M/S. PHARMADEEP TURNKEY CONSULTANTS AND ENGINEERS PVT. LTD.

B-509, Lodha Supremus-II, near Dosti Pinnacle, Road


No-22 ,Wagle Estate, Thane (West), 400604. TEL : +91 22 65766646 / 21731540 FAX : +91 22 21731540
e-Mail: info@pharmadeep.com Web: www.pharmadeep.com
Date : 2019-05-19
Client Name : M/s. Nitika Pharmaceutical Speciality Pvt. Ltd.
Revision : 0
Document Name : LIST OF DELIVERABLES - MAY 2019
DEPARTMENT Drawing No. Drawing / Document Description Target Date Responsibiity Current Status Remark
SITE DEVELOPMENT
CIV CIV / 01 Site Plan 05/15/19 Vaibhav / Sunil / Pradip S. Ready To be made as per MIDC
CIV CIV / 02 Formation Level Plan 05/20/19 Vaibhav / Sunil / Pradip S. Yet to start -
CIV CIV / DDL/01 Domestic Drain Line Layout 05/24/19 Vaibhav / Sunil / Pradip S. Yet to start -
FRONT ENGINEERING MANUAL
CIV PRD / CIV / 01 Production Blocks Concept Plan 05/15/19 Vaibhav / Sunil / Pradip S. In progress -
CIV PRD / CIV / 02 Production Blocks Man & Material Flow Layout 05/20/19 Vaibhav / Sunil / Pradip S. Yet to start -
CIV PRD / CIV / 03 Production Blocks Floor Finishing Schedule Layout 05/24/19 Vaibhav / Sunil / Pradip S. Yet to start -
CIV PRD / CIV / 05 Production Blocks Industrial Drain Piping Layout 05/31/19 Vaibhav / Sunil / Pradip S. Yet to start -
PM PRD / EQUIP / 01 Equipment List (with Electrical Load) 05/15/19 Vaibhav / Pradip S. In progress Extended due to recently added products
CIV PRD / CIV / 06 Goods Lift GA drawing 05/20/19 Vaibhav / Sunil / Pradip S. Yet to start Client to confirm Capacity
PM PRD / EQUIP / 02 Utility Chart / Consumption Sheet 05/24/19 Vaibhav / Pradip S. In progress -
ELE PRD / ELE / 02 Electrical Design Basis 05/21/19 Chirag/ Vaibhav / Pradip S. Yet to start -
PM PRD / MECH / 01 Utility Piping Design Basis 05/20/19 Vaibhav / Pradip S. Yet to start -
CIV UT / CIV / 01 Utility Block Concept Plan 05/15/19 Vaibhav / Sunil / Pradip S. Yet to start -
CIV UT / CIV / 02 Utility Block Floor Finishing Schedule Layout 05/20/19 Vaibhav / Sunil / Pradip S. Yet to start -
CIV UT / CIV / 04 Utility Block Industrial Drain Piping Layout 05/24/19 Vaibhav / Sunil / Pradip S. Yet to start -
ELE UT / ELE / 01 Utility Block Lux Level Distribution Layout 05/31/19 Chirag/ Vaibhav / Pradip S. Yet to start -
CIV UGT/CIV/01 UGT & Pump Room Concept Plan 05/15/19 Vaibhav / Sunil / Pradip S. In progress Will be submitted by 05/17/19
CIV GR-1/CIV/01 Security Room-1 Cocnept plan 05/15/19 Vaibhav / Sunil / Pradip S. Yet to start Delay due to clearance
CIV GR-1/CIV/02 Security Room-1 Finishing Schedule Layout 05/20/19 Vaibhav / Sunil / Pradip S. Yet to start -
CIV HT/CIV/01 HT, DG Meter & Panel Room Concept Plan 05/24/19 Chirag/ Sunil / Pradip S. Yet to start -
CIVIL & ARCHITECTURAL
CIV PRD /CIV / 01 Excavation drawings 05/27/19 Sunil / Kankalia Yet to start -
ARCH PRD /ARCH / 01 Production Buildings Civil Working Drawing 05/28/19 Sunil / Kankalia Yet to start -
