SW01,SW02 Hold for shoe allowable loads highlighted : SW01, SW03, SW04.
Hold
Para. Description of Hold
No.
1 Appendix 1 GH01,GH03, GH04, SW01, SW02,SW03 & SW04 all details. Specifically the
allowable loads for welded shoes are subject to review.
00102W-C-G0-G000-PE-SPC-0013 Page 3 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
CONTENTS
1. INTRODUCTION ................................................................................................................ 5
Appendices
APPENDIX 1 - STANDARD PIPE SUPPORTS
00102W-C-G0-G000-PE-SPC-0013 Page 4 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
1. INTRODUCTION
1.1 Purpose
The purpose of this specification is to aid in the selection of standard pipe supports, and is specific to
the detailed design scope of Rumaila Project, MWO only.
This specification shall be followed by all London based Pipe Support Engineers , Stress Engineers ,
Piping Engineers , Piping Designers and the Fabricator so that supports are selected consistently
over the project.
1.2 Scope
This specification covers all standard pipe supports to be used for Process and Utility Piping, and is
specific to the detailed design scope of Rumaila Project, MWO only. Exceptions are as stated below.
The following categories of supports are not included in the scope of this specification and are the
design responsibility of the FABRICATOR / SUPPLIER.
• Supports for Instrument control piping or tubing after the first piping block valve.
The following categories of supports are not included in the scope of this specification and are the
design responsibility of the Civil and Structural Group.
• Non standard structural support members and support for underground piping systems.
The following categories of supports are not included in the scope of this specification and are the
design responsibility of the Pipelines Group.
The FABRICATOR / SUPPLIER must take account of all design considerations set out within this
specification, the Piping Support Design Criteria 00102W-C-G0-G000-PE-CRT-0003 and Pipe
Fabrication and Installation Specification 00102W-C-G0-G000-PE-SPC-0002.
00102W-C-G0-G000-PE-SPC-0013 Page 5 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
CONTRACT - shall mean the formal agreement between CLIENT and CONTRACTOR.
CONTRACTOR - shall mean WorleyParsons, contracted to the COMPANY to carry out the agreed
WORK.
FABRICATOR - shall mean fabrication contractor and installation contractor, contracted to the
COMPANY to carry out the agreed WORK.
SUPPLIER – Party which manufactures or supplies equipment services to perform the duties
WORK - means all and any of the works and/or services specified in the CONTRACT.
SHOULD - indicate that a provision is not mandatory, but recommended as good practice.
2.2 Abbreviations
ANSI American National Standards Institute
BS British Standards
CS Carbon Steel
EN European Norm
00102W-C-G0-G000-PE-SPC-0013 Page 6 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
NB Nominal Bore
PS Pipe Support
TBC To be confirmed
00102W-C-G0-G000-PE-SPC-0013 Page 7 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
00102W-C-G0-G000-PE-SPC-0013 Page 8 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
EPP-0035 Checking
00102W-C-G0-G000-PE-SPC-0013 Page 9 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
3. GENERAL NOTES
1. All Dimensions and Elevations are to be in millimetres (mm), loads to be in Newtons (N)
or kiloNewtons (kN) unless noted otherwise.
2. All Welds to Pipe Support Frameworks to be 6mm fillet weld unless otherwise noted.
3. All weld sizes are specified using leg length dimensions unless noted otherwise.
4. For welded attachments to pipe work, maximum weld size must be the lesser of 0.7 x wall
thickness of pipe or 6mm continuous fillet weld.
5. All dissimilar welds to be carried out using appropriate electrodes and to ‘Company’
approved procedures.
6. All welded attachments to pipe work must be of same material as parent pipe unless
otherwise stated.
8. All weep holes to be 6mm Diameter and sealed with mastic after fabrication and testing.
10. All bolt holes in structural sections to be drilled to standard back marks and cross centres
unless otherwise noted on Pipe Support Detail. All bolt / U strap holes to be drilled on
site.
11. Field/Fabrication shop is to determine length of bolts; bolts shall protrude 3 mm outside of
nut.
12. All set screw, bolts, nuts, and locknuts to be Grade 8.8 to Document No. 0102W-C-G0-
G000-PE-CRT-0003 ref Appendix 1 and para 4.4
13. All threads shall be metric “right handed”, unless otherwise specified.
14. All washers to be normal Form E (Table 1) to BS 4320. Tapered washers to be supplied
where bolting to tapered flanged section are being used.
00102W-C-G0-G000-PE-SPC-0013 Page 10 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
15. All Bolts and set screws to be supplied c/w nut, locknut and 2 flat washers.
16. Hollow support sections shall be blanked off to prevent the ingress of moisture. Vent
holes provided for closed welded sections shall be plugged with mastic after fabrication.
