ WAX BASED)
Providing & applying water based (WB) / wax based low viscosity wax sqm 16.00
emulsion curing compound membrane / layer applied in the form of
spray over the concrete surface. The material consists of self curing
compound membrane satisfying ASTM C309-90 standard ensuring a non
penetrating continuous film on the concrete surface covering an area
of 4.5 to 5 sqm per ltr of curing compound and shall be applied with a
distance of 45 cms after 5 hours of concreting to get the best results.
This item shall be adopted wherever there is scarcity of water and with
prior approval of Superintending Engineer.
38.13 POLYMER BASED
Providing & applying high efficiency polymer based curing compound sqm 29.00
membrane / layer applied in the form of spray over the roof surface. The
material consists of self curing compound membrane satisfying greater
curing efficiency when tested to BS 7542 -1992 standard ensuring a non
penetrating continuous film on the concrete surface, covering an area
of 3.5 to 5 sqm per liter of curing compound and shall be applied with
a distance of 45 cms after 5 hours of concreting to get the best results.
The above items shall be adopted wherever there is scarcity of water
and with prior approval of Superintending Engineer.
38.15 RBI GRADE-81
Pulverising the local soil in place, spreading with rotavator duly adding the
specified quantity of inorganic Compound RBI Grade 81 as approved
by CRRI, mixing thoroughly, sprinkling desired quantity of water, grading
with motor grader and compacting with the road roller at OMC to the
desired density for improving the subgrade & shoulders. (The laboratory
CBR of the compacted soil shall not be less than 10)

280
Sl. No. Description Unit Rate
Rs. Ps.

38.15.1 Pulverising the local soil in place, spreading with rotavator duly adding
the specified quantity of inorganic Compound RBI Grade 81 as approved
by CRRI, mixing thoroughly, sprinkling desired quantity of water, grading
with motor grader and compacting with the road roller at OMC to the
desired density for improving the subgrade & shoulders. (The laboratory
CBR of the compacted soil shall not be less than 10)
38.15.1.1 For soils having WL between 35 & 50, with 1% of inorganic Compound cum 566.00
like RBI Grade 81 by weight of Soil.
38.15.1.2 For soils having WL more than 50, with 2% of inorganic Compound like cum 1,052.00
RBI Grade 81 by weight of Soil.
38.15.2 RBI GRADE -81 (Gravel soil & Aggregate Mix Material)
Pulverising and mixing 80% Gravel Soil and 20% Aggregates (30mm
nominal size), spreading with rotavator duly adding the specified quantity
of inorganic Compound RBI GRADE-81 as specified by IRC: 37-2012,
mixing thoroughly, sprinkling desired quantity of water, grading with motor
grader and compacting with vibratory roller at OMC to the desired density
for preparing the Base / Sub Base Layer (The Laboratory CBR of the
gravel soil shall not be less that 9%) including cost of all materials,
labour, HOM complete as per specification.
38.15.2.1 With 2% inorganic Compound like RBI GRADE 81 by weight of Soil & cum 1,441.00
Aggregate Mix Material :
38.15.2.2 With 3% inorganic Compound like RBI GRADE 81 by weight of Soil & cum 1,930.00
Aggregate Mix Material
38.15.2.3 With 4% inorganic Compound like RBI GRADE 81 by weight of Soil & cum 2,419.00
Aggregate Mix Material
38.15.2.4 With 5% inorganic Compound like RBI GRADE 81 by weight of Soil & cum 2,906.00
Aggregate Mix Material:
38.15.3 RBI GRADE -81 (Coarse Aggregate & Fine Aggregate Mix Material)
Pulverising and mixing coarse Aggregates (10mm & down size) and
Fine aggregate (2.36mm & down size) in 1:1 proportion, spreading with
rotavator duly adding the specified quantity of inorganic Compound RBI
GRADE-81 as specified by IRC: 37-2012, mixing thoroughly, sprinkling
desired quantity of water, grading with motor grader and compacting with
vibratory roller at OMC to the desired density for preparing the Stabilized
Base / Sub Base Layer including cost of all materials, labour, HOM of
Machineries complete as per specification.
38.15.3.1 With 2% inorganic Compound like RBI GRADE 81 by weight of Coarse cum 2,385.00
& Fine Aggregate Mix Material
38.15.3.2 With 3% inorganic Compound like RBI GRADE 81 by weight of Coarse cum 3,052.00
& Fine Aggregate Mix Material

281
Sl. No. Description Unit Rate
Rs. Ps.

38.15.3.3 With 4% inorganic Compound like RBI GRADE 81 by weight of Coarse cum 3,703.00
& Fine Aggregate Mix Material
38.15.4 RBI GRADE -81 - Cold In Place Recycling
Pulverising and mixing the existing worn-out/ damaged road with
recycler/milling machine duly adding the specified quantity of inorganic
Compound RBI GRADE-81 as specified by IRC: 37-2012, mixing
thoroughly, sprinkling desired quantity of water, grading with motor grader
and compacting with vibratory roller at OMC to the desired density for
preparing the Stabilized Base including cost of all materials, labour,
HOM of Machineries complete as per specification. (RAP-Reclaimed
Asphalt Pavement)
38.15.4.1 With 2% inorganic Compound like RBI GRADE 81 by weight of Milled cum 2,055.00
Material:
38.15.4.2 With 3% inorganic Compound like RBI GRADE 81 by weight of Milled cum 2,706.00
Material:
38.15.4.3 With 4% inorganic Compound like RBI GRADE 81 by weight of Milled cum 3,357.00
Material
38.15.4.4 With 5% inorganic Compound like RBI GRADE 81 by weight of Milled cum 4,008.00
Material:
38.16 Cutting the pothole to regular shape, trimming to provide firm vertical cum 2,130.00
faces, removing all loose materials, cleaning of surface, filling with a
mix of aggregates (40mm downsize) & local soil (except BC Soil) in
1:1 proportion duly adding 2 % of Inorganic compound RBI Grade 81,
mixing thoroughly, compacting & finishing etc., complete in WBM layers
for Pothole/Patch repairs.
Methodology and Construction :
Stabilization using RBI Grade 81 (the process of improving the
engineering properties of a material by means of the addition of RBI
Grade 81) is subject to the quality of materials available and the impact
of the environment (traffic, climate, etc.) on the structural design.
Stabilization with RBI Grade 81 endeavors to increase the quality of
the project and reduce construction costs by improving the properties
of substandard, readily available material to comply with the relevant
specifications.
1. Materials
Soil or Gravel
Stabilizer agent, RBI Grade 81
Should be kept under cover and protected from moisture from the time
of purchase to the time of use. If material has been left exposed to
environmental elements, consult a RBI Grade 81 representative.

282
Sl. No. Description Unit Rate
Rs. Ps.

It is preferable to stabilize a soil with a continuously smooth gradation


curve from the maximum particle size to the smallest particle size with
no excess or lack in certain particles. This will ensure better interlocking
capabilities of the soil particles resulting in increased density and
strength of the soil. It is recommended that the soil material have
sufficient fine material (< 2.00 mm) to effectively stabilize the material with
RBI Grade 81.
2. Water
Water used should be free from harmful substances that may affect the
setting and hardening process of the stabilizer. Water that is thought
to encourage adverse reactions should be tested for compatibility with
RBI Grade 81.
3. Construction procedures
The stabilization of soil requires the careful programming of several
operations:
a. Pulverization, which may require initial scarifying
b. Addition of stabilizer
c. Thorough mixing of soil, stabilizer and added water
d. Laying, spreading and compacting
e.Curing - (minimum of 7 days curing is necessary)
Thus efficient planning of the side operations is necessary to minimize
the time between mixing and compacting. The periods of working should
also be consistent with the climatic conditions and the capability of the
construction equipment or plant, to keep to a minimum, if any changes
in moisture content and delays before compaction. Therefore moisture
control has to be considered throughout the stabilization process. A good
indication of the moisture content is to be found in the wheel tracks on the
uncompacted mixture. If too dry for satisfactory compaction, the material
in the tracks would crumble and crack; if too wet it would be easily
moulded, deforming plastically. Close to the optimum moisture content
the wheel tracks would have a dense, stiff surface. It is recommended
that 8 – 12 tons smooth-wheeled rollers or 6 – 10 tons vibrating rollers
be used for the compaction effort. During shaping of the road before
initial compaction it is essential to build in a camber to prevent rainwater
ponding on the road surface and the construction of side drains by
shaping with a grader. The road should therefore have adequate cross-
falls across the shoulders to the side drains to allow for easy run-off of
the surface water into the adjacent side drains. See figures 1(a) and 1(b).
4. Prior to the construction of the stabilized layer
i) Stabilized layers should be constructed only where the underlying
layer or foundation meets all specified requirements.

283
Sl. No. Description Unit Rate
Rs. Ps.

ii) Before construction of any stabilized material or pavement layer as


well as before any transported material for stabilization is dumped on
the road, the underlying layer should be investigated to establish
whether there is any damage, wet spots or other defects. Any
defects to the layer should be rectified before the stabilized layer is
constructed.
iii) Where the stabilized layer is constructed on the floor of a pavement
excavation or on the top of an existing pavement layer i.e. where
the underlying layer has not been reworked or reconstructed, the
floor of the excavation or the top of the existing pavement layer should
first be watered and the compaction of the layer should be verified.
5. Preparing the layer
Road levels shall be implemented to control (1) the shape of the road and
(2) the specified stabilized layer height. To minimize surface irregularities
it is recommended that the levels be set up at intervals of 10m or 20m
apart.

The material to be stabilized should be placed, or in the case of an


existing pavement layer, scarified to the full depth specified, broken
down, watered if necessary and mixed to achieve a homogenous layer.
Any oversize material should be removed. or broken down to -53mm
on the road by means of a grid roller as the occurrence of large stones
will influence (1) the quality of the finish and (2) the depth control due
to the “pulling out” of the oversize rocks.

6 Applying the stabilizing agent, RBI Grade 81


i) Prior to product application, dosage determination and soil testing
should be performed under Section 3 Testing of materials and
workmanship.
ii) After the layer of soil or gravel has been prepared the stabilizing
agent should be spread uniformly over the full area of the layer by
means of an approved type of mechanical spreader or by hand.
iii) If application is administered by hand, pockets or bags of stabilizing
agent should be accurately spaced at equal intervals along the
section to be stabilized so that the specified rate of application can
be achieved. The stabilizing agent should be spread as evenly as
possible and then be uniformly distributed over the entire surface.

7. Mixing in the stabilizing agent, RBI Grade 81


i) Immediately after the stabilizing agent has been spread it should
be mixed with the material to the full depth of treatment. Special
attention should be taken not to disturb the compacted layer
underneath and especially not to mix the stabilizing agent in below
the desired depth. Mixing should continue for as long as necessary
and repeated as often as required to ensure homogeneity and
thorough mixing of the soil with RBI Grade 81 over the full area of
the application site.

284
Sl. No. Description Unit Rate
Rs. Ps.

ii) Mixing should be done by grader, disc harrow, rotary mixer (rotovator)
or equivalent equipment over successive passes of the layer.

8. Watering
i) Immediately after RBI Grade 81 has been properly mixed into the
layer, the pre­determined moisture content should be administered.
ii) Each application or increment of water should be well mixed with
the material so as to avoid concentration of water near the surface
or in pockets within the layer.
iii) Particular care should be taken to ensure satisfactory moisture
distribution over the full depth, width and length of the section
being stabilized and to prevent any portion of the work from getting
excessively wet after the stabilizing agent has been added. The
moisture content of the material and stabilizing agent should be
the optimum moisture content (OMC) calculated at maximum dry
density (Mod AASHTO density).
iv) If any portion of the work becomes too wet after the stabilizing agent
has been added and before the mixture has been compacted, as
during rain or downpour, the application shall be rejected. These
portions should be allowed to dry out to the required moisture content
and then be scarified, re-stabilized, re-compacted and finished off.
v) The water supply and watering equipment should be adequate
to ensure that all the water required is added and mixed with
the material being treated within the prescribed period to enable
compaction and finishing to be completed.
Ensure that the moisture content in the mixture is not below the OMC or
more than 2 % above the OMC and less than the quantity that causes
the road bed to become unstable during compaction and finishing. If
any portion of the work becomes too wet after the stabilising agent has
been added and before the mixture has been compacted, as during rain
or downpour the application shall be rejected. These portions should be
allowed to dry out to the required moisture content and then be scarified,
re-stabilised, re-compacted and finish the layer.
38.17 Soilfix Chemical compound
Cutting the pothole to regular shape, trimming to provide firm vertical cum 2,875.00
faces, removing all loose materials, cleaning of surface, filling with a
mix of aggregates (40mm downsize) & local soil (except BC Soil) in
1:1 proportion duly adding 0.5 % of Soilfix Chemical compound, mixing
thoroughly, compacting & finishing etc., complete in WBM layers for
Pothole/Patch repairs.
Ref: IRC SP 20 : 2002 : RURAL ROADS MANUAL AND MORT&H
SPECIFICATIONS FOR ROAD AND BRIDGE WORKS ( 4TH REVISION)

285
Sl. No. Description Unit Rate
Rs. Ps.

38.18 CLAY HOLLOW BRICKS (Extruded)


Providing and constructing thick clay hollow brick masonry in cement
mortar 1:6 using horizontal perforated clay hollow brick with minimum
crushing strength of 35 kg/sqcm including scaffolding, curing etc.,
complete as directed at all levels.
38.18.1 _do_ of size 400 x 200 x 200mm Sqm 721.00
38.18.2 _do_ of size 400 x 200 x1 50mm Sqm 565.00
38.18.3 _do_ of size 400 x 200 x 100mm Sqm 547.00
STANDARDS
Minimum Crushing Strength 35 Kg/Sqcm.
U- Value 1.1 W/SqmK.
Density 695 Kg /Cum.
Water absorption <20 %.
Reduces the energy consumption and hence help to maintain comfortable
temperature inside.
Natural & Green Building Product.
*Ref: - IS 3952 Guidelines for use of horizontally perforated clay bricks.
Construction Methodology
* All concrete surfaces of beams and columns coming in contact with
brick work is to be hacked.
* Pre wet the bricks before construction.
* Use cement mortar slurry of 1:2 on the hacked surface to create a
roughened surface for proper bonding.
* Use silt free (less than 5%) sieved clean sand for mortar.
* Place the marker course of brick (1st course) after checking the
vertical & horizontal alignment. And also mark the vertical course up
to beam bottom on the column to maintain the equal mortar joints.
* Mix mortar in proportion of 1:6 for 200 & 150 mm thick walls and
1:4 for 100 mm thick walls using Farma box (Equal to 1 cement bag)
for measuring sand and a measuring can to standardize quantum
of water to get a consistent mix. Mix well for uniformity. Mix mortar
in small manageable quantities and use it within ½ an hour.
* Mortar joints should be 10 to 12 mm for both vertical and horizontal
joints. The joints should be neatly pointed using an Aluminum
Straight edge.
* Give concrete band of 1:2:4 with 8 mm steel (2 Nos.) in a 100 mm
thick wall at every 1 meter height.
* Adjuster course in concrete 1:2:4 should be laid two in courses
below the beam and not above the top most courses.

286
Step 1 Step 2

Step 3 Step 4

Step 5 Step 6

287
Step 7

Step 8

Step 9

288
Sl. No. Description Unit Rate
Rs. Ps.

38.19 Dry Lean Concrete (DLC) for Profile correction of existing cum 2,786.00
bituminous road surface before carrying out White Topping
Dry Lean Concrete (DLC) M-5 for Profile correction of existing bituminous
road surface before carrying out White Topping Construction of dry lean
cement concrete sub base layer over existing scarified (to the depth of
25 mm with miller machine includes mobilization, diesel and operating
cost, includes cleaning by air blower/sand blasting/brooming etc.)
bituminous road surface with coarse and fine aggregate conforming to
IS 383, the size of coarse aggregate not exceeding 25mm, aggregate
cement ratio not to exceed 15:1, aggregate gradation after blending to be
as per Table 600-1, cement content not less than 160 kg/cum, optimum
moisture content to be determined during trial length construction,
concrete strength not to be less than 10 Mpa at 7 days, mixed in ready
mix concrete plant or a batching plant (to ensure consistency) transported
to site, laid to the depth of 40 mm - 50 mm with a fixed form paver with
electric sensor, having gang mounted vibrators equally spaced with
variable rpm and atleast three integral steel tubes with 8-10 tonnes
vibratory rollers for screeding, levelling, compaction, finishing and curing,
includes lifting/shifting charges of paver, as per specifications complete, (
cement 160kgs. coarse aggregate= 0.86 cum, Fine aggregate=0.58cum)
MORTH specifications No.601.
38.20 Providing and laying White Topping as per IRC:SP76-2008 over
bituminous surface (Existing bituminous surface preparation to be done
if necessary either by milling or levelling course with BM/DBM to correct
surface profile and to be paid separately) with unreinforced M-40 grade
pavement quality concrete (PQC)using polymeric synthetic fibre as per
ASTM (1116) such as polyester / polyethylene / polypropylene at 1.20
kg/cum, mixed in batching and mixing plant or weigh batcher as per
approved mix design to achieve minimum flexural strength or modulus of
rupture of concrete 4.50 MPa at 28 days limiting maximum water cement
ratio to 0.40, transported to site, laid with mechanical paver finisher,
spread, vibrated, compacted and finished in a continuous operation
to the lines and grades as per drawing, texture finishing of surface,
spraying two layers of curing compound, curing with water sprayed on
hessian cloth coverd over concrete surface, groove cutting to a depth of
1/3 of the slab depth and of width 3-5 mm including the cost of filling
the joint with joint sealant as per IRC-15. as per design (grove cutting
to be paid separately). For Thin white Topping and ultra thin white
topping the groove cutting shall be 1.25mm x 1.25m grid including
cost of all materal, side form work, labour and HOM of machineries
etc. complete as per specifications.
38.20.1 -Do- with unreinforced M40 grade pavement quality concrete using cum 4,844.00
43 grade OPC @ 420 kg/cum, coarse aggregate, fine aggregate and
Admixture confirming to IS 9130-1999 (R-2004)

289
Sl. No. Description Unit Rate
Rs. Ps.

38.20.2 -Do- with un-reinforced M-40 grade Pavement quality concrete (PQC) cum 4,679.00
using 53 grade OPC at 315 kg/cum and cementitious material Ground
Granulated Blast furnace slag at 105 kg/cum, satisfying IS : 12089-1987
(R2004) coarse aggregate, fine aggregate, admixture conforming to
IS:9103-1999 (R-2008)
38.20.3 - do - with un-reinforced M-40 grade Pavement Quality Concrete (PQC) cum 4,536.00
using 53 grade OPC at 357 kg/cum and cementitious material FlyAsh,
at 63 kg/cum, satisfying IS:3812-2013(Part-1) coarse aggregate fine
aggregate, Admixture conforming to IS:9103-1999(R2008)
Note : If slip form paver with sensor is used, additional rate of
Rs. 200.00 per cum to be given for item Nos. 38.20.1, 38.20.2
and 38.20.3
38.21 Providing groove cutting for width of 4mm - 6mm and 1/3rd depth of m 104.00
PQC Whitetopping within 8-10 hrs of placing/finishing of PQC including
cost of cutting machine, generators, HOM of machinery, blades, coolant
etc., including cleaning of groove and providing sand and hot bituminous
or equivalent approved sealant filling etc., including cost of conveyance
of all materials, labour, lead and lift charges and all other incidental
charges as per drawing and as per specifications.
Cement Concrete White Topping/Concrete Overlay as per
IRC: SP: 76-2008
White topping is defined as a PCC (Portland Cement Concrete) overlay
constructed on the top of an existing bituminous pavement. Thus, it is
a rehabilitation or structural strengthening alternative on bituminous
pavement. Rutting of pavement is a real problem in a country like India,
with heavy truck loads, operating under frequent start/stop conditions. It
is commonly applied where rutting of bituminous pavements is a recurring
problem, particularly in case of city roads. Concrete over lays offers the
potential for extended service life, increased structural capacity, reduced
maintenance requirements and lower life-cycle costs when compared
with bituminous overlay alternative.
Concrete overlays have been used on both bituminous (flexible)
pavements since 1918 and existing concrete pavement since 1913.
White topping is classified into three types, based on the thickness of overlay,
types of interface provided i.e., degree of bonding between the underlying
bituminous layers with PCC overlay & thickness of overlay. They are:
i) Conventional White topping – which consists of PCC overlay of thickness
200 mm or more, which is designed & constructed without consideration
of any bond between existing overlay & underlying bituminous layer
(without assuming any composite action).
ii) Thin White topping (TWT) – which has PCC overlay between 100 – 200
mm. It is designed either considering bond between overlay & underlying
bituminous layer or without consideration of bond. High strength concrete
(M 40 or higher) is normally used to take care of flexure requirement.
Joints are at shorter spacing of 0.6 to 1.25 m.

290
Sl. No. Description Unit Rate
Rs. Ps.

iii) Ultra-Thin White topping (UTWT) – which has PCC overlay of less than
100 mm. Bonding between overlay & underlying bituminous layer is
mandatory. To ensure this, the existing layer of bitumen is either milled
(to a depth of 25 mm) or surface scrapped (with a non-impact scrapper)
or gently chiselled. Joints are provided at a spacing of 0.6 to 1.25 m.
Surface preparation
In case of TWT, bond between PCC overlay & existing bituminous
pavement is atleast partly desirable; in case of UTWT, effective bond is
essential. To ensure this any of the following method can be adopted.
- Milling the existing bituminous surface to obtain a uniform surface.
Milling can be used to remove surface distortion like cracks in the top
portion and adjust cross slopes. Thickness of milling usually is in the
range of 25 to 50 mm.
- Surface scrapping is carried out on bituminous surfaces which are
quite hard. This can be for a depth of 10 mm and carried out with tools
which have vertical impact control, so that the subgrade is not damaged.
- Chiselling of the surface at regular intervals, if the existing surface is
hard.
The minimum thickness of existing bituminous pavement (excluding the
milled/scrapped thickness) shall be 75 – 100 mm to ensure a reliable
& strong base.

291
Sl. No. Description Unit Rate
Rs. Ps.

38.22 Use of GEO Textiles / GEO fabrics in road pavements and sub- m 66.00
surface drainage works.
Providing and Inserting Prefabricated Vertical Drain, core with
synthetic material and wrapped with Non-woven geotextile 120GSM in
very soft clay for quick consolidation.
Ref: IRC SP 59 : GUIDELINES FOR USE OF GEO TEXTILES IN ROAD
PAVEMENT S AND ASSOCIATED WORKS- 2002
Technical Data;
-do- with 100mm width ,thickness = 4mm,mass per linear meter
90g/m,with tensile strength =2.0 KN
-do –with 100mm width,thickness =5.2 mm,mass per linear meter
110g/m,with tensile strength = 2.4 KN
Application Methodology;
Vertical drains may be installed employing either vibratory or static
methods. In either case, the drain is enclosed in a tubular steel mandrel
of small cross-sectional area usually 50x125mm. A small steel anchor
plate is attached to the drain at the bottom of the mandrel. The mandrel
is then driven in to the soil either with a static or vibratory rig. When the
design depth is reached, the mandrel is extracted. The anchor plate
retains the drain in the soil. When the mandrel is fully extracted the
drain is cut off a new anchor plate is installed and the process begins
again. These are used in Land reclamation projects, Construction of
highways ,railways ,airfields and dykes,Ports and harbor construction,
Development of industrial sites ,Mitigation of liquefaction,etc.
38.23 Providing and Laying Needle punched and mechanically bonded Non-
woven Geotextile indigenously manufactured from high quality synthetic
fibres on the prepared subgrade for separator cum filtration cum drainage
application with necessary overlaps as per drawing.
38.23.1 _do_ with GSM 150 Sqm 73.00
38.23.2 _do_ with GSM 200 Sqm 77.00
38.23.3 _do_ with GSM 250 Sqm 81.00
38.23.4 _do_ with GSM 300 Sqm 85.00
38.23.5 _do_ with GSM 400 Sqm 93.00
38.23.6 _do_ with GSM 500 Sqm 100.00
38.23.7 _do_ with GSM 600 Sqm 107.00

292
Sl. No. Description Unit Rate
Rs. Ps.

Technical Data :
-do-with GSM 150,1.3mm thickness,Grabtensile strength 540N, Puncture
strength 315N,Trapezoidal tear 230N,Apparent opening size 180 µm,
-do- 200Gsm,1.6 mm thickness,Grabtensile strength 720N,Puncture
strength 400N,Trapezoidal tear 300N,Apparent opening size 150µm
-do-250Gsm,1.8 mm thickness, Grabtensile strength 865N,Puncture
strength 525N,Trapezoidal tear 360N,Apparent opening size 150µm
-do-300Gsm,1.9 mm thickness, Grabtensile strength 1010N,Puncture
strength 650N,Trapezoidal tear 415N, Apparent opening size 120µm
-do-400GSM,2.5 mm thickness, Grabtensile strength1325N,Puncture
strength 785N,Trapezoidal tear 510N, Apparent opening size 106µm
-do-500GSM,2.9 mm thickness, Grabtensile strength1570N,Puncture
strength 910N,Trapezoidal tear 600N, Apparent opening size 90µm
-600GSM,3.4 mm thickness, Grabtensile strength1980KN,Puncture
strength 1080N, Trapezoidal tear 705N, Apparent opening size
=70µm

Application Methodology;
These contribute to road structure strength by providing separation
between the base course aggregate and underlaying, weaker soils,
maintaining the structural integrity of the structure and avoiding
the intermixing of the different layers. It also acts as filter around
aggregate drains,it also allows water to flow into the drainage system
while minimizing the passage of fine soil particle that could diminish
drainage capacity. These used in application like Retaining Wall and
Steep sided embankments, Embankment on soft ground, Shallow
foundations,Railway tracks,Confinement ponds, reservoirs and canals.
38.24 Providing and Laying rope Gabions, indigenously manufactured from
high strength rope for slope protection and erosion control for river bank
and sea-shore protection. Exclusive of providing & filling stones.
38.24.1 _do_ copper and synthetic rope gabion of size 1mx1mx1m, aperture Box 966.00
100mm x 100mm
38.24.2 _do_ copper and synthetic rope gabion of size 1mx1mx2m, aperture Box 1,785.00
100mm x 100mm
38.24.3 _do_ copper and synthetic rope gabion of size 1mx1mx3m, aperture Box 2,678.00
100mm x 100mm

293
Sl. No. Description Unit Rate
Rs. Ps.

Technical Data;
do - size 1M x1M x 1M, aperture 150mm x 150mm, Tensile strenth
9500Kg/m, Punching shear strenth 5200Kg
-do - size 1M x1M x 2M, aperture 100mm x 100mm, Tensile strenth
14000Kg/m, Punching shear strenth 6200Kg
-do-size 1M x1M x 3M, aperture 100mm x 100mm, Tensile strenth
14000Kg/m, Punching shear strenth 6200Kg,

Application Methodology;
Copper and polymer Gabions are rectangular or cylindrical baskets
fabricated from polymer meshes and usually filled with stone and
used for structural purposes such as retaining walls,revetments,slope
protection,and similar applications. These are fabricated from ropes of
suitable diameter into a box like form with required size and apertures.
These are used in application like River bank protection, revetment,
toe-walls,aprons,groynes,spurs,channel linings, sea shore protection,
seawalls, Anti-erosion structures,etc.
38.25 Providing and Synthetic Biaxial Geogrid indigenously manufactured from
selected high tenacity synthetic yarn with high molecular weight (> 25000
g/mol), and low carboxyl end group (<30mmol/kg) for soil reinforcement
application for stabilisation, requirement of geogrid strength in both
direction with granular fill.
38.25.1 _do_ with 30 x 30 Kn/m Ultimate Tensile Strength Sqm 93.00
38.25.2 _do_ with 40 x 40 Kn/m Ultimate Tensile Strength Sqm 107.00
38.25.3 _do_ with 60 x 60 Kn/m Ultimate Tensile Strength Sqm 133.00
38.25.4 _do_ with 90 x 90 Kn/m Ultimate Tensile Strength Sqm 163.00
Technical Data;
-do- ultimate tensile strenth 30Kn/m in MD and CMD, Tensile strenth
at 2% elongation 6Kn/m in MD and 6Kn/m in CD, aperture size in MD
and CD 26X26mm.
-do- ultimate tensile strenth 40Kn/m in MD and CMD, Tensile strenth at
2% elongation 7.5Kn/m in MD and 7.5Kn/m in CD, aperture size in MD
and CD 25X25mm
-do- ultimate tensile strenth 60Kn/m in MD and CMD, Tensile strenth at
2% elongation 9Kn/m in MD and 7.5Kn/m in CD, aperture size in MD
and CD 25X25mm
-do- ultimate tensile strenth 90Kn/m in MD and CMD, Tensile strenth
at 2% elongation 11Kn/m in MD and 9Kn/m in CD, aperture size in MD
and CD 23X23mm

294
Sl. No. Description Unit Rate
Rs. Ps.

Application Methodology;
Biaxial geogrids are designed for applications where strength requirement
is in both directions. They are used in reinforcement of granular roadbase
and subbase, area stabilization, trackbed stabilization, load transfer
platforms,etc.
38.26 Providing and Synthetic Uniaxial Geogrid, indigenously manufactured
from selected high tenacity synthetic yarn with high molecular weight (>
25000 g/mol), and low carboxyl end group (<30mmol/kg) for reinforced
soil wall and slope application with granular fill as per design prepared
by technology provider of reinforced earth wall and slope.
38.26.1 _do_ with 40 Kn/m Ultimate Tensile Strength Sqm 83.00
38.26.2 _do_ with 60 Kn/m Ultimate Tensile Strength Sqm 100.00
38.26.3 _do_ with 80 Kn/m Ultimate Tensile Strength Sqm 115.00
38.26.4 _do_ with 100 Kn/m Ultimate Tensile Strength Sqm 133.00
38.26.5 _do_ with 120 Kn/m Ultimate Tensile Strength Sqm 152.00
38.26.6 _do_ with 150 Kn/m Ultimate Tensile Strength Sqm 170.00
38.26.7 _do_ with 200 Kn/m Ultimate Tensile Strength Sqm 215.00
38.26.8 _do_ with 250 Kn/m Ultimate Tensile Strength Sqm 245.00
Technical Data:
-do- with ultimate tensile strenth 40Kn/m in MD and 20Kn/m in CD,
aperture size in MD and CD 30X25mm,
-do- with ultimate tensile strenth 60Kn/m in MD and 20Kn/m in CMD,
aperture size in MD and CD 30X25mm,
-do-with ultimate tensile strenth 80Kn/m in MD and 30Kn/m in CMD,
aperture size in MD and CD 30X25mm,
-do- with ultimate tensile strenth 100Kn/m in MD and 30Kn/m in CMD,
aperture size in MD and CD 30X23mm,
-do- with ultimate tensile strenth 120Kn/m in MD and 30Kn/m in CMD,
aperture size in MD and CD 30X23mm,
-do- with ultimate tensile strenth 150Kn/m in MD and 30Kn/m in CMD,
aperture size in MD and CD 30X23mm,
-do-with ultimate tensile strenth 200Kn/m in MD and 30Kn/m in CMD,
aperture size in MD and CD 30X22mm,

295
Sl. No. Description Unit Rate
Rs. Ps.

-do- ultimate tensile strenth 250Kn/m in MD and 30Kn/m in CMD, aperture


size in MD and CD 30X20mm,
-do- ultimate tensile strenth 35Kn/m in MD and 60Kn/m in CMD, Tensile
strenth at 2% elongation 8Kn/m in MD and 9Kn/m in CD, aperture size
in MD and CD 25X25mm
-do- ultimate tensile strenth 40Kn/m in MD and 80Kn/m in CMD, Tensile
strenth at 2% elongation 8Kn/m in MD and 12Kn/m in CD,
Application Methodology:
Uniaxial geogrids are available in a range of tensile strength and are
suitable for applications, which require strength in one direction,these
are used in reinforced soil walls,steep slopes and basal reinforcement
of embankments,veneer reinforcement,etc..
38.27 Paving Fabric
Providing and Laying Needle punched and mechanically bonded Non- Sqm 104.00
woven Paving Fabric indigenously manufactured from high quality
Synthetic staple fibres having grab tensile strength of 39Kg , and melting
point of 150 °C confirming to ASTM / Morth sec - 700 over a tack coat
of paving grade bitumen 80-100 preparation, laid at the rate of 1 kg
per sq.mtr over thoroughly cleaned and repaired surface to surface
with pneumatic roller to maximize paving fabric contact with pavement
surface as per drawing.

Application Methodology:
Paving fabric is a strong layer of fabric is applied under asphalt to
minimize surface water infiltration and prevent existing cracks in the road
from surfacing to enhance the performance of pavement. The Barrier
function refers to the prevention of fluid movement across the plane of
the geotextile. A nonwoven geotextile provides a barrier function when
saturated with an impermeable material, like bitumen. It Retards the
propagation of cracks, Reduced the required design overlay thickness,
Extends the life of the overlay and the pavement section,These can be
used as asphalt over lay on flexible pavement a nd rigid pavement –a
layer of DBM/BC should be provided on rigid pavement before laying
the paving fabric.

