10.

00
RB
FULL TRUSS APEX LINE OF TRUSS
2 - ANGLE BAR 1/4" X 1 1/ 2" X 1 1/ 2"
1.54 1.54 35 x 75 MM C-PURLINS 5.31 TOP CHORD
SPACED AT 1.80 2 - ANGLE BAR 3/16" X 1" X 1"
0.60 MTS. ON CENTER VERTICAL & DIAGONAL WEB
4.00 TOP OF R.B.
1.54 1.54 2 - ANGLE BAR 1/4" X 1 1/ 2" X 1 1/ 2"
BOTTOM CHORD
FULL TRUSS
1.67 1.67 1.67 1.67 1.67 1.67
10.00
8.00 RB
RB RB
2.77 9.00
3.05
2-35 x 100 MM C-PURLINS AS
RAFTERS SPACED AS FULL TRUSS DETAIL

HI
S

INDICATED
US

P
RB

TR
TR

SCALE 1:100

U
0 1 2 3 4 5
P

SS
5.00
HI

2.77 2.47
RB

APEX LINE OF TRUSS


2.50 2.50 RB PROVIDE 10MM SAG RODS
1.00 2 - ANGLE BAR 1/4" X 1 1/ 2" X 1 1/ 2"
SPACED AT 1.50 MTS. ON 6.66 TOP CHORD
CENTER 1.80
2.25 2.25 2 - ANGLE BAR 3/16" X 1" X 1"
VERTICAL & DIAGONAL WEB
TOP OF R.B.
2 - ANGLE BAR 1/4" X 1 1/ 2" X 1 1/ 2"
3.12 BOTTOM CHORD
1.28 1.28 1.28 1.28 1.28
8.50 6.41

ROOF FRAMING PLAN HIP TRUSS DETAIL


0 1 2 3 4 5 SCALE 1:100 0 1 2 3 4 5 SCALE 1:100
L
L/3 L/3 0.10 0.10
2-12mmØ 2-12mmØ

1.75 0.2 0.20 0.20

2-12mmØ 2-12mmØ
L/5 L/5 SUPPORT MIDSPAN
USE : 9MMØ STIRR. 4 @ 0.05M; 6 @ 0.075M;
6 @ 0.10M REST @ 0.20M.0.C.

ROOF BEAM DETAIL (RB)


SCALE 1:10

DATE SUBJECT PREPARED BY : PROJECT TITLE: APPROVED BY: DRAWN BY: SASHEEN T. DELA CRUZ SHEET CONTENT SHEET NO.

A
DATE: SEPTEMBER 2, 2016

OCT 14, 2016 CE405: BUILDING DESIGN SASHEEN DELA CRUZ DEOCAMPO RESIDENCE SHEILA MAE B. DEOCAMPO CHECKED BY: ENGR. JEROME MONGCAL
VICINITY MAP, SITE
DEVELOPMENT PLAN &
LOCATION: LOT 39, BLOCK 12, PSD -06-038463 PERSPECTIVE

BSCE - 4 TERRANOVA SUBD., BACOLOD CITY, NEGROS OCC. PROJECT OWNER DATE: SEPTEMBER 2, 2016 5 6