Documente Academic
Documente Profesional
Documente Cultură
COMPANY PROFILE
1.0 INTRODUCTION
ABOUT US
Founded in 2010 and registered in 2015, Granedos Nigeria Limited is a registered and incorporated Private Limited
Liability Company with an authorized share capital of =N= 5,000,000.00 (five Million Naira Only) in 2015 with the vision
that it rises to 30 Million ordinary shares by December, 2016. Granedos Nigeria Limited is experience in asset integrity in
oil and gas field. Corrosion Management and Inspection, Integrity assessment/certification of pressure vessels, boiler
tubes, heat exchangers, air gas cooler process and Relief valves of different types.
Granedos Nigeria Limited is a full Engineering Servicing Company rendering services to industries in Pipeline repairs
with the used of Clock spring maintenance, welding and fabrication, Non- destructive testing (NDT), Leak testing,
Electrical / Instrumentation and Control, and general construction including training. Since its inception, Pressure
vessels inspection, boiler tubes inspection /certification (hydro testing). Relief valve inspection/certification, crane
inspection.
Provision of QA/QC personnel in different fields of specialty
We have qualified and experienced manpower and up to date basic industrial equipment. Amongst our past and present
operating clients are:- NIPP odupkani, Neitco dietman Agip station okapai, Afam gas plant VI Port Harcourt, Dowel
Schlumberger Nigerian Limited, Nigeria National Petroleum Corporation (NNPC) Warri Refining Company, Nigeria Gas
Transport company limited (NGTPC) thus, our business activities over the years with these oil companies covered
Process installation, Calibrations , maintenance of operational equipment and Flow station / Wellhead Maintenance,
Instrumentation. This is not limited to erecting, revamping, refurbishing, servicing, repairing, maintaining and performing
all manner of operations necessary to ensure that Process Systems work at optimum efficiency.
Through well thought out strategic planning, It is our goal to provide quantitative and qualitative, internationally
acceptable services to our clients. Towards this end, we have aligned ourselves with a consortium of highly specialized
companies to enable us provide first class services for the oil and gas industry.
We have no doubt from a professional angle that an average analysis could conclude that our effective performance
within the period which obviously informed the need for adequate classification and availing us the opportunity to
represent your company will be to our advantage.
2
...Integrity Inspection/Ment ainance Repair
Km 23 East West Rd. Rumosi Port-Harcourt
t
Granedos.com
Granedos Nigeria Limited Rc1243403
Rc1243403
No. 5 ri - Sapele road Enehren junction,ri -
By Eku annex
warNo. 5 Sapele
Granedos Nigeria Limited
building, warBy
ri delta
road Enehren
Granedosnl@gmail.com
state ri
junction,
Eku annex building, war delta state
war
Tel: 09074809726, 07036173069, 08079429502 el:
Granedosnl@gmail.com
T09074809726, 07036173069, 08079429502
2.5 FITNESS FOR SERVICE (FFS)
GNL provides fitness for service assignments in Nigeria for chemical, petrochemical, power plants and their
components. GRANEDOS FFS methodology is primarily based on API 510, 653, 570,580, NACE, FID, PCN, ASNT,
CWIPS, and CWI and correlated with engineering calculations, actual characterization/ flaw / degradation,
along with fracture mechanical calculations. It is a practical tool that assists the management to select the
alternative action of whether to run, repair or replace the equipment. The heuristic aspect of useful remaining
life of the equipment at the time of inspection is also part of FFS study.
ASME, API, BS 5500 & other recognized design codes provide rules for design and fabrication of new items of
plant e.g. pressure vessels, piping & storage tanks. These codes do not address the fact that many items
deteriorates during operation & that defects due to deterioration or from original fabrication, which are larger
than allowed by the “Quality Control levels” found during in-service inspections.
The need for FFS arises when an equipment undergoes some serious operational misshape exposing it to
severe conditions than the equipment was originally designed had crossed or flaws such as localized corrosion
or cracks are observed or other de-bottlenecking design limiting factors. FFS assessment is a multi-disciplinary
approach. The component under screening may contain flaws or other damages, or it might have been
subjected to non-anticipated operating conditions.
