Sunteți pe pagina 1din 21

Flow no.

Flow Name Test Case Name Test No


BOM Creation & Routing Define Inside Processing
62 BOM-001
Creation, Rollup Cost Resource

BOM Creation & Routing Define Outside Processing


62 BOM-002
Creation, Rollup Cost Resource

BOM Creation & Routing


62 Define Costed Resource BOM-003
Creation, Rollup Cost

BOM Creation & Routing


62 Define Uncosted Resource BOM-004
Creation, Rollup Cost
BOM Creation & Routing Define Standard Operation
62 BOM-005
Creation, Rollup Cost (Inside Processing)

BOM Creation & Routing Define Standard Operation


62 BOM-006
Creation, Rollup Cost (Outside Processing)

BOM Creation & Routing Define Routings with


62 BOM-007
Creation, Rollup Cost Standard Operations

BOM Creation & Routing Define Routings with Outside


62 BOM-008
Creation, Rollup Cost Processing Operation

BOM Creation & Routing


62 Define Alternative sets BOM-009
Creation, Rollup Cost

BOM Creation & Routing Define Alternate Routings


62 BOM-010
Creation, Rollup Cost with Standard Operations

BOM Creation & Routing Query Resource Where


62 BOM-011
Creation, Rollup Cost Used

BOM Creation & Routing


62 Create Bills of Material BOM-012
Creation, Rollup Cost

Create Bills of Material with


BOM Creation & Routing
62 Component Supply type as BOM-013
Creation, Rollup Cost
Push

Create Bills of Material with


BOM Creation & Routing
62 Component Supply Sub BOM-014
Creation, Rollup Cost
Inventory and type as Pull

Create BOM with


BOM Creation & Routing
62 Components assigned to BOM-015
Creation, Rollup Cost
multiple operations

BOM Creation & Routing


62 Create an Alternate BOM BOM-016
Creation, Rollup Cost

BOM Creation & Routing


62 Rollup Cost BOM-017
Creation, Rollup Cost
BOM Creation & Routing
62 Cost Estimate BOM-018
Creation, Rollup Cost

Attach the Rolledup Material


BOM Creation & Routing And Resource Cost output to
62 BOM-019
Creation, Rollup Cost BOM and put the same in the
BOM DFF
Test Case Objective Navigation Path Input Data Description
Define Resource for Inside
BOM > Routing > Resource Type of resource, charge type
Operations

Type of resource, charge type,


Define Resource for Outside Outside Processing Item if you
BOM > Routing > Resource
Processing Operations are associating for PO
generation

Type of resource, charge type,


cost type & std cost if you want
Define the Costed Resource BOM > Routing > Resource
the resource to charge at
standard

Define Uncosted Resource BOM > Routing > Resource Type of resource, charge type

Define Inside Processing Standard Department, Resource used in


BOM > Routings > Standard Operations
Operation I.e Production Process the operation

Define Outside Processing Standard Department, Outside Resource


BOM > Routings > Standard Operations
Operation I.e Production Process used in the operation

Define Routings for Make Item for Item number standard


BOM > Routings > Routings
Manufacturing Inside operations to be used

Define Routings for Make Item for Item number, standard


BOM > Routings > Routings
Manufacturing Outside operations to be used

Define Alternates to Create Alternate


BOM > Setup > Alternates Alternatives, Descriptions
BOMs and Routings

Item number, standard


Define Alternate Routings with
BOM > Routings > Routings operations to be used and
Standard Opeartions
Alternate Name

Able to View the Resources Usage BOM > Routings > Resources Where Used Resource name

Assembly item number,


Define the Bills of Material BOM > Bills > Bills component item numbers,
component qty, subinventory

Assembly item number,


Define the Bills of Material BOM > Bills > Bills component item numbers,
component qty

Assembly item number,


Define the Bills of Material BOM > Bills > Bills component item numbers,
component qty, subinventory

Assembly item number,


Define the Bills of Material BOM > Bills > Bills component item numbers,
component qty, subinventory

Assembly item number,


Alternate Name,component item
Define Alternate Bills BOM > Bills > Bills
numbers, component qty,
subinventory

Assembly Item Number, Cost


Cost Rollup of Assembly BOM > Bills > Bills > Tools > Cost Rollup
Type
Assembly Item Number, Source
Rollup the Source Material and
BOM > Bills > Bills Material and Operations with
Resource Cost
Resources

