CENTRIFUGAL PUMP HORIZONTAL

ITR No
Item/Tag No. System No.

Item/Tag Description Sub System No.


Sub System Description
Location Print Date

INFORMATION
Ref Drawing KW/HP
Equipment Type RPM
Serial No.
Manufacturer

No. Items to be Checked OK N/A Punch List no.

Verify that all construction / installation activities have been


1
completed.
Baseplate is design with grouting ensure the grout hole is covered
2
to avoid water accumulation.
Name plate/tag details correct & in accordance with design data
3 sheet. Manufacturers test certificates & FAT documentation
available.
Base frame, drip pan, holding down bolts, shims, washers
4
correctly installed in correct location as per design specification.
Check lubrication system. Ensure correct quantity & grade of
5
lubricant is installed. Note in comments section.
6 Pump case vent & drains are clear & unobstructed as per design.
7 Confirm pump free to rotate/move.
Verify the pre-alignment checks for: coupling / pulley / belts are
8
correct.
9 Confirm that pre-Coupling Alignment is complete (If applicable).
Pump and driver sit solidly on all mounting (soft foot check
10
carried out).
Confirm all associated pipe work including flexible pipe are
11
connected correctly, aligned & are damaged free.
12 Verify that all electrical/instrument signal are completed.
Pumps installed correctly as per design with no misalignment of
12 coupling / pipe / pump case flanges, no imposed load on pump
casing.
Mechanical seal system installed in accordance with design.
13
Record and specify the level/pressure of the mechanical seal pot.
14 Verify earthing boss connection.
15 Record preservation measures taken in preservation log.
16 Verify that an adequate lifting arrangement with the correct SWL

Page 1 of 2
for equipment and access is available for the removal/re-
installation of the pump.
Coupling / pulley guard installed correctly & ensure that
17
coupling / pulley / belts are free without any rubbing.
As-if instructed by commissioning whether it is require the
18 suction strainer off pump skid. If so, ensure that it is fitted
correctly and to specification.
If the pump is fitted with a pressurised cooling or lubrication
19
ensure that it is charged to the vendor’s recommended pressure.
If Pulsation damper is fitted to suction line record vendor’s
20
recommended pre-charge pressure here: ………………………Bar
Confirm that Pulsation damper (suction) has been pre-charged to
21
the vendor’s recommended pre-charge.
If Pulsation damper is fitted to discharge line record vendor’s
22
recommended pre-charge pressure here: ………………………Bar
Confirm that Pulsation damper (discharge) has been pre-charged
23
to the vendor’s recommended pre-charge.
Equipment release note signed and punch list agreed, cleared or
24
recorded.
COMMENT(S) / ADDITIONAL INFORMATION:

CONTRACTOR PMT/OWNER
Designation
Company
Name
Signature
Date

Page 2 of 2