296
Sl. No. Description Unit Rate
Rs. Ps.

38.28 Providing and construction of steel wire mesh Gabion retaining wall for
retaining walls with Mechanically woven double twisted, mechanically
selvedge, Zinc+PVC coated Gabion of mesh type 10x12, wire dia
2.7/3.7mm (inner/outer diameter), Selvedge wire dia 3.4/4.4mm as per
standards (EN/IS 16014) with diapragms (partitions), in every 1M for
Gabions of length higher then 1.5M as per standards, from manufacturers
of proven experience in similar technology, including filling of rubble of
size 150mm to 250mm at site including packing compactness to lins and
levels in the exposed face of masonry, in dry condition, simultaneously
during the course as per construction guidelines by the department/
installtion guidelines of manufacturer, including all lead, lift and labour
etc. complete. (In case of under water installation, the approrite provision
for crane, extra labour etc., need to be taken extra).
38.28.1 -do- for Gabion box size of 1x1x1 cum 2,157.00
38.28.2 -do- for Gabion box size of 1.5x1x1 cum 1,896.00
38.28.3 -do- for Gabion box size of 2x1x1/1 diaphragm cum 1,971.00
38.28.4 -do- for Gabion box size of 3x1x1/2 diaphragm cum 1,822.00
38.28.5 -do- for Gabion box size of 4x1x1/3 diaphragm cum 1,785.00
38.28.6 -do- for Gabion box size of 1x1x0.5 cum 3,125.00
38.28.7 -do- for Gabion box size of 1.5x1x0.5 cum 2,715.00
38.28.8 -do- for Gabion box size of 2x1x0.5/1 diaphragm cum 2,752.00
38.28.9 -do- for Gabion box size of 3x1x0.5/2 diaphragm cum 2,678.00
38.28.10 -do- for Gabion box size of 4x1x0.5/3 diaphragm cum 2,604.00

Application Methodology:

297
Sl. No. Description Unit Rate
Rs. Ps.

Metal Gabion is comprised double twisted hexagonally woven steel wire


mesh with zinc galvanized and PVC coated compartmented baskets with
a rectangular box shape. The compartments are of equal dimension and
are formed by internal diaphragms. The compartment is filled with natural
stone at the site of use,to form flexible,permeable,monolithic structures
for earth retension and the diaphragms assure minimum stone migration
within the basket. Thus providing even distribution of the stone even in
abnormal conditions,and adding strength to the container to help retain its
rectangular shape during the filling operation,depending on the application
and requirement,these gabions can be manufactured in different size
i.e.length and width with diaphragm mat every 1.0 m length.These are used
in application like Earth control and soil conservation,Retaining structures/
walls,Rock wall protection netting,Protection of highways/Railways,Barriers
at the river,Bridges and culvert protection,Marine and sea wall
protection,Lining of steep slopes or slopes protection,Revetments for
lakes and sea shores ,Lining of canals and dams,etc.
38.29 BORE PACKING for pipe joints
Providing & applying high strength non shrink free flow grout (confirming No 245.00
to BS 1881-Part 116 : 1983)comprising of blend of portland cement,
graded fillars and chemical additives which impart controlled expansion
in the plastic state duly minimizing water demand. (Minimum 25mm
thickness around the pipe)
Standards
1. Compressive strength for 28 days 78 N/sqmm
2. Flowable (Water powder ratio 0.18)
3. Pourable (Water powder ratio 0.165)
4. Tensile strength for 28 days 3.5 N/ sqmm
5. Flexural strength for 28 days 10 N/ sqmm
6. Unrestrained expansion – 2 to 4 % in the plastic state
Methodology :
Non shrink free flow grout shall be added to the water in the ratio of 25
Kg : 4.125 ltrs of water for pourable condition and for flowable condition
4.5 ltrs by using heavy duty slow speed grill (400 to 500 RPM) fitted with
the suitable peddle for 5 minutes. To get the best result the mixed grout
should be placed and used in 20 minutes after the mixture.
38.30 PROVIDING TRAPEZOIDAL PROFILED SHEET
Providing and installing of pre painted Galvolume iron Trapezoidal Sqm 573.00
profiled sheet of approved make 1060 mm width (1000 mm cover width),
28-30 mm crest height with crest distance of 200 mm c/c with 2 ribs at
the centre for stiffening. The total coated thickness (TCT) of the sheet
will be 0.47 mm +/- 0.02 mm tolerance Zinc-Alu Alloy coating AZ150
gsm as per ASTM 1397/A755-550 mpa steel grade, 5-7 microns epoxy

298
299
Sl. No. Description Unit Rate
Rs. Ps.

primer on both side of the sheet and polyester top coat 20-22 microns
using self drilling/self tapping screws of 25 mm length, to be fixed over
the existing purlins, rafters, channels and trusses.
38.31 Providing and installing of approved make pre painted Galvalume iron Sqm 550.00
Accessories, like, plain, ridges, plain gutter, plain flashing, corner Trim,
etc The total coated thickness (TCT) of the sheet shall be 0.47 mm
+/- 0.02 tolerance mm Zinc-Alu Alloy coating AZ 150 gsm as per ASTM
1397/755 -550 mpa steel grade, 5-7 microns epoxy primer on both side
of the sheet and polyester top coat 20-22 microns using self drilling /
self tapping screws of 25 mm length. (width upto 500-600 mm only),
to be fixed over the existing purlins, rafters, channels and trusses.
38.33  Stone cleaning specification:
Cleaning Unpolished granite surface by application of Proven, Readily
Biodegradable, VOC free, Stabilised, Non-Dilutable, Water Base & Ready
to Use (RTU) liquid chemical formulation with no contact time restriction
over the heavily soiled unpolished granite stone surface using a 30 psi
spraying equipment / Roller / Brush spreading & thoroughly wetting the
chemical @ minimum 0.25 ltr to cover 1 sq.mtr on the surface to be
treated. Allow the penetration & chemical reaction time for a minimum
of 24 hrs time. The surface is then low pressure water rinsed with rotary
nozzle @ 700 psi after scrubbing the surface till all the organic & inorganic
contamination, dirt, hydro-carbon soils, algae & rust stains from both
the surface & pore of the substrate is completely removed, the stone is
returned to its natural colour & permeability restored. The formulation
being used should be free from corrosive acids such as Hydrochloric or
Muriatic acid, Hydrofluoric acid, caustics or Sodium Hydroxide, bleach or
Sodium Hypochlorite, abrasives and petroleum distillates. No free Acids
or Alkalis to be used.The process should include all chemical materials,
labour, application tools, spraying equipment, Low pressure washer,
safety procedures, hand gloves, face shields, goggles, protective wear
clothing, scaffolding & working platform, lead & lift, transportation, all
incidental charges etc., complete as per the directions of the Engineer-
in-charge of the work.
Conditional submittals to carry out any restoration cleaning project.
1. The company manufacturing restoration chemical should have at least
a minimum of 10 years of successful & proven presence with respect to
this formulation in restoration industry either in India or Internationally.
This comes with declaration of the same from the manufacturer on
company letter head.
2. The restoration contracting company should have at least a minimum
of 5 years experience in restoration industry with successful completion
certificate & also having completed a minimum of 50% value of the
tendered value.
3. The product should accompany Material Safety Data Sheet meeting
OSHA Standards & Product Data Sheet.
300
Sl. No. Description Unit Rate
Rs. Ps.

4. Chemical formulation should be certified or approved from a reputed


and registered Heritage Conservation institution for its quality & safe
performance at least for a minimum of 3 Yrs.
5. The work to be started after formal approval of test patch executed at
the site by Engineer-in-charge.
The above conditions are very vital since any damage that occurs
on stone is irreversible & will end up with damaged surface which is
irreparable. Hence, to protect what we can call assets of our heritage and
culture for decades, these kind of stringent measures to be considered
to evaluate & see whether a particular product or a contracting company
deserves & qualifies to take up such restoration cleaning project.
WORK PROCEDURE 
Step No. 1: SURFACE PREPARATION.
 The Stone surface to be prepared by removing all loose particles & dust. The surface
to be made free from the above said contaminations by wire brushing with non-metallic
brushes, followed by dusting off with Electric blower after the installation of modular
steel Scaffolding. 

Step No. 2: APPLICATION & PENETRATION. 


Application of special chemical formulation, a water based READY TO USE chemical
cleaning formulation applied by brush or roller on Stone surface, followed by scrubbing

the surface thoroughly by plastic bristled brushes to enable proper penetration & left
to dry for a minimum period of 24 hrs. Depth of penetration is directly dependent on
surface preparation & hence the stone surface to be prepared with ruthless dedication
to bring out the best in decontamination of the stone surface.

Step No. 3: EXTRACTION - PRESSURE WASH.


The dissolved & suspended grime on the Stone surface ready to be rinsed by
thoroughly washing with Low-pressure washing equipment, which should effectively
remove all the contamination that has been extracted & dislodged by chemical
treatment completely. This is the most critical process technically in this entire cleaning
operation, which calls for high skill in both handling & application. Only Turbo-rotary
nozzles to be used & pressure at any given point of time should be in range of 700
psi & not to exceed the same. 

Guarantee:
Should assure that treatment will never give rise to formation of yellow stains
& neither erodes stone or pointing for life time which is normal with either acid
washing or using unproven and un-stabilised inferior acid based stone cleaning
formulations. The treatment should also not give rise to dust retentive surface
which happens due to surface becoming rough because of erosion of a layer
from the original surface after cleaning which denotes the initiation of surface
deterioration & leading to stone becoming dirty, dingy & discoloured soon.

301
Sl. No. Description Unit Rate
Rs. Ps.

After completion of the work a warranty of 5 years shall be submitted declaring


that there will no deterioration of any nature to either stone surface or cement
pointing on Rs 200/- Government stamp paper.

38.33.1 Stone cleaning using biodegradable liquid solution


The granite stone surface to be cleaned by means of coconut wire Sqm 303.00
brush and dry cloth and there after apply safe N easy/Equivalent
Bio-degradeable liquid solution on the cleaned surface with nylon brush
or sponge to an extent, towards upwards from the bottom, approximate
1 liter covers 10 sqmtr and let the soaked surface react with the applied
chemical, the depositis of dust, dirt and other material depositis on the
surface and finally to be cleaned after two hours of application. Connect
a water pipe with water source to wash with pressure of 130ps per
seccound on the safe N Easy/Equivalent Bio-Degradable liquid solution
applied surface, untill the deposit of dirt, hydro corbon soils and alge
from the surafce and pores of the substrate is completely removed. The
principal properties of the stone is to be retained without any slightest
pitting on the surface. let the cleaned surface to dry from the natural
environment fopr a day or 24hrs. the process should include all chemical
materials, labour application, tools, high pressure water jet machine,
safety procedures like hand gloves, helmet, safety belt gum boots,
scaffolding, transportation etc., as per the instructions of the Engineer
-in-charge of the work. The Bio-Degradable liquid solution sholud be
ammonium hydrogendifloride solution and be approved by OSHA( The

Occupational safety & Health administration) as user friendly, substrate


friendly and Environmental friendly & Sara III section 313 standards
(Toxic Chemical Release Reporting Section 313 of the Emergency
planning community Right to know Act 1986 requires EPA to esatblish
an inventory of routine toxic chemicals emissions from certain faclities).
The solution should not contain Hydrofloric acids, Muratic acids, caustic,
bleach, abbressive or petroleum distillates, anit should containa bare
minimum of near neutral PH 5.0 -5.55
38.34 SLIDING WINDOWS (2 Shutters) or Equivalent Sliding Windows
(Suitable for residential and non-residential buildings)
Providing and fixing of Sliding Windows made of Galvanized Steel (Base
Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120
GSM). The factory made section should be powder coated with Pure
polyester powder upto 50-60 microns thick with total coated thickness
of 0.8 mm for Outer Frame and 0.58mm thickness for Sliding Shutter
Section. The Outer Frame size for Two Tracks with Grill provision is
90mm x 50mm and without grill provision is of 75mm x 50 mm. The
Window Shutter section is of 58 mm x 36 mm. The Outer Frame should
have Two integrated Guide tracks of 12mm width and 24mm deep for

302
Sl. No. Description Unit Rate
Rs. Ps.

provision to slide the Shutter / sash frame and facilitates with a water
drain outlet component made of PVC. The Shutter frame should be fitted
with 5mm thick plain float glass of reputed make and fixed with EPDM
weathering seal resistant accessories and handle made of Alumimium
1 No. per each shutter. The sections are to be cut to length miter joined
with corner brackets. The total window system is to be installed at the
site using anchor fasteners, Silicon sealant applied at the Outer Frame
Corners. The cost is inclusive of conveyance of all materials accessories,
labour charges, and erection at site with complete finished item of work.
38.34.1 Window with Two Sliding Shutters and with Grill Outer Frame Size Sqm 4,303.00
90 mm x 50 mm have a rebate of 15mm x 5 mm to fit grill made of 10mm
MS Sq Rods for horizontal bars welded at a regular pitch of 150mm to
12mm x 6 mm MS flat.
38.35 SLIDING WINDOWS (3 Shutters) or Equivalent Sliding Windows
(Suitable for residential and non-residential buildings):
Providing and fixing of Sliding Windows made of Galvanized Steel (Base
Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120
GSM). The factory made section should be powder coated with pure
polyester powder upto 50-60 microns thick with total coated thickness of
0.8 mm for Outer Frame and 0.58mm thickness for Sliding Shutter Section.
The Outer Frame size for Two Tracks with Grill provision is 135mm x
50mm. The Window Shutter section is of 58 mm x 36 mm. The Outer
Frame should have Two integrated Guide tracks of 12mm width and 24mm
deep for provision to slide the Shutter / sash frame and facilitates with a
water drain outlet component made of PVC. The Shutter frame should be
fitted with 5mm thick plain float glass of reputed make and fixed with EPDM
weathering seal resistant accessories and handle made of Alumimium 1
No. per each shutter. The sections are to be cut to length miter joined with
corner brackets. The total window system is to be installed at the site using
anchor fasteners, Silicon sealant applied at the Outer Frame Corners. The
cost is inclusive of conveyance of all materials accessories, labour charges,
and erection at site with complete finished item of work.
38.35.1 i) Center Shutter Fixed: center shutter frame made of section with size Sqm 4,748.00
36mm x 58mm should be fitted with 5mm thick plain float glass of reputed
make, EPDM gasket all around the glass and fixed to the Outer Frame
with the supporting section of size 29mm x 20mm of 0.58mm thick fixed
horizontally on top and bottom of the shutter frame
38.35.2 ii) Center Shutter Sliding: center shutter frame made of section of Sqm 4,806.00
size36mm x 58mm should be fitted with 5 mm thick plain float glass
of reputed make. The supporting guide section of size 15mm x 19mm
of 0.58mm thick fixed horizontally at top and bottom of shutter frame
and slides along the bottom and top guide tracks made of sections size
24mm x 20mm of 0.58mm thick and 29mm x 20mm of 0.58mm thick.
38.36 Steel Windows with grill and flymesh for residential buildings

303
Sl. No. Description Unit Rate
Rs. Ps.

Providing and fixing of windows made of pre-painted steel (base steelas


per IS 513 of 0.58mm tick galvanized as per IS 277 with zinc of 120GSM).
Primer coated with epoxy primer of 5-7 microns thick, finishpainted with
a polyester paint of 12-16 microns thick and back coatedwith 5-7microns
thick alkyd backer. Section for outer frame should beof 72x55mm, centre
mullion should be of 72x50mm, section of the fixed glass beading should
be of 12x12mm. and section of the shutter shouldbe of 48x25mm. Outer
frame and mullion sections to have rebate forglazed shutters, fly mesh
and 20mm provision for guard bars/grill flymesh shutters section should
be of 20x40mm. The sections are to becut to length mitre joined with
corner bracket. Centre mullion is to befixed with mullion cap. Handle
latch 2 Nos of heavy duty stainless steelpivot hinges shall be provided
for shutter. The window should be ledwith 50mm thick plain float glass
and S.S. Mesh for fly mesh shutter(304 grade). Rubber gaskets are to
be provided all around the glass. The above frames should be fixed to
the concrete/masonry wall bymeans of self-expanding screws, including
10mm square guard barswith 6” (152.4mm) pitch complete for finished
item of work.
38.36.1 Double shutter window with vertical mullion 3’0”x4’0” (914.4mm Sqm 5,410.00
x1219.2mm) outer frame section size of 72x50mm shutter frame section
size of 48x25mm mullion section size of 72x50mm.
38.36.2 Centre fixed both side openable shutter window 5’0”x4’0” (1524mm x Sqm 5,225.00
1219.2mm). Outer frame section size of 72x50mm. Shutter frame section
size of 48x25mm mullion section size of 72x50mm. Fixed beading section
size of 12x12mm.
38.37 Steel Windows with grill for residential buildings
Providing and fixing of windows made of pre-painted steel (base steel
as per IS 513 of 0.58mm tick galvanized as per IS 277 with zinc of 120
GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick and back coated
with 5-7microns thick alkyd backer. Section for outer frame should be
of 48x50mm, centre mullion should be of 48x50mm, section for shutter
should be of 48x25mm and fixed glass beading section should be of
12x12mm. Outer frame and mullions to have rebate for glazed shutter
and a 20mm provision for guard bars/grills. The sections are to be cut
to length mitre joined with corner bracket. Centre mullion is to be fixed
with mullion cap. Handle stay 2Nos of stainless steel heavy duty pivot
hinges shall be provided for shutter. The window should be panelled with
5mm thick plain float glass. Rubber gaskets are to be provided all around
the glass. The above frames should be fixed to the concrete/ masonry
wall by means of self expanding screws, including 10mm square guard
bars with 6” (152.4mm) pitch etc., complete for finished item of work.
38.37.1 Double shutter window with vertical mullion 3’0”x4’0” (914.4mmx1219.2mm) Sqm 3,131.00
outer frame section size of 48x50mm shutter frame section size of
48x25mm mullion section size of 48x50mm.

304
Sl. No. Description Unit Rate
Rs. Ps.

38.37.2 Centre fixed both side openable shutter window 6’0”x4’0” (1828.8mmx Sqm 3,418.00
1219.2mm). Outer frame section size of 48x50mm shutter frame section
size of 48x25mm mullion section size of 48x50mm. Fixed beading section
size of 12x12mm.
38.38 Pre-painted steel windows / Ventilators & door frames
Supply and fixing of windows and top hung and fixed louered
ventilatorsmade of pre-painted steel (base steel as per IS 513 of
-0.58mm thick‘D’ quality, galvanized as per IS 277 with zinc of 120 GSM)
with apolyester paint, of 12-16 microns thick and back coated with 5-7
micronsthick alkyd backer. Section for outer frame should be 46x52mm,
sectionfor shutter should be 46x46mm, section for mullion should be
46x70mm,and section for beading should be 18x25mm and section for
louvered ventilator should be 33x57mm the windows hould be pannaled
with 5 mm thick plain float glass and 4mm pinhead glass for ventilators
with rubber Gasket. The sections are to be cut to length, mitre joined
with corner bracket and centre mullions are to be fixed using mullion
cap. Handle made of high grade aluminium powder coated and nylon
receiver. Corner brackets made of CRCA with Zinc Phosphate. Mullion
caps made of glass filled nylon. The above frames should be ixed to the
concrete/ masonry will by means of self-expanding screws. Including
10mm square bars with 6” pitch complete finished item of work.
38.38.1 WINDOWS : Double shutter 3’-0” X 4’ - 0” (914.4MM x 1219.2 MM) outer Sqm 3,201.00
frame section size of 46x52mm shutter frame section size of 46x46mm.
38.38.2 WINDOWS : Centre fixed both side openable shutter 5’-0” x 4’-0” Sqm 2,996.00
(1524x1219.2mm) outer frame section size of 46x52mm shutter frame
section size of 46x48mm mullion section size of 46x70mm fixed beading
section size of 18x25mm.
38.38.3 Ventilators : Top hung 4’-0” x 3’-0” (1219.2x914.4mm) outer frame section Sqm 3,013.00
size of 46x52mm shutter frame section size of 46x46mm mullion section
size of 46x70mm.
38.38.4 Ventilators : Fixed lovers 4’-0” x 3’-0” (1219.2x914.4mm) (Box section) Sqm 2,901.00
outer frame section size of 33x57mm mullion section.
38.39 Road Humps / Speed breakers for control of vehicular speeds on roads
Providing road humps for the entire formation width, using bituminous
premix materials and heavy duty cobble stones 60 mm thick, having
road hump dimension of 1.00 mtr. (width) X 0.15 mtr (height) rectangular
sections and ramp on either side of road hump of 0.85 mtr (wide),
including providing WBM (2 layers) for shoulder portion 1.7mts in
length on either side, completing with road marking paint with applied
thermoplastic compound with reflecting glass beeds on bituminous
surface and providing 2 Nos. retro reflective traffic signs as per IRC SP
67 -2010 (for details refer IRC 99-1988)
38.39.1 for single lane for formation width of 7.50 mtrs. and using SDBC mix Unit 24,871.00
material
38.39.2 Intermediate lane for formation width of 9.00 mtrs using SDBC mix Unit 28,940.00
material

305
Sl. No. Description Unit Rate
Rs. Ps.

38.39.3 lane for formation width of 12 mtrs. using SDBC mix material Unit 37,271.00
38.40 Providing road humps for the entire formation width, using bituminous
premix materials and heavy duty cobble stones 60 mm thick, having
road hump dimension of 1.00 mtr. (width) X 0.15 mtr (height) rectangular
sections and ramp on either side of road hump of 0.85 mtr (wide),
including providing WBM (2 layers) for shoulder portion 1.7mts in
length on either side, completing with road marking paint with applied
thermoplastic compound with reflecting glass beeds on bituminous
surface and providing 2 Nos. retro reflective traffic signs as per IRC SP
67 -2010 (for details refer IRC 99-1988)
38.40.1 for single lane for formation width of 7.50 mtrs. and using BC mix material Unit 26,921.00
38.40.2 Intermediate lane for formation width of 9.00 mtrs using BC mix material Unit 28,941.00
38.40.3 lane for formation width of 12 mtrs. using BC mix material Unit 38,382.00
38.41 Providing, laying, rumble strips, 250 mm wide and 25mm height in
rectangular shape at 1.00 mtr center to center for the entire formation
width of road using pre mix bituminous material, including providing
WBM (2 layers) for shoulder portions, applying tack coat, providing
2 Nos. retro reflective traffic signs as per IRC SP 67-2010 (for details
IRC 99-1988)
38.41.1 For 3 nos - including WBM layers for length of 2 mtrs on either side
of carriage way in shouldr portion.
38.41.1.1 Single lane using SDBC mix material. Unit 13,497.00
38.41.1.2 Intermediate lane using SDBC mix material. Unit 13,167.00
38.41.1.3 2 lane using SDBC mix material. Unit 16,420.00
38.41.2 For 5 nos - including WBM layers for length of 4 mtrs on either side
of carriage way in shouldr portion.
38.41.2.1 Single lane using SDBC mix material. Unit 18,914.00
38.41.2.2 Intermediate lane using SDBC mix material. Unit 18,342.00
38.41.2.3 2 lane using SDBC mix material. Unit 23,743.00
38.41.3 For 10 nos - including WBM layers for length of 9mtrs on either
side of carriage way in shouldr portion.
38.41.3.1 Single lane using SDBC mix material. Unit 32,395.00
38.41.3.2 Intermediate lane using SDBC mix material. Unit 31,248.00
38.41.3.3 2 lane using SDBC mix material. Unit 42,050.00
38.41.4 For 15 nos - including WBM layers for length of 15 mtrs on either
side of carriage way in shouldr portion.
38.41.4.1 Single lane using SDBC mix material Unit 45,855.00
38.41.4.2 Intermediate lane using SDBC mix material. Unit 44,132.00
38.41.4.3 2 lane using SDBC mix material. Unit 60,332.00

306
Sl. No. Description Unit Rate
Rs. Ps.

38.42 Providing and laying Geocells ultrasonically welded 1.30mm thick,


HDPE strips, expandable to form GEOCELLS of honeycomb structure,
anchoring to metal pegs at each and cell to be laid on prepared surface.
38.42.1 - do - 100mm height Sqm 308.00
38.42.2 - do - 150mm height Sqm 400.00
38.43 Providing, fabricating and fixing profiled poly erethane insulated roof Sqm 1,675.00
of 1,06m width and 7,60m length sheets roof having external sheet of
0.5mm steel with powder coated finish, bottom sheet of 0.4mm steel
with powder coated finish. The roofing system shall have water proof
over lapping arrangement at the inter section of two sheets the fasting
shall be of self tapping screws dia 6.3mm or required length with PVC
head along with washer pre-painted aluminium cap unit with build in seal
arrangements. The entire roof shall be firmly fasteed to the existing frame.
38.44 UPVC Windows and Doors
38.44.1 Providing & fixing of 2-track x 2-panel sliding windows made out of multi Sqm. 2,521.00
chambered UPVC(Matching to RAL-9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized)
and lead free, gaskets -grey colour having isolated drainage and
reinforced with Galvanized Iron profile through-out the window frame.
The outer frame having a overall size of 44mm width x 40mmheight
with reinforcement of 1mm thickness and Sash with overall size of
27mm X 53mm with UPVC honeycomb structureinside in lieu of GI
reinforcement. Glazing bead for fixing of glass shall be of size 9.5mm
x 21.5mm. Windows shall be provided with 5mm plain float glass,
standardhardware& single point locking system with Crescent Locks.
Wall thickness of frame & sash shall be of 2 mm.Maximum possible
size – 1219mm x 1219mm.
38.44.2 Specification for uPVC ventilator with fixed Louvers
Providing & fixing of louvered ventilator made out of multi chambered Sqm. 3,026.00
UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium
Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free
with gaskets -grey colour having isolated drainage and reinforced with
Galvanized Iron profile through-out the ventilator frame. The frame having
overall size of 39mm x 39mm with GI reinforcement of 1mm thickness.
Louver clip in Aluminium (powder coated in white) will be used on the
frame along with plastic parts for fixing the 4 mm pin head glass. Wall
thickness of frame shall be 2mm.Maximum possible size – 1000mm x
1000mm.
38.44.3 2 track x 2 Panel Specification for uPVC windows

307
Sl. No. Description Unit Rate
Rs. Ps.

Providing & fixing of 2-track x 2-panel sliding windows made out of multi Sqm. 3,783.00
chambered UPVC(Matching to RAL-9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized)
and lead free, gaskets -grey colour having isolated drainage and
reinforced with Galvanized Iron profile through-out the window frame.
The outer framehaving a overall size of 50mm width x 42mmheight with
reinforcement of 1mm thickness and Sash with overall size of 31mm
X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for
the sash. Glazing bead for fixing of glass shall be of size 21.5mm
x 9.5 mm. Windows shall be provided with 5mm plain float glass,
standardhardware& single point locking system with touch lock. Wall
thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible
size – 1519mm x 1519mm.
38.44.4 2.5 track x 2 Panel with mesh Specification for uPVC windows
Providing & fixing of 2.5 track x 2-panel sliding windows made out Sqm. 4,350.00
of multi chambered UPVC(Matching to RAL-9016) sections and with
minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic
Vulcanized) and lead free, gaskets -grey colour having isolated
drainage and reinforced with Galvanized Iron profile through-out the
window frame. The outer framehavinga overall size of 81mm width x
42mmheight with reinforcement of 1mm thickness and Sash with overall
size of 31mm x 57mm and mesh sash of size with GI reinforcement
of 1.5mm thickness. Glazing bead for fixing of glass shall be of size
21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass,
standardhardware& single point locking system with touch lock. Wall
thickness of frame & sash shall be of 1.8-2.0mm. Maximum possible
size – 1519mm x 1519mm
38.44.5 2 track x 2 Panel Specification for uPVC windows
Providing & fixing of 2-track x 2-panel sliding windows made out of multi Sqm. 4,097.00
chambered UPVC(Matching to RAL-9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized)
and lead free, gaskets -grey colour having isolated drainage and
reinforced with Galvanized Iron profile through-out the window frame.
The outer frame having a overall size of 60mm width x 45mmheight
with reinforcement of 1mm thickness and Sash with overall size of
39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm
for the sash. Glazing bead for fixing of glass shall be of size 20mm x
24mm. Windows shall be provided with 5mm plain float glass, standard
hardware& single point locking system with touch lock. Wall thickness of
frame & sash shall be of 2-2.5 mm. Maximum possible size – 1819mm
x 1819mm

308
Sl. No. Description Unit Rate
Rs. Ps.

38.44.6 2.5 track x 2 Panel with mesh Specification for uPVC windows
Providing & fixing of 2.5 track x 2-panel sliding windows made out Sqm. 4,729.00
of multi chambered UPVC(Matching to RAL-9016) sections and with
minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic
Vulcanized) and lead free, gaskets -grey colour having isolated drainage
and reinforced with Galvanized Iron profile through-out the window frame.
The outer frame havinga overall size of 94mm width x 45mmheight with
reinforcement of 1mm thickness and Sash with overall size of 39mm x
58mm with GI reinforcement of 1.5mm and mesh sash of size 25mm
x 42mm. Glazing bead for fixing of glass shall be of size 20mm x 24
mm. Windows shall be provided with 5mm plain float glass, standard
hardware& single point locking system with touch lock. Wall thickness
of frame & sash shall be of 2mm-2.5mm. Maximum possible size –
1819mm x 1819mm.
38.44.7 3 track x 2 Panel with mesh Specification for uPVC windows
Providing & fixing of 3track x 2-panel sliding windows made out of multi Sqm. 4,729.00
chambered UPVC(Matching to RAL-9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized)
and lead free, gaskets -grey colour having isolated drainage and
reinforced with Galvanized Iron profile through-out the window frame.
The outer frame havinga overall size of 108mm width x 45mmheight with
reinforcement of 1mm thickness and Sash with overall size of 39mm
x 75mm with GI reinforcement of 2mm and mesh sash of size 30mm
x 48.5mm. Glazing bead for fixing of glass shall be of size 20mm x 24
mm. Windows shall be provided with 5mm plain float glass, standard
hardware& single point locking system with touch lock. Wall thickness
of frame & sash shall be of 2mm-2.5mm. Maximum possible size –
2419mm x 2119mm.
38.44.8 Specification for uPVC Openable window
Providing& fixing of Openable window made out of multi chambered Sqm. 4,540.00
UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium
Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free
with gaskets -grey colour having isolated drainage and reinforced with
Galvanized Iron profile through-out the openable frame. The frame
having overall size of 60mm x 55mm with GI reinforcement of 1mm
thickness and openable sash with overall size of 60mm x 75mm and GI
reinforcement of 1.5mm thickness. Glazing bead for fixing of glass shall
be of size 20mm x 34 mm. Windows shall be provided with 5mm plain
float glass, Standard hardware with friction hing & Multi point locking
system with Handle. Wall thickness of frame & sash shall be of 2mm-
2.5mm.Maximum possible size – 900mm x 1819mm.
38.45 Consultancy Services for Preparation of Land PlanSurvey for State
Highways and Major District Roads
The entire Land Survey Plan should be carried out using LiDAR KM 26,666.00
Technology only, Collection of all the relevant information for 50 Mtr on
either side from

309
Sl. No. Description Unit Rate
Rs. Ps.

The entire Land Survey Plan should be carried out using LiDAR
Technology only, Collection of all the relevant information for 50 Mtr on
either side from centre of the road, Details of Structures (if any), Cross
Drainage Structures, Arboriculture counts and other Assets, which have
been developed as a part of the road furniture / development. Establishing
the Primary Control Points (Horizontal Control), using the DGPS at every
1000 meters interval and secondary control points at every 500 meters
and also at important and salient locations, such as major inter sections,
Village / Town limits etc.,. The DGPS controls will be so established that it
meets the minimum criteria specified for carrying out the mapping activities
on a scale of 1:5000 or 1:10000. (Inclusive of all taxes) (Read also note
provided @ the end of this chapter)
38.46 Providing and fixing self-supported, ribbed, high quality, high grade
(D:350 MPA Yst Min ), pre- painted Galvalume steel roof sheet, coated
with bare Galvalume coating AZ 150, @ 150 gms/Smtr 55%AL,45%Zn)
by hot dip process , of total coated thickness as specified for different
spans with a tolerance of +/- 0.02 mm, according to technical specification
confirming to A 792, with NCCA ll-1, or ECCA T4 Pencil hardness HB,
NCCA standard T-Bend test. The roof should be fastened to the gutter
beam, on the external sloping side, at an interval of 51mm Centre to
Centre, to a depth of 65 mm with GI anchor bolts and neoprene
washers & subjecting the gutter beam to Schmidt, Hammer test to
ensure the anchorage of the anchor bolts. The self-supported roofing
system should be designed to with stand the wind load (As per IS 875
part-3) & Earthquake load (as per IS 1893) & the design should also
comply with any other technical requirements such as turbo ventilators
of 0.60 mts. dia and skylights of size 4.26 x 0.60 mts. fixed one in each
row @ 10.00 Mtr C/C along the length & hangers for electrical fixtures
as per the requirements including cost of all materials &labour for
erection, all lead and lift, loading and unloading, HOM of machineries
etc., complete as per the standard detailed technical specification,
design and directions of the engineer in charge of the work.
38.46.1 - do - sqm 1,300.00
(a) Span : 9 Meters upto 15 Meters
(b) Material Specification: Colour Coated Galvalume Sheet, weighing
10.10 kg/sqm
BMT: 0.80 MM, APT : 0.85 MM, tolerance +/- 0.02mm
38.46.2 - do - sqm 1,375.00
a) Span :Above 15 Meters upto 18 Meters
(b) Material Specification: Colour Coated Galvalume Sheet, weighing
11.35 g/sqm
BMT: 0.90 MM, APT : 0.95 MM, tolerance +/- 0.02mm
38.46.3 - do - sqm 1,450.00
(a) Span : Above 18 Meters upto 21 Meters
(b) Material Specification: Colour Coated Galvalume Sheet weighing
12.57kg/sqm
BMT: 1.00 MM, APT : 1.05 MM, tolerance +/- 0.02mm

310
Sl. No. Description Unit Rate
Rs. Ps.

38.46.4 - do - sqm 1,562.00


(a) Span : Above 21 Meters upto 23 Meters
(b) Material Specification: Colour Coated Galvalume Sheet weighing
13.80kg/sqm
BMT: 1.10 MM, APT : 1.15 MM, tolerance +/- 0.02mm
38.46.5 - do - sqm 979.00
(a) Span : Above 23 Meters upto 25 Meters
(b) Material Specification: Colour Coated Galvalume Sheet, weighing
15.16kg/sqm
BMT: 1.20 MM, APT : 1.25 MM, tolerance +/- 0.02mm
38.46.6 - do - sqm 1,708.00
(a) Span : Above 25 Meters upto 27 Meters
(b) Material Specification: Colour Coated Imported Galvalume Sheet,
weighing 16.40 kg/sqm
BMT: 1.30 MM, APT : 1.37 MM, tolerance +/- 0.02mm
38.46.7 - do - sqm 1,820.00
(a) Span :Above 27 Meters upto 30 Meters
(b) Material Specification: Colour Coated Imported Galvalume Sheet,
weighing 17.63 kg/sqm
BMT: 1.40 MM, APT : 1.47 MM, tolerance +/- 0.02mm
38.46.8 - do - sqm 1,933.00
(a) Span :Above 30 Meters upto 32 Meters
(b) Material Specification: Colour Coated Imported Galvalume Sheet,
weighing 18.87 kg/sqm
BMT: 1.50 MM, APT : 1.57 MM, tolerance +/- 0.02mm
38.46.9 - do - sqm 2,008.00
(a) Span : Above 32 Meters upto 35 Meters
(b) Material Specification: Colour Coated Imported Galvalume Sheet,
weighing 20.10kg/sqm
BMT: 1.60 MM, APT : 1.67 MM, tolerance +/- 0.02mm
38.47 Providing and applying a heat reflecting anti-fungal water based, flexible,
water proofing, roof coating for use on Roof/Terrace/Parapet. by formulating
the undercoat with polymer modified cementations water proof slurry mortar
and top coat consisting of 100% Acrylic Elastometric Ploymers embedded
with heat reflecting particles. For surfaces having cracks less than 5mm.
38.47.1 - do - in high rainfall areas(Two layers of under coat plus two layers of top coat) sqm 408.00
38.47.2 - do - in low rainfall areas(One layer of under coat plus two layers of top coat) sqm 364.00
38.48 Construction of Embankment / Sub grade using Nanotechnology
based chemical stabilizer and Cement.
38.48.1 Construction of Embankment using Nanotechnology material.
Construction of embankment with approved material gravel/murrum cum 658.00
and chemical stabilized like nanotechnology based organosilane or
equivalent (confirming to the required spec.) mixed in water @0.5kg/

311
Sl. No. Description Unit Rate
Rs. Ps.

cum (for soil CBR above 5%) and 1% cement by weight of soil, with
all lifts and leads, transporting to site, spreading, grading to required
slope and compacting to meet requirement table 300-2 complete as per
specifications. (Which includes cost of gravel/murrum, watering charges
& compacting by vibratory roller) MORTH Specification No. 305
38.48.2 Construction of Embankment with material deposited from roadway
cutting using nanotechnology material.
Construction of Embankment with approved material deposited at site from cum 550.00
roadway cutting and excavation from drain and foundation of other structures
graded and chemical stabilizer like nanotechnology based organolilane
or equivalent (confirming to the required spec.) Mixed in water @ 0.5kg/
cum and 1% cement by weight of soil and compacted to meet requirement
of table 300-2 complete as per specifications. (Which includes, watering
charges & compacting by vibratory roller) MORTH Specification No. 305
38.48.3 Construction of subgrade and earthen shoulders using
nanotechnology material
Construction of sub-grade and earthen shoulders with approved material cum 661.00
gravel/murrum and chemical stabilizer like nanotechnology based
organosilane or equivalent (confirming to the required spec.) Mixed in
water @ 0.5kg/cum (for soil CBR above 5%) and 1% cement by weight
of soil with all lifts & leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of table no. 300-2
complete as per specifications (Including cost of earth, watering charges
& compaction by vibratory roller) MORTH Specification No. 305
38.48.4 Loosening of the ground upto a level of 500mm below the subgrade cum 526.00
level, watered, graded and compacted in layers to meet requirement of
table 300-2 for subgrade construction complete as per specifications.
Case-I : Compacting original ground supporting subgrade using chemical
stabilizer like nanotechnology based organosilane or equivalent
(confirming to the required spec.) mixed in water @ 0.5kg/cum and 1%
cement by weight of soil, (which includes water charges & compaction
by vibratory roller) MORTH Specification No. 305.3.4
38.48.5 Loosening, levelling and compacting original ground supporting cum 508.00
embankment to facilitate placement of first layer of embankment, scarified
to a depth of 150mm, mixed with water at OMC and then compacted
by rolling so as to achieve minimum dry density as given in table 300-2
for embankment construction. Compete as per specifications. Case – II
: Compacting original ground supporting embankment using chemical
stabilizer like nanotechnology based organosilane or equivalent
(confirming to the required spec.) mixed in water @0.5kg/cum and 1%
cement by weight of soil (which includes watering charges & compaction
by vibratory roller) MORTH Specification No. 305.3.4
38.49 METALLIC DOOR FRAMES
38.49.1 Door Frame – Entrance
Providing & fixing factory made Galvanized plain steel door frame of rmt. 454.00
profile size 125 x 60 mm single rebate manufactured from galvanized
plain steel sheet 1.25 mm thick, conforming to IS:277. The door frame
312
Sl. No. Description Unit Rate
Rs. Ps.

