POWER GRID OF
HPSEBL (66kV & Above)
1
INDEX
S.No. Description Page No. S.No. Description Page No.
1 List of Sub-Stations 2 6 Ghanvi 51
2 Detail/Status of Capacitor Banks Installed 5 7 Golthai 52
3 Network Diagram 6 8 Gumma 53
4 EHV Lines Detail 7 9 Khotkhai(Hulli) 54
5 Single Line Diagrams 10 Kumarsain 55
I 220kV Sub-Stations 8 11 Nalagarh 56
1 Baddi 9 12 Nathpa 57
2 Bhabha 10 13 Nogli 58
3 Giri 11 14 Parwanoo 59
4 Hamirpur-II 12 15 Sainj 60
5 Jassore 13 16 Sansarpur Terrace 61
6 Jeori(Kotla) 14 17 Smoli(Rohru) 62
7 Kangoo 15 18 Totu 63
8 Kunihar 16 6 Fibre Optic Details
9 Mandhala 17 I Proposed OFC Routing Diagram 64
10 Uperla Nangal 18 II Detail of OPGW Network 65
II 132kV Sub-Stations 19 III OLTE Detail 66
1 Amb 20 7 PLCC Details
2 Bagga 21 I PLCC Network Diagram 67
3 Bajaura 22 II PLCC Link/Channel Detail-48V 68
4 Barotiwala 23 III Exchange Detail 70
5 Bassi 24 IV SLDC Shimla MDF Detail 72
6 Bathri 25
7 Darlaghat 26
8 Dehan(Palampur) 27
9 Dehra 28
10 Gagret 29
11 Gaura 30
12 Gondpur(PoantaSahib) 31
13 Hamirpur-I 32
14 Jahoo 33
15 Jutogh 34
16 Kala-Amb 35
17 Kandrori 36
18 Kangra 37
19 Kurthala 38
20 Larji 39
21 Malana 40
22 Mandi 41
23 Rakkar(Una) 42
24 Solan 43
25 Tahliwala 44
III 66kV Sub-Stations 45
1 Akhanwali 46
2 Andhra 47
3 Anni 48
4 Batoli-Kalan 49
5 Davni 50
2
132/33 kV, 1x16 MVA M/c: 4x16.667 MW ON LTC 17 8 Motorola RTU as gateway for IEC-104
Non-
Boost:98A Boost:13A Motorola ACE Bassi to Hamirpur-II on PLCC and to IEC-101 conversion intalled at Bassi
5 Bassi 13.09.1970 200Ah Function OK 400Ah OK OK
Float:49A Float:13A 3600 Hamirpur-II to Jutogh through OFC and interfaced with SAS of Andritz
33/11 kV, 2x2.5 MVA GT:11/132, 4x20.4/22.5 MVA ON LTC 5 2 al
Hydro at Bassi
12.13% normal tap
132/33kV, 2x25/31.5MVA
12.07% normal tap
6 Bathri 12.05.1987
Tap-1-6.81 %; Tap-5 (N)-6.25 %; Tap 17-6.06 %
33/11kV, 2x1.6MVA
Boost:50A Boost:50A Motorola ACE Darlaghat to Kunihar on PLCC and IEC-104 port can be
7 Darlaghat 132/11 kV, 7.5 MVA ON LTC 17 7 23.06.2006 200Ah OK OK 100Ah OK Ageing
Float:50A Float:50A 3600 Kunihar to Jutogh through OFC configured in future
Tap-1-13.28 %; Tap-5 (N)-12.85 %; Tap 17-11.93 % ON LTC 17 5
132/33KV, 2x25/31.5 MVA Palampur to Bassi on PLCC, Hamirpur-I
Tap-1-13.02 %; Tap-5 (N)-12.65 %; Tap 17-11.77 % ON LTC 17 5 Boost:2x40A
8 Dehan, Palampur 19.12.1997 400Ah OK OK 100Ah OK OK Alstom S-900 to Hamirpur-II on PLCC and Hamirpur-II
7.37% ON LTC 17 7 Float:2x40A
33/11KV, 2x4 MVA to Jutogh through OFC
7.59% ON LTC 17 7
132/33kV, 2x16/20MVA 10.68% ON LTC 17 5 Boost:30A Boost:60A Dehra to Hamirpur-II on PLCC and
9 Dehra 21.12.1993 200Ah OK OK 400Ah OK OK Alstom S-900
33/11kV, 2x4MVA 7.28% Off LTC 5 2 Float:20A Float:40A Hamirpur-II to Jutogh through OFC
132/33kV, 25/31.5MVA Tap-1-13.13 %; Tap-5 (N)-12.78 %; Tap 17-11.85 % ON LTC 17 5 Boost:60A Boost:60A
10 Gagret Dez.09 400Ah OK OK 400Ah OK OK
132/11kV, 25/31.5 MVA Tap-1-13.26 %; Tap-5 (N)-12.42 %; Tap 17-10.26 % ON LTC 17 5 Float:40A Float:40A
Tap-1-10.09 %; Tap-5 (N)-9.76 %; Tap 17-9.06 %
132/33kV, 16MVA(1-p) Tap-1-10.16 %; Tap-5 (N)-9.86 %; Tap 17-9.18 % Float cum Float cum
11 Gaura ON LTC 17 5 09.09.2014 200Ah OK OK 400Ah OK OK
+1 as Stand-By 1-phase Tap-1-10.17 %; Tap-5 (N)-9.85 %; Tap 17-9.13 % Boost: 30A Boost: 60A
Tap-1-10.15 %; Tap-5 (N)-9.84 %; Tap 17-9.12 % 1-Ø BANK
Tap-1-13.17 %; Tap-5 (N)-12.84 %; Tap 11.92 % ON LTC 17 5
Gondpur 132/33 kV, 2x25/31.5 MVA Boost:2x40A Boost:2x40A Non
12 Tap-1-12.44 %; Tap-5 (N)-12.27 %; Tap 11.76 % ON LTC 17 5 21.10.2007 200Ah OK OK 200Ah OK
(Paonta Sahib) Float:2x20A Float:2x20A Functional
132/11 kV,1x25/31.5 MVA Tap-1-12.51 %; Tap-5 (N)-12.13 %; Tap 11.77 % ON LTC 17 5
Tap-1-12.44 %; Tap-5 (N)-12.20 %; Tap 17-11.76 % ON LTC 17 5
132/33KV, 2x25/31.5MVA 3-phase
Tap-1-12.41 %; Tap-5 (N)-12.33 %; Tap 17-11.76 % ON LTC 17 5 Boost:2x40A Boost:2x60A Hamirpur-I to Hamirpur-II on PLCC and
13 Hamirpur-I (Anu) 1979 200Ah OK OK 400Ah OK OK Alstom S-900
7.37% ON LTC 17 5 Float:2x40A Float:2x60A Hamirpur-II to Jutogh through OFC
33/11KV, 2x5 MVA
7.42% ON LTC 17 5
14 Jahoo 132/33 kV, 1x25/31.5 MVA ON LTC 17
132/66 KV 50/63 MVA TFR No. 01(1-p) Tap-1-9.972 %; Tap-5 (N)-9.794 %; Tap 9.547 % ON LTC 17 5
132/66 KV 25/31.5MVA TFR No. 02(3-p) Tap-1-12.49 %; Tap-5 (N)-12.23 %; Tap 11.94 % ON LTC 17 5 1-Ø BANK
Boost:50A Jutogh to CFE Modem through Twisted
15 Jutogh 132/33 KV 31.5MVA TFR No. 01(1-p) Tap-1-9.81 %; Tap-5 (N)-10.079 %; Tap 11.45 % ON LTC 17 5 17.05.1981 200Ah OK OK Being fed from SLDC System Alstom S-900 1-Ø BANK
Float:30A Pair Cable
132/33 KV 31.5MVA TFR No. 02(3-p) Tap-1-10.67 %; Tap-5 (N)-10.43 %; Tap 9.49 % ON LTC 17 5
66/33 KV 20 MVA TFR No. 01 Tap-1-10.25 %; Tap-5 (N)-10.80 %; Tap 9.45 % ON LTC 17 5
Tap-1-12.41 %; Tap-5 (N)-12.349 %; Tap 11.765 % ON LTC 17 5
132/33 kV, 3x25/31.5 MVA Tap-1-12.41 %; Tap-5 (N)-12.349 %; Tap 11.765 % ON LTC 17 5 Boost:2x30A Boost:2x30A Motorola ACE Kala Amb to Jutogh on GPRS and IEC-
16 Kala-Amb 30.11.2006 200Ah OK OK 200Ah OK OK
Tap-1-12.41 %; Tap-5 (N)-12.122 %; Tap 11.765 % ON LTC 17 5 Float:2x20A Float:2x20A 3600 101 converter installed at Jutogh
132/11 kV, 1x25/31.5 MVA Tap-1-12.70 %; Tap-5 (N)-12.33 %; Tap 11.43 % ON LTC 17 5
Tap-Min-10.45 %; Tap- (N)-10.27 %; Tap Max-9.55 % ON LTC 17
132/33kV, 3x16MVA Tap-Min-10.45 %; Tap- (N)-10.22 %; Tap Max-9.46 % ON LTC 17
17 Kandrori Tap-Min-10.36 %; Tap- (N)-10.18 %; Tap Max-9.45 % ON LTC 17 28.08.1996 200Ah OK 200Ah OK
7.15 Normal tap ON LTC 17
33/11kV , 2x6.3MVA
Tap-Min-7.79 %; Tap-(N)-7.15 %; Tap Max-6.94 % ON LTC 17
Tap-1-12.56 %; Tap-5 (N)-12.00 %; Tap 17-11.60 % ON LTC 17 5
132/33kV, 2x25/31.5MVA
Tap-1-12.32 %; Tap-5 (N)-12.13 %; Tap 17-11.76 % ON LTC 17 5 Kangra to Hamirpur-II on PLCC and
18 Kangra Feb.78 200Ah OK OK 400Ah OK OK Alstom S-900
ON LTC 17 Hamirpur-II to Jutogh through OFC
33/11kV, 2x10MVA Tap-Min-9.60 %; Tap- (N)-8.35 %; Tap Max-7.95 %
ON LTC 17
19 Kurthala 33/132 kV, 1x50/63 MVA ON LTC 17 30.08.2014 400Ah OK 400Ah OK
M/c: 3x42 MW ON LTC 17 Motorola ACE Larji to Kangoo on PLCC and Kangoo to Provisions already made for IEC-104
20 Larji 132/11 kV, 1x6.3 MVA 28.09.2006
GT:11/132 kV, 3x52 MVA ON LTC 17 3600 Jutogh through OFC communication
Boost:30A Malana to Kangoo on PLCC and Kangoo
21 Malana 33/132kV, 25/31.5MVA Tap-1-13.01 %; Tap-5 (N)-12.66 %; Tap 17-11.75 % ON LTC 17 5 11.08.2009 200Ah OK OK N.A. Alstom S-900
Float:20A to Jutogh through OFC
132/33kV, 16/20MVA Tap-1-9.936 %; Tap-5 (N)-9.842 %; Tap 17-9.148 % ON LTC 17 5
132/33kV, 25/31.5MVA Tap-1-13.03 %; Tap-5 (N)-12.67 %; Tap 17-11.73 % ON LTC 17 5
Boost:30A Boost:60A Mandi to Kangoo on PLCC and Kangoo
22 Mandi (Bijni) 66/33kV, 1x20MVA Tap-1-1017 %; Tap-5 (N)-9.93 %; Tap 17-9.33 % ON LTC 17 5 26.10.1979 200Ah OK OK 400Ah OK OK Alstom S-900
Float:20A Float:40A to Jutogh through OFC
6.25% Off LTC 5 2
33/11 kV, 2x3.15 MVA
Off LTC 5 2
Tap-1-12.32 %; Tap-5 (N)-12.13 %; Tap 17-11.77 %
132/33kV, 2x25/31.5MVA ON LTC 17 5
12.28%
30V DC
8.50% Boost:60A Boost:60A
23 Rakkar (Una) 66/33kV, 2x10MVA Off LTC 5 2 30.12.1985 200Ah OK OK 400Ah OK OK System
Float:40A Float:40A
also in use
66/11kV, 1x20MVA Tap-1-10.25 %; Tap-5 (N)-9.93 %; Tap 17-9.18 % Off LTC 5 2
33/11kV, 2x6.3MVA Tap-Lowest-7.79 %; Tap-(N)-7.15 %; Tap Highest-6.94 % Off LTC 5 2
132/66 KV, 1x25/31.5 MVA Tap-1-12.32 %; Tap-5 (N)-12.20 %; Tap 11.69 % ON LTC 17 5
Tap-1-12.534 %; Tap-5 (N)-12.174 %; Tap 11.088 % ON LTC 17 5
Solan to Kunihar on PLCC and Kunihar
24 Solan 132/33 KV, 1x50MVA(1-p) Tap-1-12.192 %; Tap-5 (N)-12.046 %; Tap 11.914 % ON LTC 17 5 31.08.1993 Alstom S-900
to Jutogh through OFC
+1 as Stand-by Tap-1-12.406 %; Tap-5 (N)-12.050 %; Tap 11.054 % ON LTC 17 5
Tap-1-12.471 %; Tap-5 (N)-12.124 %; Tap 11.101 % ON LTC 17 5
9 Khotkhai (Hulli) 66/22 kV, 2x10 MVA ON LTC 17 7 22.12.2008 200Ah OK 40A OK N.A.
66/22 kV, 1x10 MVA T1-8.05%; T5-8.35%; T17-8.00% ON LTC 17 5 Boost:30A Boost:30A
10 Kumarsain Jul.84 200Ah OK OK 200Ah OK OK
66/22 kV, 1x6.3 MVA T1-8.35%; T5-8.50%; T17-8.82% ON LTC 17 5 Float:20A Float:20A
66/11 KV 20MVA TFR No. 01 T1-10.39%; T5-9.93%; T17-9.36% ON LTC 17 5
66/11 KV 20MVA TFR No. 02 T1-10.39%; T5-9.93%; T17-9.36% ON LTC 17 5
66/33 KV 20MVA TFR No. 03 T1-10.24%; T5-9.84%; T17-9.18% ON LTC 17 5 Boost:50A Boost:30A
11 Nalagarh 26.12.2005 200Ah OK OK 400Ah OK OK
66/33 KV 20MVA TFR No. 04 T1-10.25%; T5-9.85%; T17-9.09% ON LTC 17 5 Float:50A Float:30A
66/33 KV 10MVA TFR No. 05 8.50% ON LTC 17 5
33/11 kV, 1x3.15 MVA
66/22 kV, 1x10 MVA TFR No. 01 T1-8.11%; T5-8.36%; T17-9.41% Off LTC 17 5
12 Nathpa 31.01.2009 200Ah OK 20A OK 200Ah OK 16A OK
66/22 kV, 1x20 MVA TFR No. 02 T1-10.2%; T5-9.88%; T17-9.24% ON LTC 17 5
66/22 kV, 1x10 MVA M/c: 2x 250 kW+4x500 kW ON LTC 17
13 Nogli GT:0.4/22 kV, 2x300 kVA ON LTC 17 Dez.63
GT: 0.4/22 kV, 2x1250 kVA ON LTC 17
Non-
66/11kV, 1x20MVA, TR-1 Tap-1-10.13 %; Tap-5 (N)-9.955 %; Tap 17-9.147 % ON LTC 17 5 Boost:30A Boost:30A Non-
14 Parwanoo 02.11.2001 200Ah OK OK 200Ah Functiona
66/11kV, 1x20MVA, TR-2 Tap-1-10.390 %; Tap-5 (N)-10.111 %; Tap 17-9.366 % ON LTC 17 5 Float:20A Float:20A Functional
