General Schedule of Inspection and Testing is shown in the master schedule.
Although each exact schedule for the execution can’t be decided, generally, it will be done in accordance with the rule below:
1. SUPPLY OF ALL MATERIALS REQUIRED FOR THE PROJECT
Materials/ Supplier (approval) It shall be done prioritizes 2nd quarter of
construction period Materials Inspection and Verification It shall be finished prioritized on 2nd quarter (Inspection and Testing) of the construction period Materials Factory Assessment Test (FAT) Prioritized before construction period Materials Delivery on site ( Verification) Upon construction period Materials shipping (Verification) Borne prioritized when shipment govern Materials Handling (verification) Upon delivery and stock filling
2. DURING CONSTRUCTION
Workmanship During construction and execution
Identification During construction
3. AFTER CONSTRUCTION
Testing and Commissioning After construction period