Rollup the Source Material and


Assembly Item no, Material cost
Resource Cost and Attach the Output BOM > Bills > Bills
and Resource Cost
to BOM
Method To Validate Expected Result Actual Result
Query resource or run the Resource
Resource Defined
Report

Query resource or run the Resource


Outside Processing Resource defined
Report

Query resource or run the Resource


Costed Resource defined
Report

Query resource or run the Resource


Uncosted Resource Defined
Report
Query operation or run Standard Standard Operation defined with associated
Operation report department and resource

Query operation or run Standard Standard Operation defined with associated


Operation report department and resource

Routings with Inside Processing standard


Query routing or run Routing Report
operations defined

Routings with outside processing operation


Query routing or run Routing Report
defined

Query alternate names Alternatives are available

Query routing or run Routing Report Alternate routing with standard operation defined

Displays a list of what assemblies the resource is


Run Resource Where Used report
used in

Query BOM BOM Created for the Assembly

Query BOM BOM with component supply type as Push created

BOM with component supply Sub Inventory and


Query BOM
Pull Supply type created

BOM with Components assigned to Multiple


Query BOM
Operations created

Query Alternate BOM Alternate BOM Created

Query the Assemby Cost for the Same Cost Rollup Completed and Rolled up cost
Cost type in Item Cost Screen assigned to the Assembly
Query the Output of the Rollup cost Rollup cost Completed

Query the BOM and Sea the


Rollup Cost Attached
Attachment and Values in DFF
Executor Pass/Fail Remarks About the Transaction
Flow no. Flow Name Test Case Name Test No

Create Standard Discrete


63 Work Order Creation WIP-002
Job

Create Unreleased Standard


63 Work Order Creation WIP-003
Discrete Job

63 Work Order Creation Hold the Discrete Job WIP-004

Release Discrete Job


63 Work Order Creation WIP-005
through Discrete Job Form

Print Shop Documents


63 Work Order Creation Automatically when the Job WIP-006
is being Released

Modify Discrete Job by


63 Work Order Creation WIP-007
Changing Quantities/Dates
Modify Material
63 Work Order Creation Requirements on a Discrete WIP-008
Job

Modify Operations on a
63 Work Order Creation WIP-009
Discrete Job

63 Work Order Creation WIP-material issue WIP-010

WIP-material return (return


63 Work Order Creation WIP-011
part of the quantity issued)

Verify Material Backflush of


63 Work Order Creation WIP-012
Pull Components

Work Order Creation


63 Create OSP Discrete jobs WIP-013
-Outside Processing
Perform Move Transactions
63 Work Order Creation Between Sequences or WIP-014
Steps

Scrap and Process Assembly


63 Work Order Creation WIP-015
Through a Routing Move

Complete a Discrete Job


63 Work Order Creation WIP-016
Through Completions Form

63 Work Order Creation Attach a Document WIP-020

63 Work Order Creation Close Discrete Job WIP-021


View the Source and
63 Work Order Creation Destination Material Cost in WIP-022
WIP Screens

Create Work Order for


63 Work Order Creation Destination Item Not Having WIP-023
BOM & Routing

WIP Quantity Round up in


63 Work Order Creation WIP-024
WIP Transactions
Test Case Objective Navigation Path Input Data Description

Create Discrete Job for Making


WIP > Discrete > Discrete Jobs Item number, quantity
Assembly

Create Discrete Job for Making


Assembly but not Released to WIP > Discrete > Discrete Jobs Item number, quantity
Production

Apply Hold Status to Discrete Job WIP > Discrete > Discrete Jobs Job number

Release the Job to Production WIP > Discrete > Discrete Jobs Job number

Shop Documents has to be Printed WIP > Discrete > Discrete Jobs Job number

Make Changes in Created Discrete


WIP > Discrete > Discrete Jobs Job number
Job
Change Source Material or
WIP > Discrete > Job/Schedule Details > Job number, item number of
Quantities of Source Material on
Material Requirements component being changed
Discete Job

Change Operations or Modify the


WIP > Discrete > Job/Schedule Details >
Operation Requirements on Discrete Job number, operation
Operations
jobs