consists of hinge jamb, lock jamb, head & bottom tie bars, supply in
knockdown condition & to be assembled at site by mechanical means
with special mitre joint. The bottom tie bar made out of galvanized plain
steel sheet 1.60 mm thick pressed angle 20 x 20 mm screwed to the
door frame. The stiffeners of 3 mm thick pre- punched & pre-trapped
are to be welded inside the pre-punched slots of the door frames &
4 nos. of S.S. butt hinges 100 x 59 x 2.5 mm to be screwed to the door
frame. The necessary stiffeners & mortar guards to be provided for
fixing hardware fixtures. The door frame to be powder coated after pre-
treatment of the surface. The door frame shall be filled with 1:3:6 cement
concrete & to be fixed with adjustable lugs/ hold fasts. Alternatively, dry
fixing shall be permitted by using metallic expansion bolt. The rate is
including transportation, loading, unloading, HOM etc. but excluding the
hardware fixtures. Size 1000 x 2130 mm
38.49.2 Door Frame – Internal
Providing & fixing factory made Galvanized plain steel door frame of rmt. 358.00
profile size 125 x 60 mm single rebate manufactured from galvanized
plain steel sheet 1.25 mm thick, conforming to IS: 277. The door frame
consists of hinge jamb, lock jamb, head & bottom tie bars, supply in
knockdown condition & to be assembled on site by mechanical means
with the special miter joint. The bottom tie bar made out of galvanized
plain steel sheet 1.60 mm thick pressed angle 20 x 20 mm to be screwed
to the door frame. The 4 nos. of G.I. Lift off hinge 100 x 67 x 2 mm to be
projected welded to the door frame. The necessary stiffeners & mortar
guards to be provided for fixing hardware fixtures. The door frame to be
powder coated after pre-treatment of the surface. The door frame shall be
filled with 1:3:6 cement concrete & to be fixed with adjustable lugs/ hold
fasts. Alternatively, dry fixing shall be permitted by using metallic expansion
bolt. The rate is including transportation, loading, unloading, HOM etc. but
excluding the hardware fixtures. Size 900 x 2130 mm
38.49.3 Door Frame – Wet areas – W.C. / Bath
Providing & fixing factory made Aluminium Zinc coated steel door frame
of profile size 105 x 60 mm single rebate manufactured from Aluminium
Zinc metallic coated steel sheet 1.20 mm thick, conforming to IS: 15961.
The door frame consists of hinge jamb, lock jamb, head & bottom tie bars rmt. 397.00
& supply in knockdown condition & to be assembled on site by mechanical
means with special mitre joint to be bottom tie bar made out of galvanized
plain steel sheet 1.60 mm thick pressed angle 20 x 20 mm to be screwed
to the door frame. The 3 nos. of S.S. butt hinges 100 x 58 x 1.9 mm to be
projection welded to the door frame. The necessary stiffeners & mortar
guards to be provided for fixing hardware fixtures. The door frame to be
powder coated after pre-treatment of the surface. The door frame shall be
filled with 1:3:6 cement concrete & to be fixed with adjustable lugs/ hold
fasts. Alternatively dry fixing shall be permitted by using metallic expansion
bolt. The rate is including transportation, loading, unloading, HOM etc. but
excluding the hardware fixtures. Size 750 x 2130 mm
38.49.4 Door Frame – Wet areas – W.C. / Bath rmt. 366.00
-Do- with Profile Size 90 x 50 mm - Size 750 x 2130 mm

313
Sl. No. Description Unit Rate
Rs. Ps.

38.50 METALLIC DOOR SHUTTERS


38.50.1 Door Shutters - Entrance
Providing & fixing factory made Galvanized steel door Shutters 32 mm sqm. 1,783.00
thick manufactured from pre- painted Galvanized plain steel sheet 0.60
mm thick conforming to the IS: 14246. The door shutters consist of two
outer skins if steel sheets, lock seam jointed at vertical stile edges,
horizontal top & bottom sides to form a double skin fully flush shell.
Rigid polyurethane Foam (PUF) of density 40 Kg/M3 shall be filled in the
hollow portion of door shutters for structure rigidly & sound insulation.
The necessary stiffeners of the Galvanized plain steel sheet of minimum
thickness 1.60 mm to be provided for fixing all hardware fixtures. The rate
is including transportation, loading, unloading, HOM etc. but excluding
the hardware fixtures. Size – 900 x 2035 x 32 mm thick.
38.50.2 Door Shutters - internal sqm. 1,858.00
- Do - of Size – 800 x 2035 x 32 mm thick.
38.50.3 Door Shutters - Wet areas – W.C. / Bath
Providing & fixing factory made Galvanized steel door Shutters 32 mm sqm. 2,083.00
thick manufactured from pre- painted Aluminium-zinc metallic coated
steel sheet 0.60 mm thick conforming to the IS: 15961. The door shutters
consist of two outer skins of steel sheets, lock seam jointed at vertical
stile edges, horizontal top & bottom sides to form a double skin fully
flush shell. Rigid polyurethane Foam (PUF) of density 40 Kg/M3 shall be
filled in the hollow portion of door shutters for structure rigidly & sound
insulation. The necessary stiffeners of Galvanized plain steel sheet of
minimum thickness 1.60 mm to be provided for all hardware fixtures.
The rate is including transportation, loading, unloading, HOM etc. but
excluding the hardware fixtures. Size – 650 x 2035 x 32 mm thick.
38.50.4 Door Shutters - Wet areas – W.C. / Bath
Providing & fixing factory made Galvanized steel door Shutters 32 mm
thick manufactured from pre- painted Aluminium-zinc metallic coated
steel sheet 0.60 mm thick conforming to the IS: 15961. The door shutters
consists of two outer skins of steel sheets, lock seam jointed at vertical
stile edges, horizontal top & bottom sides to form a double skin fully
flush shell. Rigid polyurethane Foam (PUF) of density 40 Kg/M3 shall be
filled in the hollow portion of door shutters for structure rigidly & sound
insulation. The necessary stiffeners of Galvanized plain steel sheet of
minimum thickness 1.60 mm to be provided for all hardware fixtures.
The rate is including transportation, loading, unloading, HOM etc. but
excluding the hardware fixtures. Size – 670 x 2045 x 32 mm thick.
38.52 Providing Stainless steel reinforcement (Duplex Grade - 532101) for RCC work Tonne 1,59,562.00
including straightening, cutting, bending, hooking, placing in position, lapping
and / or welding wherever required, tying with binding wire and anchoring
to the adjoining members wherever necessary complete as per design
(laps, hooks and wastage shall not be measured and paid) cost of
materials, labour, HOM complete as per specifications.

314
Sl. No. Description Unit Rate
Rs. Ps.

38.53 Providing and mixing Alkali resistant integral glass fibers HD 67/36 to cum 2,583.00
act as a replacement of steel reinforcement in supported slabs and to
provide secondary reinforcement in concrete at 5 kg / cum of concrete,
fibers of length 36 mm, diameter 19 microns,specific gravity 2.68,
modulus of elasticity 72 Gpa and having the aspect ratio (length/dia) of
67, including cost of labour,materials and HOM etc complete.(Note:The
work to be carried out with prior permission of the competent authourity.)
( NOTE: Rate is for cum of concrete)
38.54 Providing and applying 2 coats of corrosion Inhibition cement slurry on Tonne 1,391.00
Reinforcement bars prepared by mixing of 1 Kg of OPC with 500 CC of
Inhibitor solution of approved quality by dipping or brushing method,the
first coat being applied after cleaning the bars by wire brush or alkaline
cleaning powder to remove the rust and dust, and allowed to air dry for
12-24 hours as the case may be and the second coat being applied on the
fabricated bars before placing in position as per clause 5.3.3 of IS 9077-1979.
The Rate includes cost and conveyance of all materials, labour charges
etc., complete as per the direction of Engineer in-charge.
38.55 Providing and laying self-compacting controlled concrete produced by cum 4,020.00
IS 9001 accredited plants conforming to EN 206-1 M-20 grade, with
OPC @ 185 kg/cum conforming to EN-197-1 GGBS 175 kg/cum, 20 mm
to 12.50 mm graded coarse aggregates @ 865 kg/cum, conforming to
EN-12620 obtained from a single source with a ceiling flakiness index of
5% , M-sand @ 1015 kg/cum, having aggregate particles finer than 45
microns, limited to 8% (2% for natural sand) and water cement ratio as
per EN 1008, with vertical free fall distance and horizontal flow for concrete
from point of discharge limited to 5m & 10mts respectively including cost of
all materials, labour charges, scaffolding, curing, hire charges of machineries
etc., complete as per the direction of Engineer-in-charge of work.
38.56 Providing and laying self-compacting controlled concrete produced by IS cum 4,362.00
9001 accredited plants conforming to EN 206-1 M-25 grade, with OPC @
255kg/cum conforming to EN-197-1 GGBS 145 kg/cum, 12.5mm graded
coarse aggregates 745kg/cum, conforming to EN-12620 obtained from
a single source with a ceiling flakiness index of 5%, M-sand @ 1065 kg/
cum, having aggregate particles finer than 45 microns, limited to 8% (2%
for natural sand) and water cement ratio as per EN 1008, with vertical
free fall distance and horizontal flow for concrete from point of discharge
limited to 5m & 10mts respectively including cost of all materials, labour
charges, scaffolding, curing, hire charges of machineries etc., complete
as per the direction of Engineer-in-charge of work.
38.57 Providing and laying self-compacting controlled concrete produced by IS cum 4,666.00
9001 accredited plants conforming to EN 206-1 M-30grade, with OPC @
275kg/cum conforming to EN-197-1 GGBS 185 kg/cum, 12.5mm graded
coarse aggregates 790kg/cum, conforming to EN-12620 obtained from
a single source with a ceiling flakiness index of 5%, M-sand @ 990kg/

315
Sl. No. Description Unit Rate
Rs. Ps.

cum, having aggregate particles finer than 45 microns, limited to 8% (2%


for natural sand) and water cement ratio as per EN 1008, with vertical
free fall distance and horizontal flow for concrete from point of discharge
limited to 5m & 10mts respectively including cost of all materials, labour
charges, scaffolding, curing, hire charges of machineries etc., complete
as per the direction of Engineer-in-charge of work.
38.58 Providing and laying self-compacting controlled concrete produced by IS cum 4,925.00
9001 accredited plants conforming to EN 206-1 M-35 grade, with OPC @
305kg/cum conforming to EN-197-1 GGBS 195 kg/cum, 12.5mm graded
coarse aggregates 800kg/cum, conforming to EN-12620 obtained from
a single source with a ceiling flakiness index of 5%, M-sand @ 970kg/
cum, having aggregate particles finer than 45 microns, limited to 8% (2%
for natural sand) and water cement ratio as per EN 1008, with vertical
free fall distance and horizontal flow for concrete from point of discharge
limited to 5m & 10mts respectively including cost of all materials, labour
charges, scaffolding, curing, hire charges of machineries etc., complete
as per the direction of Engineer-in-charge of work.
38.59 Providing and laying self-compacting controlled concrete produced by IS cum 5,154.00
9001 accredited plants conforming to EN 206-1 M-40 grade, with OPC @
400kg/cum conforming to EN-197-1 GGBS 105 kg/cum, 12.5mm graded
coarse aggregates 910kg/cum, conforming to EN-12620 obtained from
a single source within a ceiling flakiness index of 5%, M-sand @ 820
kg/cum, having aggregate particles finer than 45 microns, limited to 8%
(2% for natural sand) and water cement ratio as per EN 1008, with vertical
free fall distance and horizontal flow for concrete from point of discharge
limited to 5m & 10mts respectively including cost of all materials, labour
charges, scaffolding, curing, hire charges of machineries etc., complete
as per the direction of Engineer-in-charge of work.
38.60 Light gauge steel frame structure (lgsfs) for dry wall panel system
Providing and fixing factory finished custom designed structurally stable, KG 129.00
corrosion resistant, cold formed wall structure, trusses, joists, purlins,
connection accessories etc., made out of 0.95 mm thick galvanized
steel coils, (AZ – 150 gms, Aluminium-Zinc alloy coated steel) having
minimum yield strength of 550 Mpa, using computerized cold forming
machine to ‘C’ type sections having a minimum web thickness of 89
mm, flange width 40 mm with 10mm lip as per drawings conforming to
AISI specifications and IBC 2009 for cold formed steel and construction
confirming to Indian standards as per IS: 800-1984, IS: 801-1975, IS:875-
1987(Part III) and IS:1893, the LGS frames shall be manufactured using
computerized machine duly punched with dimple, service holes and slots
at required location and supplied in assembled state using self tapping
screws with corrosion resistant coating in accordance with ASTM B633
of specified pitch as per requirements or in a dismantled state , and
mounted / firmly fixed to the existing plinth beam using self expandable
carbon steel anchor bolts, 12 mm dia and 121 mm in length conforming
to AISI 304 & 306 standards @ 500 mm c/c with a minimum embedment
of 100 mm in RCC located at 300 mm from corners or from bottom LGS
frames confirming to Designs and Specifications

316
Sl. No. Description Unit Rate
Rs. Ps.

including all costs of labour, materials, fabrication, assembling,


transportation, erection, incidental and unforeseen charges complete
as per the directions of the engineer in charge of the work.
38.61 Providing and fixing with internal and external cement fibre boards/
coir composite boards to lgsfs Dry wall panel system
Providing and fixing for both external and internal faces of Light Gauge Sqm 2,466.00
Steel Frame Structure in two layers, sandwiching a breathable vapour
barrier in between layers as per NBC code 2009, with external face
having a 6mm thick heavy duty fiber cement board/coir composite board
fixed on a 9mm thick heavy duty fiber cement board/coir composite
board confirming to IS 14862:2000, Category IV type A or equivalent
in standard sizes and internal face with 12.5mm thick gypsum plaster
board/coir composite board fixed on 8mm thick fiber cement board/coir
composite boards confirming to IS 14862:2000 of category III type B
(High pressure steam cured) or equivalent ,as per standard sizes with
self drilling tapping screws half counter sunk, rib head of 1.60mm to
4mm thick, 8 to 10 gauge, length varying from 25 to 45mm / fasteners @
600mm c/c of approved make, with a staggered vertical joint of 2mm to
3mm sealed with a silicon based sealant and smooth finished using fiber
mesh tape and Epoxy and acrylic based joining compound for seamless
finish and the material and process of manufacture and assembly/
erection confirming to Designs and Specifications including all costs
of labour, materials, fabrication, assembling, transportation, erection,
incidental and unforeseen charges complete as per the directions of the
engineer in charge of the work.
38.62 Providing and fixing with eps –weld mesh-cement-sand shotcrete
wall panels to lgsfs.
Providing and fixing in position factory made expanded polystyrene core Sqm 2,408.00
(EPS core) panels 90 mm thick having a density not less than 10 kg per
cum. to both faces of LGSFS FOR WALLS and covered on both sides
with welded wire fabric mesh made of 2.2mm dia GI wire with 50mm
pitch in both the directions, connected by GI wire of 3mm dia to the LGS
frame structure duly plaster finished with shotcrete plastering/ guniting
equipment in required layers, 30mm thick with cement mortar 1:3 {1
cement: 3 coarse sand not having more than 40% stone chips of size
upto 6mm} at a pressure not less than 1 bar (100 KN/m2) and both faces
finished with trowel and completed in all respect as per drawings and
specifications confirming to Designs and Specifications including all costs
of labour, materials, fabrication, assembling, transportation, erection,
incidental and unforeseen charges complete as per the directions of the
engineer in charge of the work.
38.63 Providing and fixing with EPS –weld mesh-cement-sand shotcrete
roof/floor panels to lgsfs
Providing and fixing in position factory made expanded polystyrene core Sqm 2,516.00
(EPS core) panels 90 mm thick having a density not less than 10 kg per
cum. to both faces of LGSFS FOR ROOF/FLOOR PANELS and covered
on both sides with welded wire fabric mesh made of 2.2mm dia GI wire
with 50mm pitch in both the directions, connected by GI wire of 3mm

317
Sl. No. Description Unit Rate
Rs. Ps.

dia to the LGS frame structure duly plaster finished with shotcrete
plastering/guniting equipment in required layers, 30mm thick with cement
mortar 1:3 {1 cement: 3 coarse sand not having more than 40% stone
chips of size upto 6mm)} at a pressure not less than 1 bar (100 KN/m2)
and both faces finished with trowel and completed in all respect as per
drawings and specifications confirming to Designs and Specifications
including all costs of labour, materials, fabrication, assembling,
transportation, erection, incidental and unforeseen charges complete
as per the directions of the engineer in charge of the work.
COIR COMPOSITE DOORS
38.64 Engineered Coir Composite Flush Door Shutter of 30mm Thick.
Providing and fixing engineered coir composite flush door shutter Sqm 1,666.00
manufactured using infill solid core with coir and wood particle blended
with high quality polymer encased with 28mm thick wooden styles
and rails all-round the boundary of the shutter and veneer laminated
with non oven coir felt impregnated with high temperature cure phenol
formaldehyde resin of density 800kg/cum with high quality adhesive
processed at 155 Deg.C , using 650 tonnage hot compression moulding
press and all four sides of the door shutter coated with water resistant
coating and whole process of manufacturing confirming to Designs
and Specifications including all costs of labour, materials, fabrication,
assembling, transportation, erection, incidental and unforeseen charges
complete as per the directions of the engineer in charge of the work ,
but excluding the cost of fixtures and painting.
38.65 Engineered wood plastic composite door frames with cross section
of 55 x 110 mm
Providing and fixing engineered wood door frame of requires size Rmt 583.00
fabricated using Wood Plastic Composites profiles (WPC) of cross
section 55 mm X 110 mm with a density of 1250-1300 kg/m3, resistant
to water, termite, fungal and UV, using four numbers of L shaped MS
or plastic clamps at the corners of the frame to fix it firmly to form
a rectangular shape door frame and provided with six numbers of
260mmx25mmx5mm size z shaped MS flat hold fasts for fixing the door
frame in the wall and the material and process for manufacturing the
door frame confirming to Designs and Specifications including all costs of
labour, materials, fabrication, assembling, transportation, erection, incidental
and unforeseen charges complete as per the directions of the engineer in
charge of the work, but excluding the cost of fixtures and painting.
38.66 Engineered wood plastic composite door frames with cross section
of 75 x 125 mm
Providing and fixing engineered wood door frame fabricated using Wood Rmt 1,083.00
Plastic Composites profiles (WPC) of cross section 75 mm X 125mm
with a density of 1250-1300 kg/m3, resistant to water, termite, fungal and
UV, using four numbers of L shaped MS or plastic clamps at the corners
of the frame to fix it firmly to form a rectangular shape door frame and
provided with six numbers of 260mmx25mmx5mm size z shaped MS
flat hold fasts for fixing the door frame in the wall and the material and
process for manufacturing the door frame confirming to Designs and

318
Sl. No. Description Unit Rate
Rs. Ps.

Specifications including all costs of labour, materials, fabrication,


assembling, transportation, erection, incidental and unforeseen charges
complete as per the directions of the engineer in charge of the work, but
excluding the cost of fixtures and painting.
38.67 Engineered wood plastic composite window frames with cross
section of 55 mm x 110 mm
Providing and fixing engineered wood window frame fabricated Sqm 3,208.00
using Wood Plastic Composites profiles (WPC) of cross section
55 mm X 110mm with a density of 1250-1300 kg/m3, resistant to water,
termite, fungal and UV, using four numbers of L shaped MS or plastic
clamps at the corners of the frame to fix it firmly to form a rectangular
shape door frame and provided with six numbers of 260mmx25mmx5mm
size z shaped MS flat hold fasts for fixing the window frame in the wall,
MS rods of 12mm dia are provided in window frame as per design and
drawings. The material and process for manufacturing the door frame
confirming to Designs and Specifications including all costs of labour,
materials, fabrication, assembling, transportation, erection, incidental
and unforeseen charges complete as per the directions of the engineer
in charge of the work , but excluding the cost of fixtures and painting.
38.68 Providing and fixing in position half paneled window shutters with wood Sqm 1,833.00
plastic composite styles and rails of 30mm thick, 65mm wide and with
4mm thick reeded glass panels fixed in the groves provided in the styles
and rails and the material and process for manufacturing the window
shutters confirming to Designs and Specifications including all costs
of labour, materials, fabrication, assembling, transportation, erection,
incidental and unforeseen charges complete as per the directions of
the engineer in charge of the work, but excluding the cost of fixtures
and painting.
38.69 Providing and supplying water proofing membrane of size 1m X 5m Sqm 733.00
with 6.4 mm thick having a puncture resistance of 620 N as per ASTM
D 4833 and hydrostatic pressure resistance upto 70 m as per ASTM D
5385 consisting of Bentonite granuals weighing 4.80 kg/sqm encased
between needle punched non-oven geotextile covered with HDPE sheet
of 200 microns thick and uncovered oven geotextile on the other side
laid over levelling concrete to arrest subsurface water with a staggered
over lapping of 100 mm and with a minimum staggered lapping of 300
mm at the corners and the laps secured by washer headed mechanical
fasteners spaced at 300 mm c/c and the lap joints are sealed with
Bento seal of not lessthan 19 mm thick and the terminated ends of
water proofing membrane is covered with aluminium strip and Bento
seal.,complete including the cost of lapping, materials, labour, complete
as per specifications.
Ref: ASTM D 4833, ASTM D 5385, ASTM D 3776, ASTM D 903,
ASTM D 5084, ASTM D 4632,ASTM D 1970,ASTM E 96.

319
Sl. No. Description Unit Rate
Rs. Ps.

38.70 Migrating Corrosion Inhibiting Admixture cum


Providing and applying Corrosion inhibiting admixture at a dose of 3 kgs
per cum of concrete. The admixture should protect both cathodic and
anodic sites and should have accredited by Indian Roads Congress,
recommended for use by Ministry of Road Transport & Highways.
Admixture should have evaluated test reports demonstrating a corrosion
rate of zero coulombs after 9 test cycles as per ASTM G 109. PH of
admixture should be alkaline in nature, specific gravity of 0.99 - 1.1,
colour: brownish.
The contractor must intimate the engineer in charge prior to addition in
concrete for recording. If the admixture is put in the concrete mix at the
batching plant, a written record of the amount of admixture used shall
be supplied to the engineer. The engineer must ensure that the specified
dosage of admixture is added in the concrete mix.
38.71 High performance Anti carbonation protective coating Sqm 250.00
Providing and applying primer and two coats of 100% acrylic breathable,
water based, anti-carbonation coating.
Coating to be applied at the rate 300 g/m2. Minimum DFT of coating
to be 225 micron. The coating shall have atleast a 4 year track record
of use as an anti-carbonation coating and shall have the test reports
evaluated from Ministry of New and renewable Resources supported
laboratory demonstrating Solar Reflectance Index (ASTM E 1980-11,
EN 673:2011, EN 410:2011) > 104.
1. Carbon dioxide diffusion equivalent air layer thickness (DIN EN
1062-6) > 100 m
2. Carbon dioxide diffusion resistance co-efficient (DIN EN 1062-6) >
7.50 X 105
3. Elongation of cured film shall be as per ASTM D 2370/98 > 400%
4. Chloride Ion Diffusion(ASTM C 1202) = Zero Penetration
5. Adhesion (ASTM D 4541) > 2 N/mm2
38.72 Waterproofing Sqm
Providing and applying compatible PU based primer + 2 coats of Single
component, high solids, cold applied liquid polyurethane elastomer
waterproof membrane over uniform surface of slab. Apply 2 coats
at dosage of 1. 5 kgs per sq. mtr total with minimum total WFT (Wet
Film Thickness) of 1.5mm to achieve the required minimum DFT of
1.2mm. This should be followed by application of protective plaster. The
manufacturer of the liquid membrane shall be Dakks ISO 9001:2015
accredited for manufacturing and design. Liquid applied, polyurethane
waterproofing membrane should have following minimum properties:
1. Water permeability (DIN 1048) - Nil as per DIN 1048 § 7 bar of
hydrostatic pressure
2. Moisture permeability- < 0. 4 g/m2/day

320
Sl. No. Description Unit Rate
Rs. Ps.

3. Accelerated Weathering (IS 101)- 2000 hrs No cracking or blister


formation.
4. Adhesion to concrete (ASTM D 1000)- >21 Kg/cm2 (Concrete Fails)
5. Tensile Strength > 2.0 MPa (ASTM D412)
6. Should not be water soluble or water dilutable
7. Shore A Hardness -40+5 (ASTM D2240)
8. Elongation at Break > 600 % (ASTM D412)
9. Solids > 95 %
10. No micro-bubble formation or blistering should take place during the
curing of thick films.
It shall be applied as per manufacturers specification.
38.73 Structural Steel Coatings Sqm
Cleaning the existing steel surface by mechanical means such as sand
blasting so as to remove all the existing loose rust etc. Using cotton
waste swab apply rust converting,steel passivating ,flash rust preventing
sulphate and chloride free, non-alkaline, inorganic single component,
rust converter and nano film forming surface passivator. After 24 hours
remove the free / loose rust particles by simple dusting with brush.
Providing and applying one coat of Two component, anticorrosive, solvent
free, substituted long chain nylon reticulant based epoxy coating/primer.
This should be followed by two coats of protective two component, APR
based, UV resistant anticorrosive coating. Apply the coats by brush or
spray at 4-6 hours interval between each coat.
38.74 Providing and fixing Sacrificial Anode for damaged RCC Member Sqm 1,000.00
such as slab, beam, column etc
Providing and fixing zinc alloy based galvanic disk type sacrificial anodes
(50 mm dia, 18 mm thick) to the reinforcement and pass 500 hours salt
spray test as per ASTM B 117, The anode shall be connected to the
reinforcement steel by connectors provided with the anode.

321
Sl. No. Description Unit Rate
Rs. Ps.

NOTE for 38.45 : The following documents in both Hard and Soft Copy (where required)
(a) The DGPS control points established will be further should be furnished :
extended using the total station for densification so that there 1. 1:4000 Drawings which includes, Details of SH, shall cause to be
are Control Points for every 200 m interval at staggered marked on the map, thereon, Highway boundaries and Buildings and
locations. All Physical details shall be picked up for a width of Controll Lines and other particulars. such as RoW, Road Boundaries,
50M from the center line on either side of the road. Primary DGPS Points, Existing Inventories, Survey Numbers, Control Points,
Alignment Details etc.
control points shall be a properly monumented using Cement
Concrete Pillar (RCC) of size 230 mm x 230 mm x 1250 mm, 2. All required data sheets
out of which 550 mm is embedded in Cement Concrete below 3. Point Cloud Data of Area of Interes
the ground level. All such Pillars shall be serially numbered 4. Drawing File containing 3D information of required details
and painted in two coats of Golden Yellow Colour. The X, Y, Z 5. Images Captured along with Video files using LiDAR
co-ordinates shall be referred to center of the Pillar marked on 6. Superimposed Alignment on the State Map supplied by the client,
top of it. The co-ordinates shall be painted in red color. A list of duly indicating the Survey Numbers and other details such as
all Primary and Secondary control points with X,Y,Z Co-ordinate encroachments
should be submitted. 7. RTC Copies collected from Revenue Authorities and RTC Transferred
accordingly
Original Revenue Village Survey Maps will be collected 8. Khatha Certificate from respective authorities for the entire stretch
from revenue authorities and all the Control Points shall be of land registered in the name of the Executive Engineer of the
physically verified and marked on top of it. (a. RTC and other respective Divisions.”
information required shall be collected by the Consultants from 9. List of land encroached along with extent of land and name of the
the appropriate authorities, b. Within RoW, if there are any encroacher with all details as per standard format.
encroachments, then the consultant shall get relevant records 10. All Documents shall be submitted in colour and with proper binding
and prepare the relevant documents for transferring RTC in the along with soft copies – 5 Nos. each.
name of PWD.) Cadastral (Revenue) Survey will be carried out 11. The formats for Data Collection and reports, layerisation of drawings
in order to demarcate the Right of Way of the road and also of all indicating the factors in standard prescribe colour and symbals,
the encroachments. A statement shall be prepared showing the shall be approved by PRAMC (Note: The soft copies to be made
extent of Right of Way, Encroachment, including other assets, compatible to be uploaded in the PWD web site - www.kpwd.gov.in)
Survey Number wise in standard format as approved by PRAMC. 12. In areas, where cities/urban development is encountered, mapping
The process carried out should be accurate enough to issue the shall be carried out on 1:2000 Scale, whereas, in cross country it
necessary notices to the encroachers for getting them cleared. can be on 1:4000 scale.”

322
Chapter - 39
FURNISHING WORK

323
Sl. No. Description Unit Rate
Rs. Ps.

39.0 FURNISHING WORK


39.1 Providing and fixing Veneer paneling, over the 50mm x 35mm sal wood Sqm 3,115.00
frame work at spacing not exceeding 600mm c/c fixed to the wall and top
covered out of 4mm thick approved quality Veneer, fixed over 12mm thick
ply of approved brand, termite and water resistant, finished with melamine
polish, complete including cost and conveyance of all materials, labour
for all items of work HOM etc., complete as per specification.
39.2 Providing and fixing Acoustic Veneer paneling, over the 50mm x 35mm Sqm 5,258.00
sal wood frame work at spacing not exceeding 600mm c/c fixed to the
wall filled with 50mm thick 32kg density glass wool and top covered out
of 4mm thick approved quality Veneer, fixed over 19mm thick ply strips
of 100mm to 200mm with a gap of 6mm to 10mm in between strips of
approved brand, termite and water resistant, finished with melamine
polish, complete including cost and conveyance of all materials, labour
for all items of work, HOM complete as per specification.
39.3 Manufacturing, supplying and fixing wooden ward robe of 0.60m deep Sqm 8,960.00
using 19mm thick vinyl bonded water proof block board, shutters allround
ward robe, lockable drawers with sliding channels, cupboard drapery
hangers, curtain rods with end brackets, openable shutters with 19mm x
6mm thick plain teak wood beading, lipping 1.5mm thick commercial ply
vertical support finished in approved 1mm lamination sheet of approved
colour, shade and quality on all exposed surfaces. Inner surface painted
with 2 coats of white synthetic enamel paint over 2 coats of Patti, one
coat of wood primer, including cost of brass fittings, parliamentary
hinges, C handles, tower bolts, magnetic catches, approved brand lock,
adhesives, synthetic resins, nails, screws etc., complete including cost
of all materials, labour charges, complete as per specification.
39.4 Providing and fixing storage unit of 0.75m depth made out of 19mm thick Sqm 10,891.00
commercial ply vertical support finished in approved 1.00mm laminate
with 12mm thick ply packing internally finished with enamel paint of
approved colour and shade shelves shall be formed out of 19mm ply
finished with enamel paint of approved shade and colour and 19mm
thick shutters formed out of 19mm thick ply finished with 1.00mm thick
laminate of approved shade and colour etc., complete the rate includes
cost of all materials, labour charges, complete as per specification.
39.5 Providing and fixing Single shutter glass door of 12mm thick plain Sqm 7,446.00
toughened glass. The door is fixed by using any approved make hardware
fitting like patch fitting, pivot, floor machine, locking arrangements and
suitable SS door rails with floral glass etching for 1/3 portion of door area
etc complete. The rate includes cost of all materials, labour, hire of tools &
machineries,and as per specification.
39.6 Providing and fixing Double shutter glass door of 12mm thick plain Sqm 6,705.00
toughened glass of approved make. The door is fixed by using any
approved make hardware fitting like patch fitting, pivot, floor machine,
locking arrangements and suitable SS door rails with floral glass etching
for 1/3 portion of door area etc complete. The rate includes cost of all
materials, labour, hire of tools & machineries, as per the specification.

324
Sl. No. Description Unit Rate
Rs. Ps.

39.7 Providing and fixing Single shutter glass door of 12mm thick frosted Sqm 7,823.00
toughened glass of approved make. The door is fixed by using any
approved make hardware fitting like patch fitting, pivot, floor machine,
locking arrangements and suitable SS door rails with floral glass etching
for 1/3 portion of door area etc complete. The rate includes cost of all
materials, labour, hire of tools & machineries, as per specification.
39.8 Providing and fixing Double shutter glass door of 12mm thick frosted Sqm 7,090.00
toughened glass of approved make. The door is fixed by using any
approved make hardware fitting like patch fitting, pivot, floor machine,
locking arrangements and suitable SS door rails with floral glass etching
for 1/3 portion of door area etc complete. The rate includes cost of all
materials, labour, hire of tools & machineries, as per specifications etc
complete. The rate includes cost of all materials, labour, hire of tools &
machineries, as per specifications.
39.9 Providing, fabricating and fixing partition frame work consisting of 50mm x Sqm 12,845.00
50mm sal wood frame work at spacing not exceeding 600mm c/c fixed to
the bottom and ceiling, the partition shall be skinned on both sides using
12mm thick commercial plywood of approved brand termite and water
resistance, and top covered with 4mm thick approved quality veneer
finished with melamine polish, complete including cost and conveyance
of all materials, labour for all items of work, HOM as per specification.
39.10 Removing wall paneling / false ceiling / wooden partition / aluminium Sqm 45.00
partition, stacking it with all cost and conveyance labour for all items of
work, HOM of equipment etc., complete as per specification
39.11 Providing and fixing 100mm wide venetian blinds of window fashion Sqm 750.00
fabric of Taiwan make, with 50mm thick powder coated channel with
balance, imported, acrylic self alignable mechanism and equally placed
spacers, imported tilting mechanism for easy tilting operation,with
nylon imported thread and beadings, 100mm wide imported washable
reusable fabric placed with top hanger and bottom with 100mm long
bottom plate connected to nylon imported bottom link chain. The rate is
inclusive of drilling holes for fixing channels to the wall, fixing threads
and beadings and link chains, hard ware fixtures etc., complete as per
drawing, specifications.