17. Finishing / Painting of all catalogue items (including nuts, bolts and washers) shall be in
accordance with the ‘specification for protective paint and coatings ’ Document No.
00102W-C-G0-G000-ML-SPC-0007.
00102W-C-G0-G000-PE-SPC-0013 Page 11 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
BRANCH BRACING
BB06 1 20/04/12
1/1 Branch Bracing Block and Bleed Valves
BB07
BS02 1/3 Base Support Trunnion - Adjustable Base Plate for Elbow 1 20/04/12
BS02 3/3 Base Support Trunnion Adjustable Base Plate Dims 1 20/04/12
00102W-C-G0-G000-PE-SPC-0013 Page 12 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
PIPE CLAMPS
CL02 1/1 2 Bolt Pipe Clamp - Lined for Stainless Steel 1 20/04/12
FR02 1/1 Cantilever Bracket with Brace (up to 6" NB) 1 20/04/12
FR03 1/1 Cantilever Bracket with Brace (8" NB to 30" NB) 1 20/04/12
FR11 1/1 Inverted Half Goal Post (up to 6" NB) 1 20/04/12
FR12 1/1 Inverted Half Goal Post (8" NB to 30" NB) 1 20/04/12
00102W-C-G0-G000-PE-SPC-0013 Page 13 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
GUIDES
GH01 1/1 Guide - Hold Down for Pipe Shoes - up to 42" NB 1 20/04/12
GH04 1/1 Guide – Hold Down for Pipe Shoes - bolted 1 20/04/12
GUIDE STRAPS
U BOLTS 20/04/12
IS00 1/1 PTFE & Acoustic Slide Plate - Size Selection 1 20/04/12
00102W-C-G0-G000-PE-SPC-0013 Page 14 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
STOPS
LS01 1/2 Line Stop for Uninsulated LTCS Pipes - up to 20" NB 1 20/04/12
LS02 2/2 Line Stop for Pipe Shoes - 24" NB to 42" NB 1 20/04/12
MISCELLANEOUS ITEMS
PIPE RESTS
SC01 2/2 Clamped Shoe for LTCS Pipe 24" NB to 42" NB 1 20/04/12
SC01A 1/1 Single Clamp Shoe for LTCS Pipe up to 2" NB 1 20/04/12
SC02A 1/1 Single Clamp Shoe for Stainless Steel Pipe up to 2" NB 1 20/04/12
SC03 1/2 Clamped Shoe (Lined) for Duplex Pipe up to 20" NB 1 20/04/12
SC03 2/2 Clamped Shoe (Lined) for Duplex Pipe 24" NB to 42" NB 1 20/04/12
00102W-C-G0-G000-PE-SPC-0013 Page 15 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
SW01 2/3 Welded Shoe for LTCS Pipe 24" NB to 42" NB 1 20/04/12
SW01 3/3 Load Data for Shoe Type SW01 for LTCS Pipe 1 20/04/12
SW02 1/3 Welded Shoe with Re-Pad for LTCS Pipe up to 20" 1 20/04/12
Welded Shoe with Re-Pad for LTCS Pipe 24" NB to 42" 1 20/04/12
SW02 2/3
NB
SW02 3/3 Load Data for Shoe Type SW02 for LTCS Pipe 0 26/07/11
Welded Shoe for Duplex and Stainless Steel Pipe 24" NB 1 20/04/12
SW03 2/4
to 42" NB
SW03 3/4 Load Data for Shoe Type SW03 for LTCS 1 20/04/12
Load Data for Shoe Type SW03 for Duplex and Stainless 1 20/04/12
SW03 4/4
Steel Pipe
Welded Shoe with Repad for Duplex and Stainless Steel 1 20/04/12
SW04 1/4
up to 20"NB
Welded Shoe with Repad for Duplex and Stainless Steel 1 20/04/12
SW04 2/4
Pipe 24" NB to 42" NB
SW04 3/4 Load Data for Shoe Type SW04 for Duplex 1 20/04/12
SW04 4/4 Load Data for Shoe Type SW04 for Stainless Steel Pipe 1 20/04/12
00102W-C-G0-G000-PE-SPC-0013 Page 16 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
RE – PADS/ MISC
TRUNNIONS
STOPS
00102W-C-G0-G000-PE-SPC-0013 Page 17 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
00102W-C-G0-G000-PE-SPC-0013 Page 18 of 20
Rev 1 (20 April 2012) Rumaila Template R3
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
00102W-C-G0-G000-PE-SPC-0013 Page 19 of 20
Rev 1 (20 April 2012)
RUMAILA PROJECT
STANDARD PIPE SUPPORTS
MINIMUM WORK OBLIGATION
00102W-C-G0-G000-PE-SPC-0013 Page 20 of 20
Rev 1 (20 April 2012)