l
66/11 kV, 2x6.3 MVA ON LTC 17 8 Boost:40A
15 Sainj 21.11.2007 200Ah OK OK N.A.
66/22 kV, 1x6.3 MVA ON LTC 17 8 Float:24A
7.73% Off LTC 5 2 Boost:30A Boost:30A
16 Sansarpur Terrace 66/11kV, 2x10MVA 08.10.1990 200Ah OK OK 200Ah OK OK
7.87% Off LTC 5 2 Float:20A Float:20A
66/22 kV, 1x10 MVA T1-8.37%; T5-8.33%; T17-7.04% ON LTC 17 5 Boost:30A Boost:15A
17 Smoli (Rohru) 17.12.2008 200Ah OK OK 200Ah OK OK
66/22 kV, 1x16 MVA (1-p) 10.15% ON LTC 17 5 Float:20A Float:10A
66/11 kV, 20 MVA ON LTC 17 5 Boost:60A
18 Totu 16.07.1995 200Ah OK OK N.A.
66/11 kV, 3x6.3MVA(to be dismantled) Off LTC 5 2 Float:40A
ABSTRACT
S.No. Voltage level No. of Sub-Station/Power Houses
1 220 kV 10
2 132 kV 25
3 66 kV 18
Total (66 & above) 53
6.6 E16
C42 C13
6.6 kV Visco D44
Andhra-2 C17 GIRI
kV KANGRA(PSEB) C19 NOGLI
Line Length Line Length Line Length Line Length Line Length Line Length 220 kV SUB-STNS./POWER HOUSES 9. Mandhala 9. Dehra 20. Larji 7. Golthai
220/66kV, 1x100 MVA 132/33 kV, 2x16/20 MVA 132/11 kV, 1x6.3 MVA 66/11 kV,1x6.3 MVA
code km. code km. code km. code km. code km. code km. 1.Baddi
33/11 kV,2x4 MVA M/c: 3x42 MW
220/66 kV,3x80/100 MVA 66/11kV, 4x20 MVA 8. Gumma
E1 57.00 D1 024.234 D22 002.90 D42 31.960 C1 35.00 C22 01.545 10. Gagret GT:11/132 kV, 3x52 MVA
220/33 kV, 1x25/31.5 MVA 66/22 kV,2x6.3 MVA,1x10 MVA
E2 040.00 D2 038.390 D23 016.205 D43 16.390 C2 03.820 C23 016.739 66/33 kV,1x20 MVA 10.Uparla Nangal(Nalagarh) 132/33 kV, 1x25/31.5 MVA 21.Malana 33/132 kV, 1x25/31.5 MVA
132/11 kV, 1x25/31.5 MVA 9.Khotkhai(Hulli)
E3 025.602 D3 060.639 D23A 013.563 D44 017.60 C3 14.507 C24 40.304 66/11 kV, 4x20 MVA 220/66 kV, 2x100 MVA 22. Mandi (Bijni) 66/22 kV, 2x10 MVA
2. Bhaba 220/33 kV, 1x25/31.5 MVA 11.Gaura 132/33 kV, 1x16 MVA,1x25/31.5 MVA
E4 9.50 D4 060.639 D24 046.00 D45 031.330 C4 0.425 C25 006.40 10. Kumarsain
9.50 D5 C26
220/11 kV,1x10 MVA Mc:3x40 MW 132kV SUB-STNS/POWER HOUSES 132/33 kV,1x16 MVA(1-Ø) 66/33 kV,1x20 MVA 66/22 kV, 1x6.3MVA,1x10MVA
E5 027.492 D25 047.039 D46 055.83 C5 1.740 15.980 GT:11/220 kV,3x50MVA 33/11 kV, 2x3.15 MVA
1. Amb 12.Gondpur(Poanta) 11. Nalagarh
E6 03.177 D6 027.492 D26 022.301 D47 055.83 C6 017.210 C27 10.172 3. Girinagar 132/33 kV, 2x25/31.5 MVA 23. Una (Rakkar)
132/33 kV, 1x25/31.5 MVA 66/33 kV, 2x20 MVA,10 MVA
220/132 kV, 2x80/100 MVA 132/33 kV, 1x16 MVA 132/11 kV,1x25/31.5 MVA 132/33 kV, 2x25/31.5 MVA 66/11 kV,2x20 MVA
E7 130.90 D7 043.123 D27 022.00 D48 7.80 C7 03.256 C28 21.029 66/33 kV, 2x10 MVA
132/33 kV, 1x25/31.5 MVA 33/11 kV,2x5 MVA 13. Hamirpur-I (Anu) 33/11 kV, 1x3.15 MVA
E8 D8 043.123 D28 020.00 D49 1.918 C8 008.230 C29 009.992 132/33 kV, 1x16/20 MVA 66/11 kV, 1x20 MVA
024.70 132/33 kV, 2x25/31.5 MVA
M/c: 2x30 MW 2.Bagga Interlinking S/Stn 33/11 kV, 2x6.3 MVA 12. Nathpa
E9 106.72 D9 029.935 D29 015.34 D50 0.080 C9 018.50 C30 02.40 33/11 kV,2x5 MVA
GT:11/132 kV, 2x40 MVA 24. Solan 66/22kV,1x10MVA,1x20MVA
3. Bajaura
E10 67.5 D10 00.135 D30 016.00 D51 0.043 C10 025.27 C31 3.510 132/33 kV, 2x25/31.5 MVA 14. Jutogh 132/66 kV,1x25/31.5 MVA 13. Nogli
4. Hamirpur-II (Mattansidh) 132/66kV,25/31.5MVA,50/63MVA 132/33 kV,1x50 MVA 66/22 kV, 1x10 MVA
E11 031.091 D11 005.25 D31 026.03 D52 16.94 C11 01.555 C32 3.510 220/132 kV, 3x80/100 MVA 4. Barotiwala 132/33kV,31.5MVA,25/31.5MVA M/c: 2x250kW + 4x500kW
E12 042.764 D12 005.25 D32 026.03 D53 35.699 C12 015.49 C33 33/11kV, 2x3.15 MVA 132/66 kV, 3x25/31.5 MVA 66/33kV,1x20MVA 25.Tahliwala132/33 kV,2x25/31.5MVA
02.00 GT:0.4/22 kV, 2x300 kVA
132/11 kV,1x16 MVA 66 kV SUB-STNS./POWER HOUSES GT: 0.4/22 kV, 2x1250 kVA
E13 035.06 D13 049.75 D33 063.99 D54 35.699 C13 007.30 C34 1.813 5.Jassore 132/11 kV, 3x25/31.5 MVA 15. Jahoo
220/132 kV,1x150MVA,1x50/63MVA 132/33 kV,1x25/31.5 MVA 1. Akanwali
E14 035.06 D14 032.00 D34 20.662 D55 16.949 C14 017.3 C35 014.507 220/33 kV, 2x25/31.5 MVA 5. Bassi 66/33 kV, 2x20 MVA 14. Parwanoo
D56 45.510 132/33 kV, 1x16 MVA 66/11 kV,1x20 MVA 66/11 kV, 2x20 MVA
E15 024.115 D15 004.95 D35 060.70 C15 025.694 C36 019.995 16. Kala-Amb
6.Jeori (Kotla) 33/11 kV,2x2.5 MVA 132/33 kV, 3x25/31.5 MVA 2. Andhraa
E16 002.65 D16 004.95 D36 073.199 D57 45.510 C16 34.408 C37 002.11 220/66 kV, 1x100 MVA(1-Ø BANK) M/c: 4x16.667 MW 66/22 kV, 1x6.67 MVA 15. Sainj
132/11 kV, 1x25/31.5 MVA 66/11 kV, 2x6.3 MVA
003.569 D58 60.491 C38 0.72 220/66 kV, 1x31.5 MVA GT:11/132, 4x20.4/22.5 MVA M/c: 3x5.65 MW
E17 D17 076.00 D37 020.196 C17 013.10 66/22 kV,1x10 MVA,1x31.5 MVA 66/22 kV, 1x6.3 MVA
17. Kandrori GT:11/66 kV, 2x6.67 MVA
E18 003.569 D18 042.139 D38 024.11 D59 1.00 C18 024.71 C39 010.172 6. Bathri GT:11/22 kV, 1x6.67 MVA
7.Kangoo 132/33 kV, 2x25/31.5 MVA 132/33 kV, 3x16 MVA 16. Sansarpur Terrace
E19 0.300 D19 24.836 D39 024.11 D60 C19 26.270 C40 09.837 220/132 kV,1x80/100 MVA 33/11 kV,2x1.6 MVA 33/11 kV,2x6.3 MVA 66/11 kV, 2x10 MVA
3. Anni 66/22 kV,2x10MVA
132/33 kV, 2x25/31.5 MVA
E20 7.80 D20 001.65 D40 020.00 D61 29.403 C20 06.952 C41 21.078 7. Darlaghat 18.Kangra 17. Samauli(Rohru)
8. Kunihar 4. Batoli Kalan 66/11 kV,2x20MVA
E21 C21 5.750 C42 3.280 132/11 kV, 7.5 MVA 132/33 kV, 2x25/31.5 MVA 66/22kV, 1x16MVA,1x10MVA
24.562 D21 001.65 D41 050.00 220/132 kV, 2x80/100 MVA 33/11 kV,2x10 MVA
8. Dehan(Palampur) 5. Davni 66/11 kV,2x20MVA
E22 0.804 C43 0.260 220/132 kV, 1x160/200 MVA 18. Totu
132/33 kV, 1x16 MVA 132/33 kV, 2x25/31.5 MVA 19.Kurthala 6.Ghanvi M/c: 2x11.25 MW
30.253 C44 0.400 33/11 kV,2x4 MVA 33/132 kV,1x50/63MVA GT:11/66 kV, 2x13.75 MVA 66/11 kV,1x10MVA,3x6.3 MVA
E23
7
220 kV Sub-Stations/
Power Houses
SINGLE LINE DIAGRAM OF 220/66/33/11 SUB-STATION, BADDI
AS ON: 06-01-2016 9
CONDUCTOR/EARTH-WIRE DETAIL
LEGEND
(D/C LINE) (D/C LINE) (D/C LINE) (D/C LINE) (S/C LINE)
220 kV BUS TWIN AAAC TARANTULA (33/5.23 mm) [42.764 km] [31.191 km] [24.562 km] [7.80 km] [0.804 km]
TWIN ACSR MOOSE (54/7/3.53mm) PANCHKULA KUNIHAR-1 UPEARLA NANGAL MANDHALA VARDHMAN LIGHTENING ARRESTOR
220 kV LINE ACSR - ZEBRA (54/7/3.18 mm)
TWIN ZEBRA TWIN ZEBRA XLPE-630mm2
EARTH-WIRE GSS - (7/3.15 mm) CIRCUIT BREAKER
B2 (PTR:
66kV/110V
SF6
(CTR:400-200/1-1-1) SF6 SF6 SF6 SF6 SF6 SF6 SF6 SF6 SF6
(CTR:200-100/ (CTR:500-250/ (CTR:500-250/ (CTR:800-400/ (CTR:400-200/ (CTR:200-100/ (CTR:200-100/ (CTR:400-200/ (CTR: SF6 SF6 SF6 SF6
1-1-1-1A) 1-1-1-1A) 1-1-1-1A) 1-1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1-1A) 300-150/1) (CTR: 200-100/ (CTR: 200-100/ (CTR: 200-100/ (CTR: 200-100/
1-1-1-1-0.577) 1-1-1-1-0.577) 1-1-1-1-0.577) 1-1-1-1-0.577)
Y T1 Y T2 Y T3 Y T4
66/11 kV 66/11 kV 66/11 kV 66/11 kV
20 MVA 20 MVA 20 MVA 20 MVA
Y Y Y Y
(PANTHER) TC: ON LOAD TC: ON LOAD TC: ON LOAD
TC: ON LOAD No.of Taps:17 No.of Taps:17
(AAA) (AAA) (AAA) (AAA) (PANTHER) (PANTHER) (PANTHER) No.of Taps:17 No.of Taps:17
C2 NormalTap:5 NormalTap:7 NormalTap:7
C1 NormalTap:5
14.4 MVAR 14.4 MVAR
(AAAC-1 & (ACSR-1) (XLPE-
(ACSR-1) (ACSR-1) (ACSR-1) (AAAC-1) (AAAC-2)
ACSR-2) 300mm2)
(CTR:1200-600 (CTR:1200-600 (CTR:1200-600 (CTR:1200-600
Birla Taxtiles Akanwali-I Akanwali-II P&G (Functional) /1-1-0.577A) /1-1-0.577A) /1-1-0.577A)
Barotiwala-II/ Barotiwala-I Batoli Kalan Nalagarh /1-1-0.577A)
10MVAR (1.74 km) (10.172 km) (10.172 km) Winsom from T14 (3.82 km) (2.00 km) (2.40 km) (16.739 km)
(S/C LINE) (S/C LINE) (S/C LINE) (S/C LINE) VCB VCB VCB VCB
CAPACITOR BANK (D/C LINE) (D/C LINE) (3.256 km.) (S/C LINE)
(Functional) (S/C LINE)
11 kV Bus
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
(CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR:
200-100/1) 400-200/1) 400-200/1) 200-100/1) 400-200/1) 200-100/1) 400-200/1) 200-100/1) 400-200/1) 400-200/1) 400-200/1) 400-200/1) 400-200/1) 400-200/1)
FEEDER-1 FEEDER-2 FEEDER-3 FEEDER-6 FEEDER-9 FEEDER-10 FEEDER-11 FEEDER-12 FEEDER-13 FEEDER-14 FEEDER-16 FEEDER-21 FEEDER-22 FEEDER-23
(3.5 km.) (10.0 km.) (11.0 km.) (2.0 km.) (12.0 km.) (2.0 km.) (14.00 km.) (0.4 km.) (12.50 km.) (0.80 km.) (28.00 km.) (4.5 km.) (4.0 km.) (3.5 km.)