325
Sl. No. Description Unit Rate
Rs. Ps.

39.12.1 Providing & Fixing of Mineral Fibre Suspended Ceiling System in Sqm 2,070.00
the module size of 600x600x19mm with Exposed grid.
The tiles should have Humidity Resistance (RH) of 99%, Light
Reflectance 87%, Thermal Conductivity k = 0.052 - 0.057 w/m K,
NRC -0.7,Colour White, Fire Performance UK A2 S1, d0, with Anti
Microbial coating on the face of the tile, suitable for zone 4 area
according to NF S 90-35:2003 with cleanroom class of ISO 5 (Class
100), Decontamination Class of CP10and Bacteriological Cleanliness
Class B1 for specific strains and reduction in colony size. Washability
properties of 500 wash cycles as per ASTM D-4828 and suitable for
Green Building application with Recycled content of 37%.
The tile shall be laid on 24mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15 Kgs/Sqm& pull out strength of minimum 100 Kgs. The T
Sections should have a Galvanizing of 90 grams per Sqm and need to
be installed with Suspension system of approved make.
39.12.2 Providing and supplying Acoustical Wall Paneling’ with square edges Sqm 3,883.00
made of fibre glass substrate 25mm thick and wrapped on the front
side with an acoustically transparent and classified for Fire reaction
Class A, as per ASTM E-84, fabric with option of colors – as per the
choice of the Architect/Engineer incharge of the size 600x600mm,
600x1200mm & 600x1800mm providing a minimum sound absorption
level of 0.85 NRC to be affixed to wall using Wall panel Impalersand
construction adhesives as per the instructions laid down by the certified
manufacturer.
39.12.3 Providing & Fixing of Mineral Fibre Acoustical Suspended Ceiling Sqm 1,258.00
System in module size of 600 x 600 x 16mm with Exposed Grid.
The tiles should have Humidity Resistance (RH) of 99%, NRC 0.5,
Light Reflectance ≥87%, Thermal Conductivity k = 0.052 - 0.057 w/m
K, Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6
&7)and suitable for Green Building application with Recycled content
of 30%.
The tile shall be laid on 24 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15Kgs/sqm&pull out strength of minimum 100 Kgs. The T
Sections should have a Galvanizing of 90 grams per Sqm and need to
be installed with Suspension system of approved make.

326
Sl. No. Description Unit Rate
Rs. Ps.

39.12.4 Providing & Fixing of Mineral Fibre Acoustical Suspended Ceiling Sqm 1,371.00
System in module size of 600 x 600 x 16mm with Exposed Grid.
Tiles having Humidity Resistance (RH) of 99%, NRC 0.5, Light
Reflectance ≥83%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Colour
White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6 &7)with
sand texture finished Dune and suitable for Green Building application
with Recycled content of 39%.
The tile shall be laid on 24 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15Kgs/sqm&pull out strength of minimum 100 Kgs. The T
Sections should have a Galvanizing of 90 grams per Sqm and need to
be installed with Suspension system of approved make.
39.12.5 Providing & Fixing of Mineral Fibre Acoustical Suspended Ceiling Sqm 1,313.00
System in module size of 600 x 600 x 16mm with Exposed Grid.
Tiles having Humidity Resistance (RH) of 99%, NRC 0.6, Light
Reflectance ≥87%, Thermal Conductivity k = 0.052 - 0.057 w/m K,
Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6
&7) & Euroclass A2 S1, d0and suitable for Green Building application
with Recycled content of 50%.
The tile shall be laid on 24 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15Kgs/sqm&pull out strength of minimum 100 Kgs. The T
Sections should have a Galvanizing of 90 grams per Sqm and need to
be installed with Suspension system of approved make.
39.12.6 Providing & Fixing of Mineral Fibre Acoustical Suspended Ceiling Sqm 1,400.00
System in module size of 600 x 600 x 20mm with Exposed Grid.
The tiles should have Humidity Resistance (RH) of 99%, NRC 0.7,
Light Reflectance ≥85%, Thermal Conductivity k = 0.052 - 0.057 w/m
K, Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6
&7)with sand texture finish andsuitable for Green Building application
with Recycled content of 47%.
The tile shall be laid on 24 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15Kgs/sqm&pull out strength of minimum 100 Kgs. The T
Sections should have a Galvanizing of 90 grams per Sqm and need to
be installed with Suspension system of approved make.

327
Sl. No. Description Unit Rate
Rs. Ps.

39.12.7 Providing & Fixing of Mineral Fibre Acoustical Suspended Ceiling Sqm 1,906.00
System inmodule size of 600x600x19mmwith Exposed Grid.
The tiles should have Humidity Resistance (RH) of 99%, NRC 0.7,
Light Reflectance ≥85%, Thermal Conductivity k = 0.045 - 0.048 W/mK,
Colour White, Fire Performance BS 476 Class 0/Class 1 with Durabrite
scrim on the face of the tile and suitable for Green Building application,
with Recycled content of 27%.
The tile shall be laid on 24 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15 Kgs/Sqm&pull out strength of minimum 100 Kgs. The T
Sections should have a Galvanizing of 90 grams per Sqm and need to
be installed with Suspension system of approved make.
39.12.8 Providing & Fixing of Soft Fibre Acoustical Suspended Ceiling Sqm 1,728.00
System in module size of 600x600x15mm with Angled Tegular Edge
Tiles with Exposed grid.

The tiles should have Humidity Resistance (RH) of 95%, NRC 0.9, Light
Reflectance ≥85%, Colour White, Fire Performance UK Class 0 / Class
1 (BS 476 pt - 6 &7) and suitable for Green Building application, with
Recycled content of 66% GW & 74% RW.

The tile shall be laid on 24mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 13.2 Kgs/Sqm& pull out strength of minimum 100 Kgs.. The
T Sections have a Galvanizing of 90 grams per M2 and need to be
installed with Suspension system of approved make.
39.12.9 Providing & Fixing true horizontal level suspended ceiling comprising of Sqm 1,568.00
GI Clip-in with double pip self-leveling feature and special tabs to allow
removal of tile to enable plenum access with plain visual consisting of
600x600mm clip in tiles of galvanized steel in 0.5 mm thickness with
bevel edge in pre-coated Global white colorwith Light Reflectance >
75% and fire performance of Class 1 as per BS 476 Part 7
39.12.10 Providing & Fixing true horizontal level suspended ceiling comprising of Sqm 1,813.00
GI Clip-in Standard Perforated metal ceilingconsisting of 600x600mm
Clip-in tiles of pre-coated galvanized steel in 0.5 mm thickness in Global
white color with Light Reflectance > 68%. The perforation shall be
Standard Perforation having hole diameter as 2.5mm and open area as
16%. The tiles shall have double pip self-leveling feature and special tabs
to allow removal of tile to enable plenum access.The tiles would have
Fire Performance of Class 1 as per BS-476 part 7 standard in module
size of 600x600mm

328
Sl. No. Description Unit Rate
Rs. Ps.

39.12.11 Providing & Fixing of GI Lay in Plain metal ceiling in module size Sqm 1,491.00
of 600x600 mm Lay-in tiles of pre-coated galvanized steel in 0.5 mm
thickness in Global white color. The tiles would have Fire Performance
of Class 1 as per BS-476 part 7. standard in module size of 600x600 mm

The tile shall be laid on 15 mm wide T - section flanges colour white


having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 12.5Kgs/Sqm& pull out strength of 100Kgs. The T Sections
have a Galvanizing of 90 grams per Sqm and need to be installed with
Suspension system of approved make.
39.12.12 Providing & Fixing of GI Lay-in Standard Perforated metal ceiling in Sqm 1,735.00
module size of 600x600 mm Lay-in tiles of pre-coated galvanized steel
in 0.5 mm thickness in Global white color. The perforation shall have
Standard Perforation having hole diameter as 2.5mm and open area as
16%. The tiles would have Fire Performance of Class 1 as per BS-476
part 7 standard.
The tile shall be laid on 15 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 12.5Kgs/Sqm& pull out strength of 100Kgs. The T Sections
have a Galvanizing of 90 grams per Sqm and need to be installed with
Suspension system of approved make.
39.12.13 Providing & Fixing of Wooden finished Suspended Ceiling System with Sqm 4,277.00
WoodWorks edge tiles exposed grid.
The Tile in Plain/Perforatedwith approved laminate (Portland Maple,
Sea Beech, Siam Wood & Mystique Walnut) finish with 0.7mm matching
PVC edge banding or with perforation of RD6006 ( RD6) / RG3003
(RG3) / RG6011 (RG6) – ( either plain or perforation and pattern to be
chosen)would have Humidity Resistance (RH) of 70%in module size of
600x600x18mm and density of 725Kgs/m3.
The tile shall be laid on 15 mm wide T - section flanges colour white
having rotary stitching on all T sections i.e. the Main Runner, 1200 mm
& 600 mm Cross Tees with a web height of 38mm and a load carrying
capacity of 15.5 Kgs/Sqm& pull out strength of minimum 100 Kgs. The
T Sections have a Galvanizing of 90 grams per Sqm and need to be
installed with Suspension system of approved make.

329
Sl. No. Description Unit Rate
Rs. Ps.

39.12.14 Providing and Fixing Channeled Woodworks perforated panels of Sqm 4,037.00
width 192mm, thickness of 15mm and length 2400 mm or as required
by the Architect/ approving engineer, made of a Moisture resistant fibre
board with minimum 595 Kg/m3 density substrate with a laminated
facing as per the approved shade & finish and a melamine balancing
layer on the reverse side. The boards shall have a special perforation
pattern where the visible surface has a “Helmholtz” fluted perforation
of 3mm width and 5mm of visible panel each. The edges of the panels
shall be “tongue-and-grooved” to receive special clips for installation.
The back of the perforated panel shall have sound absorbing non-woven
acoustical fleece having NRC of 0.63. The panels shall be mounted on
special aluminium splines (keel) using clips provided and approved by
the Engineer-in-Charge of work.
39.12.15 Providing & Fixing true horizontal level suspended ceiling comprising Sqm 2,921.00
of GI Clip-in with double pip self-leveling feature and special tabs to
allow removal of tile to enable plenum access with plain visual consisting
of 600x600mm clip in tiles of galvanized steel in 0.5 mm thickness with
bevel edge in White colour. The tile shall be powder coated with dust
repellant, anti-microbial coating having light reflectance greater than 85%.
The coating will have resistance to fluorescence and UV-A as per ISO
4892-2 & ISO 16474-3 respectively. The coating also resists the mold
growth as per ASTM D3273. The tiles would have Fire Performance of
Class A1 as per BSEN 13823:2010+A1:2014 standard in module size
of 600x600mm.
39.12.16 Providing & Fixing true horizontal level suspended ceiling comprising Sqm 3,641.00
of GI Clip-in with double pip self-leveling feature and special tabs to
allow removal of tile to enable plenum access with plain visual consisting
of 600x600mm clip in tiles of galvanized steel in 0.5 mm thickness with
bevel edge in White colour. The tile shall be powder coated with dust
repellant, anti-microbial coating having light reflectance greater than 85%.
The coating will have resistance to fluorescence and UV-A as per ISO
4892-2 & ISO 16474-3 respectively. The coating also resists the mold
growth as per ASTM D3273. The tiles would have Fire Performance of
Class A1 as per BSEN 13823:2010+A1:2014 standard in module size
of 600x600mm.
39.13 COURT HALL FURNITURE
39.13.1 DIAS for Judges:
Providing and fixing dias for judges in court halls of overall size Sqm 6,026.00
3650 x 3050 x 600 mm using 40 x 40 x 2mm slotted angle for frame
work at suitable intervals using double angle back to back wherever
necessary with suitable stiffeners for legs including diagonal members
fabricated using nuts and bolts, the top of the dias to be covered with
25mm treated commercial block board of approved make, seated and
fastened properly by bolt and nut to the slotted angle frame work, the
sides of the dias to be covered with 12mm thick novopan sheet fixed

330
Sl. No. Description Unit Rate
Rs. Ps.

firmly to the slotted angle, including making a parapet alround the dias to
a height of 750mm using the slotted angle frame work and covered with
novopan sheet of 12mm thick for outside and 4mm thick one side teak
plywood for inside of the parapet with 50x25mm sal wood frame work
attached to the slotted angle, the top of the parapet is fixed with 20mm teak
wood ornamental beeding alround complete as per specification including
cost of all materials and labour, painting, lead & lift and as per the direction
of Engineer-in-Charge of the work and also as per drawing appended.
39.13.2 Teak wood platform:
Providing and fixing wooden platform of overall size 2450x1850x175mm Sqm 5,250.00
using teak wood of section 50x50mm of legs, 50x50mm for horizontals
both at suitable intervals from the point of view of stability, the top of the
platform covered with commercial block board of 25mm thick, all sides
covered with 6mm thick one side teak plywood fixed firmly to the platform
including joining the wooden sections properly using nails/screws, fevicol
including cost of wood, nails/screws, fevicol, cost of painting/polishing
complete as per specification including cost of all materials and labour,
painting, lead & lift and as per the direction of Engineer-in-Charge of the
work and also as per drawing appended.
39.13.3 Horse Shoe Table:
Providing and fixing “HORSE SHOE TABLE” of overall size Sqm 8,183.00
4500 x 2200x 750mm using teak wood of size 100x100mm for legs at
suitable intervals, 50x75mm section for horizontal support at top,
50x100mm section horizontal support at bottom as shown in figure. The
top of the table which should be 600mm in width all along, is covered
with 19mm thick block board and 1.50mm thick formica sheet fixed on
top of the block board, all of approved make. The inside vertical surface
is covered with 6mm thick one side teak plywood, including providing
teak wood beeding alround the table for good aesthetic appearance,
including joining the wooden sections properly using nails/screws, fevicol
complete as per specification including cost of all materials and labour,
painting, lead & lift and as per the direction of Engineer-in-Charge of the
work and also as per drawing appended.

39.13.4 Teak wood witness box:


Providing and fixing witness box of overall size 1200x750x1350mm with No 20,608.00
one side door way as shown in figure using teak wood of size 75x75mm
for legs, 50x75mm size for horizontal support at top and bottom, and
25x50mm size section for verticals between legs with a spacing of 150mm
including fixing 19mm thick commercial block board for full area at bottom
and for a length of 300mm at top to facilitate keeping the file during the
course of witness including joining the wooden sections properly using
nails/screws, fevicol including cost of wood, nails/screws, fevicol, cost
of painting/polishing complete as per specification including cost of all
materials and labour, painting, lead & lift and as per the direction of
Engineer-in-Charge of the work and also as per drawing appended.

331
Sl. No. Description Unit Rate
Rs. Ps.

39.13.5 Teak wood Accused box:


Providing and fixing accused box of overall size 3000x1150x1350mm with No 31,250.00
one side door way as shown in figure using teak wood of size 75x75mm
for legs, 50x75mm size for horizontals at top and bottom and 25x50mm
size for verticals between legs with a spacing of 150mm including fixing
19mm thick commercial board for full area at bottom, including joining
the wooden sections properly using nails/screws, fevicol including cost
of wood, nails/screws, hinges, locking arrangements for the opening,
fevicol, cost of painting/polishing complete as per specification including
cost of all materials and labour, painting, lead & lift and as per the direction
of Engineer-in-Charge of the work and also as per drawing appended.

39.14 STRAIGHT WORKSTATION (Frame and separator)


Providing and fixing STRAIGHT WORKSTATION consisting of back to
back unit made out of 75 mm thick MS CRCA powder coated,tile based
system for main sprine, Separator 25 mm tghick PLPB - BSL wooden
separator for return spine,Top tile finish 8 mm thick MDF covered with
Fabric of approved colour and one writing board (600 mm W) and
one soft board (600 mmw) per workstation,Bottom tile finish 9 mm
thick Laminate tile of approved colour, Raceway- one middle raceway
(600mm W) below table top per workstation and continous raceway at
the skirting level, Wire manager- ABS plastic grommet one number per
table,Table top - 25 mm thick PLPB with straight table top Hardware_

MS powder coated corner bkt,cantilever bkt,separator hook on bkt, L bkt


and Table joint plate., as per specifications, drawings and as directed
by Engineer in charge.
39.14.1 Sharing workstation
1 A) Size : 1200 mmW x 600mm D x 1200 mm ht - (Sharing work station No 15,025.00
with Edge Binding table top, Back to Back (set of 2)):
39.14.2 Sharing workstation
1 B)Size : 1200 mmW x 540mm D x 1200 mm ht - (Sharing work station unit 14,508.00
with Post formed table top, Back to Back (set of 2)):
39.14.3 Non Sharing workstation
1 C) Size : 1200 mmW x 600mm D x 1200 mm ht (Non Sharing work No 9,858.00
station with Edge Binding table top, Single unit):
39.14.4 Non Sharing workstation
1 D) Size : 1200 mmW x 540mm D x 1200 mm ht (Non Sharing work No 10,825.00
station with Post formed table top, Single unit)
39.15 STRAIGHT WORKSTATION(Frame)

332
Sl. No. Description Unit Rate
Rs. Ps.

Providing and fixing STRAIGHT WORKSTATION (Frame)consisting of


back to back unit made out of 75 mm thick MS CRCA powder coated,tile
based system for main and return spine, Top tile finish 8 mm thick
MDF covered with Fabric of approved colour and one writing board
(600 mm W) and one soft board (600 mm W) per workstation, Bottom tile
finish 9 mm thick Laminate tile of approved colour, Raceway- one middle
raceway (600mm W) below table top per workstation and continous
raceway at the skirting level, Wire manager- ABS plastic grommet one
number per table,Table top - 25 mm thick PLPB with straight table top
End Table 25 mm thick PLPB with straightedge bound Hardware-M
powder coated corner bkt,cantilever bkt,separator hook on bkt, L bkt
and Table joint plate., as per specifications, drawings and as directed
by Engineer in charge.
39.15.1 Sharing workstation
2 A) Size : 1200 mmW x 600mm D x 1200 mm ht - (Sharing work station No 18,183.00
with Edge Binding table top, Back to Back (Set of 2))
39.15.2 Sharing workstation
2 B)Size : 1200 mmW x 540mm D x 1200 mm ht - (Sharing work station No 18,966.00
with Post formed table top, Back to Back (Set of 2)):
39.15.3 Non Sharing workstation
2 C) Size : 1200 mmW x 600mm D x 1200 mm ht (Non Sharing work No 11,950.00
station with Edge binding table top, Single unit)
39.15.4 Non Sharing workstation
2 D) Size : 1200 mmW x 540mm D x 1200 mm ht (Non Sharing work No 12,458.00
station with Post formed table top, Single unit)
39.16 CUBICLE WORKSTATIONS
Providing and fixing CUBICLE WORKSTATIONS consisting of wings
made out of 75 mm thick MS CRCA powder coated,tile based system
for main and return spine, Top tile finish 8 mm thick MDF covered with
Fabric of approved colour and one writing board (600 mm W) and one
soft board (600 mm W) per workstation, Bottom tile finish 9 mm thick
Laminate tile of approved colour, Raceway- one middle raceway (600mm
W) below table top per workstation and continous raceway at the skirting
level, Wire manager - ABS plastic grommet one number per table,Table
top - 25 mm thick PLPB with straight table top End Table 25 mm thick
PLPB with straightedge bound Hardware-MS powder coated corner bkt,
cantilever bkt, separator hook on bkt, L bkt and Table joint plate., as per
specifications, drawings and as directed by Engineer in charge.
39.16.1 X TYPE 4 wings
3 A) Size : 1500 mmW x 1200mm D x 1200 mm ht. No 41,666.00
39.16.2 X TYPE 4 wings
3 B)Size : 1500 mmW x 1500mm D x 1200 mm ht. No 51,666.00

333
Sl. No. Description Unit Rate
Rs. Ps.

39.16.3 T TYPE 2 wings


3 C) Size : 1500 mmW x 1200mm D x 1200 mm ht. No 26,666.00
39.16.4 T TYPE 2 wings
3 D) Size : 1500 mmW x 1500mm D x 1200 mm ht. No 39,416.00
39.16.5 C TYPE 2 wings
3 C) Size : 1500 mmW x 1200mm D x 1200 mm ht. No 29,083.00
39.16.6 C TYPE 2 wings
3 D) Size : 1500 mmW x 1500mm D x 1200 mm ht. No 43,000.00
39.16.7 L TYPE 1 wing
3 C) Size : 1500 mmW x 1200mm D x 1200 mm ht. No 17,500.00
39.16.8 L TYPE 1 wing
3D) Size : 1500 mmW x 1500mm D x 1200 mm ht. No 19,491.00
39.17 FREE STANDING TABLE FOR CABIN - WITHOUT FRAMES
Providing and fixing Free Standing Table for Cabin- without frames
consisting of 25 mm thick PLPB table top, 25 mm thick PLPB with edge
bomded End table,18 mm thick PLPB with edge bonded Modesty, Wire
manager -ABS plastic grommet one number per table Hardware-Minifix
assembly and screw leg., as per specifications, drawings and as directed
by Engineer in charge.
39.17.1 Main Table : 1500 mmW x 750mm D x 750 mm ht (Edgebinding table No 9,966.00
top) Side Table : 900 mm W x 450mm D X 750 mm ht.
39.17.2 Main Table : 1500 mmW x 750mm D x 750 mm ht (Post formed table No 8,916.00
top) Side Table : 900 mm W x 450mm D X 750 mm ht.
39.18 Free Standing Table for Cabin - without frames
Providing and fixing Free Standing Table for Cabin- without frames
consisting of 25 mm thick PLPB table top, 25 mm thick PLPB with edge
bonded End table,18 mm thick PLPB with edge bonded Modesty, Wire
manager - ABS plastic grommet one number per table Hardware-Minifix
assembly and screw leg., as per specifications, drawings and as directed
by Engineer in charge
39.18.1 200 mmW x 600mm D x 750 mm ht (Main table and Side table with No 5,841.00
Edge binding table top):
39.18.2 1500 mmW x 600mm D x 750 mm ht (Main table and Side table with No 6,541.00
Post formed table top):
39.18.3 1200 mmW x 540mm D x 750 mm ht (Main table with Post formed table top) No 6,078.00
39.18.4 1500 mmW x 540mm D x 750 mm ht (Main table with Post formed table top) No 6,286.00
39.19 Discussion table - wooden

334
Sl. No. Description Unit Rate
Rs. Ps.

Providing and fixing discussion table wooden consisting of 25 mm thick


PLPB table top edge bounded, 25 mm thick PLPB with edge bonded End
table, Hardware-Minifix assembly and screw leg., as per specifications,
drawings and as directed by Engineer in charge
39.19.1 600 mm Dia X 750 mm Ht (4 seater) No 3,533.00
39.19.2 750 mm Dia X 750 mm Ht (4 seater) No 4,333.00
39.19.3 900 mm Dia X 750 mm Ht (4 seater) No 4,791.00
39.20 Discussion table - Metal leg
Providing and fixing discussion table metal leg consisting of 25 mm thick
PLPB table top edge bounded MS CRCA sheet round plate at bottom and
75 mm dia pole at centre with 25 X 25 tube welded at top Hardware-L
bkt and screw leg., as per specifications, drawings and as directed by
Engineer in charge
39.20.1 600 mm Dia X 750 mm Ht (4 seater) No 5,575.00
39.20.2 750 mm Dia X 750 mm Ht (4 seater) No 7,433.00
39.20.3 900 mm Dia X 750 mm Ht (4 seater) No 7,812.00
39.21 Meeting table - wooden
Providing and fixing meeting table consisting of 25 mm thick PLPB table
top edge bounded, 25 mm thick PLPB with edge bonded End table,18 mm
thick PLPB with edge bonded Modesty, Hardware-Minifix assembly and screw
leg., as per specifications, drawings and as directed by Engineer in charge
39.21.1 1500 mm Dia X900 mm D X 750 mm Ht (6 seater) No 10,041.00
39.21.2 2400 mm Dia X1200 mm D X 750 mm Ht (12 seater) No 16,666.00
39.22 Conference table - wooden
Providing and fixing conference table consisting of 25 mm thick PLPB No 53,166.00
table topedge bounded, 25 mm thick PLPB with edge bonded End
table,18 mm thick PLPB with edge bonded Modesty, Hardware-
Minifix assembly and screw leg., as per specifications, drawings and
as directed by Engineer in charge 4800 mmX 2400mm X 750 mm Ht
(20 seater) - U shaped with a top width of 600 mm.
39.23 Modular Partition
Providing and fixing modular partition consisting of 75mm thick MS CRCA
frames powder coated, tile based system frame, 8mm thick MDF covered
with Fabric of approved colour for Top file finish, 5mm thick clear ordinary
glass both side Middle tile finish, or 8mm thick MDF covered with Fabric of
approved colour for Middle tile finish, 9mm thick Laminate tile of approved
colour for Botom tile finish, Continuous skirting level raceway will be provided.
as per specifications, drawings and as directed by Engineer in charge.
39.23.1 75mm thick frames tile based system (Frame with Tile) Sqm 4,000.00
39.23.2 75mm thick frames tile based system (Frame with Glass) Sqm 4,390.00
39.24 Storage Unit - Wooden - One side laminate

335
Sl. No. Description Unit Rate
Rs. Ps.
Straight workstation (Frame and separator)

Sharing workstation Non Sharing workstation

Straight workstation(Frame)

Sharing workstation Non Sharing workstation

Cubicle Workstations

X TYPE T TYPE

336
Sl. No. Description Unit Rate
Rs. Ps.

“Free Standing Table for Cabin “Free Standing Table for


- without frames” Cabin - without frames”

Discussion table-wooden Discussion table-Metal leg

Meeting table-wooden Conference table-wooden

337
Sl. No. Description Unit Rate
Rs. Ps.

Modular Partition “Storage Unit - wooden


- One side laminate”

Mobile pedestal unit- WOODEN

338
339
340
341
342
FIRE FIGHTING WORK

343
Sl. No. Description Unit Rate
Rs. Ps.

40.0 FIRE FIGHTING WORK


40.1 Providing ABC Powder based MAP 50, 1Kg
Providing 1kg Fire Extinguisher Mono Ammonium Phosphate Powder Each 1,915.00
50, Stored Pressure Type, Pressure Gauge, Gross Weight 2.3 Kg, empty
weight 1.3 Kg, Can Height 298MM, Diameter 86.50MM, Discharge
Time less than 8 Secs, Controllable discharge mechanism (Squeeze
grip with easy snap safety seal), Range minimum 2 meters, applicable
on Class A,B,C and electrically started Fire, A Rating 1A, B Rating 8B,
Can construction : Deep drawn & Co., Mig welded, valve Construciton :
Forging and Machining, Internal Coating of Can: Epoxy powder coating,
External Coating of Can: Epoxy Polyster power coating, Sheet metal
thickness: 1.60MM, 5 years Warranty with instalert system etc., including
cost of materials, labour, HOM complete as per specifications. complete
40.2 Providing ABC Powder based MAP 50, 2Kg
Providing 2kg Fire Extinguisher Mono Ammonium Phosphate Each 2,872.00
Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight
3.6 Kg, empty weight 1.6 Kg, Can Height 344MM, Diameter 108MM,
Discharge Time less than 8 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum
2 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 1A, B Rating 8B, Can construction : Deep drawn & Co., Mig
welded, valve Construciton : Forging and Mechining, Internal Coating of
Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster power
coating, Sheet metal thickness: 1.60MM, 5 years Warranty with instalert
system with Superior quality EPDM Rubber Hosepipe etc., including cost
of materials, labour, HOM complete as per specifications. complete.
40.3 Providing ABC Powder based MAP 50, 4Kg
Providing 4kg Fire Extinguisher Mono Ammonium Phosphate Each 3,990.00
Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight
6.9 Kg, empty weight 2.9 Kg, Can Height 440MM, Diameter 140MM,
Discharge Time less than 13 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum
4 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 2A, B Rating 21B, Can construction : Deep drawn & Co.,
Mig welded, valve Construciton : Forging and Mechining, Internal Coating
of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 1.60MM, Helium Leak Detection
Tested, ISI and EN Approved, 5 years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete  
40.4 Providing ABC Powder based MAP 50, 6Kg
Providing 6kg Fire Extinguisher Mono Ammonium Phosphate Each 4,849.00
Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight
9.5 Kg, empty weight 3.5 Kg, Can Height 435MM, Diameter 160MM,

344
Sl. No. Description Unit Rate
Rs. Ps.

Discharge Time less than 9 Secs, Controllable discharge mechanism


(Squeeze grip with easy snap safety seal), Range minimum
4 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 3A, B Rating 21B, Can construction : Deep drawn & Co., Mig
welded, valve Construciton : Forging and Mechining, Internal Coating
of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 1.60MM, Helium Leak Detection
Tested, ISI and EN Approved, 5 years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete
40.5 Providing ABC Powder based MAP 50, 9Kg
Providing 9kg Fire Extinguisher Mono Ammonium Phosphate Each 6,384.00
Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight
14.90 Kg, empty weight 5.90 Kg, Can Height 615MM, Diameter
175MM, Discharge Time less than 13Secs, Controllable discharge
mechanism (Squeeze grip with easy snap safety seal), Range minimum
4 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 4A, B Rating 34B, Can construction : Deep drawn & Co.,
Mig welded, valve Construciton : Forging and Mechining, Internal Coating
of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 2.00MM, Helium Leak Detection
Tested, ISI and EN Approved, 5 years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete
40.6 Providing ABC Powder based MAP 90, 2Kg
Providing 2 kg Fire Extinguisher Mono Ammonium Phosphate Each 3,683.00
Powder 90, Stored Pressure Type, Pressure Gauge, Gross Weight
3.6 Kg, empty weight 1.6 Kg, Can Height 344MM, Diameter 108MM,
Discharge Time less than 8 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum
2 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 1A, B Rating 8B, Can construction : Deep drawn & Co.,
Mig welded, valve Construciton : Forging and Mechining, Internal Coating
of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 1.60MM, Helium Leak Detection
Tested, ISI and EN Approved, 5 years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete
40.7 Providing ABC Powder based MAP 90, 4Kg
Providing 4kg Fire Extinguisher Mono Ammonium Phosphate Each 5,156.00
Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight
6.9 Kg, empty weight 2.9 Kg, Can Height 440MM, Diameter 140MM,
Discharge Time less than 13 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum
4 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 2A, B Rating 21B, Can construction : Deep drawn & Co., Mig
welded, valve Construciton : Forging and Mechining, Internal Coating

345
Sl. No. Description Unit Rate
Rs. Ps.

of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster


power coating, Sheet metal thickness: 1.60MM, Helium Leak Detection
Tested, ISI and EN Approved, 5 years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete
40.8 Providing ABC Powder based MAP 90, 6Kg
Providing 6kg Fire Extinguisher Mono Ammonium Phosphate Powder Each 6,384.00
90, Stored Pressure Type, Pressure Gauge, Gross Weight 9.40
Kg, empty weight 3.4 Kg, Can Height 480MM, Diameter 160MM,
Discharge Time less than 13 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum
4 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 3A, B Rating 21B, Can construction : Deep drawn & Co.,
Mig welded, valve Construciton : Forging and Mechining, Internal
Coating of Can: Epoxy powder coating, External Coating of Can: Epoxy
Polyster power coating, Sheet metal thickness: 1.60MM, Helium Leak
Detection Tested, ISI and EN Approved, 5 years Warranty with instalert
system with Superior quality EPDM Rubber Hosepipe etc., including
cost of materials, labour, HOM complete as per specifications. complete
40.9 Providing ABC Powder based MAP 90, 9Kg
Providing 9kg Fire Extinguisher Mono Ammonium Phosphate Each 10,475.00
Powder 90, Stored Pressure Type, Pressure Gauge, Gross Weight
14.9 Kg, empty weight 5.90 Kg, Can Height 615MM, Diameter
175MM, Discharge Time less than 13Secs, Controllable discharge
mechanism (Squeeze grip with easy snap safety seal), Range minimum
4 meters, applicable on Class A,B,C and electrically started Fire,
A Rating 4A, B Rating 34B, Can construction : Deep drawn & Co.,
Mig welded, valve Construciton : Forging and Mechining, Internal Coating
of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 2.00 MM, Helium Leak Detection
Tested, ISI and EN Approved, 5 years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete
40.10 Providing ABC Powder based MAP 90, 25Kg
Providing 25kg Fire Extinguisher Mono Ammonium Phosphate Powder Each 24,553.00
90, Stored Pressure Type, Pressure Gauge, Gross Weight 76Kg, empty
weight 51 Kg, Can Height 1200 MM, Diameter 300 MM, Discharge
Time less than 30 Secs, Controllable discharge mechanism (Squeeze
grip with easy snap safety seal), Range minimum 6 meters, applicable
on Class A,B,C and electrically started Fire, Can construction : Deep
drawn & Co., Mig welded, valve Construciton: Forging and Mechining,
Internal Coating of Can: Epoxy powder coating, External Coating of
Can: Epoxy Polyster power coating, Sheet metal thickness: 4.00 MM,
1 year Warranty. with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete

346
Sl. No. Description Unit Rate
Rs. Ps.

40.11 Providing Ceiling mounted 5 Kg


Providing 5kg Fire Extinguisher Mono Ammonium Phosphate Powder Each 9,002.00
90, Stored Pressure Type, Pressure Gauge, Gross Weight 7.7Kg,
empty weight 2.7 Kg, Can Height 264 MM, Diameter 240 MM,
Discharge Time less than 8 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum 10 meters,
applicable on Class A,B,C and electrically started Fire, Can construction
: Deep drawn & Co., Mig welded, valve Construciton : Forging and
Mechining, Internal Coating of Can: Epoxy powder coating, External
Coating of Can: Epoxy Polyster power coating, Sheet metal thickness:
2.00 MM, Helium Leak Detection Tested, 5 years warranty. etc., including
cost of materials, labour, HOM complete as per specifications. complete
40.12 Providing 10Kg Ceiling Mounted
Providing 10kg Fire Extinguisher Mono Ammonium Phosphate Each 13,830.00
Powder 90, Stored Pressure Type, Pressure Gauge, Gross Weight
14.8Kg, empty weight 4.8 Kg, Can Height 320 MM, Diameter 300 MM,
Discharge Time less than 10 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum 10
meters, applicable on Class A,B,C and electrically started Fire, Can
construction : Deep drawn & Co., Mig welded, valve Construciton : Forging
and Mechining, Internal Coating of Can: Epoxy powder coating, External
Coating of Can: Epoxy Polyster power coating, Sheet metal thickness:
2.00 MM, Helium Leak Detection Tested, 5 years warranty. etc., including
cost of materials, labour, HOM complete as per specifications. complete
40.13 Providing 1 Kg Fire Extinguisher Monnex powder
Providing 1kg Stored Pressure Type, Pressure Guage, Gross Weight 2.7 Each 4,420.00
Kg, empty weight 1.7 Kg, Can Height 344 MM, Diameter 108MM, Discharge
Time less than 8 Secs, Controllable discharge mechanism (Squeeze grip
with easy snap safety seal), Range minimum 4 meters, applicable on Class
A,B and electrically started Fire, B Rating 89B, Can construction : Deep
drawn & Co., Mig welded, valve Construciton : Forging and Mechining,
Internal Coating of Can: Epoxy powder coating, External Coating of
Can: Epoxy Polyster power coating, Sheet metal thickness: 1.60 MM,
5 years warranty.with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete
40.14 Providing 2 Kg Fire Extinguisher Monnex powder
Providing 2kg Stored Pressure Type, Pressure Guage, Gross Weight Each 6,875.00
4.9 Kg, empty weight 2.9 Kg, Can Height 440 MM, Diameter 140 MM,
Discharge Time less than 9 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum 4 meters,
applicable on Class A,B and electrically started Fire, Very effective on
Class B Fire, B Rating 144B, Can construction : Deep drawn & Co., Mig

347
Sl. No. Description Unit Rate
Rs. Ps.

welded, valve Construciton : Forging and Mechining, Internal Coating of


Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 1.60 MM, 5 years warranty. with
instalert system with Superior quality EPDM Rubber Hosepipe etc.,
including cost of materials, labour, HOM complete as per specifications.
complete
40.15 Providing 4 Kg Fire Extinguisher Monnex powder
Providing 4kg Stored Pressure Type, Pressure Guage, Gross Each 11,540.00
Weight 7.4Kg, empty weight 3.4 Kg, Can Height 480 MM, Diameter
160 MM, Discharge Time less than 13 Secs, Controllable discharge
mechanism (Squeeze grip with easy snap safety seal), Range
minimum 4 meters, Can construction : Deep drawn & Co., Mig
welded, valve Construciton : Forging and Mechining, Internal
Coating of Can: Epoxy powder coating, External Coating of Can:
Epoxy Polyster power coating, Sheet metal thickness: 1.60 MM,
5 years warranty. with instalert system with Superior quality EPDM
Rubber Hosepipe etc., including cost of materials, labour, HOM complete
as per specifications. complete
40.16 Providing 4 Kg Fire Extinguisher for Lite metal fires SPM-TEC
Providing 4kg SPM-TEC Powder Based stored presure type melting Each 8,839.00
point at 600-650 degree C, Applicable on Class D metal fires in
Magnesium, Aluminium, Zinc, Sodium Potassium, Francium, Lithium,
Cesium, Pressure Guage, Gross weight Gross Weight 6.9Kg, empty
weight 2.9 Kg, Can Height 440 MM, Diameter 140 MM, Discharge
Time less than 15 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum 4 meters,
Can construction : Deep drawn & Co., Mig welded, valve Construciton
: Forging and Mechining, Internal Coating of Can: Epoxy powder
coating, External Coating of Can: Epoxy Polyster power coating,
Sheet metal thickness: 1.60 MM, helium leak detection tested,
EN approved, 5 years warranty with instalert system with Superior quality
EPDM Rubber Hosepipe etc., including cost of materials, labour, HOM
complete as per specifications. complete
40.17 Providing 6 Kg Fire Extinguisher for Lite metal fires SPM-TEC
Providing 6kg SPM-TEC Powder Based stored presure type melting Each 12,276.00
point at 600-650 degree C, Applicable on Class D metal fires in
Magnesium, Aluminium, Zinc, Sodium Potassium, Francium, Lithium,
Cesium, Pressure Guage, Gross weight Gross Weight 9.4Kg, empty
weight 3.4 Kg, Can Height 480 MM, Diameter 160 MM, Discharge
Time less than 16 Secs, Controllable discharge mechanism (Squeeze
grip with easy snap safety seal), Range minimum 4 meters, Can
construction : Deep drawn & Co., Mig welded, valve Construciton
: Forging and Mechining, Internal Coating of Can: Epoxy powder
coating, External Coating of Can: Epoxy Polyster power coating,
Sheet metal thickness: 1.60 MM, helium leak detection tested,
EN approved, 5 years warranty. with instalert system with Superior quality
EPDM Rubber Hosepipe etc., including cost of materials, labour, HOM
complete as per specifications. complete
348
Sl. No. Description Unit Rate
Rs. Ps.