ARCH PRD /ARCH / 02 Production Buildings Toilet Block Working Drawing 05/29/19 Sunil / Kankalia Yet to start -
ARCH PRD /ARCH / 03 Production Buildings Stair Case details 05/30/19 Sunil / Kankalia Yet to start -
ARCH PRD /ARCH / 05 Production Buildings Centre Line drawing 05/27/19 Sunil / Kankalia Yet to start -
ARCH PRD /ARCH / 06 Typical Details Of Plinth 05/28/19 Sunil / Kankalia Yet to start -
ARCH UGT/ARCH/01 UG Water Tank working drawing 05/29/19 Sunil / Kankalia Yet to start -
ARCH UGT/ARCH/02 UGT Centre Line drawing 05/30/19 Sunil / Kankalia Yet to start -
STR UGT/STR/01 UGT RCC detail drawing 05/31/19 Sunil / Kankalia Yet to start -
ARCH GR-1/ARCH/01 Security Room, Gate-1 & Culvert working drawing 05/28/19 Sunil / Kankalia Yet to start -
ARCH GR-1/ARCH/02 Security Room, Gate-1 & Culvert Centre line drawing 05/29/19 Sunil / Kankalia Yet to start -
STR GR-1/STR/01 Security Room, Gate-1 & RCC drawing 05/30/19 Sunil / Kankalia Yet to start -
ARCH ETP/ARCH/01 ETP working drawing 05/31/19 - - -
ARCH CW/ARCH/01 Compound Wall working drawing 05/24/19 Sunil / Kankalia In progress -
STR CW/STR/01 Compound Wall RCC drawing 05/27/19 Sunil / Kankalia In progress -
ARCH UT/ARCH/01 Utility Building Civil Working Drawing 05/30/19 Sunil / Kankalia Yet to start -
ARCH UT/ARCH/02 Toilet Block Working Drawing 05/31/19 Sunil / Kankalia Yet to start -
ARCH UT/ARCH/03 Stair Case details 05/28/19 Sunil / Kankalia Yet to start -
ARCH UT/ARCH/04 Utility Building Centre Line drawing 05/29/19 Sunil / Kankalia Yet to start -
STR UT/STR/01 Utility Foundation Level Plan 05/30/19 Sunil / Kankalia Yet to start -
STR UT/STR/02 Utility Building Plinth Beam RCC Drawing 05/31/19 Sunil / Kankalia Yet to start -
STR UT/STR/03 Utility Building Tye Beam RCC Drawing 05/28/19 Sunil / Kankalia Yet to start -
STR UT/STR/04 Utility Building Roof Level & Stair case Cap RCC drawing 05/29/19 Sunil / Kankalia Yet to start -
ARCH HT/ARCH/01 HT, DG & Panel Room Civil Working Drawing 05/30/19 Sunil / Kankalia Yet to start -
ARCH HT/ARCH/02 HT, DG & Panel Room Centre Line drawing 05/31/19 Sunil / Kankalia Yet to start -
ARCH GEN/ARCH/03 Road detail drawings 05/31/19 Sunil / Kankalia Yet to start -
DETAIL ENGINEERING MANUAL
ELE ELE / Gen / 01 ABBRIVIATION_GENERAL NOTES 05/27/19 Chirag / Vaibhav In progress -
ELE PRD / ELE / 07 Electrical Main Schematic Diagram 05/28/19 Chirag / Vaibhav Yet to start -
ELE PRD / ELE / 14 Site Plan with Street Light, cable routine, Earth Pit Location etc 05/29/19 Chirag / Vaibhav Yet to start -
ELE PRD / ELE / 15 Earthing Schedule 05/30/19 Chirag / Vaibhav Yet to start -
ELE PRD / ELE / 16 Earhing Drawing with pit location and pit drawing 05/31/19 Chirag / Vaibhav Yet to start -
MECH PRD / EQUIP / 101 URS for Steam Boiler 05/20/19 Vaibhav / Pradip S. Draft ready -
MECH PRD / EQUIP / 102 URS for Chiller 05/20/19 Vaibhav / Pradip S. In progress -
MECH PRD / EQUIP / 103 URS for Cooling Tower 05/21/19 Vaibhav / Pradip S. Draft ready -