(2x3 MVAR)
CAPACITOR BANK
(Functional)
10
SINGLE LINE DIAGRAM OF BHABA
CONDUCTOR/EARTH-WIRE DETAIL
[130.90 km] [24.70 km]
KUNIHAR(HP) JEORI(HP)
132 kV BUS
132 kV LINE
EARTH-WIRE
33 kV BUS-1
33 kV BUS-2
33kV LINE
Connected Connected
(CTR: 600/1) (CTR: 600/1)
LEGEND
LIGHTENING ARRESTOR
Bus B2 B4
CIRCUIT BREAKER
CURRENT TRANSFORMER
B3
ISOLATOR WITHOUT
220 kV
Bus B1 EARTH SWITCH
ISOLATOR WITH
EARTH SWITCH
POTENTIAL TRANSFORMER
T1
(220/11 KV)
GT1 GT2 GT3
(50 MVA) (50 MVA) (50 MVA) POWER TRANSFORMER
(11/220 KV) (11/220 KV) (11/220 KV)
TC: ON/Off LOAD TC: ON/Off LOAD TC: ON/Off LOAD
No.of Taps:17 No.of Taps:17 No.of Taps:17
Connected NormalTap:7 Connected NormalTap:7 Connected NormalTap:7 CAPACITOR VOLTAGE
(CTR: A) (CTR: A) (CTR: A) TRANSFORMER
220 V
48 V
SINGLE LINE DIAGRAM OF 220/132/33 kV SUB-STATION, GIRI AND 60 MW POWER HOUSE, GIRI
AS ON: 20-01-2016 11
(S/C LINE) (D/C LINE) (D/C LINE)
[2.65 km] [35.06 km] [35.06 km]
VISCO KHODRI-2 KHODRI-1
LEGEND
CONDUCTOR/EARTH-WIRE DETAIL DC SYSTEM STATUS
220 kV BUS B1
WAVE TRAP 33kV LINE ACSR (6/1/4.72mm)
Bus PTR:
(S/C LINE) (S/C LINE)
[220kV/110V]
POTENTIAL TRANSFORMER [17.6 km] [16.39 km]
KULHAL POANTA
Bus PTR: B2
POWER TRANSFORMER [220kV/110V]
SF6
CAPACITOR VOLTAGE
TRANSFORMER SF6 SF6 (CTR:800/1)
(CTR:300/1) (CTR:300/1)
T2(80/100MVA) T1 (80/100MVA)
Y Y (220/132kV)
(220/132kV)
TC: ON LOAD
TC: ON LOAD
Y Y No.of Taps:17
No.of Taps:17
NormalTap:7 NormalTap:7
Connected Connected
(CTR: 400/1) (CTR: 500/1)
(CTR:500/1) (CTR:500/1)
ABCB SF6
SF6 SF6
132 kV Bus B1
Bus PTR:
[132kV/110V]
B2
Bus PTR:
[132kV/110V]
ABCB
T3 T4
(16/20 MVA) (25/31.5 MVA)
(132/33 KV) (132/33 KV)
GT2 GT1
TC: ON/Off LOAD TC: ON/Off LOAD (40 MVA)
No.of Taps:17
(40 MVA)
No.of Taps:17 (11/132 kV)
NormalTap:7 NormalTap:7 (11/132 kV)
TC: ON/Off LOAD TC: ON/Off LOAD
No.of Taps:17 No.of Taps:17
NormalTap:7 NormalTap:7
Connected Connected
(CTR: 600/1) (CTR: 600/1)
(CTR: 2000/5) (CTR: 2000/5)
VCB VCB
PTR: PTR:
[11kV/110V] [11kV/110V]
SOLAN-2 SOLAN-1 JAGADHARI KALA AMB
[63.99 km] [65.758 km] [50 km] [31.96 km] UNIT-II UNIT-I
(S/C LINE) (S/C LINE) (S/C LINE) (S/C LINE) (30 MW) (30 MW)
33 KV BUS
450 kVA
33/11 kV
132 kV BUS-II
VCB VCB
(CTR:200-100/1-1-1A) (CTR:200-100/1-1-1A)
33 kV BUS
T1 33/11 kV T2 33/11 kV
3.15 MVA 3.15 MVA
Y Y
400-200/5-5A
200-100/5-5A 200-100/5-5A 200-100/5-5A 200-100/5-5A 200-100/5-5A
220 kV BUS-II
(PTR: CTR:
SF6 300-150/1-1A
220 kV/110 V)
SF6
SF6 (CTR:800-400/ SF6 SF6
(CTR:800-400/ 1-1-1-1-1)
(CTR:800-400/ (CTR:150-75/ (CTR:150-75/
1-1-1-1A)
1-1-1-1-1) 1-1-0.577A) 1-1-1-1-1A)
T4 220/132 KV T3 220/132 KV
Y T1 220/33 KV T2 220/33 KV
Y (50/63 MVA) Y (150 MVA) (25/31.5 MVA)
Y (25/31.5 MVA)
TC: ON LOAD TC: ON LOAD TC: ON LOAD TC: ON LOAD
Y No.of Taps:17
NormalTap:5 Y No.of Taps:17 Y No.of Taps:17 Y No.of Taps:17
NormalTap:13 NormalTap:5 NormalTap:5
(CTR:600-300/ (CTR:1600-800/ (CTR:1000-500/ (CTR:1200-600/
1-1-1-1-1A) 1-1-1-1-1) 1-1-0.577A) 1-1-1-1-0.577A)
SF6 SF6 MOCB MOCB
(CTR:1000-500/ 33kV
(CTR:1500-750/1-1-1) 1-1-1-1-0.577A) (2x3.6 MVAR)
132 kV BUS 33 kV Bus B1 PTR:33kV/110V CAPACITOR BANK
[BOTH FUNCTIONAL]
SF6
PTR: PTR:
132kV/110V 132kV/110V
(CTR: (CTR:300-150/ (CTR: (CTR: (CTR:400-200/ (CTR:200-100/
(CTR:400-200/ (CTR:10-5/ (CTR:400-200/
400-200/1-1) 1-1-1A) 200-100/1-1) 400-200/1-1) 1-1-1A) 1-1A)
SF6 SF6 SF6 SF6 1-1-1-0.577) 1-1A) 1-1-1-0.577)
MOCB MOCB MOCB MOCB MOCB MOCB
MOCB
(CTR:500-250/ (CTR:300-150/ (CTR:600-300/ (CTR:500-250/ MOCB MOCB
1-1-1-1A) 1-1-1A) 1-1-1-1A) 1-1-1-1A)
(CTR:
200/1)
T2 10 MVA T1 10 MVA
Y 33/11 kV 33/11 kV
TC: ON LOAD TC: ON LOAD
No.of Taps:17 No.of Taps:17
Y NormalTap:5 NormalTap:5
(CTR:1200-600/ (CTR:1200-600/
1-1-1-.577A) 1-1-1-.577A)
Bakloh Shahpur Raja ka VCB Kandrori VCB Bharmar Raja ka
(22.417)km Bag-I 33/0.4kV (16.20)km
(23.34+ (27=20+7)km Bag-II
400kVA
11.00)km
PTR:
VCB
DC SYSTEM STATUS 11kV/110V VCB
BATTERY BANK BATTERY CHARGER VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
DC VOLTAGE
CAPACITY STATUS RATING STATUS (CTR:100-50/ (CTR:100-50/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:100-50/ (CTR:100-50/
(CTR:200-100/ (CTR:200-100/
1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A)
Boost:2x60A
220 V 400Ah Functional
Float:2x40A Functional
Boost:2x100A
48 V 600Ah Functional Float:2x60A Functional
Spare Spare Gangath Kotla Aund Nurpur Suliali Agro Jassore Colony Stn X-frmr
LIGHTENING ARRESTOR
CIRCUIT BREAKER
CURRENT TRANSFORMER
ISOLATOR WITHOUT
EARTH SWITCH
(CTR: 600-300-150/
1-1-1-1) (CTR: 1200-600/1-1-1-1-1) ISOLATOR WITH
EARTH SWITCH
POTENTIAL TRANSFORMER
220 kV BUS
POWER TRANSFORMER
ACSR-1. TARANTULA(37/5.23mm)
66 kV BUS 2. WOLF(30/7/2.59mm)
VCB-CB
VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB VCB-CB
250 kVA
22/0.4kV
Y
MANGLAD Spare Jhakri-II Kinnaur Manglad Wadhal-I Wadhal-II Daj Rampur Sarahan Ghanvi
ST.Xmer (5.00km) (20.0km)
SHEP (7.50km) (30.72km) (7.50km) (7.5km) (24.0km) (39.90km) (7.910 km)
(ACSR-1) (ACSR-2&4) (ACSR-1) (ACSR-1) (ACSR-1) (ACSR-1) (ACSR-1&2) (ACSR-2&4) (ACSR-1&4)
(4.50km)
(ACSR-1)
SINGLE LINE DIAGRAM OF 220/132/33 kV SUB-STATION AT KANGOO
[24.115 km] [3.177 km] 15
RAURI DEHAR-BBMB
LEGEND CONDUCTOR/EARTH-WIRE DETAIL
(CTR:600-300-100/1-1-1-1-1) (CTR:600-300/1-1)
ISOLATOR WITH 33 kV BUS ACSR - ZEBRA (54/7/3.18 mm)
EARTH SWITCH
SF6 SF6 33 kV LINE ACSR - DOG (6/1/4.72 mm)
AAA - (7/4.26 mm)
WAVE TRAP
POWER TRANSFORMER
(PTR:220 kV/110 V)
SF6
CAPACITOR VOLTAGE
(CTR:1200-600-300/ TRANSFORMER
1-1-1-1-1)
Y T1
(80/100 MVA)
Y 220/132 KV
(CTR:600-300/
1-1-1-0.577)
SF6
B3 B4
(CTR:600-300/ (CTR:600-300/
1-0.577) 1-0.577)
VCB VCB
(CTR:200-100/
1-1)
VCB LARJI-I LARJI-II JAHOO HAMIRPUR-II-2 KUNIHAR-II BAGGA ACC-II ACC-I KUNIHAR-I DEHAR-BBMB MANDI BAJAURA
[55.83 km] [55.83 km] [29.403 km] [42.139 km] [48.95 km] [16.205 km] [1.65 km] [1.65 km] [46 km] [2.90 km.] [62.70 km] [77.199 km]
33kV BUS [42.90 km upto Pandoh +[57.00 km upto Larji+
33 kV Bus 19.80 km Pandoh to Bijni]
20.00 km Larji to Bajaura]
(PTR:
33 kV/110 V)
VCB
VCB VCB VCB (CTR:10-5/ VCB VCB VCB VCB
1-1)
(CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/
1-1) 1-1) 1-1) 1-1) 250 kVA 1-1) 1-1) 1-1) 1-1)
33/0.4 KV
Y
POTENTIAL TRANSFORMER
220 kV
Bus B2
POWER TRANSFORMER
(PTR:220 kV/110 V)
CAPACITOR VOLTAGE
TRANSFORMER Bus B1
DC SYSTEM STATUS
SF6-CB (PTR:220 kV/110 V)
BATTERY BANK BATTERY CHARGER
DC (CTR:600-300-150/
VOLTAGE SF6-CB SF6-CB 1-1-1-1-1) SF6-CB
CAPACITY STATUS RATING STATUS (CTR:600-300-150/1-1-1-1-1) (CTR:600-300-150/1-1-1-1-1) (CTR:600-300/1-1-1-1-1)
220 V 400Ah Functional Float:40-60A Functional T1, (80/100 MVA) T3, (160/200 MVA)
T2, (80/100 MVA)
Boost:40-60A Y (220/132 KV) Y Y (220/132 KV)
(220/132 KV)
48 V Boost:60A Functional TC: Off LOAD TC: Off LOAD TC: ON LOAD
400Ah Functional Float:60A No.of Taps:17 No.of Taps:17
Y NormalTap:5 Y No.of Taps:17 Y NormalTap:9
NormalTap:5
132 kV
Bus B2
B1 (PTR:132 kV/110 V)
SF6-CB
(PTR:132 kV/110 V)
SF6-CB SF6-CB SF6-CB SF6-CB SF6-CB SF6-CB SF6-CB SF6-CB SF6-CB (CTR:1000-500-250/1-1-1-1)
SF6-CB
(CTR:500-250/ (CTR:500-250/ (CTR:400-200/ (CTR:400-200/ (CTR:500-250/ (CTR:500-250/ (CTR:400-200/ (CTR:500-250/ (CTR:400-200/ (CTR:100-50/1-1-0.577)
1-1-1-1-1) 1-1-1-1-1) 1-1-1-1-1) 1-1-1) 1-1-1-1-1) 1-1-1-1-1) 1-1-1) 1-1-1) 1-1-1)
T5, (16 MVA)
Y (132/33 KV)
TC: ON LOAD
No.of Taps:17
Y NormalTap:5
(CTR:400-200/1-1-0.577)
MOCB
(PTR:33 kV/110 V)
MOCB MOCB
ACB MOCB VCB
(CTR:15-7.5/1) (CTR:15-7.5/1)
(CTR:150-750/ (CTR:150-750/ (CTR:300-150/1)
1-1) 1-1) 33/0.4 kV
33/0.4 kV
Y 630 KVA Y 200 KVA
LEGEND
LIGHTENING ARRESTOR
CIRCUIT BREAKER
CURRENT TRANSFORMER
ISOLATOR WITHOUT
EARTH SWITCH
(CTR:2000-1000/1-1-1-1-1A) (CTR: (CTR:2000-1000/1-1-1-1-1A) (CTR:2000-1000/1-1-1-1-1A)
2000-1000/1-1-1-1-1A)
ISOLATOR WITH
EARTH SWITCH
WAVE TRAP
220 kV Bus B1
(PTR: POTENTIAL TRANSFORMER
220kV/110V
220 kV Bus B2
POWER TRANSFORMER
(PTR:
220kV/110V
CAPACITOR VOLTAGE
TRANSFORMER
CONDUCTOR/EARTH-WIRE DETAIL
(CTR:1000-500/1-1-1-1-1A)
11 kV BUS
11 kV LINE
66 kV Bus B1
(PTR:
66kV/110V
DC SYSTEM STATUS
B2 (PTR:
66kV/110V BATTERY BANK BATTERY CHARGER
DC VOLTAGE
CAPACITY STATUS RATING STATUS
T2 T3 T4
T1 66/11 kV
66/11 kV 66/11 kV
66/11 kV 20 MVA
20 MVA 20 MVA
20 MVA
TC: ON LOAD TC: ON LOAD
TC: ON LOAD TC: ON LOAD No.of Taps:17
No.of Taps:17 No.of Taps:17
No.of Taps:17 NormalTap:5 NormalTap:5
NormalTap:5 NormalTap:5
(D/C LINE) (D/C LINE) (D/C LINE) (D/C LINE) (S/C LINE)
[3.569 km] [3.569 km] [24.562km] [7.80km] [0.30km]
PGCIL REHRU-I PGCIL REHRU-II BADDI MANDHALA VARDHMAN
SINGLE ZEBRA
LEGEND
LIGHTENING ARRESTOR
CIRCUIT BREAKER
CURRENT TRANSFORMER
ISOLATOR WITHOUT
(CTR:2000-1000/ (CTR:2000-1000/ (CTR:2000-1000/ (CTR:100-50/ EARTH SWITCH
(CTR:2000-1000/
1-1-1-1-1A) 1-1-1-1-1A) 1-1-1-1-1A) 1-1-1-1-1A)
1-1-1-1-1A)
ISOLATOR WITH
EARTH SWITCH
WAVE TRAP
220 kV Bus B1
(PTR: POTENTIAL TRANSFORMER
220kV/110V
220 kV Bus B2
POWER TRANSFORMER
(PTR:
220kV/110V
CAPACITOR VOLTAGE
TRANSFORMER
(CTR:1500-750/1-1-1-1-1A)
CONDUCTOR/EARTH-WIRE DETAIL
(CTR:300-150/1-1-1-1-.577) (CTR:300-150/1-1-1-1-.577)
220 kV BUS TWIN MOOSE(54/7/3.53 mm)
T1 (100 MVA)
T2 (100 MVA)
Y (220/66)KV Y (220/66)KV
TC: ON LOAD 220 kV LINE TWIN ZEBRA (54/7/3.18 mm)
No.of Taps:17 TC: ON LOAD
Y NormalTap:9b Y No.of Taps:17
NormalTap:9b EARTH-WIRE GSS - (7/3.15 mm)
(CTR:1000-500/ (CTR:1000-500/
1-1-1-1-.577A) 1-1-1-1-.577A) 66 kV BUS QUAD MOOSE(54/7/3.53 mm)
(CTR: )
132 kV Sub-Stations/
Power Houses
SINGLE LINE DIAGRAM OF 132/33/11KV SUBSTATION AMB 20
AS ON: 21-01-2016
T2 T1 48 V 400Ah Boost:60A
(25/31.5 MVA) Functional Float:40A Functional
(16 MVA)
Y (132/33 kV) Y (132/33 kV)
TC: ON LOAD TC: ON LOAD
Y No.of Taps:17 Y No.of Taps:17
NormalTap:5 NormalTap:5
(CTR:600-300/1-1-1-0.577) (CTR:600-300/1-1-1-0.577)
VCB VCB
VCB
33 kV Bus
(CTR:600-300/1-1) VCB
VCB VCB (CTR:
(PTR:33 kV/110 V) 300-150/1-1)
(CTR:200-100/1-1) (CTR:200-100/1-1)
VCB
Y 33/11 kV Y 33/11 kV (CTR:
VCB VCB T2,5 MVA T1,5 MVA VCB VCB 10-5/1-1) VCB
Y TC: Off LOAD Y TC: Off LOAD (CTR:
(CTR: (CTR: No.of Taps:5
(CTR: (CTR:
150-75/1-1) 200-100/1-1) No.of Taps:5 400-200/1-1) 400-200/1-1) 300-150/1-1)
NormalTap:3 NormalTap:3 33/0.4 kV
(CTR:1200-600/ (CTR:1200-600/ 250 KVA
5-5-.577A) 5-5-.577A)
VCB VCB
Stn. Xfmr
Bharwain Daulatpur Baruhi Gagret Him Alloy
[14.838km] [17.30km] [15.50km] [7.355km] [0.380km]
(AAAC) (AAAC) (ACSR) (AAAC) (AAAC)
VCB
11 kV Bus
LEGEND
LIGHTENING ARRESTOR
CIRCUIT BREAKER
CURRENT TRANSFORMER
(CTR:500/1) (CTR:500/1)
ISOLATOR WITHOUT
EARTH SWITCH
ISOLATOR WITH
EARTH SWITCH
132kV BUS
B1
WAVE TRAP
POTENTIAL TRANSFORMER
CAPACITOR VOLTAGE
TRANSFORMER
DC SYSTEM STATUS
220 V
48 V
JPCCL
SINGLE LINE DIAGRAM OF 132/33 kV SUB-STATION BAJAURA, KULLU(H.P.)