40.18 Providing 9 Kg Fire Extinguisher for Lite metal fires SPM-TEC


Providing 9kg SPM-TEC Powder Based stored presure type melting point Each 17,187.00
at 600-650 degree C, Applicable on Class D metal fires in Magnesium,
Aluminium, Zinc, Sodium Potassium, Francium, Lithium, Cesium, Pressure
Guage, Gross weight Gross Weight 14.9Kg, empty weight 5.9 Kg, Can Height
615 MM, Diameter 175 MM, Discharge Time less than 18 Secs, Controllable
discharge mechanism (Squeeze grip with easy snap safety seal), Range
minimum 4 meters, Can construction : Deep drawn & Co., Mig welded,
valve Construciton : Forging and Mechining, Internal Coating of Can:
Epoxy powder coating, External Coating of Can: Epoxy Polyster power
coating, Sheet metal thickness: 2.00 MM, helium leak detection tested,
EN approved, 5 years warranty with instalert system with Superior quality
EPDM Rubber Hosepipe etc., including cost of materials, labour, HOM
complete as per specifications. complete
40.19 Providing 4 Kg Fire Extinguisher for Heavy metal fires SPM-PYRO
Providing 4 Kg Powder Based stored presure type melting Each 19,642.00
point at 1200 degree C, Applicable on Class D metal fires in
heavy metals, alkali metals and alloys Pressure Guage, Gross
weight Gross Weight 6.9Kg, empty weight 2.9 Kg, Can Height
440 MM, Diameter 140 MM, Discharge Time less than 15 Secs,
Controllable discharge mechanism (Squeeze grip with easy snap
safety seal), Range minimum 4 meters, Can construction : Deep
drawn & Co., Mig welded, valve Construciton : Forging and Mechining,
Internal Coating of Can: Epoxy powder coating, External Coating of
Can: Epoxy Polyster power coating, Sheet metal thickness: 1.60 MM,
helium leak detection tested, EN approved, 5 years warranty. including
cost of materials, labour, HOM complete as per specifications. complete
40.20 Providing 6Kg Fire Extinguisher for Heavy metal fires SPM-PYRO
Providing 6Kg Powder Based stored presure type melting point at 1200 Each 29,464.00
degree C, Applicable on Class D metal fires in heavy metals, alkali metals
and alloys Pressure Guage, Gross weight Gross Weight 9.4Kg, empty
weight 3.4 Kg, Can Height 480MM, Diameter 160 MM, Discharge Time
less than 16 Secs, Controllable discharge mechanism (Squeeze grip
with easy snap safety seal), Range minimum 4 meters, Can construction
: Deep drawn & Co., Mig welded, valve Construciton : Forging and
Mechining, Internal Coating of Can: Epoxy powder coating, External Coating
of Can: Epoxy Polyster power coating, Sheet metal thickness: 1.60 MM,
helium leak detection tested, EN approved, 5 years warranty with instalert
system with Superior quality EPDM Rubber Hosepipe etc., including cost
of materials, labour, HOM complete as per specifications. complete
40.21 Providing 9 Kg Fire Extinguisher for Heavy metal fires, SPM-PYRO
Providing 9Kg Powder Based stored presure type melting point at 1200 Each 44,196.00
degree C, Applicable on Class D metal fires in heavy metals, alkali metals
and alloys Pressure Guage, Gross Weight 14.9Kg, empty weight 5.90
Kg, Can Height 615MM, Diameter 175 MM, Discharge Time less than

349
Sl. No. Description Unit Rate
Rs. Ps.

18 Secs, Controllable discharge mechanism (Squeeze grip with easy snap


safety seal), Range minimum 4 meters, Can construction : Deep drawn & Co.,
Mig welded, valve Construciton : Forging and Mechining, Internal Coating of
Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster
power coating, Sheet metal thickness: 2.00 MM, helium leak detection
tested, EN approved, 5 years warranty with instalert system with Superior
quality EPDM Rubber Hosepipe etc., including cost of materials, labour,
HOM complete as per specifications. complete
40.22 Providing 2Kg Fire Extinguisher Clean Agent HCFC 123
Providing 2Kg Pressure type, Pressure Guage, Gross Weight 3.7Kg, Each 13,504.00
empty weight 1.7 Kg, Can Height 344MM, Diameter 108 MM, Discharge
Time less than 8 Secs, Controllable discharge mechanism (Squeeze
grip with easy snap safety seal), Range minimum 2 meters, applicable on
Class A,B,C and electrically started Fire, B Rating 21B, Can construction :
Deep drawn & Co., Mig welded, valve Construciton : Forging and Mechining,
Internal Coating of Can: Epoxy powder coating, External Coating of Can:
Epoxy Polyster power coating, Sheet metal thickness: 2.00 MM, helium leak
detection tested, EN approved, 5 years warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete
40.23 Providing 4 Kg Fire Extinguisher Clean Agent HCFC 123
Providing 4Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 26,844.00
6.9 kg empty weight 2.9 kg Can Height 440MM, Diameter 140 MM,
Discharge minium 9 Secs, Controllable discharge mechanism (Squeeze
grip with easy snap safety seal), Range minimum 4 Meters, applicable
on Class A,B,C and electrically started Fire, A Rating 1A, B Rating
13B Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 1.60MM, Helium Leak Detection Tested, EN Approved,
5 years warranty with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete
40.24 Providing 6 Kg Fire Extinguisher Clean Agent HCFC 123
Providing 6Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 37,975.00
9.4kg. empty weight 3.4 kg Can Height 480MM, Diameter 160 MM,
Discharge Time less than 13 Secs, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Range minimum 4 Meters,
applicable on Class A,B,C and electrically started Fire, A Rating 2A,
B Rating 21B Can Construction; Deep drawn & CO, Mig welded, Valve
Construction: Forging & Machining, Internal Coating of Can : Epoxy Powder
coating, External Coating of Can : Epoxy Polyster Powder coating, Sheet
metal thickness: 1.60MM, Helium Leak Detection Tested, EN Approved,
5 years warranty with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete

350
Sl. No. Description Unit Rate
Rs. Ps.

40.25 Providing 5Kg Ceiling Mounted Fire Extinguisher Clean Agent


HCFC 123
Providing 5Kg Stored Pressure Type, Pressure Gouge, Gross Weight Each 34,865.00
7.7kg. empty weight 2.7 kg Can Height 267MM, Diameter 230 MM,
Discharge Time less than 8Secs,Auto discharge mechanism, on
temperature rise, applicable on Class A,B,C and electrically started Fire,
Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 1.60MM, Helium Leak Detection Tested, 5 Years Warranty.
including cost of materials, labour, HOM complete as per specifications.
40.26 Providing 10Kg Ceiling Mounted Fire Extinguisher Clean Agent
HCFC 123
Providing 10Kg Stored Pressure Type, Pressure Gouge, Gross Weight Each 55,654.00
14.8kg. empty weight 4.8 kg Can Height 316MM, Diameter 300 MM,
Discharge Time less than 10Secs,Auto discharge mechanism, on
temperature rise, applicable on Class A,B,C and electrically started Fire,
Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 2.0MM, Helium Leak Detection Tested, 5 Years Warranty
including cost of materials, labour, HOM complete as per specifications.
40.27 Providing 2Kg Fire Extinugisher Clean Agent FE36 Dupont
Providing 2Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 19,232.00
3.70kg. empty weight 1.7 kg Can Height 344MM, Diameter 108 MM,
Discharge Time minimum 8 Secs, Controlable discharge mechanism,
Range minimum 2 Meters, applicable on Class A,B,C and electrically
started Fire B, Rating 8B, Can Construction; Deep drawn & CO, Mig
welded, Valve Construction: Forging & Machining, Internal Coating of Can
: Epoxy Powder coating, External Coating of Can : Epoxy Polyster Powder
coating, Sheet metal thickness: 1.60MM, Helium Leak Detection Tested, 5
Years Warranty with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete
40.28 Providing 4Kg Fire Extinugisher Clean Agent FE36, Dupont
Providing 4Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 33,965.00
6.9kg. empty weight 2.9 kg Can Height 440MM, Diameter 140 MM,
Discharge Time minimum 13 Secs, Controlable discharge mechanism,
Range minimum 4 Meters, applicable on Class A,B,C and electrically
started Fire A, Rating 1A, B, Ranting 13B, Can Construction; Deep drawn
& CO, Mig welded, Valve Construction: Forging & Machining, Internal
Coating of Can : Epoxy Powder coating, External Coating of Can : Epoxy
Polyster Powder coating, Sheet metal thickness: 1.60MM, Helium Leak
Detection Tested, 5 Years Warranty with instalert system with Superior
quality EPDM Rubber Hosepipe etc., including cost of materials, labour,
HOM complete as per specifications. complete

351
Sl. No. Description Unit Rate
Rs. Ps.

40.29 Providing 6Kg Fire Extinugisher Clean Agent FE36, Zeri ODP
Providing 6Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 55,408.00
9.4kg. empty weight 3.4 kg Can Height 480MM, Diameter 160 MM,
Discharge Time minimum 13 Secs, Controlable discharge mechanism,
Range minimum 4 Meters, applicable on Class A,B,C and electrically
started Fire A Rating 5A, B, Ranting 34B, Can Construction; Deep drawn
& CO, Mig welded, Valve Construction: Forging & Machining, Internal
Coating of Can : Epoxy Powder coating, External Coating of Can : Epoxy
Polyster Powder coating, Sheet metal thickness: 1.60MM, Helium Leak
Detection Tested, 5 Years Warranty with instalert system with Superior
quality EPDM Rubber Hosepipe etc., including cost of materials, labour,
HOM complete as per specifications. complete
40.30 Providing 9Kg Fire Extinugisher Clean Agent FE36, Zeri ODP
Providing 9Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 36,830.00
13.8kg. empty weight 4.8 kg Can Height 611MM, Diameter 175 MM,
Discharge Time minimum 12 Secs, Controlable discharge mechanism,
Range minimum 4 Meters, applicable on Class A,B,C and electrically
started Fire, Can Construction; Deep drawn & CO, Mig welded, Valve
Construction: Forging & Machining, Internal Coating of Can : Epoxy
Powder coating, External Coating of Can : Epoxy Polyster Powder
coating, Sheet metal thickness: 1.60MM, Helium Leak Detection Tested,
5 Years Warranty including cost of materials, labour, HOM complete as
per specifications.
40.31 Providing 5Kg Ceiling Mounted Fire Extinugisher Clean Agent
FE36, Zeri ODP
Providing 5Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 45,014.00
7.7kg. empty weight 2.7kg Can Height 267MM, Diameter 230 MM,
Discharge Time less than 8 Secs,Auto discharge mechanism, on
temperature rise, applicable on Class A,B,C and electrically started Fire,
Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 1.60MM, Helium Leak Detection Tested, 5 Years Warranty
including cost of materials, labour, HOM complete as per specifications.
40.32 Providing 10Kg Ceiling Mounted Fire Extinugisher Clean Agent
FE36, Zeri ODP
Providing 10Kg Stored Pressure Type, Pressure Gauge, Gross Weight Each 45,178.00
14.8kg. empty weight 4.8kg Can Height 316MM, Diameter 300 MM,
Discharge Time less than 8 Secs,Auto discharge mechanism, on
temperature rise, applicable on Class A,B,C and electrically started Fire,
Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 1.60MM, Helium Leak Detection Tested, 5 Years Warranty
including cost of materials, labour, HOM complete as per specifications.

352
Sl. No. Description Unit Rate
Rs. Ps.

40.33 CO2 2Kg Squeeze grip


Providing 2 Kg CO2 Gas Type Fire Extinugisher Squeeze grip type, Each 9,247.00
used Unused Mechanism, Squeeze Grip, Gross Weight 9.1 Kg. empty
Weight 7.1 Kg. Can Height 595MM Diameter 108MM, Discharge Time
less than 8 Secs, Controllable discharge mechanism, Applicable on
Class B&C Fire, B Rating 8B, Can Construction : Hot spinning/Forging,
Valve Construction : Forging & Machining, Internal Coating of Can :
Not Applicable, External coating of Can : Spray Painting, Sheet metal
thickness : 4.0MM ISI Approved, 1 Year Warranty.with instalert system
with Superior quality EPDM Rubber Hosepipe etc., including cost of
materials, labour, HOM complete as per specifications. complete
40.34 CO2 4.5Kg Squeeze grip
Providing 4.5Kg CO2 Gas Type Fire Extinugisher, Trolley Mounted, Each 13,585.00
Easy Weight Management used Unused Mechanism, Squeeze Grip,
Gross Weight 19.1 Kg. empty Weight 14.6 Kg. Can Height 860MM
Diameter 140MM, Discharge Time less than13 Secs, Controllable
discharge mechanism, Applicable on Class B&C Fire, B Rating 13B,
Can Constuctin : Hot spinning/Forging, Valve Construction : Forging &
Machining, Internal Coating of Can : Not Applicable, External coating
of Can : Spray Painting, Sheet metal thickness : 4.5MM ISI Approved,
1 Year Warranty. with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete
40.35 Providing 4.5Kg CO2 Wheel Type
Providing 4.5Kg CO 2 gas valve type Fire Extinugisher, Trolley Each 8,102.00
Mounted, Easy Weight Management used Unused Mechanism,
Gross Weight 19.1 Kg. empty Weight 14.6 Kg. Can Height 860MM
Diameter 140MM, Discharge Time less than13 Secs, Controllable
discharge mechanism, Applicable on Class B&C Fire, B Rating 13B,
Can Constuction : Hot spinning/Forging, Valve Construction : Forging
& Machining, Internal Coating of Can : Not Applicable, External coating
of Can : Spray Painting, Sheet metal thickness : 4.5MM ISI Approved,
1 Year Warranty.with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete
40.36 Providing 6.5Kg CO2 Wheel Type
Providing 6.5Kg CO 2 Gas valve type Fire Extinugisher, Trolley Each 12,276.00
Mounted, Easy Weight Management used Unused Mechanism,
Gross Weight 30.5 Kg. empty Weight 24.0 Kg. Can Height 1015MM
Diameter 140MM, Discharge Time less than 13 Secs, Controllable
discharge mechanism, Applicable on Class B&C Fire, B Rating 34B,
Can Constuctin : Hot spinning/Forging, Valve Construction : Forging &
Machining, Internal Coating of Can : Not Applicable, External coating
of Can : Spray Painting, Sheet metal thickness : 4.5MM ISI Approved,
1 Year Warranty. with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete

353
Sl. No. Description Unit Rate
Rs. Ps.

40.37 Providing 22.5Kg CO2 Wheel Type


Providing 22.5Kg CO2 Gas Type Fire Extinugisher, Trolley Mounted, Each 34,375.00
Easy Weight Management used Unused Mechanism, Gross Weight
93.5 Kg. empty Weight 71.0Kg. Can Height 1333MM Diameter
232MM, Discharge Time less than20 Secs, Controllable discharge
mechanism, Applicable on Class B&C Fire, Can Constuction:
Hot spinning/Forging, Valve Construction : Forging & Machining,
Internal Coating of Can : Not Applicable, External coating of Can
: Spray Painting, Sheet metal thickness : 5.20 MM ISI Approved,
1 Year Warranty. including cost of materials, labour, HOM complete as
per specifications. complete
40.38 Providing CO2 Aluminium - 2kg
Providing 2Kg CO2 Gas aluminium body Squeeze grip Fire Extinugisher, Each 8,102.00
Used Unused Mechanism, Squeeze Grip, Gross Weight 5.16 Kg. empty
Weight 3.16Kg. Can Height 615MM Diameter 111MM, Discharge Time
less than 8 Secs, Controllable discharge mechanism, Applicable on
Class B&C Fire, B Rating 13B, Can Constuction : Cold Impact Extrusion,
Valve Construction : Forging & Machining, Internal Coating of Can : Not
Applicable, External coating of Can : Spray Painting, Aluminium metal
ISO & PESO Approved, 3 Year Warranty. including cost of materials,
labour, HOM complete as per specifications. complete
40.39 Providing CO2 Aluminium - 4.5kg
Providing 4.5Kg CO2 Gas Type aluminium body Squeeze grip Fire Each 11,785.00
Extinugisher, Trolley Mounted, Easy Weight Management, Used Unused
Mechanism, Squeeze Grip, Gross Weight 11.16Kg. empty Weight
6.66Kg. Can Height 860MM Diameter 140MM, Discharge Time less
than10 Secs, Controllable discharge mechanism, Applicable on Class
B&C Fire, B Rating 13B, Can Constuction : Cold Impact Extrusion,
Valve Construction : Forging & Machining, Internal Coating of Can : Not
Applicable, External coating of Can : Spray Painting, Aluminium metal
ISO & PESO Approved, 3 Year Warranty. including cost of materials,
labour, HOM complete as per specifications. complete
40.40 Providing Aqueous Film-Forming Foam - 9 Ltr
Providing 9 Ltr Fire Extinugisher Aqueous Film-Forming Foam Type, Each 6,055.00
Stored Pressure Type, Pressure Gauge, Gross Weight 15.10kg. empty
weight 6.10kg Can Height 615MM, Diameter 175 MM, Discharge Time
less than 60 Secs, Controllable discharge mechanism (Squeeze grip with
easy snap safety seal), Range minimum 6 Meters, applicable on Class
A,B,C A Rating 13A, B Rating 55B, Can Construction; Deep drawn & CO,
Mig welded, Valve Construction: Forging & Machining, Internal Coating
of Can : Epoxy Powder coating, External Coating of Can : Epoxy Polyster
Powder coating, Sheet metal thickness: 2.0MM, ISI and EN Approved,
Helium Leak Detection Tested, 1 Years Warranty with instalert system with
Superior quality EPDM Rubber Hosepipe etc., including cost of materials,
labour, HOM complete as per specifications. complete

354
Sl. No. Description Unit Rate
Rs. Ps.

40.41 Providing Aqueous Film-Forming Foam - 50 Ltr


Providing 50 Ltr Fire Extinugisher Aqueous Film-Forming Foam Type, Each 22,098.00
External Cartridge Type, Pressure Gauge, Gross Weight 102kg. empty
weight 52kg Can Height 1192MM, Diameter 300 MM, Discharge Time
less than 180 Secs, Controllable discharge mechanism (Squeeze grip
with easy snap safety seal), Range minimum 10 Meters, applicable on
Class A,B,Can Construction; Deep drawn & CO2, Mig welded, Valve
Construction: Forging & Machining, Internal Coating of Can : Epoxy
Powder coating, External Coating of Can : Epoxy Polyster Powder
coating, Sheet metal thickness: 4.0MM, 1 Years Warranty with instalert
system with Superior quality EPDM Rubber Hosepipe etc., including
cost of materials, labour, HOM complete as per specifications. complete
40.42 Providing Water - 9 Ltr - Stored Pressure
Providing 9 Ltr Water type Fire Extinugisher, Stored Pressure Type, Each 5,728.00
Pressur Gauge, Gross Weight 15.1kg. empty weight 6.1kg Can Height
615MM, Diameter 175 MM, Discharge Time less than 120 Secs,
Controllable discharge mechanism (Squeeze grip with easy snap safety
seal), Range minimum 6 Meters, applicable on Class A Fire, A Rating 3A,
Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 2.0MM, ISI and EN Approved, Helium Leak Detection Tested, 1
Years Warranty with instalert system with Superior quality EPDM Rubber
Hosepipe etc., including cost of materials, labour, HOM complete as per
specifications. complete
40.43 Providing Water - 50 Ltr
Providing 50 Ltr Fire Extinugisher Water Type, External Cartidge, Each 19,642.00
Pressure Gauge, Gross Weight 108kg. empty weight 58kg Can Height
1200MM, Diameter 300 MM, Discharge Time less than 180 Secs,
Controllable discharge mechanism (Squeeze grip with easy snap
safety seal), Range minimum 10 Meters, applicable on Class A Fire,
Can Construction; Deep drawn & CO, Mig welded, Valve Construction:
Forging & Machining, Internal Coating of Can : Epoxy Powder coating,
External Coating of Can : Epoxy Polyster Powder coating, Sheet metal
thickness: 4.0MM, 1 Years Warranty with instalert system with Superior
quality EPDM Rubber Hosepipe etc., including cost of materials, labour,
HOM complete as per specifications. complete
40.44 Providing Hydro Pyroquell Sytem - 2ltr
Providing 2 Ltr Hydro Pyroquell Sytem Watermist technology base, Each 17,514.00
Stored pressure type, Rating -15F, Solid stainless body to withstand hight
temperatures, Tamper-proof safety seal, Effective on Class-A, Class-B,
Class-F and Electrically Started Fires, Built-in pressure gauge, Instalert,
Uses distilled water, Gross Weight 4.60 Kg, empty Weight 2.60kg, can
Height 440mm Diameter 140MM, Controllable discharge mechanism
(Squeeze grip with easy snap safety seal), Can Construction : Deep

355
Sl. No. Description Unit Rate
Rs. Ps.

drawn & CO2 Mig welded, Valve Construction : Forgin &


Machining, ERDA approved, Sheet metal thickness : 1.50MM,
Helium Leak Detection Tested, Discharge Time : Min. 8 Sec.,
5 Year Warranty including cost of materials, labour, HOM complete as
per specifications. complete
40.45 Providing Hydro Pyroquell Sytem - 3ltr
Providing 3 Ltr Hydro Pyroquell Sytem Watermist technology base, Each 20,951.00
Stored pressure type, Rating -5A. 21B & 25F, Solid stainless body
to withstand hight temperatures, Tamper-proof safety seal, Effective
on Class-A, Class-B, Class-F and Electrically Started Fires, Built-in
pressure gauge, Instalert, Uses distilled water, Gross Weight 6.23 Kg,
empty Weight 3.23kg, can Height 480mm Diameter 160MM, Controllable
discharge mechanism (Squeeze grip with easy snap safety seal), Can
Construction : Deep drawn & CO2 Mig welded, Valve Construction
: Forgin & Machining, ERDA approved, Sheet metal thickness :
1.50MM, Helium Leak Detection Tested, Discharge Time : Min. 13 Sec.,
5 Year Warranty including cost of materials, labour, HOM complete as
per specifications. complete
40.46 Providing Hydro Pyroquell Sytem - 6ltr
Providing 6 Ltr Hydro Pyroquell Sytem Watermist technology base, Each 28,072.00
Stored pressure type, Rating -8A. 34B & 40F, Solid stainless body
to withstand hight temperatures, Tamper-proof safety seal, Effective
on Class-A, Class-B, Class-F and Electrically Started Fires, Built-in
pressure gauge, Instalert, Uses distilled water, Gross Weight 10.4 Kg,
empty Weight 4.4kg, can Height 615mm Diameter 175MM, Controllable
discharge mechanism (Squeeze grip with easy snap safety seal), Can
Construction : Deep drawn & CO2 Mig welded, Valve Construction
: Forgin & Machining, ERDA approved, Sheet metal thickness :
1.50MM, Helium Leak Detection Tested, Discharge Time : Min. 13 Sec.,
5 Year Warranty including cost of materials, labour, HOM complete as
per specifications. complete
40.47 Providing Green mist - 2ltr
Green mist Extinguishers : Providing 2 Ltr Watermist technology base, Each 12,275.00
Stored pressure type, Rating -15F, Mild steel body, Tamper-proof safety
seal, Effective on Class-A, Class-B, Class-F and Electrically Started
Fires, Built-in pressure gauge, Instalert, Uses distilled water, Gross
Weight 4.55 Kg, empty Weight 2.73kg, can Height 435mm Diameter
140MM, Controllable discharge mechanism (Squeeze grip with easy
snap safety seal), Can Construction : Deep drawn & CO2 Mig welded,
Valve Construction : Forgin & Machining, ERDA approved, Sheet metal
thickness : 1.60MM, Helium Leak Detection Tested, Discharge Time :
Min. 22 Sec., 5 Year Warranty with instalert system with Superior quality
EPDM Rubber Hosepipe etc., including cost of materials, labour, HOM
complete as per specifications. complete

356
Sl. No. Description Unit Rate
Rs. Ps.

40.48 Providing Green mist - 3ltr


Green mist Extinguishers : Providing 3 Ltr Watermist technology base, Each 11,049.00
Stored pressure type, Rating -5A. 21B & 25F, Mild Steel body, Tamper-
proof safety seal, Effective on Class-A, Class-B, Class-F and Electrically
Started Fires, Built-in pressure gauge, Instalert, Uses distilled water,
Gross Weight 6.23 Kg, empty Weight 3.23kg, can Height 480mm
Diameter 160MM, Controllable discharge mechanism (Squeeze grip
with easy snap safety seal), Can Construction : Deep drawn & CO2 Mig
welded, Valve Construction : Forgin & Machining, ERDA approved, Sheet
metal thickness : 1.60MM, Helium Leak Detection Tested, Discharge
Time : Min. 13Sec., 5 Year Warranty with instalert system with Superior
quality EPDM Rubber Hosepipe etc., including cost of materials, labour,
HOM complete as per specifications. complete
40.49 Providing Green mist - 6ltr
Green mist Extinguishers : Providing 6 Ltr Watermist technology base, Each 20,951.00
Stored pressure type, Rating -8A. 34B & 40F, Mild steel body t, Tamper-
proof safety seal, Effective on Class-A, Class-B, Class-F and Electrically
Started Fires, Built-in pressure gauge, Instalert, Uses distilled water,
Gross Weight 12.15 Kg, empty Weight 6.15kg, can Height 615mm
Diameter 175MM, Controllable discharge mechanism (Squeeze grip
with easy snap safety seal), Can Construction : Deep drawn & CO2 Mig
welded, Valve Construction : Forgin & Machining, ERDA approved, Sheet
metal thickness : 2.00MM, Helium Leak Detection Tested, Discharge
Time : Min. 64 Sec., 5 Year Warranty with instalert system with Superior
quality EPDM Rubber Hosepipe etc., including cost of materials, labour,
HOM complete as per specifications. complete
40.50 Providing CQRS 2 Kg - Direct Low Pressue System
Providing CQRS 2 Kg - Direct Low Pressue System - Gross Weight Each 81,026.00
3.98 Kg, Empty Weight 1.98 Kg, Can Height 333 MM, Diameter 108MM,
Can construction : Deep Drawn, Valve Construction : Forging / Machining,
External Construction : Epoxy Powder Coating, Helium Leak Detection
Tested, Sheet Metal Thickness: 1.60MM, 1 Year warranty, Valve, Nickel
Plated, With Intergrated Ball Valve, Integrated position control for ball
valve: open - close, Extinguishing Clean Agent FE 36, Zero ODP, Stored
Pressue, Fitted with Pressue Gauge, Control Panel having Monitoring
LED’s for AC Power, System On, Discharged, Valve Closed, Valve Open,
Pressure Healthy, Strobe Red, Strobe Amber, OLED Graphic Display
95x16, Battery Backp, 3 Outputs using Potential Free relay contact,
Audio Output using Piezo buzzer, 3 Meter Sensor Tue UV Resistance
with Pressrization of Tube Using Nitrogen Gas, End of Line Plug 1 Pc,
End of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection 1 Pc,
Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube Attchment 6 Pc.
including cost of materials, labour, HOM complete as per specifications.
complete
40.51 Providing CQRS 4 Kg - Direct Low Pressue System
Providing CQRS 4 Kg - Direct Low Pressue System - Gross Weight Each 98,214.00
7 Kg, Empty Weight 3 Kg, Can Height 413 MM, Diameter 140MM, Can

357
Sl. No. Description Unit Rate
Rs. Ps.

construction : Deep Drawn, Valve Construction : Forging / Machining,


External Construction : Epoxy Powder Coating, Helium Leak Detection
Tested, Sheet Metal Thickness: 1.60MM, 1 Year warranty, Valve, Nickel
Plated, With Intergrated Ball Valve, Integrated position control for ball
valve: open - close, Extinguishing Clean Agent FE 36, Zero ODP, Stored
Pressue, Fitted with Pressue Gauge, Control Panel having Monitoring
LED’s for AC Power, System On, Discharged, Valve Closed, Valve Open,
Pressure Healthy, Strobe Red, Strobe Amber, OLED Graphic Display
95x16, Battery Backp, 3 Outputs using Potential Free relay contact,
Audio Output using Piezo buzzer, 4 Meter Sensor Tue UV Resistance
with Pressrization of Tube Using Nitrogen Gas, End of Line Plug 1 Pc,
End of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection
1 Pc, Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube
Attchment 8Pc. including cost of materials, labour, HOM complete as
per specifications. complete
40.52 Providing CQRS 6 Kg - Direct Low Pressue System
Providing CQRS 6 Kg - Direct Low Pressue System - Gross Weight Each 1,12,946.00
9.42 Kg, Empty Weight 3.42 Kg, Can Height 460 MM, Diameter 160MM,
Can construction : Deep Drawn, Valve Construction : Forging / Machining,
External Construction : Epoxy Powder Coating, Helium Leak Detection
Tested, Sheet Metal Thickness: 2.00MM, 1 Year warranty, Valve, Nickel
Plated, With Intergrated Ball Valve, Integrated position control for ball
valve: open - close, Extinguishing Clean Agent FE 36, Zero ODP, Stored
Pressue, Fitted with Pressue Gauge, Control Panel having Monitoring
LED’s for AC Power, System On, Discharged, Valve Closed, Valve Open,
Pressure Healthy, Strobe Red, Strobe Amber, OLED Graphic Display
95x16, Battery Backp, 3 Outputs using Potential Free relay contact,
Audio Output using Piezo buzzer, 5 Meter Sensor Tue UV Resistance
with Pressrization of Tube Using Nitrogen Gas, End of Line Plug 1 Pc,
End of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection 1 Pc,
Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube Attchment 10Pc.
including cost of materials, labour, HOM complete as per specifications.
complete
40.53 Providing CQRS 9 Kg - Direct Low Pressue System
Providing CQRS 9 Kg - Direct Low Pressue System - Gross Weight Each 1,27,678.00
14.53 Kg, Empty Wight 5.53Kg, Can Height 590 MM, Diameter 175MM,
Can construction : Deep Drawn, Valve Construction : Forging / Machining,
External Construction : Epoxy Powder Coating, Helium Leak Detection
Tested, Sheet Metal Thickness: 2.00MM, 1 Year warranty, Valve, Nickel
Plated, With Intergrated Ball Valve, Integrated position control for ball
valve: open - close, Extinguishing Clean Agent FE 36, Zero ODP, Stored
Pressue, Fitted with Pressue Gauge, Control Panel having Monitoring
LED’s for AC Power, System On, Discharged, Valve Closed, Valve Open,
Pressure Healthy, Strobe Red, Strobe Amber, OLED Graphic Display
95x16, Battery Backp, 3 Outputs using Potential Free relay contact,
Audio Output using Piezo buzzer, 6 Meter Sensor Tue UV Resistance
with Pressrization of Tube Using Nitrogen Gas, End of Line Plug 1 Pc,

358
Sl. No. Description Unit Rate
Rs. Ps.

End of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection 1 Pc,


Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube Attchment 10Pc.
including cost of materials, labour, HOM complete as per specifications.
complete
40.54 Providing CQRS 2 Kg - Direct high Pressue System
Providing CQRS 2 Kg - Direct high Pressue System - Gross Weight Each 73,660.00
8.52 Kg, Empty Weight 6.52 Kg, Can Height 595 MM, Diameter 108MM,
Can construction : Hot Spinning/Heat Treatment, Valve Construction :
Forging / Machining, External Construction : Epoxy Powder Coating,
Sheet Metal Thickness: 3.5MM, 1 Year warranty, Valve, Brass, Cylinder
thread : M10x1, Outlet thread: W21, 8x1/14”, Bursting Disc: 250 bar,
Integrated position control for Valve: activated - not activated, Intergrated
position control for ball valve: open-close, Extinguishing Agent CO2
Control Panel having Monitoring LED’s for AC Power, System on,
Discharged, Valve Closed, Valve Open, Pressure Healthy, Strobe Red,
Strobe Amber, OLED Graphic Display 95x16, Battery Backp, 3 Outputs
using Potential Free relay contact, Audio Output using Piezo buzzer,
3 Meter Sensor Tube UV Resistance with Pressurization of Tube
Using Nitrogen Gas, End of Line Plug 1 Pc, End of Line Adapter 1 Pc,
T Connection/Elbow/Straight Connection 1 Pc, Pressure Switch M
10x1, Switchpoint 15 bar - 1 Pc, Tube Attchment, 6 Pc. including cost of
materials, labour, HOM complete as per specifications. complete
40.55 Providing CQRS 4.5 Kg - Direct high Pressue System
Providing CQRS 4.5Kg - Direct High Pressue System - Gross Weight Each 88,392.00
14.73 Kg, Empty Weight 13.23 Kg, Can Height 735 MM, Diameter
139MM, Can construction : Hot Spinning/Heat Treatment, Valve
Construction : Forging / Machining, External Construction : Epoxy Powder
Coating, Sheet Metal Thickness: 4.2MM, 1 Year warranty, Valve, Brass,
Cylinder thread : 25E, Dip tube thread M10x1, Outlet thread: W21,
8x1/14”, Bursting Disc: 250 bar, Integrated position control for Valve:
activated - not activated, Intergrated position control for ball valve:
open-close, Extinguishing Agent CO2 Control Panel having Monitoring
LED’s for AC Power, System on, Discharged, Valve Closed, Valve Open,
Pressure Healthy, Strobe Red, Strobe Amber, OLED Graphic Display
95x16, Battery Backp, 3 Outputs using Potential Free relay contact,
Audio Output using Piezo buzzer, 3 Meter Sensor Tube UV Resistance
with Pressurization of Tube Using Nitrogen Gas, End of Line Plug 1
Pc, End of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection
1 Pc, Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube
Attchment 8 Pc. including cost of materials, labour, HOM complete as
per specifications. complete
40.56 Providing CQRS 6.5Kg - Direct High Pressue System
Providing CQRS 6.5Kg - Direct High Pressue System - Gross Weight Each 1,00,670.00
23.2 Kg, Empty Weight 16.7 Kg, Can Height 980 MM, Diameter 139.7MM,
Can construction : Hot Spinning/Heat Treatment, Valve Construction :
Forging / Machining, External Construction : Epoxy Powder Coating,

