Project Construction of Sewage Treatmeny Plant of Capacity 375KLD

Document Prepared Checked Approved Rev


19-H20-STP-STR-01
Number
VJ GJ DM 0
Title Structural Design Calculation of Underground STP tank
Design of Base Raft

Grade of concrete = M30


Grade of steel = Fe500
Density of soil = 18.5 kN/m3
Density of water = 10.1 kN/m3
3
Density of concrete = 25 kN/m
Clear Size of the Septage Holding Tank Length = 25.0 m
Width = 7.0 m
SBC of soil = 100 kN/m2
Thickness of Chamber wall W1 at top = 350 mm
Thickness of Chamber wall W1 at bottom = 350 mm
Thickness of Chamber wall W2 at bottom = 350 mm
Projection of raft = 1200 mm
Thickness of base raft = 400 mm

350 + 0.000 350

+ 0.000

3.63
1200 -+ 3.63 7.00m 1200
350 350
400
-+ 4.030

10.10m
UG TANK
SNo Description Downward Loads
1) Load due to concrete wall 1x 0.35 x 3.63 x 25 = 31.763 kN/m
x1x 0.35 x 0.00 x 25 = 0.000 kN/m
2) Self weight of raft 1x 28.1 x 0.40 x 25 = 27.82 kN/m
3) Load due to dry soil 2x 1.2 x 3.63 x 20 = 72.60 kN/m
4) load due to sewage x1x 7.00m x 3.63 x 10.1 = 36.66 kN/m
Total downward load = 168.9 kN/m
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD

Document Prepared Checked Approved Rev


19-H20-STP-STR-01
Number
VJ GJ DM 0

31.76 kN 31.76 kN
100.42 kN/m 46.16kN-m 100.42 kN/m
64.48 kN/m 46.16kN-m

B D
2 2
80.56 kN/m 80.56 kN/m
1.375 7.35 1.375
Taking Moment at Left End
Hence ∑P = 813.65 kN
2 2
Max. pressure at the base = (P/A+6Pe/b ) = = 80.56 kN/m
Min pressure at the base = (P/A-6Pe/b2) = = 80.56 kN/m2
SAFE
BM at bottom along Longer span (From Staad) = 74.028 kN-m
BM at Top along Longer span (From Staad) = 62.12 kN-m
BM at bottom along shorter span (From Staad) = 66.9135 kN-m
BM at top along longer span (From Staad) = 43.28 kN-m
Thickness of Raft Required = 133.72045 mm
Overall Depth = 400 mm
Clear cover (For Bottom of Raft) = 50 mm
Clear cover (For Top of Raft) = 50 mm
Dia of Bar (For Bottom of Raft RC) = 12 mm
Dia of Bar (For Top of Raft RC) = 12 mm
Effective Depth (For Bottom of Raft) = 344 mm
Effective Depth (For Top of Raft) = 344 mm
Steel Required at Support / Top of Raft
Percentage of steel required = 0.35 %
2
Ast required = = 509.12 mm
Providing 12 mm dia bars at 150 mm c/c
Area of minimum steel = =0.35x 1000 x200/100 = 700 mm2
Ast Provided = 753.98 mm2 > Ast Req Hence Ok
Provide 12 mm dia bars at 150 mm c/c on Top face
Pt provided = 0.22 %
Steel Required at Bottom of Raft
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD

Document Prepared Checked Approved Rev


19-H20-STP-STR-01
Number
VJ GJ DM 0
Percentage of steel required = 0.35 %
Ast required = = 460.96 mm2
Area of minimum steel = =0.35x 1000 x200x100 = 700 mm2
Providing 16 mm dia bars at 150 mm c/c
2
Ast Provided = 1340.41 mm > Ast Req Hence Ok
Provide 16 mm dia bars at 150 mm c/c on Bottom face
Pt provided = 0.39 %
Distribution steel (Top)
Minimum percentage of steel required = 0.35 %
Ast required = 426.56
2
Min .,Area required in each face = 700.0 mm
Dia of steel bar = 12 mm
Provide 12 mm dia bars at 150 mm c/c on each face
Ast provided = 754.0 mm2 > 700.0 Ast Req
Pt provided = 0.22 % Hence Ok
Distribution steel (Bottom)
Minimum percentage of steel required = 0.35 %
Ast required = 295.84
2
Area required in each face = 700.0 mm

Dia of steel bar = 16 mm


Provide 12 mm dia bars at 150 mm c/c on each face
Ast provided = 1340.4 mm2 > 700.0 Ast Req
Pt provided = 0.39 % Hence Ok
Check for shear
Maximum shear stress acting = 0.175 N/mm2
Percentage of steel provided = 0.22 %
2
Permissible shear stress = 0.596 N/mm
SAFE