AS ON: 12-01-2016 22
(D/C LINE) (D/C LINE) (D/C LINE) (D/C LINE)
[24.11 km] [24.11 km] [73.199 km] [20.196 km]
MALANA CKT-I MALANA CKT-II KANGOO LARJI
CONDUCTOR/EARTH-WIRE DETAIL
Y
Y
B2
CIRCUIT BREAKER
ISOLATOR WITH
EARTH SWITCH
WAVE TRAP
T2 (25/31.5 MVA) T1 (25/31.5 MVA)
(132/33 KV) (132/33 KV)
TC: ON LOAD TC: ON LOAD POTENTIAL TRANSFORMER
No.of Taps:17 No.of Taps:17
NormalTap:5 NormalTap:5
33/0.415 kV
250kVA Cells
Series Series
Bhuntar Kullu Manali Mani-karan Reactor Reactor
Spare Bay Gadsa Thalout-I Thalout-II Spare Bay
[4.00km] [16.00km] [31.10km] [27.840km] (2*3.6 MVAR Cap. bank) [12.015km] [20.0km] [20.0km]
Stn. Xfmr
(ACSR) (ACSR) (ACSR) (AAAC) (BOTH BANKS FUNCTIONAL) (AAAC) (ACSR) (ACSR)
SINGLE LINE DIAGRAM OF 132/66/11 kV SUB-STATION, BAROTIWALA 23
AS ON: 06-01-2016
132KV BUS B1
PT
132 kV/110 V
132KV BUS B2
PT
132 kV/110 V
St. Xmer SF6
11/0.4kV
(CTR: (CTR:
400-200/1-1) 400-200/1-1)
Baddi-1 U.T. SRForging SF6 OPTEC SF6 Baddi2 SF6 SF6 SF6 (CTR:300-150/ SF6 SF6
(CTR:300-150/ (CTR:300-150/
(CTR:150-75/ 1-1-1-1-.577A) 1-1-1-1-.577A)
(CTR:150-75/ (CTR:150-75/ 1-1-1-1-.577A) (CTR:150-75/
1-1-1-1-.577) 1-1-1-1-.577) 1-1-1-1-.577) B/wala 4 EPIP5 T2 132/66 kV B/Wala2 B/Wala5 B/Wala7 1-1-1-1-.577) B/wala 8
T3 132/11 kV
Y T1 132/66 kV Y 25/31.5 MVA
Y T3 132/66 kV
T1, 132/11 kV 25/31.5 MVA 25/31.5 MVA T4 132/11 kV
Y T2 132/11 kV Y 25/31.5 MVA Y 16/20 MVA TC: ON LOAD
Y 25/31.5 MVA
25/31.5 MVA
TC: ON LOAD TC: ON LOAD Y TC: ON LOAD Y No.of Taps:17 Y TC: ON LOAD
No.of Taps:17 TC: ON LOAD
No.of Taps:17
Y TC: ON LOAD
Y No.of Taps:17 Y No.of Taps:17 NormalTap:5
NormalTap:5 NormalTap:5 Y No.of Taps:17
No.of Taps:17 NormalTap:5 CTR: NormalTap:5 NormalTap:5
CTR: CTR: CTR: NormalTap:5 CTR: CTR: 50-25/1 CTR: CTR: (CTR:600-300/ (CTR:600-300/ CTR: CTR: CTR: CTR:
400-200/1 400-200/1 400-200/1 500-250/5-5 (CTR:600-300/ 400-200/1 400-200/1 400-200/1 200-100/1
200-100/1 400-200/1 500-250/5-5 1-1-1-1.577A) 1-1-1-1.577A) 1-1-1-1.577A)
(CTR:2400-1200/ (CTR:1800-900/ (CTR:1100/5-5-.577) MOCB MOCB MOCB CTR:1800/
1-1-1-.577A) 1-1.577A) 1-1-1-.577A
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
VCB VCB VCB
VCB VCB (CTR:
11KV BUS 11 kV Bus
600-300/1)
VCB 66 kV Bus
VCB VCB VCB
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
(DAMAGED)
PT CTR: CTR: CTR:
CTR: CTR: CTR: CTR: CTR: CTR: CTR: CTR: CTR: CTR: 400-200/1 400-200/1 200-100/1
CTR:
400-200/1 250-125/1 200-100/1 200-100/1 400-200/1 400-200/1 500-250/5-5 500-250/5-5 500-250/5-5 400-200/1 400-200/1
EPIP1 USV EPIP4 HARIPUR Hill Top EPIP3 Patta Baddi3 EPIP2 B/Wala6 B/Wala3 Ranbaxy B/Wala1 Gridwell
CIRCUIT BREAKER
CURRENT TRANSFORMER
ISOLATOR WITHOUT
EARTH SWITCH CONDUCTOR/EARTH-WIRE DETAIL
LEGEND
SF6-CB
132kV Bus B1 B2
LIGHTENING ARRESTOR
(CTR:400/ (CTR:400/
(PTR: 1A) 1A)
132kV/110V/110V) (PTR: CIRCUIT BREAKER
132kV/110V/110V)
SF6-CB SF6-CB SF6-CB SF6-CB CURRENT TRANSFORMER
SF6-CB
(CTR: 400/1) (CTR: 400/1) (CTR: 400/1) (CTR: 400/1)
(CTR: 400/1) ISOLATOR WITHOUT
EARTH SWITCH
DC SYSTEM STATUS
VCB
VCB VCB
VCB VCB VCB VCB VCB
11/0.4 kV
400kVA
(PTR:
11kV/110V)
SHANAN BASSI BALAKRUPI TIKKRU Joginder
[5.25km] [0.50km] [10 KM] [6.0km] Nagar
Station Xfmr. [10.426km]
(0.6 MVAR)
CAPACITOR BANK
(Functional)
SINGLE LINE DIAGRAM OF 132/33/11 kV SUB-STATION BATHRI
AS ON: 15-01-2016 25
(45.440 km) (45.440 km) (38.54 km)
KURTHALA-I KURTHALA-II JASSORE
CONDUCTOR/EARTH-WIRE DETAIL LEGEND
DC SYSTEM STATUS
POTENTIAL TRANSFORMER
BATTERY BANK BATTERY CHARGER
132kV BUS B1 DC VOLTAGE
CAPACITY STATUS RATING STATUS
POWER TRANSFORMER
PTR: Boost:30A
220 V 200Ah Functional Functional
132kV/110V Float:20A
(CTR:600-300/
(CTR:600-300/
1-1-1-1-1A)
1-1-1-1-1A)
MOCB VCB
PTR:
33kV/110V PTR:
(CTR:600-300/ 33kV/110V
1-1-1-1-1A)
33kV BUS BAR
B1 B2
MOCB
(CTR:200-100/ (CTR:200-100/
33/0.4 kV 5-5A) 5-5A)
200 KVA
VCB (CTR:200-100/ VCB
33/0.4 kV
5-5A)
200 KVA Residual
Voltage Xfmr
DALHOUSIE BAKLOH BAIRASUIL KOTI CHAMBA CHAMERA SPARE
[12 KM] [9.00 KM] STAGE-1
PTR: PTR:
ACSR ACSR STN.Xmer VCB VCB 11kV/110V VCB STN.Xmer
11kV/110V
(6/1/4.7mm) (6/1/4.7mm) No.1 No.2
BAKLOH (CTR:100-50/ (CTR:100-50/ (CTR:100-50/
5-5A) Capacitor Bank-1 Capacitor Bank-2
5-5A) 5-5A)
HOSPITAL KAKISE (3.6 MVAR) (3.6 MVAR)
[1.395 KM] [15.520 KM]
[BOTH FUNCTIONAL]
ACSR ACSR
(6/1/2.59mm) (6/1/2.59mm)
(7/3.15mm)
TUNIHATTI [12.56+2.96]KM WSS WSS BATHRI
[37.22 KM] DEVI DEHRA CHOWTRA LOCAL
ACSR
(6/1/2.59mm) NAINIKHAD
(6/1/2.11mm) [35.44 KM]
AAAC ACSR
(7/3.15/2.59mm) (6/1/2.59mm)
[29.42+6.3+1.5]KM (6/1/2.11mm)
[29.2+6.24]KM
SINGLE LINE DIAGRAM OF 132/11 kV SUB-STATION DARLAGHAT 26
AS ON: 05-01-2016
[13.563 km] LEGEND
[22.301 km]
KUNIHAR BAGGA
D/C (CKT-1) D/C (CKT-1)
LIGHTENING ARRESTOR
CIRCUIT BREAKER
CURRENT TRANSFORMER
ISOLATOR WITHOUT
EARTH SWITCH
ISOLATOR WITH
EARTH SWITCH
CAPACITOR VOLTAGE
PTR: 132 kV/110 V
TRANSFORMER
VCB
AMBUJA 11 kV LINE AAA- (7/3.15 mm)
[1.918 km]
11KV BUS PTR: 11 kV/110 V
DC SYSTEM STATUS
DC SYSTEM STATUS
Boost:2x40A
220 V 400Ah Functional Functional
LEGEND Float:2x40A
132 KV BUS
ISOLATOR WITH 66 kV BUS - KARANKULA (33/5.23 mm)
EARTH SWITCH
66 kV LINE ACSR - PANTHER (30/7/3.00 mm)
AAA - (37/2.88 mm)
WAVE TRAP PTR: 132 kV/110 V
SF6 CB SF6 CB Make: BHEL 33 kV BUS ACSR - ZEBRA (54/7/3.18 mm)
Make: ABB Make: ABB
POTENTIAL TRANSFORMER
CTR: CTR: 33 kV LINE - (30/2.59 mm)
150-75/1-1-1-0.577 150-75/1-1-1-0.577
11 kV BUS Indoor Copper Strip
POWER TRANSFORMER
11 kV LINE - (7/4.26 mm)
T-1 T-2
25/31.5MVA Y 25/31.5MVA Y
CAPACITOR VOLTAGE 132/33kV
TRANSFORMER 132/33kV
TC: ON LOAD Y TC: ON LOAD Y
No.of Taps:17 No.of Taps:17
CTR: NormalTap:5 CTR:
NormalTap:5
600-300/1-1-1-0.577 A 600-300/1-1-1-0.577 A
VCB VCB
PTR:33kV/110V PTR:33kV/110V
VCB
CTR:300-150/1A
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
400-200/1-1A 400-200/1-1A 400-200/1-1A 400-200/1-1A 150-75/1-1A 400-200/1-1A 300-150/1-1A 400-200/1-1A 400-200/1-1A 150-75/1-1A 400-200/1-1A 300-150/1-1A 400-200/1-1A
10-5/1-1A
CTR:800-400/5-5-5-0.577 CTR:800-400/5-5-5-0.577
CTR:
600-300/1-1-1A
PTR:11kV/110V PTR:11kV/110V
VCB
VCB VCB VCB VCB VCB BUS COUPLER VCB
VCB VCB VCB VCB
CTR:300-150/1A
CTR: CTR: CTR: CTR: CTR: CTR: CTR: CTR:
500-250/1-1-1A 250/1-1-1A 250/1-1-1A 250/1-1-1A 250/1-1-1A 250/1-1-1A 250/1-1-1A 250/1-1-1A
ACSR(6/1/4.72mm)
33kV LINE AAAC(7/4.26mm)
ACSR(6/1/3.35mm)
(CTR: (CTR:500-250/ (CTR:300-150/ (CTR: (CTR: 11kV LINE AAAC(7/4.26mm)
(CTR:500-250/ (CTR:500-250/ 300-150/1-1-1-1-1) 1-1-1-1A) 1-1-1-1-1A) 300-150/1-1-1-1-1) 300-150/1-1-1-1-1)
1-1-1-1A) 1-1-1-1A)
SF6 SF6 SF6 SF6 SF6 SF6 SF6
DC SYSTEM STATUS
(PTR:
132kV/110V)
SF6
LEGEND
SF6 SF6
(CTR:150-75/ (CTR:150-75/ (CTR:
300-150/1-1-1-1-1)
1-1-1-1-.577A) 1-1-1-1-.577A) LIGHTENING ARRESTOR
T2 (16/20 MVA) T1 (16/20 MVA)
132/33 KV 132/33 KV
CIRCUIT BREAKER
TC: ON LOAD
TC: ON LOAD
No.of Taps:17
No.of Taps:17 NormalTap:5
NormalTap:5 CURRENT TRANSFORMER
(CTR:600-300/ (CTR:600-300/
1-1-1A) 1-1-1A) ISOLATOR WITHOUT
EARTH SWITCH
VCB VCB
ISOLATOR WITH
EARTH SWITCH
33 kV Bus B1
WAVE TRAP
(PTR: (PTR:
33kV/110V) POTENTIAL TRANSFORMER
33kV/110V)
(S/C LINE)
DC SYSTEM STATUS CONDUCTOR/EARTH-WIRE DETAIL [7.952 KM]
AMB LIGHTENING ARRESTOR
BATTERY BANK BATTERY CHARGER
DC VOLTAGE 132 kV BUS ACSR ZEBRA (54/7/3.15 mm)
CAPACITY STATUS CIRCUIT BREAKER
RATING STATUS
Boost:60A 132 kV LINE PANTHER (30/7/3.00mm)
Functional Float:40A Functional CURRENT TRANSFORMER
220 V 400Ah
Boost:60A
EARTH-WIRE OPGW
48 V 400Ah Functional Functional
Float:40A ISOLATOR WITHOUT
EARTH SWITCH
33 kV BUS ACSR ZEBRA (54/7/3.15 mm)
POTENTIAL TRANSFORMER
POWER TRANSFORMER
132kV BUS BAR
CAPACITOR VOLTAGE
PTR: 132kV/110V TRANSFORMER
SF6 SF6
(CTR:200-100/1-1-1-0.577A)
(CTR:200-100/1-1-1-0.577A)
T1, (25/31.5 MVA) T2, (25/31.5 MVA)
Y (132/11 KV) Y (132/33 KV)
TC: ON LOAD TC: ON LOAD
No.of Taps:17
Y No.of Taps:17 Y NormalTap:5
NormalTap:5
(CTR:2400-1200/1-1-1A)
800-400/1-1-0.577
VCB
VCB
PT:
33/0.11kV
VCB
VCB VCB VCB VCB VCB VCB VCB VCB
(CTR:300-150/
1-1-1A)
(CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (200-100/1-1-1A)
1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) VCB VCB VCB VCB VCB
11/0.4kV VCB
(CTR:400-200/ (CTR:150-75/ (CTR:400-200/ (CTR:300-150/ (CTR:200-100/
250kVA 1-1-1A)
(CTR:10-5/1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A)
33/0.4KV
SPARE SUPPER MAX INDUSTRY-2 INDUSTRY-1 BHARWAIN SPARE POLYTECHNIC 250kVA
[0.40m] [2.325km] [4.250km] (2x2.5 MVAR)
[4.420km] [2.625km] STN AUX XMER CAPACITOR BANK
(FUNCTIONAL)
[8.58+12.082=20.622km] [51.911+8.58=60.491km]
(S/C) (S/C) SPARE
SOLAN-GAURA GIRI-GAURA SPACE
CONDUCTOR/EARTH-WIRE DETAIL
ACSR- 6/1/4.72 mm
33 kV LINE AAAC- 7/4.26 mm
(CTR:500-250/1-1-1-1) (CTR:500-250/1-1-1-1)
132kV BUS
DC SYSTEM STATUS
BATTERY BANK
(VRLA Type)
BATTERY CHARGER
DC VOLTAGE
CAPACITY STATUS RATING STATUS
SF6
220 V 200Ah Float cum Functional
(CTR: 150-75/1-1-1-1) Functional Boost: 30A
CIRCUIT BREAKER
ISOLATOR WITHOUT
EARTH SWITCH
VCB
ISOLATOR WITH
(CTR:15-7.5/1-1-1) VCB VCB VCB EARTH SWITCH
(CTR:400-200/1-1-1) (CTR:400-200/1-1-1) (CTR:400-200/1-1-1)
WAVE TRAP
100 kVA
33/0.4 kV
POTENTIAL TRANSFORMER
POWER TRANSFORMER
132kV BUS
CAPACITOR VOLTAGE
TRANSFORMER
VCB
400-200/1
(CTR: 600-300/1-1-1)
33kV BUS BAR
300-150/1-1A
300-150/1-1A
33kV/110V
PT: 33kV/110V
VCB VCB (CB-MOCB) VCB
2x3.6 MVAR
Capacitor Bank
(Functional)
LEGEND
[76 km] [49.75 km]
CONDUCTOR/EARTH-WIRE DETAIL
CHOHAL-PSEB BASSI
LIGHTENING ARRESTOR
132 kV BUS ACSR - ZEBRA (54/7/3.18 mm)
SF6-CB ABCB
POTENTIAL TRANSFORMER
DC SYSTEM STATUS
220 V Boost:2x40A
200Ah Functional Functional
CAPACITOR VOLTAGE (PTR:132kV/110 V) Float:2x40A
TRANSFORMER
48 V Boost:2x60A
SF6-CB SF6-CB SF6-CB 400Ah Functional Float:2x60A
Functional
ABCB
(CTR: 150/1) (CTR: 150/1)
(CTR:500-250/1-1A) (CTR: 500/1)
T1
T2, (25/31.5 MVA) (25/31.5 MVA)
(13.002 km) (132/33 kV) (132/33 kV)
(20 km) (28.630 km) (19.385 km) (19.395 km)
Tauni Devi Sujanpur Barsar TC: ON LOAD Ladrour Nadaun
Y No.of Taps:17 Y TC: ON LOAD
NormalTap:5 No.of Taps:17
NormalTap:5
HAMIRPUR(II)-1 HAMIRPUR(II)-2
[4.95 km.] [4.95 km.]