359
Sl. No. Description Unit Rate
Rs. Ps.

Sheet Metal Thickness: 4.5MM, 1 Year warranty, Valve, Brass, Cylinder


thread : 25E, Dip tube thread M10x1, Outlet thread: W21, 8x1/14”,
Bursting Disc: 250 bar, Integrated position control for Valve: activated
- not activated, Intergrated position control for ball valve: open-close,
Extinguishing Agent CO2 Control Panel having Monitoring LED’s for AC
Power, System on, Discharged, Valve Closed, Valve Open, Pressure
Healthy, Strobe Red, Strobe Amber, OLED Graphic Display 95x16,
Battery Backp, 3 Outputs using Potential Free relay contact, Audio
Output using Piezo buzzer, 3 Meter Sensor Tube UV Resistance with
Pressurization of Tube Using Nitrogen Gas, End of Line Plug 1 Pc,
End of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection
1 Pc, Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube Attchment
10 Pc. including cost of materials, labour, HOM complete as per
specifications. complete
40.57 Providing CQRS 22.5Kg - Direct High Pressure System
Providing CQRS 22.5Kg - Direct High Pressue System - Gross Weight Each 1,27,678.00
63.6 Kg, Empty Weight 41.1 Kg, Can Height 1170 MM, Diameter 232MM,
Can construction : Hot Spinning/Heat Treatment, Valve Construction :
Forging / Machining, External Construction : Epoxy Powder Coating,
Sheet Metal Thickness: 4.5MM, 1 Year warranty, Valve, Brass, Cylinder
thread : 25E, Dip tube thread M10x1, Outlet thread: W21, 8x1/14”,
Bursting Disc: 250 bar, Integrated position control for Valve: activated
- not activated, Intergrated position control for ball valve: open-close,
Extinguishing Agent CO2 Control Panel having Monitoring LED’s for AC
Power, System on, Discharged, Valve Closed, Valve Open, Pressure
Healthy, Strobe Red, Strobe Amber, OLED Graphic Display 95x16,
Battery Backp, 3 Outputs using Potential Free relay contact, Audio
Output using Piezo buzzer, 3 Meter Sensor Tube UV Resistance with
Pressurization of Tube Using Nitrogen Gas, End of Line Plug 1 Pc, End
of Line Adapter 1 Pc, T Connection/Elbow/Straight Connection 1 Pc,
Pressure Switch M 10x1, Switchpoint 15 bar - 1 Pc, Tube Attchment
12 Pc. including cost of materials, labour, HOM complete as per
specifications. complete
40.58 Smoke Detection - Wireless
Providing Smoke Detection Control Panel - 28 Wireless Zone, Each 31,183.00
2 Hardwired Zone, Tamper Altert, passcode protected, RF Jamming
recongnition, diagnition, diagnostic feture for RF signal strength between
panel and each detector, event reporting using PSTN Telephone line,
dialing upto 4 telephone numbers, event reporting as per users choice,
remote control using telephone line, LCD Screen Display, Intuitive
graphic and audible user interphase, Two Way voice interaction, Battery
Backup stand by time upto 12 hrs. including cost of materials, labour,
HOM complete as per specifications. complete
40.59 Smoke Detector
Smoke Detector - Fully Supervised Smoke Detector, Photoelectric Each 3,193.00
detection technology for superior detection sensitivity, sound and

360
Sl. No. Description Unit Rate
Rs. Ps.

transmitted alrerts for smoke, tamper and low battery, works on


powercode protocol, easy programming and enrolling to the control
panel, Long life 9 votl alkaline or lithium battery simple ceiling mount
installation with separate installation bracket. including cost of materials,
labour, HOM complete as per specifications. complete
40.60 Wireless Repeater
Repeater : The Wireless repeater extends the communication range Each 8,102.00
of Detectors, by relaying data between receiver and remote wireless
transmitters, Up to 16 auxiliary repeaters can be positioned between
the farthest group of receivers transmitters and the receiver. including
cost of materials, labour, HOM complete as per specifications. complete
40.61 Wireless Siren Strobe
External Wireless Siren - a fuly supervised Power Code “outdoor (IP55) Each 10,803.00
wireless siren and strobe light, Designed for external installation, Wirefree
connection between control panel and siren, Convenient and rapid no-
mess installation, Separate fire alarm signals, 98 db Piezo siren and high
power strobe light, Weather-resistant IP55, Two-way communication
for local & remote diagnostic, Plug-in powr supply, NIMH rechargeable
back up battery, Transmits status, tamper, low battery, supervisior and
AC loss messages to the control panel, Tri-state tamper switch identifies
screw mainpulation removal of cover or prying from the wall including
cost of materials, labour, HOM complete as per specifications. complete
40.62 Smoke Detector Model
Dual chamber ionization detectors provide a high degree of sensitivity Each 3,193.00
and reliability, A unique inter-connectivity feature can be used to warn
occupants in adjoining areas, An independent 9 volt power supply and a
low battery warning system ensure that the smoke detectors are always
in working condition, Type - Dual Chamber lonisation, Connectivity -
Wired, Alarm Sound Level - 85dB including cost of materials, labour,
HOM complete as per specifications. complete
40.63 External GSM Dialler
Providing the GSM unit enables the system to operate over cellular Each 20,081.00
net work. Indoor plug-in transformer, 120VAC 60 Hz / 9 VAC Current
Consumption : 40mA approx (idle), < 400mA (transmission), Backup
Battery: Ni-Metal, 7.2V, 1300 mAh including cost of materials, labour,
HOM complete as per specifications. complete
40.64 Smoke Detector Model
Proividing Dual Technology Smoke Detectors, Sensor Ionisation and Each 3,362.00
photo electric, Button for Test/Silence, Remote Control silence/Test uses
mot remote controls to temporarily quiet unwanted alarms and test alarm
function, Intelligent Sensing Technology TM helps reduce the number
of nuisance alarms, 9V Battery including cost of materials, labour, HOM
complete as per specifications. complete

361
Sl. No. Description Unit Rate
Rs. Ps.

40.65 Smoke Detector


Providing Dual Chamber lonisation type Smoke Detectors with Escape Each 2,534.00
Light, 9V Battery Operated, Test Button including cost of materials,
labour, HOM complete as per specifications. complete
40.66 Escape Singage
Providing’s Escape Singage : Photoluminescent rigid plastic, Sqcm 0.80
2 mm thickness, Printed on High Quality glass paint with UV resistance,
5 years warranty, Material Used - Non Radiocactive, non-phosphorous,
non toxic and lead free. Available in different types & sizes, Time after
removing the light source (in minutes) : 60 minutes, Luminescent
intensity (milicandelas * per square meter - mcd/sqm) : 30 mcd/sqm.
Luminescent Intensity greater than 0.32 mcd/sqm, Period of Light Decay*
(In Minutes) :3100, including cost of materials, labour, HOM complete
as per specifications.
40.67 Singages for Walls/Floors
Providing’s Escape Singage : Photoluminescent rigid plastic, Sqcm 1.00
2 mm thickness, Printed on High Quality glass paint with UV resistance,
5 years warranty, Material Used - Non Radiocactive, non-phosphorous,
non toxic and lead free. Available in different types & sizes, Time after
removing the light source (in minutes) : 60 minutes, Luminescent
intensity (milicandelas * per square meter - mcd/sqm) : 30 mcd/sqm.
Luminescent Intensity greater than 0.32 mcd/sqm, Period of Light Decay*
(In Minutes) :3100, including cost of materials, labour, HOM complete
as per specifications.
40.68 Panaromic Signage
Providing’s Escape Singage : Photoluminescent rigid plastic, Sqcm 0.80
2 mm thickness, Printed on High Quality glass paint with UV resistance,
5 years warranty, Material Used - Non Radiocactive, non-phosphorous,
non toxic and lead free. Available in different types & sizes, Time after
removing the light source (in minutes) : 60 minutes, Luminescent
intensity (milicandelas * per square meter - mcd/sqm) : 30 mcd/sqm.
Luminescent Intensity greater than 0.32 mcd/sqm, Period of Light Decay*
(In Minutes) :3100, including cost of materials, labour, HOM complete
as per specifications.
40.69 Evacution Plan (Price for 10 + unit)
Providing’s Escape Singage : Photoluminescent rigid plastic, Sqcm 5.00
2 mm thickness, Printed on High Quality glass paint with UV resistance,
5 years warranty, Material Used - Non Radiocactive, non-phosphorous,
non toxic and lead free. Available in different types & sizes, Time after
removing the light source (in minutes) : 60 minutes, Luminescent
intensity (milicandelas * per square meter - mcd/sqm) : 30 mcd/sqm.
Luminescent Intensity greater than 0.32 mcd/sqm, Period of Light Decay*
(In Minutes) :3100, including cost of materials, labour, HOM complete
as per specifications.

362
Sl. No. Description Unit Rate
Rs. Ps.

40.70 Evacution Plan (Price for less than 10 unit)


Providing’s Escape Singage : Photoluminescent rigid plastic, Sqcm 6.00
2 mm thickness, Printed on High Quality glass paint with UV resistance,
5 years warranty, Material Used - Non Radiocactive, non-phosphorous,
non toxic and lead free. Available in different types & sizes, Time after
removing the light source (in minutes) : 60 minutes, Luminescent
intensity (milicandelas * per square meter - mcd/sqm) : 30 mcd/sqm.
Luminescent Intensity greater than 0.32 mcd/sqm, Period of Light Decay*
(In Minutes) :3100, including cost of materials, labour, HOM complete
as per specifications.
40.71 Marking Strips
Providing’s Escape Singage : Photoluminescent rigid plastic, Sqcm 1.00
2 mm thickness, Printed on High Quality glass paint with UV resistance,
5 years warranty, Material Used - Non Radiocactive, non-phosphorous,
non toxic and lead free. Available in different types & sizes, Time after
removing the light source (in minutes) : 60 minutes, Luminescent
intensity (milicandelas * per square meter - mcd/sqm) : 30 mcd/sqm.
Luminescent Intensity greater than 0.32 mcd/sqm, Period of Light Decay*
(In Minutes) : 3100, including cost of materials, labour, HOM complete
as per specifications.
40.72 Escape Gear
Providing’s Escape Gear, Mild Steel Box size 425mm x 360 mm Each 13,259.00
140mm, Epoxy power coated to protect it from weathering, Smoke
Hood: Tested to European Standard EN 403 : 1993-S, Known to reduce
Carbon monoxide,propenal (acrolein), hydrogen choloride, hydrogen
cyanide and solid & liquid toxic particles to manageable level for at least
15 minutes, shall withstand temperatures upto 80 Deg. Single Use only,
Fire Blanket : Size : 1.2m x 1.8m, Used to cover any vessel containing
the fire completely, Used to extinuish a clothing fire wrap blanket
around victim including cost of materials, labour, HOM complete as per
specifications.
40.73 Supplying, Installing testing & commissioning approved make Centrifugal Nos. 94,200.00
pump end suction type coupled to Electric motor of suitable HP, fitted
on a commonbase frame and rated for Fireduty. The quated price shall
aslo include 2 Nos. Pressureguages fitted on suction & delivery sides
of the pump. The pumps shall run on 400/440V 3 ph. 50 Hz electric
supply. Duty of pumps: 1620 Lpm @ 70.0m Head. Control panel shall
be as specified in item no, 87, including cost of materials, labour, HOM
complete as per specifications.
40.74 Supplying, Installing testing & commissioning electrically driven jockey Nos. 79,299.00
pump of capacity 180.0 Lmpm at 75.0m head with all the necessary
accessories viz. Pressure guages etc. operating on 3Ph 50Hz, 400/440V
AC supply including foundation bolt etc. complete. Control panel shall
be as per item No.87, including cost of materials, labour, HOM complete
as per specifications.

363
Sl. No. Description Unit Rate
Rs. Ps.

40.75 Supply installing, testing and commissioning COMMON control panel Unit 1,56,250.00
for fire fighting system consisting of electrical mortor driven 60 HP
Main fire pump, Jockey pump and 12.5 HP consisting of the following
INCOMING: 1 No. Set of phase indicing lamps with SFU Rate 350A
1 No. set of 400 Amps. TPNE Ai.Bus bars 1 No. 0-400 Amps. Ammeter,
1 No.0-600V voltmeter with phase selector switch, Isolating Switch
400 A OUTGOING for Main Electrical Pump: 1 No. 200 Amps MCB
1 No.S/D starter suitable for 60 HP 1 No. Singel phse preventor suitable
for the pump described above 1 No. set of ON/OFF indicating lamps
1 No. Automanual selector switch OUTGOING for Jockey Pump: 1 No.
50 Amps MCB 1 No. DOL starter suitable for 12.50 HP 1 No. Single
phase preventor suitable for the pump described above 1 No. set of
ON/OFF indicating lamps 1 No. Automanual selector switch ENGINE
CONTROL SECTION NO.1 Diesel Engine for Standby pump: a) Main
switch 2 pole ON/OFF -1 No. b) Batter charger with transpormer with
rectifier reistance DC ammeter, DC voltmeter, T/B selector swith -1 set
c) Indicating lamps for fault communication (Battery charger, supply ON,
Control ON, engine running, low oil pressure, high water pressure and
enginer overspeed) - 6 Nos. Push buttons for starter, stop reset - 4 Nos.
e) Selector switches (Engine control, mode selctor) - 2 Nos. f) Auxilary
rellays/contractors/timer for dsequience operating for starting and
stopping of the engine -1 g) Hooter for audio alarm (Industrial type) -1 No.
Accessoreis for outgoing supply for the morttors GI SWD earthing wire
for the aove motor Accessories for outgoing supply for Diesel Enginer:
Copper conductor armoured cabe 2.5 sqmm of 12 Core x 2 runs a)
Battery 2 strands b) Enginer ON/OFF 2 strands c) Low oil pressure 3
strands d) Enginer oversped 2 strands e) Water temperature 2 strands
f) Spare 1 strand The cost of control panel shall also include necessary
pressure swithces with necessary cabling & inter-locked with the panel
to enable sequential operation of Pumps. Including terrace mortor
necessary earthing All the components shall be housed in a common
cubical. However, the feed cable for diesel engine driven pump battery
charger shall be taken separately including cost of materials, labour,
HOM complete as per specifications.
40.76 Supplying Installing testing and commissioning electrically driven Nos. 65,848.00
Terrance pump of capacity 900.0 Lpm at 35.0m Head with all the
necessary accessories viz. Pressure guages etc. operating on 3Ph 50Hz,
400/440V AC supply includng foundation, bolts etc. complete. Control
panel shall be as per spesification 87 including cost of materials, labour,
HOM complete as per specifications.
40.77 Exacavation in all sorts of soil for laying pipes upto 100mm dia including cum 182.00
forming bottom surface to required level, refilling seleted excavated
earth around the pipe in layers of 150mm thick, watering consolidating
and disposing off the surplus earath within the stie or as directed by the
site engineer etc. complete Depth upto 1.0m including cost of materials,
labour, HOM complete as per specifications.

364
Sl. No. Description Unit Rate
Rs. Ps.

40.78 Supply installation, testing and commissioning of fire alarm Main panel Nos. 59,524.00
with15 zone indication alaram etc. as required including cost of materials,
labour, HOM complete as per specifications.
40.79 Supplying Installing testing and commissioning approved make Nos. 2,14,285.00
Centrifugal pump end suction type couple to Electric mortor of suitable
HP, fitted on a common base frame and rated for Fire duty. including
2 nos. Pressure guages fitted on suction & delivery side of the pump. The
pums shall run on 400/440V, 3ph, 50Hz electric supply, Duty of pumps:
2850 Lpm @ 70.0m Head. Control panel shall be per specification stated
in Item No.87. including cost of materials, labour, HOM complete as per
specifications. (Cost of control pannel is not included)
40.80 Supplying, Installing, testing and commisioning of fire hydrant multi stage Nos. 4,09,225.00
pump capable of delivering 2850Lpm @ 70.0m head coupled to water
cooled diesel engine of adequiate HP. It shall be fitted with a radiator
on a common base from with complete ancilalary units such as colling
system, non return Valve, Y strainer, fuel tank of adequate coapcity,
Pressue guage, pressure switch. Control panel shall be per specification
stated in Item No.87. including cost of materials, labour, HOM complete
as per specifications. (Cost of control pannel is not included)
40.81 Supplying, Installing, testing and commisioning electrically driven jockey Nos. 61,736.00
pump of capacity 180.0 Lpm at 70.0m head with all the necessary
accessories viz. Pressure guages etc. operating on 3Ph 50Hz, 400/440
V AC supply incldung foudnation, bolts etc. complete Control panel shall
be per specification stated in Item No.87. including cost of materials,
labour, HOM complete as per specifications. (Cost of controle pannel
is not included)
40.82 Supplying, Installing, testing and commissioning approved make Nos. 2,42,687.00
Centrifugal pump end suction type couple to Electric motor of suitable
Hp, fitted on a common base frame and rated for Fire duty. The quoted
price shall aslso include 2 nos. Pressure guages fitted on suction and
delivery side of the pump. The pumps shall run on 400/440V, 3ph,
35-Hz electric supply. Duty of pumps: 2850 Lpm @ 90.0m Head. Control
panel shall be per specification stated in Item No.87. including cost of
materials, labour, HOM complete as per specifications. (Cost of control
pannel is not included)
40.83 Supplying Installing testing and commissiong COMMON Control panel Nos. 1,86,011.00
for fire fighting system consiting of electrical motor driven 60HP Main
fire pump, Diesel engine driven pump 60 HP Sprinkler pump 50HP &
Jockey pump 25HP
40.84 Supplying, Installing, testing and commissioning approved make Nos. 2,14,285.00
Centrifugal pump end suction type couple to Electric motor of suitable
Hp, fitted on a common base frame and rated for Fire duty. The quoted
price shall aslso include 2 nos. Pressure guages fitted on suction &
delivery side of the pump. The pumps shall run on 400/440V, 3 ph,
50Hz electric supply. Duty of pums: 1620 Lpm @ 70.0m Head. Control
panel shall be per specification stated in Item No.87. including cost of
materials, labour, HOM complete as per specifications. (Cost of control
pannel is not included)
365
Sl. No. Description Unit Rate
Rs. Ps.

40.85 Supplying, Installing testing and commissioning of fire hydrant multi stage Nos. 2,60,416.00
pump capable of delivering 1620 Lpm @ 70.0m head coupled to water
colled diesel enginer of adequate. HP. It shall be fitted with a radiator
on a common base frame with complete ancillary units such as colling
sytem, non return vialve, Y strainer, fuel tank of adequante capactiy,
Pressure guage, pressure switch etc. complete Control panel shall be per
specification stated in Item No.87. including cost of materials, labour, HOM
complete as per specifications. (Cost of control pannel is not included)
40.86 Supplying, Installing testing and commissioning electrically driven jockey Nos. 79,299.00
pump of capacity 180.0 Lpm at 70.0m. Head with all the necessary
accessories viz. Pressure guages etc., operating on 3Ph 50Hz, 400/440V
AC supply including foundatin, bolts etc. complete, Control panel shall
be per specification stated in Item No.87. including cost of materials,
labour, HOM complete as per specifications. (Cost of control pannel is
not included)
40.87 FIRE HYDRANT SYSTEM Supplying Installing, testing and commissioning Each 5,244.00
of 63mm mm dia single headed Gun mental Hydrant Valve with flanged
inlet, stop valve, spindle and cast iron hand wheel. It has a female
instantaneous outlet with Blank Cap and is Hydrostatically tested
to 21 Kgf/cm2 pressure having a flow rate of 900 LPM at 7 Kgf/cm
2 of pressure with blank cap and wheel as per IS 5290 etc. complete
Make : WINCO/NEW Age including cost of materials, labour, HOM
complete as per specifications.
40.88 Supplying Installing, testing and commissioning of 63mm mm dia double Each 8,437.00
headed Gun mental Hydrant Valve with flanged inlet 2Nos, stop valve,
spindle and cast iron hand wheel. It has a 2 Nos female instantaneous
outlet with blank cap and is hydrostatically tested to 21 Kgf/cm2 pressure
having a flow rate of 900 LPM at 7 Kgf/cm2 of pressure confirms to
IS : 2190 with blank cap and wheel as per IS 5290 etc. including cost of
materials, labour, HOM complete as per specifications. complete
40.89 Supplying Installing, testing and commissioning of Gun metal AIR Each 1,562.00
RELEASE VALVE SIZE OF 25mm dia including cost of materials, labour,
HOM complete as per specifications. complete
40.90 Supplying Installing, testing and commissioning of Gun metal Branch Each 2,232.00
pipe size of 63mm dia x19mm dia as per IS 903 Make: WINCO/NEW
AGE complete including cost of materials, labour, HOM complete as
per specifications.
40.91 Supplying Installing, testing and commissioning of Reinforced Rubber Each 5,242.00
Lined RRL Fire hose of 63mm dia 15m length as per IS 8423 binded with
one set of male and Female Instantainious Gun metal coupling as per
IS 903 WINCO/NEW AGE complete including cost of materials, labour,
HOM complete as per specifications.

366
Sl. No. Description Unit Rate
Rs. Ps.

40.92 Supplying Installing, testing and commissioning of Hose cabinet made out Each 3,199.00
of 18 gauge M.S.sheet with double glass door with locing arrangement
and painted with two coats of Fire red Enamel paint at outer ise of the
Box and two coats of white enamel paint at inner side of the box is to
accomodated 2 Nos. of Fire hose box size 20”x24”x10” complete including
cost of materials, labour, HOM complete as per specifications.
40.93 Supplying Installing, testing and commissioning of Hose reel cabin Each 3,571.00
M.S.Pressed reel of 600mm dia swinging type motion which allows a
180° swing and conforms to IS:884/85. including cost of materials, labour,
HOM complete as per specifications.
40.94 Supplying Installing, testing and commissioning of 19mm dia 36.50m Each 3,869.00
length hose with rubber lining smooth bore, reinforced of natural/synthetic
fibres, a rubber cover finish shall be smooth, fluted or fabric marked with
minimum thickness of 1.50mm and to with stand a working pressure of
10Kgf/sqcm confirms & tested as per IS 444 including cost of materials,
labour, HOM complete as per specifications.
40.95 Supplying Installing, testing and commissioning of approved make Each 371.00
15mm dia sprinkler bulb pendent/wall mounted type designed to operate
68 degrees centegrad Make Tyco/HD FIRE complete (Colour code of bulb
liquid inside Glass bulb type Pendents As per IS 9972: 57°C- Orange,
68°C - Red, 79°C - Yellow, 93°C - Green, 141°C - Blue, 182°C - Mauve,
227/260°C - Black) including cost of materials, labour, HOM complete
as per specifications.
40.96 Supplying Installing, testing and commissioning of hydraulicallying
operated sprinkler cabit Valve with water meter gong bell and trims as
required, pressure gauges drain Valve, ball Valves check valve, strainer etc.
including cost of materials, labour, HOM complete as per specifications.
40.96.1 -do-100 mm dia. complete Unit 595.00
40.96.2 -do- 150 mm dia. complete Unit 1,115.00
40.97 Supply, Installation testing and commissioning of approved make heavy
quantity (Class ‘C’) confirming to as per IS1239 Such as Tees elbows
check nuts unions, Flanger, Nipples etc. including cutting welding,
Trending fixing on walls, cealing (Using 41-Tech pipe/M.S.angle supports
work includes two coats of metal primer and two coats of Red enamel
paint etc.
40.97.1 -do- 200 mm dia. complete m 1,656.00
40.97.2 -do- 150 mm dia. complete m 1,346.00
40.97.3 -do- 100 mm dia. complete m 1,025.00
40.97.4 -do- 80 mm dia. complete m 815.00
40.97.5 -do- 65 mm dia. complete m 720.00
40.97.6 -do- 50 mm dia. complete m 635.00
40.97.7 -do- 40 mm dia. complete m 545.00

367
Sl. No. Description Unit Rate
Rs. Ps.

40.97.8 -do- 32 mm dia. complete m 515.00


40.97.9 -do- 25 mm dia. complete m 475.00
40.98 Wraping and Galing of U/G pipe line work includes one coat of anti
corrossion paint (Black) and two coats of Bituminous cloth. including
cost of materials, labour, HOM complete as per specifications.
40.98.1 -do- 200 mm dia. complete m 267.00
40.98.2 -do- 150 mm dia. complete m 185.00
40.98.3 -do- 100 mm dia. complete m 149.00
40.98.4 -do- 80 mm dia. complete m 111.00
40.99 Supplying Installation testing and Commissiong of Micro precess base
Fire alram Control panel having power regulation Circuit, which conner
to 230 AC to @$V.D.C. Indicating FIRE-FAULT, ISOLATION with
Feather touch push button switches, Test facility also with work test
facility arrangement, provided in the panel. All this electronic circuits
componets are assembled in M.S.16 gauge suitable panel cabinet with
glass Fraonted and locking arrangements including cost of all mateials
etc. complete including cost of materials, labour, HOM complete as per
specifications.
40.99.1 -do- Make Ravel/Golbe/Royale 8 Zone. complete Each 13,392.00
40.99.2 -do- Make Ravel/Golbe/Royale 12 Zone. complete Each 17,857.00
40.99.3 -do- Make Ravel/Golbe/Royale 16 Zone. complete Each 26,041.00
40.99.4 -do- Make Ravel/Golbe/Royale 20 Zone. complete Each 37,202.00
40.99.5 -do- Make Ravel/Golbe/Royale 40 Zone. complete Each 78,125.00
40.99.6 -do- Make Ravel/Golbe/Royale 60 Zone. complete Each 1,10,119.00
40.99.7 -do- Make Ravel/Golbe/Royale 76 Zone. complete Each 1,37,649.00
40.100 Supplying Installing, testing and commissioning of Smoke/Heat detector Each 2,534.00
Photo electric type detctor with base LED indicator on Smioke detector
fixed cum rise temperature type heat detector with base Make Applow/
System Sensor complete including cost of materials, labour, HOM
complete as per specifications.
40.101 Supplying Installing, testing and commissioning of Manual Call point : Each 892.00
It consists of Micro push button switch with LED and circutary etc.
works on 24V DC LED indicator with glass Fronted, Also with hammer
for breaking the glass incase of Fire. Accomdated in 75x75x30mm size
M.S.16 gauge red enamel painted box Make/Golbe/Ravel/Royale. complete
including cost of materials, labour, HOM complete as per specifications.

368
Sl. No. Description Unit Rate
Rs. Ps.

40.102 Supplying Installing, testing and commissioning of electronic Hooter, Each 1,339.00
it conists of electronic circuit to give dual Fire alaram sound with works
24V DC with speaker all encosed in suitable in MS 16 gauge red painted
box. complete including cost of materials, labour, HOM complete as per
specifications.
40.103 Supplying Installing, testing and commissioning of Response Indicator Each 223.00
constists of twin LED wioth electronic circutarx work on 24 DC enclose
in PVC retangular. complete including cost of materials, labour, HOM
complete as per specifications.
40.104 Supplying and fixing sheet metal box made out of 18 SWG sheet metal Each 71.00
with necessary holes for cable/conduit entry as required with one coat of
primer of approved make etc. including cost of materials, labour, HOM
complete as per specifications.
40.105 Supplying and drawing Flexible Multicore Cable manufactured with m 24.00
electrolytic grade copper with flexible copper conductor confirming to
table 3 class 5 of IS:8130-1984 and PVC insulation and sheathed suitable
for working voltage upto 1100Volts as per IS-694:1990 & confirming to
GTP of GROUP-B. 2C x 1.5 Sqmm including cost of materials, labour,
HOM complete as per specifications.
40.106 SITC of 7AM-12 V Battery for fire alaram system Make EXIDE/AMCo Each 892.00
40.107 Providing and Fixing Fire force board size of 3’x2’ made out to Acrylic Each 2,195.00
sheet of 3mm thick with letter of different Colums with 8mm thick ply
wood, Alumimum side frame and fixing etc. complete including cost of
materials, labour, HOM complete as per specifications.
40.108 Supplying Installing, testing and commissioning of Public address system Each 1,711.00
(Two way comminication type) as per requirement of Fire Force authority
and which Generally comprise of Supplying Installing, testing and
commissioning of Approved make 5 W.wall mounted speaker with talk
back facility with store enamel painted M.S.Sheet hosing etc. complete
including cost of materials, labour, HOM complete as per specifications.
40.109 Supplying Installing, testing and commissioning of P.A.System console
panel with push button with speaker and indictoron Accomdated in
M.S.Cabinet with painting including cost of materials, labour, HOM
complete as per specifications.
40.109.1 -do- 20 Zone cansole. complete Each 35,714.00
40.109.2 -do- 40 Zone cansole. complete Each 70,684.00
40.109.3 -do- 60 Zone cansole. complete Each 93,005.00
40.110 P.A.System amplifier 250W RMS out put with complete wiring and Each 23,809.00
controls accessable form front Make AHUJA. complete
40.111 Supplying Installing, testing and commissioning of Ahuja make MIKE Each 1,115.00
suitable to I.A.System. complete

369
Sl. No. Description Unit Rate
Rs. Ps.

40.112 Supplying and drawing Flexible Multicore Cable manufactured with m 27.00
electrolytic grade flexible copper with low conductor confirming to table
3 class 5 of IS:8130-1984 and (Virgin) PVC insulation and sheathed
suitable for working voltage upto 1100Volts as per IS-694:1990 &
confirming to GTP of GROUP-A. 2C x 1.50 Sqmm including cost of
materials, labour, HOM complete as per specifications.
40.113 Supplying of four bucket stand alongwith buckets. complete Each 892.00
40.114 Supplying of two bucket stand alongwith buckets. complete Each 469.00
40.115 Supplying of Hand gloves. complete Pair 126.00
40.116 Supplying of first aid box. complete Each 160.00
40.117 Supplying of SAFETY MASK. complete Each 47.00
40.118 Supplying of FIRST AID CHART with lamination. complete Each 167.00
40.119 Supplying and installation of RUBBER MAT 1mtr x 1mtr -10mm thick. Nos. 822.00
complete including cost of materials, labour, HOM complete as per
specifications.
40.120 Supply, Installation testing and commissioning of approved make heavy
tubes (Class ‘C’) confirming to as per IS1239 Part - I (25mm Nominal
bore 4.05mm thick @ 2.97 Kg/m, 32mm Nominal bore 4.05mm thick
@ 3.84 Kg/m,40mm Nominal bore 4.05mm thick @ 4.43 Kg/m,50mm
Nominal bore 4.47mm thick @ 6.17 Kg/m, 65mm Nominal bore 4.47mm
thick @ 7.90 Kg/m, 80mm Nominal bore 4.85mm thick @ 10.10 Kg/m,
100mm Nominal bore5.40mm thick @ 14.40 Kg/m,150mm Nominal bore
5.40mm thick @ 21.20 Kg/m, Such as Tees elbows check nuts unions,
Flanger, Nipples etc. including cutting welding, Trending fixing on walls,
ceiling (Using 41-Tech pipe/M.S.angle supports work includes two coats
of metal primer and two coats of Red enamel paint etc. including cost of
materials, labour, HOM complete as per specifications.
40.120.1 -do- Galvanized Iron Pipes 200 mm dia. complete m 1,815.00
40.120.2 -do- Galvanized Iron Pipes 150 mm dia. complete m 1,755.00
40.120.3 -do- Galvanized Iron Pipes 100 mm dia. complete m 1,575.00
40.120.4 -do- Galvanized Iron Pipes 80 mm dia. complete m 1,056.00
40.120.5 -do- Galvanized Iron Pipes 65 mm dia. complete m 942.00
40.120.6 -do- Galvanized Iron Pipes 50 mm dia. complete m 827.00
40.120.7 -do- Galvanized Iron Pipes 40 mm dia. complete m 731.00
40.120. 8 -do- Galvanized Iron Pipes 32 mm dia. complete m 683.00
40.120.9 -do- Galvanized Iron Pipes 25 mm dia. complete m 635.00

370
Sl. No. Description Unit Rate
Rs. Ps.

Note : ANNEX B
(Clause 5.3, IS2190:2010)
RECOMMENDATIONS FOR INSTALLATION OF FIRE EXTINGUISHERS
B-1 occupancies classified according to IS 1641 are given together with nature of fire hazard and type of fire risk along with typical
examples. The classifications, groupings etc., given in this Annex are only for general guidance for installation of fire extinguishers and not
for other purposes.

Class of Type of Nature of Class


Typical Examples
Occupancy Occupancy Occupancy of Fire
Residential Lodging or rooming, one or two family houses, Private dwellings dormitories,
Group A LH Class A
buildings apartment houses, flats, upto 4 star hotels, etc
LH Class C Small Kitchens having LPG connection, electrical heaters, etc.
MH Class A Multi-storeyed buildings, multi-risk buildings, five star hotels, etc.
Educational
Group B LH Class A Tutorials, vocational training institutes, evening colleges, commercial institutes
buildings
MH Class A Schools, Colleges, etc
Institutional
Group C MH Class A Hospitals, sanatoria, homes for aged, orphanage jails, etc.
buildings
Theatres, Assembly halls, Exhibition halls, Museums, Restaurants, Places of
Assembly
Group D HH Class A Worship, Club rooms, Dance halls, etc., Having seating capacity of over
buildings D-1
100 persons
Theatres, Assembly halls, Exhibition halls, Museums, Restaurants,
D-2 MH Class A Places of Worship, Club rooms, Dance halls etc. Having seating capacity less
than 1000 persons
Theatres, Assembly halls, Exhibition halls, Museums, Restaurants, Places of
Worship, Club rooms, Dance halls etc. but having accommodation for more than
D-3 MH Class A
300 persons, but less than 1000 persons, with no permanent seating
arrangement
Theatres, Assembly halls, Exhibition halls, Museums, Restaurants,
D-4 & D-5 MH Class A Places of Worship, Club rooms, Dance halls etc. Having accommodation less
than 300 and those not covered under D-1 to D-3
Business
Group E SH Class A Offices, Banks, Record Rooms, Archives, Libraries, data processing centres, etc.
buildings E-1
E-2 MH Class B Laboratories, research establishment, test houses etc.
E-3 SH Class A Computer installations
Mercantile Shops, Stores, Markets, Departmental stores, Underground shopping centres,
Group F MH Class A
buildings etc.
Industrial
Group G LH Class A Small industrial units
buildings
Corrugated carton manufacturing units, Paper cane units, Packing case
MH Class A
manufacturing units, cotton waste manufacturing units.
Large number yards, saw mills godowns and warehouses storing combustible
HH Class A
materials, cold Storages, freight depots, etc.
LH Class B Demonstration chemical plants, small chemical, processing plants, pilot plants, etc.
Workshops, painting shops, large kitchens, industrial canteens, generator rooms,
MH Class B heat treatment shops, tread rubber manufacturing units, petrol bunks, tubes &
flaps units, etc.,
Petroleum processing units, chemical plants, industrial alcohol plants, effluent
HH Class B
treatment plants etc.
LH Class C ---

371
Sl. No. Description Unit Rate
Rs. Ps.

MH Class C ---
HH Class C Fertiliser plants, petrochemical plants, LPG bottling plants, etc.
All processes involving use of combustible highly flammable materials,
HH Class D
reactive metals and alloys, including their storage
Storage Flammable liquid stores, storage in drums and cans in open, paints and
Group H MH Class B
buildings varnishes godown.
Tank farmes chemical and petroleum bulk storage depots, large service stations,
HH Class B
truck and marine terminals, underground LDO/furnace oil storage yards, etc.
LPG distribution godown/office, distribution storage godowns/offices of
MH Class C
D, N, H, Argon and other industrial gases
Storage and handling of gas cylinders in bulk, gas plant, gas holders (Horton),
HH Class C
spheres, etc.
Buildings used for storage, handling, manufacture and processing of highly
combustible explosive materials. (Risks involved in terms of class of fire
Group J hazardous --- --- and intensity of fire has to be assessed on case to case basis and statutory
authorities to be consulted, environmental factors and mutual aid facilities to be
taken into account before deciding on the fire extinguisher requirements.)