The purpose of FFS assessment is not simply to continue the component in its service beyond its serviceable
life, but to ensure utilization of full potential concerning present damage assessment. The typical outcome of a
fitness-for-service approach provides a “go/no-go” decision. This provides a rational makeshift arrangement to
continue the production. Additionally, the fitness for service assessment of components can help setting up
proper inspection schedules, modified maintenance procedures and more of online monitoring systems.
3
...IntIegrity Inspection/Mentegrity
ainance Repair
Km 23 East WKm
est Rd. umosi ort- t
Granedos.com
23 East W Rest Rd. Pumosi
R or
P Harcourtt- ...nt Inspection/Ment
Granedos.com
ainance Repair
Granedos Nigeria Limited Rc1243403
Ultrasonic set Pipeline and cable locator Eddy current Test Ultra Probe set
Olympus38DLPlus Ultrasonic
Set
5
...Integrity Inspection/Ment ainance Repair
Km 23 East West Rd. Rumosi Port-Harcourt
t
Granedos.com
GranedosNigeria Limited Rc1243403
ENGINEERING DESIGN WORK; Full design packages are available including engineering and drafting for
particular manufactured products such as Design services include;
1. Complete design packages using auto cad
2. New build electrical system design (AC and DC)
3. Isometric piping drawing, PFES, P&ID
6
...Integrity Inspection/Ment ainance Repair
Km 23 East West Rd. Rumosi Port-Harcourt
t
Granedos.com
Granedos Nigeria Limited Rc1243403
5.1 INSTALLATION
Deep Anode Ground bed Installation
Shallow Ground bed Installation
Distributed Ground bed Installation
Test Station & Monitoring Station Installation
Quality and Reliability That Make a Difference! Our team of API-653 above ground storage tank
inspection experts provides our clients thorough and reliable evaluation for code compliance. Our
comprehensive API-653 tank inspection services are performed by well trained and competent
professionals that are knowledgeable in regulatory and industry standards. When it comes to state-of-
the-art technology in above ground storage tank inspection, tank repair and tank engineering, Granedos
is always on the cutting edge. Our commitment to providing new and approved applications and
services is why we are highly regarded by our clients.
8
...Integrity Inspection/Ment ainance Repair
Km 23 East West Rd. Rumosi Port-Harcourt
t
Granedos.com
Granedos Nigeria Limited Rc1243403
1 STEEL TUBING
4 PRESSURE RECORDER
7 CONNECTORS
8 WATER PUMP
9 SUCTION HOSE
10 SIGN POST
11 COPPER/SLEDGE HAMMER
12 PIPE RENCH
13 SET OF SPANNERS
15 FILLING SPOOL
16 Plastic shovel
7.2 PROJECT REPORTING: At the conclusion of an Engineering Project, A written report is generated for each
phase of the project and submitted to the customer in a timely manner. A copy of each report is maintained
on file at GNL for reference.
The Management of Granedos Nigeria Limited has a carefully selected and formidable Organizational
structure by designing it such a way that the formal system of communication, division of labor, co-
ordination of activities as well as well thought out control measures (in pre-control, con-current ,post-
control and corrective measures in cases of deviants) to achieve organizational objectives and goals.
Secondly, there arose a need to have a comprehensive decision making pattern to ensure that the
process encompasses environmental factors, technological factors and strategic choice that will enable
re-organization and change management very flexible without necessarily involving much cost and fear
of losing one’s job.
Fourthly, our organizational structure has enabled both physical and psychological work conditions to
positively affect the behavior of people within the organization to achieve its objectives and goals.
Fifthly, because we at Granedos Nigeria limited understand the dynamics and associated technicalities
involved in our business environment, effect of management style of leadership to job satisfaction and
external pressure to jobs to staff behavior, we have harnessed them effectively to achieve organizational
goal and gaining staff loyalty yet maintaining one’s beliefs, values and culture
Further to this, management took another step to the indigenization ideals of the Nigerian Local Content
by measurably adopting an 80%: 20% ratio to make sure that Nigerians have a greater opportunity of
being recruited as it were.
In areas where we may be lacking in knowledge, staff training has been introduced to different levels of
management in making sure that as many that needs to improve them and move to the next level of job
responsibility.