33 kV Bus
(CTR:500-250/5A) OCB
OCB VCB OCB
Connected (CTR:200/1)
(CTR:100/1) (CTR:100/1)
(CTR:400/1)
VCB
TC: Off LOAD (CTR: TC: Off LOAD
No.of Taps:17 33/11 kV ST. Aux. Xmer No.of Taps:17 33/11 kV
300-150/1-1)
NormalTap:5 T2, 5 MVA 33/0.4 kV NormalTap:5 T1 ,5 MVA
100 kVA
(CTR:400/5) (CTR:250/5) Bagana
(26.200 km)
11 kV Bus 11 kV Bus
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
Cells
(CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR:
100/1) 200/1) 100/1) 100/1) Series Series 200/1) 200/1) 200/1) 200/1) 200/1) 200/1)
Reactor Reactor
Ind. Area H/Board Rangus M/wave REC Nalti Hamirpur Kuthera Tikkar Heera Nagar
(ACSR) (AAAC-1) (AAAC-2) (ACSR) (ACSR) (ACSR) (AAAC-1) (ACSR) (AAAC-1) (AAAC-2)
SINGLE LINE DIAGRAM OF 1x25/31.5 MVA,132/33 kV SUB-STATION, JAHOO
AS ON: 11-05-2016 33
(CTR:500-250/1-1-1-1-1A) (CTR:500-250/1-1-1-1-1A)
SF6 SF6
LIGHTENING ARRESTOR
CIRCUIT BREAKER
SF6
(CTR:150-75/1-1-1-1-1A)
CURRENT TRANSFORMER
T2
(3x16.67 MVA)
Y (132/33 KV) ISOLATOR WITHOUT
EARTH SWITCH
TC: ON LOAD
Y No.of Taps:17
NormalTap:5
ISOLATOR WITH
EARTH SWITCH
(CTR:600-300/1-1-1-1-1A)
POTENTIAL TRANSFORMER
33KV BUS
POWER TRANSFORMER
PT:
33kV/110V
CAPACITOR VOLTAGE
TRANSFORMER
VCB VCB
VCB
(400-200/1-1-1A) (400-200/1-1-1A) (15-7.5/1-1-1A) DC SYSTEM STATUS
220 V
48 V
(CB-SF6) (CB-ABCB)
POWER TRANSFORMER
(CTR:300-150/1-1A)
132kV BUS
CAPACITOR VOLTAGE
B1 B2
(CB-ABCB) TRANSFORMER
DC SYSTEM STATUS
(CTR:300-150/1-1)
66kV BUS B1 33kV BUS BAR
B1 B2 B2
(CB-SF6)
(CB-VCB)
(CTR:400-200/ (CTR:200-100/ (CTR:200-100/ (CTR:600-300/
(CTR:200-100/1-1A) (CTR:600-300/1-1) 1-1-1A) 1-1A) 1-1A) 1-1-1-1-1A) (CTR:150-300/1A)
(CTR:200-100/ (CTR:400-200/
1-1-1-1-1A) 1-1-1A) VCB VCB VCB
SF6 CB CB-GCB VCB
SF6 CB VCB (Dropout
Fuse)
33/0.4 kV
630 KVA
Y
T1 Residual
(20 MVA) Voltage Xfmr
(66/33 KV)
TC: ON LOAD ST. Aux.
No.of Taps:17 Bharari Dhami Shogi Ashwani Khad Xmer
NormalTap:5 (7.8 km) (13.63 km) (11.5 km) (14.0 km)
Totu Gumma Khalini
Capacitor Bank/ Capacitor Bank/
(1.555 km) (15.49 km) (7.2 km) Series Reactor Series Reactor
(3.6 MVAR) (3.6 MVAR)
[NON-FUNCTIONAL] [NON-FUNCTIONAL]
SINGLE LINE DIAGRAM OF 132/33/11 kV SUB-STATION AT KALA-AMB
AS ON: 06-01-2016 35
CONDUCTOR/EARTH-WIRE DETAIL LEGEND
132 kV BUS ACSR- ZEBRA(54/7/3.18mm)
Incomer
CAPACITOR VOLTAGE
132kV BUS TRANSFORMER
Feeder-9 (CTR:200-100/1-1) SF6-CB SF6-CB SF6-CB SF6-CB CAPACITY STATUS RATING STATUS
[1.60km] Boost:2x30A
(AB Cable (CTR: 150-75/0.57-1-1-1) (CTR: 200-100/0.577-1-1-1-1) (CTR: 150-75/0.577-1-1-1-1) (CTR: 150-75/0.577-1-1-1-1) 220 V 200Ah Functional Functional
Float:2x20A
120mm2)
(CTR:400-200/1-1)
48 V 200Ah Functional Boost:2x30A Functional
Feeder-10 Float:2x20A
T3 T(ECE) T2 T1
[5.195km]
(AAAC-1)
(25/31.5 MVA) (25/31.5 MVA) (25/31.5 MVA) (25/31.5 MVA)
(132/33 KV) (132/11 KV) (132/33 KV) (132/33 KV)
(CTR:400-200/1-1) Y Y Y Y ST.Xmer
Feeder-5 TC: ON LOAD TC: ON LOAD
No.of Taps:17
Y TC: ON LOAD TC: ON LOAD
No.of Taps:17
[9.580km] Y NormalTap:5
No.of Taps:17 Y No.of Taps:17 Y NormalTap:5
(AAAC-2&3) NormalTap:5 NormalTap:5
VCB-CB
VCB-CB
(CTR:300-150/1-1-1) 300-150/1-1-1
LIGHTENING ARRESTOR
CONDUCTOR/EARTH-WIRE DETAIL
CIRCUIT BREAKER
132 kV BUS ZEBRA (54/7/3.18mm)
(24.234 km) CURRENT TRANSFORMER
JASSORE 132 kV LINE ACSR - PANTHER (30/7/3.00 mm)
ISOLATOR WITHOUT
EARTH SWITCH EARTH-WIRE GSS - (7/3.15 mm)
132kV BUS B1
(CTR:150-75/ (CTR:150-75/
1-1-1-0.577A) 1-1-1-0.577A) (CTR:150-75/
1-1-1-0.577A)
T1 T2
(16 MVA) (16 MVA) T3
Y Y Y (16 MVA)
(132/33 KV) (132/33 KV)
(132/33 KV)
Y TC: ON LOAD Y TC: ON LOAD Y TC: ON LOAD
No.of Taps:17 No.of Taps:17
NormalTap:5 NormalTap:5 No.of Taps:17
NormalTap:5
(CTR:600-300/ (CTR:600-300/
1-1-1-0.577A) (CTR:600-300/
1-1-1-0.577A) 1-1-1-0.577A)
PTR:
PTR: 33kV/110V
PTR:
33kV/110V
33kV/110V
(CTR: 600-300/
1-1-1-1A)
B1 B2 B3 33kV BUS BAR
(CTR: 600-300/
1-1-1-1A)
VCB
(CTR: (CTR: (CTR:200-100/ (CTR: (CTR: (CTR:200-100/ (CTR:200-100/
(CTR: (CTR:400-200/
400-200/1-1) 150-75/1-1)
(CTR: 1-1-1-.577A) 150-75/1-1A) 150-75/1-1A) 1-1-1A) 1-1-1-1-.577A) 1-1-1-1-.577A)
150-75/1-1) (CB-VCB) 400-200/1-1-1) (CB-VCB) (CB-VCB) (CB-VCB) (CTR:400-200/1-1-1)
(CB-VCB)
(VCB) (CB-VCB) (CB-VCB)
(Dropout
(VCB)
Fuse)
T1 T2
33/11 kV 33/11 kV
Y Y 6.3 MVA
6.3 MVA 33/0.4 kV
Y TC: Off LOAD
TC: Off LOAD Y 250 KVA
No.of Taps:5 Y No.of Taps:5
STN.Xmer
NormalTap:2
NormalTap:2
(CTR:1800-1200/1-1-.577A)
Y
Residual (CTR:1800-1200/1-1-.577A)
(VCB) (VCB) PTR:
Voltage Xfmr
11KV/110v
BADUKHAR THAKURDWARA SURAJPUR ID SOOD KC ALLOY MET INDIA HRA 33kV SAIL
PAPER MILL (Not iin Operation)
Capacitor Bank/ VCB PTR:
Series Reactor B1 B2 11KV/110V
SURAJPUR-1 BAI ATTERIAN-1 BAI ATTERIAN-2
(2x3.6 MVAR) [5.0 km]
[BOTH FUNCTIONAL] (CTR:1800-1200/1-1-.577A) [1.20 km] [1.20 km]
ACSR ACSR ACSR
VCB VCB VCB VCB VCB VCB VCB VCB VCB (6/1/4.72mm) (6/1/4.72mm) (6/1/4.72mm)
PTR: VCB
11KV/110v SURAJPUR-2
(CTR:400-200/ (CTR:200-100/ (CTR:200-100/ (CTR:400-200/ (CTR:400-200/ (CTR:200-100/ (CTR:400-200/ (CTR:200-100/ (CTR:400-200/ (CTR:400-200/ [8.45 km]
1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) ACSR
AIRFORCE DHANGU LODHWAN
(6/1/2.11mm)
AIRFORCE [10.24 km] [7.5 km] [15.25 km]
ACSR ACSR ACSR
[20.32 km]
ACSR (6/1/3.35mm) (6/1/3.35mm) (6/1/3.35mm)
SPARE (6/1/3.35mm)
REY INDORA AGRO BAIN SURAJPUR KANDRORI DAMTAL BAIN DAH
[4.0 km] INDUSTRIES-II [4.0 km] INDUSTRIES-I GANGATH
[4.0 km]
ACSR ACSR ACSR [9.5 km] [9.14 km]
(6/1/3.35mm) (6/1/3.35mm) (6/1/3.35mm) ACSR(6/1/4.72mm) AAAC
(7/3.81mm)
SINGLE LINE DIAGRAM OF 132/33/11 kV SUB-STATION KANGRA LEGEND
AS ON: 15-01-2016
37
LIGHTENING ARRESTOR
CURRENT TRANSFORMER
DC SYSTEM STATUS
BATTERY BANK BATTERY CHARGER ISOLATOR WITHOUT
DC VOLTAGE
EARTH SWITCH
CAPACITY STATUS RATING STATUS
Boost:30A ISOLATOR WITH
220 V 200Ah Functional Functional EARTH SWITCH
Float:30A
48 V 400Ah Boost:60A
Functional Functional
Float:60A WAVE TRAP
SF6 SF6
POWER TRANSFORMER
(CTR: 300-150/1-1-1-1-0.577 A)
132 kV BUS B1 B2 CAPACITOR VOLTAGE
TRANSFORMER
SF6
CONDUCTOR/EARTH-WIRE DETAIL
VCB VCB
33 KV LINE WOLF
(PTR:33kV/110V)
(CTR:150-75/ (CTR:400-200/ (CTR:400-200/ (CTR: (CTR:400-200/ (CTR:400-200/
1-1A) 1-1-1-1A) 1-1-1-1A) (CTR:400-200/ (CTR:200-100/ 600-300/1-1-1) 1-1-1A) 1-1-1A)
OCB OCB VCB 1-1-1-.577A) 1-1-1-.577A) (Dropout OCB VCB
(Dropout Fuse) VCB
VCB VCB
Fuse)
T1 T2
33/11 kV 33/11 kV
10 MVA 10 MVA
Y TC: ON LOAD TC: ON LOAD Y
No.of Taps:17 No.of Taps:17
NormalTap:5 NormalTap:5
(CTR: (CTR:
33/0.4 kV 600-300/5-5-0.577A) 600-300/5-5-0.577A) 33/0.4 kV
100 KVA 100 KVA
STN. XFMR STN. XFMR
OCB (PTR:11kV/
OCB OCB OCB OCB OCB OCB OCB OCB OCB VCB VCB 110V)
MOCB OCB
(CTR:50-25/ (CTR:100-50/ (CTR:100-50/ (CTR:100-50/ (CTR:200-100/ (CTR:200-100/ (CTR:100-50/ (CTR:100-50/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/
5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A)
PSEB Mandal Serathana Daultpur Kangra-I Bagli Kangra-II Tiara Rajol Spare Lanj Rajol Exp.
[0.2km] [11.455km] [15.6km] [36.8km] [5.375km] [23.77km] [7.964km] [22.671km] [19.055km] Express [6.05km]
[15.195km]
(1.2+1.8 MVAR)
CAPACITOR BANK
[BOTH FUNCTIONAL]
SINGLE LINE DIAGRAM OF 33/132 kV, 1X50/63 MVA (SINGLE PHASE 16.67/21 MVA POWER TRANSFORMER 3+1) 38
SUB STATION HPSEBL KURTHALA, DISTT. CHAMBA (H.P.)
LEGEND
AS ON: 15-01-2016
LIGHTENING ARRESTOR
CONDUCTOR/EARTH-WIRE DETAIL
(D/C LINE) (D/C LINE)
132 kV BUS ZEBRA (ACSR) CIRCUIT BREAKER
[45.51 km] [45.51 km]
BATHRI-I BATHRI-II FUTURE FUTURE
132 kV LINE PANTHER (ACSR) CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
500-250/1-1-1-1-1A 500-250/1-1-1-1-1A
PTR:
SF6 SF6 SF6 SF6 (132kV/110V) POWER TRANSFORMER
Y
CAPACITOR VOLTAGE
Y TRANSFORMER
132 kV BUS
DC SYSTEM STATUS
VCB
PTR:
300-150/1-1-1-1-0.577 A (33 kV/110V)
300-150/1-1-1-1-0.577 A
VCB
33 kV BUS
1200-600
/1-1-1-1-1A
PTR:
(33 kV/110V)
VCB
PT
132kV/110V POTENTIAL TRANSFORMER
LA
132kV
POWER TRANSFORMER
Bus B1 PT
132kV/110V
LA
CAPACITOR VOLTAGE
Bus B2 TRANSFORMER
(CTR:600-300/1-1-1-1-1A) (CTR:600-300/1-1-1-1-1A)
PTR:
(132kV/110V)
Y Y LEGEND
Y Y PTR:
(CTR:600-300/1-1-1-1-1A)
132KV Bus B1 (132kV/110V)
LIGHTENING ARRESTOR
B2
CIRCUIT BREAKER
43MW 43MW
UNIT-1 UNIT-1 CAPACITOR VOLTAGE
TRANSFORMER
(CTR:400-200/1-1) (CTR:400-200/1-1)
VCB VCB
DC SYSTEM STATUS
TOSS VIRAH
[21.365km] [21.365km]
SINGLE LINE DIAGRAM OF 132/66/33/22 kV SUB-STATION AT MANDI
AS ON: 13-01-2016
41
[35.0 km]
DC SYSTEM STATUS SHANAN (PSEB) [20 km] [60.70 km]
LARJI KANGOO CONDUCTOR/EARTH-WIRE DETAIL LEGEND
BATTERY BANK BATTERY CHARGER
DC VOLTAGE
132 kV BUS ACSR- ZEBRA (54/7/3.18mm)
CAPACITY STATUS LIGHTENING ARRESTOR
RATING STATUS
132 kV LINE ACSR - PANTHER (30/7/3.00 mm)
220 V 200Ah Functional Boost:30A
Float:20A Functional CIRCUIT BREAKER
EARTH-WIRE GSS - (7/3.15 mm)
48 V 400Ah Boost:60A
Functional Functional CURRENT TRANSFORMER
Float:40A
66 kV BUS ACSR-WOLF (30/7/2.59 mm)
ISOLATOR WITHOUT
66 kV LINE ACSR- WOLF(30/7/2.59mm) EARTH SWITCH
(PTR:
33 kV/110 V)
T2 (25/31.5 MVA) T1 (16/20 MVA)
Y (132/33 KV) Y (132/33 KV)
VCB TC: ON LOAD TC: ON LOAD
Y No.of Taps:17 Y No.of Taps:17
NormalTap:5 NormalTap:5
(CTR:
400-200/1-1) (CTR:600-300/ (CTR:600-300/
1-1-1-0.577) 1-1-1-0.577)
VCB VCB
33 kV Bus Connected
400-200/1-1A VCB (CTR: 300-150/1-1A)
(CTR:600-300/
(PTR: 1-1)
(PTR:
33 kV/110 V) (PTR:
33 kV/110 V)
VCB VCB 33 kV/110 V)
200-100/1-1-1A 200-100/1-1-1A VCB VCB VCB VCB VCB
400-200/1-1A 400-200/1-1A (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/
T2 33/11 kV T1 33/11 kV (CTR:400-200/
1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A)
3.15 MVA 3.15 MVA 1-1-1A)
TC: Off LOAD TC: Off LOAD
No.of Taps:5 No.of Taps:5
NormalTap:2 NormalTap:2
600-300/1-1A 600-300/1-1A
MANDI-I MANDI-II
[3.0km] 600-300/1-1A
[3.0km]
Padhar Sunder-nagar-II Sunder-nagar-I Seiglu Pandoh-I
[23.490 km] Katalila Pandoh-II
[19 km] [25 km] [7.5 km] [10.00 km] [20.689 km] [24.0 km]
(CTR:600-300/0.577-1-1-1A) (CTR:600-300/1-1)
33kV BUS B1
VCB (CB-SF6)
PTR: (CTR:400-200/ (CTR:200-100/ (CTR:200-100/ (CTR:400-200/ (CTR:400-200/ (CTR:500-250/ (CTR:200-100/ (CTR:400-200/ (CTR:150-75/
(CB-VCB) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A) (CTR:200-100/1-1-1A) 1-1-1A) 1-1A) 1-1A) 1-1A)
33kV/110V/ 400/1A (CTR:200-100/
110V (CTR:300-150/1-1) (CB-VCB) (CB-VCB) (CB-VCB) (CB-VCB) 1-1-1A)
VCB
(CB-VCB) (CB-VCB)
33/0.4 kV
100 KVA
T1 T2
33/0.4 kV
(6.3MVA) (6.3MVA) Y
250 KVA
Y (33/11 KV) (33/11 KV)
TC:Off LOAD TC:Off LOAD
Y No.of Taps:5 Y No.of Taps:5
NormalTap:2 NormalTap:2
WOLF WOLF WOLF DOG ST. Aux.