Notes : 1 LH - Low Hazard, 2 MH - Medium Hazard, 3 HH - High Hazard, 4 SH: Special Hazard.

B-2 RECOMMENDED SCALE OF EQUIPMENT TO BE INSTALLED


B-2.1 Class A
LH Occupancy One 9 litre water expelling extinguisher or ABC 5kg/6 kg fire extinguisher, for every 200 m2 of floor area or part
there of with minimum of two extinguishers per compartment or floor of the building. The extinguishers should be
so located as to be available within 15 m radious.
MH Occupancy Two 9 litre water expelling extinguisher or ABC 5kg/6 kg fire extinguisher, for every 200 m2 with minimum of
4 extinguishers per compartment or floor .The extinguishers should be so located as to be available within 15 m
radious.
HH Occupancy Provision as per MH occupancy, in addition to one 50 litre water CO2/ 25 kg ABC fire extinguisher for every
100 m2 of floor area or part thereof.
Special One 4.5 kg capacity carbon dioxide or one 2/3 kg capacity clean agent extinguisher for every 100 m2 of floor
Hazard area or part there of with minimum of two extinguishers so located as to be available within 10 m radious.
B-2.2 Class B
LH Occupancy One 9 litre foam extinguisher, mechanical or BC or ABC, 5 kg / 6 kg fire extinguisher, for every 200 m2 of floor
area or part there of with minimum of two extinguishers per compartment or floor. The extinguishers located as
to be available within 15m radious.
MH Occupancy Two 9 litre foam extinguisher, mechanical type, or 5/6 kg dry powder extinguisher (or one of each type) for every
200 m2 area with minimum of four extinguisher per compertment. Extinguisher should be available within 15 m
radious.
HH Occupancy Provision as per MH, and in addition to one 50 litre mechanical foam type extinguisher or 25 kg BC fire
extinguisher for every 100 m2 or part thereof one 135 litre foam mechanical extinguisher for every 300 m2 of
floor area or part thereof.
B-2.3 Class C
LH Occupancy One 2/3kg dry powder of clean agent extinguisher for every 20 m2 of floor area or part thereof; extinguisher
available within 15 m radious.
MH Occupancy One 10kg dry powder extinguisher(stored pressure) or 6.5kg carbon dioxide extinguisher or 5kg clean agent for
100 m2 of floor area or part thereof, with minimum of one extinguisher of the same type for every compartment;
extinguisher should be available within a radious of 15m, the same type for every compartment; extinguisher.

372
Sl. No. Description Unit Rate
Rs. Ps.

HH Occupancy Dry powder extinguisher (stored pressure) of 10 kg or 6.5 Kg CO2 extinguisher, or 5 kg clean agent extinguisher
for every 100 m2 of floor area or part thereof, subject to a minimum of two extinguishers of same type per room
or compartment. Extinguishers should be available within a radius of 10 m.
B-2.4 Class D
HH Occupancy One 10 kg dry powder extinguisher with special dry powder for metal fires for every 100 m2 of floor area or part
thereof with minimum of two extinguisher per compartment/ room. Extinguishers should be available within a
radius of 10m.

Notes -
1.     The recommendations are minimum for a specific area.Incase, the area is more than specified, high capacity extinguishers may be
used based on these minimum requirements,that is proportionately higher capacity can be used.
2.     In case of dry powder /Co2/clean agent types, equivalent lower capacities may also be used.
3.     The halons shall be restricted for essential use only.
4. On implementation of IS 15683, 6 kg and 9 kg dry powder extinguishers shall be replaced by 5 kg or 10 kg dry powder extinguishers.

373
Chapter - 41
Energy Conservation
Building Code

374
Sl. No. Description Unit Rate
Rs. Ps.

WALL INSULATION
EXTERNAL WALL INSULATION WITH POLYURETHANE FOAM (PUF) SLAB
41.1 Providing and fixing polyurethane foam (PUF) slab 40mm thick average Sqm 1,189.00
with PU slab density 36+/-2 kg/m³ for external wall insulation including
necessary polymerized plaster reinforced with glass fibre mesh,
epoxy based bonding adhesive etc., complete with all lead and lift,
transportation charges, loading unloading charges, all taxes, cost of all
materials, labour, HOM etc., complete
EXTERNAL WALL INSULATION WITH POLYURETHANE FOAM (PUF) SPRAY
41.2 Providing and fixing cast in situ polyurethane foam (PUF) spray with PU
foam spray density 35+/-5 kg/m³ for external wall insulation including
necessary adhesive etc., complete with all lead and lift, transportation
charges, loading unloading charges ,all taxes, cost of all materials, labour,
HOM of machinery etc., complete
41.2.1 - do - Polyurethane foam (PUF) spray 40mm thick Sqm 824.00
41.2.2 - do -Polyurethane foam (PUF) spray 50mm thick Sqm 968.00
EXTERNAL WALL INSULATION WITH EXTRUDED POLYSTYRENE (XPS)
THERMAL INSULATING BOARDS
41.3 Providing and fixing EXTRUDED POLYSTYRENE (XPS) thermal
insulating boards for external wall insulation including necessary
fasteners etc., complete with all lead and lift, transportation charges,
loading unloading charges, all taxes, cost of all materials, labour, HOM
of machinery etc., complete
41.3.1 - do - Extruded Polystyrene (XPS) thermal insulating boards 25mm thick Sqm 374.00
41.3.2 - do - Extruded Polystyrene (XPS) thermal insulating boards 50mm thick Sqm 615.00
41.3.3 - do - Extruded Polystyrene (XPS) thermal insulating boards 75mm thick Sqm 855.00
41.3.4 - do - Extruded Polystyrene (XPS) thermal insulating boards 100mm thick Sqm 1,097.00
CAVITY WALL INSULATION WITH POLYURETHANE FOAM (PUF) SPRAY
41.4 Providing and fixing polyurethane foam (PUF) spray with PU foam
spray having density 35+/-5 kg/cum density for insulatiom of cavity wall
with including necessary fasteners etc., complete with all lead and lift,
transportation charges, loading unloading charges, all taxes, cost of all
materials, labour, HOM etc., complete
41.4.1 - do - Polyurethane foam (PUF) spray with PU foam 40mm thick Sqm 738.00
41.4.2 - do - Polyurethane foam (PUF) spray with PU foam 50mm thick Sqm 971.00
CAVITY WALL INSULATION WITH GLASS WOOL SLAB
41.5 Providing and fixing glass wool slab- resin bonded with density 48kg/
cum for insulation of cavity wall, fixed using GI wire 200 SWG, GI
chicken mesh 12.50mm x 24 SWG including necessary criss-cross
GI wire mesh,raw plugs, adhesive etc., complete with all lead and lift,
transportation charges, loading unloading charges, all taxes, cost of all
materials, labour, HOM etc., complete

375
Sl. No. Description Unit Rate
Rs. Ps.

41.5.1 - do - Glass wool slab 12mm thick resin bonded slab Sqm 375.00
41.5.2 - do - Glass wool slab 25mm thick resin bonded slab Sqm 513.00
41.5.3 - do - Glass wool slab 50mm thick resin bonded slab Sqm 620.00
CAVITY WALL INSULATION WITH ROCK WOOL SLAB
41.6 Providing and fixing rock wool slab - resin bonded rock wool having
density 36+/-5 kg/cum for insulation of cavity wall with including
necessary criss-cross GI wire, mesh,raw plugs, adhesive etc., complete
with all lead and lift, transportation charges, loading unloading charges,
all taxes, cost of all materials, labour, HOM etc., complete
41.6.1 - do - Rock wool slab 25mm thick resin bonded rock wool slab Sqm 312.00
41.6.2 - do - Rock wool slab 40mm thick resin bonded rock wool slab Sqm 350.00
41.6.3 - do - Rock wool slab 50mm thick resin bonded rock wool slab Sqm 362.00
41.6.4 - do - Rock wool slab 65mm thick resin bonded rock wool slab Sqm 395.00
41.6.5 - do - Rock wool slab 75mm thick resin bonded rock wool slab Sqm 425.00
41.6.6 - do - Rock wool slab 100mm thick resin bonded rock wool slab Sqm 591.00
CAVITY WALL INSULATION WITH EXTRUDED POLYSTYRENE (XPS)
41.7 Providing and fixing extruded polystyrene (XPS) thermal insulating
boards having density 36+/-5 kg/cum for insulation of cavity wall including
necessary criss-cross GI wire, mesh,raw plugs, adhesive etc., complete
with all lead and lift, transportation charges, loading unloading charges,
all taxes, cost of all materials, labour, HOM etc., complete
41.7.1 - do - Extruded polystyrene (XPS) 50mm thick thermal insulating boards Sqm 880.00
41.7.2 - do - Extruded polystyrene (XPS) 60mm thick thermal insulating boards Sqm 1.030.00
41.7.3 - do - Extruded polystyrene (XPS) 70mm thick thermal insulating boards Sqm 1,060.00
41.7.4 Providing and fixing extruded polystyrene (XPS) 25mm thick thermal Sqm 514.00
insulating boards having dentity 32 kg/cum for insulation of cavity wall
including necessary criss-cross GI wire, mesh, raw plugs, adhesive etc.,
complete with all lead and lift, transportation charges, loading unloading
charges, all taxes, cost of all materials, labour, HOM complet.
41.7.5 Providing and fixing extruded polystyrene (XPS) 50mm thick thermal Sqm 772.00
insulating boards having dentity 32 kg/cum for insulation of cavity wall
including necessary criss-cross GI wire, mesh, raw plugs, adhesive etc.,
complete with all lead and lift, transportation charges, loading unloading
charges, all taxes, cost of all materials, labour, HOM complet.
41.7.6 Providing and fixing extruded polystyrene (XPS) 75mm thick thermal Sqm 1,030.00
insulating boards having dentity 32 kg/cum for insulation of cavity wall
including necessary criss-cross GI wire, mesh, raw plugs, adhesive etc.,
complete with all lead and lift, transportation charges, loading unloading
charges, all taxes, cost of all materials, labour, HOM complet.

376
Sl. No. Description Unit Rate
Rs. Ps.

41.7.7 Providing and fixing extruded polystyrene (XPS) 100mm thick thermal Sqm 1,289.00
insulating boards having dentity 32 kg/cum for insulation of cavity wall
including necessary criss-cross GI wire, mesh, raw plugs, adhesive etc.,
complete with all lead and lift, transportation charges, loading unloading
charges, all taxes, cost of all materials, labour, HOM complet.
ROOF INSULATION
OVER DECK INSULATION WITH POLYURETHANE FOAM (PUF) SLAB
41.8 Providing and fixing polyurethane foam (PUF) slab with PU slab density
36+/-2 kg/m³ insulation for over deck covered with two layers of 40mm
thick cement concrete screed with mix proportion 1:1.5:3 (M20grade)
using 12.50mm nominal size aggregates and top layer of 10mm thick
plaster with cement mortar 1:3 finished with floating coat of neat cement,
including necessary polymerized plaster reinforced with glass fibre mesh
for PUF slab, epoxy bases bonding adhesive etc., complete with all lead
and lift, transportation charges, loading unloading charges, all taxes,
cost of all materials, labour, HOM etc., complete
41.8.1 - do - Polyurethane foam (PUF) slab 40mm thick Sqm 1,216.00
41.8.2 - do - Polyurethane foam (PUF) slab 50mm thick Sqm 1,512.00
41.8.3 - do - Polyurethane foam (PUF) slab 60mm thick Sqm 1,720.00
41.8.4 - do - Polyurethane foam (PUF) slab 70mm thick Sqm 2,480.00
OVER DECK INSULATION WITH POLYURETHANE FOAM (PUF) SPRAY
41.9 Providing and fixing Over deck insulation with cast insitu polyurethane
foam (PUF) spray with PU foam spray including necessary fasteners
etc., complete covered with two layers of 40mm thick cement concrete
screed with mix proportion 1:1.5:3 (M20grade) using 12.50mm nominal
size aggregates and top layer of 10mm thick plaster with cement mortar
1:3 finished with floating coat of neat cement, including necessary
polymerized plaster reinforced with glass fibre mesh for PUF slab,
epoxy bases bonding adhesive etc., complete with all lead and lift,
transportation charges, loading unloading charges, all taxes, cost of all
materials, labour, HOM etc., complete
41.9.1 - do - Over deck insulation with polyurethane foam (PUF) spray 40mm thick Sqm 1,670.00
41.9.2 - do - Over deck insulation with polyurethane foam (PUF) spray 50mm thick Sqm 1,802.00
41.9.3 - do - Over deck insulation with polyurethane foam (PUF) spray 60mm thick Sqm 2,287.00
41.9.4 - do - Over deck insulation with polyurethane foam (PUF) spray 70mm thick Sqm 2,772.00
UNDER DECK INSULATION WITH EXPANDED POLYSTYRENE (EPS)
41.10 Providing and fixing expanded polystyrene (EPS) board using aluminium
strips 20mm wide for under deck thermal insulation including necessary
fasteners etc., complete (excluding cost of screed concrete which is to
be measured and paid seperately) with all lead and lift, transportation
charges, loading unloading charges ,all taxes, cost of all materials,
labour, HOM etc., complete

377
Sl. No. Description Unit Rate
Rs. Ps.

41.10.1 - do - Expanded polystyrene (EPS) 50mm thick Sqm 555.00


41.10.2 - do - Expanded polystyrene (EPS) 70mm thick Sqm 683.00
41.10.3 - do - Expanded polystyrene (EPS) 90mm thick Sqm 810.00
41.10.4 - do - Expanded polystyrene (EPS) 110mm thick Sqm 935.00
41.10.5 - do - Expanded polystyrene (EPS) 120mm thick Sqm 999.00
41.10.6 Providing and fixing expanded polystyrene (EPS) 30mm thick with Sqm 429.00
density 20 kg/m3 for under deck thermal insulation including necessary
fasteners etc., complete (excluding cost of screed concrete which is to
be measured and paid seperately) with all lead and lift, transportation
charges, loading unloading charges, all taxes, cost of all materials,
labour, HOM etc., complete
41.10.7 Providing and fixing expanded polystyrene (EPS) 40mm thick with Sqm 490.00
density 20 kg/m3 for under deck thermal insulation including necessary
fasteners etc., complete (excluding cost of screed concrete which is to
be measured and paid seperately) with all lead and lift, transportation
charges, loading unloading charges, all taxes, cost of all materials,
labour, HOM etc., complete
41.10.8 Providing and fixing expanded polystyrene (EPS) 60mm thick with Sqm 620.00
density 20 kg/m3 for under deck thermal insulation including necessary
fasteners etc., complete (excluding cost of screed concrete which is to
be measured and paid seperately) with all lead and lift, transportation
charges, loading unloading charges, all taxes, cost of all materials,
labour, HOM etc., complete
41.10.9 Providing and fixing expanded polystyrene (EPS) 75mm thick with Sqm 715.00
density 20 kg/m3 for under deck thermal insulation including necessary
fasteners etc., complete (excluding cost of screed concrete which is to
be measured and paid seperately) with all lead and lift, transportation
charges, loading unloading charges, all taxes, cost of all materials,
labour, HOM etc., complete
41.10.10 Providing and fixing expanded polystyrene (EPS) 100mm thick with Sqm 873.00
density 20 kg/m3 for under deck thermal insulation including necessary
fasteners etc., complete (excluding cost of screed concrete which is to
be measured and paid seperately) with all lead and lift, transportation
charges, loading unloading charges, all taxes, cost of all materials,
labour, HOM etc., complete
THERMAL INSULATION OF ROOF WITH EXPANDED POLYSTYRENE
41.11 Providing and fixing expanded polystyrene with aluminium strips at every
600mm c/c over existing false ceiling for thermal insulation of roofing
including necessary fasteners etc., complete (excluding cost of screed
concrete which is to be measured and paid seperately) with all lead and
lift, transportation charges, loading unloading charges ,all taxes, cost of
all materials, labour, HOM scaffolding etc., complete
41.11.1 - do - Expanded polystyrene (EPS) 50mm thick Sqm 495.00

378
Sl. No. Description Unit Rate
Rs. Ps.

41.11.2 - do - Expanded polystyrene (EPS) 70mm thick Sqm 581.00


41.11.3 - do - Expanded polystyrene (EPS) 90mm thick Sqm 673.00
41.11.4 - do - Expanded polystyrene (EPS) 110mm thick Sqm 778.00
41.11.5 - do - Expanded polystyrene (EPS) 120mm thick Sqm 764.00
OVER DECK THERMAL INSULATION OF ROOF WITH EXPANDED
POLYSTYRENE
41.12 Providing and fixing expanded polystyrene (50mm thick) for over deck
thermal insulation of roofing including necessary fasterners etc., complete
covered with two layers of 40mm thick cement concrete screed with mix
proportion 1:1.5:3 (M20grade) using 12.50mm nominal size aggregates
and top layer of 10mm thick plaster with cement mortar 1:3 finished with
floating coat of neat cement, including necessary polymerized plaster
reinforced with glass fibre mesh for PUF slab, epoxy based bonding
adhesive etc., complete with all lead and lift, transportation charges,
loading unloading charges, all taxes, cost of all materials, labour, HOM
etc., complete
41.12.1 - do - Expanded polystyrene (EPS) 50mm thick Sqm 1,336.00
41.12.2 - do - Expanded polystyrene (EPS) 70mm thick Sqm 1,412.00
41.12.3 - do - Expanded polystyrene (EPS) 90mm thick Sqm 1,488.00
41.12.4 - do - Expanded polystyrene (EPS) 110mm thick Sqm 1,575.00
41.12.5 - do - Expanded polystyrene (EPS) 120mm thick Sqm 1,593.00
OVER DECK WITH GLASS WOOL
41.13 Providing and fixing resin bonded glass wool slab having density
48kgs/cum for over deck insulation of roofing with glass wool including
necessary fasteners,GI wire & mesh etc., complete covered with one
layers of 40mm thick cement concrete screed with mix proportion 1:1.5:3
(M20grade) using 12.50mm nominal size aggregates and top layer of
10mm thick plaster with cement mortar 1:3 finished with floating coat of
neat cement, including necessary polymerized plaster reinforced with
glass fibre mesh for PUF slab, epoxy based bonding adhesive etc.,
complete with all lead and lift, transportation charges, loading unloading
charges ,all taxes, cost of all materials, labour, HOM etc., complete
41.13.1 - do - Glass wool slab 12mm thick Sqm 978.00
41.13.2 - do - Glass wool slab 25mm thick Sqm 1,124.00
41.13.4 - do - Glass wool slab 50mm thick Sqm 1,250.00
OVER DECK WITH ROCK WOOL
41.14 Providing and fixing ROCK wool 25mm resin bonded rock wool slab
having density 48kgs/cum for over deck insulation of roofing including
necessary fasteners,GI wire & mesh etc., complete (excluding cost of
screed concrete which is to be measured and paid seperately) with all
lead and lift, transportation charges, loading unloading charges, all taxes,
cost of all materials, labour, HOM scaffolding etc., complete
379
Sl. No. Description Unit Rate
Rs. Ps.

41.14.1 - do - ROCK wool slab 25mm thick Sqm 470.00


41.14.2 - do - ROCK wool slab 40mm thick Sqm 502.00
41.14.3 - do - ROCK wool slab 50mm thick Sqm 521.00
41.14.4 - do - ROCK wool slab 65mm thick Sqm 555.00
41.14.5 - do - ROCK wool slab 75mm thick Sqm 576.00
41.14.6 - do - ROCK wool slab 100mm thick Sqm 632.00
UNDER DECK INSULATION WITH GLASS WOOL
41.15 Providing and fixing glass wool resin bonded glass wool slab having
density 48kgs/cum for under deck insulation of roofing including
necessary fasteners,GI wire & mesh etc., complete (excluding cost of
screed concrete which is to be measured and paid seperately) with all
lead and lift, transportation charges, loading unloading charges, all taxes,
cost of all materials, labour, HOM scaffolding etc., complete
41.15.1 - do - Glass wool slab 25mm thick Sqm 748.00
41.15.2 - do - Glass wool slab 40mm thick Sqm 895.00
UNDER DECK WITH ROCK WOOL
41.16 Providing and fixing ROCK wool resin bonded rock wool slab having
density 48kgs/cum for under deck insulation of roofing including
necessary fasteners,GI wire & mesh etc., complete with all lead and lift,
transportation charges, loading unloading charges ,all taxes, cost of all
materials, labour, HOM scaffolding etc., complete
41.16.1 - do - ROCK wool slab 25mm thick Sqm 487.00
41.16.2 - do - ROCK wool slab 40mm thick Sqm 523.00
41.16.3 - do - ROCK wool slab 50mm thick Sqm 545.00
41.16.4 - do - ROCK wool slab 65mm thick Sqm 585.00
41.16.5 - do - ROCK wool slab 75mm thick Sqm 610.00
41.16.6 - do - ROCK wool slab 100mm thick Sqm 676.00

380
381
Annexure 1
Co-efficients for painting, varnishing etc.,
table : 1 Equivalent plain areas of uneven surfaces (clause 3.5)
Sl. Description of Work How Measured Multiplying Factor
No.
(1) (2) (3) (4)

i) Panelled or framed and brazed or Measured flat (not girthed) including CHOWKAT 1.30 (for each side)
ledged and battened or ledged, or frame, Edged, chocks, cleats, etc., shall be
batten-battened and braced deemed to be included in the item
joinery

ii) Flush joinery Measured flat (not girthed) including CHOWKAT 1.20 (for each side)
or frame, edges, chocks, cleats, etc., shall be
deemed to be included in the item

iii) Flush shutter Measured flat overall 1.20 (for each side)

iv) Fully glazed or gauzed joinery Measured flat (not girthed) including CHOWKAT 0.80 (for each side)
or frame, Edges, chocks, cleats shall be
deemed to be included in the item

v) Partly panelled and partly glazed Measured flat (not girthed) including CHOWKAT 1 (for each side)
or gauzed joinery or frame, edges, chocks, cleats, etc., shall
deemed to be included in the item

vi) Fully venetianed or louvred joinery Measured flat (not girthed) including CHOWKAT 1.80 (for each side)
or frame, edges, chocks, cleats, etc., shall be
deemed to be included in the item

vii) Weather boarding Measured flat (not girthed) supporting frame 1.20 (for each side)
work shall not be measured separately

viii) Wood shingle roofing Measured flat (not girthed) 1.10 (for each side)

ix) Boarding with covers fillets and Measured flat (not girthed) 1.05 (for each side)
match boarding

x) Tile and slate battening Measured flat overall; no deduction shall be made 0.80 (for painting all
for open spaces over)
xi) Trellis (or JAFFRI) work one-way or two way Measured overall; no deduction shall be made for 2 (for painting all over)
open spaces, supporting members shall not be
measured seperately

xii) Guard bars, balus-traders, gates Measured flat overall; no deduction shall be made 1 (for painting all
greetings, grills expanded for open spaces; supporting members shall not be over)
metal and railings measured separately

382
xiii) Gates and open palisade fencing Measured flat overall; no deduction shall made 1 (for painting all
including standards, braces, rails for open spaces; supporting members shall not be over)
stays etc., measured separately (see Note 1)

xiv) Carved or enriched work Measured flat 2 (for each side)

xv) Steel roller shutter Measured flat (size of opening) overall; jam 1.10 (for each side)
guides, bottom raise and locking arrangement, etc.,
shall be included in the item (top cover shall be
measured separately)

xvi) Plain sheet steel doors and windows Measured flat (not girthed) including frame, edges, 1.10 (for each side)
etc

xvii) Fully glazed or gauzed steel doors Measured flat (not girthed) including frame, edges 0.50 (for each side)
and windows

xviii) Partly papelled and partly glazed Measured flat (not girthed) including frame, edges 0.80 (for each side)
gauged steel door

xiix) Collapsible gate Measured flat (size of opening) 1.50 (for painting all over)

Note 1 : The height shall be taken from bottom of lowest rail, if palisades do not go below it or from lower end of palisades, if they
project below lowest rail, up to top of palisades, but not up to top of standards, if they are higher than palisades.

Note 2 : Where doors, windows, etc., are of composite types other than thoses included in this table, different portions shall be measured
separately with their appropriate coefficients, centre line of common rail being taken as the dividing line between the two portions.

Note 3 : Measurements of painting doors, windows, collapsible gates, rolling shutters, etc., as given in this table shall be deemed to
include painting, if required, of all iron fittings in the same shade.

Note 4 : When two faces of a door, window, etc., are to be treated with different specified finishes, measurable under separate items,
edges of frames and shutters shall be treated with the one or the other type of finish and measurement thereof shall be deemed to be
included in the measurement of the face treated with that finish.

Note 5 : In case where shutters are fixed on both faces of a frame, measurement for the door frame and shutter on one face shall be
taken in the manner already described, while the additional shutter on the other face shall be measured exclusive of the frame.

Note 6 : Where shutter is provided with clearence exeeding 15 cm at top and / or at bottom, such openings shall be deducted from the
overall measurement and relevant coefficient applied.

383
38. Material Requirement details

Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9
Mortar
1 0.5.1.1 Cement Mortar of mix 1:1 Cum 0.7125 20.4 1020.00
2 0.5.1.2 Cement Mortar of mix 1:2 Cum 0.95 13.6 680.00
3 0.5.1.3 Cement Mortar of mix 1:3 Cum 1.07 10.2 510.00
4 0.5.1.4 Cement Mortar of mix 1:4 Cum 1.07 7.6 380.00
5 0.5.1.5 Cement Mortar of mix 1:5 Cum 1.07 6.2 310.00
6 0.5.1.6 Cement Mortar of mix 1:6 Cum 1.07 5.00 250.00
7 0.5.1.7 Cement Mortar of mix 1:8 Cum 1.07 3.8 190.00
8 0.5.1.8 Cement Mortar of mix 1:10 Cum 1.07 3.00 150.00
9 0.5.1.1 Lime Mortar of mix 1:1 Cum 0.7125 9.02 451.00
10 0.5-2.2 Lime Mortar of mix 1:2 Cum 0.95 6.02 301.00
11 0.5-2.3 Lime Mortar of mix 1:3 Cum 1.07 4.52 226.00
12 0.5-3.1 Limesurkhi Mortar of mix 1:1 Cum 0.7125 9.02 451.00
13 0.5-3.2 Limesurkhi Mortar of mix 1:2 Cum 0.95 6.02 301.00
14 0.5-3.3 Limesurkhi Mortar of mix 1:3 Cum 1.07 4.52 226.00
15 0.5-4.1 Limesurkhi Sand Mortar of mix 1:1:1 Cum 0.475 0.475 6.02 301.00
16 0.5-4.2 Limesurkhi Sand Mortar of mix 1:1:2 Cum 0.357 0.357 4.52 226.00
17 0.5-5.1 Cement Mortar with Stone dust of mix 1:2 Cum 6.95 13.6 680.00
C=8.20 C=410.00
18 0.5-6.1 Cement Lime Mortar of mix 1:1:3 Cum 0.86 L=3.62 L=181.00
19 0.5-6.2 Cement Lime Mortar of mix 1:1:4 Cum 1.07 C=7.6 C=380.00
L=3.40 L=170.00
20 0.5-6.3 Cement Lime Mortar of mix 1:1:5 Cum 1.07 C=6.20 C=310.00
L=2.70 L=135.00
C=50L=2.26 C=250.00
384
Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9
21 0.5-6.4 Cement Lime Mortar of mix 1:1:6 Cum 1.07 L=113.00
C=4.40 C=220.00
22 0.5-6.5 Cement Lime Mortar of mix 1:1:7 Cum 1.07 L=1.94 L=97.00
C=3.80 C=190.00
23 0.5-6.6 Cement Lime Mortar of mix 1:1:8 Cum 1.07 L=1.68 L=84.00
C=3.40 C=170.00
24 0.5-6.7 Cement Lime Mortar of mix 1:2:9 Cum 1.07 L=3.02 L=151.00
C=2.60 C=130.00
25 0.5-6.8 Cement Lime Mortar of mix 1:3:2 Cum 1.07 L=3.40 L=170.00
26 0.5-7.1 White cement Mortar with Marble 1:2 Cum 0.95 13.60 680.00
dust of mix
27 0.5-7.2 White cement Mortar with Marble dust of mix 1:3 Cum 1.07 10.2 510.00
28 0.5-7.3 White cement Mortar with Marble dust of mix 1:4 Cum 1.07 7.6 380.00
29 0.5-7.4 White cement Mortar with Marble dust of mix 1:5 Cum 1.07 6.20 310.00
30 0.5-8.1 Fly ash sand Mortar of mix 1:1.5:3 Cum 0.357 0.7150 6.8 340.00
31 0.5-8.2 Fly ash sand Mortar ofmix 1:2:4 Cum 0.356 0.7150 5.0 250.00
32 0.5-8.3 Fly ash sand Mortar of mix 1:2.5:5 Cum 0.356 0.7150 4.0 200.00
33 0.5-8.4 Fly ash sand and Mortar of mix 1:3:6:5 Cum 0.366 0.7150 3.2 160.00
EARTH WORK
1 2.6 Sand filling Cum 1.0000
2 2.8 Filling Foundation with granite metal Cum 1.00 0.50000
3 2.10 Sand cement bed with 5% cement Cum 1.0000 1.43 71.40
4 2.11 Sand cement bed with 10% cement Cum 1.0000 2.86 142.80
5 2.12 Sand Piles Sqmt 0.0140 - -
6 2.13 Sand cement Piles Sqmt 0.014 0.04 2.00

385
Sl. Item No.
Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
CEMENT CONCRETE
1 4.1 KSRB 4.1.1: Providing and laying ...... cement concrete of mix M15 Cum - 240 Kg -
2 4.2 KSRB 4.1.2 : Providing and laying ...... cement concrete of mix M10 Cum - 220 Kg -
3 4.3 KSRB 4.1.3 : Providing and laying ...... cement concrete of mix M 7.5 Cum - 180 Kg -
4 4.4 KSRB 4.1.4 : Providing and laying ...... cement concrete of mix M 5 Cum - 160 Kg -
5 4.5 KSRB 4.1.5 : Providing and laying ...... cement concrete of mix M 20 Cum - 280 Kg -
6 4.6 KSRB 4.1.6 : Providing and laying ...... cement concrete of mix M 15 Cum - 240 Kg -
7 4.7 KSRB 4.1.7 : Providing and laying ...... cement concrete of mix M 10 Cum - 220 Kg -
8 4.10 KSRB 4.2.1 : Providing and laying ...... cement concrete of mix M 25 Cum - 340 Kg -
9 4.11 KSRB 4.2.2 : Providing and laying ...... cement concrete of mix M 20 Cum - 320 Kg -
10 4.12 KSRB 4.2.3 : Providing and laying ...... cement concrete of mix M 25 Cum - 340 Kg -
11 4.13 KSRB 4.2.4 : Providing and laying ...... cement concrete of mix M 20 Cum - 320 Kg -
12 4.19 KSRB 4.2.10 : Providing and laying ...... cement concrete of mix M 20 Sqm - 24 Kg -
13 4.20 KSRB 4.2.11 : Providing and laying ...... cement concrete of mix M 20 Sqm - 27.2 Kg -
14 4.46 KSRB 4.9.2: Providing T.M.T. steel reinforcement for RCC work MT - 1.075 MT -
15 4.49.1 Providing and laying readymix concrete ...... M20 Cum - 320 Kg -
16 4.49.2 Providing and laying readymix concrete ...... M25 Cum - 340 Kg -
17 4.49.3 Providing and laying readymix concrete ...... M30 Cum - 360 Kg -
18 4.49.4 Providing and laying readymix concrete ...... M35 Cum - 390 Kg -
19 4.49.5 Providing and laying readymix concrete ...... M40 Cum - 420 Kg -
20 4.55 Providing and casting reinforced CC racks ...... M20 Sqm - 16 Kg -
21 4.56 Providing RCC loft (atta) Sqm - 30 Kg -
22 4.57 Providing and fixing RCC slabs 5 cms thick for wall shelves .... M20 Sqm - 16 Kg -
23 4.58.1 Providing RCC design mix M20 ..... solid parapet .... 7.5 cms thick Sqm - 24 Kg -
24 4.58.2 Providing RCC design mix M20 ..... solid parapet .... 10.00 cms thick Sqm - 32 Kg -
386

Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9

STONE WORK

1 5-1.1 Rubble stone masonry in foundation with mud


Cum 1.10 0.33
Mortar
2 5-1.2 Rubble stone masonry in foundation with
Cum 1.10 0.35 1.254 62.70
cement Mortar in 1:8
3 5-1.3 Rubble stone masonry in foundation with
Cum 1.10 0.35 1.65 82.50
cement Mortar in 1:6
4 5-2.1 Size stone masonry in foundation with mud
Cum 1.05 0.28
Mortar
5 5-2.2 Size stone masonry in foundation with
Cum 1.05 0.30 1.064 53.20
cement Mortar 1:8
6 5-2.3 Size stone masonry in foundation with
Cum 1.05 0.30 1.4 70.00
cement Mortar 1:6
7 5-3.1 Size stone masonry in basement with
Cum 1.449 0.28
mud Mortar
8 5-3.2 Size stone masonry in basement with
Cum 1.449 0.30 1.064 53.20
cementMortar 1:8
9 5-3.3 Size stone masonry in basement with
Cum 1.440 0.30 1.40 70.00
cementMortar 1:6
10 5-4.1 Size stone masonry in super structure with mud
Cum 1.449 0.28
Mortar
11 5-4.2 Size stone masonry in super struture with
Cum 1.449 0.30 1.064 53.20
cement mortar 1:8
12 5-4.3 Size stone masonry in super structure with
Cum 1.449 0.30 1.40 70.00
cement mortar 1:6

387
Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9
13 5-4.4 Size stone masonry in super structure with
Cum 1.449 0.30 2.128 106.40
cement mortar 1:4
14 5-11 Hallow block masonry in cement mortar 1:4
Sqm 12.11Nos. 0.02 0.15 7.36
40x20x20 cms 50kg/sqcm
15 5-12 Hallow block masonry in cement mortar 1:4
Sqm 12.11 Nos. 0.02 0.15 7.38
40x20x20 cms 35kg/sqcm
16 5-13 Hallow block masonry in cement mortar 1:4
Sqm 12.11Nos. 0.012 0.082 4.09
40x10x20 cms 35kg/sqcm
17 5-14 Solid block masonry in cement mortar 1:4
Sqm 12.11Nos 0.02 0.15 7.38
40x20x20 cms 35kg/sqcm
18 5-15 Solid block masonry in cement mortar 1:4
Sqm 12.11 Nos. 0.012 0.082 4.09
40x10x20 cms 35kg/sqm
19 5.29.1 Providing and fixing pre cast solid concrete kerb
No. – – – 0.234 11.72
size 450x200x400 mm
20 5.29.2 Providing and fixing pre cast solid concrete kerb
No. – – – 0.22 11.00
size 450x150x500 mm
21 5.30 Providing and fixing pre cast solid C.C. kerb
No. – – – 0.165 8.235
stones

