Project Bridges And Tunnels

Ambedkar Road Flyovers in Mumbai


Services :
Planning
Feasibility Reports
Detailed Project Report
Architectural Planning
Drafting Tender Documents

Design
Detailed Structural Design
Design Review
Design of Enabling Structure

Supervision
Project Management Consultancy
Independent Consultancy
Quality Audit

Company INDIA / TPF Engineering Pvt. Ltd.

The construction of yovers on Dr. Babasaheb Ambedkar Road at 4 crucial junctions has
considerably eased the ow of tra c and has reduced congestion in the city of Mumbai.

Preparation of “Detailed Project Report” including Tra c Survey, Topographical Survey, Soil Investigation, Sound Mapping
Survey, Preparation of Estimates, Design and Drawings, other pre-tender activities and post-tender activities including Proof
Checking, Project Management Consultancy for the work of design and construction of viaduct portion on Dr. Babasaheb
Ambedkar Road.

Sion Hospital Junction: Total Length: 590m / Viaduc span length and arrangement: 280m – 35m / Solid Approach – Sion
End: 110m / Solid Approach – CST End: 200m
King’s Circle – Tulpule Chowk: Total Length: 1454m / Viaduc span length and arrangement: 1174m – 35m / Solid
Approach – Sion End: 122m / Solid Approach – CST End: 158 m
Hindmata Junction: Total Length: 480m / Viaduc span length and arrangement: 175m – 35m / Solid Approach – Sion End:
155m / Solid Approach – CST End: 150m
Bharatmata – Lalbaug Junction: Total Length: 2386m / Viaduc span length and arrangement: 2106m – 26m to 36m /
Solid Approach – Sion End: 142m / Solid Approach – CST End: 138m

All yovers are with 4 Lanes – divided carriageway separated by median verge with a total width of 17.20m with Box Girder
superstructure -segmentally constructed continuous span.

https://tpf.eu/projects/ambedkar-road-flyovers-ease-traffic-woes-in-mumbai/ 1/2
3/26/2019 Ambedkar Road Flyovers in Mumbai | TPF

CLIENT PROJECT DATES PROJECT


Mumbai Metropolitan 2010 – 2011
FIGURES
Region Development Project costs: INR 3770
Authority million