Issuing Source Components to WIP > Material Transactions > WIP Material Job number, subinventory, item
Discrete Jobs Transactions number, quantity

Return excess material from Discrete WIP > Material Transactions > WIP Material Job number, item number of
job Transactions component being returned

Issuing all Pull supply Components to WIP > Move Transactions > Move Job number, sequence number,
Discrete job Transaction step, quantity

Create Outside Processing Jobs WIP > Discrete > Discrete Jobs Item number, quantity

Move the Items through Operation WIP > Move Transactions > Move Job number, sequence number,
steps Transaction step, quantity

Job number, sequence number,


Move the quantities through WIP > Move Transactions > Move
step, quantity, account alias or
intraoperation steps Transaction
account number

Comple the job through Completion WIP > Material Transaction > Completion Assembly item number,
screen Transaction component qty

Attach documents or files to Discrete


WIP >Discrete > Discrete Jobs Job Number
jobs

Discrete > Close Discrete Jobs > Close


Close the Discrete jobs Job Number
Discrete Jobs (Form)
View the Material Cost Job Number

WIP > Discrete > Discrete Jobs Destination Item

WIP > Discrete > Discrete Jobs >


View the Matreial Consumed Job No
Components
Method To Validate Expected Result Actual Result

View Discrete Jobs or run Discrete Job


Standard discrete job was created
Value report

View Discrete Jobs or run Discrete Job


Standard discrete job with Unreleased Status was
Value report or Should not appear in
created
Move Transactions

Should not Appear in Move &


Hold Applied to the Dicsrete Job
Completion Transactions

View Discrete Jobs or run Discrete Job


Value report or Should appear in Discrete job Created with Released Status
Move & Completion Transactions

Report Shop Document has to be fired


Shop Document Printed
once the Job is released

View Discrete Jobs or run Discrete Job


Verify the Job Quantities/Dates have changed
Value report

View Discrete Jobs or run Discrete Job


Verify material requirements were changed
Value report

View Discrete Jobs or run Discrete Job


Verify operations were changed
Value report

View Discrete job/Material


Verify material was transacted from inventory
requirements screen

View Discrete job/Material


Verify material was transacted back into inventory
requirements screen

View Discrete job/Material


Material was issued to a job
requirements screen

Requisition Import needs to be run in


OSP requisition was created
Purchasing
Verify that move transactions which complete an
View Move Transactions/Discrete jobs operation result in the backflush of all operation
pull components.

The operation shows a quantity in the SCRAP


View Move Transactions/Discrete jobs
operation step

Verify that the Completions form allows you to


Query the Discrete job Status
complete the quantities moved to completion.

View Discrete Jobs Document is attached

View Discrete Jobs Job closed successfully


Cost to be Shown in WIP Screens Material Cost Defaulted

Component Issued qty should be rounded to


Issued Qty should not be in decimals
nearest integer upwards
Executor Pass/Fail Remarks About the Transaction
Flow no. Flow Name Test Case Name Test No
Material Transfers - Sub-Inventory, Misc Receipts,
Define Subinventories in new
73 Misc Issues, Component Issue to Job, Move INV-001
Inventory Organization
Orders

Material Transfers - Sub-Inventory, Misc Receipts,


73 Misc Issues, Component Issue to Job, Move Setup Shipping Network INV-002
Orders

Material Transfers - Sub-Inventory, Misc Receipts,


73 Misc Issues, Component Issue to Job, Move Sub Inventory Transfers INV-003
Orders

Material Transfers - Sub-Inventory, Misc Receipts,


73 Misc Issues, Component Issue to Job, Move Create Move Orders INV-004
Orders

Material Transfers - Sub-Inventory, Misc Receipts,


73 Misc Issues, Component Issue to Job, Move Move Order Transfers INV-005
Orders

Standard Item Creation with


59 Item creation INV-009
Approval

Standard Item Creation with


59 Item creation INV-010
Approval

59 Item creation Non Standard Item Creation INV-011

60 Item Cost Update Item Standard Cost Update INV-012

60 Item Cost Update Cost Mass Updation INV-013

75 Cycle Count INV-014


76 Physical Inventory INV-015
76 Physical Inventory INV-016

76 Physical Inventory INV-017

77 Reorder Point Planning Define the Forecast Rule INV-018

Define The Forecast Set and


77 Reorder Point Planning INV-019
Forecast

Enter the Forecasted qty of


77 Reorder Point Planning INV-020
Items Manually
Generate the Forecast
quantities of different Class
77 Reorder Point Planning INV-021
of items Based on the History
and Forecast Rule