BRICK WORK
1 6-1.1 Non modular CL35 brick masonry in mud
Cum 485 Nos. 2.40
mortar for basement and super structure
2 6-1.2 Non modular CL35 brick masonry in
cementmortar 1:8 for basement and super Cum 485 0.26 0.912 45.60
structure
3 6-1.3 Non modular CL35 brick masonry in
cementmortar 1:6 for basement and super Cum 485 0.26 1.20 60.00
structure

388
Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9
4 6-2.1 Non modular CL50 table moulded brick
masonry in mud mortar for basement and super Cum 485 2.40
structure
5 6-2.2 Non modular CL50 table moulded brick
masonry in cement mortar 1:8 for basement Cum 485 0.26 0.912 45.60
and super structure
6 6-2.3 Non modular CL50 table moulded brick
masonry in cement mortar 1:6 for basement Cum 485 0.26 1.20 60.00
and super structure
7 6-2.4 Non modular CL50 table moulded brick
masonry in cement mortar 1:4 for basement Cum 485 0.26 1.824 91.20
and super structure
8 6-3.1 Non modular CL75 machine moulded brick
masonry in cement mortar 1:8 for basement and Cum 456 0.26 0.912 45.60
super structure
9 6-3.2 Non modular CL75 machine moulded brick
masonry in cement mortar 1:8 for basement and Cum 456 0.26 1.2 80.00
super structure
10 6-3.3 Non modular CL75 machine moulded brick
masonry in cement mortar 1:4 for basement Cum 456 0.26 1.824 91.20
and super structure
11 6-3.4 Non modular CL75 machine moulded brick
masonry in cement mortar 1:3 for basement Cum 456 0.26 2.448 122.40
and super structure
12 6-4.1 Modular CL35 brick masonry in mud mortar for
basement and super structure Cum 520 0.21

389
Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9
13 6-4.2 modular CL35 brick msonry in cement
Cum 520 0.225 0.80 39.90
mortar 1:8 for basement and super structure

14 6-4.3 modular CL35 brick masonry in cement


Cum 520 0.225 1.05 52.50
mortar 1:6 for basement and super structure

15 6-5.1 modular CL50 table moulded brick masonry in


Cum 520 0.21
mud mortar for basement and super structure

16 6-5.2 modular CL50 table moulded brick masonry in


cement mortar 1:6 for basement and super Cum 520 0.225 0.8 39.90
structure

17 6-5.3 modular CL50 table moulded brick masonry in


cement mortar 1:6 for basement and super Cum 520 - 0.225 1.05 52.50
structure

18 6-5.4 modular CL50 table moulded brick masonry in


cement mortar 1:4 for basement and super Cum 520 - 0.225 1.60 79.80
structure

19 6-6.1 modular CL75 machine moulded brick masonry


in cement mortar 1:8 for basement and super Cum 520 - 0.225 0.80 39.90
structure

20 6-6.2 modular CL75 machine moulded brick masonry


in cement mortar 1:6 for basement and super Cum 520 - 0.225 1.05 52.50
structure

21 6-6.3 modular CL75 machine moulded brick masonry


in cement mortar 1:4 for basement and super Cum 520 - 0.225 1.60 79.80
structure

390
Granite / Metal
Surkhi /
Stones / Bricks Mortar / Cement / Lime /
Sl. KSRB / Marbledust or Flyash
Description Unit Tiles / Hallow / sand in white cement
No. KSRRB No. stone dust in
Solid block etc cum
cum
in cum
Bags Kgs 
1 2 3 4 5 6 7 8 9
22 6-6.4 modular CL75 machine moulded brick masonry
in cement mortar 1:3 for basement and super Cum 520 - 0.225 2.14 107.10
structure

23 6-7.1 Nonmodular CL35 brick partition wall 11.2cms


Sqm 66.80 - 0.026 0.18 9.12
thick in cm 1:4 with G I plastermesh

24 6-7.2 Nonmodular CL50 table moulded brick partition


wall 11.2 cms thick in cm 1:4 with G I plas- Sqm 66.8 - 0.026 0.18 9.12
termesh

25 6-7.3 Nonmodular CL35 brick partition wall 11.2 cms


Sqm 66.8 - 0.026 0.18 9.12
thick in cm 1:4

26 6-7.4 Nonmodular CL50 table moulded brick partition


Sqm 66.8 - 0.026 0.18 9.12
wall 11.2 cms thick in cm 1:4

27 6-8.1 modular CL35 brick partition wall 10 cms thick


Sqm 56.7 - 0.022 0.16 7.98
in cm 1:4 G I plastermesh

28 6-8.2 modular CL50 table moulded brick partition wall


Sqm 56.7 - 0.022 0.16 7.98
10 cms thick in cm 1:4 with G I plastermesh

29 6-8.3 modular CL35 brick partition wall 10 cms thick


Sqm 56.7 - 0.022 0.16 7.98
in cm 1:4

30 6-8.4 modular CL50 table moulded brick partition wall


Sqm 58.7 - 0.022 0.16 7.98
10 cms thick in cm 1:4

391
Sl. Item No.
Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7

DRAINAGE WORK
KSRB 12-5.1: Construction brick masonry circular type manhole
1 11.37 No. - 300.00 Kg -
0.91 m internal dia
2 11.38 KSRB 12.5.2 - -do- 1.67m No. - 362 Kg -

3 11.39 KSRB 12-5.3 : -do- 1.22m internal dia No. - 553 Kg -

4 11.40 KSRB 12-5.4: -do- 2.29m deep No. - 633 Kg -


KSRB 12-5.5 : Construction brick masonry circular type manhole
5 11.41 No. - 1000 Kg -
1.52 m internal dia
6 11.42 KSRB 12-5.6 -do- bottom 4.18m Nos - 1615 Kg -
KSRB 12-5.7 : construction circular type manhole 1500mm internal
7 11.43 Nos - 880 Kg -
dia
8 11.51 KSRB 12-8.1: Extra for item No. KSRB 12-8.1 depth beyond 450mm Each - 11.30 Kg -
KSRB 12-8.2 : constructing brick masonry inspection chamber
9 11.52 Each - 96 Kg -
500x700mm and 450mm depth
KSRB 12-8.2.1 : Extra for item No. KSRB 12-8.2 depth beyond
10 11.53 Each - 12.30 Kg -
450mm and brick masonry
KSRB 12-8.3: Construction brick masonry inspection chamber
11 11.54 Each - 120 Kg -
600x850mm and 450mm depth
KSRB 12-8.3.1: Extra for item No. KSRB 12-8.3 depth beyond
12 11.55 Each - 14.20 Kg -
450 mm and brick

392
MATERIAL REQUIREMENT DETAILS

Sl. KSRB /
Brief Description Unit
No. KSRRB No.
1 2 3 4 5
16.4 24.90 Repairs to Building Sqm Nitric acid - 0.01 ltr/ sqm
Repairs to Building paint remover - 0.07 ltr/sqm, blow, lamp, brushes,
16.5 24.10 Sqm scraper, turpentine oil, putty at 5% on
paint removal cost
Repairs to Building caustic soda - 0.073 kg/sqm, scraper, brushes,
16.6 24.11 Sqm terpentine oil, acetic acid or vinegar,
putty 10% on cost of soda
Repairs to Building Kerosene oil - 0.10 ltr/sqm, scrapper, putty at 5% on
16.7 24.12 Sqm
cost of kerosene oil
Repairs to Building kerosene oil - 0.10 ltr/sqm, scraper, putty at 5% on
16.9 24.14 Sqm
cost of kerosene oil
Repairs to Building Paint remover - 0.07 ltr / sqm, brushes, scraper,
16.10 24.15 Sqm
terpentine oil, putty at 2% on paint removal cost
16.12 24.17 Repairs to Building EACH Honne wood - 0.002 cum / each
16.13 24.18 Repairs to Building EACH mathi / nandi wood - 0.002 cum / each
16.14 24.19 Repairs to Building EACH Sal wood - 0.002 cum/each
16.15 24.20 Repairs to Building EACH Teak wood - 0.005 cum / each
16.16 24.21 Repairs to Building EACH Honne wood - 0.005 cum / each
16.17 24.22 Repairs to Building EACH Mathi / Nandi wood - 0.005 cum / each
Repairs to Building M.S. flat 300 mm x 25mm x 3mm - 0.20 kg/each,
16.21 24.26 EACH
screwe, 40mm - 4.00 nos / each
Repairs to Building Honne wood, battens including wastage at 2% - 0.12
16.22 24.27 CUM
cum / cum
Repairs to Building Mathi / nandi wood batterns including wastage at 2% -
16.23 24.28 CUM
0.12 cum/cum
Repairs to Building Sal wood battens including wastage at 2% - 0.12 cum/
16.24 24.29 CUM
cum
393
Sl. KSRB /
Brief Description Unit
No. KSRRB No.
1 2 3 4 5
16.28 24.33 Repairs to Building Metre. Teak wood - 0.0001 cum / meter
16.29 24.34 Repairs to Building Honne wood beads including wastages - 0.0001 cum/
Metre.
metre
16.30 24.35 Repairs to Building Metre. Putty for filling holes - 0.068 kg/metre
16.31 24.36 Repairs to Building Sqm cement - 0.11 qntl/sqm
16.32 24.37 Repairs to Building Sqm cement - 0.11qntl/sqm
16.33 24.38 Repairs to Building Metre. Cement - 0.01 bag/metre, sand 0.001 cum/metre
16.34 24.39 Repairs to Building bitument 85/25 grade - 0.045 kg/sqm, sand - 0.001
Sqm
cum/sqm
16.35 24.40 Repairs to Building Sqm cement - 0.204 bag / sqm, sand 0.02 cum/sqm
16.36 24.41 Repairs to Building Sqm cement - 0.152 bag / sqm, sand - 0.02 cum / sqm
16.37 24.42 Repairs to Building Sqm cement - 0.10 bags / sqm, sand - 0.02 cum / sqm
16.37.2 24.43 Repairs to Building Sqm cement - 0.025 bag / sqm, sand - 0.005 cum / sqm
16.39 24.44 Repairs to Building Sqm cement - 0.20 bags / sqm, sand - 0.02 cum / sqm
16.40 24.45 Repairs to Building Sqm cement - 0.015 bag / sqm, sand - 0.002 cum / sqm
16.41 24.46 Repairs to Building Sqm cement - 0.01 bag / sqm, sand - 0.002 cum / sqm

394
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
BRIDGES
KSRRB 1100-1 Bored/cast in situ RCC 1000mm
1 25.1.1 m 320 Kg -
dia piles - M20
KSRRB 1100-1 Bored/cast in situ RCC 1000mm
2 25.1.1.2 m 360 Kg
dia piles - M30
KSRRB 1100-1 Bored/cast in situ RCC 1000mm
3 25.1.3 m 390 Kg
dia piles - M35
KSRRB 1100.2 Driving cast-in- place vertical
4 25.2.1 m 320 Kg -
RCC 500mm dia - M20
KSRRB 1100-1 Bored/cast in situ RCC 500mm
5 25.2.2 360 Kg
dia piles - M30
KSRRB 1100-1 Bored/cast in situ RCC 500mm
6 25.2.3 390 Kg
dia piles - M35
KSRRB M-1100-3.1 Bored cast-in-situ RCC Pile
7 25.3 m 390 Kg -
with OPC - M35
KSRRB M1100-3.2 -do- B. Pile diametre
8 25.4 m 390 Kg
= 1000mm- M35
KSRRB M1100.3.3 -do- C.pile diametre
9 25.5 m 390 Kg
= 1200 mm - M35
KSRRB M1100-4.1 Driven cast-in-place vertical
10 25.6 m 390 kgs -
RCC Pile with OPC design mix M35
KSRRB - M1100-4.2 - DO- pile diametre
11 25.7 m 390 Kg
= 1000mm
KSRRB M1100-4.3 -do- pile diametre
12 25.8 m 390 Kg
= 1200mm
KSRRB M1100-4.4 - Driven precast vertical
13 25.9 RCC piles with OPC design mix M35 m 390 Kg -
- file diametre = 500mm
KSRRB M1100-4.5 -do- Pile diametre = 750mm
14 25.10 m 390 Kg
- M35
KSRRB M1100-4.6 -Do- pile diametre =
15 25.11 m 390 Kg
1000mm - M35
KSRRB M-1100-4.7 Driven precast vertical
16 25.12 RCC Piles with OPC deisgn mix M35 - size of m 390 Kg -
pile = 300mm x 300mm
KSRRB M1100-4.8 -do- size of pile
17 25.13 m 390 Kg
= 500mm x 500mm - M35
KSRRB M1100-4.9 : -do- size of pile
18 25.14 m 390 Kg
= 750mm x 750mm - M35

395
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
KSRRB M1100-5: Driven vertical steel piles
19 25.15 86.28
as per drawing = pile 400x250mm (ISHB series)
KSRRB M1100-6: Driven vertical steel piles
97.16
20 25.16 as per drawing = H section steel column
Kg/m
450x250mm (ISHB Series)
KSRRB M1100-8.1: Cement Concrete for
reinforced concrete in pile cap as per drawing
21 25.18 Cum 320 kgs -
and technical specifcation complete A.RCC with
OPC design M20
KSRRB M1100-8.2 -do A. RCC with OPC
22 25.19 Cum 320 kgs -
design mix M-20
KSRRB M1100-9.1 Cement concrete for
reinforced concrete inm pile cap as per drawing
23 25.20 Cum 340 Kgs -
and technical specifications - B RCC with OPC
design mix M25
KSRRB M1100-9.2 : -do- RCC with OPC design
24 25.21 Cum 340 kgs -
mix M25
KSRRB M1100-10.1 : Cement concrete for
reinforcement concrete in pile cap per drawing
25 25.22 Cum 360 kgs -
and technical specification - C. RCC with OPC
design mix M30
KSRRB M-1100-10.2 -do- C. RCC with OPC
26 25.23 Cum 360 kgs -
design mix M30
KSRRB M1100-11.1 : Cement concrete for
reinforced concrete in Pile Cap complete as per
27 25.24 Cum 390 kgs -
drawing - D. RCC with OPC design
mix M35
KSRRB M1100-11.2 : -do- D. RCC with OPC
28 25.25 Cum 390 Kgs -
design mix M35
KSRRB M1100-12 Providing and laying of PCC
29 25.26 Cum 240 Kg
M15 levelling course 100mm thick below
KSRRB M1100-13. Supplying, fitting and 1.050
30 25.27 Tonne -
placing uncoated TMT bar reinforcement Tonne
KSRRB M1100-14: Supplying, fitting and
1.050
31 25.28 placing un-coated Mild steel reinforcement in Tonne -
Tonne
foundation as per drawing
KSRRB M1200-3.1 i) RCC with OPC
32 26.5.1 Cum 320 Kg
design mix M20

396
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7

33 26.5.2 KSRRB M1200.3.2 ii) -do- with M-25 Cum 340 Kgs -
KSRRB M1200-3.3 iii) RCC with OPC
34 26.5.3 Cum 390 Kgs -
design mix M35
KSRRB M1200-4.1 : i) PCC design mix M15
35 26.5.4 Cum 240 Kgs -
with OPC
KSRRB M1200-4.2 ii) PCC with OPC
36 26.5.5 Cum 300 Kgs -
design mix M20
KSRRB M1200-4.3 iii) RCC with OPC
37 26.5.6 Cum 320 kgs -
design mix M20
KSRRB M1200-4.4: iv) PCC with OPC
38 26.5.7 Cum 340 Kgs -
design mix M25
KSRRB M-1200-4.5 : v) RCC with OPC
39 26.5.8 Cum 340 Kgs -
design mix M25
KSRRB M1200-4.6 vi) PCC with OPC
40 26.5.9 Cum 360 Kgs -
design mix M30
KSRRB M-1200-4.7 vii) RCC with OPC
41 26.5.10 Cum 360 Kgs -
design mix M30
KSRRB M1200-4.8 viii) RCC with OPC
42 26.5.11 Cum 390 kgs -
design mix M35
KSRRB M1200-4.9 ix) RCC with OPC
43 26.5.12 Cum 420 kgs -
design mix M40
KSRRB M1200-5.1 : Plain / Reinforced cement
44 26.6 concrete, in well foundation complete as per Cum 320 kgs -
drawing and technical specification mix M20
KSRRB M1200-5.2 : Plain / reinforced cement
45 26.7 concrete, in well foundation complete as per Cum 320 kgs -
drawing- M 20
KSRRB M1200-6.1: Plain/reinforced cement
46 26.8 concrete, in well foundation complete ii) PCC Cum 340 kgs -
with OPC design mix M25
KSRRB M1200-6.2: Plain / reinforced cement
47 26.9 Cum 340 kgs -
concrete, in well foundation complete mix M25
KSRRB M1200-7.1: Plain/ reinforced cement
48 26.10 Cum 360 kgs -
concrete, in well foundation design mix M30
KSRRB M1200-7.2 : Plain/ reinforced cement
49 26.11 concrete, in well foundation complete as per Cum 360 kgs -
drawing design mix M30
397
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
50 26.12 KSRRB M1200-8.1: Plain/ reinforced cement
concrete, in well foundation complete as per Cum 390 kgs -
drawing iv) PCC with OPC design mix M35
51 26.13 KSRRB M1200-8.2: Plain/ reinforced cement
concrete, in well foundation complete as per
Cum 390 kgs -
drawing and Techical specifcation PCC with
OPC design mix M35
52 26.14 KSRRB M1200-9.1 (i) PCC with OPC
Cum 320 kgs -
design mix M20
53 26.15 D.Intermediate Plug - Plain/ reinforced
concrete, in well foundation
54 26.15.1 KSRRB M1200-9.2 (ii) PCC with OPC
Cum 340 kgs -
design mix M25
55 26.15.2 KSRRB M1200-9.2 (ii) PCC with OPC
Cum 360 kgs -
design mix M30
56 26.16 E-Top Plug : KSRRB M1200-10.1
Cum 240 Kgs -
(i) i) PCC design mix M15 with OPC
57 26.17 KSRRB M1200-10.2 : (ii) PCC with OPC
Cum 300 kgs -
design mix M20
58 26.18 KSRRB M1200-10.3 : (iii) PCC with OPC
Cum 340 Kgs -
design mix M25
59 26.19 KSRRB M1200-10.4: (iv) PCC with OPC
Cum 360 kgs -
design mix M30
60 26.20 KSRRB M1200-11.1 : Plain/reinforcement
cement concrete, in well foundation F.well cap i) Cum 320 kgs -
RCC with OPC design mix M20
61 26.21 KSRRB M1200-11.2 : Plain/reinforced cement
concrete, in well foundation complete as per
Cum 320 kgs -
drawing and technical specification i) RCC with
OPC design mix M20
62 26.22 KSRRB M1200-11.3 : Plain/reinforced cement
concrete, in well foundation complete as per
Cum 320 kgs -
drawing and technical specification i) RCC with
OPC design mix M20
63 26.23 KSRRB M1200-11.4 : Plain / reinforced cement
concrete, in well foundation complete as per
Cum 340 kgs -
drawing and technical specification (ii) RCC with
OPC design mix M25

398
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
64 26.24 KSRRB M1200-11.5 : Plain/ reinforced cement
concrete, in well foundation complete as per
Cum 360 Kgs -
drawing and technical specification (iii) RCC
with OPC design mix M30
65 26.25 KSRRB M1200-11.6 : Plain / Reinforced cement
concrete, in well foundation complete as per
Cum 360 Kgs -
drawing and technical specification: RCC with
OPC design mix M30
66 26.26 KSRRB M1200-11.7: Plain / Reinforced cement
concrete, in well foundation complete as per
Cum 390 Kgs -
drawing and technical specification (iv) RCC
with OPC design mix M35
67 26.27 KSRRB M1200-11.8: Plain/ reinforced cement
concrete, in well foundation complete as per
Cum 390 Kgs -
drawing and technical specification: RCC with
OPC design mix M35
68 26.28 KSRRB M1200-12. Plain/ reinforced cement
concrete in well foundation complete as per
Cum 420 kgs -
drawing and technical specification (v) RCC
with OPC design mix M40
69 26.126 KSRRB M1200-48.1 : Construction of cement
concrete kerb with top and bottom width 115
m 15.83 kgs -
and 165mm respectively 250mm high in M-20
grade PCC on M10 Grade
70 26.127 KSRRB M1200-48.2 Construction of cement
concrete kerb with top and bottom width 115
m 15.83 kgs -
and 165mm respectively 250mm high in M20
grade PCC on M10
71 26.128 KSRRB M1200-49.1: Cast-in-Situ cement
concrete M20 kerb with channel, construction of
m 30.03 m -
cement concrete kerb with channel with top and
bottom with 115 and 165mm
72 26.129 KSRRB M1200-49.2. Cast-in-situ cement
m 30.03/m -
concrete M20 kerb with channel
73 26.130.1 Providing and fixing 3m long 25mm dia TMT
dowel bars 1.5m -Providing and fixing -do- LWL Each - 11.50 kg
in open foundation upto 3m
74 26.130.2 Providing and fixing 3m long 25mm dia TMT
dowel bars 1.5m - do- below LWL in open Each - 11.50 kg
foundation beyond 3m
399
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
75 26.130.3 Providing and fixing 3m long 25mm dia TMT
dowel bars 1.5m -do- for well foundation below Each 11.50 Kg
LWL upto 3m
76 26.130.4 Providing and fixing 3m long 25mm dia TMT
dowel bars 1.5m -do- for well foundation below Each 11.50 kg
LWL beyond 3m
77 27.18 KSRRB M2100-10 Plain cement concrete M10
with OPC KSRRB M2100-11. Brick Masonry Cum 220 kgs -
work in
78 27.24 KSRRB M2100-13: plain/reinforced cement
Cum 240 kgs -
concrete M15 with OPC
79 27.25 KSRRB M2100-14 : Plain / reinforcement
Cum 320 Kgs -
cement concrete M20 with OPC
80 27.27 KSRRB M2100-15.2 : Plain/ reinforcement
Cum 320 Kgs -
cement concrete M20 with OPC
81 27.29 KSRRB M2100-16.2 : Plain / reinforced cement
Cum 340 kgs -
concrete idesign mix M25 with OPC
82 27.31 KSRRB M2100-17.2 : Plain /reinforced cement
Cum 340 kgs -
concrete idesign mix M25 with OPC
83 27.33 KSRRB M2100-18.2 : Plain / reinforced cement
concrete in open foundation with OPC cum 360 kgs -
design mix M30
84 27.35 KSRRB M2100-19.2: Plain / reinforced cement
concrete in open foundation with OPC Cum 360 kgs -
design mix M30
85 27.37 KSRRB M2100-20.2 : Plain/ reinforced cement
concrete in open foundation with OPC Cum 390 kgs -
design mix M35
86 28.7.1 KSRRB M2200-5.1 : M15 with OPC Cum 240 kgs -
87 28.7.2 KSRRB M2200-5.2 : Design mix M20 with OPC Cum 320 kgs -
88 28.7.3 KSRRB M2200-5.3 Design mix M25 with OPC Cum 340 kgs -
89 28.7.4 KSRRB M2200-5.4: Design mix M25 @ with
Cum 340 kgs -
OPC
90 28.7.5 KSRRB M2200-5.5 : Design mix M25 with OPC Cum 340 kgs -
91 28.7.6 KSRRB M2200-5.6 : Design mix M30 with OPC Cum 360 kgs -
92 28.7.7 KSRRB M2200-5.7: Design mix M30 with OPC Cum 360 kgs -
93 28.7.8 KSRRB M2200-5.8 Design mix M30 with OPC Cum 360 kgs -
94 28.7.9 KSRRB M2200-5.9: Design mix M20 with OPC Cum 320 Kgs -

400
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
95 28.7.10 KSRRB M2200-5.10 - Design mix M20 with
Cum 320 Kgs -
OPC
96 28.7.11 KSRRB M2200-5.11: Design mix M20 with OPC
Cum 320 kgs -

97 28.7.12 KSRRB M2200-5.12 : Design mix M25 with


Cum 340 kgs -
OPC
98 28.7.13 KSRRB M2200-5.13: Design mix M25 with OPC Cum 340 kgs -
99 28.7.14 KSRRB M2200-5.14 : Design mix M25 with
Cum 340 kgs -
OPC
100 28.7.15 KSRRB M2200-5.15: design mix M30 with OPC Cum 360 kgs -
101 28.7.16 KSRRB M2200-5.16: Design mix M30 with OPC Cum 360 kgs -
102 28.7.17 KSRRB M2200-5.17: Design mix M30 with OPC Cum 360 kgs -
103 28.7.18 KSRRB M2200-5.18 : Design mix M35 with
Cum 390 kgs -
OPC
104 28.7.19 KSRRB M2200-5.19: Design mix M35 with OPC Cum 390 kgs -
105 28.7.20 KSRRB M2200-5.20: Design mix M35 with OPC Cum 390 kgs -
108 28.8 KSRRB M2200-6: Supplying, fitting and placing 1.05
Tonne
TMT bar Tonne
109 29.1, KSRRB M2300-1.1 : Furnishing and placing
29.1.1, Reinforced Prestressed cement concrete M20
29.1.2,
29.1.3, Cum 320 Kgs
29.1.4,
29.1.5
110 29.2.1, KSRRB M2300-1.2: Furnishing placing
29.2.2, reinforced /Prestressed cement concretge in
29.2.3, super structure -M20 Cum 320 Kgs
29.2.4,
29.2.5
111 29.5.1, KSRRB M2300-3.1 : Furnishing and placing
29.5.2, reinforced/ prestressed cement concrete in
29.5.3, super Cum 340 kgs
29.5.4, structure - M25
29.5.5
112 29.6.1, KSRRB M2300-3.2: Furnishing and placing
29.6.2, reinforced/ prestressed cement concrete in
29.6.3, super Cum 340 kgs
29.6.4, structure as per drawing - M25
29.6.5

401
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
113 29.9.1, KSRRB M2300-5.1: Furnishing and Placing
29.9.2, reinforced/ prestressed cement concrete in
29.9.3, super Cum 360 kgs
29.9.4, structure - M30
29.9.5
114 29.10.1, KSRRB M2300-5.2: Furnishing and placing
29.10.2, reinforced / prestressed cement concrete in
29.10.3, super Cum 360 kgs
29.10.4, structure - M30
29.10.5
115 29.13.1, KSRRB M230-7.1: Furnishing and placing
29.13.2, Reinforced/ prestressed cement concrete in
29.13.3, super structure as per drawing - M35 Cum 390 kgs
29.13.4,
29.13.5
116 29.14.1, KSRRB M2300-7.2: Furnishing and placing
29.14.2, reinforced/ prestressed cement concrete in
29.14.3, super structure M35 Cum 390 kgs
29.14.4,
29.14.5
117 29.15.1, KSRRB M2300-7.3: Furnishing and Placing
29.15.2, Reinforced/ Prestressed cement concrete in
29.15.3, super structure - M35 Cum 390 kgs
29.15.4,
29.15.5
118 29.19.1, KSRRB M2300-9.1: Furnishing and placing
29.19.2, reinforced/ Prestressed cement concrete in
29.19.3, super structure M40 Cum 420 kgs
29.19.4,
29.19.5
119 29.20.1, KSRRB M2300-9.2: Furnishing and placing
29.20.2, reinforced/ prestressed cement concrete in
29.20.3, super structure as per drawing M40 Cum 420 kgs
29.20.4,
29.20.5
120 29.22.1, KSRRB M2300-10.2: Furnishing and placing
29.22.2, reinforced/ prestressed cement concrete in
29.22.3, super structure M40 Cum 420 kgs
29.22.4,
29.22.5

402
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
121 29.23.1, KSRRB M230-10.3: Furnishing and placing
29.23.2, reinforced/ prestressed cement concrete in
29.23.3, super structure M40 Cum 420 kgs
29.23.4,
29.23.5
122 29.24.1, KSRRB M2300-11.1: Furnishing and placing
29.24.2, reinforced/ prestressed cement concrete in
29.24.3, super structure as per drawing M40 Cum 420 kgs
29.24.4,
29.24.5,
123 29.25.1, KSRRB M2300-11.2: Furnishing and placing
29.25.2, reinforced/ Prestressed cement concrete in
29.25.3, super structrure as per drawing M45 Cum 440 kgs
29.25.4,
29.25.5,
124 29.26.1, KSRRB M2300-11.3: Furnishing and placing
29.26.2, reinforced/ Prestressed cement concrete in
29.26.3, super structure M45 Cum 440 kgs
29.26.4,
29.26.5
125 29.27.1, KSRRB M2300-12: Furnishing and placing
29.27.2, reinforced/ Prestressed cement concrete in
29.27.3, super structure as per drawing M50 Cum 450 kgs
29.27.4,
29.27.5,
126 29.28.1, KSRRB M2300-13: Furnishing and placing
29.28.2, reinforced/ prestressed cement concrete in
29.28.3, super structure M55 Cum 450 kgs
29.28.4,
29.28.5,
127 29.30 KSRRB M2300-15: High tensile steel wires/
Tonne 1.02 Tonne
strands including all accessories
128 29.31 KSRRB 2300-16: Providing and laying cement
concrete wearing coat with OPC design mix Cum 360 kgs
M30
129 30.3 KSRRB M2500-2: Providing and laying of
apron with cement concrete blocks of size Cum 240 kgs
0.5x0.5x0.5m M15

403
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
130 30.6 KSRRB M2500-4.2: providing and laying
pitching on slopes laid over prepared filter
media including boulder apron laid dry in front
of toe of embankment complete as per drawing Cum 240 kgs
and technical specifications -do- B. Cement
concrete Blocks of size 0.3x0.3x0.3m cast in
cement concrete of grade M-15
131 32.1 KSRRB M2700-1: Providing and laying 12mm 2.83 kg/
thick mastic asphalt wearing course on top of Sqm Bitumen
deck slab 80/100
132 32.6 KSRRB M2700-6: PCC M15 grade leveling
course below approach slab complete as per
Cum 240kg
drawing and technical specification complete as
per specifications
133 32.7 KSRRB M2700-7: Reinforced cement concrete
Cum 360 kg
M30 approach slab
134 33.1 KSRRB M2800-2: Removal of existing asphaltic
Sqm 16 kg
wearing coat comprising
135 33.5 KSRRB M2800-5.1: Sealing of cracks/porous
Kgs 1.10 kg
concrete by injection
136 34.1 KSRRB M2900-1: Plain cement concrete 1:3:6
Cum 220 kg
mix with crushed
137 35.4 KSRRB 3000 Filling Potholes and Patch repairs 1.46 kg
with open graded premix surfacing, 20mm 80/100
KSRRB M300-4 Sqm Bitumen
Emulsion
0.24 kg
138 35.5 KSRRB 3000 Filling pot holes and patch repairs 4.59kg
with Bituminous concrete 40mm 80/100
Sqm Bitumen
0.24 kg
emulsion
139 35.6 KSRRb M300-6: Filling of crack using slow -
curing bitumen emulsion and applying crusher m 0.066 kg
dust in case crack are wider
140 27.16 KSRRB M2100-8. Filling Annular Space Around - 0.240
Footing in Rock Lean cement concrete 1:3:6 M.Ton or
nominal mix cum 240 Kgs -

404
MATERIAL REQUIREMENTS DETAILS

Sl. Item No.


Brief Description of Item Unit Bitumen Cement Steel
No. of SR

1 2 3 4 5 6 7
141 32.2 KSRRB M2700-2. Construction of precast RCC 0.03069
- 0.01892 M.T.
railing of M-30 grade M.Ton or
Rmt or 18.92 Kgs
30.69Kgs
142 30.12 KSRRB M2500-9 Curtain wall complete as per
drawing and technical specifications. A stone Cum - 153 Kgs -
masonry in cement mortar (1:3)

405
C£ÀĪÉÆâvÀ ¥Àæw

n¥Ààt : ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛzÀ 2018-19 ¸Á°£À C£ÀĪÉÆâvÀ ¹«¯ï zÀgÀ¥ÀnÖAiÀÄ ¥Àæw ¥ÀæwUÉ gÀÆ.
800-00 (JAlÄ £ÀÆgÀÄ gÀÆ¥Á¬ÄUÀ¼ÀÄ) UÀ¼ÀAvÉ ªÉƧ®UÀ£ÀÄß ¥ÀqÉzÀÄ ±Á¸À£À§zÀÞªÁzÀ CgÉ ¸ÀPÁðj ¸ÀA¸ÉÜUÀ¼ÀÄ
ªÀÄvÀÄÛ C£ÀĪÉÆâvÀ ªÀiË®åªÀiÁ¥À£ÀPÁgÀjUÉ ºÁUÀÆ UÀÄwÛUÉzÁgÀjUÉ «vÀj¸À¯ÁUÀĪÀÅzÀÄ.

¸À»/-
C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ,
¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ,
¨ÉAUÀ¼ÀÆgÀÄ

PÀÈvÀdÕvÉ

2018-19£Éà ¸Á°£À ¨ÉAUÀ¼Æ À gÀÄ ªÀÈvÀÛzÀ zÀg¥


À n
À ÖAiÀÄ PÀgqÀ ÄÀ ¥Àw
æ AiÀÄ£ÀÄß vÀAiÀiÁj¸ÀĪÀ PÁAiÀÄðzÀ°è G¥À¸«À ÄwAiÀÄ CzsåÀ PÀëgÄÀ
ªÀÄvÀÄÛ ¸ÀzÀ¸ÀågÀÄUÀ¼ÀÄ ºÁUÀÆ UÀÄwÛUÉzÁgÀgÀ ¸ÀAWÀzÀ ¥Àæw¤¢üUÀ¼ÀÄ ¸À°è¹zÀ ¸ÉêÉUÁV PÀÈvÀdÕvÉUÀ¼ÀÄ.

zÀgÀ¥ÀnÖAiÀÄ PÀgÀqÀÄ ¥ÀæwAiÀÄ£ÀÄß vÀAiÀiÁj¸ÀĪÀ°è, ¥Àæ¸ÀÄÛvÀ ªÀiÁgÀÄPÀmÉÖAiÀÄ zÀgÀUÀ¼ÀÄ EvÁå¢ «ªÀgÀuÉUÀ¼À£ÀÄß ¤Ãr ¸ÀºÀPÀj¹zÀ
vÀAiÀiÁgÀPÀgÀÄ, ¸ÀgÀ§gÁdÄzÁgÀgÀÄ, UÀÄwÛUÉzÁgÀgÀÄ ºÁUÀÆ E¤ßvÀgÉ SÁ¸ÀV ¸ÀA¸ÉÜUÀ¼À£ÀÄß PÀÈvÀdÕvÁ¥ÀƪÀðPÀªÁV ¸Àäj¸À¯ÁVzÉ.

2018-19£Éà PÀgÀqÀÄ zÀgÀ¥ÀnÖAiÀÄ£ÀÄß vÀAiÀiÁj¸ÀĪÀ°è ¸ÀºÀPÀj¹zÀ E¯ÁSÉAiÀÄ J¯Áè ¹§âA¢ ªÀUÀðzÀªÀjUÉ PÀÈvÀdÕvÉUÀ¼À£ÀÄß
¸À°è¹zÉ.

¸À»/-
C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ,
¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ,
¨ÉAUÀ¼ÀÆgÀÄ

406

S-ar putea să vă placă și