DOG DOG DOG WOLF
ST. Aux. Xmer
Capacitor Bank/ Capacitor Bank/
Series Reactor Xmer MEHATPUR
Series Reactor TAHLIWALA-I GAGRET BANGANA BARSAR SABER PAPER PTR: PTR: TAHLIWALA-II HAROLI AMB/BASAL
(3.6 MVAR) (3.6 MVAR) [16.00km] [35.20km] [23.289km] 11kV/110V 11kV/110V (CTR:800-400/ [16.433km] [8.368km] [7.750km] [11.122km]
[27.80km] [40.196km]
.577-5-5-5A)
(BOTH FUNCTIONAL) (AAAC-7/4.72mm) (CTR:1200-600/ (CTR:800-400/
.577-5-5-5A) VCB VCB 5-5A)
11KV BUS 11KV BUS
(CTR:800-400/
5-5A)
VCB VCB VCB VCB VCB VCB VCB VCB
VCB VCB VCB VCB
(CTR:250-125/
(CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ 1-1A)
5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A) 5-5A)
5-5A) 5-5A)
SANTOSH SPARE UNA-III UNA-I UNA-I PIRNIGAH SAMOOR UNA-IV M/PUR UNA-II JHALERA
GARH [2.20km] [4.60km] [4.60km] [10.570km] [3.0km] [4.956km] [12.30km] [20.70km]
[7.186km] Cells
(AAAC- (AAAC- (AAAC- (AAAC- (AAAC- (AAAC-
[27.697km] (AAAC- (AAAC- (AAAC-
7/4.72mm) 7/4.72mm) 7/4.72mm 7/4.72mm) 7/4.72mm) 7/4.72mm) 7/4.72mm)
(ACSR- 7/4.72mm) 7/4.72mm)
6/1/3.35mm) &ACSR- Series Series
6/1/3.35mm) Reactor Reactor
(1.8 MVAR) (1.2 MVAR)
(BOTH FUNCTIONAL)
SINGLE LINE DIAGRAM OF 132/66/33 kV SUB-STATION SOLAN
AS ON: 07-01-2016 43
CONDUCTOR/EARTH-WIRE DETAIL
(S/C) (S/C) (S/C) (S/C)
[81.153 km] [65.758 km] [20.00 km] [22.00 km] ACSR- ZEBRA(54/7/3.18mm)
132 kV BUS
GIRI-II GIRI-I KUNIHAR-II KUNIHAR-I
LIGHTENING ARRESTOR
CIRCUIT BREAKER
SF6 SF6
(CTR: 250/1-1-1-1) (CTR: 150/1-1-0.577) CURRENT TRANSFORMER
T2 T1
(3x16.67 MVA) (25/31.5 MVA)
Y (132/33 KV) Y (132/66 KV) ISOLATOR WITHOUT
EARTH SWITCH
TC: ON LOAD TC: ON LOAD
Y No.of Taps:17 Y No.of Taps:17
NormalTap:5 NormalTap:5
ISOLATOR WITH
EARTH SWITCH
(CTR:1200-600/1-1-1-1-0.577) (CTR:300-150/1-1-0.577)
VCB WAVE TRAP
POTENTIAL TRANSFORMER
ZEBRA TWIN
ZEBRA SINGLE ZEBRA SINGLE 66KV BUS B1
To To Lower
Upper Yard POWER TRANSFORMER
Yard
PT
Connected Connected (66kV/110V) CAPACITOR VOLTAGE
(CTR:600-300/1-1-1) (CTR:600-300/1-1-1) TRANSFORMER
VCB MOCB BOCB
(CTR:300-150 (400-200/
/1-1) 1-1-1)
(400-200/ (600-300/1-1-1) (400-200/ (400-200/ (150-75/ (400-200/ (300-150/1) 48 V 400Ah Functional 13A Functional
1-1-1) 1-1-1) 1-1-1) 1-1)
1-1-1)
Shimla Parwanoo
(Totu) (18.50 km.)
(25.27 km.)
Solan-I Solan-II
(1.14 km.) Kasauli Rajgarh Sarahan Kandaghat
(1.14 km.) (16.80 km.) (36.00 km.) (32.00 km.) (12.20 km.)
(ACSR-2) (ACSR-2)
(ACSR-3) (ACSR-3/ (AAAC) (AAAC)
AAAC) Cells Cells
ST. TR Series Series
(33/0.4 kV) Reactor Reactor
(250 kVA) TO 33kV KATHED (2x2.5 MVAR)
S/STN (Functional) (Functional)
SINGLE LINE DIAGRAM OF 132/33 KV S/STN TAHLIWALA 44
AS ON: 21-01-2016
LEGEND
(S/C LINE)
UNA
[16.949km] LIGHTENING ARRESTOR
CONDUCTOR/EARTH-WIRE DETAIL
CIRCUIT BREAKER
132 kV BUS ZEBRA (54/7/3.18mm)
CURRENT TRANSFORMER
132 kV LINE PANTHER (30/7/3.00mm)
ISOLATOR WITHOUT
EARTH-WIRE GSS (7/3.15mm) EARTH SWITCH
OPGW:24/1/81.5mm-132kV Line
POTENTIAL TRANSFORMER
SF6
POWER TRANSFORMER
132kV BUS BAR
CAPACITOR VOLTAGE
TRANSFORMER
PTR:
132kV/110V
SF6 SF6
150-75/1-1-1-1-1A 150-75/1-1-1-1-1A
DC SYSTEM STATUS
T1 T2
(25/31.5 MVA) (25/31.5 MVA)
Y (132/33 KV) Y (132/33 KV) DC VOLTAGE
BATTERY BANK BATTERY CHARGER
(CTR: 600-300/1-1-1-1A)
33KV BUS BAR
33/0.4 kV
250 KVA
STN.Xmer FDR-I FDR-II HN STEEL SUKHJEET TAHLIWALA
[2.50km] INDUSTRIES [9.20km]
(ACSR) [0.8km] (AAAC)
(ACSR)
45
66 kV Sub-Stations/
Power Houses
SINGLE LINE DIAGRAM OF 66/33/11 kV SUB-STATION AKANWALI 46
AS ON: 06-01-2016
(D/C LINE) (D/C LINE) (D/C LINE) (D/C LINE) (S/C LINE) (S/C LINE)
[14.507 km] [14.507 km] [10.172 km] [10.172 km] [0.425 km] [2.11 km]
LEGEND
NALAGARH-I NALAGARH-II BADDI-I BADDI-II ALKEM DAVNI
DC SYSTEM STATUS
220 V Boost:2x40A
200Ah Functional
Float:2x40A Functional
CURRENT TRANSFORMER
48 V Boost:2x60A
400Ah Functional Float:2x60A Functional
ISOLATOR WITHOUT
EARTH SWITCH
ISOLATOR WITH
(CTR:500-250/ (CTR:500-250/ (CTR:500-250/ (CTR:500-250/ (CTR:200-100/ (CTR:400-200/ EARTH SWITCH
1-1-1-1A) 1-1-1-1A) 1-1-1-1A) 1-1-1-1A) 1-1-1-1A) 1-1-1-1A)
SF6 SF6 SF6 SF6 SF6 SF6
WAVE TRAP
POWER TRANSFORMER
Main Bus -I
66 kV BUS CAPACITOR VOLTAGE
TRANSFORMER
(PTR:66kV/110V)
CONDUCTOR/EARTH-WIRE DETAIL
11 kV BUS
33 kV BUS
PTR:
PTR: VCB VCB VCB VCB VCB VCB [33kV/110V]
[11kV/110V]
(CTR:300-150/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/ (CTR:400-200/
1-1-1) 1-1-1) 1-1-1) 1-1-1) 1-1-1) 1-1-1)
VCB VCB VCB VCB VCB
(CTR:15-7.5/ (CTR:200-100/ (CTR:200-100/ (CTR:300-150/ (CTR:200-100/
1-1-1) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A)
Feeder No.4 Feeder No.5 Feeder No.6 Feeder No.8 Feeder No.9 Feeder No.10
(4.00 km.) (6.00 km.) (2.50 km.) (5.50 km.) (25.30 km.) (5.75 km.)
Y
66 kV LINE
EARTH-WIRE MS FLAT
22 kV 22 kV 22 kV 22 kV
Feeder-I Feeder-II 3 MW Gumma 6 MW Tanganu Proposed
22 kV BUS-1 WOLF [30/7/2.59 mm]
22 kV LINE
(CTR:400-200/1-1-1 A) (CTR:150-75/1 A)
(CTR: (CTR: (CTR:
200/1-1-1 A) (CTR:400-200/1-1-1 A)
100/1-1-1 A) 150/1-1-1 A)
(PTR: 22kV/110V)
(PTR:
66kV/110V) LEGEND
66 kV Bus B1
LIGHTENING ARRESTOR
22 kV Bus B1
CIRCUIT BREAKER
CURRENT TRANSFORMER
DC SYSTEM STATUS
220 V
48 V
SINGLE LINE DIAGRAM OF 66/22 kV SUB-STATION NAGAN (ANNI)
AS ON: 07-01-2016 48
(S/C LINE) (S/C LINE) LEGEND
[40.304Km.) [17.30Km.)
GUMMA KUMARSAIN
CONDUCTOR/EARTH-WIRE DETAIL
LIGHTENING ARRESTOR
66 kV BUS MOOSE (54/7/3.54mm)
CIRCUIT BREAKER
66 kV LINE WOLF (30/7/2.59mm)
CURRENT TRANSFORMER
EARTH-WIRE GSS-(7/3.15 mm)
ISOLATOR WITHOUT
22 kV BUS COPPER FLAT (75x12mm) EARTH SWITCH
POTENTIAL TRANSFORMER
CAPACITOR VOLTAGE
TRANSFORMER
SF6-CB SF6-CB
DC SYSTEM STATUS
(CTR:200-100/1-1-1-1) (CTR:200-100/1-1-1-1)
T2. 10 MVA BATTERY BANK BATTERY CHARGER
T1. 10 MVA
66/22kV XFMR 66/22kV XFMR DC VOLTAGE
TC: ON LOAD
TC: ON LOAD No.of Taps:17 CAPACITY STATUS RATING STATUS
No.of Taps:17 NormalTap:5
NormalTap:5
Functional Boost:30A
220 V 200Ah Functional
Float:30A
(CTR:600-300/1-1) (CTR:600-300/1-1)
48 V N.A. N.A. N.A. N.A.
(CTR:600-300/1-1-1)
22kV Bus
PTR: PTR:
[22kV/110V] [22kV/110V]
22/0.433 kV
[250 kVA]
Y
STN. XFMR
(50mm2 Cable)
ANNI KHANAG SHAWAD BARAD DALASH
[46.047km] [470.912km] [69.207km] [9.00km] [9.750km]
(ACSR-1&2) (ACSR-2) (ACSR-2) (ACSR-2) (ACSR-2)
SINGLE LINE DIAGRAM OF 66/11 kV SUB-STATION BHATOLIKALAN 49
AS ON: 06-01-2016
48 V 200Ah Boost:2x20A
Functional Functional
Float:2x20A
CONDUCTOR/EARTH-WIRE DETAIL
22 kV BUS
66 kV BUS 22 kV LINE
PTR: 66kV/110V
1200-600/1-1
11KV BUS ISOLATOR WITH
EARTH SWITCH
WAVE TRAP
POTENTIAL TRANSFORMER
11kV/110V 100-50/1-1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 PTR:
11KV/110v
POWER TRANSFORMER
250 kVA
11/0.4 KV
CAPACITOR VOLTAGE
12 TRANSFORMER
1 2 3 4 9 10 11
ST. Aux.
Xmer
SINGLE LINE DIAGRAM OF 66/11 kV SUB-STATION DAVNI 50
AS ON: 06-01-2016
48 V 200Ah Boost:2x20A
Functional Functional
Float:2x20A
CONDUCTOR/EARTH-WIRE DETAIL
22 kV BUS
66 kV BUS 22 kV LINE
PTR: 66kV/110V
1200-600/1-1
11KV BUS ISOLATOR WITH
EARTH SWITCH
WAVE TRAP
POTENTIAL TRANSFORMER
11kV/110V 100-50/1-1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 200/1-1 PTR:
11KV/110v
POWER TRANSFORMER
250 kVA
11/0.4 KV
CAPACITOR VOLTAGE
12 TRANSFORMER
1 2 3 4 9 10 11
ST. Aux.
Xmer
SINGLE LINE DIAGRAM OF GHANVI 51
CONDUCTOR/EARTH-WIRE DETAIL
132 kV LINE
EARTH-WIRE
33 kV BUS-1
33 kV BUS-2
33kV LINE
LEGEND
LIGHTENING ARRESTOR
66 kV Bus B1 Bus B2
CIRCUIT BREAKER
Y Y CURRENT TRANSFORMER
Y Y
Y Y
(PTR: (PTR:
66kV/110V) 66kV/110V) ISOLATOR WITHOUT
EARTH SWITCH
22 kV Bus
ISOLATOR WITH
EARTH SWITCH
GT1 GT2
(13.75 MVA) (13.75 MVA)
11/66 KV 11/66 KV WAVE TRAP
TC: ON/Off LOAD Y TC: ON/Off LOAD Y
No.of Taps:17 No.of Taps:17
NormalTap: NormalTap:
POTENTIAL TRANSFORMER
ST. XFMR-I ST. XFMR-II
22/0.415 kV 22/0.415 kV
Y 500 KVA Y 500 KVA
(PTR: POWER TRANSFORMER
(PTR:
11kV/110V) Connected 11kV/110V) Connected
(CTR:750/5) (CTR:750/5)
To 415 V, AC Kotla(Jeori) To 415 V, AC Kotla(Jeori) CAPACITOR VOLTAGE
Switchgear&UAT Switchgear&UAT TRANSFORMER
Feeder-I Feeder-II
UNIT-I UNIT-II
(11.25 MW) (11.25 MW)
DC SYSTEM STATUS
220 V
48 V
52
SINGLE LINE DIAGRAM OF 66/11 kV SUB-STATION GOLTHAI
AS ON: 21-01-2016
(CTR:500-250/1-1-1) (CTR:500-250/1-1-1)
LEGEND
SF6 SF6
LIGHTENING ARRESTOR
CIRCUIT BREAKER
66 kV Bus Bar B1
CURRENT TRANSFORMER
ISOLATOR WITH
EARTH SWITCH
PTR:[66kV/110V]
WAVE TRAP
SF6
(CTR:200-100/1-1-1-0.577) (CTR:200-100/1-1-1-0.577)
(CTR:500-250/1-1-1) POTENTIAL TRANSFORMER
66/11 kV
Y (6.3 MVA)
TC: ON LOAD
Y No.of Taps:17
POWER TRANSFORMER
NormalTap:5
(CTR:1200-600/0.577-5-5-5A)
VCB CAPACITOR VOLTAGE
TRANSFORMER
11 kV BUS
PANTHER PANTHER
PTR:11kV/110V VCB VCB VCB VCB
SPS IND. SURAJ IND.
[.40km] [.260km]
(CTR:200-100/ (CTR:200-100/ (CTR:400-200/ (CTR:200-100/
DC SYSTEM STATUS 5-5-5A) 5-5-5A) 5-5-5A) 5-5-5A)
ISOLATOR WITH
EARTH SWITCH
(CTR:300-150/1-1A) (CTR:300-150/1-1A) (CTR:300-150/1-1A)
DC SYSTEM STATUS
POTENTIAL TRANSFORMER
BATTERY BANK BATTERY CHARGER
DC VOLTAGE
(CTR:300-150/1-1A)
66 kV BUS CAPACITY STATUS RATING STATUS
POWER TRANSFORMER
MOCB
220 V 200Ah Functional Boost:50A
Functional
Float:30A
CAPACITOR VOLTAGE
48 V N.A. N.A. N.A. N.A. TRANSFORMER
CTR:150-300/1-1
PT: 22kV/
110V
VCB
(CTR:300-150/1-1A) (CTR:300-150/1-1A)
22 kV BUS
(CTR:50-25/1-1A) (CTR:200-100/ (CTR:200-100/ (CTR:100-50/ (CTR:200-100/ (CTR:100-50/ (CTR:100-50/ (CTR:200-100/ (CTR:100-50/ (CTR:300-150/ (CTR:200-100/ (CTR:200-100/
(CTR:100-50/1-1A)
1-1A) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A) 1-1A)
MOCB MOCB MOCB MOCB MOCB MOCB MOCB MOCB MOCB MOCB MOCB VCB VCB VCB
(CTR:15-7.5/1-1A)
100 KVA
22/0.4 KV
ST. Aux.