Finally, safety training and seminars too is on hand to provide personnel security alert from every staff.
Part of these, is ensuring that PPE materials (hand gloves, nose mousses, coveralls, eye goggles, safety
boots, helmet) are worn according to the job requirement.
SECRETARY
MANAGING DIRECTOR/CEO
DRIVER
OPERATIONS MANAGER
We believe that our environment which is of vital importance to all living things must be protected at all
time.
We shall in pursuance of our technical objectives, recognize the significance of the environment by
conducting our activities in a manner to achieve maximum protection of the environment.
We shall also put in place all the necessary measures aimed at rectifying the environment when the
unavoidable is done.
Audit of work areas shall form an integral part of our routine site audits.
Environmental impact assessment (E I A) shall be conducted on as need basis.
Prompt reporting, investigation and following up of negative interferences with the environment shall be
affected without delay.
All workers shall participate in activities aimed at developing and sustaining awareness on the need to
protect and rescue workers on third party environment.
The company shall follow strictly all the relevant clients and governmental regulations on the environment
as it affects drugs, smoking and alcohol usage
10.0 Pictorial view of jobs done in different location
Inspection of LP Drum vessel in Afarm VI Gas Plant external and internal inspection
HRS 11, 12, 13 personnel carrying UT inspection Dye penetrates on inspection test
10.1 Pressure vessel and relieve valve inspection at Jones creek flow station
Internal view of pressure vessel personnel opening the manhole personnel removing relieve valve
External view of J10-s7 smith meter, external view of inner mechanism, partial view of strainer J10-s7
Leak at gas cooler fin tube gas cooler process fin tubes leak at gas cooler process fin tubes
At Odidi CPF during inspection at Odidi CPF
Connection of points personnel about to cald weld carrying out cald welding after cald welding at escravo
At obobo abitey
Cald welding taking place personnel carrying anode carrying out reading on a test point soil resistivity test on going
Pipeline construction at Odidi well 7
Grinding ongoing welding ongoing holiday detector test on welding machines and pipes
Pipes and Pipeline repair work with the Used of clock spring and wet trap Coating on Risers
Conoil riser Pipe leak noted Hole noted on the 4’’ riser Block Hole noted
12’’ Export repair line with clock spring at DiBi chevron location
calibration SRV
Test Bench Personal carrying out hydro-test on HP drum Ultrasonic test on boiler
tubes (UTM)
...Integrity Inspection/Ment ainance Repair
Km 23 East West Rd. Rumosi Port-Harcourt
t
Granedos.com
Granedos Nigeria Limited Rc1243403
We have in stock quiet large number of valves of various sizes ranging from Ball, Check, and Gate,
plug valves, cork valve, shutdown valves and relief valves both lower rating to higher rating
11.1 BOLTS AND NUTS
We stock Cad weld and galvanized bolts and nuts of different sizes
CHARTS PAPER
OUR PROPOSAL
We can sustain your static fixed equipments on both planned and intervention on call out basis, this
will reduce your maintenance cost and our rotating arms can also help out with campaign works
(Major overhaul) planned for the pumps and compressors.
Pressure vessel and relief valve re certification at Egbin Power plant lagos for NGTPC
Procurement of valves, charts paper, actuators, bolts and nuts for NGTPC
Pressure vessel and relief valve re certification at Oben gas plant for NGTPC
De sanding/flushing of vessel and scrubbers of the Ajaoukuta gas Metering plant for NGTPC
12” gas line Abiteye escravos sacrificial anode installation as subcontractor to Fenog to deliver
the project to Chevron Nigeria Limited (CNL).
Fixed crane inspection/ re certification for Rostrum oil and gas
Magnetic particle inspection for Dorman long Engineering.
Valves overhaul for Kaduna Petrochemical Refinery company
Relief valve certification for Energia
Pressure gauges calibration/certification for Energia
......Int
Integrity
egrity Inspection/Ment
Inspection/Ment ainance
ainance Repair
Repair
Km 23 East West Rd. Rumosi Port-Harcourt
t
Km 23 East West Rd. Rumosi Port-Harcourt
t Granedos.com
Granedos.com