MECH PRD / EQUIP / 104 URS for Air Compressor & System 05/21/19 Vaibhav / Pradip S. Draft ready -
MECH PRD / EQUIP / 106 URS for Pumps 05/22/19 Vaibhav / Pradip S. In progress -
MECH PRD / EQUIP / 107 URS for ETP - -
MECH PRD / EQUIP / 108 MDS for Fabricated Equipments 05/24/19 Vaibhav / Pradip S. In progress -
MECH PRD / FIRE / 01 Production Block Fire Evacuation Plan Layout 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH UGT / FIRE / 04 Fire Hydrant system P&ID 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH PRD / PFD /001 PFD for Organic Product 05/15/19 Vaibhav / Pradip S. Submitted Awating for final approval
MECH PRD / PFD /002 PFD for Inorganic Product 05/15/19 Vaibhav / Pradip S. Submitted Awating for final approval
MECH PRD / PFD /003 PFD for MCC 05/15/19 Vaibhav / Pradip S. Submitted Awating for final approval
MECH PRD / P&ID /001 P&ID for Organic Product 05/24/19 Vaibhav / Pradip S. Yet to start -
MECH PRD / P&ID /002 P&ID for Inorganic Product 05/28/19 Vaibhav / Pradip S. Yet to start -
MECH PRD / P&ID /003 P&ID for MCC 05/29/19 Vaibhav / Pradip S. Yet to start -
MECH MECH / 02 P&ID for Steam Piping 05/30/19 Vaibhav / Pradip S. Yet to start -
MECH MECH / 03 P&ID for DM Water Piping 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH MECH / 04 P&ID for Compressed Air Piping 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH MECH / 06 P&ID for Chiller Piping 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH MECH / 07 P&ID for Process CW Piping 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH MECH / 08 P&ID for Hot Oil Piping 05/31/19 Vaibhav / Pradip S. Yet to start -
MECH PRD / MECH / 105 Equipment & Piping cleaning Procedures 05/28/19 Pradip S. Ready
MECH PRD / MECH / 106 Hydrotesting & Pneumatic testing procedures 05/28/19 Pradip S. Ready
MECH PRD / MECH / 109 Piping Specifications 05/28/19 Pradip S. - Part of Tender
MECH PRD / MECH / 110 Valves Specifications 05/28/19 Pradip S. - Part of Tender
MECH PRD / MECH / 111 Hose specifications 05/28/19 Pradip S. - Part of Tender
COM PRD / PREQ / 101 URS for New Process Equipments 05/27/19 Vaibhav / Pradip S. In progress -
MECH GEN / ETP/ 107 URS for DM+RO Plant 05/31/19 Vaibhav / Pradip S. Yet to start -
1. Excavation drawing
2. MDS for Fabricated Equipments
3.Water Treatment Plant
4. Instrument list with specifications (mostly bulk instruments & Load Cell arrangements
5.Plant Eshaust Fans their arrangements for ventilation
6. Earhing Drawing with pit location and pit drawing
7. Scrubbing system
8. Cable tray lay out with cable schedule
9.Equipment Erection tender
10. Insulation specifications, Insulation tender
11. Painting specification with painting tender
12.Equpment & Piping cleaning Procedures
13. Hydrotesting & Pneumatic testing procedures
14 Procurment documents : Enqity, TBA, Comparative statements
15. Piping Specifications
16. Valves Specifications
17. Hose specifications
18. Valves MTO
!9. SOP
20. As Built Drawings