Xmer
AIR SUNI DRABLA NO-I GUMMA-I DRABLA-II KADHAR CHAIR GUMMA-II THEOG CHABBA MASHOBRA GUMMA-III GHARGUMMA
(4.900 km) (17.00 km) (1.450 km) (0.600 km) (1.450 km) (11.00 km) (12.900 km) (0.550 km) (18.0 km) (10.5 km) (6.750 km) (0.750 km) (0.900 km)
SINGLE LINE DIAGRAM OF 66/22 kV SUB-STATION HULLI
AS ON: 13-01-2016 54
SAINJ
(9.992 Km.)
(S/C LINE) CONDUCTOR/EARTH-WIRE DETAIL
LEGEND
66 kV BUS ZEBRA (54/7/3.18mm)
Connected (CTR:
(CTR: 400-200/1-1A) 300-150/1-1)
250 KVA
22/0.433 kV
ACSR- 1. 6/1/3.35mm
22 kV LINE 2. 6/1/4.9mm ISOLATOR WITH
AAAC- 7/3.8mm EARTH SWITCH
(CTR: 300-150/1-1-1) (CTR: 300-150/1-1-1)
WAVE TRAP
POTENTIAL TRANSFORMER
CAPACITOR VOLTAGE
TRANSFORMER
PTR: PTR:
[22kV/110V] [22kV/110V]
(CTR:100-50/ (CTR:150-/1-1) (CTR:100-50/ (CTR:100-50/ (CTR:100-50/ (CTR:200-100/1-1A) (CTR:50-25/ (CTR:100-50/ (CTR:180-90/ (CTR:50-25/ (CTR:15-7.5/
1-1) 1-1) 1-1) 1-1) 1-1) 1-1) 1-1) 1-1) 5-5)
STN. XFMR
THANEDHAR ANNI NANKHARI MADHWANI SPARE ADANI NARKANDA KUMARSAIN RAMPUR BARAGAON [63 KVA]
FEEDER FEEDER FEEDER FEEDER FEEDER FEEDER FEEDER FEEDER FEEDER FEEDER (7 m, 50mm2)
[8.0km] [22.0km] [25.0km] [132.0km]
[76km] [23.8km] [40.0km] [18.0km] [48.0km]
(ACSR-1) (ACSR-1) (ACSR-2) (ACSR-1) (ACSR-1)
(AAAC) (ACSR-1) (ACSR-1) (ACSR-1)
SINGLE LINE DIAGRAM OF 66/33/11 kV SUB-STATION, NALAGARH LEGEND
56
AS ON: 06-01-20116
LIGHTENING ARRESTOR
(ACSR-2) (ACSR-2)
UPERLA UPERLA (ACSR-1)
NANGAL-1 NANGAL-2 AKANWALI CIRCUIT BREAKER
[3.510 km] [3.510 km] [14.507 km]
(ACSR-1) (ACSR-1) CURRENT TRANSFORMER
CONDUCTOR/EARTH-WIRE DETAIL AKANWALI BADDI GPIL
WOLF [14.507 km] [16.739 km] [1.545 km]
ISOLATOR WITHOUT
66 kV BUS TWIN AAAC TARANTULA(37/5.23mm) EARTH SWITCH
POPLAR-II PANTHER PANTHER
ACSR 1.PANTHER (30/7/3.00 mm)
66 kV LINE
2. ZEBRA (54/7/3.18mm) ISOLATOR WITH
POPLAR-II (37/3.05mm) EARTH SWITCH
CAPACITOR VOLTAGE
TRANSFORMER
CTR:1200-600/ 66 kV BUS
1-1-1-1
PTR:
66kV/110V
CTR:200-100/
CTR:200-100/ 1-1-1-0.577 CTR:200-100/ CTR:200-100/ CTR:200-100/
SPARE SPARE SIDHARTHA MANJHOLI 1-1-1-0.577 1-1-1-0.577 1-1-1-0.577 1-1-1-0.577
MOCB MOCB MOCB
T4 66/33 kV POOJA
T2 66/11 kV B/WALA INDUSTRIAL KHERA-II DABHOTA NALAGARH COTSPIN T1 66/11 kV
T5 66/33 kV (10 MVA) T3 66/33 kV
(20 MVA) (20 MVA) (20 MVA)
(20 MVA) TC: ON LOAD
33/11 kV TC: ON LOAD TC: ON LOAD TC: ON LOAD
TC: ON LOAD No.of Taps:17
No.of Taps:17 No.of Taps:17 No.of Taps:17
3.15 MVA No.of Taps:17 NormalTap:5
NormalTap:5 NormalTap:5 NormalTap:5
NormalTap:5 CTR: CTR: CTR: CTR: CTR: CTR:
300-150/5 300-150/5 600-300/5 300-150/5 300-150/5 300-150/5 CTR:1200-600/
CTR: CTR: CTR: CTR: CTR:400-200/ CTR:1200-600/
100-50/5 200-100/1 100-50/1 300-150/1 CTR:400-200/ 1-1-1-0.577 CTR:400-200/ 1-1-.577A 1-1-.577A
1-1-1-0.577 1-1-1-0.577
PTR:
11kV/110V 11kV/110V
33 kV BUS
GODREJ ASIDE G/CLARIDGE PANJAHRA KHERA-I MIDC RAMSHAHAR HIMCHEM
SF6 SF6
CTR: CTR: PTR:
150-75/1-1 150-75/1-1 33kV/110V
DC SYSTEM STATUS
66 kV BUS
CIRCUIT BREAKER
ISOLATOR WITH
22 kV LINE EARTH SWITCH
Connected Connected Connected CTR:
(CTR: 300/1) (CTR: 300/1) (CTR: 300/1) 400-200/1-1-1-1 WAVE TRAP
POTENTIAL TRANSFORMER
T1
(10 MVA)
(66/22 KV)
22kV BUS
OLD RAMPUR JAKAT KHANA DANSA TAKLECH THANEDHAR KUMARSAIN RAMPUR NIRMAND BAHLI
59
SINGLE LINE DIAGRAM OF 66/11 kV SUB-STATION PARWANOO
AS ON: 07-01-2016
LEGEND
(S/C) (S/C)
SOLAN BAROTIWALA LIGHTENING ARRESTOR
(18.50 km.) (17.213 km.)
(S/C)
CIRCUIT BREAKER
PINJORE
AAAC (8.230 km.)
DOTTEREL
CURRENT TRANSFORMER
DOTTEREL
ISOLATOR WITHOUT
EARTH SWITCH
DC SYSTEM STATUS
POWER TRANSFORMER
66 kV Bus Bar
CAPACITOR VOLTAGE
TRANSFORMER
PTR:[66kV/110V]
CONDUCTOR/EARTH-WIRE DETAIL
VCB
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
(CTR:200-100 300-150/1-1 300-150/1-1 CTR:25/1 (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR: (CTR:
(CTR:200-100 400-200/5-5) 400-200/5-5) 400-200/5-5) 400-200/5-5) 400-200/5-5) 400-200/5-5) 400-200/5-5) 400-200/5-5) 400-200/5-5) 200-100/5-5)
/1-1A) 200-100/1-1) 250-125/1-1) 250-125/1-1)
/1-1A)
100 kVA
11/0.4 kV
Y
KHADEEN SPARE PARWANOO-4 PARWANOO-2 PARWANOO-3 PARWANOO-5
(2 MVAR) (2 MVAR) WATER SUPPLY KASAULI COSMO GABRIAL SPARE PARWANOO-1 SPARE
[3.50 km] [4.00km] (2 MVAR) (2 MVAR)
Cap Bank-3 Cap Bank-4 (1.3 km.) (34.8 km.) (11.885 km.) (2.65 km.) (8.5 km.) (1.2 km.) (4.1 km.) (2.3 km.) Cap Bank-1
(ACSR-DOG) St. Xmer (ACSR-2) (ACSR-1) Cap Bank-2
Non- Non- (ACSR-2) (ACSR-DOG) UPTO NARIYAL (AAAC 1/ (ACSR-DOG) (ACSR-1) (AAAC 1) Functional
Functional
Functional Functional (ACSR-DOG) AAAC 2)
SINGLE LINE DIAGRAM OF 66/11 kV SUB-STATION SAINJ 60
AS ON: 20-01-2016
66 kV LINE WOLF(30/7/3.00mm)
ACSR 6/1/3.35mm
22 kV LINE AAAC 1. 7/3.18mm
2. 7/3.15mm
LEGEND
66 kV BUS
LIGHTENING ARRESTOR
POWER TRANSFORMER
DC SYSTEM STATUS
VCB VCB VCB VCB VCB
BATTERY BANK BATTERY CHARGER
DC VOLTAGE
CTR:200-100/1 CTR:200-100/1 CTR:25/1 CTR:200-100/1 CTR:200-100/1 CAPACITY STATUS RATING STATUS
AS ON: 13-01-2016
CONDUCTOR/EARTH-WIRE DETAIL
DC SYSTEM STATUS
LEGEND
BATTERY BANK BATTERY CHARGER
DC VOLTAGE
LIGHTENING ARRESTOR
(CTR: 300-150/1-1-1A) CAPACITY STATUS RATING STATUS
SF6 Boost:30A
220 V 200Ah Functional Float:20A Functional CIRCUIT BREAKER
200Ah Boost:30A
48 V Functional Float:20A Functional CURRENT TRANSFORMER
ISOLATOR WITHOUT
66 kV Bus Bar EARTH SWITCH
PTR:.
[66kV/110V]
ISOLATOR WITH
EARTH SWITCH
VCB
VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB VCB
(CTR:100-50/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:100-50/ (CTR:100-50/ (CTR:100-50/ (CTR:200-100/ (CTR:200-100/ (CTR:200-100/ (CTR:100-50/
1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A) 1-1-1A)
100 kVA
11/0.4 kV
Y
Goyal Sri Ganesh Kasba Ind. Area Spare Spare Premier Spare Ind. Area DV Steel Seul Khad
Furnance Furnance Kotla Phase-1 Alcobev Phase-2 [0.390km] [13.981km]
St. Xmer [0.240km] [0.120km] [29.388km] [3.520km] [0.265km] [2.615km] (AAAC-1) (ACSR)
(AAAC-1) (ACSR) (AAAC-2) (XLPE) (AAAC-1)
(AAAC-1)
SINGLE LINE DIAGRAM OF 66/22 kV SUB-STATION SMOLI
AS ON: 07-01-2016 62
66 kV BUS PANTHER(30/7/3.00mm)
LIGHTENING ARRESTOR
ISOLATOR WITH
EARTH SWITCH
Connected Connected
(CTR: 300-150/1-1A) (CTR: 300-150/1-1A) WAVE TRAP
POTENTIAL TRANSFORMER
66 KV, B1
POWER TRANSFORMER
16 MVA 10 MVA
Y 66/22 kV 66/22 kV DC SYSTEM STATUS
TC: ON LOAD TC: ON LOAD
No.of Taps:17 No.of Taps:17 BATTERY BANK BATTERY CHARGER
NormalTap:5 NormalTap:5 DC VOLTAGE
Connected CAPACITY STATUS RATING STATUS
(CTR: 200-100/1-1A) (CTR: 200-100/1-1A)
(NON-FUNCTIONAL) Boost:30A
CAPACITOR BANK [(2x2.4) = 4.8 MVAR] 220 V 200Ah Functional Functional
Connected Float:20A
(CTR: 900-450/1-1-1) (CTR: 600-300/1-1)
48 V Boost:15A Functional
200Ah Functional
Float:10A
(CTR:
300-150/1-1)
Connected Connected
(CTR: (CTR: (CTR:200-100/1-1A) (CTR:300-150/1-1A)
(CTR:200-100/1-1A)
400-200/1-1-1) 400-200/1-1-1)
100 KVA
22kV/0.4kV
STN.XFMR
Rohru-1 Rohru-2 Spare SWARA KUDDU MASLIHED
[2.64km] [2.64km] [26.5km] [12.0km]
(AAAC) (AAAC) (ACSR) (ACSR)
SINGLE LINE DIAGRAM OF 66/15/11 kV SUB-STATION AT TOTU (SHIMLA) 63
AS ON: 18-01-2016
EARTH-WIRE
33 kV BUS
66 kV BUS
DC SYSTEM STATUS
T1
Y 20 MVA INCOMING (A/R) CIRCUIT BREAKER
66/11 kV
Y CHAKKAR (A/R) CURRENT TRANSFORMER
TC: ON LOAD
No.of Taps:17
NormalTap:5 TARADEVI (A/R)
ISOLATOR WITHOUT
(CTR:1200-600/ EARTH SWITCH
1-1A)
VCB
(CTR:1200-600/ ISOLATOR WITH
VCB 1-1A) EARTH SWITCH
11 kV BUS
WAVE TRAP
POTENTIAL TRANSFORMER
(CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/ (CTR:300-150/
1A) 1A) 1A) 1A) 1A) 1A) 1A) 1A) 1A)
POWER TRANSFORMER
CAPACITOR VOLTAGE
STP M.E.S. JUTOGH DHAMI C/PLANT TARADEVI BANUTI CHAKKAR SUMMER HILL STN AUXILIARY TRANSFORMER
(GADOG) [54.0km] [18.0km] [1.0km] [40.0km] [45.0km] [6.50km] [2.360km]
[3.0km]
64
PROPOSED OFC ROUTING DIAGRAM OF HPSEBL ABOVE 66kV( INCLUDING EXISTING & OFC PROPOSED UNDER PRIORITY LINKS &
ADDITIONAL COMMUNICATION REQUIREMENT)
2.00 km.
Naptha Bhaba(E) 13.10 km.
Proposed SAMOLI ANDRA(E)
Proposed
(OPGW) Proposed
39.00 km. (OPGW)
(OPGW) Proposed PLCC
Proposed 20.140 km. Baspa (E) Wangtoo
34.41 km. (OPGW)
(OPGW) Kashang
Proposed
Proposed
3.565 km. (OPGW) PLCC
Ghanvi (E) Jeori(E) 24.71km. (OPGW) NOGLI 25.69km.
Proposed Ksain
Proposed 42.04km.
(OPGW)
PGCIL Proposed (OPGW)
1.55 km. (OPGW) 15.490 km. GUMMA 21.29km. Sainj 9.992km.
HULLI
Totu Existing Proposed Proposed
Proposed
(ADSS) (OPGW) (OPGW) (OPGW)
6.0 km. 20.000 km.
Kumar House JUTOGH(E) Maliana KALA AMB(E)
32.00 km. Proposed
Palampur (E) Jhakri
Bassi(E) Darlaghat (E) 15.34km. (OPGW) Proposed 31.96km.
Proposed Kunihar(E) (OPGW)
(OPGW) Proposed
Proposed (OPGW)
13.563 km. Proposed 47.64km.
180km.
Kurthala (OPGW) 20.00 km. 63.99 km.(OPGW) Under Central
Proposed 15.00 km. Existing SOLAN(E) GIRI(E) 16.39km. PONTA
(OPGW) PGCIL Existing Proposed Sector
(OPGW) 18.5 km. Existing
45.42 km. Proposed (OPGW) (OPGW)
PGCIL Existing (OPGW) Abdullapur
(OPGW)
(OPGW)
Bathri Kangra(E)
26.03km. PARWANOO
36.00 km. Bagha (E) PGCIL Existing
Chullah Gaura
39 km. Proposed 16.205km. (OPGW)
30 km. Proposed BAROTIWALA (E)
(OPGW) (OPGW) Proposed Sonepat
(OPGW)
Hamirpur-I(E) Proposed Kangoo(E)
42.139 km. 3.250 km. PGCIL Existing 27.0 km.
(OPGW)
Existing (OPGW)
Proposed Existing
60 km. (OPGW)
Jassore(E) Dehra(E) (OPGW) (OPGW)
PGCIL Existing
Proposed
(OPGW)
(OPGW) 17.0 km. 3.50km.