Define the Item Safety


77 Reorder Point Planning INV-022
Stocks

Load the Safety Stocks


77 Reorder Point Planning based on Satistical Method INV-023
with Service Level

77 Reorder Point Planning Run the ROP Plan INV-024

Updation of Item Status based on the Transaction Run GEINV Update Master
Customization INV-025
history Item Status Program
Updation of Item Vitality Code based on the Run GEINV Update Vitality
Customization INV-026
Transaction history Code Program
Updation of Item Class based on Sales Transaction
Customization
History
Test Case Objective Navigation Path Input Data Description
Name, description, parameters,
INV > Setup > Organizations > Sub
Define Sub Inventories locator control, valuation
Inventories
accounts

From\To Organizations, Transfer


Setup the Shipping networks INV >Setup > Organizations > Shipping
Type, FOB, Receipt Routing,
between the Orgnization Network
Inter-Org Accounts

Material to be Transferred between Inv > Transactions > Sub Inventory Item number, Source Sub Inv
Sub inventories in the Same Org transfers and Destination Sub Inv and Qty

Create Move Orders to Transfer Item number, Source Sub Inv


Inv > Transactions > Move Orders
Material between Sub Inventories and Destination Sub Inv and Qty

Transfer Material through Move


Inv > Transactions > Transact Move Orders Move Order No
Orders

Requestor will send the Stnd Item


Creation request Mail to be sent to
Inventory Type, template, Cost
Approver and Approver will approver Inv >Item Entry Screen
and All attributes
the same then Item sould be Created
and Mail to be sent to Requestor

Requestor will send the Stnd Item


Creation request Mail to be sent to
Approver and Approver will Reject
Inv >Item Entry Screen
the same then Item sould not be
Created and Mail to be sent to
Requestor

Inventory Type, template, Cost


Non Standard Items Creation on Fly Inv >Item Entry Screen
and All attributes
Item Standard Cost Upadtion Inv > Cost > Cost Update Item Number
Mass Cost Updation. I.e Cost
updation for Many items in Either Inv > Cost > Mass Cost Updation
Region or National level

Define Forecast Rule with Alpha


Inv > Setup > Rules > Forecast Rule Name and Alpha Value
Smoothing Factor
Define the Forecast Set and Forecast
Inv > Planning > Forecast > Sets Set Name and Forecast Name
for Each Item Class

Forecasted Qty to be Entered in the Set Name and Forecast Name,


Inv > Planning > Forecast > Sets
Forecast Item numbers and Qty
Generate the Item Forecasts based Forecast Name, Rule and Item
Inv > Planning > Forecast > Generate
on Historical Shipments Class Category

Define the Item Safety Stocks


Inv > Planning > Safety Stock Item Number and Qty
Manually

Define the Item Safety Stocks


Item Class Categoty and
Automatically through Satistical Inv > Planning > Reload Safety Stocks
Service level
Method

Run the Reorder Point Planning for Forecast Name and Item Class
Inv > Planning > ROP
Item Class Category Category
Method To Validate Expected Result Actual Result
Subinventories defined and usable for new
Query subinventory
organization

Shipping Network usable for Inter-Org Transfers,


Query Shipping Network
Internal Orders and Supply Chain Planning

Query the Material Transactons or


Material Transferred
Onhand qty

Query the Move Order Move Order Created

Query the Material Transactons or


Material Transferred
Onhand qty

Query Item and verify the Attributes Item Created with required attributes

Query Item and verify the Attributes Item Created with required attributes

Query the Cost Item Cost Updated

Query the Cost Item Cost Updated

Query the Rule Forecast Rule Defined

Query Sets and Forecasts Forecast Set and Forecast defined

Query the Qty in the Forecast Forecasted Qty entered in the Forecast
Query the Qty in the Forecast Forecasts are Generated

Query the Safety Stocks Safety Stocks Define for Items

Query the Safety Stocks Safety Stocks Reloaded

View the Output of ROP


Executor Pass/Fail Remarks About the Transaction

S-ar putea să vă placă și