Jahoo Mandhala BADDI(E) Nalagarh U/Nangal (E)
24.234 km. Proposed 4.90km. 53.00 km. 8.0 km. PGCIL Existing HPSEB PGCIL Existing
(OPGW) 6.40 km.
Proposed Existing Existing (OPGW) (OPGW) PGCIL Existing
(OPGW) (OPGW) (OPGW) (OPGW)
28 km.
Hmpr-II(E)
Ratti 10.301km. Existing Nalagarh
Kandrori (OPGW) PGCIL
43 km. Proposed
Existing Akkanwali
Proposed (OPGW) Proposed
(OPGW) Proposed
(OPGW) (OPGW)
Tahliwal
17.0 km.
Rakkar
31.3km.
Amb
Larji (E) (OPGW)
Mandi(E) ROW AGREEMENT SIGNED WITH PGCIL
20.00 km.
Pandoh
Existing
(OPGW)
ON 26.07.2010 FOR LAYING OF OPGW ON
15.980 km. Proposed
Proposed
(OPGW)
21.00 km. HPSEB HT/EHT LINES (PG-9 CP-303)
7.80 km. Proposed
(OPGW) (OPGW)
JUTOGH
Bajura(E) Legends
Golthai Gagret
1.55 km.
22 kV
25.27 km.
33 kV TOTU SOLAN
66 kV
132 kV 22.00 km.
220 kV 26.03 km.
BAROTIWALA KUNIHAR
33 kV S.Stn.
66 kV S.Stn. 3.250 km.
17.00 km.
132 kV S.Stn. BADDI NALAGRAH
S.No. Name of Line Total Voltage Existing (ULDC- Laid by ES Existing Laid by OPGW OPGW Proposed Total OPGW Remarks
OPGW Level (kV) I) (Kms) Wing (Kms) PGCIL Telecom as Proposed under Additional Proposed
(Existing+ per agreement under Priority Communication (Kms)
Proposed) Links Requirement
(Kms)
Part-I Part-II
1 Amb - Dehra 28 132 28 28
2 Dehra - Hamirpur II 43 132 43 43
3 Chullah - Bassi 15 132 15 15
4 Hamirpur II - Chullah 36 132 36 36
5 Jassore - Dehra 60 132 60 60
6 Pandoh - Mandi 20 132 20 20
7 Larji - Bajura 21 132 21 21
8 Jassore - Bathri 39 132 39 39
9 Amb-Gagret 7.80 132 7.80 7.80
10 Rakkar-Golthai 15.98 132 15.98 15.98
11 Kangoo - Ratti-Pandoh -Larji 53 132 53 53
12 Dehra-Kangra 29.93 132 29.93 29.93
13 Bhaba-Nathpa 2.000 220 2.000 2.000
14 Nathpa-Ghanvi 20.140 66 20.140 20.140
15 Ghanvi-Jeori 3.565 66 3.565 3.565
16 Jeori-Nogli 24.710 66 24.710 24.710
17 Nogli-Samoli 34.410 66 34.410 34.410
18 Samoli-Andhra 13.100 66 13.100 13.100
19 Nogli-Kumarsain 25.690 66 25.690 25.690
20 Kumarsain-Guuma 42.040 66 42.040 42.040
21 Gumma-Sainj 21.290 66 21.290 21.290
22 Sainj-Hulli 9.992 66 9.992 9.992
23 Gumma-Jutogh 15.490 66 15.490 15.490
24 Jutogh-Totu 1.550 66 1.55 To be Laid by PGCIL
25 Totu-Solan 25.270 66 25.27
26 Solan-Kunihar 22.000 66 22
27 Kunihar-Barotiwala 26.030 66 26.03
28 Barotiwala-Baddi 3.250 66 3.25
29 Baddi-Nalagarh 17.000 66 17
30 Baddi-Akhanwali 10.301 66 10.301
31 Nalagarh-Uperala Nangal 3.510 66 3.51
32 Uperala Nangal-Nalagarh PGCIL 3.569 220 3.569 63.990 63.990
33 Solan-Giri 63.990 132 31.960 31.960
34 Giri-KalaAmb 31.960 132 16.390 16.390
35 Giri-Poanta 16.390 132 16.205 16.205
36 Kangoo-Bagga 16.205 132 13.563 13.563
37 Bagga-Darlaghat 13.563 132 32.000 32.000
38 Bassi-Palampur 32.000 132 24.234 24.234
39 Jassore-Kandrori 24.234 132 20.000 20.000
40 Jutogh-Maliana 20.000 132 45.42 45.42
41 Bathri-Kurathala 45.42 132
42 Jutogh-Kunihar 15.340 132 15.340
43 Kunihar-Kangoo 47.640 132 47.640
44 Kangoo-Hamirpur 42.139 132 42.139
45 Rakkar - Amb 31.3 132 31.3
46 Una-Tahliwal 17 132 17
47 LILO Kangoo-Hamirpur to Jahu 6.4 132 6.4
48 Uperala Nangal-Baddi 27 220 27
49 Baddi-Mandhala 8 220 8
50 Hamirpur I - Hamirpur II 5 132 5
51 Solan-Parwanoo 18.5 18.5
52 Jutogh-Kumar House 6 11 6 ADSS already laid by PGCIL
Total 1181.698 105.119 100.001 102.179 29.500 368.710 476.189 844.899
Note: 39 Km Bhaba-Kashang line has been included in proposed OPGW network as per the request of HPPCL. The expenditure on this account shall be born by HPPCL.
66
List of HPSEBL Sub-Stations/Power Houses where Optical line terminal Equipment are installed and proposed to be installed.
252/232
kHZ
BPL66kV
396/4000
AMB
372/376 kHZ 244/248 kHZ
CHULLAH ABB 132 kV DEHRA kHZ , ABB RAKKER, UNA GOLTHAI
ET1-21 204/156 &
180/100
132 kV 132 kV kHz BPL 82 25,888 356/352 238/230
kHZ kHZ
91 ABB,66 KV BPL,66 KV
BIJNI 256/264 kHZ 432/442 &
ABB ET1-21 200/208 kHZ GAGRET
204/246 kHZ BPL 132 kV BPL 220 kV
66 kV 360/368
kHZ
BPL 66kV
999
128/136 &
144/152 kHZ
340/3336 kHZ
RAURI WSI 220 kV
272/268 & ROHRU
ET1-21 ABB 324/320 kHZ
132 kV 39 23,57
ABB 132 kV 45 22,56
BAJOURA 33
196/368 LARJI KANGOO 220 kV KUNIHAR JUTOGH GUMMA KUMARSAIN
kHZ BPL 132 kV D/C 340/348kHZ
9505
132 kV 360/368 & BPL 66 kV
30 472/468 kHZ
BPL 132 kV 312/320kHZ
456/412 & BPL 66 kV
420/400 kHZ
228/360 kHZ BPL 132 kV
BPL 9505
392/388, 445/480
428/424 kHZ ABB 132 kV
SAINJ 372/368 kHz kHZ 132 kV
132 kV BPL 66 kV
240/220 kHZ 296/292 kHZ 64,65 49
ABB 132 kV ABB 132 kV TOTU
448/456 kHZ
BPL 132 kV BAGGA KULHAL RISHIKESH
KOTKHAI
72 52,60
USEB USEB
Kunihar (20) 51 220 kV Kunihar-Kotla (1) 144/152 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
52 220 kV Kunihar-Kotla (2) 128/136 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
53 220 kV Kunihar-Bhaba (1) 444/432 kHz ABB ETL-42 (T/C) Yes --
Only in Red phase Good
54 220 kV Kunihar-Bhaba (2) 200/208 kHz ABB ETL-42 (T/C) Yes --
55 132 kV Kunihar-Solan (1) 288/296 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
56 132 kV Kunihar-Solan (2) 372/364 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
57 132 kV Kunihar-Solan (3) 384/388 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
58 220 kV Kunihar-Baddi (1) 196/368 kHz ABB ETL-42 (T/C) Yes -- Healthy Healthy
Only in Red phase Good
59 220 kV Kunihar-Baddi (2) 440/448 kHz ABB ETL-42 (T/C) Yes --
60 132 kV Kunihar-Barotiwala 304/352 kHz ABB ETI-22 (T/C) Yes -- Good Only in Red phaGood
61 132 kV Kunihar-Darlaghat (1) 300/308 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
62 132 kV Kunihar-Darlaghat (2) 236/276 kHz BPL-6515 T2 (T/C) -- Yes Good Good Faulty
63 132 kV Kunihar-Jutogh (1) 160/152 kHz BPL-6515 R2 (T/C) -- Yes Good Good Faulty
64 132 kV Kunihar-Jutogh (2) 420/400 kHz BPL-6515 R2 (T/C) -- Yes Not provided Faulty
65 220 kV Kunihar-Panchkulla 180/188 kHz ABB ETI-22 (T/C) 0 27 27 -- Yes Not Provided
Jutogh(21) 66 66 kV Jutogh-Gumma 312/320 kHz BPL-6515 R2 (T/C) 4 2 6 -- Yes Good Good Faulty Healthy Healthy
Darlaghat(22) covered in Kunihar(21)& Bagga(7) 4 0 4
Gumma (23) 67 66 kV Gumma-Huli (1) 392/388 kHz BPL-6515 R1 (S/C) -- Yes Good Good Faulty
68 66 kV Gumma-Huli (2) 368/372 kHz BPL-6515 R1 (S/C) -- Yes Good Good Faulty Not Healthy Not Healthy
69 66 kV Gumma-Kumarsain 340/348 kHz BPL-6515 R2 (T/C) 2 4 6 -- Yes Good Good Faulty
Kumarsain(24) 70 66 kV Kumarsain-Nogli 360/368 kHz BPL-6515 R2 (T/C) 2 2 4 -- Yes Not Provided Faulty Healthy Not Healthy
Huli (26) Covered in Gumma(23) 2 0 2
Nogli (27) 71 66 kV Nogli-Kotla (1) 312/320 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
72 66 kV Nogli-Kotla (2) 384/400 kHz ABB ETI-22 (T/C) Yes -- Good Good Good
Not Healthy Not Healthy
73 66 kV Nogli-Samauli (1) 436/412 kHz ABB ETL-42 (T/C) Yes --
Only in Red Phase Good
74 66 kV Nogli-Samauli (2) 356/312 kHz ABB ETI-21 (S/C) 2 7 9 Yes --
Kotla(28) 75 220 kV Kotla-Bhaba 468/476 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
76 220 kV Kotla-Ghanvi (1) 364/368 kHz ABB ETL-41 (S/C) Yes -- Good Good Good Healthy Not healthy
77 220 kV Kotla-Ghanvi (2) 252/232 kHz BPL-9505 V3 (T/C) 8 6 14 -- Yes Good Good Good
Ghanvi (29) 78 66 kV Ghanvi-Nathpa 360/368 kHz BPL-6515 R2 (T/C) 4 2 6 -- Yes Good Good Faulty Healthy Not Healthy
Bhaba(30) Covered in Kotla(28) & Kunihar(20) 6 0 6
Nathpa(31) Covered in Ghanvi(29) 2 0 2
Samoli (32) 79 66 kV Samauli-Andhra (1) 236/228 kHz ABB ETL-42 (T/C) Yes -- Good Good Good Not Healthy Not Healthy
80 66 kV Samauli-Andhra (2) 400/396 kHz ABB ETI-21 (S/C) 3 3 6 Yes -- Good Good Good Not Healthy Not Healthy
Andhra HEP(33) Covered in Samoli (32) 3 0 3
Solan (34) 81 132 kV Solan-Giri (1) 180/188 kHz BPL-6515 R2 (T/C) -- Yes Good Good Faulty
82 132 kV Solan-Giri (2) 464/460 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
Healthy Healthy
83 132 kV Solan-Giri (3) 480/476 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
84 66 kV Solan-Parwanoo 340/348 kHz BPL-6515 R2 (T/C) 4 6 10 -- Yes Good Good Faulty
Parwanoo(35) 85 66 kV Parwanoo-Barotiwala 140/148 kHz BPL-6515 R2 (T/C) 2 2 4 -- Yes Good Good Faulty Healthy Healthy
Barotiwala(36) 86 66 kV Barotiwala-Baddi 230/238 kHz BPL-6515 R2 (T/C) 4 2 6 -- Yes Good Good Faulty Healthy Healthy
Baddi(37) 87 66 kV Baddi-Nalagarh (1) 420/428 kHz BPL-6515 R2 (T/C) -- Yes Good Good Faulty
88 66 kV Baddi-Nalagarh (2) 240/280 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
89 220 kV Baddi-Panchkulla 404/400 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
90 220 kV Baddi-U.Nangal 420/428 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
Healthy Healthy
91 220 kV Baddi-Mandhala 248/272 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
92 66 kV Baddi-Akanwali (1) 316/336 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
93 66 kV Baddi-Akanwali (2) 212/256 kHz ABB ETL-42 (T/C) 6 13 19 Yes -- Good Good Good
Akanwali(38) 94 66 kV Akanwali-Davni (1) 472/380 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
Healthy Healthy
95 66 kV Akanwali-Davni (2) 320/312 kHz ABB ETL-42 (T/C) 4 4 8 Yes -- Good Good Good
Davni(39) Covered in Akanwali (39)
Nalagarh(40) 96 66 kV Nalagarh-U.Nangal 344/372 kHz ABB ETL-42 (T/C) 4 2 6 Yes -- Good Good Good Healthy Healthy
U.Nangal (41) 97 220 kV U.Nangal-Reru (PGCIL)(1) 480/488 kHz ABB ETL-42 (T/C) Yes -- Good Good Good
98 220 kV U.Nangal-Reru (PGCIL)(2) 468/444 kHz ABB ETL-42 (T/C) Yes -- Good Good Good Healthy Healthy
99 220 kV U.Nangal-Mandhala ABB ETL-42 (T/C) 4 6 10 Yes -- Good Good Good
Mandhala (42) Covered in U.Nangal(41)&Baddi(37)
Giri(43) 100 132 kV Giri-KalaAmb(1) 324/328 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
101 132 kV Giri-KalaAmb(2) 396/400 kHz ABB ETI-21 (S/C) Yes -- Good Good Good
102 132 kV Giri-Poanta 356/376 kHz BPL-6515 R2 (T/C) -- Yes Good Good Faulty
Healthy Healthy
103 132 kV Giri-Abdullapur 4118/456 kHz BPL-6515 R2 (T/C) -- Yes Good Good Faulty
104 220 kV Giri-Khodri (1) 114/106 kHz HBB ETI-22 (T/C) Yes -- Only on one phase Good
105 220 kV Giri-Khodri (2) 308/316 kHz ABB ETL-42 (T/C) 4 10 14 Yes -- Good Good Good
KalaAmb(44) Covered in Giri(43)
Poanta (45) Covered in Giri(43)
Gagret(46) Covered in Amb(10)
Tahliwal(47) Covered in Rakkar(9)
Sansarpur Terr.(48) 106 66 kV Terrace-Pong BPL-6515 R2 (T/C) 0 2 2 -- Yes Faulty Faulty Faulty Not Healthy Not Healthy
Anu(49) Covered in Bassi(11)&Mattansidh(16)
Total 106 169 76 30
S/C: Single Channel Cabinets
T/C: Twin Channel Cabinets
70
Exchange Description
Name of Sub-Station/
S.No. Capacity Used Capacity/Description
Power House Make/Model (ID)
Trunks Subscribers Trunks Subscribers
II) 132 kV Sub-Stations/Power Houses
Kangoo Control Room-20
21 Mandi (Bijni) BPL MDX-50 (047) 3 8 Shanan Carrier-22
Larji
Golthai Carrier-20
22 Rakkar (Una) BPL-MDX-50 (082) 2 24
Amb
Kunihar-3 20
23 Solan Matrix Eternity (034) 7 20 Poanta Sahib-3
Parwanoo
24 Tahliwala
III) 66 kV Sub-Stations/Power Houses
1 Akanwali
Samoli
2 Andhra BPL-1997 MDX-50 (026) 2 4
Nogli
3 Ani (Nagan)
4 Batoli Kalan
5 Davni
6 Ghanvi - - - EPABX not in function
Bhakhra Carrier-20
7 Golthai BPL MDX-50 (083) 2 20
Rakkar
8 Gumma BPL-1997 MDX-50 (22) 4 4 EPABX not in function
9 Khotkhai (Hulli)
10 Kumarsain
Baddi-2 20
11 Nalagarh Matrix Eternity (036) 3 20
Uperla Nangal-1
12 Nathpa Nelco - - EPABX not in function
Kotla 20
13 Nogli BPL-1997 MDX-50 (20) 2 4
Andhra
14 Parwanoo
15 Sainj
16 Sansarpur Terrace
Andhra 20
17 Smoli (Rohru) BPL-1997 MDX-50 (028) 2 4
Nogli
18 Totu
72